==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT S 05000334/2018006 AND 05000412/2018006)
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORTS 05000334/2018006 AND 05000412/2018006)


==Dear Mr. Bologna ,==
==Dear Mr. Bologna,==
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program,"
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and The enclosed inspection plan lists the inspections scheduled through December 31, 202 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 202 In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 202 Therefore, the inspection schedule is tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change R. Bologna 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 610-337-5205 with any questions you have regarding this lette
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and 2.


Sincerely,
The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 2021. Therefore, the inspection schedule is tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
/RA/ Matt hew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73 Enclosure:
Beaver Valley Inspection Plan


ML19064B365 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/DRP MYoung/DRP DATE 2/26/19 2/27/19 Beaver Valley
Please contact me at 610-337-5205 with any questions you have regarding this letter.


01/01/2019 - 12/31/2020
Sincerely,
 
/RA/  
Unit Start End Activity CAC Title Staff Count
 
RAD SAFETY 01,02,03,04
 
1, 2 02/25/2019
 
03/01/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 02/25/2019
 
03/01/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 02/25/2019
 
03/01/2019
 
IP 71124.03


000727 In-Plant Airborne Radioactivity Control and Mitigation
Matthew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects


1, 2 02/25/2019
Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73


03/01/2019
Enclosure:
Beaver Valley Inspection Plan


IP 71124.04
ML19064B365


000728 Occupational Dose Assessment
SUNSI Review


PI&R BIENNIAL
Non-Sensitive


1, 2 03/04/2019
Sensitive


03/08/2019
Publicly Available


IP 71152B 000747 Problem Identification and Resolution
Non-Publicly Available


1, 2 03/18/2019
OFFICE RI/DRP RI/DRP


03/22/2019
NAME SShaffer/DRP MYoung/DRP


IP 71152B 000747 Problem Identification and Resolution
DATE 2/26/19 2/27/19


FORCE-ON-FORCE PLANNING AND EXERCISES
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04


1, 2 03/25/2019
1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2019 03/01/2019 IP 71124.04 000728 Occupational Dose Assessment PI&R BIENNIAL


03/29/2019
1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISES


IP 71130.03
1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM
 
000735 Contingency Response - Force-On-Force Testing
 
1, 2 04/15/2019
 
04/19/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
EQ PROGRAM
 
1, 2 04/29/2019
 
05/03/2019
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
1, 2 05/20/2019
 
05/24/2019
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)


1, 2 04/29/2019 05/03/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
1, 2 05/20/2019 05/24/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
BV2 REQUAL INSP WITH P/F RESULTS
BV2 REQUAL INSP WITH P/F RESULTS


2 05/05/2019
2 05/05/2019 05/10/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
 
05/10/2019
 
IP 71111.11A
 
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
 
05/05/2019
 
05/10/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)


05/05/2019 05/10/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


1, 2 06/10/2019
1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP
 
06/14/2019
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71114.05


000720 Maintenance of Emergency Preparedness
1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink


1, 2 06/10/2019
1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial 2/22/2019 9:41:27 AM Page 1 of 4 This report does not include INPO and OUTAGE activities.


06/14/2019
This report shows only on-site and announced inspection procedures.


IP 71151 001397 Performance Indicator Verification
IP 22 Inspection Activity Plan Report


RAD SAFETY REMP
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING


1, 2 07/08/2019
1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04


07/12/2019
1, 2 08/05/2019 08/09/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process


IP 71124.07
1, 2 08/11/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM


000731 Radiological Environmental Monitoring Program
2 09/01/2019 09/06/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 07/08/2019
 
07/12/2019
 
IP 71151 000746 Performance Indicator Verification
 
Triennial Heat Sink
 
1, 2 07/14/2019
 
07/20/2019
 
IP 71111.07T
 
000700 Heat Sink Performance -Triennial
 
2/22/2019 9:41:27 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
01/01/2019 - 12/31/2020
 
Unit Start End Activity CAC Title Staff Count
 
ACCESS CONTROL, EQUIP PERF, TRAINING
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.02
 
000734 Access Control
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.07
 
000739 Security Training
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71151 001338 Performance Indicator Verification
 
RAD SAFETY 01,02,03,04
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
50.59 Process
 
1, 2 08/11/2019
 
08/17/2019
 
IP 71111.17T
 
000709 Evaluations of Changes, Tests, and Experiments
 
BEAVER VALLEY 2 INITIAL OL EXAM
 
2 09/01/2019
 
09/06/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
10/06/2019
 
10/18/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)


10/06/2019 10/18/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
INSERVICE INSPECTION - UNIT 1
INSERVICE INSPECTION - UNIT 1


1 10/20/2019
1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
11/02/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)
 
RAD SAFETY OUT
RAD SAFETY OUT


1, 2 10/28/2019
1, 2 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/28/2019 11/01/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/28/2019 11/01/2019 IP 71151 000746 Performance Indicator Verification Rad Safety Inspection
 
11/01/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 10/28/2019
 
11/01/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 10/28/2019
 
11/01/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 10/28/2019
 
11/01/2019
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
1, 2 10/28/2019
 
11/01/2019
 
IP 71151 000746 Performance Indicator Verification
 
Rad Safety Inspection
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
2/22/2019 9:41:27 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
01/01/2019 - 12/31/2020
 
Unit Start End Activity CAC Title Staff Count
 
BV1 Requal Inspection with P/F Results
 
1 04/12/2020
 
04/18/2020
 
IP 71111.11A


000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment 2/22/2019 9:41:27 AM Page 2 of 4 This report does not include INPO and OUTAGE activities.


04/12/2020
This report shows only on-site and announced inspection procedures.


04/18/2020
IP 22 Inspection Activity Plan Report


IP 71111.11B
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count BV1 Requal Inspection with P/F Results


000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)


04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
Rad Safety Refuel
Rad Safety Refuel


1, 2 04/13/2020
1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2
 
04/17/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
ISI - UNIT 2
 
2 04/20/2020
 
05/01/2020
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)


2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
BEAVER VALLEY EP EXERCISE INSPECTION
BEAVER VALLEY EP EXERCISE INSPECTION


1, 2 06/08/2020
1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS
 
06/12/2020
 
IP 71114.01
 
000716 Exercise Evaluation
 
1, 2 06/08/2020
 
06/12/2020
 
IP 71151 001397 Performance Indicator Verification
 
Rad Safety RETS
 
1, 2 06/22/2020
 
06/26/2020
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
1, 2 06/22/2020
 
06/26/2020
 
IP 71151 000746 Performance Indicator Verification
 
Rad Safety Instruments
 
1, 2 08/17/2020
 
08/21/2020
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
Access Control, Equip Perf, Training
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.02
 
000734 Access Control
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.07
 
000739 Security Training
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71151 001338 Performance Indicator Verification
 
DESIGN BASIS ASSURANCE INSPECTION
 
1, 2 09/14/2020
 
09/18/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
1, 2 09/28/2020
 
10/02/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
2/22/2019 9:41:27 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
01/01/2019 - 12/31/2020
 
Unit Start End Activity CAC Title Staff Count
 
Rad safety Inspection
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
1, 2 11/16/2020
 
11/20/2020


IP 71151 000746 Performance Indicator Verification
1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments


Radwaste
1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training


1, 2 11/16/2020
1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION


11/20/2020
1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
2/22/2019 9:41:27 AM Page 3 of 4 This report does not include INPO and OUTAGE activities.


IP 71124.08
This report shows only on-site and announced inspection procedures.


000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
IP 22 Inspection Activity Plan Report


Transportation
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Rad safety Inspection


2/22/2019 9:41:27 AM
1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste


Page  
1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2/22/2019 9:41:27 AM Page 4 of 4 This report does not include INPO and OUTAGE activities.


of
This report shows only on-site and announced inspection procedures.


This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report
}}
}}

Latest revision as of 04:28, 5 January 2025

Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Reports 05000334/2018006 and 05000412/2018006)
ML19064B365
Person / Time
Site: Beaver Valley
Issue date: 03/04/2019
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Bologna R
FirstEnergy Nuclear Operating Co
References
IR 2018006
Download: ML19064B365 (7)


Text

March 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORTS 05000334/2018006 AND 05000412/2018006)

Dear Mr. Bologna,

The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and 2.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 2021. Therefore, the inspection schedule is tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely,

/RA/

Matthew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73

Enclosure:

Beaver Valley Inspection Plan

ML19064B365

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME SShaffer/DRP MYoung/DRP

DATE 2/26/19 2/27/19

Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04

1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2019 03/01/2019 IP 71124.04 000728 Occupational Dose Assessment PI&R BIENNIAL

1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISES

1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM

1, 2 04/29/2019 05/03/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 05/20/2019 05/24/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

BV2 REQUAL INSP WITH P/F RESULTS

2 05/05/2019 05/10/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

05/05/2019 05/10/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

EP PROGRAM INSPECTION

1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP

1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink

1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial 2/22/2019 9:41:27 AM Page 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04

1, 2 08/05/2019 08/09/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process

1, 2 08/11/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM

2 09/01/2019 09/06/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

10/06/2019 10/18/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 1

1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RAD SAFETY OUT

1, 2 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/28/2019 11/01/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/28/2019 11/01/2019 IP 71151 000746 Performance Indicator Verification Rad Safety Inspection

1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment 2/22/2019 9:41:27 AM Page 2 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count BV1 Requal Inspection with P/F Results

1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Rad Safety Refuel

1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2

2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

BEAVER VALLEY EP EXERCISE INSPECTION

1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS

1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments

1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training

1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION

1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2/22/2019 9:41:27 AM Page 3 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Rad safety Inspection

1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste

1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2/22/2019 9:41:27 AM Page 4 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report