==SUBJECT:== | ==SUBJECT:== | ||
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 ( | ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORTS 05000334/2018006 AND 05000412/2018006) | ||
==Dear Mr. Bologna ,== | ==Dear Mr. Bologna,== | ||
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 , through December 31, | The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. | ||
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and 2. | |||
The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 2021. Therefore, the inspection schedule is tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Beaver Valley | |||
Please contact me at 610-337-5205 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Matthew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects | |||
Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73 | |||
Enclosure: | |||
Beaver Valley Inspection Plan | |||
ML19064B365 | |||
SUNSI Review | |||
Non-Sensitive | |||
Sensitive | |||
Publicly Available | |||
Non-Publicly Available | |||
OFFICE RI/DRP RI/DRP | |||
NAME SShaffer/DRP MYoung/DRP | |||
DATE 2/26/19 2/27/19 | |||
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04 | |||
1, 2 03/25/2019 | 1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2019 03/01/2019 IP 71124.04 000728 Occupational Dose Assessment PI&R BIENNIAL | ||
03/ | 1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISES | ||
IP 71130.03 | 1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM | ||
000735 Contingency Response - Force-On-Force Testing | |||
1, 2 04/15/2019 | |||
04/19/2019 | |||
IP 71130.03 | |||
000735 Contingency Response - Force-On-Force Testing | |||
EQ PROGRAM | |||
1, 2 04/29/2019 05/03/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | |||
1, 2 05/20/2019 05/24/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | |||
BV2 REQUAL INSP WITH P/F RESULTS | BV2 REQUAL INSP WITH P/F RESULTS | ||
2 05/05/2019 | 2 05/05/2019 05/10/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual) | ||
05/10/2019 | |||
IP 71111.11A | |||
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual | |||
05/05/2019 05/10/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial) | |||
EP PROGRAM INSPECTION | EP PROGRAM INSPECTION | ||
1, 2 06/10/2019 | 1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP | ||
06/14/2019 | |||
IP 71114.02 | |||
000717 Alert and Notification System Testing | |||
1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71114.03 | |||
000718 Emergency Response Organization Staffing and Augmentation System | |||
1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71114.05 | |||
1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink | |||
1, 2 | 1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial 2/22/2019 9:41:27 AM Page 1 of 4 This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. | |||
IP | IP 22 Inspection Activity Plan Report | ||
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING | |||
1, 2 07/ | 1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04 | ||
1, 2 08/05/2019 08/09/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process | |||
IP | 1, 2 08/11/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM | ||
2 09/01/2019 09/06/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
2 09/01/2019 | |||
09/06/2019 | |||
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV | |||
10/06/2019 10/18/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) | |||
INSERVICE INSPECTION - UNIT 1 | INSERVICE INSPECTION - UNIT 1 | ||
1 10/20/2019 | 1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR) | ||
11/02/2019 | |||
IP 71111.08P | |||
000702 Inservice Inspection Activities (PWR) | |||
RAD SAFETY OUT | RAD SAFETY OUT | ||
1, 2 10/28/2019 | 1, 2 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/28/2019 11/01/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/28/2019 11/01/2019 IP 71151 000746 Performance Indicator Verification Rad Safety Inspection | ||
11/01/2019 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 10/28/2019 | |||
11/01/2019 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 10/28/2019 | |||
11/01/2019 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 10/28/2019 | |||
11/01/2019 | |||
IP 71124.04 | |||
000728 Occupational Dose Assessment | |||
1, 2 10/28/2019 | |||
11/01/2019 | |||
IP 71151 000746 Performance Indicator Verification | |||
Rad Safety Inspection | |||
1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment 2/22/2019 9:41:27 AM Page 2 of 4 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
IP 22 Inspection Activity Plan Report | |||
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count BV1 Requal Inspection with P/F Results | |||
1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual) | |||
04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial) | |||
Rad Safety Refuel | Rad Safety Refuel | ||
1, 2 04/13/2020 | 1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2 | ||
04/17/2020 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 04/13/2020 | |||
04/17/2020 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 04/13/2020 | |||
04/17/2020 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 04/13/2020 | |||
04/17/2020 | |||
IP 71124.04 | |||
000728 Occupational Dose Assessment | |||
ISI - UNIT 2 | |||
2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR) | |||
BEAVER VALLEY EP EXERCISE INSPECTION | BEAVER VALLEY EP EXERCISE INSPECTION | ||
1, 2 06/08/2020 | 1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS | ||
06/12/2020 | |||
IP 71114.01 | |||
000716 Exercise Evaluation | |||
1, 2 06/08/2020 | |||
06/12/2020 | |||
IP 71151 001397 Performance Indicator Verification | |||
Rad Safety RETS | |||
IP 71151 000746 Performance Indicator Verification | 1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments | ||
1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training | |||
1, 2 11/ | 1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION | ||
1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | |||
1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | |||
2/22/2019 9:41:27 AM Page 3 of 4 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
IP 22 Inspection Activity Plan Report | |||
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Rad safety Inspection | |||
2/ | 1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste | ||
Page | 1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2/22/2019 9:41:27 AM Page 4 of 4 This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. | |||
IP 22 Inspection Activity Plan Report | |||
}} | }} | ||
Latest revision as of 04:28, 5 January 2025
| ML19064B365 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/04/2019 |
| From: | Matt Young NRC/RGN-I/DRP/PB6 |
| To: | Bologna R FirstEnergy Nuclear Operating Co |
| References | |
| IR 2018006 | |
| Download: ML19064B365 (7) | |
Text
March 4, 2019
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORTS 05000334/2018006 AND 05000412/2018006)
Dear Mr. Bologna,
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and 2.
The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 2021. Therefore, the inspection schedule is tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5205 with any questions you have regarding this letter.
Sincerely,
/RA/
Matthew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects
Docket Nos.: 50-334 and 50-412 License Nos.: DPR-66 and NPR-73
Enclosure:
Beaver Valley Inspection Plan
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE RI/DRP RI/DRP
NAME SShaffer/DRP MYoung/DRP
DATE 2/26/19 2/27/19
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04
1, 2 02/25/2019 03/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 02/25/2019 03/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/25/2019 03/01/2019 IP 71124.04 000728 Occupational Dose Assessment PI&R BIENNIAL
1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISES
1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM
1, 2 04/29/2019 05/03/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
1, 2 05/20/2019 05/24/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
BV2 REQUAL INSP WITH P/F RESULTS
2 05/05/2019 05/10/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
05/05/2019 05/10/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
EP PROGRAM INSPECTION
1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP
1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink
1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial 2/22/2019 9:41:27 AM Page 1 of 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count ACCESS CONTROL, EQUIP PERF, TRAINING
1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04
1, 2 08/05/2019 08/09/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process
1, 2 08/11/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM
2 09/01/2019 09/06/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/06/2019 10/18/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
INSERVICE INSPECTION - UNIT 1
1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RAD SAFETY OUT
1, 2 10/28/2019 11/01/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/28/2019 11/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/28/2019 11/01/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/28/2019 11/01/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/28/2019 11/01/2019 IP 71151 000746 Performance Indicator Verification Rad Safety Inspection
1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment 2/22/2019 9:41:27 AM Page 2 of 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count BV1 Requal Inspection with P/F Results
1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
Rad Safety Refuel
1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2
2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
BEAVER VALLEY EP EXERCISE INSPECTION
1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS
1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments
1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training
1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION
1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
2/22/2019 9:41:27 AM Page 3 of 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Rad safety Inspection
1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste
1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2/22/2019 9:41:27 AM Page 4 of 4 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report