The inspection will include two weeks of onsite inspection.  The inspection team will consist of  
The inspection will include two weeks of onsite inspection.  The inspection team will consist of  
three NRC inspectors.  The current inspection schedule is as follows:
three NRC inspectors.  The current inspection schedule is as follows:
Preparation week:  November 21 - 25, 2022
Preparation week:  November 21 - 25, 2022
Onsite weeks:  November 28 - December 2, 2022, and December 12 - 16, 2022
Onsite weeks:  November 28 - December 2, 2022, and December 12 - 16, 2022
Experience with previous baseline engineering inspections of similar depth and length has  
Experience with previous baseline engineering inspections of similar depth and length has  
Line 50: Line 52:
onsite portions of the inspection.  Insofar as possible, this information should be provided  
onsite portions of the inspection.  Insofar as possible, this information should be provided  
electronically to the lead inspector.  The information request has been divided into four groups:
electronically to the lead inspector.  The information request has been divided into four groups:
The first group lists information necessary for our initial risk-informed scoping activities.   
The first group lists information necessary for our initial risk-informed scoping activities.   
This information should be provided to the lead inspector no later than August 29, 2022.July 27, 2022
This information should be provided to the lead inspector no later than August 29, 2022.
D. Rhoades                                                      - 2 -
July 27, 2022


D. Rhoades
- 2 -


    The second group lists information necessary for our initial inspection scoping activities.
The second group lists information necessary for our initial inspection scoping activities.
      This information should be provided to the lead inspector no later than September 26,
This information should be provided to the lead inspector no later than September 26,  
      2022.  By October 11, 2022, the lead inspector will communicate the initial selected
2022.  By October 11, 2022, the lead inspector will communicate the initial selected  
      samples and any additional information needed to support the in-office preparation
samples and any additional information needed to support the in-office preparation  
      activities.
activities.


    The third group of documents requested are those items needed to support our in-office
The third group of documents requested are those items needed to support our in-office  
      preparation activities.  This set of documents should be provided to the lead inspector no
preparation activities.  This set of documents should be provided to the lead inspector no  
      later than November 14, 2022.  During the preparation activities, the team may identify
later than November 14, 2022.  During the preparation activities, the team may identify  
      additional information needed to support the inspection.
additional information needed to support the inspection.


    The fourth group includes the additional information above as well as plant-specific
The fourth group includes the additional information above as well as plant-specific  
      reference material.  This information should be available to the team onsite on
reference material.  This information should be available to the team onsite on  
      November 28, 2022.  It is also requested that corrective action documents and answers
November 28, 2022.  It is also requested that corrective action documents and answers  
      to questions developed during the inspection be provided to the lead inspector as the
to questions developed during the inspection be provided to the lead inspector as the  
      documents are generated.
documents are generated.
 
In addition, the enclosure includes information and requests addressing inspection logistics.
In addition, the enclosure includes information and requests addressing inspection logistics.
These items are requested to be provided to the lead inspector by November 7, 2022.
These items are requested to be provided to the lead inspector by November 7, 2022.
 
The lead inspector for this inspection is Jorge Corujo-Sandin.  We understand that our licensing  
The lead inspector for this inspection is Jorge Corujo-Sandin.  We understand that our licensing
contact for this inspection is Zoe L. Cox of your organization.  If there are any questions about  
contact for this inspection is Zoe L. Cox of your organization.  If there are any questions about
the inspection or the material requested in the enclosure, contact the lead inspector at  
the inspection or the material requested in the enclosure, contact the lead inspector at
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.


This letter does not contain new or amended information collection requirements subject to
D. Rhoades
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
- 3 -
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
D. Rhoades - 3 -
This letter and its enclosure will be made available for public inspection and copying at  
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
Line 104: Line 108:
  on 07/27/22
  on 07/27/22


D. Rhoades                                                     - 4 -
D. Rhoades
 
- 4 -
 
Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.
Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.
 
SUBJECT:  BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE  
SUBJECT:  BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE
INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
          INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
          INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
 
 
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 126: Line 126:
DRPIII
DRPIII
DRSIII
DRSIII
ADAMS Accession Number:  ML22207B857
ADAMS Accession Number:  ML22207B857
  Publicly Available             Non-Publicly Available             Sensitive Non-Sensitive
Publicly Available
OFFICE     RIII
Non-Publicly Available
NAME       JCorujo-Sandin:mb
Sensitive
DATE       07/27/2022
Non-Sensitive
                              OFFICIAL RECORD COPY
OFFICE
              DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
RIII
                              REQUEST FOR INFORMATION
NAME
 
JCorujo-Sandin:mb
 
DATE
I.  ADMINISTRATIVE INSPECTION INFORMATION
07/27/2022
 
OFFICIAL RECORD COPY
Inspection Report Number:    05000454/2022010 and 05000455/2022010
 
Onsite Inspection Dates:    November 28 - December 2, 2022, and
                              December 12 - 16, 2022
 
                              IP 71111.21N, Design Bases Assurance Inspection
Inspection Procedure:        (Programs), Attachment 2, Design-Basis Capability of
                              Power-Operated Valves Under 10 CFR 50.55a Requirements
 
                              Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS
Lead Inspector:              630-829-9741
                              Jorge.Corujo-Sandin@nrc.gov
 
Teammate Inspectors:        Kevin Barclay, Reactor Inspector, RIII/DRS
                              Michael Jones, Reactor Inspector, RIII/DRS
 
 
 
II.  LOGISTICS
 
  Email the following inspection logistics to the lead inspector by November 7, 2022, or
  sooner:
 
  1.  Inspection room name/number, directions from the main access facility, and phone
      number;
 
  2.  Interview room name/number;
 
  3.  Response team contact information (names and phone numbers) and team roles
      (e.g., management sponsor, lead, inspector counterpart);
 
  4.  Any site access/badging actions needed for each inspector;
 
  5.  Any dosimetry actions needed for each inspector;
 
  6.  Entrance meeting time and location;
 
  7.  Confirmation that the team will have access to a licensee computer with a nearby printer;
 
  8.  Confirmation that the team will have Wi-Fi access;
 
  9.  Cafeteria location and hours;
 
  10.Inspection response team normal working hours; and


Enclosure
DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
REQUEST FOR INFORMATION
I.
ADMINISTRATIVE INSPECTION INFORMATION
Inspection Report Number:
05000454/2022010 and 05000455/2022010
Onsite Inspection Dates:
November 28 - December 2, 2022, and
December 12 - 16, 2022
Inspection Procedure:
IP 71111.21N, Design Bases Assurance Inspection
(Programs), Attachment 2, Design-Basis Capability of
Power-Operated Valves Under 10 CFR 50.55a Requirements
Lead Inspector:
Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS
630-829-9741
Jorge.Corujo-Sandin@nrc.gov
Teammate Inspectors:
Kevin Barclay, Reactor Inspector, RIII/DRS
Michael Jones, Reactor Inspector, RIII/DRS
II.
LOGISTICS
Email the following inspection logistics to the lead inspector by November 7, 2022, or
sooner:
1.
Inspection room name/number, directions from the main access facility, and phone
number;
2.
Interview room name/number;
3.
Response team contact information (names and phone numbers) and team roles
(e.g., management sponsor, lead, inspector counterpart);
4.
Any site access/badging actions needed for each inspector;
5.
Any dosimetry actions needed for each inspector;
6.
Entrance meeting time and location;
7.
Confirmation that the team will have access to a licensee computer with a nearby printer;
8.
Confirmation that the team will have Wi-Fi access;
9.
Cafeteria location and hours;
10. Inspection response team normal working hours; and


 
2
 
11. Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff  
                                                                                Enclosure
meetings).
  11.Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff
      meetings).
 
III. INFORMATION REQUEST
III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request.  Provide the information electronically in searchable formats, if possible. 
The files should contain descriptive names, and be indexed and hyperlinked to facilitate
ease of use.  Information in lists should contain enough information to be easily
understood by someone who has knowledge of light-water reactor technology.
Important Note:  For the purpose of this inspection, POVs are valves with power actuators. 
Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-
operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves
(e.g., squib valves).
1.
Information Requested to Support Risk-Informed Selections
The following information is requested by August 29, 2022, or sooner, to facilitate the
initial sample selection.
1.1. List of systems, system numbers/designators, and corresponding system names.
1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
document.
1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth
(RAW).  Include values for Birnbaum Importance, Risk-Reduction Worth, and
Fussell-Veseley (as applicable).  The list should include (a) component
identification number, including noun name (i.e., descriptive name); (b) applicable
plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and
Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related
classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,
and manufacturer.  If the U.S. Nuclear Regulatory Commission (NRC) has granted
a license amendment to categorize structures, systems, and component in
accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,
please provide the Risk-Informed Safety Category of the component.  (Please
provide in Excel.)
1.4. List of corrective action documents related to the POV programs for the last
5 years, including the document identifier and brief description.  Provide a separate
list for each POV program.
1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years.  The list
should include a brief description of the surrounding circumstances.
2.
Information Requested for Initial Inspection Scoping Activities
The following information is requested by September 26, 2022, or sooner, to facilitate
the initial sample selection.


  Contact the lead inspector as soon as possible if you have any questions regarding this
3
  information request.  Provide the information electronically in searchable formats, if possible.
2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)  
  The files should contain descriptive names, and be indexed and hyperlinked to facilitate
Program and relief and alternative requests submitted in accordance with  
  ease of use.  Information in lists should contain enough information to be easily
10 CFR 50.55a for POVs.  Identify the edition of the ASME Operation and  
  understood by someone who has knowledge of light-water reactor technology.
Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the  
 
current 10-year IST Program interval, as well as any self-imposed standards  
  Important Note:  For the purpose of this inspection, POVs are valves with power actuators.
related to the IST Program elements applicable to POVs.
  Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-
2.2. IST Program documents, including implementing procedures, IST plan, and the  
  operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves
document that identifies the in-scope valves and the associated IST Program  
  (e.g., squib valves).
requirements for each valve (e.g., IST valve table identifying category,  
 
active/passive function).
  1.  Information Requested to Support Risk-Informed Selections
2.3. Site (and corporate if applicable) procedures associated with implementation of the  
 
POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code  
      The following information is requested by August 29, 2022, or sooner, to facilitate the
Mandatory Appendix III.
      initial sample selection.
2.4. Joint Owners Group (JOG) MOV program classification evaluation.
 
2.5. List of any valve removed from a POV program and basis for removal.
      1.1.  List of systems, system numbers/designators, and corresponding system names.
2.6. Current list of operator workarounds.
 
2.7. List of open operability evaluations related to POVs.
      1.2.  Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
2.8. List of permanent plant modifications to POVs completed in the last 5 years.  For  
            document.
the purpose of this inspection, permanent plant modifications include permanent:  
 
plant changes, design changes, set point changes, equivalency evaluations,  
      1.3.  List of POVs from your site-specific PSA sorted by Risk-Achievement Worth
suitability analyses, and commercial grade dedications.  The list should contain the  
            (RAW).  Include values for Birnbaum Importance, Risk-Reduction Worth, and
modification identifier, title, revision/date, the affected system, completion date, and  
            Fussell-Veseley (as applicable).  The list should include (a) component
a brief modification description.
            identification number, including noun name (i.e., descriptive name); (b) applicable
2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.
            plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and
2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications,  
            Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related
Technical Specifications Bases, and Technical Requirements Manual.
            classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,
2.11. The lead inspector will deliver forms to the licensee point of contact identified in the  
            and manufacturer.  If the U.S. Nuclear Regulatory Commission (NRC) has granted
letter for approximately 30 valves.  Fill out the valve characteristics in the form  
            a license amendment to categorize structures, systems, and component in
fields.  It is possible that not all fields can be completed.  For those fields that  
            accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,
cannot be filled, leave the fields blank.
            please provide the Risk-Informed Safety Category of the component.  (Please
2.12. Current management and engineering organizational chart.
            provide in Excel.)
3.
 
Information Requested to Support Inspection Preparation Activities
      1.4.  List of corrective action documents related to the POV programs for the last
The following information is requested by November 14, 2022, or sooner, to facilitate the  
            5 years, including the document identifier and brief description.  Provide a separate
final inspection preparation.
            list for each POV program.
 
      1.5.  List of POVs in the Maintenance Rule (a)(1) category for the last 5 years.  The list
            should include a brief description of the surrounding circumstances.
 
  2.  Information Requested for Initial Inspection Scoping Activities
 
      The following information is requested by September 26, 2022, or sooner, to facilitate
      the initial sample selection.
 
 
 
                                              2
  2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)
        Program and relief and alternative requests submitted in accordance with
        10 CFR 50.55a for POVs.  Identify the edition of the ASME Operation and
        Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the
        current 10-year IST Program interval, as well as any self-imposed standards
        related to the IST Program elements applicable to POVs.
 
  2.2. IST Program documents, including implementing procedures, IST plan, and the
        document that identifies the in-scope valves and the associated IST Program
        requirements for each valve (e.g., IST valve table identifying category,
        active/passive function).
 
  2.3. Site (and corporate if applicable) procedures associated with implementation of the
        POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code
        Mandatory Appendix III.
 
  2.4. Joint Owners Group (JOG) MOV program classification evaluation.
 
  2.5. List of any valve removed from a POV program and basis for removal.
 
  2.6. Current list of operator workarounds.
 
  2.7. List of open operability evaluations related to POVs.
 
  2.8. List of permanent plant modifications to POVs completed in the last 5 years.  For
        the purpose of this inspection, permanent plant modifications include permanent:
        plant changes, design changes, set point changes, equivalency evaluations,
        suitability analyses, and commercial grade dedications.  The list should contain the
        modification identifier, title, revision/date, the affected system, completion date, and
        a brief modification description.
 
  2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.
 
  2.10.Updated Final Safety Analysis Report (in one file), Technical Specifications,
        Technical Specifications Bases, and Technical Requirements Manual.
 
  2.11.The lead inspector will deliver forms to the licensee point of contact identified in the
        letter for approximately 30 valves.  Fill out the valve characteristics in the form
        fields.  It is possible that not all fields can be completed.  For those fields that
        cannot be filled, leave the fields blank.
 
  2.12.Current management and engineering organizational chart.
 
3. Information Requested to Support Inspection Preparation Activities
 
  The following information is requested by November 14, 2022, or sooner, to facilitate the
  final inspection preparation.
 
 
 
 
 
 
 
                                          3
3.1.  All corrective action documents, evaluations, and NRC correspondence, including
    any associated NRC requests for additional information (RAIs) and Safety
    Evaluation Report(s), generated in response to the NRC communications listed
    below.  Also, any NRC inspection reports that were conducted to close out the
    sites associated responses.
 
    3.1.1.  Generic Letter (GL) 89-10;
 
    3.1.2.  GL 96-05;
 
    3.1.3.  GL 95-07;
 
    3.1.4.  Bulletin 85-03;
 
    3.1.5.  Regulatory Issue Summary (RIS) 2000-03; and
 
    3.1.6.  GL 88-14.
 
3.2.  Any NRC correspondence regarding the stations POV programs other than the
    IST Program, including any associated NRC RAIs and any NRC Safety Evaluation
    Report(s).  Identify any self-imposed standards related to these programs.
 
3.3.  Preventive Maintenance (PM) Program document, implementing procedures, and
    PM templates applicable to POVs.
 
3.4.  Title 10 CFR 50, Appendix J Program document and implementing procedures.
 
3.5.  Corrective Action Program procedures, including the operability/functionality
    determination procedure.
 
3.6.  Quality Assurance Program document.
 
3.7.  Procedure for addressing issues captured in 10 CFR 21 notifications.
 
3.8.  All emergency and abnormal operating procedures.
 
3.9.  For each selected POV, including its actuator (the response should be separated
    by POV such as by creating a folder for each valve that includes the associated
    documents):
 
    3.9.1.  Procurement and design specifications, and Certificate of Conformance.
 
    3.9.2.  Vendor documents addressing installation, operation, and maintenance.
 
    3.9.3.  Piping and instrumentation drawings (PI&Ds) for the associated system.
 
    3.9.4.  Electrical diagrams, including control logic diagrams.
 
    3.9.5.  Valve and actuator component drawings.
 
    3.9.6.  System description and/or training documents associated with the POV.
 
 
                                      4
3.9.7.  Operations procedures that direct operators to control the valve, including
      alarm response procedures.
 
3.9.8.  Applicable Maintenance Rule scoping document and the Maintenance Rule
      performance criteria which would cause the system or component to be
      moved from (a)(2) status to (a)(1) status.  Also, documents (e.g., corrective
      action and work orders) associated with any instance the POV was placed
      in (a)(1) status during the last 5 years.
 
3.9.9.  List of tests, including technical specification surveillances.  The list should
      identify the test periodicity and test procedure identifier.
 
3.9.10.Completed tests and surveillances performed during the last 5 years.  For
      those tests and surveillances performed at a periodicity of less than 1 year
      or greater than 5 years, provide the latest three performed.  Include the
      associated acceptance criteria basis calculations.
 
3.9.11.Completed preservice testing (PST).
 
3.9.12.List of applicable PMs.  The list should identify the PM periodicity and last
      completion date, and briefly describe the PM.
 
3.9.13.Completed PMs performed during the last 5 years, including any post
      maintenance testing.  For those PMs performed at a periodicity of less than
      1 year or greater than 5 years, provide the latest three performed.
 
3.9.14.Corrective maintenance work orders performed on the POV during the last
      5 years, including any post maintenance testing.
 
3.9.15.An all-inclusive list of calculation revisions in effect associated with the
      POV.  The list should include the document identifier, title, and revision
      number.
 
3.9.16.Calculations associated with the POV.  Data files may be excluded.
      Calculation examples include (as applicable):
 
        Minimum available and required voltage at transient and steady state;
        Thermal overload sizing evaluation;
        Critical setpoint calculations (e.g., limit switch settings);
        Required thrust/torque;
        Maximum allowed leakage;
        Maximum differential pressure;
        Ambient room temperature under normal and accident conditions;
        Environmental qualification (EQ) file;
        (For AOVs) Pneumatic supply sizing and setpoint calculations;
        System hydraulic calculations;
        Pressure locking/thermal binding evaluations; and
        Valve weak link/seismic weak link analysis.
 
 
 
 
 
                                  5
        3.9.17.History of permanent modifications performed on the POV since
                installation.  Include modification identifier and brief modification
                description.
 
        3.9.18.List of corrective action documents associated with the POV for the last
                5 years.  The list should include the document identifier, brief description,
                and status (e.g., open or completed).
 
        3.9.19.Open and closed operability evaluations originated during the last 5 years.
 
4.  Additional Information to be Provided Onsite
 
  4.1.  During the in-office preparation activities, the team may identify additional
        information needed to support the inspection.  The lead inspector will provide a list
        of the additional information needed during the week of November 28, 2022.
 
  4.2.  Information requested to be provided throughout the inspection:
 
        4.2.1.    Any corrective action documents generated as a result of the teams
                  questions during this inspection as the documents are generated.
 
        4.2.2.    List of questions and/or document requests submitted by the team and
                  their status (e.g., open, closed) sorted by inspector.  Provide to each
                  inspector daily 1.5 hours prior to the daily debrief.  It is recommended to
                  provide the team leader with a master list sorted by inspector and each
                  inspector with a list containing only the items originated by that inspector.
 
        4.2.3.    If available in hardcopy form, one complete set of PI&Ds and simplified
                  drawings (e.g., training schematics).  If any of these documents are not
                  available in hardcopy form, contact the lead inspector.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


4
3.1. All corrective action documents, evaluations, and NRC correspondence, including
any associated NRC requests for additional information (RAIs) and Safety
Evaluation Report(s), generated in response to the NRC communications listed
below.  Also, any NRC inspection reports that were conducted to close out the
sites associated responses.
3.1.1. Generic Letter (GL) 89-10;
3.1.2. GL 96-05;
3.1.3. GL 95-07;
3.1.4. Bulletin 85-03;
3.1.5. Regulatory Issue Summary (RIS) 2000-03; and
3.1.6. GL 88-14.
3.2. Any NRC correspondence regarding the stations POV programs other than the
IST Program, including any associated NRC RAIs and any NRC Safety Evaluation
Report(s).  Identify any self-imposed standards related to these programs.
3.3. Preventive Maintenance (PM) Program document, implementing procedures, and
PM templates applicable to POVs.
3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.
3.5. Corrective Action Program procedures, including the operability/functionality
determination procedure.
3.6. Quality Assurance Program document.
3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.
3.8. All emergency and abnormal operating procedures.
3.9. For each selected POV, including its actuator (the response should be separated
by POV such as by creating a folder for each valve that includes the associated
documents):
3.9.1. Procurement and design specifications, and Certificate of Conformance.
3.9.2. Vendor documents addressing installation, operation, and maintenance.
3.9.3. Piping and instrumentation drawings (PI&Ds) for the associated system.
3.9.4. Electrical diagrams, including control logic diagrams.
3.9.5. Valve and actuator component drawings.
3.9.6. System description and/or training documents associated with the POV.


5
3.9.7. Operations procedures that direct operators to control the valve, including
alarm response procedures.
3.9.8. Applicable Maintenance Rule scoping document and the Maintenance Rule
performance criteria which would cause the system or component to be
moved from (a)(2) status to (a)(1) status.  Also, documents (e.g., corrective
action and work orders) associated with any instance the POV was placed
in (a)(1) status during the last 5 years.
3.9.9. List of tests, including technical specification surveillances.  The list should
identify the test periodicity and test procedure identifier.
3.9.10. Completed tests and surveillances performed during the last 5 years.  For
those tests and surveillances performed at a periodicity of less than 1 year
or greater than 5 years, provide the latest three performed.  Include the
associated acceptance criteria basis calculations.
3.9.11. Completed preservice testing (PST).
3.9.12. List of applicable PMs.  The list should identify the PM periodicity and last
completion date, and briefly describe the PM.
3.9.13. Completed PMs performed during the last 5 years, including any post
maintenance testing.  For those PMs performed at a periodicity of less than
1 year or greater than 5 years, provide the latest three performed.
3.9.14. Corrective maintenance work orders performed on the POV during the last
5 years, including any post maintenance testing.
3.9.15. An all-inclusive list of calculation revisions in effect associated with the
POV.  The list should include the document identifier, title, and revision
number.
3.9.16. Calculations associated with the POV.  Data files may be excluded. 
Calculation examples include (as applicable):
Minimum available and required voltage at transient and steady state;
Thermal overload sizing evaluation;
Critical setpoint calculations (e.g., limit switch settings);
Required thrust/torque;
Maximum allowed leakage;
Maximum differential pressure;
Ambient room temperature under normal and accident conditions;
Environmental qualification (EQ) file;
(For AOVs) Pneumatic supply sizing and setpoint calculations;
System hydraulic calculations;
Pressure locking/thermal binding evaluations; and
Valve weak link/seismic weak link analysis.


                                            6
6
3.9.17. History of permanent modifications performed on the POV since
installation.  Include modification identifier and brief modification
description.
3.9.18. List of corrective action documents associated with the POV for the last
5 years.  The list should include the document identifier, brief description,
and status (e.g., open or completed).
3.9.19. Open and closed operability evaluations originated during the last 5 years.
4.
Additional Information to be Provided Onsite
4.1. During the in-office preparation activities, the team may identify additional
information needed to support the inspection.  The lead inspector will provide a list
of the additional information needed during the week of November 28, 2022.
4.2. Information requested to be provided throughout the inspection:
4.2.1.
Any corrective action documents generated as a result of the teams
questions during this inspection as the documents are generated.
4.2.2.
List of questions and/or document requests submitted by the team and
their status (e.g., open, closed) sorted by inspector.  Provide to each
inspector daily 1.5 hours prior to the daily debrief.  It is recommended to
provide the team leader with a master list sorted by inspector and each
inspector with a list containing only the items originated by that inspector.
4.2.3.
If available in hardcopy form, one complete set of PI&Ds and simplified
drawings (e.g., training schematics).  If any of these documents are not
available in hardcopy form, contact the lead inspector.
}}
}}

Latest revision as of 20:28, 2 January 2025

Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000454/2022010 and 05000455/2022010
ML22207B857
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/27/2022
From: Jorge Corujo-Sandin
NRC/RGN-III/DRS/EB2
To: Rhoades D
Constellation Energy Generation
References
IR 2022010
Download: ML22207B857 (10)


See also: IR 05000454/2022010

Text

Mr. David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE

INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:

INSPECTION REPORT 05000454/2022010 AND 05000455/2022010

Dear Mr. Rhoades:

On November 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

Design Bases Assurance Inspection (Programs) at Byron Station. This inspection will be

performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design Bases

Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-Operated

Valves Under 10 CFR 50.55a Requirements.

This inspection will evaluate the reliability, functional capability, and design basis of

risk-important power-operated valves (POVs) as required by Title 10 of the Code of Federal

Regulations (10 CFR) 50.55a and applicable 10 CFR Part 50, Appendix A and Appendix B,

requirements. In conducting this inspection, the team will select risk-important POVs used to

prevent and mitigate the consequences of a design basis accident.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: November 21 - 25, 2022

Onsite weeks: November 28 - December 2, 2022, and December 12 - 16, 2022

Experience with previous baseline engineering inspections of similar depth and length has

shown this type of inspection is extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection. It is important that all of these documents are up-to-date and complete in order

to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection. Insofar as possible, this information should be provided

electronically to the lead inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial risk-informed scoping activities.

This information should be provided to the lead inspector no later than August 29, 2022.

July 27, 2022

D. Rhoades

- 2 -

The second group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than September 26,

2022. By October 11, 2022, the lead inspector will communicate the initial selected

samples and any additional information needed to support the in-office preparation

activities.

The third group of documents requested are those items needed to support our in-office

preparation activities. This set of documents should be provided to the lead inspector no

later than November 14, 2022. During the preparation activities, the team may identify

additional information needed to support the inspection.

The fourth group includes the additional information above as well as plant-specific

reference material. This information should be available to the team onsite on

November 28, 2022. It is also requested that corrective action documents and answers

to questions developed during the inspection be provided to the lead inspector as the

documents are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

These items are requested to be provided to the lead inspector by November 7, 2022.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Zoe L. Cox of your organization. If there are any questions about

the inspection or the material requested in the enclosure, contact the lead inspector at

630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

D. Rhoades

- 3 -

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Jorge Corujo-Sandin, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000454 and 05000455

License Nos. NPF-37 and NPF-66

Enclosure:

Design Bases Assurance Inspection

(Programs) Document Request

cc: Distribution via LISTSERV

Signed by Corujo-Sandin, Jorge

on 07/27/22

D. Rhoades

- 4 -

Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.

SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE

INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:

INSPECTION REPORT 05000454/2022010 AND 05000455/2022010

DISTRIBUTION:

Jessie Quichocho

Robert Orlikowski

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML22207B857

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JCorujo-Sandin:mb

DATE

07/27/2022

OFFICIAL RECORD COPY

Enclosure

DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM

REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000454/2022010 and 05000455/2022010

Onsite Inspection Dates:

November 28 - December 2, 2022, and

December 12 - 16, 2022

Inspection Procedure:

IP 71111.21N, Design Bases Assurance Inspection

(Programs), Attachment 2, Design-Basis Capability of

Power-Operated Valves Under 10 CFR 50.55a Requirements

Lead Inspector:

Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS

630-829-9741

Jorge.Corujo-Sandin@nrc.gov

Teammate Inspectors:

Kevin Barclay, Reactor Inspector, RIII/DRS

Michael Jones, Reactor Inspector, RIII/DRS

II.

LOGISTICS

Email the following inspection logistics to the lead inspector by November 7, 2022, or

sooner:

1.

Inspection room name/number, directions from the main access facility, and phone

number;

2.

Interview room name/number;

3.

Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart);

4.

Any site access/badging actions needed for each inspector;

5.

Any dosimetry actions needed for each inspector;

6.

Entrance meeting time and location;

7.

Confirmation that the team will have access to a licensee computer with a nearby printer;

8.

Confirmation that the team will have Wi-Fi access;

9.

Cafeteria location and hours;

10. Inspection response team normal working hours; and

2

11. Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff

meetings).

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in searchable formats, if possible.

The files should contain descriptive names, and be indexed and hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light-water reactor technology.

Important Note: For the purpose of this inspection, POVs are valves with power actuators.

Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-

operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves

(e.g., squib valves).

1.

Information Requested to Support Risk-Informed Selections

The following information is requested by August 29, 2022, or sooner, to facilitate the

initial sample selection.

1.1. List of systems, system numbers/designators, and corresponding system names.

1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary

document.

1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth

(RAW). Include values for Birnbaum Importance, Risk-Reduction Worth, and

Fussell-Veseley (as applicable). The list should include (a) component

identification number, including noun name (i.e., descriptive name); (b) applicable

plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and

Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related

classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,

and manufacturer. If the U.S. Nuclear Regulatory Commission (NRC) has granted

a license amendment to categorize structures, systems, and component in

accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,

please provide the Risk-Informed Safety Category of the component. (Please

provide in Excel.)

1.4. List of corrective action documents related to the POV programs for the last

5 years, including the document identifier and brief description. Provide a separate

list for each POV program.

1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list

should include a brief description of the surrounding circumstances.

2.

Information Requested for Initial Inspection Scoping Activities

The following information is requested by September 26, 2022, or sooner, to facilitate

the initial sample selection.

3

2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)

Program and relief and alternative requests submitted in accordance with

10 CFR 50.55a for POVs. Identify the edition of the ASME Operation and

Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the

current 10-year IST Program interval, as well as any self-imposed standards

related to the IST Program elements applicable to POVs.

2.2. IST Program documents, including implementing procedures, IST plan, and the

document that identifies the in-scope valves and the associated IST Program

requirements for each valve (e.g., IST valve table identifying category,

active/passive function).

2.3. Site (and corporate if applicable) procedures associated with implementation of the

POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code

Mandatory Appendix III.

2.4. Joint Owners Group (JOG) MOV program classification evaluation.

2.5. List of any valve removed from a POV program and basis for removal.

2.6. Current list of operator workarounds.

2.7. List of open operability evaluations related to POVs.

2.8. List of permanent plant modifications to POVs completed in the last 5 years. For

the purpose of this inspection, permanent plant modifications include permanent:

plant changes, design changes, set point changes, equivalency evaluations,

suitability analyses, and commercial grade dedications. The list should contain the

modification identifier, title, revision/date, the affected system, completion date, and

a brief modification description.

2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.

2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications,

Technical Specifications Bases, and Technical Requirements Manual.

2.11. The lead inspector will deliver forms to the licensee point of contact identified in the

letter for approximately 30 valves. Fill out the valve characteristics in the form

fields. It is possible that not all fields can be completed. For those fields that

cannot be filled, leave the fields blank.

2.12. Current management and engineering organizational chart.

3.

Information Requested to Support Inspection Preparation Activities

The following information is requested by November 14, 2022, or sooner, to facilitate the

final inspection preparation.

4

3.1. All corrective action documents, evaluations, and NRC correspondence, including

any associated NRC requests for additional information (RAIs) and Safety

Evaluation Report(s), generated in response to the NRC communications listed

below. Also, any NRC inspection reports that were conducted to close out the

sites associated responses.

3.1.1. Generic Letter (GL) 89-10;

3.1.2. GL 96-05;

3.1.3. GL 95-07;

3.1.4.Bulletin 85-03;

3.1.5. Regulatory Issue Summary (RIS) 2000-03; and

3.1.6. GL 88-14.

3.2. Any NRC correspondence regarding the stations POV programs other than the

IST Program, including any associated NRC RAIs and any NRC Safety Evaluation

Report(s). Identify any self-imposed standards related to these programs.

3.3. Preventive Maintenance (PM) Program document, implementing procedures, and

PM templates applicable to POVs.

3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.

3.5. Corrective Action Program procedures, including the operability/functionality

determination procedure.

3.6. Quality Assurance Program document.

3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.

3.8. All emergency and abnormal operating procedures.

3.9. For each selected POV, including its actuator (the response should be separated

by POV such as by creating a folder for each valve that includes the associated

documents):

3.9.1. Procurement and design specifications, and Certificate of Conformance.

3.9.2. Vendor documents addressing installation, operation, and maintenance.

3.9.3. Piping and instrumentation drawings (PI&Ds) for the associated system.

3.9.4. Electrical diagrams, including control logic diagrams.

3.9.5. Valve and actuator component drawings.

3.9.6. System description and/or training documents associated with the POV.

5

3.9.7. Operations procedures that direct operators to control the valve, including

alarm response procedures.

3.9.8. Applicable Maintenance Rule scoping document and the Maintenance Rule

performance criteria which would cause the system or component to be

moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective

action and work orders) associated with any instance the POV was placed

in (a)(1) status during the last 5 years.

3.9.9. List of tests, including technical specification surveillances. The list should

identify the test periodicity and test procedure identifier.

3.9.10. Completed tests and surveillances performed during the last 5 years. For

those tests and surveillances performed at a periodicity of less than 1 year

or greater than 5 years, provide the latest three performed. Include the

associated acceptance criteria basis calculations.

3.9.11. Completed preservice testing (PST).

3.9.12. List of applicable PMs. The list should identify the PM periodicity and last

completion date, and briefly describe the PM.

3.9.13. Completed PMs performed during the last 5 years, including any post

maintenance testing. For those PMs performed at a periodicity of less than

1 year or greater than 5 years, provide the latest three performed.

3.9.14. Corrective maintenance work orders performed on the POV during the last

5 years, including any post maintenance testing.

3.9.15. An all-inclusive list of calculation revisions in effect associated with the

POV. The list should include the document identifier, title, and revision

number.

3.9.16. Calculations associated with the POV. Data files may be excluded.

Calculation examples include (as applicable):

Minimum available and required voltage at transient and steady state;

Thermal overload sizing evaluation;

Critical setpoint calculations (e.g., limit switch settings);

Required thrust/torque;

Maximum allowed leakage;

Maximum differential pressure;

Ambient room temperature under normal and accident conditions;

Environmental qualification (EQ) file;

(For AOVs) Pneumatic supply sizing and setpoint calculations;

System hydraulic calculations;

Pressure locking/thermal binding evaluations; and

Valve weak link/seismic weak link analysis.

6

3.9.17. History of permanent modifications performed on the POV since

installation. Include modification identifier and brief modification

description.

3.9.18. List of corrective action documents associated with the POV for the last

5 years. The list should include the document identifier, brief description,

and status (e.g., open or completed).

3.9.19. Open and closed operability evaluations originated during the last 5 years.

4.

Additional Information to be Provided Onsite

4.1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide a list

of the additional information needed during the week of November 28, 2022.

4.2. Information requested to be provided throughout the inspection:

4.2.1.

Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

4.2.2.

List of questions and/or document requests submitted by the team and

their status (e.g., open, closed) sorted by inspector. Provide to each

inspector daily 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> prior to the daily debrief. It is recommended to

provide the team leader with a master list sorted by inspector and each

inspector with a list containing only the items originated by that inspector.

4.2.3.

If available in hardcopy form, one complete set of PI&Ds and simplified

drawings (e.g., training schematics). If any of these documents are not

available in hardcopy form, contact the lead inspector.