==Inspection Report==
==Inspection Report==
Docket Numbers: 05000528, 05000529 and 05000530
Docket Numbers:
 
05000528, 05000529 and 05000530
License Numbers: NPF-41, NPF-51 and NPF-74
License Numbers:
 
NPF-41, NPF-51 and NPF-74
Report Numbers: 05000528/2023003, 05000529/2023003 and 05000530/2023003
Report Numbers:
 
05000528/2023003, 05000529/2023003 and 05000530/2023003
Enterprise Identifier: I-2023-003-0008
Enterprise Identifier:
 
I-2023-003-0008
Licensee: Arizona Public Service
Licensee:
 
Arizona Public Service
Facility: Palo Verde Nuclear Generating Station
Facility:
 
Palo Verde Nuclear Generating Station
Location: Tonopah, AZ
Location:
 
Tonopah, AZ
Inspection Dates: July 1, 2023 to September 30, 2023
Inspection Dates:
 
July 1, 2023 to September 30, 2023
Inspectors: L. Merker, Senior Resident Inspector E. Lantz, Resident Inspector N. Cuevas, Resident Inspector J. Dykert, Health Physicist
Inspectors:
 
L. Merker, Senior Resident Inspector
Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety
E. Lantz, Resident Inspector
 
N. Cuevas, Resident Inspector
Enclosure
J. Dykert, Health Physicist
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety


=SUMMARY=
=SUMMARY=
Line 106: Line 110:
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
: (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023
: (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023
Line 150: Line 153:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
 
The inspectors verified licensee performance indicators submittals listed below:
 
MS06: Emergency AC Power Systems (IP Section 02.05)===
MS06: Emergency AC Power Systems (IP Section 02.05)===
{{IP sample|IP=IP 71151|count=3}}
{{IP sample|IP=IP 71151|count=3}}
Line 201: Line 201:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.01 Miscellaneous 5240822 Potential Tornado Borne Missile Permit
Type
71111.01 Miscellaneous 5372141 Potential Tornado Borne Missile Permit
Designation
71111.01 Miscellaneous 5496757 Potential Tornado Borne Missile Permit
Description or Title
71111.01 Miscellaneous 5530394 Potential Tornado Borne Missile Permit
Revision or
71111.01 Miscellaneous 5537602 Potential Tornado Borne Missile Permit
Date
71111.01 Procedures 01DP-0XX01 Control and Monitoring of Potential Tornado Borne Missiles6
71111.01
71111.01 Procedures 40AO-9ZZ21 Acts Of Nature 39
Miscellaneous
71111.04 Corrective Action 22-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-
240822
Documents 07107
Potential Tornado Borne Missile Permit
71111.04 Drawings 02-M-DFP-001 P & I Diagram Diesel Fuel Oil & Transfer System 12
71111.01
71111.04 Drawings 02-M-DGP-001 P & I Diagram Diesel Generator System 64
Miscellaneous
71111.04 Drawings 03-M-CHP-002 P and I Diagram Chemical and Volume Control System 57
5372141
71111.04 Miscellaneous TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain 05/03/2023
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5496757
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5530394
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5537602
Potential Tornado Borne Missile Permit
71111.01
Procedures
01DP-0XX01
Control and Monitoring of Potential Tornado Borne Missiles
71111.01
Procedures
40AO-9ZZ21
Acts Of Nature
71111.04
Corrective Action
Documents
2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-
07107
71111.04
Drawings
2-M-DFP-001
P & I Diagram Diesel Fuel Oil & Transfer System
71111.04
Drawings
2-M-DGP-001
P & I Diagram Diesel Generator System
71111.04
Drawings
03-M-CHP-002
P and I Diagram Chemical and Volume Control System
71111.04
Miscellaneous
TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain
Solenoid Isolation Valve
Solenoid Isolation Valve
71111.04 Miscellaneous PVNGS DBM - Chemical and Volume Control System 26
05/03/2023
71111.04 Procedures 40OP-9CH01 CVCS Normal Operations 81
71111.04
71111.04 Procedures 40OP-9DF01 Diesel Fuel Oil Storage and Transfer (DF) 45
Miscellaneous
71111.04 Procedures 40OP-9DG02 Emergency Diesel Generator B 80
PVNGS DBM - Chemical and Volume Control System
71111.04 Procedures 40OP-9SP02 Essential Spray Pond (SP) B 58
71111.04
71111.04 Work Orders 5448137, 5448135
Procedures
71111.05 Calculations 13-MC-FP-0809 Combustible Loads - Auxiliary Building 13
40OP-9CH01
71111.05 Corrective Action 23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-
CVCS Normal Operations
Documents 05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,
71111.04
Procedures
40OP-9DF01
Diesel Fuel Oil Storage and Transfer (DF)
71111.04
Procedures
40OP-9DG02
Emergency Diesel Generator B
71111.04
Procedures
40OP-9SP02
Essential Spray Pond (SP) B
71111.04
Work Orders
5448137, 5448135
71111.05
Calculations
13-MC-FP-0809
Combustible Loads - Auxiliary Building
71111.05
Corrective Action
Documents
23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-
05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-
2690, 23-02692
2690, 23-02692
71111.05 Fire Plans Pre-fire Strategies Manual 30
71111.05
71111.05 Miscellaneous Critique Letter from Darrin Green, Battalion Chief - Threat 06/24/2021
Fire Plans
Pre-fire Strategies Manual
71111.05
Miscellaneous
Critique Letter from Darrin Green, Battalion Chief - Threat
Liaison Officer, Goodyear Fire Department, to Scott Martin,
Liaison Officer, Goodyear Fire Department, to Scott Martin,
Training Officer, Palo Verde Nuclear Generating Station
Training Officer, Palo Verde Nuclear Generating Station
71111.05 Miscellaneous 5563638 Open Door Permit
06/24/2021
71111.05 Miscellaneous NPL41-D-2Q1B-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B 05/17/2023
71111.05
 
Miscellaneous
Inspection Type Designation Description or Title Revision or
5563638
Procedure Date
Open Door Permit
71111.05
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
05/17/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Shift Drill Scenario
Shift Drill Scenario
71111.05 Miscellaneous NPL41-D-2Q1B-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B 07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05 Miscellaneous NPL41-D-2Q2C-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C 07/12/2023
07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q2C-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05 Miscellaneous NPL41-D-2Q3A-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A 06/20/2023
07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Drill Scenario
Shift Drill Scenario
71111.05 Miscellaneous NPL41-D-2Q3A-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A 07/06/2023
06/20/2023
71111.05
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05 Miscellaneous NPL41-D-3Q1A-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A 07/20/2023
07/06/2023
71111.05
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Drill Scenario
Shift Drill Scenario
71111.05 Miscellaneous NPL41-D-3Q1A-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A 08/23/2023
07/20/2023
71111.05
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05 Miscellaneous NPL41-D-3Q2B-Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B 08/03/2023
08/23/2023
71111.05
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Drill Scenario
Shift Drill Scenario
71111.05 Miscellaneous NPL41-D-3Q2B-Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B 08/29/2023
08/03/2023
71111.05
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05 Procedures 14DP-0FP01 Firewatch Requirements 14
08/29/2023
71111.05 Procedures 14DP-0FP32 Emergency Notification and Response 38
71111.05
71111.05 Procedures 14DP-0FP33 Control of Transient Combustibles 33
Procedures
71111.05 Procedures 14FT-9FP61 Semi-Annual Operational Test of Appendix R and Appendix 20
14DP-0FP01
Firewatch Requirements
71111.05
Procedures
14DP-0FP32
Emergency Notification and Response
71111.05
Procedures
14DP-0FP33
Control of Transient Combustibles
71111.05
Procedures
14FT-9FP61
Semi-Annual Operational Test of Appendix R and Appendix
A Fire Door Closers
A Fire Door Closers
71111.05 Procedures 18FT-9FP38 Functional Test of Appendix R Fire/HELB Doors 1
71111.05
71111.05 Procedures 18FT-9FP39 Functional Test of Appendix A Fire/HELB Doors 0
Procedures
71111.05 Procedures 40AO-9ZZ27 Significant Turbine Building Oil System Leaks 0
18FT-9FP38
71111.05 Procedures 40DP-9ZZ17 Control of Doors, Hatches and Floor Plugs 69
Functional Test of Appendix R Fire/HELB Doors
71111.05 Procedures 40DP-9ZZ19 Operational Considerations Due to Plant Fire 37
71111.05
71111.05 Procedures 40OP-9HJ02 Control Building HVAC (Smoke Removal) 6
Procedures
71111.05 Work Orders 5535529, 5501387
18FT-9FP39
 
Functional Test of Appendix A Fire/HELB Doors
Inspection Type Designation Description or Title Revision or
71111.05
Procedure Date
Procedures
71111.07A Corrective Action 23-06257, 22-08195, 22-07864
40AO-9ZZ27
Significant Turbine Building Oil System Leaks
71111.05
Procedures
40DP-9ZZ17
Control of Doors, Hatches and Floor Plugs
71111.05
Procedures
40DP-9ZZ19
Operational Considerations Due to Plant Fire
71111.05
Procedures
40OP-9HJ02
Control Building HVAC (Smoke Removal)
71111.05
Work Orders
5535529, 5501387
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.07A
Corrective Action
Documents
Documents
71111.07A Miscellaneous 23-0620 U3 DGB Jacket Water Eddy Current Examination Report
23-06257, 22-08195, 22-07864
71111.07A Procedures 73DP-9ZZ21 Heat Exchanger Visual Inspection 8
71111.07A
71111.07A Work Orders 5398352, 5298385, 5398411, 5396107, 5398303, 5398421,
Miscellaneous
23-0620
U3 DGB Jacket Water Eddy Current Examination Report
71111.07A
Procedures
73DP-9ZZ21
Heat Exchanger Visual Inspection
71111.07A
Work Orders
5398352, 5298385, 5398411, 5396107, 5398303, 5398421,
27973
27973
71111.11Q Corrective Action 13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-
71111.11Q
Documents 07771, 23-07823, 23-07865, 23-07874, 23-08727
Corrective Action
71111.11Q Miscellaneous Specific Maneuver Plan: 258 [Effective Full Power Days] 0
Documents
13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-
07771, 23-07823, 23-07865, 23-07874, 23-08727
71111.11Q
Miscellaneous
Specific Maneuver Plan: 258 [Effective Full Power Days]
Downpower Unit 3 Cycle 24
Downpower Unit 3 Cycle 24
71111.11Q Miscellaneous Adverse Condition Monitoring Plan: Unit 3 A Circulating 0
71111.11Q
Miscellaneous
Adverse Condition Monitoring Plan: Unit 3 A Circulating
Water Pump/Motor Vibrations
Water Pump/Motor Vibrations
71111.11Q Miscellaneous Operator Logs: Unit 3 August 1-2, 2023 08/07/2023
71111.11Q
71111.11Q Miscellaneous SES-0-09-A-03 Licensed Operator Continued Training Simulator Exam 07/13/2023
Miscellaneous
Operator Logs: Unit 3 August 1-2, 2023
08/07/2023
71111.11Q
Miscellaneous
SES-0-09-A-03
Licensed Operator Continued Training Simulator Exam
Scenario
Scenario
71111.11Q Procedures 40DP-9OP02 Conduct of Operations 77
07/13/2023
71111.12 Corrective Action 21-13093, 21-15262, 23-03918, 23-03885, 23-04848
71111.11Q
Procedures
40DP-9OP02
Conduct of Operations
71111.12
Corrective Action
Documents
Documents
71111.12 Miscellaneous Unit 2 EC PMG Unavailability Criteria Status 08/23/2023
21-13093, 21-15262, 23-03918, 23-03885, 23-04848
71111.12 Miscellaneous Performance Monitoring Group, Essential Chilled Water 06/27/2023
71111.12
Miscellaneous
Unit 2 EC PMG Unavailability Criteria Status
08/23/2023
71111.12
Miscellaneous
Performance Monitoring Group, Essential Chilled Water
Train A Unit 2
Train A Unit 2
71111.12 Miscellaneous 13-NS-C025 Risk Informed Performance Criteria 9
06/27/2023
71111.12 Miscellaneous EVT-EC-2021-Maintenance Rule Event
71111.12
Miscellaneous
13-NS-C025
Risk Informed Performance Criteria
71111.12
Miscellaneous
EVT-EC-2021-
2254
2254
71111.12 Miscellaneous EVT-EC-2021-Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2021-
414689
414689
71111.12 Miscellaneous EVT-EC-2023-Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2023-
438568
438568
71111.12 Miscellaneous EVT-EC-2023-Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2023-
2921
2921
71111.12 Miscellaneous MR 2.0 Performance Monitoring Bases Document Worksheet - 0
Maintenance Rule Event
71111.12
Miscellaneous
MR 2.0
Performance Monitoring Bases Document Worksheet -
Essential Chilled Water (HVAC)
Essential Chilled Water (HVAC)
71111.12 Procedures 70DP-0MR01 Maintenance Rule 49
71111.12
71111.12 Procedures 70DP-0MR02 Maintenance Rule Monitoring Process 0
Procedures
70DP-0MR01
Maintenance Rule
71111.12
Procedures
70DP-0MR02
Maintenance Rule Monitoring Process


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.12 Work Orders 5080139
Type
71111.15 Calculations 13-MC-FP-0315 10CFR50 Appendix R Safe Shutdown Equipment List 15
Designation
71111.15 Corrective Action 23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-
Description or Title
Documents 05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,
Revision or
Date
71111.12
Work Orders
5080139
71111.15
Calculations
13-MC-FP-0315
10CFR50 Appendix R Safe Shutdown Equipment List
71111.15
Corrective Action
Documents
23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-
05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,
23-05751, 23-09598
23-05751, 23-09598
71111.15 Drawings 01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] 9
71111.15
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
System containment Spray Isolation Valve 1J-SIA-HV-687
71111.15 Drawings 01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] 10
71111.15
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
System containment Spray Isolation Valve 1J-SIA-HV-687
71111.15 Drawings 13-E-ZAC-050 Conduit & Tray Notes, Symbols & Details 43
71111.15
71111.15 Drawings 13-M-FPR-005 Appendix R Safety Function Diagram Chemical & Volume 4
Drawings
13-E-ZAC-050
Conduit & Tray Notes, Symbols & Details
71111.15
Drawings
13-M-FPR-005
Appendix R Safety Function Diagram Chemical & Volume
Control System
Control System
71111.15 Drawings 13-N001-1104-SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring 9
71111.15
271 Diagram
Drawings
71111.15 Drawings 13-Q-ZZP-001 EQ Configuration Drawing Limitorque Valve Actuator 1
13-N001-1104-
71111.15 Drawings N001-1104-Y-Type Globe Valve Stainless Steel, Socket Weld, Cres, 13
271
00015 Size: 1 Class: 1586 LB
SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring
71111.15 Miscellaneous System Training Manual: Volume 40 Safety Injection System 4
Diagram
(SI)
71111.15
71111.15 Miscellaneous System Training Manual: Safety Equipment Status System 4
Drawings
(ES)
13-Q-ZZP-001
71111.15 Miscellaneous Design Basis Manual: Plant Annunciator / Safety Equipment 4
EQ Configuration Drawing Limitorque Valve Actuator
71111.15
Drawings
N001-1104-
00015
Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,
Size: 1 Class: 1586 LB
71111.15
Miscellaneous
System Training Manual: Volume 40 Safety Injection System  
(SI)
71111.15
Miscellaneous
System Training Manual: Safety Equipment Status System  
(ES)
71111.15
Miscellaneous
Design Basis Manual: Plant Annunciator / Safety Equipment
Status System
Status System
71111.15 Miscellaneous CH and XO Maintenance Rule Scoping Diagram 02/12/2013
71111.15
71111.15 Miscellaneous 13-VTD-N383-BW/IP Operation and Maintenance Manual for Manual and 3
Miscellaneous
00019 Motor Operated 1, 1-1/2 and 2 High Pressure Globe
CH and XO Maintenance Rule Scoping Diagram
2/12/2013
71111.15
Miscellaneous
13-VTD-N383-
00019
BW/IP Operation and Maintenance Manual for Manual and
Motor Operated 1, 1-1/2 and 2 High Pressure Globe
Valves [PUB. #OMM2016]
Valves [PUB. #OMM2016]
71111.15 Miscellaneous CH DBM Chemical and Volume Control system Design Basis Manual 26
71111.15
71111.15 Miscellaneous EEQ-L200-001 Electrical Equipment Qualification Data File 27
Miscellaneous
71111.15 Miscellaneous RSS-01-1360 Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA- 0
CH DBM
Chemical and Volume Control system Design Basis Manual
71111.15
Miscellaneous
EEQ-L200-001
Electrical Equipment Qualification Data File
71111.15
Miscellaneous
RSS-01-1360
Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)
71111.15 Miscellaneous SB Reactor Protection System DBM 18
71111.15
71111.15 Miscellaneous VTD-C490-00001 Combustion Engineering Technical Manual for Limitorque
Miscellaneous
SB
Reactor Protection System DBM
71111.15
Miscellaneous
VTD-C490-00001
Combustion Engineering Technical Manual for Limitorque
Corporation Motor Operated Valve Actuators
Corporation Motor Operated Valve Actuators
 
Inspection
Inspection Type Designation Description or Title Revision or
Procedure
Procedure Date
Type
[PUB.#976F[83Y3]BH]
Designation
71111.15 Procedures Molded Case Circuit Breaker Test 53
Description or Title
71111.15 Procedures 01DP-0AP12-01 Condition Reporting Process Administrative Guideline 20
Revision or
71111.15 Procedures 32MT-9ZZ74 Molded Case Circuit Breaker Test 53
Date
71111.15 Procedures 36ST-9SB32 PPS Input Loop Calibration for Parameter 20, LO RWT 27
[PUB.#976F[83Y3]BH]
71111.15
Procedures
Molded Case Circuit Breaker Test
71111.15
Procedures
01DP-0AP12-01
Condition Reporting Process Administrative Guideline
71111.15
Procedures
2MT-9ZZ74
Molded Case Circuit Breaker Test
71111.15
Procedures
36ST-9SB32
PPS Input Loop Calibration for Parameter 20, LO RWT
LEVEL
LEVEL
71111.15 Procedures 40DP-9OP26 Operations Operability Determination Process 48
71111.15
71111.15 Procedures 40DP-9OP26-01 Operations Operability Determination Process Administrative 0
Procedures
40DP-9OP26
Operations Operability Determination Process
71111.15
Procedures
40DP-9OP26-01
Operations Operability Determination Process Administrative
Guideline
Guideline
71111.15 Procedures 40ST-9CH02 Boron Injection Flow Test 19
71111.15
71111.15 Procedures 70TI-9ZC01 Boric Acid Walkdown Leak Detection 27
Procedures
71111.15 Procedures 73ST-9CH02 Charging Pumps - Comprehensive Test 15
40ST-9CH02
71111.15 Work Orders 5362779, 5379047, 5561932, 5538035
Boron Injection Flow Test
71111.24 Corrective Action 23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-
71111.15
Documents 06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,
Procedures
70TI-9ZC01
Boric Acid Walkdown Leak Detection
71111.15
Procedures
73ST-9CH02
Charging Pumps - Comprehensive Test
71111.15
Work Orders
5362779, 5379047, 5561932, 5538035
71111.24
Corrective Action
Documents
23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-
06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-
08726, 23-10046
08726, 23-10046
71111.24 Miscellaneous FLEX SFP Pump Fluid Sample Results 09/05/2023
71111.24
71111.24 Miscellaneous PVGS Diverse and Flexible Coping Strategies (FLEX) 4
Miscellaneous
FLEX SFP Pump Fluid Sample Results
09/05/2023
71111.24
Miscellaneous
PVGS Diverse and Flexible Coping Strategies (FLEX)
Program Plan
Program Plan
71111.24 Miscellaneous 13-NS-A116 Engineering Guide to NRC Post Fukushima Requirements 1
71111.24
71111.24 Miscellaneous VTD-G080-00658 Vendor Technical Document: General Electric Electronic 1
Miscellaneous
13-NS-A116
Engineering Guide to NRC Post Fukushima Requirements
71111.24
Miscellaneous
VTD-G080-00658
Vendor Technical Document: General Electric Electronic
Speed Governor (MDT-20 Control System)
Speed Governor (MDT-20 Control System)
71111.24 Miscellaneous VTD-G080-00659 Vendor Technical Document: General Electric MDT-20 2
71111.24
Miscellaneous
VTD-G080-00659
Vendor Technical Document: General Electric MDT-20
Governor Setting Instructions
Governor Setting Instructions
71111.24 Procedures 14MT-9BD61 FLEX SFP Makeup Pump Inspections and Tests 6
71111.24
71111.24 Procedures 14MT-9BD61 FLEX SFP Makeup Pump Inspections and Tests Bases 6a
Procedures
71111.24 Procedures 30DP-9WP04 Post-Maintenance Testing Development 20
14MT-9BD61
71111.24 Procedures 31MT-9CH01 Charging Pump Disassembly and Assembly 37
FLEX SFP Makeup Pump Inspections and Tests
71111.24 Procedures 32MT-9PE01 Cleaning, Inspection, and Testing of the Class 1E Diesel 50
71111.24
Procedures
14MT-9BD61
FLEX SFP Makeup Pump Inspections and Tests Bases
6a
71111.24
Procedures
30DP-9WP04
Post-Maintenance Testing Development
71111.24
Procedures
31MT-9CH01
Charging Pump Disassembly and Assembly
71111.24
Procedures
2MT-9PE01
Cleaning, Inspection, and Testing of the Class 1E Diesel
Generator
Generator
71111.24 Procedures 40DP-9OP08 Diesel Generator Test Record 54
71111.24
71111.24 Procedures 40OP-9CH01 CVCS Normal Operations 81
Procedures
40DP-9OP08
Diesel Generator Test Record
71111.24
Procedures
40OP-9CH01
CVCS Normal Operations


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.24 Procedures 40OP-9DF01 Diesel Fuel Oil Storage and Transfer (DF)
Type
71111.24 Procedures 40OP-9DG02 Emergency Diesel Generator B 79
Designation
71111.24 Procedures 40OP-9FT01 Feedwater Pump Turbine A 63
Description or Title
71111.24 Procedures 40ST-9DG02 Diesel Generator B Test 57
Revision or
71111.24 Procedures 73DP-9XI01 Pump and Valve Inservice Testing Program 22
Date
71111.24 Procedures 73DP-9ZZ14 Surveillance Testing 32
71111.24
71111.24 Procedures 73ST-9CH06 Charging Pumps - Inservice Test 14
Procedures
71111.24 Procedures 73ST-9DF02 Diesel Fuel Oil Transfer Pumps - Comprehensive Pump 19
40OP-9DF01
Diesel Fuel Oil Storage and Transfer (DF)
71111.24
Procedures
40OP-9DG02
Emergency Diesel Generator B
71111.24
Procedures
40OP-9FT01
Feedwater Pump Turbine A
71111.24
Procedures
40ST-9DG02
Diesel Generator B Test
71111.24
Procedures
73DP-9XI01
Pump and Valve Inservice Testing Program
71111.24
Procedures
73DP-9ZZ14
Surveillance Testing
71111.24
Procedures
73ST-9CH06
Charging Pumps - Inservice Test
71111.24
Procedures
73ST-9DF02
Diesel Fuel Oil Transfer Pumps - Comprehensive Pump
Test
Test
71111.24 Procedures 73ST-9ST06 Containment Spray Pumps and Check Valves - Inservice 48
71111.24
Procedures
73ST-9ST06
Containment Spray Pumps and Check Valves - Inservice
Test
Test
71111.24 Work Orders 5398306, 5398390, 5427973, 5536211, 5551182, 5539323,
71111.24
Work Orders
5398306, 5398390, 5427973, 5536211, 5551182, 5539323,
5442500, 5443639, 5453624, 5448003, 5448007, 5549702,
5442500, 5443639, 5453624, 5448003, 5448007, 5549702,
5555891, 5446696, 5446673, 5446695, 5446700, 5459882
5555891, 5446696, 5446673, 5446695, 5446700, 5459882
71114.06 Corrective Action 23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-
71114.06
Documents 08194, 23-08198, 23-08275, 23-09186
Corrective Action
71114.06 Miscellaneous Emergency Preparedness 2304 Drill Report - Drill Date Aug 09/08/2023
Documents
23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-
08194, 23-08198, 23-08275, 23-09186
71114.06
Miscellaneous
Emergency Preparedness 2304 Drill Report - Drill Date Aug
8, 2023
8, 2023
71114.06 Miscellaneous EP-0801H [Emergency Action Level] Classification Matrix Hot
09/08/2023
71114.06
Miscellaneous
EP-0801H
[Emergency Action Level] Classification Matrix Hot
Conditions ([Reactor Coolant System] > 210°F)
Conditions ([Reactor Coolant System] > 210°F)
71114.06 Miscellaneous EP-0803H [Protective Action Recommendation] Flowchart
71114.06
71114.06 Miscellaneous EP-0804G Release Evaluation Flowchart
Miscellaneous
71114.06 Miscellaneous EP-0930B [Emergency Action Level] Classification Matrix All Conditions
EP-0803H
71114.06 Procedures EP-0900-012 ERO Positions - Engineering Director (EOF) 4
[Protective Action Recommendation] Flowchart
71151 Corrective Action 21-06710, 21-12485, 22-03043, 22-07259
71114.06
Miscellaneous
EP-0804G
Release Evaluation Flowchart
71114.06
Miscellaneous
EP-0930B
[Emergency Action Level] Classification Matrix All Conditions
71114.06
Procedures
EP-0900-012
ERO Positions - Engineering Director (EOF)
71151
Corrective Action
Documents
Documents
71151 Miscellaneous Units 1, 2, and 3 PI Summary Report MS06-10 07/2022- 08/03/2023
21-06710, 21-12485, 22-03043, 22-07259
71151
Miscellaneous
Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-
06/2023
06/2023
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report July 2022 08/04/2023
08/03/2023
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report February 2023 08/04/2023
71151
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report May 2023 08/04/2023
Miscellaneous
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
Units 1, 2, and 3 MSPI Margin Report July 2022
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report February 2023
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report May 2023
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE August 2022
Reports: PLE August 2022
 
08/04/2023
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI August 2022
Reports: UAI August 2022
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI August 2022
Reports: URI August 2022
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE June 2023
Reports: PLE June 2023
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI June 2023
Reports: UAI June 2023
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI June 2023
Reports: URI June 2023
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE April 2023
Reports: PLE April 2023
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI April 2023
Reports: UAI April 2023
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation 08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI April 2023
Reports: URI April 2023
71151 Miscellaneous 13-NS-C075 MSPI Bases Document 16
08/04/2023
71151 Procedures 70DP-0MR01 Maintenance Rule 47
71151
71151 Procedures 70DP-0MR01 Maintenance Rule 48
Miscellaneous
71151 Procedures 70DP-0MR01 Maintenance Rule 49
13-NS-C075
71151 Procedures 70DP-0PI01 Performance Index Data Mitigating Systems Cornerstone 9
MSPI Bases Document
71151 Procedures 70DP-0PI01 Performance Index Data Mitigating Systems Cornerstone 10
71151
71151 Procedures 93DP-0LC09 NRC ROP PI Data Collection, Verification and Submittal 12
Procedures
71152A Corrective Action 22-03027, 23-05330, 23-05514
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0PI01
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
70DP-0PI01
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
93DP-0LC09
NRC ROP PI Data Collection, Verification and Submittal
71152A
Corrective Action
Documents
Documents
71152A Miscellaneous Pre-Fire Strategies Manual 30
2-03027, 23-05330, 23-05514
71152A Miscellaneous Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire 05/12/2023
71152A
Miscellaneous
Pre-Fire Strategies Manual
71152A
Miscellaneous
Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire
Detector TRM Change
Detector TRM Change
71152A Miscellaneous FPCRR, Fire Hose Removal Fire Protection Change 08/09/2022
05/12/2023
71152A
Miscellaneous
FPCRR, Fire Hose Removal Fire Protection Change
Regulatory Review
Regulatory Review
71152A Miscellaneous 102-05627 APS Commitment Letter 01/11/2027
08/09/2022
71152A Miscellaneous 22-R002/22-F009 LDCR Review Packages
71152A
71152A Miscellaneous Generic Letter Implementation of Fire Protection Requirements
Miscellaneous
2-05627
APS Commitment Letter
01/11/2027
71152A
Miscellaneous
2-R002/22-F009
LDCR Review Packages
71152A
Miscellaneous
Generic Letter
86-10
86-10
 
Implementation of Fire Protection Requirements
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71152A Miscellaneous Generic Letter Removal of Fire Protection Requirements from Technical
Type
88-12 Specifications
Designation
71152A Miscellaneous NFPA 14 Standpipe and Hose Systems 1976
Description or Title
71152A Miscellaneous NFPA 14 Installation of Standpipe and Hose Systems 2019
Revision or
71152A Procedures 40AO-9ZZ19 Control Room Fire 42
Date
71152A Procedures 40DP-9ZZ19 Operational Considerations Due to Plant Fire 37
71152A
71152A Procedures 40MG-9ZZ05-002 Mitigating Guidelines Supplemental Strategies 0
Miscellaneous
71153 Corrective Action 23-07440, 23-07500, 23-07791, 23-07845
Generic Letter
88-12
Removal of Fire Protection Requirements from Technical
Specifications
71152A
Miscellaneous
NFPA 14
Standpipe and Hose Systems
1976
71152A
Miscellaneous
NFPA 14
Installation of Standpipe and Hose Systems
2019
71152A
Procedures
40AO-9ZZ19
Control Room Fire
71152A
Procedures
40DP-9ZZ19
Operational Considerations Due to Plant Fire
71152A
Procedures
40MG-9ZZ05-002
Mitigating Guidelines Supplemental Strategies
71153
Corrective Action
Documents
Documents
71153 Miscellaneous Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023, 07/19/2023
23-07440, 23-07500, 23-07791, 23-07845
71153
Miscellaneous
Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023,
0600
0600
71153 Miscellaneous Dose Assessment User Manual 10
07/19/2023
71153 Miscellaneous Event Reporting Manual 48
71153
71153 Miscellaneous 2-23-034 Compensatory Action Document 07/29/2023
Miscellaneous
71153 Procedures 16DP-0EP31 Emergency Preparedness Equipment Out of Service 14
Dose Assessment User Manual
71153 Procedures 40AO-9ZZ08 Load Rejection 35
71153
71153 Procedures 40DP-9OP02 Conduct of Operations 77
Miscellaneous
 
Event Reporting Manual
15
71153
Miscellaneous
2-23-034
Compensatory Action Document
07/29/2023
71153
Procedures
16DP-0EP31
Emergency Preparedness Equipment Out of Service
71153
Procedures
40AO-9ZZ08
Load Rejection
71153
Procedures
40DP-9OP02
Conduct of Operations
77
}}
}}

Latest revision as of 17:08, 2 January 2025

Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003
ML23285A245
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/17/2023
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Heflin A
Arizona Public Service Co
References
IR 2023003
Download: ML23285A245 (18)


Text

October 17, 2023

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2023003 AND 05000529/2023003 AND 05000530/2023003

Dear Adam Heflin:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On October 6, 2023, the NRC inspectors discussed the results of this inspection with Todd Horton, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2023003, 05000529/2023003 and 05000530/2023003

Enterprise Identifier:

I-2023-003-0008

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

July 1, 2023 to September 30, 2023

Inspectors:

L. Merker, Senior Resident Inspector

E. Lantz, Resident Inspector

N. Cuevas, Resident Inspector

J. Dykert, Health Physicist

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 entered the inspection period at full power. On September 26, 2023, the unit began a coastdown for refueling outage 1R24 and ended the inspection period at approximately 95 percent power.

Unit 2 operated at or near full power for the duration of the inspection period.

Unit 3 entered the inspection period at full power. On July 18, 2023, the unit experienced a partial load reject to approximately 87 percent power due to main turbine control valve number 4 going full closed and stabilized at 88 percent power on July 19, 2023. On July 21, 2023, the operators raised power to 90 percent power. On July 30, 2023, the operators lowered power to 40 percent power to perform tube leak repairs in condenser hotwell 2A. On August 2, 2023, the operators lowered power to 12 percent power to take the main turbine offline and restore main turbine control valve number 4. On August 4, 2023, the unit returned to full power, where it remained for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending monsoon thunderstorms, on August 18, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3, chemical and volume control system following maintenance on charging pump A, on September 13, 2023
(2) Unit 2, emergency diesel generator train B, during emergency diesel generator train A maintenance outage, on September 29, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2, control building 100-foot elevation, fire zones 5A, 5B, 6A, 6B, 8A,10A, and 10B, on July 20, 2023
(2) Unit 1, auxiliary building 120-foot elevation, fire zones 47A, 51B, 52A, 52D, and 54, on August 17, 2023
(3) Units 1 and 3, class 1E 125 Vdc equipment rooms, fire zones 6A, 6B, 7A, and 7B, on August 22, 2023
(4) Unit 2, auxiliary building west corridor, train A and B piping penetration rooms, fire zones 37A, 37C and 37D, on September 15, 2023
(5) Unit 2, emergency diesel generator room train A, fire zone 21A, on September 27, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire department training and performance during announced fire drills on July 21, 2023, and August 4, 2023.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 3, emergency diesel generator train B, jacket water heat exchanger, on July 25, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated licensed operator performance in the control room during the following activities:

(1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator continued training simulator exam activities, on August 24, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2, essential chilled water train A, on August 25, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 3, boration flow path functionality determination due to boric acid makeup pump to volume control tank bypass line check valve, CHA-V177, failed bi-directional close test, on August 1, 2023
(2) Unit 3, engineered safety features actuation system channel D operability determination due to refueling water tank low level bistable setpoint spiking, on September 6, 2023
(3) Unit 2, shutdown cooling suction valve, SIB-UV-675, from containment recirculation sump train B operability determination due to degraded conduit connection to valve actuator, on September 7, 2023
(4) Unit 1, containment spray train A valves SIA-HV-678, SIA-HV-684, and SIA-HV-687, operability determinations following a safety equipment inoperable status panel alarm, on September 8, 2023
(5) Unit 1, safety injection tank 2B level transmitter high pressure root valve operability determination due to excessive boric acid residue on packing gland, on September 29, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)

(1) Unit 3, emergency diesel generator train B post-maintenance testing following maintenance outage, on July 31, 2023
(2) Unit 2, main feedwater pump A post-maintenance testing following turbine governor pilot valve, linear variable differential transformer, and servo valve replacement, on July 31, 2023
(3) Unit 3, main turbine control valve 4 post-maintenance testing following replacement of shorted signal cable, on August 7, 2023
(4) Unit 3, charging pump E post-maintenance testing following maintenance outage, on September 28, 2023

Surveillance Testing (IP Section 03.01) (1 Sample)

(1) Unit 2, diesel generator fuel oil transfer pump A comprehensive pump test, on September 29, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 2, containment spray pump B inservice testing, on September 1, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) Units 1, 2, and 3, and N+1 diverse and flexible coping strategies spent fuel pool makeup pump testing, on September 22, 2023

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated an emergency preparedness drill, on August 8,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS07: High Pressure Injection Systems (IP Section 02.06) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS08: Heat Removal Systems (IP Section 02.07) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS09: Residual Heat Removal Systems (IP Section 02.08) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS10: Cooling Water Support Systems (IP Section 02.09) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:

(1) Units 1, 2, and 3, review of actions associated with removal of fire hoses from plant fire hose stations, on September 28, 2023

71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03)

(1) The inspectors evaluated the Unit 3 partial load reject to 87 percent power due to main turbine control valve number 4 going closed at full power and the licensees response, on July 18, 2023.

Reporting (IP section 03.05) (1 Sample)

(1) The inspectors evaluated the reportability of the Unit 2 steam generator 2 main steam line radiation monitor, RU-140, channels 1 and 2 being inoperable at the same time, on August 2,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 6, 2023, the inspectors presented the integrated inspection results to Todd Horton, Senior Vice President, Site Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Miscellaneous

240822

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5372141

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5496757

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5530394

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5537602

Potential Tornado Borne Missile Permit

71111.01

Procedures

01DP-0XX01

Control and Monitoring of Potential Tornado Borne Missiles

71111.01

Procedures

40AO-9ZZ21

Acts Of Nature

71111.04

Corrective Action

Documents

2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-

07107

71111.04

Drawings

2-M-DFP-001

P & I Diagram Diesel Fuel Oil & Transfer System

71111.04

Drawings

2-M-DGP-001

P & I Diagram Diesel Generator System

71111.04

Drawings

03-M-CHP-002

P and I Diagram Chemical and Volume Control System

71111.04

Miscellaneous

TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain

Solenoid Isolation Valve

05/03/2023

71111.04

Miscellaneous

PVNGS DBM - Chemical and Volume Control System

71111.04

Procedures

40OP-9CH01

CVCS Normal Operations

71111.04

Procedures

40OP-9DF01

Diesel Fuel Oil Storage and Transfer (DF)

71111.04

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.04

Procedures

40OP-9SP02

Essential Spray Pond (SP) B

71111.04

Work Orders

5448137, 5448135

71111.05

Calculations

13-MC-FP-0809

Combustible Loads - Auxiliary Building

71111.05

Corrective Action

Documents

23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-

05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,

23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-

2690, 23-02692

71111.05

Fire Plans

Pre-fire Strategies Manual

71111.05

Miscellaneous

Critique Letter from Darrin Green, Battalion Chief - Threat

Liaison Officer, Goodyear Fire Department, to Scott Martin,

Training Officer, Palo Verde Nuclear Generating Station

06/24/2021

71111.05

Miscellaneous

5563638

Open Door Permit

71111.05

Miscellaneous

NPL41-D-2Q1B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B

05/17/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Shift Drill Scenario

71111.05

Miscellaneous

NPL41-D-2Q1B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/12/2023

71111.05

Miscellaneous

NPL41-D-2Q2C-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/12/2023

71111.05

Miscellaneous

NPL41-D-2Q3A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A

Shift Drill Scenario

06/20/2023

71111.05

Miscellaneous

NPL41-D-2Q3A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/06/2023

71111.05

Miscellaneous

NPL41-D-3Q1A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A

Shift Drill Scenario

07/20/2023

71111.05

Miscellaneous

NPL41-D-3Q1A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A

Shift Summary/After Action Review Report for Regulatory

Fire Drill

08/23/2023

71111.05

Miscellaneous

NPL41-D-3Q2B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B

Shift Drill Scenario

08/03/2023

71111.05

Miscellaneous

NPL41-D-3Q2B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B

Shift Summary/After Action Review Report for Regulatory

Fire Drill

08/29/2023

71111.05

Procedures

14DP-0FP01

Firewatch Requirements

71111.05

Procedures

14DP-0FP32

Emergency Notification and Response

71111.05

Procedures

14DP-0FP33

Control of Transient Combustibles

71111.05

Procedures

14FT-9FP61

Semi-Annual Operational Test of Appendix R and Appendix

A Fire Door Closers

71111.05

Procedures

18FT-9FP38

Functional Test of Appendix R Fire/HELB Doors

71111.05

Procedures

18FT-9FP39

Functional Test of Appendix A Fire/HELB Doors

71111.05

Procedures

40AO-9ZZ27

Significant Turbine Building Oil System Leaks

71111.05

Procedures

40DP-9ZZ17

Control of Doors, Hatches and Floor Plugs

71111.05

Procedures

40DP-9ZZ19

Operational Considerations Due to Plant Fire

71111.05

Procedures

40OP-9HJ02

Control Building HVAC (Smoke Removal)

71111.05

Work Orders

5535529, 5501387

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.07A

Corrective Action

Documents

23-06257, 22-08195, 22-07864

71111.07A

Miscellaneous

23-0620

U3 DGB Jacket Water Eddy Current Examination Report

71111.07A

Procedures

73DP-9ZZ21

Heat Exchanger Visual Inspection

71111.07A

Work Orders

5398352, 5298385, 5398411, 5396107, 5398303, 5398421,

27973

71111.11Q

Corrective Action

Documents

13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-

07771, 23-07823, 23-07865, 23-07874, 23-08727

71111.11Q

Miscellaneous

Specific Maneuver Plan: 258 [Effective Full Power Days]

Downpower Unit 3 Cycle 24

71111.11Q

Miscellaneous

Adverse Condition Monitoring Plan: Unit 3 A Circulating

Water Pump/Motor Vibrations

71111.11Q

Miscellaneous

Operator Logs: Unit 3 August 1-2, 2023

08/07/2023

71111.11Q

Miscellaneous

SES-0-09-A-03

Licensed Operator Continued Training Simulator Exam

Scenario

07/13/2023

71111.11Q

Procedures

40DP-9OP02

Conduct of Operations

71111.12

Corrective Action

Documents

21-13093, 21-15262, 23-03918, 23-03885, 23-04848

71111.12

Miscellaneous

Unit 2 EC PMG Unavailability Criteria Status

08/23/2023

71111.12

Miscellaneous

Performance Monitoring Group, Essential Chilled Water

Train A Unit 2

06/27/2023

71111.12

Miscellaneous

13-NS-C025

Risk Informed Performance Criteria

71111.12

Miscellaneous

EVT-EC-2021-

2254

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2021-

414689

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2023-

438568

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2023-

2921

Maintenance Rule Event

71111.12

Miscellaneous

MR 2.0

Performance Monitoring Bases Document Worksheet -

Essential Chilled Water (HVAC)

71111.12

Procedures

70DP-0MR01

Maintenance Rule

71111.12

Procedures

70DP-0MR02

Maintenance Rule Monitoring Process

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Work Orders

5080139

71111.15

Calculations

13-MC-FP-0315

10CFR50 Appendix R Safe Shutdown Equipment List

71111.15

Corrective Action

Documents

23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-

05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,

23-05751, 23-09598

71111.15

Drawings

01-E-SIB-0024

Elementary Diagram Safety Injection - Shutdown [Cooling]

System containment Spray Isolation Valve 1J-SIA-HV-687

71111.15

Drawings

01-E-SIB-0024

Elementary Diagram Safety Injection - Shutdown [Cooling]

System containment Spray Isolation Valve 1J-SIA-HV-687

71111.15

Drawings

13-E-ZAC-050

Conduit & Tray Notes, Symbols & Details

71111.15

Drawings

13-M-FPR-005

Appendix R Safety Function Diagram Chemical & Volume

Control System

71111.15

Drawings

13-N001-1104-

271

SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring

Diagram

71111.15

Drawings

13-Q-ZZP-001

EQ Configuration Drawing Limitorque Valve Actuator

71111.15

Drawings

N001-1104-

00015

Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,

Size: 1 Class: 1586 LB

71111.15

Miscellaneous

System Training Manual: Volume 40 Safety Injection System

(SI)

71111.15

Miscellaneous

System Training Manual: Safety Equipment Status System

(ES)

71111.15

Miscellaneous

Design Basis Manual: Plant Annunciator / Safety Equipment

Status System

71111.15

Miscellaneous

CH and XO Maintenance Rule Scoping Diagram

2/12/2013

71111.15

Miscellaneous

13-VTD-N383-

00019

BW/IP Operation and Maintenance Manual for Manual and

Motor Operated 1, 1-1/2 and 2 High Pressure Globe

Valves [PUB. #OMM2016]

71111.15

Miscellaneous

CH DBM

Chemical and Volume Control system Design Basis Manual

71111.15

Miscellaneous

EEQ-L200-001

Electrical Equipment Qualification Data File

71111.15

Miscellaneous

RSS-01-1360

Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-

M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)

71111.15

Miscellaneous

SB

Reactor Protection System DBM

71111.15

Miscellaneous

VTD-C490-00001

Combustion Engineering Technical Manual for Limitorque

Corporation Motor Operated Valve Actuators

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

[PUB.#976F[83Y3]BH]

71111.15

Procedures

Molded Case Circuit Breaker Test

71111.15

Procedures

01DP-0AP12-01

Condition Reporting Process Administrative Guideline

71111.15

Procedures

2MT-9ZZ74

Molded Case Circuit Breaker Test

71111.15

Procedures

36ST-9SB32

PPS Input Loop Calibration for Parameter 20, LO RWT

LEVEL

71111.15

Procedures

40DP-9OP26

Operations Operability Determination Process

71111.15

Procedures

40DP-9OP26-01

Operations Operability Determination Process Administrative

Guideline

71111.15

Procedures

40ST-9CH02

Boron Injection Flow Test

71111.15

Procedures

70TI-9ZC01

Boric Acid Walkdown Leak Detection

71111.15

Procedures

73ST-9CH02

Charging Pumps - Comprehensive Test

71111.15

Work Orders

5362779, 5379047, 5561932, 5538035

71111.24

Corrective Action

Documents

23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-

06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,

23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-

08726, 23-10046

71111.24

Miscellaneous

FLEX SFP Pump Fluid Sample Results

09/05/2023

71111.24

Miscellaneous

PVGS Diverse and Flexible Coping Strategies (FLEX)

Program Plan

71111.24

Miscellaneous

13-NS-A116

Engineering Guide to NRC Post Fukushima Requirements

71111.24

Miscellaneous

VTD-G080-00658

Vendor Technical Document: General Electric Electronic

Speed Governor (MDT-20 Control System)

71111.24

Miscellaneous

VTD-G080-00659

Vendor Technical Document: General Electric MDT-20

Governor Setting Instructions

71111.24

Procedures

14MT-9BD61

FLEX SFP Makeup Pump Inspections and Tests

71111.24

Procedures

14MT-9BD61

FLEX SFP Makeup Pump Inspections and Tests Bases

6a

71111.24

Procedures

30DP-9WP04

Post-Maintenance Testing Development

71111.24

Procedures

31MT-9CH01

Charging Pump Disassembly and Assembly

71111.24

Procedures

2MT-9PE01

Cleaning, Inspection, and Testing of the Class 1E Diesel

Generator

71111.24

Procedures

40DP-9OP08

Diesel Generator Test Record

71111.24

Procedures

40OP-9CH01

CVCS Normal Operations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

40OP-9DF01

Diesel Fuel Oil Storage and Transfer (DF)

71111.24

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.24

Procedures

40OP-9FT01

Feedwater Pump Turbine A

71111.24

Procedures

40ST-9DG02

Diesel Generator B Test

71111.24

Procedures

73DP-9XI01

Pump and Valve Inservice Testing Program

71111.24

Procedures

73DP-9ZZ14

Surveillance Testing

71111.24

Procedures

73ST-9CH06

Charging Pumps - Inservice Test

71111.24

Procedures

73ST-9DF02

Diesel Fuel Oil Transfer Pumps - Comprehensive Pump

Test

71111.24

Procedures

73ST-9ST06

Containment Spray Pumps and Check Valves - Inservice

Test

71111.24

Work Orders

5398306, 5398390, 5427973, 5536211, 5551182, 5539323,

5442500, 5443639, 5453624, 5448003, 5448007, 5549702,

5555891, 5446696, 5446673, 5446695, 5446700, 5459882

71114.06

Corrective Action

Documents

23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-

08194, 23-08198, 23-08275, 23-09186

71114.06

Miscellaneous

Emergency Preparedness 2304 Drill Report - Drill Date Aug

8, 2023

09/08/2023

71114.06

Miscellaneous

EP-0801H

[Emergency Action Level] Classification Matrix Hot

Conditions ([Reactor Coolant System] > 210°F)

71114.06

Miscellaneous

EP-0803H

[Protective Action Recommendation] Flowchart

71114.06

Miscellaneous

EP-0804G

Release Evaluation Flowchart

71114.06

Miscellaneous

EP-0930B

[Emergency Action Level] Classification Matrix All Conditions

71114.06

Procedures

EP-0900-012

ERO Positions - Engineering Director (EOF)

71151

Corrective Action

Documents

21-06710, 21-12485, 22-03043, 22-07259

71151

Miscellaneous

Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-

06/2023

08/03/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report July 2022

08/04/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report February 2023

08/04/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report May 2023

08/04/2023

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE August 2022

08/04/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI August 2022

08/04/2023

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI August 2022

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE June 2023

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI June 2023

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI June 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE April 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI April 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI April 2023

08/04/2023

71151

Miscellaneous

13-NS-C075

MSPI Bases Document

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0PI01

Performance Index Data Mitigating Systems Cornerstone

71151

Procedures

70DP-0PI01

Performance Index Data Mitigating Systems Cornerstone

71151

Procedures

93DP-0LC09

NRC ROP PI Data Collection, Verification and Submittal

71152A

Corrective Action

Documents

2-03027, 23-05330, 23-05514

71152A

Miscellaneous

Pre-Fire Strategies Manual

71152A

Miscellaneous

Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire

Detector TRM Change

05/12/2023

71152A

Miscellaneous

FPCRR, Fire Hose Removal Fire Protection Change

Regulatory Review

08/09/2022

71152A

Miscellaneous

2-05627

APS Commitment Letter

01/11/2027

71152A

Miscellaneous

2-R002/22-F009

LDCR Review Packages

71152A

Miscellaneous

Generic Letter 86-10

Implementation of Fire Protection Requirements

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152A

Miscellaneous

Generic Letter 88-12

Removal of Fire Protection Requirements from Technical

Specifications

71152A

Miscellaneous

NFPA 14

Standpipe and Hose Systems

1976

71152A

Miscellaneous

NFPA 14

Installation of Standpipe and Hose Systems

2019

71152A

Procedures

40AO-9ZZ19

Control Room Fire

71152A

Procedures

40DP-9ZZ19

Operational Considerations Due to Plant Fire

71152A

Procedures

40MG-9ZZ05-002

Mitigating Guidelines Supplemental Strategies

71153

Corrective Action

Documents

23-07440, 23-07500, 23-07791, 23-07845

71153

Miscellaneous

Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023,

0600

07/19/2023

71153

Miscellaneous

Dose Assessment User Manual

71153

Miscellaneous

Event Reporting Manual

71153

Miscellaneous

2-23-034

Compensatory Action Document

07/29/2023

71153

Procedures

16DP-0EP31

Emergency Preparedness Equipment Out of Service

71153

Procedures

40AO-9ZZ08

Load Rejection

71153

Procedures

40DP-9OP02

Conduct of Operations

77