IR 05000528/2023003: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 34: | Line 34: | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Numbers: 05000528, 05000529 and 05000530 | Docket Numbers: | ||
05000528, 05000529 and 05000530 | |||
License Numbers: NPF-41, NPF-51 and NPF-74 | License Numbers: | ||
NPF-41, NPF-51 and NPF-74 | |||
Report Numbers: 05000528/2023003, 05000529/2023003 and 05000530/2023003 | Report Numbers: | ||
05000528/2023003, 05000529/2023003 and 05000530/2023003 | |||
Enterprise Identifier: I-2023-003-0008 | Enterprise Identifier: | ||
I-2023-003-0008 | |||
Licensee: Arizona Public Service | Licensee: | ||
Arizona Public Service | |||
Facility: Palo Verde Nuclear Generating Station | Facility: | ||
Palo Verde Nuclear Generating Station | |||
Location: Tonopah, AZ | Location: | ||
Tonopah, AZ | |||
Inspection Dates: July 1, 2023 to September 30, 2023 | Inspection Dates: | ||
July 1, 2023 to September 30, 2023 | |||
Inspectors: L. Merker, Senior Resident Inspector E. Lantz, Resident Inspector N. Cuevas, Resident Inspector J. Dykert, Health Physicist | Inspectors: | ||
L. Merker, Senior Resident Inspector | |||
Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety | E. Lantz, Resident Inspector | ||
N. Cuevas, Resident Inspector | |||
J. Dykert, Health Physicist | |||
Approved By: | |||
John L. Dixon, Jr., Chief | |||
Reactor Projects Branch D | |||
Division of Operating Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
| Line 106: | Line 110: | ||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | ||
The inspectors observed and evaluated licensed operator performance in the control room during the following activities: | The inspectors observed and evaluated licensed operator performance in the control room during the following activities: | ||
: (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023 | : (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023 | ||
| Line 150: | Line 153: | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71151 - Performance Indicator Verification | ===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | ||
The inspectors verified licensee performance indicators submittals listed below: | |||
MS06: Emergency AC Power Systems (IP Section 02.05)=== | MS06: Emergency AC Power Systems (IP Section 02.05)=== | ||
{{IP sample|IP=IP 71151|count=3}} | {{IP sample|IP=IP 71151|count=3}} | ||
| Line 201: | Line 201: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71111.01 Miscellaneous | Type | ||
71111.01 Miscellaneous 5372141 Potential Tornado Borne Missile Permit | Designation | ||
71111.01 Miscellaneous 5496757 Potential Tornado Borne Missile Permit | Description or Title | ||
71111.01 Miscellaneous 5530394 Potential Tornado Borne Missile Permit | Revision or | ||
71111.01 Miscellaneous 5537602 Potential Tornado Borne Missile Permit | Date | ||
71111.01 Procedures 01DP-0XX01 Control and Monitoring of Potential Tornado Borne | 71111.01 | ||
71111.01 Procedures 40AO-9ZZ21 Acts Of Nature | Miscellaneous | ||
71111.04 Corrective Action | 240822 | ||
Potential Tornado Borne Missile Permit | |||
71111.04 Drawings | 71111.01 | ||
71111.04 Drawings | Miscellaneous | ||
71111.04 Drawings 03-M-CHP-002 P and I Diagram Chemical and Volume Control System | 5372141 | ||
71111.04 Miscellaneous TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain | Potential Tornado Borne Missile Permit | ||
71111.01 | |||
Miscellaneous | |||
5496757 | |||
Potential Tornado Borne Missile Permit | |||
71111.01 | |||
Miscellaneous | |||
5530394 | |||
Potential Tornado Borne Missile Permit | |||
71111.01 | |||
Miscellaneous | |||
5537602 | |||
Potential Tornado Borne Missile Permit | |||
71111.01 | |||
Procedures | |||
01DP-0XX01 | |||
Control and Monitoring of Potential Tornado Borne Missiles | |||
71111.01 | |||
Procedures | |||
40AO-9ZZ21 | |||
Acts Of Nature | |||
71111.04 | |||
Corrective Action | |||
Documents | |||
2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23- | |||
07107 | |||
71111.04 | |||
Drawings | |||
2-M-DFP-001 | |||
P & I Diagram Diesel Fuel Oil & Transfer System | |||
71111.04 | |||
Drawings | |||
2-M-DGP-001 | |||
P & I Diagram Diesel Generator System | |||
71111.04 | |||
Drawings | |||
03-M-CHP-002 | |||
P and I Diagram Chemical and Volume Control System | |||
71111.04 | |||
Miscellaneous | |||
TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain | |||
Solenoid Isolation Valve | Solenoid Isolation Valve | ||
71111.04 Miscellaneous PVNGS DBM - Chemical and Volume Control System | 05/03/2023 | ||
71111.04 Procedures 40OP-9CH01 CVCS Normal Operations | 71111.04 | ||
71111.04 Procedures 40OP-9DF01 Diesel Fuel Oil Storage and Transfer (DF) | Miscellaneous | ||
71111.04 Procedures 40OP-9DG02 Emergency Diesel Generator B | PVNGS DBM - Chemical and Volume Control System | ||
71111.04 Procedures 40OP-9SP02 Essential Spray Pond (SP) B | 71111.04 | ||
71111.04 Work Orders 5448137, 5448135 | Procedures | ||
71111.05 Calculations 13-MC-FP-0809 Combustible Loads - Auxiliary Building | 40OP-9CH01 | ||
71111.05 Corrective Action 23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23- | CVCS Normal Operations | ||
71111.04 | |||
Procedures | |||
40OP-9DF01 | |||
Diesel Fuel Oil Storage and Transfer (DF) | |||
71111.04 | |||
Procedures | |||
40OP-9DG02 | |||
Emergency Diesel Generator B | |||
71111.04 | |||
Procedures | |||
40OP-9SP02 | |||
Essential Spray Pond (SP) B | |||
71111.04 | |||
Work Orders | |||
5448137, 5448135 | |||
71111.05 | |||
Calculations | |||
13-MC-FP-0809 | |||
Combustible Loads - Auxiliary Building | |||
71111.05 | |||
Corrective Action | |||
Documents | |||
23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23- | |||
05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999, | |||
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23- | 23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23- | ||
2690, 23-02692 | 2690, 23-02692 | ||
71111.05 Fire Plans Pre-fire Strategies Manual | 71111.05 | ||
71111.05 Miscellaneous Critique Letter from Darrin Green, Battalion Chief - Threat | Fire Plans | ||
Pre-fire Strategies Manual | |||
71111.05 | |||
Miscellaneous | |||
Critique Letter from Darrin Green, Battalion Chief - Threat | |||
Liaison Officer, Goodyear Fire Department, to Scott Martin, | Liaison Officer, Goodyear Fire Department, to Scott Martin, | ||
Training Officer, Palo Verde Nuclear Generating Station | Training Officer, Palo Verde Nuclear Generating Station | ||
71111.05 Miscellaneous 5563638 Open Door Permit | 06/24/2021 | ||
71111.05 Miscellaneous NPL41-D-2Q1B-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B 05/17/2023 | 71111.05 | ||
Miscellaneous | |||
5563638 | |||
Open Door Permit | |||
71111.05 | |||
Miscellaneous | |||
NPL41-D-2Q1B- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B | |||
05/17/2023 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Shift Drill Scenario | Shift Drill Scenario | ||
71111.05 Miscellaneous NPL41-D-2Q1B-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B | 71111.05 | ||
Miscellaneous | |||
NPL41-D-2Q1B- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B | |||
Shift Summary/After Action Review Report for Regulatory | Shift Summary/After Action Review Report for Regulatory | ||
Fire Drill | Fire Drill | ||
71111.05 Miscellaneous NPL41-D-2Q2C-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C | 07/12/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-2Q2C- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C | |||
Shift Summary/After Action Review Report for Regulatory | Shift Summary/After Action Review Report for Regulatory | ||
Fire Drill | Fire Drill | ||
71111.05 Miscellaneous NPL41-D-2Q3A-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A | 07/12/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-2Q3A- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A | |||
Shift Drill Scenario | Shift Drill Scenario | ||
71111.05 Miscellaneous NPL41-D-2Q3A-Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A | 06/20/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-2Q3A- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A | |||
Shift Summary/After Action Review Report for Regulatory | Shift Summary/After Action Review Report for Regulatory | ||
Fire Drill | Fire Drill | ||
71111.05 Miscellaneous NPL41-D-3Q1A-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A | 07/06/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-3Q1A- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A | |||
Shift Drill Scenario | Shift Drill Scenario | ||
71111.05 Miscellaneous NPL41-D-3Q1A-Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A | 07/20/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-3Q1A- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A | |||
Shift Summary/After Action Review Report for Regulatory | Shift Summary/After Action Review Report for Regulatory | ||
Fire Drill | Fire Drill | ||
71111.05 Miscellaneous NPL41-D-3Q2B-Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B | 08/23/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-3Q2B- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B | |||
Shift Drill Scenario | Shift Drill Scenario | ||
71111.05 Miscellaneous NPL41-D-3Q2B-Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B | 08/03/2023 | ||
71111.05 | |||
Miscellaneous | |||
NPL41-D-3Q2B- | |||
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B | |||
Shift Summary/After Action Review Report for Regulatory | Shift Summary/After Action Review Report for Regulatory | ||
Fire Drill | Fire Drill | ||
71111.05 Procedures 14DP-0FP01 Firewatch Requirements | 08/29/2023 | ||
71111.05 Procedures 14DP-0FP32 Emergency Notification and Response | 71111.05 | ||
71111.05 Procedures 14DP-0FP33 Control of Transient Combustibles | Procedures | ||
71111.05 Procedures 14FT-9FP61 Semi-Annual Operational Test of Appendix R and Appendix | 14DP-0FP01 | ||
Firewatch Requirements | |||
71111.05 | |||
Procedures | |||
14DP-0FP32 | |||
Emergency Notification and Response | |||
71111.05 | |||
Procedures | |||
14DP-0FP33 | |||
Control of Transient Combustibles | |||
71111.05 | |||
Procedures | |||
14FT-9FP61 | |||
Semi-Annual Operational Test of Appendix R and Appendix | |||
A Fire Door Closers | A Fire Door Closers | ||
71111.05 Procedures 18FT-9FP38 Functional Test of Appendix R Fire/HELB Doors | 71111.05 | ||
71111.05 Procedures 18FT-9FP39 Functional Test of Appendix A Fire/HELB Doors | Procedures | ||
71111.05 Procedures 40AO-9ZZ27 Significant Turbine Building Oil System Leaks | 18FT-9FP38 | ||
71111.05 Procedures 40DP-9ZZ17 Control of Doors, Hatches and Floor Plugs | Functional Test of Appendix R Fire/HELB Doors | ||
71111.05 Procedures 40DP-9ZZ19 Operational Considerations Due to Plant Fire | 71111.05 | ||
71111.05 Procedures 40OP-9HJ02 Control Building HVAC (Smoke Removal) | Procedures | ||
71111.05 Work Orders 5535529, 5501387 | 18FT-9FP39 | ||
Functional Test of Appendix A Fire/HELB Doors | |||
71111.05 | |||
Procedures | |||
71111.07A Corrective Action | 40AO-9ZZ27 | ||
Significant Turbine Building Oil System Leaks | |||
71111.05 | |||
Procedures | |||
40DP-9ZZ17 | |||
Control of Doors, Hatches and Floor Plugs | |||
71111.05 | |||
Procedures | |||
40DP-9ZZ19 | |||
Operational Considerations Due to Plant Fire | |||
71111.05 | |||
Procedures | |||
40OP-9HJ02 | |||
Control Building HVAC (Smoke Removal) | |||
71111.05 | |||
Work Orders | |||
5535529, 5501387 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.07A | |||
Corrective Action | |||
Documents | Documents | ||
71111.07A Miscellaneous 23-0620 U3 DGB Jacket Water Eddy Current Examination Report | 23-06257, 22-08195, 22-07864 | ||
71111.07A Procedures 73DP-9ZZ21 Heat Exchanger Visual Inspection | 71111.07A | ||
71111.07A Work Orders 5398352, 5298385, 5398411, 5396107, 5398303, 5398421, | Miscellaneous | ||
23-0620 | |||
U3 DGB Jacket Water Eddy Current Examination Report | |||
71111.07A | |||
Procedures | |||
73DP-9ZZ21 | |||
Heat Exchanger Visual Inspection | |||
71111.07A | |||
Work Orders | |||
5398352, 5298385, 5398411, 5396107, 5398303, 5398421, | |||
27973 | 27973 | ||
71111.11Q Corrective Action 13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23- | 71111.11Q | ||
Corrective Action | |||
71111.11Q Miscellaneous Specific Maneuver Plan: 258 [Effective Full Power Days] | Documents | ||
13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23- | |||
07771, 23-07823, 23-07865, 23-07874, 23-08727 | |||
71111.11Q | |||
Miscellaneous | |||
Specific Maneuver Plan: 258 [Effective Full Power Days] | |||
Downpower Unit 3 Cycle 24 | Downpower Unit 3 Cycle 24 | ||
71111.11Q Miscellaneous Adverse Condition Monitoring Plan: Unit 3 A Circulating | 71111.11Q | ||
Miscellaneous | |||
Adverse Condition Monitoring Plan: Unit 3 A Circulating | |||
Water Pump/Motor Vibrations | Water Pump/Motor Vibrations | ||
71111.11Q Miscellaneous Operator Logs: Unit 3 August 1-2, 2023 08/07/2023 | 71111.11Q | ||
71111.11Q Miscellaneous SES-0-09-A-03 Licensed Operator Continued Training Simulator Exam | Miscellaneous | ||
Operator Logs: Unit 3 August 1-2, 2023 | |||
08/07/2023 | |||
71111.11Q | |||
Miscellaneous | |||
SES-0-09-A-03 | |||
Licensed Operator Continued Training Simulator Exam | |||
Scenario | Scenario | ||
71111.11Q Procedures 40DP-9OP02 Conduct of Operations | 07/13/2023 | ||
71111.12 Corrective Action | 71111.11Q | ||
Procedures | |||
40DP-9OP02 | |||
Conduct of Operations | |||
71111.12 | |||
Corrective Action | |||
Documents | Documents | ||
71111.12 Miscellaneous Unit 2 EC PMG Unavailability Criteria Status 08/23/2023 | 21-13093, 21-15262, 23-03918, 23-03885, 23-04848 | ||
71111.12 Miscellaneous Performance Monitoring Group, Essential Chilled Water | 71111.12 | ||
Miscellaneous | |||
Unit 2 EC PMG Unavailability Criteria Status | |||
08/23/2023 | |||
71111.12 | |||
Miscellaneous | |||
Performance Monitoring Group, Essential Chilled Water | |||
Train A Unit 2 | Train A Unit 2 | ||
71111.12 Miscellaneous 13-NS-C025 Risk Informed Performance Criteria | 06/27/2023 | ||
71111.12 Miscellaneous EVT-EC-2021- | 71111.12 | ||
Miscellaneous | |||
13-NS-C025 | |||
Risk Informed Performance Criteria | |||
71111.12 | |||
Miscellaneous | |||
EVT-EC-2021- | |||
2254 | 2254 | ||
71111.12 Miscellaneous EVT-EC-2021- | Maintenance Rule Event | ||
71111.12 | |||
Miscellaneous | |||
EVT-EC-2021- | |||
414689 | 414689 | ||
71111.12 Miscellaneous EVT-EC-2023- | Maintenance Rule Event | ||
71111.12 | |||
Miscellaneous | |||
EVT-EC-2023- | |||
438568 | 438568 | ||
71111.12 Miscellaneous EVT-EC-2023- | Maintenance Rule Event | ||
71111.12 | |||
Miscellaneous | |||
EVT-EC-2023- | |||
2921 | 2921 | ||
71111.12 Miscellaneous MR 2.0 Performance Monitoring Bases Document Worksheet - | Maintenance Rule Event | ||
71111.12 | |||
Miscellaneous | |||
MR 2.0 | |||
Performance Monitoring Bases Document Worksheet - | |||
Essential Chilled Water (HVAC) | Essential Chilled Water (HVAC) | ||
71111.12 Procedures 70DP-0MR01 Maintenance Rule | 71111.12 | ||
71111.12 Procedures 70DP-0MR02 Maintenance Rule Monitoring Process | Procedures | ||
70DP-0MR01 | |||
Maintenance Rule | |||
71111.12 | |||
Procedures | |||
70DP-0MR02 | |||
Maintenance Rule Monitoring Process | |||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71111.12 Work Orders 5080139 | Type | ||
71111.15 Calculations 13-MC-FP-0315 10CFR50 Appendix R Safe Shutdown Equipment List | Designation | ||
71111.15 Corrective Action 23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23- | Description or Title | ||
Revision or | |||
Date | |||
71111.12 | |||
Work Orders | |||
5080139 | |||
71111.15 | |||
Calculations | |||
13-MC-FP-0315 | |||
10CFR50 Appendix R Safe Shutdown Equipment List | |||
71111.15 | |||
Corrective Action | |||
Documents | |||
23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23- | |||
05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749, | |||
23-05751, 23-09598 | 23-05751, 23-09598 | ||
71111.15 Drawings 01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] | 71111.15 | ||
Drawings | |||
01-E-SIB-0024 | |||
Elementary Diagram Safety Injection - Shutdown [Cooling] | |||
System containment Spray Isolation Valve 1J-SIA-HV-687 | System containment Spray Isolation Valve 1J-SIA-HV-687 | ||
71111.15 Drawings 01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] | 71111.15 | ||
Drawings | |||
01-E-SIB-0024 | |||
Elementary Diagram Safety Injection - Shutdown [Cooling] | |||
System containment Spray Isolation Valve 1J-SIA-HV-687 | System containment Spray Isolation Valve 1J-SIA-HV-687 | ||
71111.15 Drawings 13-E-ZAC-050 Conduit & Tray Notes, Symbols & Details | 71111.15 | ||
71111.15 Drawings 13-M-FPR-005 Appendix R Safety Function Diagram Chemical & Volume | Drawings | ||
13-E-ZAC-050 | |||
Conduit & Tray Notes, Symbols & Details | |||
71111.15 | |||
Drawings | |||
13-M-FPR-005 | |||
Appendix R Safety Function Diagram Chemical & Volume | |||
Control System | Control System | ||
71111.15 Drawings 13-N001-1104-SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring | 71111.15 | ||
Drawings | |||
71111.15 Drawings 13-Q-ZZP-001 EQ Configuration Drawing Limitorque Valve Actuator | 13-N001-1104- | ||
71111.15 Drawings N001-1104-Y-Type Globe Valve Stainless Steel, Socket Weld, Cres, | 271 | ||
SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring | |||
71111.15 Miscellaneous System Training Manual: Volume 40 Safety Injection System | Diagram | ||
71111.15 | |||
71111.15 Miscellaneous System Training Manual: Safety Equipment Status System | Drawings | ||
13-Q-ZZP-001 | |||
71111.15 Miscellaneous Design Basis Manual: Plant Annunciator / Safety Equipment | EQ Configuration Drawing Limitorque Valve Actuator | ||
71111.15 | |||
Drawings | |||
N001-1104- | |||
00015 | |||
Y-Type Globe Valve Stainless Steel, Socket Weld, Cres, | |||
Size: 1 Class: 1586 LB | |||
71111.15 | |||
Miscellaneous | |||
System Training Manual: Volume 40 Safety Injection System | |||
(SI) | |||
71111.15 | |||
Miscellaneous | |||
System Training Manual: Safety Equipment Status System | |||
(ES) | |||
71111.15 | |||
Miscellaneous | |||
Design Basis Manual: Plant Annunciator / Safety Equipment | |||
Status System | Status System | ||
71111.15 Miscellaneous CH and XO Maintenance Rule Scoping Diagram | 71111.15 | ||
71111.15 Miscellaneous 13-VTD-N383-BW/IP Operation and Maintenance Manual for Manual and | Miscellaneous | ||
CH and XO Maintenance Rule Scoping Diagram | |||
2/12/2013 | |||
71111.15 | |||
Miscellaneous | |||
13-VTD-N383- | |||
00019 | |||
BW/IP Operation and Maintenance Manual for Manual and | |||
Motor Operated 1, 1-1/2 and 2 High Pressure Globe | |||
Valves [PUB. #OMM2016] | Valves [PUB. #OMM2016] | ||
71111.15 Miscellaneous CH DBM Chemical and Volume Control system Design Basis Manual | 71111.15 | ||
71111.15 Miscellaneous EEQ-L200-001 Electrical Equipment Qualification Data File | Miscellaneous | ||
71111.15 Miscellaneous RSS-01-1360 Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA- | CH DBM | ||
Chemical and Volume Control system Design Basis Manual | |||
71111.15 | |||
Miscellaneous | |||
EEQ-L200-001 | |||
Electrical Equipment Qualification Data File | |||
71111.15 | |||
Miscellaneous | |||
RSS-01-1360 | |||
Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA- | |||
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp) | M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp) | ||
71111.15 Miscellaneous SB Reactor Protection System DBM | 71111.15 | ||
71111.15 Miscellaneous VTD-C490-00001 Combustion Engineering Technical Manual for Limitorque | Miscellaneous | ||
SB | |||
Reactor Protection System DBM | |||
71111.15 | |||
Miscellaneous | |||
VTD-C490-00001 | |||
Combustion Engineering Technical Manual for Limitorque | |||
Corporation Motor Operated Valve Actuators | Corporation Motor Operated Valve Actuators | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
71111.15 Procedures Molded Case Circuit Breaker Test | Description or Title | ||
71111.15 Procedures 01DP-0AP12-01 Condition Reporting Process Administrative Guideline | Revision or | ||
71111.15 Procedures | Date | ||
71111.15 Procedures 36ST-9SB32 PPS Input Loop Calibration for Parameter 20, LO RWT | [PUB.#976F[83Y3]BH] | ||
71111.15 | |||
Procedures | |||
Molded Case Circuit Breaker Test | |||
71111.15 | |||
Procedures | |||
01DP-0AP12-01 | |||
Condition Reporting Process Administrative Guideline | |||
71111.15 | |||
Procedures | |||
2MT-9ZZ74 | |||
Molded Case Circuit Breaker Test | |||
71111.15 | |||
Procedures | |||
36ST-9SB32 | |||
PPS Input Loop Calibration for Parameter 20, LO RWT | |||
LEVEL | LEVEL | ||
71111.15 Procedures 40DP-9OP26 Operations Operability Determination Process | 71111.15 | ||
71111.15 Procedures 40DP-9OP26-01 Operations Operability Determination Process Administrative | Procedures | ||
40DP-9OP26 | |||
Operations Operability Determination Process | |||
71111.15 | |||
Procedures | |||
40DP-9OP26-01 | |||
Operations Operability Determination Process Administrative | |||
Guideline | Guideline | ||
71111.15 Procedures 40ST-9CH02 Boron Injection Flow Test | 71111.15 | ||
71111.15 Procedures 70TI-9ZC01 Boric Acid Walkdown Leak Detection | Procedures | ||
71111.15 Procedures 73ST-9CH02 Charging Pumps - Comprehensive Test | 40ST-9CH02 | ||
71111.15 Work Orders 5362779, 5379047, 5561932, 5538035 | Boron Injection Flow Test | ||
71111.24 Corrective Action 23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23- | 71111.15 | ||
Procedures | |||
70TI-9ZC01 | |||
Boric Acid Walkdown Leak Detection | |||
71111.15 | |||
Procedures | |||
73ST-9CH02 | |||
Charging Pumps - Comprehensive Test | |||
71111.15 | |||
Work Orders | |||
5362779, 5379047, 5561932, 5538035 | |||
71111.24 | |||
Corrective Action | |||
Documents | |||
23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23- | |||
06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520, | |||
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23- | 23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23- | ||
08726, 23-10046 | 08726, 23-10046 | ||
71111.24 Miscellaneous FLEX SFP Pump Fluid Sample Results 09/05/2023 | 71111.24 | ||
71111.24 Miscellaneous PVGS Diverse and Flexible Coping Strategies (FLEX) | Miscellaneous | ||
FLEX SFP Pump Fluid Sample Results | |||
09/05/2023 | |||
71111.24 | |||
Miscellaneous | |||
PVGS Diverse and Flexible Coping Strategies (FLEX) | |||
Program Plan | Program Plan | ||
71111.24 Miscellaneous 13-NS-A116 Engineering Guide to NRC Post Fukushima Requirements | 71111.24 | ||
71111.24 Miscellaneous VTD-G080-00658 Vendor Technical Document: General Electric Electronic | Miscellaneous | ||
13-NS-A116 | |||
Engineering Guide to NRC Post Fukushima Requirements | |||
71111.24 | |||
Miscellaneous | |||
VTD-G080-00658 | |||
Vendor Technical Document: General Electric Electronic | |||
Speed Governor (MDT-20 Control System) | Speed Governor (MDT-20 Control System) | ||
71111.24 Miscellaneous VTD-G080-00659 Vendor Technical Document: General Electric MDT-20 | 71111.24 | ||
Miscellaneous | |||
VTD-G080-00659 | |||
Vendor Technical Document: General Electric MDT-20 | |||
Governor Setting Instructions | Governor Setting Instructions | ||
71111.24 Procedures 14MT-9BD61 FLEX SFP Makeup Pump Inspections and Tests | 71111.24 | ||
71111.24 Procedures 14MT-9BD61 FLEX SFP Makeup Pump Inspections and Tests Bases 6a | Procedures | ||
71111.24 Procedures 30DP-9WP04 Post-Maintenance Testing Development | 14MT-9BD61 | ||
71111.24 Procedures 31MT-9CH01 Charging Pump Disassembly and Assembly | FLEX SFP Makeup Pump Inspections and Tests | ||
71111.24 Procedures | 71111.24 | ||
Procedures | |||
14MT-9BD61 | |||
FLEX SFP Makeup Pump Inspections and Tests Bases | |||
6a | |||
71111.24 | |||
Procedures | |||
30DP-9WP04 | |||
Post-Maintenance Testing Development | |||
71111.24 | |||
Procedures | |||
31MT-9CH01 | |||
Charging Pump Disassembly and Assembly | |||
71111.24 | |||
Procedures | |||
2MT-9PE01 | |||
Cleaning, Inspection, and Testing of the Class 1E Diesel | |||
Generator | Generator | ||
71111.24 Procedures 40DP-9OP08 Diesel Generator Test Record | 71111.24 | ||
71111.24 Procedures 40OP-9CH01 CVCS Normal Operations | Procedures | ||
40DP-9OP08 | |||
Diesel Generator Test Record | |||
71111.24 | |||
Procedures | |||
40OP-9CH01 | |||
CVCS Normal Operations | |||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71111.24 Procedures 40OP-9DF01 Diesel Fuel Oil Storage and Transfer (DF) | Type | ||
71111.24 Procedures 40OP-9DG02 Emergency Diesel Generator B | Designation | ||
71111.24 Procedures 40OP-9FT01 Feedwater Pump Turbine A | Description or Title | ||
71111.24 Procedures 40ST-9DG02 Diesel Generator B Test | Revision or | ||
71111.24 Procedures 73DP-9XI01 Pump and Valve Inservice Testing Program | Date | ||
71111.24 Procedures 73DP-9ZZ14 Surveillance Testing | 71111.24 | ||
71111.24 Procedures 73ST-9CH06 Charging Pumps - Inservice Test | Procedures | ||
71111.24 Procedures 73ST-9DF02 Diesel Fuel Oil Transfer Pumps - Comprehensive Pump | 40OP-9DF01 | ||
Diesel Fuel Oil Storage and Transfer (DF) | |||
71111.24 | |||
Procedures | |||
40OP-9DG02 | |||
Emergency Diesel Generator B | |||
71111.24 | |||
Procedures | |||
40OP-9FT01 | |||
Feedwater Pump Turbine A | |||
71111.24 | |||
Procedures | |||
40ST-9DG02 | |||
Diesel Generator B Test | |||
71111.24 | |||
Procedures | |||
73DP-9XI01 | |||
Pump and Valve Inservice Testing Program | |||
71111.24 | |||
Procedures | |||
73DP-9ZZ14 | |||
Surveillance Testing | |||
71111.24 | |||
Procedures | |||
73ST-9CH06 | |||
Charging Pumps - Inservice Test | |||
71111.24 | |||
Procedures | |||
73ST-9DF02 | |||
Diesel Fuel Oil Transfer Pumps - Comprehensive Pump | |||
Test | Test | ||
71111.24 Procedures 73ST-9ST06 Containment Spray Pumps and Check Valves - Inservice | 71111.24 | ||
Procedures | |||
73ST-9ST06 | |||
Containment Spray Pumps and Check Valves - Inservice | |||
Test | Test | ||
71111.24 Work Orders 5398306, 5398390, 5427973, 5536211, 5551182, 5539323, | 71111.24 | ||
Work Orders | |||
5398306, 5398390, 5427973, 5536211, 5551182, 5539323, | |||
5442500, 5443639, 5453624, 5448003, 5448007, 5549702, | 5442500, 5443639, 5453624, 5448003, 5448007, 5549702, | ||
5555891, 5446696, 5446673, 5446695, 5446700, 5459882 | 5555891, 5446696, 5446673, 5446695, 5446700, 5459882 | ||
71114.06 Corrective Action 23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23- | 71114.06 | ||
Corrective Action | |||
71114.06 Miscellaneous Emergency Preparedness 2304 Drill Report - Drill Date Aug | Documents | ||
23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23- | |||
08194, 23-08198, 23-08275, 23-09186 | |||
71114.06 | |||
Miscellaneous | |||
Emergency Preparedness 2304 Drill Report - Drill Date Aug | |||
8, 2023 | 8, 2023 | ||
71114.06 Miscellaneous EP-0801H [Emergency Action Level] Classification Matrix Hot | 09/08/2023 | ||
71114.06 | |||
Miscellaneous | |||
EP-0801H | |||
[Emergency Action Level] Classification Matrix Hot | |||
Conditions ([Reactor Coolant System] > 210°F) | Conditions ([Reactor Coolant System] > 210°F) | ||
71114.06 Miscellaneous EP-0803H [Protective Action Recommendation] Flowchart | 71114.06 | ||
71114.06 Miscellaneous EP-0804G Release Evaluation Flowchart | Miscellaneous | ||
71114.06 Miscellaneous EP-0930B [Emergency Action Level] Classification Matrix All Conditions | EP-0803H | ||
71114.06 Procedures EP-0900-012 ERO Positions - Engineering Director (EOF) | [Protective Action Recommendation] Flowchart | ||
71151 Corrective Action | 71114.06 | ||
Miscellaneous | |||
EP-0804G | |||
Release Evaluation Flowchart | |||
71114.06 | |||
Miscellaneous | |||
EP-0930B | |||
[Emergency Action Level] Classification Matrix All Conditions | |||
71114.06 | |||
Procedures | |||
EP-0900-012 | |||
ERO Positions - Engineering Director (EOF) | |||
71151 | |||
Corrective Action | |||
Documents | Documents | ||
71151 Miscellaneous Units 1, 2, and 3 PI Summary Report MS06-10 07/2022- | 21-06710, 21-12485, 22-03043, 22-07259 | ||
71151 | |||
Miscellaneous | |||
Units 1, 2, and 3 PI Summary Report MS06-10 07/2022- | |||
06/2023 | 06/2023 | ||
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report July 2022 08/04/2023 | 08/03/2023 | ||
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report February 2023 08/04/2023 | 71151 | ||
71151 Miscellaneous Units 1, 2, and 3 MSPI Margin Report May 2023 08/04/2023 | Miscellaneous | ||
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | Units 1, 2, and 3 MSPI Margin Report July 2022 | ||
08/04/2023 | |||
71151 | |||
Miscellaneous | |||
Units 1, 2, and 3 MSPI Margin Report February 2023 | |||
08/04/2023 | |||
71151 | |||
Miscellaneous | |||
Units 1, 2, and 3 MSPI Margin Report May 2023 | |||
08/04/2023 | |||
71151 | |||
Miscellaneous | |||
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: PLE August 2022 | Reports: PLE August 2022 | ||
08/04/2023 | |||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | Type | ||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71151 | |||
Miscellaneous | |||
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: UAI August 2022 | Reports: UAI August 2022 | ||
71151 Miscellaneous Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: URI August 2022 | Reports: URI August 2022 | ||
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: PLE June 2023 | Reports: PLE June 2023 | ||
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: UAI June 2023 | Reports: UAI June 2023 | ||
71151 Miscellaneous Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: URI June 2023 | Reports: URI June 2023 | ||
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: PLE April 2023 | Reports: PLE April 2023 | ||
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: UAI April 2023 | Reports: UAI April 2023 | ||
71151 Miscellaneous Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | 08/04/2023 | ||
71151 | |||
Miscellaneous | |||
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation | |||
Reports: URI April 2023 | Reports: URI April 2023 | ||
71151 Miscellaneous 13-NS-C075 MSPI Bases Document | 08/04/2023 | ||
71151 Procedures 70DP-0MR01 Maintenance Rule | 71151 | ||
71151 Procedures 70DP-0MR01 Maintenance Rule | Miscellaneous | ||
71151 Procedures 70DP-0MR01 Maintenance Rule | 13-NS-C075 | ||
71151 Procedures 70DP-0PI01 Performance Index Data Mitigating Systems Cornerstone | MSPI Bases Document | ||
71151 Procedures 70DP-0PI01 Performance Index Data Mitigating Systems Cornerstone | 71151 | ||
71151 Procedures 93DP-0LC09 NRC ROP PI Data Collection, Verification and Submittal | Procedures | ||
71152A Corrective Action | 70DP-0MR01 | ||
Maintenance Rule | |||
71151 | |||
Procedures | |||
70DP-0MR01 | |||
Maintenance Rule | |||
71151 | |||
Procedures | |||
70DP-0MR01 | |||
Maintenance Rule | |||
71151 | |||
Procedures | |||
70DP-0PI01 | |||
Performance Index Data Mitigating Systems Cornerstone | |||
71151 | |||
Procedures | |||
70DP-0PI01 | |||
Performance Index Data Mitigating Systems Cornerstone | |||
71151 | |||
Procedures | |||
93DP-0LC09 | |||
NRC ROP PI Data Collection, Verification and Submittal | |||
71152A | |||
Corrective Action | |||
Documents | Documents | ||
71152A Miscellaneous Pre-Fire Strategies Manual | 2-03027, 23-05330, 23-05514 | ||
71152A Miscellaneous Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire | 71152A | ||
Miscellaneous | |||
Pre-Fire Strategies Manual | |||
71152A | |||
Miscellaneous | |||
Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire | |||
Detector TRM Change | Detector TRM Change | ||
71152A Miscellaneous FPCRR, Fire Hose Removal Fire Protection Change | 05/12/2023 | ||
71152A | |||
Miscellaneous | |||
FPCRR, Fire Hose Removal Fire Protection Change | |||
Regulatory Review | Regulatory Review | ||
71152A Miscellaneous | 08/09/2022 | ||
71152A Miscellaneous | 71152A | ||
71152A Miscellaneous Generic Letter | Miscellaneous | ||
2-05627 | |||
APS Commitment Letter | |||
01/11/2027 | |||
71152A | |||
Miscellaneous | |||
2-R002/22-F009 | |||
LDCR Review Packages | |||
71152A | |||
Miscellaneous | |||
Generic Letter | |||
86-10 | 86-10 | ||
Implementation of Fire Protection Requirements | |||
Inspection Type Designation Description or Title Revision or | Inspection | ||
Procedure | |||
71152A Miscellaneous Generic Letter Removal of Fire Protection Requirements from Technical | Type | ||
Designation | |||
71152A Miscellaneous NFPA 14 Standpipe and Hose Systems 1976 | Description or Title | ||
71152A Miscellaneous NFPA 14 Installation of Standpipe and Hose Systems 2019 | Revision or | ||
71152A Procedures 40AO-9ZZ19 Control Room Fire | Date | ||
71152A Procedures 40DP-9ZZ19 Operational Considerations Due to Plant Fire | 71152A | ||
71152A Procedures 40MG-9ZZ05-002 Mitigating Guidelines Supplemental Strategies | Miscellaneous | ||
71153 Corrective Action | Generic Letter | ||
88-12 | |||
Removal of Fire Protection Requirements from Technical | |||
Specifications | |||
71152A | |||
Miscellaneous | |||
NFPA 14 | |||
Standpipe and Hose Systems | |||
1976 | |||
71152A | |||
Miscellaneous | |||
NFPA 14 | |||
Installation of Standpipe and Hose Systems | |||
2019 | |||
71152A | |||
Procedures | |||
40AO-9ZZ19 | |||
Control Room Fire | |||
71152A | |||
Procedures | |||
40DP-9ZZ19 | |||
Operational Considerations Due to Plant Fire | |||
71152A | |||
Procedures | |||
40MG-9ZZ05-002 | |||
Mitigating Guidelines Supplemental Strategies | |||
71153 | |||
Corrective Action | |||
Documents | Documents | ||
71153 Miscellaneous Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023, | 23-07440, 23-07500, 23-07791, 23-07845 | ||
71153 | |||
Miscellaneous | |||
Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023, | |||
0600 | 0600 | ||
71153 Miscellaneous Dose Assessment User Manual | 07/19/2023 | ||
71153 Miscellaneous Event Reporting Manual | 71153 | ||
71153 Miscellaneous 2-23-034 Compensatory Action Document 07/29/2023 | Miscellaneous | ||
71153 Procedures 16DP-0EP31 Emergency Preparedness Equipment Out of Service | Dose Assessment User Manual | ||
71153 Procedures 40AO-9ZZ08 Load Rejection | 71153 | ||
71153 Procedures 40DP-9OP02 Conduct of Operations 77 | Miscellaneous | ||
Event Reporting Manual | |||
71153 | |||
Miscellaneous | |||
2-23-034 | |||
Compensatory Action Document | |||
07/29/2023 | |||
71153 | |||
Procedures | |||
16DP-0EP31 | |||
Emergency Preparedness Equipment Out of Service | |||
71153 | |||
Procedures | |||
40AO-9ZZ08 | |||
Load Rejection | |||
71153 | |||
Procedures | |||
40DP-9OP02 | |||
Conduct of Operations | |||
77 | |||
}} | }} | ||
Latest revision as of 17:08, 2 January 2025
| ML23285A245 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/17/2023 |
| From: | John Dixon NRC/RGN-IV/DORS/PBD |
| To: | Heflin A Arizona Public Service Co |
| References | |
| IR 2023003 | |
| Download: ML23285A245 (18) | |
Text
October 17, 2023
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2023003 AND 05000529/2023003 AND 05000530/2023003
Dear Adam Heflin:
On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On October 6, 2023, the NRC inspectors discussed the results of this inspection with Todd Horton, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000528, 05000529 and 05000530
License Numbers:
Report Numbers:
05000528/2023003, 05000529/2023003 and 05000530/2023003
Enterprise Identifier:
I-2023-003-0008
Licensee:
Arizona Public Service
Facility:
Palo Verde Nuclear Generating Station
Location:
Tonopah, AZ
Inspection Dates:
July 1, 2023 to September 30, 2023
Inspectors:
L. Merker, Senior Resident Inspector
E. Lantz, Resident Inspector
N. Cuevas, Resident Inspector
J. Dykert, Health Physicist
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 entered the inspection period at full power. On September 26, 2023, the unit began a coastdown for refueling outage 1R24 and ended the inspection period at approximately 95 percent power.
Unit 2 operated at or near full power for the duration of the inspection period.
Unit 3 entered the inspection period at full power. On July 18, 2023, the unit experienced a partial load reject to approximately 87 percent power due to main turbine control valve number 4 going full closed and stabilized at 88 percent power on July 19, 2023. On July 21, 2023, the operators raised power to 90 percent power. On July 30, 2023, the operators lowered power to 40 percent power to perform tube leak repairs in condenser hotwell 2A. On August 2, 2023, the operators lowered power to 12 percent power to take the main turbine offline and restore main turbine control valve number 4. On August 4, 2023, the unit returned to full power, where it remained for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending monsoon thunderstorms, on August 18, 2023.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 3, chemical and volume control system following maintenance on charging pump A, on September 13, 2023
- (2) Unit 2, emergency diesel generator train B, during emergency diesel generator train A maintenance outage, on September 29, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2, control building 100-foot elevation, fire zones 5A, 5B, 6A, 6B, 8A,10A, and 10B, on July 20, 2023
- (2) Unit 1, auxiliary building 120-foot elevation, fire zones 47A, 51B, 52A, 52D, and 54, on August 17, 2023
- (3) Units 1 and 3, class 1E 125 Vdc equipment rooms, fire zones 6A, 6B, 7A, and 7B, on August 22, 2023
- (4) Unit 2, auxiliary building west corridor, train A and B piping penetration rooms, fire zones 37A, 37C and 37D, on September 15, 2023
- (5) Unit 2, emergency diesel generator room train A, fire zone 21A, on September 27, 2023
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire department training and performance during announced fire drills on July 21, 2023, and August 4, 2023.
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Unit 3, emergency diesel generator train B, jacket water heat exchanger, on July 25, 2023
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
- (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator continued training simulator exam activities, on August 24, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 2, essential chilled water train A, on August 25, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 3, boration flow path functionality determination due to boric acid makeup pump to volume control tank bypass line check valve, CHA-V177, failed bi-directional close test, on August 1, 2023
- (2) Unit 3, engineered safety features actuation system channel D operability determination due to refueling water tank low level bistable setpoint spiking, on September 6, 2023
- (3) Unit 2, shutdown cooling suction valve, SIB-UV-675, from containment recirculation sump train B operability determination due to degraded conduit connection to valve actuator, on September 7, 2023
- (4) Unit 1, containment spray train A valves SIA-HV-678, SIA-HV-684, and SIA-HV-687, operability determinations following a safety equipment inoperable status panel alarm, on September 8, 2023
- (5) Unit 1, safety injection tank 2B level transmitter high pressure root valve operability determination due to excessive boric acid residue on packing gland, on September 29, 2023
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)
- (1) Unit 3, emergency diesel generator train B post-maintenance testing following maintenance outage, on July 31, 2023
- (2) Unit 2, main feedwater pump A post-maintenance testing following turbine governor pilot valve, linear variable differential transformer, and servo valve replacement, on July 31, 2023
- (3) Unit 3, main turbine control valve 4 post-maintenance testing following replacement of shorted signal cable, on August 7, 2023
- (4) Unit 3, charging pump E post-maintenance testing following maintenance outage, on September 28, 2023
Surveillance Testing (IP Section 03.01) (1 Sample)
- (1) Unit 2, diesel generator fuel oil transfer pump A comprehensive pump test, on September 29, 2023
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) Unit 2, containment spray pump B inservice testing, on September 1, 2023
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
- (1) Units 1, 2, and 3, and N+1 diverse and flexible coping strategies spent fuel pool makeup pump testing, on September 22, 2023
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill, on August 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
- (2) Unit 2 (July 1, 2022, through June 30, 2023)
- (3) Unit 3 (July 1, 2022, through June 30, 2023)
MS07: High Pressure Injection Systems (IP Section 02.06) (3 Samples)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
- (2) Unit 2 (July 1, 2022, through June 30, 2023)
- (3) Unit 3 (July 1, 2022, through June 30, 2023)
MS08: Heat Removal Systems (IP Section 02.07) (3 Samples)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
- (2) Unit 2 (July 1, 2022, through June 30, 2023)
- (3) Unit 3 (July 1, 2022, through June 30, 2023)
MS09: Residual Heat Removal Systems (IP Section 02.08) (3 Samples)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
- (2) Unit 2 (July 1, 2022, through June 30, 2023)
- (3) Unit 3 (July 1, 2022, through June 30, 2023)
MS10: Cooling Water Support Systems (IP Section 02.09) (3 Samples)
- (1) Unit 1 (July 1, 2022, through June 30, 2023)
- (2) Unit 2 (July 1, 2022, through June 30, 2023)
- (3) Unit 3 (July 1, 2022, through June 30, 2023)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
- (1) Units 1, 2, and 3, review of actions associated with removal of fire hoses from plant fire hose stations, on September 28, 2023
71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03)
- (1) The inspectors evaluated the Unit 3 partial load reject to 87 percent power due to main turbine control valve number 4 going closed at full power and the licensees response, on July 18, 2023.
Reporting (IP section 03.05) (1 Sample)
- (1) The inspectors evaluated the reportability of the Unit 2 steam generator 2 main steam line radiation monitor, RU-140, channels 1 and 2 being inoperable at the same time, on August 2,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 6, 2023, the inspectors presented the integrated inspection results to Todd Horton, Senior Vice President, Site Operations, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
240822
Potential Tornado Borne Missile Permit
Miscellaneous
5372141
Potential Tornado Borne Missile Permit
Miscellaneous
5496757
Potential Tornado Borne Missile Permit
Miscellaneous
5530394
Potential Tornado Borne Missile Permit
Miscellaneous
5537602
Potential Tornado Borne Missile Permit
Procedures
Control and Monitoring of Potential Tornado Borne Missiles
Procedures
Acts Of Nature
Corrective Action
Documents
2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-
07107
Drawings
2-M-DFP-001
P & I Diagram Diesel Fuel Oil & Transfer System
Drawings
2-M-DGP-001
P & I Diagram Diesel Generator System
Drawings
03-M-CHP-002
P and I Diagram Chemical and Volume Control System
Miscellaneous
TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain
Solenoid Isolation Valve
05/03/2023
Miscellaneous
PVNGS DBM - Chemical and Volume Control System
Procedures
CVCS Normal Operations
Procedures
Diesel Fuel Oil Storage and Transfer (DF)
Procedures
Procedures
Essential Spray Pond (SP) B
Work Orders
5448137, 5448135
Calculations
13-MC-FP-0809
Combustible Loads - Auxiliary Building
Corrective Action
Documents
23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-
05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-
2690, 23-02692
Fire Plans
Pre-fire Strategies Manual
Miscellaneous
Critique Letter from Darrin Green, Battalion Chief - Threat
Liaison Officer, Goodyear Fire Department, to Scott Martin,
Training Officer, Palo Verde Nuclear Generating Station
06/24/2021
Miscellaneous
5563638
Open Door Permit
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
05/17/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Shift Drill Scenario
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
Shift Summary/After Action Review Report for Regulatory
Fire Drill
07/12/2023
Miscellaneous
NPL41-D-2Q2C-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C
Shift Summary/After Action Review Report for Regulatory
Fire Drill
07/12/2023
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Drill Scenario
06/20/2023
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Summary/After Action Review Report for Regulatory
Fire Drill
07/06/2023
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Drill Scenario
07/20/2023
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Summary/After Action Review Report for Regulatory
Fire Drill
08/23/2023
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Drill Scenario
08/03/2023
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Summary/After Action Review Report for Regulatory
Fire Drill
08/29/2023
Procedures
Firewatch Requirements
Procedures
Emergency Notification and Response
Procedures
Control of Transient Combustibles
Procedures
Semi-Annual Operational Test of Appendix R and Appendix
A Fire Door Closers
Procedures
Functional Test of Appendix R Fire/HELB Doors
Procedures
Functional Test of Appendix A Fire/HELB Doors
Procedures
Significant Turbine Building Oil System Leaks
Procedures
Control of Doors, Hatches and Floor Plugs
Procedures
Operational Considerations Due to Plant Fire
Procedures
Control Building HVAC (Smoke Removal)
Work Orders
5535529, 5501387
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
23-06257, 22-08195, 22-07864
Miscellaneous
23-0620
U3 DGB Jacket Water Eddy Current Examination Report
Procedures
Heat Exchanger Visual Inspection
Work Orders
5398352, 5298385, 5398411, 5396107, 5398303, 5398421,
27973
Corrective Action
Documents
13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-
07771, 23-07823, 23-07865, 23-07874, 23-08727
Miscellaneous
Specific Maneuver Plan: 258 [Effective Full Power Days]
Downpower Unit 3 Cycle 24
Miscellaneous
Adverse Condition Monitoring Plan: Unit 3 A Circulating
Water Pump/Motor Vibrations
Miscellaneous
Operator Logs: Unit 3 August 1-2, 2023
08/07/2023
Miscellaneous
SES-0-09-A-03
Licensed Operator Continued Training Simulator Exam
Scenario
07/13/2023
Procedures
Conduct of Operations
Corrective Action
Documents
21-13093, 21-15262, 23-03918, 23-03885, 23-04848
Miscellaneous
Unit 2 EC PMG Unavailability Criteria Status
08/23/2023
Miscellaneous
Performance Monitoring Group, Essential Chilled Water
Train A Unit 2
06/27/2023
Miscellaneous
13-NS-C025
Risk Informed Performance Criteria
Miscellaneous
EVT-EC-2021-
2254
Maintenance Rule Event
Miscellaneous
EVT-EC-2021-
414689
Maintenance Rule Event
Miscellaneous
EVT-EC-2023-
438568
Maintenance Rule Event
Miscellaneous
EVT-EC-2023-
2921
Maintenance Rule Event
Miscellaneous
MR 2.0
Performance Monitoring Bases Document Worksheet -
Essential Chilled Water (HVAC)
Procedures
Maintenance Rule
Procedures
Maintenance Rule Monitoring Process
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
5080139
Calculations
13-MC-FP-0315
10CFR50 Appendix R Safe Shutdown Equipment List
Corrective Action
Documents
23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-
05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,
23-05751, 23-09598
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
Drawings
13-E-ZAC-050
Conduit & Tray Notes, Symbols & Details
Drawings
13-M-FPR-005
Appendix R Safety Function Diagram Chemical & Volume
Control System
Drawings
13-N001-1104-
271
SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring
Diagram
Drawings
13-Q-ZZP-001
EQ Configuration Drawing Limitorque Valve Actuator
Drawings
N001-1104-
00015
Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,
Size: 1 Class: 1586 LB
Miscellaneous
System Training Manual: Volume 40 Safety Injection System
(SI)
Miscellaneous
System Training Manual: Safety Equipment Status System
(ES)
Miscellaneous
Design Basis Manual: Plant Annunciator / Safety Equipment
Status System
Miscellaneous
CH and XO Maintenance Rule Scoping Diagram
2/12/2013
Miscellaneous
13-VTD-N383-
00019
BW/IP Operation and Maintenance Manual for Manual and
Motor Operated 1, 1-1/2 and 2 High Pressure Globe
Valves [PUB. #OMM2016]
Miscellaneous
CH DBM
Chemical and Volume Control system Design Basis Manual
Miscellaneous
EEQ-L200-001
Electrical Equipment Qualification Data File
Miscellaneous
RSS-01-1360
Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)
Miscellaneous
Miscellaneous
VTD-C490-00001
Combustion Engineering Technical Manual for Limitorque
Corporation Motor Operated Valve Actuators
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
[PUB.#976F[83Y3]BH]
Procedures
Molded Case Circuit Breaker Test
Procedures
Condition Reporting Process Administrative Guideline
Procedures
Molded Case Circuit Breaker Test
Procedures
PPS Input Loop Calibration for Parameter 20, LO RWT
LEVEL
Procedures
Operations Operability Determination Process
Procedures
Operations Operability Determination Process Administrative
Guideline
Procedures
Boron Injection Flow Test
Procedures
Boric Acid Walkdown Leak Detection
Procedures
Charging Pumps - Comprehensive Test
Work Orders
5362779, 5379047, 5561932, 5538035
Corrective Action
Documents
23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-
06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-
08726, 23-10046
Miscellaneous
FLEX SFP Pump Fluid Sample Results
09/05/2023
Miscellaneous
PVGS Diverse and Flexible Coping Strategies (FLEX)
Program Plan
Miscellaneous
13-NS-A116
Engineering Guide to NRC Post Fukushima Requirements
Miscellaneous
VTD-G080-00658
Vendor Technical Document: General Electric Electronic
Speed Governor (MDT-20 Control System)
Miscellaneous
VTD-G080-00659
Vendor Technical Document: General Electric MDT-20
Governor Setting Instructions
Procedures
FLEX SFP Makeup Pump Inspections and Tests
Procedures
FLEX SFP Makeup Pump Inspections and Tests Bases
6a
Procedures
Post-Maintenance Testing Development
Procedures
Charging Pump Disassembly and Assembly
Procedures
Cleaning, Inspection, and Testing of the Class 1E Diesel
Generator
Procedures
Diesel Generator Test Record
Procedures
CVCS Normal Operations
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Diesel Fuel Oil Storage and Transfer (DF)
Procedures
Procedures
Feedwater Pump Turbine A
Procedures
Diesel Generator B Test
Procedures
Pump and Valve Inservice Testing Program
Procedures
Surveillance Testing
Procedures
Charging Pumps - Inservice Test
Procedures
Diesel Fuel Oil Transfer Pumps - Comprehensive Pump
Test
Procedures
Containment Spray Pumps and Check Valves - Inservice
Test
Work Orders
5398306, 5398390, 5427973, 5536211, 5551182, 5539323,
5442500, 5443639, 5453624, 5448003, 5448007, 5549702,
5555891, 5446696, 5446673, 5446695, 5446700, 5459882
Corrective Action
Documents
23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-
08194, 23-08198, 23-08275, 23-09186
Miscellaneous
Emergency Preparedness 2304 Drill Report - Drill Date Aug
8, 2023
09/08/2023
Miscellaneous
[Emergency Action Level] Classification Matrix Hot
Conditions ([Reactor Coolant System] > 210°F)
Miscellaneous
[Protective Action Recommendation] Flowchart
Miscellaneous
Release Evaluation Flowchart
Miscellaneous
[Emergency Action Level] Classification Matrix All Conditions
Procedures
ERO Positions - Engineering Director (EOF)
71151
Corrective Action
Documents
21-06710, 21-12485, 22-03043, 22-07259
71151
Miscellaneous
Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-
06/2023
08/03/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report July 2022
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report February 2023
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report May 2023
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE August 2022
08/04/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI August 2022
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI August 2022
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE June 2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI June 2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI June 2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE April 2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI April 2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI April 2023
08/04/2023
71151
Miscellaneous
13-NS-C075
MSPI Bases Document
71151
Procedures
Maintenance Rule
71151
Procedures
Maintenance Rule
71151
Procedures
Maintenance Rule
71151
Procedures
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
NRC ROP PI Data Collection, Verification and Submittal
Corrective Action
Documents
2-03027, 23-05330, 23-05514
Miscellaneous
Pre-Fire Strategies Manual
Miscellaneous
Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire
Detector TRM Change
05/12/2023
Miscellaneous
FPCRR, Fire Hose Removal Fire Protection Change
Regulatory Review
08/09/2022
Miscellaneous
2-05627
APS Commitment Letter
01/11/2027
Miscellaneous
2-R002/22-F009
LDCR Review Packages
Miscellaneous
Implementation of Fire Protection Requirements
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Removal of Fire Protection Requirements from Technical
Specifications
Miscellaneous
Standpipe and Hose Systems
1976
Miscellaneous
Installation of Standpipe and Hose Systems
2019
Procedures
Control Room Fire
Procedures
Operational Considerations Due to Plant Fire
Procedures
Mitigating Guidelines Supplemental Strategies
Corrective Action
Documents
23-07440, 23-07500, 23-07791, 23-07845
Miscellaneous
Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023,
0600
07/19/2023
Miscellaneous
Dose Assessment User Manual
Miscellaneous
Event Reporting Manual
Miscellaneous
2-23-034
Compensatory Action Document
07/29/2023
Procedures
Emergency Preparedness Equipment Out of Service
Procedures
Load Rejection
Procedures
Conduct of Operations
77