IR 05000528/2023003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 28: Line 28:
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Dixon, John on 10/17/23 John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000528, 05000529 and 05000530 License Numbers: NPF-41, NPF-51 and NPF-74 Report Numbers: 05000528/2023003, 05000529/2023003 and 05000530/2023003 Enterprise Identifier: I-2023-003-0008 Licensee: Arizona Public Service Facility: Palo Verde Nuclear Generating Station Location: Tonopah, AZ Inspection Dates: July 1, 2023 to September 30, 2023 Inspectors: L. Merker, Senior Resident Inspector E. Lantz, Resident Inspector N. Cuevas, Resident Inspector J. Dykert, Health Physicist Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Enclosure
Docket Numbers:
05000528, 05000529 and 05000530
License Numbers:
NPF-41, NPF-51 and NPF-74
Report Numbers:
05000528/2023003, 05000529/2023003 and 05000530/2023003
Enterprise Identifier:
I-2023-003-0008
Licensee:
Arizona Public Service
Facility:
Palo Verde Nuclear Generating Station
Location:
Tonopah, AZ
Inspection Dates:
July 1, 2023 to September 30, 2023
Inspectors:
L. Merker, Senior Resident Inspector
E. Lantz, Resident Inspector
N. Cuevas, Resident Inspector
J. Dykert, Health Physicist
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety


=SUMMARY=
=SUMMARY=
Line 40: Line 64:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 58: Line 81:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-             significant systems from impending monsoon thunderstorms, on August 18, 2023.
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending monsoon thunderstorms, on August 18, 2023.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
Line 72: Line 92:


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 79: Line 98:
: (3) Units 1 and 3, class 1E 125 Vdc equipment rooms, fire zones 6A, 6B, 7A, and 7B, on August 22, 2023
: (3) Units 1 and 3, class 1E 125 Vdc equipment rooms, fire zones 6A, 6B, 7A, and 7B, on August 22, 2023
: (4) Unit 2, auxiliary building west corridor, train A and B piping penetration rooms, fire zones 37A, 37C and 37D, on September 15, 2023
: (4) Unit 2, auxiliary building west corridor, train A and B piping penetration rooms, fire zones 37A, 37C and 37D, on September 15, 2023
: (5) Unit 2, emergency diesel generator room train A, fire zone 21A, on
: (5) Unit 2, emergency diesel generator room train A, fire zone 21A, on September 27, 2023


===September 27, 2023 Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the onsite fire department training and performance during announced fire drills on July 21, 2023, and August 4, 2023.
: (1) The inspectors evaluated the onsite fire department training and performance during announced fire drills on July 21, 2023, and August 4, 2023.


==71111.07A - Heat Exchanger/Sink Performance==
==71111.07A - Heat Exchanger/Sink Performance==
===Annual Review (IP Section 03.01) (1 Sample)===
===Annual Review (IP Section 03.01) (1 Sample)===
The inspectors evaluated readiness and performance of:
The inspectors evaluated readiness and performance of:
Line 91: Line 109:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
: (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023
: (1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated licensed operator continued training           simulator exam activities, on August 24, 2023.
: (1) The inspectors observed and evaluated licensed operator continued training simulator exam activities, on August 24, 2023.


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
Line 107: Line 122:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 115: Line 129:
: (4) Unit 1, containment spray train A valves SIA-HV-678, SIA-HV-684, and SIA-HV-687, operability determinations following a safety equipment inoperable status panel alarm, on September 8, 2023
: (4) Unit 1, containment spray train A valves SIA-HV-678, SIA-HV-684, and SIA-HV-687, operability determinations following a safety equipment inoperable status panel alarm, on September 8, 2023
: (5) Unit 1, safety injection tank 2B level transmitter high pressure root valve operability determination due to excessive boric acid residue on packing gland, on September 29, 2023
: (5) Unit 1, safety injection tank 2B level transmitter high pressure root valve operability determination due to excessive boric acid residue on packing gland, on September 29, 2023
==71111.24 - Testing and Maintenance of Equipment Important to Risk==
==71111.24 - Testing and Maintenance of Equipment Important to Risk==
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:


The inspectors evaluated the following testing and maintenance activities to verify system
===Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)===
 
===operability and/or functionality: Post-Maintenance Testing (PMT) (IP Section 03.01)===
{{IP sample|IP=IP 71111.24|count=4}}
: (1) Unit 3, emergency diesel generator train B post-maintenance testing following maintenance outage, on July 31, 2023
: (1) Unit 3, emergency diesel generator train B post-maintenance testing following maintenance outage, on July 31, 2023
: (2) Unit 2, main feedwater pump A post-maintenance testing following turbine governor pilot valve, linear variable differential transformer, and servo valve replacement, on July 31, 2023
: (2) Unit 2, main feedwater pump A post-maintenance testing following turbine governor pilot valve, linear variable differential transformer, and servo valve replacement, on July 31, 2023
: (3) Unit 3, main turbine control valve 4 post-maintenance testing following replacement of shorted signal cable, on August 7, 2023
: (3) Unit 3, main turbine control valve 4 post-maintenance testing following replacement of shorted signal cable, on August 7, 2023
: (4) Unit 3, charging pump E post-maintenance testing following maintenance outage, on
: (4) Unit 3, charging pump E post-maintenance testing following maintenance outage, on September 28, 2023


===September 28, 2023 Surveillance Testing (IP Section 03.01) (1 Sample)===
===Surveillance Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 2, diesel generator fuel oil transfer pump A comprehensive pump test, on
: (1) Unit 2, diesel generator fuel oil transfer pump A comprehensive pump test, on September 29, 2023


===September 29, 2023 Inservice Testing (IST) (IP Section 03.01) (1 Sample)===
===Inservice Testing (IST) (IP Section 03.01) (1 Sample)===
: (1) Unit 2, containment spray pump B inservice testing, on September 1, 2023
: (1) Unit 2, containment spray pump B inservice testing, on September 1, 2023


===Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)===
===Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)===
: (1) Units 1, 2, and 3, and N+1 diverse and flexible coping strategies spent fuel pool           makeup pump testing, on September 22, 2023
: (1) Units 1, 2, and 3, and N+1 diverse and flexible coping strategies spent fuel pool makeup pump testing, on September 22, 2023


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
: (1) The inspectors evaluated an emergency preparedness drill, on August 8,
: (1) The inspectors evaluated an emergency preparedness drill, on August 8,


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05) ===
MS06: Emergency AC Power Systems (IP Section 02.05)===
{{IP sample|IP=IP 71151|count=3}}
{{IP sample|IP=IP 71151|count=3}}
: (1) Unit 1 (July 1, 2022, through June 30, 2023)
: (1) Unit 1 (July 1, 2022, through June 30, 2023)
Line 170: Line 180:
: (3) Unit 3 (July 1, 2022, through June 30, 2023)
: (3) Unit 3 (July 1, 2022, through June 30, 2023)


===71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03) ===
===71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)===
{{IP sample|IP=IP 71152|count=1}}
{{IP sample|IP=IP 71152|count=1}}
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
: (1) Units 1, 2, and 3, review of actions associated with removal of fire hoses from plant fire hose stations, on September 28, 2023
: (1) Units 1, 2, and 3, review of actions associated with removal of fire hoses from plant fire hose stations, on September 28, 2023


===71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03) ===
===71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03)===
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
: (1) The inspectors evaluated the Unit 3 partial load reject to 87 percent power due to main turbine control valve number 4 going closed at full power and the licensees response, on July 18, 2023.
: (1) The inspectors evaluated the Unit 3 partial load reject to 87 percent power due to main turbine control valve number 4 going closed at full power and the licensees response, on July 18, 2023.
Line 191: Line 201:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                       Revision or
Inspection
Procedure                                                                                              Date
Procedure
71111.01   Miscellaneous     5240822      Potential Tornado Borne Missile Permit
Type
71111.01   Miscellaneous     5372141       Potential Tornado Borne Missile Permit
Designation
71111.01   Miscellaneous     5496757       Potential Tornado Borne Missile Permit
Description or Title
71111.01   Miscellaneous     5530394       Potential Tornado Borne Missile Permit
Revision or
71111.01   Miscellaneous     5537602       Potential Tornado Borne Missile Permit
Date
71111.01   Procedures       01DP-0XX01   Control and Monitoring of Potential Tornado Borne Missiles 6
71111.01
71111.01   Procedures       40AO-9ZZ21   Acts Of Nature                                             39
Miscellaneous
71111.04   Corrective Action               22-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-
240822
Documents                      07107
Potential Tornado Borne Missile Permit
71111.04   Drawings         02-M-DFP-001 P & I Diagram Diesel Fuel Oil & Transfer System             12
71111.01
71111.04   Drawings         02-M-DGP-001 P & I Diagram Diesel Generator System                       64
Miscellaneous
71111.04   Drawings         03-M-CHP-002 P and I Diagram Chemical and Volume Control System         57
5372141
71111.04   Miscellaneous                   TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain           05/03/2023
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5496757
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5530394
Potential Tornado Borne Missile Permit
71111.01
Miscellaneous
5537602
Potential Tornado Borne Missile Permit
71111.01
Procedures
01DP-0XX01
Control and Monitoring of Potential Tornado Borne Missiles
71111.01
Procedures
40AO-9ZZ21
Acts Of Nature
71111.04
Corrective Action
Documents
2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-
07107
71111.04
Drawings
2-M-DFP-001
P & I Diagram Diesel Fuel Oil & Transfer System
71111.04
Drawings
2-M-DGP-001
P & I Diagram Diesel Generator System
71111.04
Drawings
03-M-CHP-002
P and I Diagram Chemical and Volume Control System
71111.04
Miscellaneous
TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain
Solenoid Isolation Valve
Solenoid Isolation Valve
71111.04   Miscellaneous                   PVNGS DBM - Chemical and Volume Control System             26
05/03/2023
71111.04   Procedures       40OP-9CH01   CVCS Normal Operations                                     81
71111.04
71111.04   Procedures       40OP-9DF01   Diesel Fuel Oil Storage and Transfer (DF)                   45
Miscellaneous
71111.04   Procedures       40OP-9DG02   Emergency Diesel Generator B                               80
PVNGS DBM - Chemical and Volume Control System
71111.04   Procedures       40OP-9SP02   Essential Spray Pond (SP) B                                 58
71111.04
71111.04   Work Orders                     5448137, 5448135
Procedures
71111.05   Calculations     13-MC-FP-0809 Combustible Loads - Auxiliary Building                     13
40OP-9CH01
71111.05   Corrective Action               23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-
CVCS Normal Operations
Documents                      05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,
71111.04
Procedures
40OP-9DF01
Diesel Fuel Oil Storage and Transfer (DF)
71111.04
Procedures
40OP-9DG02
Emergency Diesel Generator B
71111.04
Procedures
40OP-9SP02
Essential Spray Pond (SP) B
71111.04
Work Orders
5448137, 5448135
71111.05
Calculations
13-MC-FP-0809
Combustible Loads - Auxiliary Building
71111.05
Corrective Action
Documents
23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-
05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-
23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-
2690, 23-02692
2690, 23-02692
71111.05   Fire Plans                     Pre-fire Strategies Manual                                 30
71111.05
71111.05   Miscellaneous                   Critique Letter from Darrin Green, Battalion Chief - Threat 06/24/2021
Fire Plans
Pre-fire Strategies Manual
71111.05
Miscellaneous
Critique Letter from Darrin Green, Battalion Chief - Threat
Liaison Officer, Goodyear Fire Department, to Scott Martin,
Liaison Officer, Goodyear Fire Department, to Scott Martin,
Training Officer, Palo Verde Nuclear Generating Station
Training Officer, Palo Verde Nuclear Generating Station
71111.05   Miscellaneous     5563638       Open Door Permit
06/24/2021
71111.05   Miscellaneous     NPL41-D-2Q1B- Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B   05/17/2023
71111.05
Inspection Type         Designation   Description or Title                                     Revision or
Miscellaneous
Procedure                                                                                        Date
5563638
Open Door Permit
71111.05
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
05/17/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Shift Drill Scenario
Shift Drill Scenario
71111.05   Miscellaneous NPL41-D-2Q1B- Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B 07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q1B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05   Miscellaneous NPL41-D-2Q2C- Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C 07/12/2023
07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q2C-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05   Miscellaneous NPL41-D-2Q3A- Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A 06/20/2023
07/12/2023
71111.05
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Drill Scenario
Shift Drill Scenario
71111.05   Miscellaneous NPL41-D-2Q3A- Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A 07/06/2023
06/20/2023
71111.05
Miscellaneous
NPL41-D-2Q3A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05   Miscellaneous NPL41-D-3Q1A- Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A 07/20/2023
07/06/2023
71111.05
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Drill Scenario
Shift Drill Scenario
71111.05   Miscellaneous NPL41-D-3Q1A- Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A 08/23/2023
07/20/2023
71111.05
Miscellaneous
NPL41-D-3Q1A-
Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05   Miscellaneous NPL41-D-3Q2B- Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B 08/03/2023
08/23/2023
71111.05
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Drill Scenario
Shift Drill Scenario
71111.05   Miscellaneous NPL41-D-3Q2B- Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B 08/29/2023
08/03/2023
71111.05
Miscellaneous
NPL41-D-3Q2B-
Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B
Shift Summary/After Action Review Report for Regulatory
Shift Summary/After Action Review Report for Regulatory
Fire Drill
Fire Drill
71111.05   Procedures   14DP-0FP01   Firewatch Requirements                                   14
08/29/2023
71111.05   Procedures   14DP-0FP32   Emergency Notification and Response                       38
71111.05
71111.05   Procedures   14DP-0FP33   Control of Transient Combustibles                         33
Procedures
71111.05   Procedures   14FT-9FP61   Semi-Annual Operational Test of Appendix R and Appendix   20
14DP-0FP01
Firewatch Requirements
71111.05
Procedures
14DP-0FP32
Emergency Notification and Response
71111.05
Procedures
14DP-0FP33
Control of Transient Combustibles
71111.05
Procedures
14FT-9FP61
Semi-Annual Operational Test of Appendix R and Appendix
A Fire Door Closers
A Fire Door Closers
71111.05   Procedures   18FT-9FP38   Functional Test of Appendix R Fire/HELB Doors             1
71111.05
71111.05   Procedures   18FT-9FP39   Functional Test of Appendix A Fire/HELB Doors             0
Procedures
71111.05   Procedures   40AO-9ZZ27   Significant Turbine Building Oil System Leaks             0
18FT-9FP38
71111.05   Procedures   40DP-9ZZ17   Control of Doors, Hatches and Floor Plugs                 69
Functional Test of Appendix R Fire/HELB Doors
71111.05   Procedures   40DP-9ZZ19   Operational Considerations Due to Plant Fire             37
71111.05
71111.05   Procedures   40OP-9HJ02   Control Building HVAC (Smoke Removal)                     6
Procedures
71111.05   Work Orders                 5535529, 5501387
18FT-9FP39
Inspection Type             Designation   Description or Title                                     Revision or
Functional Test of Appendix A Fire/HELB Doors
Procedure                                                                                            Date
71111.05
71111.07A Corrective Action               23-06257, 22-08195, 22-07864
Procedures
40AO-9ZZ27
Significant Turbine Building Oil System Leaks
71111.05
Procedures
40DP-9ZZ17
Control of Doors, Hatches and Floor Plugs
71111.05
Procedures
40DP-9ZZ19
Operational Considerations Due to Plant Fire
71111.05
Procedures
40OP-9HJ02
Control Building HVAC (Smoke Removal)
71111.05
Work Orders
5535529, 5501387
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.07A
Corrective Action
Documents
Documents
71111.07A Miscellaneous     23-0620       U3 DGB Jacket Water Eddy Current Examination Report
23-06257, 22-08195, 22-07864
71111.07A Procedures       73DP-9ZZ21   Heat Exchanger Visual Inspection                         8
71111.07A
71111.07A Work Orders                     5398352, 5298385, 5398411, 5396107, 5398303, 5398421,
Miscellaneous
23-0620
U3 DGB Jacket Water Eddy Current Examination Report
71111.07A
Procedures
73DP-9ZZ21
Heat Exchanger Visual Inspection
71111.07A
Work Orders
5398352, 5298385, 5398411, 5396107, 5398303, 5398421,
27973
27973
71111.11Q Corrective Action               13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-
71111.11Q
Documents                      07771, 23-07823, 23-07865, 23-07874, 23-08727
Corrective Action
71111.11Q Miscellaneous                   Specific Maneuver Plan: 258 [Effective Full Power Days]   0
Documents
13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-
07771, 23-07823, 23-07865, 23-07874, 23-08727
71111.11Q
Miscellaneous
Specific Maneuver Plan: 258 [Effective Full Power Days]
Downpower Unit 3 Cycle 24
Downpower Unit 3 Cycle 24
71111.11Q Miscellaneous                   Adverse Condition Monitoring Plan: Unit 3 A Circulating 0
71111.11Q
Miscellaneous
Adverse Condition Monitoring Plan: Unit 3 A Circulating
Water Pump/Motor Vibrations
Water Pump/Motor Vibrations
71111.11Q Miscellaneous                   Operator Logs: Unit 3 August 1-2, 2023                   08/07/2023
71111.11Q
71111.11Q Miscellaneous     SES-0-09-A-03 Licensed Operator Continued Training Simulator Exam       07/13/2023
Miscellaneous
Operator Logs: Unit 3 August 1-2, 2023
08/07/2023
71111.11Q
Miscellaneous
SES-0-09-A-03
Licensed Operator Continued Training Simulator Exam
Scenario
Scenario
71111.11Q Procedures         40DP-9OP02   Conduct of Operations                                     77
07/13/2023
71111.12   Corrective Action               21-13093, 21-15262, 23-03918, 23-03885, 23-04848
71111.11Q
Procedures
40DP-9OP02
Conduct of Operations
71111.12
Corrective Action
Documents
Documents
71111.12   Miscellaneous                   Unit 2 EC PMG Unavailability Criteria Status             08/23/2023
21-13093, 21-15262, 23-03918, 23-03885, 23-04848
71111.12   Miscellaneous                   Performance Monitoring Group, Essential Chilled Water     06/27/2023
71111.12
Miscellaneous
Unit 2 EC PMG Unavailability Criteria Status
08/23/2023
71111.12
Miscellaneous
Performance Monitoring Group, Essential Chilled Water
Train A Unit 2
Train A Unit 2
71111.12   Miscellaneous     13-NS-C025   Risk Informed Performance Criteria                       9
06/27/2023
71111.12   Miscellaneous     EVT-EC-2021- Maintenance Rule Event
71111.12
Miscellaneous
13-NS-C025
Risk Informed Performance Criteria
71111.12
Miscellaneous
EVT-EC-2021-
2254
2254
71111.12   Miscellaneous     EVT-EC-2021- Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2021-
414689
414689
71111.12   Miscellaneous     EVT-EC-2023- Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2023-
438568
438568
71111.12   Miscellaneous     EVT-EC-2023- Maintenance Rule Event
Maintenance Rule Event
71111.12
Miscellaneous
EVT-EC-2023-
2921
2921
71111.12   Miscellaneous     MR 2.0       Performance Monitoring Bases Document Worksheet -         0
Maintenance Rule Event
71111.12
Miscellaneous
MR 2.0
Performance Monitoring Bases Document Worksheet -
Essential Chilled Water (HVAC)
Essential Chilled Water (HVAC)
71111.12   Procedures       70DP-0MR01   Maintenance Rule                                         49
71111.12
71111.12   Procedures       70DP-0MR02   Maintenance Rule Monitoring Process                       0
Procedures
Inspection Type             Designation   Description or Title                                     Revision or
70DP-0MR01
Procedure                                                                                            Date
Maintenance Rule
71111.12   Work Orders                     5080139
71111.12
71111.15   Calculations     13-MC-FP-0315 10CFR50 Appendix R Safe Shutdown Equipment List           15
Procedures
71111.15   Corrective Action               23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-
70DP-0MR02
Documents                        05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,
Maintenance Rule Monitoring Process
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.12
Work Orders
5080139
71111.15
Calculations
13-MC-FP-0315
10CFR50 Appendix R Safe Shutdown Equipment List
71111.15
Corrective Action
Documents
23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-
05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,
23-05751, 23-09598
23-05751, 23-09598
71111.15   Drawings         01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] 9
71111.15
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
System containment Spray Isolation Valve 1J-SIA-HV-687
71111.15   Drawings         01-E-SIB-0024 Elementary Diagram Safety Injection - Shutdown [Cooling] 10
71111.15
Drawings
01-E-SIB-0024
Elementary Diagram Safety Injection - Shutdown [Cooling]
System containment Spray Isolation Valve 1J-SIA-HV-687
System containment Spray Isolation Valve 1J-SIA-HV-687
71111.15   Drawings         13-E-ZAC-050   Conduit & Tray Notes, Symbols & Details                   43
71111.15
71111.15   Drawings         13-M-FPR-005   Appendix R Safety Function Diagram Chemical & Volume     4
Drawings
13-E-ZAC-050
Conduit & Tray Notes, Symbols & Details
71111.15
Drawings
13-M-FPR-005
Appendix R Safety Function Diagram Chemical & Volume
Control System
Control System
71111.15   Drawings         13-N001-1104- SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring     9
71111.15
271          Diagram
Drawings
71111.15   Drawings         13-Q-ZZP-001   EQ Configuration Drawing Limitorque Valve Actuator       1
13-N001-1104-
71111.15   Drawings         N001-1104-     Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,   13
271
00015          Size: 1 Class: 1586 LB
SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring
71111.15   Miscellaneous                   System Training Manual: Volume 40 Safety Injection System 4
Diagram
                                            (SI)
71111.15
71111.15   Miscellaneous                   System Training Manual: Safety Equipment Status System   4
Drawings
                                            (ES)
13-Q-ZZP-001
71111.15   Miscellaneous                   Design Basis Manual: Plant Annunciator / Safety Equipment 4
EQ Configuration Drawing Limitorque Valve Actuator
71111.15
Drawings
N001-1104-
00015
Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,
Size: 1 Class: 1586 LB
71111.15
Miscellaneous
System Training Manual: Volume 40 Safety Injection System  
(SI)
71111.15
Miscellaneous
System Training Manual: Safety Equipment Status System  
(ES)
71111.15
Miscellaneous
Design Basis Manual: Plant Annunciator / Safety Equipment
Status System
Status System
71111.15   Miscellaneous                   CH and XO Maintenance Rule Scoping Diagram               02/12/2013
71111.15
71111.15   Miscellaneous     13-VTD-N383-   BW/IP Operation and Maintenance Manual for Manual and     3
Miscellaneous
00019          Motor Operated 1, 1-1/2 and 2 High Pressure Globe
CH and XO Maintenance Rule Scoping Diagram
2/12/2013
71111.15
Miscellaneous
13-VTD-N383-
00019
BW/IP Operation and Maintenance Manual for Manual and
Motor Operated 1, 1-1/2 and 2 High Pressure Globe
Valves [PUB. #OMM2016]
Valves [PUB. #OMM2016]
71111.15   Miscellaneous     CH DBM         Chemical and Volume Control system Design Basis Manual   26
71111.15
71111.15   Miscellaneous     EEQ-L200-001   Electrical Equipment Qualification Data File             27
Miscellaneous
71111.15   Miscellaneous     RSS-01-1360   Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-     0
CH DBM
Chemical and Volume Control system Design Basis Manual
71111.15
Miscellaneous
EEQ-L200-001
Electrical Equipment Qualification Data File
71111.15
Miscellaneous
RSS-01-1360
Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)
M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)
71111.15   Miscellaneous     SB             Reactor Protection System DBM                             18
71111.15
71111.15   Miscellaneous     VTD-C490-00001 Combustion Engineering Technical Manual for Limitorque
Miscellaneous
SB
Reactor Protection System DBM
71111.15
Miscellaneous
VTD-C490-00001
Combustion Engineering Technical Manual for Limitorque
Corporation Motor Operated Valve Actuators
Corporation Motor Operated Valve Actuators
Inspection Type             Designation   Description or Title                                       Revision or
Inspection
Procedure                                                                                              Date
Procedure
                                            [PUB.#976F[83Y3]BH]
Type
71111.15   Procedures                       Molded Case Circuit Breaker Test                           53
Designation
71111.15   Procedures       01DP-0AP12-01 Condition Reporting Process Administrative Guideline       20
Description or Title
71111.15   Procedures       32MT-9ZZ74     Molded Case Circuit Breaker Test                           53
Revision or
71111.15   Procedures       36ST-9SB32     PPS Input Loop Calibration for Parameter 20, LO RWT         27
Date
[PUB.#976F[83Y3]BH]
71111.15
Procedures
Molded Case Circuit Breaker Test
71111.15
Procedures
01DP-0AP12-01
Condition Reporting Process Administrative Guideline
71111.15
Procedures
2MT-9ZZ74
Molded Case Circuit Breaker Test
71111.15
Procedures
36ST-9SB32
PPS Input Loop Calibration for Parameter 20, LO RWT
LEVEL
LEVEL
71111.15   Procedures       40DP-9OP26     Operations Operability Determination Process               48
71111.15
71111.15   Procedures       40DP-9OP26-01 Operations Operability Determination Process Administrative 0
Procedures
40DP-9OP26
Operations Operability Determination Process
71111.15
Procedures
40DP-9OP26-01
Operations Operability Determination Process Administrative
Guideline
Guideline
71111.15   Procedures       40ST-9CH02     Boron Injection Flow Test                                   19
71111.15
71111.15   Procedures       70TI-9ZC01     Boric Acid Walkdown Leak Detection                         27
Procedures
71111.15   Procedures       73ST-9CH02     Charging Pumps - Comprehensive Test                         15
40ST-9CH02
71111.15   Work Orders                     5362779, 5379047, 5561932, 5538035
Boron Injection Flow Test
71111.24   Corrective Action               23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-
71111.15
Documents                        06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,
Procedures
70TI-9ZC01
Boric Acid Walkdown Leak Detection
71111.15
Procedures
73ST-9CH02
Charging Pumps - Comprehensive Test
71111.15
Work Orders
5362779, 5379047, 5561932, 5538035
71111.24
Corrective Action
Documents
23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-
06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-
23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-
08726, 23-10046
08726, 23-10046
71111.24   Miscellaneous                   FLEX SFP Pump Fluid Sample Results                         09/05/2023
71111.24
71111.24   Miscellaneous                   PVGS Diverse and Flexible Coping Strategies (FLEX)         4
Miscellaneous
FLEX SFP Pump Fluid Sample Results
09/05/2023
71111.24
Miscellaneous
PVGS Diverse and Flexible Coping Strategies (FLEX)
Program Plan
Program Plan
71111.24   Miscellaneous     13-NS-A116     Engineering Guide to NRC Post Fukushima Requirements       1
71111.24
71111.24   Miscellaneous     VTD-G080-00658 Vendor Technical Document: General Electric Electronic     1
Miscellaneous
13-NS-A116
Engineering Guide to NRC Post Fukushima Requirements
71111.24
Miscellaneous
VTD-G080-00658
Vendor Technical Document: General Electric Electronic
Speed Governor (MDT-20 Control System)
Speed Governor (MDT-20 Control System)
71111.24   Miscellaneous     VTD-G080-00659 Vendor Technical Document: General Electric MDT-20         2
71111.24
Miscellaneous
VTD-G080-00659
Vendor Technical Document: General Electric MDT-20
Governor Setting Instructions
Governor Setting Instructions
71111.24   Procedures       14MT-9BD61     FLEX SFP Makeup Pump Inspections and Tests                 6
71111.24
71111.24   Procedures       14MT-9BD61     FLEX SFP Makeup Pump Inspections and Tests Bases           6a
Procedures
71111.24   Procedures       30DP-9WP04     Post-Maintenance Testing Development                       20
14MT-9BD61
71111.24   Procedures       31MT-9CH01     Charging Pump Disassembly and Assembly                     37
FLEX SFP Makeup Pump Inspections and Tests
71111.24   Procedures       32MT-9PE01     Cleaning, Inspection, and Testing of the Class 1E Diesel   50
71111.24
Procedures
14MT-9BD61
FLEX SFP Makeup Pump Inspections and Tests Bases
6a
71111.24
Procedures
30DP-9WP04
Post-Maintenance Testing Development
71111.24
Procedures
31MT-9CH01
Charging Pump Disassembly and Assembly
71111.24
Procedures
2MT-9PE01
Cleaning, Inspection, and Testing of the Class 1E Diesel
Generator
Generator
71111.24   Procedures       40DP-9OP08     Diesel Generator Test Record                               54
71111.24
71111.24   Procedures       40OP-9CH01     CVCS Normal Operations                                     81
Procedures
Inspection Type             Designation Description or Title                                         Revision or
40DP-9OP08
Procedure                                                                                              Date
Diesel Generator Test Record
71111.24   Procedures       40OP-9DF01 Diesel Fuel Oil Storage and Transfer (DF)
71111.24
71111.24   Procedures       40OP-9DG02 Emergency Diesel Generator B                                 79
Procedures
71111.24   Procedures       40OP-9FT01 Feedwater Pump Turbine A                                     63
40OP-9CH01
71111.24   Procedures       40ST-9DG02 Diesel Generator B Test                                       57
CVCS Normal Operations
71111.24   Procedures       73DP-9XI01 Pump and Valve Inservice Testing Program                     22
 
71111.24   Procedures       73DP-9ZZ14 Surveillance Testing                                         32
Inspection
71111.24   Procedures       73ST-9CH06 Charging Pumps - Inservice Test                               14
Procedure
71111.24   Procedures       73ST-9DF02 Diesel Fuel Oil Transfer Pumps - Comprehensive Pump           19
Type
Designation
Description or Title
Revision or
Date
71111.24
Procedures
40OP-9DF01
Diesel Fuel Oil Storage and Transfer (DF)
71111.24
Procedures
40OP-9DG02
Emergency Diesel Generator B
71111.24
Procedures
40OP-9FT01
Feedwater Pump Turbine A
71111.24
Procedures
40ST-9DG02
Diesel Generator B Test
71111.24
Procedures
73DP-9XI01
Pump and Valve Inservice Testing Program
71111.24
Procedures
73DP-9ZZ14
Surveillance Testing
71111.24
Procedures
73ST-9CH06
Charging Pumps - Inservice Test
71111.24
Procedures
73ST-9DF02
Diesel Fuel Oil Transfer Pumps - Comprehensive Pump
Test
Test
71111.24   Procedures       73ST-9ST06 Containment Spray Pumps and Check Valves - Inservice         48
71111.24
Procedures
73ST-9ST06
Containment Spray Pumps and Check Valves - Inservice
Test
Test
71111.24   Work Orders                   5398306, 5398390, 5427973, 5536211, 5551182, 5539323,
71111.24
Work Orders
5398306, 5398390, 5427973, 5536211, 5551182, 5539323,
5442500, 5443639, 5453624, 5448003, 5448007, 5549702,
5442500, 5443639, 5453624, 5448003, 5448007, 5549702,
5555891, 5446696, 5446673, 5446695, 5446700, 5459882
5555891, 5446696, 5446673, 5446695, 5446700, 5459882
71114.06   Corrective Action             23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-
71114.06
Documents                    08194, 23-08198, 23-08275, 23-09186
Corrective Action
71114.06   Miscellaneous                 Emergency Preparedness 2304 Drill Report - Drill Date Aug     09/08/2023
Documents
23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-
08194, 23-08198, 23-08275, 23-09186
71114.06
Miscellaneous
Emergency Preparedness 2304 Drill Report - Drill Date Aug
8, 2023
8, 2023
71114.06   Miscellaneous     EP-0801H   [Emergency Action Level] Classification Matrix Hot
09/08/2023
71114.06
Miscellaneous
EP-0801H
[Emergency Action Level] Classification Matrix Hot
Conditions ([Reactor Coolant System] > 210°F)
Conditions ([Reactor Coolant System] > 210°F)
71114.06   Miscellaneous     EP-0803H   [Protective Action Recommendation] Flowchart
71114.06
71114.06   Miscellaneous     EP-0804G   Release Evaluation Flowchart
Miscellaneous
71114.06   Miscellaneous     EP-0930B   [Emergency Action Level] Classification Matrix All Conditions
EP-0803H
71114.06   Procedures       EP-0900-012 ERO Positions - Engineering Director (EOF)                   4
[Protective Action Recommendation] Flowchart
71151     Corrective Action             21-06710, 21-12485, 22-03043, 22-07259
71114.06
Miscellaneous
EP-0804G
Release Evaluation Flowchart
71114.06
Miscellaneous
EP-0930B
[Emergency Action Level] Classification Matrix All Conditions
71114.06
Procedures
EP-0900-012
ERO Positions - Engineering Director (EOF)
71151
Corrective Action
Documents
Documents
71151     Miscellaneous                 Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-         08/03/2023
21-06710, 21-12485, 22-03043, 22-07259
71151
Miscellaneous
Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-
06/2023
06/2023
71151     Miscellaneous                 Units 1, 2, and 3 MSPI Margin Report July 2022               08/04/2023
08/03/2023
71151     Miscellaneous                 Units 1, 2, and 3 MSPI Margin Report February 2023           08/04/2023
71151
71151     Miscellaneous                 Units 1, 2, and 3 MSPI Margin Report May 2023                 08/04/2023
Miscellaneous
71151     Miscellaneous                 Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation         08/04/2023
Units 1, 2, and 3 MSPI Margin Report July 2022
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report February 2023
08/04/2023
71151
Miscellaneous
Units 1, 2, and 3 MSPI Margin Report May 2023
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE August 2022
Reports: PLE August 2022
Inspection Type             Designation     Description or Title                                   Revision or
08/04/2023
Procedure                                                                                            Date
Inspection
71151     Miscellaneous                     Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI August 2022
Reports: UAI August 2022
71151     Miscellaneous                     Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI August 2022
Reports: URI August 2022
71151     Miscellaneous                     Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE June 2023
Reports: PLE June 2023
71151     Miscellaneous                     Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI June 2023
Reports: UAI June 2023
71151     Miscellaneous                     Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI June 2023
Reports: URI June 2023
71151     Miscellaneous                     Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: PLE April 2023
Reports: PLE April 2023
71151     Miscellaneous                     Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: UAI April 2023
Reports: UAI April 2023
71151     Miscellaneous                     Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation   08/04/2023
08/04/2023
71151
Miscellaneous
Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation
Reports: URI April 2023
Reports: URI April 2023
71151     Miscellaneous     13-NS-C075     MSPI Bases Document                                     16
08/04/2023
71151     Procedures       70DP-0MR01     Maintenance Rule                                       47
71151
71151     Procedures       70DP-0MR01     Maintenance Rule                                       48
Miscellaneous
71151     Procedures       70DP-0MR01     Maintenance Rule                                       49
13-NS-C075
71151     Procedures       70DP-0PI01     Performance Index Data Mitigating Systems Cornerstone   9
MSPI Bases Document
71151     Procedures       70DP-0PI01     Performance Index Data Mitigating Systems Cornerstone   10
71151
71151     Procedures       93DP-0LC09     NRC ROP PI Data Collection, Verification and Submittal 12
Procedures
71152A     Corrective Action                 22-03027, 23-05330, 23-05514
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0MR01
Maintenance Rule
71151
Procedures
70DP-0PI01
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
70DP-0PI01
Performance Index Data Mitigating Systems Cornerstone
71151
Procedures
93DP-0LC09
NRC ROP PI Data Collection, Verification and Submittal
71152A
Corrective Action
Documents
Documents
71152A     Miscellaneous                     Pre-Fire Strategies Manual                             30
2-03027, 23-05330, 23-05514
71152A     Miscellaneous                     Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire 05/12/2023
71152A
Miscellaneous
Pre-Fire Strategies Manual
71152A
Miscellaneous
Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire
Detector TRM Change
Detector TRM Change
71152A     Miscellaneous                     FPCRR, Fire Hose Removal Fire Protection Change       08/09/2022
05/12/2023
71152A
Miscellaneous
FPCRR, Fire Hose Removal Fire Protection Change
Regulatory Review
Regulatory Review
71152A     Miscellaneous     102-05627       APS Commitment Letter                                   01/11/2027
08/09/2022
71152A     Miscellaneous     22-R002/22-F009 LDCR Review Packages
71152A
71152A     Miscellaneous     Generic Letter Implementation of Fire Protection Requirements
Miscellaneous
2-05627
APS Commitment Letter
01/11/2027
71152A
Miscellaneous
2-R002/22-F009
LDCR Review Packages
71152A
Miscellaneous
Generic Letter
86-10
86-10
Inspection Type             Designation   Description or Title                                       Revision or
Implementation of Fire Protection Requirements
Procedure                                                                                              Date
Inspection
71152A     Miscellaneous     Generic Letter Removal of Fire Protection Requirements from Technical
Procedure
88-12          Specifications
Type
71152A     Miscellaneous     NFPA 14       Standpipe and Hose Systems                                 1976
Designation
71152A     Miscellaneous     NFPA 14       Installation of Standpipe and Hose Systems                 2019
Description or Title
71152A     Procedures       40AO-9ZZ19     Control Room Fire                                         42
Revision or
71152A     Procedures       40DP-9ZZ19     Operational Considerations Due to Plant Fire               37
Date
71152A     Procedures       40MG-9ZZ05-002 Mitigating Guidelines Supplemental Strategies             0
71152A
71153     Corrective Action               23-07440, 23-07500, 23-07791, 23-07845
Miscellaneous
Generic Letter
88-12
Removal of Fire Protection Requirements from Technical
Specifications
71152A
Miscellaneous
NFPA 14
Standpipe and Hose Systems
1976
71152A
Miscellaneous
NFPA 14
Installation of Standpipe and Hose Systems
2019
71152A
Procedures
40AO-9ZZ19
Control Room Fire
71152A
Procedures
40DP-9ZZ19
Operational Considerations Due to Plant Fire
71152A
Procedures
40MG-9ZZ05-002
Mitigating Guidelines Supplemental Strategies
71153
Corrective Action
Documents
Documents
71153     Miscellaneous                   Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023, 07/19/2023
23-07440, 23-07500, 23-07791, 23-07845
71153
Miscellaneous
Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023,
0600
0600
71153     Miscellaneous                   Dose Assessment User Manual                               10
07/19/2023
71153     Miscellaneous                   Event Reporting Manual                                     48
71153
71153     Miscellaneous     2-23-034       Compensatory Action Document                               07/29/2023
Miscellaneous
71153     Procedures       16DP-0EP31     Emergency Preparedness Equipment Out of Service           14
Dose Assessment User Manual
71153     Procedures       40AO-9ZZ08     Load Rejection                                             35
71153
71153     Procedures       40DP-9OP02     Conduct of Operations                                     77
Miscellaneous
15
Event Reporting Manual
71153
Miscellaneous
2-23-034
Compensatory Action Document
07/29/2023
71153
Procedures
16DP-0EP31
Emergency Preparedness Equipment Out of Service
71153
Procedures
40AO-9ZZ08
Load Rejection
71153
Procedures
40DP-9OP02
Conduct of Operations
77
}}
}}

Latest revision as of 17:08, 2 January 2025

Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003
ML23285A245
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/17/2023
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Heflin A
Arizona Public Service Co
References
IR 2023003
Download: ML23285A245 (18)


Text

October 17, 2023

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2023003 AND 05000529/2023003 AND 05000530/2023003

Dear Adam Heflin:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On October 6, 2023, the NRC inspectors discussed the results of this inspection with Todd Horton, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528 and 05000529 and 05000530 License Nos. NPF-41 and NPF-51 and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2023003, 05000529/2023003 and 05000530/2023003

Enterprise Identifier:

I-2023-003-0008

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

July 1, 2023 to September 30, 2023

Inspectors:

L. Merker, Senior Resident Inspector

E. Lantz, Resident Inspector

N. Cuevas, Resident Inspector

J. Dykert, Health Physicist

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 entered the inspection period at full power. On September 26, 2023, the unit began a coastdown for refueling outage 1R24 and ended the inspection period at approximately 95 percent power.

Unit 2 operated at or near full power for the duration of the inspection period.

Unit 3 entered the inspection period at full power. On July 18, 2023, the unit experienced a partial load reject to approximately 87 percent power due to main turbine control valve number 4 going full closed and stabilized at 88 percent power on July 19, 2023. On July 21, 2023, the operators raised power to 90 percent power. On July 30, 2023, the operators lowered power to 40 percent power to perform tube leak repairs in condenser hotwell 2A. On August 2, 2023, the operators lowered power to 12 percent power to take the main turbine offline and restore main turbine control valve number 4. On August 4, 2023, the unit returned to full power, where it remained for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending monsoon thunderstorms, on August 18, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3, chemical and volume control system following maintenance on charging pump A, on September 13, 2023
(2) Unit 2, emergency diesel generator train B, during emergency diesel generator train A maintenance outage, on September 29, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2, control building 100-foot elevation, fire zones 5A, 5B, 6A, 6B, 8A,10A, and 10B, on July 20, 2023
(2) Unit 1, auxiliary building 120-foot elevation, fire zones 47A, 51B, 52A, 52D, and 54, on August 17, 2023
(3) Units 1 and 3, class 1E 125 Vdc equipment rooms, fire zones 6A, 6B, 7A, and 7B, on August 22, 2023
(4) Unit 2, auxiliary building west corridor, train A and B piping penetration rooms, fire zones 37A, 37C and 37D, on September 15, 2023
(5) Unit 2, emergency diesel generator room train A, fire zone 21A, on September 27, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire department training and performance during announced fire drills on July 21, 2023, and August 4, 2023.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 3, emergency diesel generator train B, jacket water heat exchanger, on July 25, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

The inspectors observed and evaluated licensed operator performance in the control room during the following activities:

(1) Unit 3, downpower to 12 percent power to take the main turbine generator offline and restore main turbine control valve 4 following replacement of shorted signal cable, on August 2, 2023

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator continued training simulator exam activities, on August 24, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2, essential chilled water train A, on August 25, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 3, boration flow path functionality determination due to boric acid makeup pump to volume control tank bypass line check valve, CHA-V177, failed bi-directional close test, on August 1, 2023
(2) Unit 3, engineered safety features actuation system channel D operability determination due to refueling water tank low level bistable setpoint spiking, on September 6, 2023
(3) Unit 2, shutdown cooling suction valve, SIB-UV-675, from containment recirculation sump train B operability determination due to degraded conduit connection to valve actuator, on September 7, 2023
(4) Unit 1, containment spray train A valves SIA-HV-678, SIA-HV-684, and SIA-HV-687, operability determinations following a safety equipment inoperable status panel alarm, on September 8, 2023
(5) Unit 1, safety injection tank 2B level transmitter high pressure root valve operability determination due to excessive boric acid residue on packing gland, on September 29, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)

(1) Unit 3, emergency diesel generator train B post-maintenance testing following maintenance outage, on July 31, 2023
(2) Unit 2, main feedwater pump A post-maintenance testing following turbine governor pilot valve, linear variable differential transformer, and servo valve replacement, on July 31, 2023
(3) Unit 3, main turbine control valve 4 post-maintenance testing following replacement of shorted signal cable, on August 7, 2023
(4) Unit 3, charging pump E post-maintenance testing following maintenance outage, on September 28, 2023

Surveillance Testing (IP Section 03.01) (1 Sample)

(1) Unit 2, diesel generator fuel oil transfer pump A comprehensive pump test, on September 29, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 2, containment spray pump B inservice testing, on September 1, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) Units 1, 2, and 3, and N+1 diverse and flexible coping strategies spent fuel pool makeup pump testing, on September 22, 2023

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated an emergency preparedness drill, on August 8,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS07: High Pressure Injection Systems (IP Section 02.06) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS08: Heat Removal Systems (IP Section 02.07) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS09: Residual Heat Removal Systems (IP Section 02.08) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

MS10: Cooling Water Support Systems (IP Section 02.09) (3 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)
(3) Unit 3 (July 1, 2022, through June 30, 2023)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:

(1) Units 1, 2, and 3, review of actions associated with removal of fire hoses from plant fire hose stations, on September 28, 2023

71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03)

(1) The inspectors evaluated the Unit 3 partial load reject to 87 percent power due to main turbine control valve number 4 going closed at full power and the licensees response, on July 18, 2023.

Reporting (IP section 03.05) (1 Sample)

(1) The inspectors evaluated the reportability of the Unit 2 steam generator 2 main steam line radiation monitor, RU-140, channels 1 and 2 being inoperable at the same time, on August 2,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 6, 2023, the inspectors presented the integrated inspection results to Todd Horton, Senior Vice President, Site Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Miscellaneous

240822

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5372141

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5496757

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5530394

Potential Tornado Borne Missile Permit

71111.01

Miscellaneous

5537602

Potential Tornado Borne Missile Permit

71111.01

Procedures

01DP-0XX01

Control and Monitoring of Potential Tornado Borne Missiles

71111.01

Procedures

40AO-9ZZ21

Acts Of Nature

71111.04

Corrective Action

Documents

2-00873, 22-05781, 22-13489, 22-13612, 23-04893, 23-

07107

71111.04

Drawings

2-M-DFP-001

P & I Diagram Diesel Fuel Oil & Transfer System

71111.04

Drawings

2-M-DGP-001

P & I Diagram Diesel Generator System

71111.04

Drawings

03-M-CHP-002

P and I Diagram Chemical and Volume Control System

71111.04

Miscellaneous

TD #: 296625, 2PDGNV255**VALVEX - Air Dryer Drain

Solenoid Isolation Valve

05/03/2023

71111.04

Miscellaneous

PVNGS DBM - Chemical and Volume Control System

71111.04

Procedures

40OP-9CH01

CVCS Normal Operations

71111.04

Procedures

40OP-9DF01

Diesel Fuel Oil Storage and Transfer (DF)

71111.04

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.04

Procedures

40OP-9SP02

Essential Spray Pond (SP) B

71111.04

Work Orders

5448137, 5448135

71111.05

Calculations

13-MC-FP-0809

Combustible Loads - Auxiliary Building

71111.05

Corrective Action

Documents

23-05960, 23-08139, 23-07964, 23-00968, 23-05379, 23-

05988, 23-06634, 23-06653, 23-06654, 23-06701, 23-06999,

23-08009, 23-08261, 23-08742, 23-09000, 23-00675, 23-

2690, 23-02692

71111.05

Fire Plans

Pre-fire Strategies Manual

71111.05

Miscellaneous

Critique Letter from Darrin Green, Battalion Chief - Threat

Liaison Officer, Goodyear Fire Department, to Scott Martin,

Training Officer, Palo Verde Nuclear Generating Station

06/24/2021

71111.05

Miscellaneous

5563638

Open Door Permit

71111.05

Miscellaneous

NPL41-D-2Q1B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B

05/17/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Shift Drill Scenario

71111.05

Miscellaneous

NPL41-D-2Q1B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 B

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/12/2023

71111.05

Miscellaneous

NPL41-D-2Q2C-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 C

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/12/2023

71111.05

Miscellaneous

NPL41-D-2Q3A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A

Shift Drill Scenario

06/20/2023

71111.05

Miscellaneous

NPL41-D-2Q3A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 3 A

Shift Summary/After Action Review Report for Regulatory

Fire Drill

07/06/2023

71111.05

Miscellaneous

NPL41-D-3Q1A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A

Shift Drill Scenario

07/20/2023

71111.05

Miscellaneous

NPL41-D-3Q1A-

Palo Verde Nuclear Fire Department Fire Drill: Unit 1 A

Shift Summary/After Action Review Report for Regulatory

Fire Drill

08/23/2023

71111.05

Miscellaneous

NPL41-D-3Q2B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B

Shift Drill Scenario

08/03/2023

71111.05

Miscellaneous

NPL41-D-3Q2B-

Palo Verde Nuclear Fire Department Fire Drill: Unit 2 B

Shift Summary/After Action Review Report for Regulatory

Fire Drill

08/29/2023

71111.05

Procedures

14DP-0FP01

Firewatch Requirements

71111.05

Procedures

14DP-0FP32

Emergency Notification and Response

71111.05

Procedures

14DP-0FP33

Control of Transient Combustibles

71111.05

Procedures

14FT-9FP61

Semi-Annual Operational Test of Appendix R and Appendix

A Fire Door Closers

71111.05

Procedures

18FT-9FP38

Functional Test of Appendix R Fire/HELB Doors

71111.05

Procedures

18FT-9FP39

Functional Test of Appendix A Fire/HELB Doors

71111.05

Procedures

40AO-9ZZ27

Significant Turbine Building Oil System Leaks

71111.05

Procedures

40DP-9ZZ17

Control of Doors, Hatches and Floor Plugs

71111.05

Procedures

40DP-9ZZ19

Operational Considerations Due to Plant Fire

71111.05

Procedures

40OP-9HJ02

Control Building HVAC (Smoke Removal)

71111.05

Work Orders

5535529, 5501387

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.07A

Corrective Action

Documents

23-06257, 22-08195, 22-07864

71111.07A

Miscellaneous

23-0620

U3 DGB Jacket Water Eddy Current Examination Report

71111.07A

Procedures

73DP-9ZZ21

Heat Exchanger Visual Inspection

71111.07A

Work Orders

5398352, 5298385, 5398411, 5396107, 5398303, 5398421,

27973

71111.11Q

Corrective Action

Documents

13-01173, 22-12690, 23-07440, 23-07500, 23-07719, 23-

07771, 23-07823, 23-07865, 23-07874, 23-08727

71111.11Q

Miscellaneous

Specific Maneuver Plan: 258 [Effective Full Power Days]

Downpower Unit 3 Cycle 24

71111.11Q

Miscellaneous

Adverse Condition Monitoring Plan: Unit 3 A Circulating

Water Pump/Motor Vibrations

71111.11Q

Miscellaneous

Operator Logs: Unit 3 August 1-2, 2023

08/07/2023

71111.11Q

Miscellaneous

SES-0-09-A-03

Licensed Operator Continued Training Simulator Exam

Scenario

07/13/2023

71111.11Q

Procedures

40DP-9OP02

Conduct of Operations

71111.12

Corrective Action

Documents

21-13093, 21-15262, 23-03918, 23-03885, 23-04848

71111.12

Miscellaneous

Unit 2 EC PMG Unavailability Criteria Status

08/23/2023

71111.12

Miscellaneous

Performance Monitoring Group, Essential Chilled Water

Train A Unit 2

06/27/2023

71111.12

Miscellaneous

13-NS-C025

Risk Informed Performance Criteria

71111.12

Miscellaneous

EVT-EC-2021-

2254

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2021-

414689

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2023-

438568

Maintenance Rule Event

71111.12

Miscellaneous

EVT-EC-2023-

2921

Maintenance Rule Event

71111.12

Miscellaneous

MR 2.0

Performance Monitoring Bases Document Worksheet -

Essential Chilled Water (HVAC)

71111.12

Procedures

70DP-0MR01

Maintenance Rule

71111.12

Procedures

70DP-0MR02

Maintenance Rule Monitoring Process

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Work Orders

5080139

71111.15

Calculations

13-MC-FP-0315

10CFR50 Appendix R Safe Shutdown Equipment List

71111.15

Corrective Action

Documents

23-05270, 22-09417, 23-02470, 23-03944, 23-04749, 23-

05749, 23-07187, 23-09098, 23-09164, 23-05220, 23-05749,

23-05751, 23-09598

71111.15

Drawings

01-E-SIB-0024

Elementary Diagram Safety Injection - Shutdown [Cooling]

System containment Spray Isolation Valve 1J-SIA-HV-687

71111.15

Drawings

01-E-SIB-0024

Elementary Diagram Safety Injection - Shutdown [Cooling]

System containment Spray Isolation Valve 1J-SIA-HV-687

71111.15

Drawings

13-E-ZAC-050

Conduit & Tray Notes, Symbols & Details

71111.15

Drawings

13-M-FPR-005

Appendix R Safety Function Diagram Chemical & Volume

Control System

71111.15

Drawings

13-N001-1104-

271

SI-657, SI-658, SI-673, SI-675, SI 678, SI-679 Wiring

Diagram

71111.15

Drawings

13-Q-ZZP-001

EQ Configuration Drawing Limitorque Valve Actuator

71111.15

Drawings

N001-1104-

00015

Y-Type Globe Valve Stainless Steel, Socket Weld, Cres,

Size: 1 Class: 1586 LB

71111.15

Miscellaneous

System Training Manual: Volume 40 Safety Injection System

(SI)

71111.15

Miscellaneous

System Training Manual: Safety Equipment Status System

(ES)

71111.15

Miscellaneous

Design Basis Manual: Plant Annunciator / Safety Equipment

Status System

71111.15

Miscellaneous

CH and XO Maintenance Rule Scoping Diagram

2/12/2013

71111.15

Miscellaneous

13-VTD-N383-

00019

BW/IP Operation and Maintenance Manual for Manual and

Motor Operated 1, 1-1/2 and 2 High Pressure Globe

Valves [PUB. #OMM2016]

71111.15

Miscellaneous

CH DBM

Chemical and Volume Control system Design Basis Manual

71111.15

Miscellaneous

EEQ-L200-001

Electrical Equipment Qualification Data File

71111.15

Miscellaneous

RSS-01-1360

Breaker Setting Sheet for Class 1E, 480V MCC 1-E-PHA-

M37 Cubicle 11 for Valve J-SIA-HV-687 (1.6hp)

71111.15

Miscellaneous

SB

Reactor Protection System DBM

71111.15

Miscellaneous

VTD-C490-00001

Combustion Engineering Technical Manual for Limitorque

Corporation Motor Operated Valve Actuators

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

[PUB.#976F[83Y3]BH]

71111.15

Procedures

Molded Case Circuit Breaker Test

71111.15

Procedures

01DP-0AP12-01

Condition Reporting Process Administrative Guideline

71111.15

Procedures

2MT-9ZZ74

Molded Case Circuit Breaker Test

71111.15

Procedures

36ST-9SB32

PPS Input Loop Calibration for Parameter 20, LO RWT

LEVEL

71111.15

Procedures

40DP-9OP26

Operations Operability Determination Process

71111.15

Procedures

40DP-9OP26-01

Operations Operability Determination Process Administrative

Guideline

71111.15

Procedures

40ST-9CH02

Boron Injection Flow Test

71111.15

Procedures

70TI-9ZC01

Boric Acid Walkdown Leak Detection

71111.15

Procedures

73ST-9CH02

Charging Pumps - Comprehensive Test

71111.15

Work Orders

5362779, 5379047, 5561932, 5538035

71111.24

Corrective Action

Documents

23-05431, 23-05432, 23-05983, 23-05990, 23-05997, 23-

06003, 23-06018, 23-06125, 23-06128, 23-07440, 23-07520,

23-09026, 23-09028, 23-09030, 23-09031, 23-08672, 23-

08726, 23-10046

71111.24

Miscellaneous

FLEX SFP Pump Fluid Sample Results

09/05/2023

71111.24

Miscellaneous

PVGS Diverse and Flexible Coping Strategies (FLEX)

Program Plan

71111.24

Miscellaneous

13-NS-A116

Engineering Guide to NRC Post Fukushima Requirements

71111.24

Miscellaneous

VTD-G080-00658

Vendor Technical Document: General Electric Electronic

Speed Governor (MDT-20 Control System)

71111.24

Miscellaneous

VTD-G080-00659

Vendor Technical Document: General Electric MDT-20

Governor Setting Instructions

71111.24

Procedures

14MT-9BD61

FLEX SFP Makeup Pump Inspections and Tests

71111.24

Procedures

14MT-9BD61

FLEX SFP Makeup Pump Inspections and Tests Bases

6a

71111.24

Procedures

30DP-9WP04

Post-Maintenance Testing Development

71111.24

Procedures

31MT-9CH01

Charging Pump Disassembly and Assembly

71111.24

Procedures

2MT-9PE01

Cleaning, Inspection, and Testing of the Class 1E Diesel

Generator

71111.24

Procedures

40DP-9OP08

Diesel Generator Test Record

71111.24

Procedures

40OP-9CH01

CVCS Normal Operations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

40OP-9DF01

Diesel Fuel Oil Storage and Transfer (DF)

71111.24

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.24

Procedures

40OP-9FT01

Feedwater Pump Turbine A

71111.24

Procedures

40ST-9DG02

Diesel Generator B Test

71111.24

Procedures

73DP-9XI01

Pump and Valve Inservice Testing Program

71111.24

Procedures

73DP-9ZZ14

Surveillance Testing

71111.24

Procedures

73ST-9CH06

Charging Pumps - Inservice Test

71111.24

Procedures

73ST-9DF02

Diesel Fuel Oil Transfer Pumps - Comprehensive Pump

Test

71111.24

Procedures

73ST-9ST06

Containment Spray Pumps and Check Valves - Inservice

Test

71111.24

Work Orders

5398306, 5398390, 5427973, 5536211, 5551182, 5539323,

5442500, 5443639, 5453624, 5448003, 5448007, 5549702,

5555891, 5446696, 5446673, 5446695, 5446700, 5459882

71114.06

Corrective Action

Documents

23-06796, 23-08122, 23-08134, 23-08145, 23-08165, 23-

08194, 23-08198, 23-08275, 23-09186

71114.06

Miscellaneous

Emergency Preparedness 2304 Drill Report - Drill Date Aug

8, 2023

09/08/2023

71114.06

Miscellaneous

EP-0801H

[Emergency Action Level] Classification Matrix Hot

Conditions ([Reactor Coolant System] > 210°F)

71114.06

Miscellaneous

EP-0803H

[Protective Action Recommendation] Flowchart

71114.06

Miscellaneous

EP-0804G

Release Evaluation Flowchart

71114.06

Miscellaneous

EP-0930B

[Emergency Action Level] Classification Matrix All Conditions

71114.06

Procedures

EP-0900-012

ERO Positions - Engineering Director (EOF)

71151

Corrective Action

Documents

21-06710, 21-12485, 22-03043, 22-07259

71151

Miscellaneous

Units 1, 2, and 3 PI Summary Report MS06-10 07/2022-

06/2023

08/03/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report July 2022

08/04/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report February 2023

08/04/2023

71151

Miscellaneous

Units 1, 2, and 3 MSPI Margin Report May 2023

08/04/2023

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE August 2022

08/04/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI August 2022

08/04/2023

71151

Miscellaneous

Unit 1 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI August 2022

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE June 2023

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI June 2023

08/04/2023

71151

Miscellaneous

Unit 2 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI June 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: PLE April 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: UAI April 2023

08/04/2023

71151

Miscellaneous

Unit 3 AF, CWS, EDG, HPSI, RHR System MSPI Derivation

Reports: URI April 2023

08/04/2023

71151

Miscellaneous

13-NS-C075

MSPI Bases Document

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0MR01

Maintenance Rule

71151

Procedures

70DP-0PI01

Performance Index Data Mitigating Systems Cornerstone

71151

Procedures

70DP-0PI01

Performance Index Data Mitigating Systems Cornerstone

71151

Procedures

93DP-0LC09

NRC ROP PI Data Collection, Verification and Submittal

71152A

Corrective Action

Documents

2-03027, 23-05330, 23-05514

71152A

Miscellaneous

Pre-Fire Strategies Manual

71152A

Miscellaneous

Unit 1, 2 and 3 Night Order, Fire Hose Station and Fire

Detector TRM Change

05/12/2023

71152A

Miscellaneous

FPCRR, Fire Hose Removal Fire Protection Change

Regulatory Review

08/09/2022

71152A

Miscellaneous

2-05627

APS Commitment Letter

01/11/2027

71152A

Miscellaneous

2-R002/22-F009

LDCR Review Packages

71152A

Miscellaneous

Generic Letter 86-10

Implementation of Fire Protection Requirements

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152A

Miscellaneous

Generic Letter 88-12

Removal of Fire Protection Requirements from Technical

Specifications

71152A

Miscellaneous

NFPA 14

Standpipe and Hose Systems

1976

71152A

Miscellaneous

NFPA 14

Installation of Standpipe and Hose Systems

2019

71152A

Procedures

40AO-9ZZ19

Control Room Fire

71152A

Procedures

40DP-9ZZ19

Operational Considerations Due to Plant Fire

71152A

Procedures

40MG-9ZZ05-002

Mitigating Guidelines Supplemental Strategies

71153

Corrective Action

Documents

23-07440, 23-07500, 23-07791, 23-07845

71153

Miscellaneous

Operator Logs: Unit 3 July 18, 2023, 1800 - July 19, 2023,

0600

07/19/2023

71153

Miscellaneous

Dose Assessment User Manual

71153

Miscellaneous

Event Reporting Manual

71153

Miscellaneous

2-23-034

Compensatory Action Document

07/29/2023

71153

Procedures

16DP-0EP31

Emergency Preparedness Equipment Out of Service

71153

Procedures

40AO-9ZZ08

Load Rejection

71153

Procedures

40DP-9OP02

Conduct of Operations

77