ML19330B521: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project = TAC:42218, TAC:42219
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:- _ - . - - .-               -    .          ..
{{#Wiki_filter:- _ -. - -.-
C034
C034
                                                                                                      \
\\
M
M GCCig!u Power
              , x n.,.3,                                                               GCCig!u Power July 25, 1980 4
, x n.,.3, July 25, 1980 4
l             U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement                               REFEREilCE:
l U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement REFEREilCE:
i            Region II - Suite 3100                                             RII: JP0 101 Marietta Street,ilW                                           50-321, 50-366
Region II - Suite 3100 RII: JP0 i
;            Atlanta, Georgia 30303                                             I&E Bulletin 80-17 ATTEllTICil: Mr. James P. O'Reilly Gentlemen:
101 Marietta Street,ilW 50-321, 50-366 Atlanta, Georgia 30303 I&E Bulletin 80-17 ATTEllTICil: Mr. James P. O'Reilly Gentlemen:
ISE Bulletin 80-17, Sucolement #2 required, within 48 hours of the telechone notification given on July 19, 1980, that an alternate vent
ISE Bulletin 80-17, Sucolement #2 required, within 48 hours of the telechone notification given on July 19, 1980, that an alternate vent path be provided to the 307 vent system. No modification was required to the Haten Units 1 and 2 SDV vent systems since the as-built system satisfies the requirements given in the reference bulletin.
;            path be provided to the 307 vent system. No modification was required to the Haten Units 1 and 2 SDV vent systems since the as-built system satisfies the requirements given in the reference bulletin.
If you have any questions in this regard, please contact this office.
If you have any questions in this regard, please contact this office.
Very truly yours, m.
Very truly yours, 2b.AYf m.
2b.AYf
/ ' W. A. Widner j^
                                                                / ' W. A. Widner j^                                                             ,s RES/mb i
RES/mb
xc:   Director of the Office of Inspection and Enforcement voirector of the Division of Operating Reactors, Office of Nuclear Reactor Regulation bc:   J. ' H. Miller, Jr.                               C. E. Selflower W. E. Ehrensperger                               J. T. Beckham, Jr.
,s i
F. G. Mitchell, Jr.                               O. Batum C. F. Whitmer                                     V. C. Valekis R._ J. Kelly                                     R. A. Glasby J. H. Boykin                                     R. F. Rogers, III l,                  C. R. Thrasher                                   R. W. Staffa M. Manry                                         Route to SRB Members 00/
xc:
L. T. Gucwa 5
Director of the Office of Inspection and Enforcement voirector of the Division of Operating Reactors, Office of Nuclear Reactor Regulation bc:
                                                                                                    //
J. ' H. Miller, Jr.
;
C. E. Selflower W. E. Ehrensperger J. T. Beckham, Jr.
F. G. Mitchell, Jr.
O. Batum C. F. Whitmer V. C. Valekis R._ J. Kelly R. A. Glasby l,
J. H. Boykin R. F. Rogers, III C. R. Thrasher R. W. Staffa M. Manry Route to SRB Members L. T. Gucwa 00/
5
//
80.08040 [3 g
80.08040 [3 g
                                                                                                .      .}}
.}}

Latest revision as of 05:07, 31 December 2024

Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Mod Required for Units 1 & 2 Vent Sys Since as-built Sys Satisfies Requirements of Bulletin
ML19330B521
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/25/1980
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly, Oreilly W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19330B522 List:
References
IEB-80-17, TAC-42218, TAC-42219, NUDOCS 8008040130
Download: ML19330B521 (1)


Text

- _ -. - -.-

C034

\\

M GCCig!u Power

, x n.,.3, July 25, 1980 4

l U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement REFEREilCE:

Region II - Suite 3100 RII: JP0 i

101 Marietta Street,ilW 50-321, 50-366 Atlanta, Georgia 30303 I&E Bulletin 80-17 ATTEllTICil: Mr. James P. O'Reilly Gentlemen:

ISE Bulletin 80-17, Sucolement #2 required, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of the telechone notification given on July 19, 1980, that an alternate vent path be provided to the 307 vent system. No modification was required to the Haten Units 1 and 2 SDV vent systems since the as-built system satisfies the requirements given in the reference bulletin.

If you have any questions in this regard, please contact this office.

Very truly yours, 2b.AYf m.

/ ' W. A. Widner j^

RES/mb

,s i

xc:

Director of the Office of Inspection and Enforcement voirector of the Division of Operating Reactors, Office of Nuclear Reactor Regulation bc:

J. ' H. Miller, Jr.

C. E. Selflower W. E. Ehrensperger J. T. Beckham, Jr.

F. G. Mitchell, Jr.

O. Batum C. F. Whitmer V. C. Valekis R._ J. Kelly R. A. Glasby l,

J. H. Boykin R. F. Rogers, III C. R. Thrasher R. W. Staffa M. Manry Route to SRB Members L. T. Gucwa 00/

5

//

80.08040 [3 g

.