ML19330B521

From kanterella
Jump to navigation Jump to search

Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Mod Required for Units 1 & 2 Vent Sys Since as-built Sys Satisfies Requirements of Bulletin
ML19330B521
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/25/1980
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly, Oreilly W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19330B522 List:
References
IEB-80-17, TAC-42218, TAC-42219, NUDOCS 8008040130
Download: ML19330B521 (1)


Text

- _ -. - -.-

C034

\\

M GCCig!u Power

, x n.,.3, July 25, 1980 4

l U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement REFEREilCE:

Region II - Suite 3100 RII: JP0 i

101 Marietta Street,ilW 50-321, 50-366 Atlanta, Georgia 30303 I&E Bulletin 80-17 ATTEllTICil: Mr. James P. O'Reilly Gentlemen:

ISE Bulletin 80-17, Sucolement #2 required, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of the telechone notification given on July 19, 1980, that an alternate vent path be provided to the 307 vent system. No modification was required to the Haten Units 1 and 2 SDV vent systems since the as-built system satisfies the requirements given in the reference bulletin.

If you have any questions in this regard, please contact this office.

Very truly yours, 2b.AYf m.

/ ' W. A. Widner j^

RES/mb

,s i

xc:

Director of the Office of Inspection and Enforcement voirector of the Division of Operating Reactors, Office of Nuclear Reactor Regulation bc:

J. ' H. Miller, Jr.

C. E. Selflower W. E. Ehrensperger J. T. Beckham, Jr.

F. G. Mitchell, Jr.

O. Batum C. F. Whitmer V. C. Valekis R._ J. Kelly R. A. Glasby l,

J. H. Boykin R. F. Rogers, III C. R. Thrasher R. W. Staffa M. Manry Route to SRB Members L. T. Gucwa 00/

5

//

80.08040 [3 g

.