{{#Wiki_filter:..                         . .-
{{#Wiki_filter:..
EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT A             l i
EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT A i
l l
l UNIT 2 TS I
UNIT 2 TS                       1 l
I l
1 i
1 i
l 1
l 1
f 9409010287 940826 PDR ADOCK 05000361 P             PDR w- N       -ww- -
f 9409010287 940826 PDR ADOCK 05000361 P
PDR w-N
-ww-


          ;,v;- Sv57Eus 3 ,: , .3     C '.T; L R::M E"!;0Ee a R c'.!WJP $3 sigea I
;,v;- Sv57Eus 3,:,.3 C '.T; L R::M E"!;0Ee a R c'.!WJP $3 sigea I
  .        t. .!T!* ",, CC'QITION FOR OPERATION 3.7.5 Two inde;endent control rocm e ergency air cleanup systems shall te 07 ERA 3kE-a::LIC t.!!LITY:       ALL MCOES ACTION:
: t..!T!* ",, CC'QITION FOR OPERATION 3.7.5 Two inde;endent control rocm e ergency air cleanup systems shall te 07 ERA 3kE-a::LIC t.!!LITY:
ALL MCOES ACTION:
Unit 2 or 3 in M00E 1, 2, 3 or 4:
Unit 2 or 3 in M00E 1, 2, 3 or 4:
With one control room emergency air cleanup system inoperable, restore the ine;erable system to CPERABLE status within 7 days or be in at least HOT STA!;*SY within the next 6 hours and in COLD SHUTOOWN within the following 30 hours.
With one control room emergency air cleanup system inoperable, restore the ine;erable system to CPERABLE status within 7 days or be in at least HOT STA!;*SY within the next 6 hours and in COLD SHUTOOWN within the following 30 hours.
Units 2 and 3 in MODE 5 or 6:
Units 2 and 3 in MODE 5 or 6:
: a. With one control room emergency air cleanup system inoperable, restore the inoperable system to OPERABLE status within 7 cays or initiate and maintain operatien of the remaining OPERABl.E contro*
With one control room emergency air cleanup system inoperable, a.
restore the inoperable system to OPERABLE status within 7 cays or initiate and maintain operatien of the remaining OPERABl.E contro*
rocm emergency air cleanup system in the recirculation mode.
rocm emergency air cleanup system in the recirculation mode.
: b. With both control room emergency air. cleanup systems inoperable, or with the OPERABLE control reem emergency air cleanup system re::uire:
b.
With both control room emergency air. cleanup systems inoperable, or with the OPERABLE control reem emergency air cleanup system re::uire:
to be in the recirculation mode by ACTION (a), not capable of be' ;
to be in the recirculation mode by ACTION (a), not capable of be' ;
powe ed by an OPERABLE emergency power source, suspend all c;erati: s involving CORE ALTERATIONS or positive reactivity changes.
powe ed by an OPERABLE emergency power source, suspend all c;erati: s involving CORE ALTERATIONS or positive reactivity changes.
: c. The provisions of Specification 3.0.3 are not applicable in MO:E 5.
The provisions of Specification 3.0.3 are not applicable in MO:E 5.
SURVEILLANCE REQUIREMENTS 4.7.5   Each control room emergency air cleanup system 1 hall be demonstra:ec OPERABLE:
c.
: a. At least once per 12 hours by verifying that the control room air te parature is less than or equal to 110'F.
SURVEILLANCE REQUIREMENTS 4.7.5 Each control room emergency air cleanup system 1 hall be demonstra:ec OPERABLE:
: b.     At least once per 31 days on a STAGGERED TEST BASIS by initating, from the control room, flow through the HEPA filters and charcoal adsaf$ers and verifying that the system operates for at least 10 hours with the heaters on.
At least once per 12 hours by verifying that the control room air a.
: c. At $esst once per 18 months or (1) after any structural maintenarce on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system by:
te parature is less than or equal to 110'F.
: 1. Verifying that with the system operating at a flew rate of     '-
b.
35415 cfm + 10% for the air conditioning unit,.and 2050 = 150 for the ventilatien unit and recirculating threagh tne respec HEPA filters and charcoal adsorbers, leakage through the sys W
At least once per 31 days on a STAGGERED TEST BASIS by initating, from the control room, flow through the HEPA filters and charcoal adsaf$ers and verifying that the system operates for at least 10 hours with the heaters on.
                          -        diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is tested by admitting cold DOP at the respective intake.
At $esst once per 18 months or (1) after any structural maintenarce c.
on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system by:
1.
Verifying that with the system operating at a flew rate of 35415 cfm + 10% for the air conditioning unit,.and 2050 = 150 for the ventilatien unit and recirculating threagh tne respec HEPA filters and charcoal adsorbers, leakage through the sys W diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is tested by admitting cold DOP at the respective intake.
MAY.161993 "S r.a re:: system with San Onofre - Unit 3.
MAY.161993 "S r.a re:: system with San Onofre - Unit 3.
SAN O*.0FRE ';N:T2                         3/4 7-13               AMENOME!iT 10.'I
SAN O*.0FRE ';N:T2 3/4 7-13 AMENOME!iT 10.'I


i punt SYSTEMS t     i i
i punt SYSTEMS t
i
i i
_sg::vEnu.'CE REQUIREMENTS (Continueo
_sg::vEnu.'CE REQUIREMENTS (Continueo i
: 2.       Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a. C.S.c and C.S.d of Regulatory Guide 1.52, Revision 2 March 1978, and the system flow rate is 2050 1 150 cfm for the ventilation unit and 35,485 cfm 1 1C%                 l for the air conditioning unit.
2.
: 3.       Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a. C.S.c and C.S.d of Regulatory Guide 1.52, Revision 2 March 1978, and the system flow rate is 2050 1 150 cfm for the ventilation unit and 35,485 cfm 1 1C%
4        Verifying a system flow rate of 2050 1 150 cfm for the                       l ventilation unit and 35,485 cfm i 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.
l for the air conditioning unit.
: d. After every 720 hours of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sart.;:le obtained in a:cordance with Regulatory Position C.6.6 of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52 Revision 2, March 1978.
3.
: e.      At least once per 18 months by:
Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
: 1.     Verifying that the pressure drep across the combined HEPA                     l, filters and charcoal adsorber banks is less than 7.0 inches Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a                   g e
Verifying a system flow rate of 2050 1 150 cfm for the l
flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm t 10% for the air conditioning unit.
4 ventilation unit and 35,485 cfm i 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.
M       Verifying that on a control room isolation ?.est signal, the system automatically switches into the eme.cgency mode of operation with flow through the HEPA filters and charcoal adsorber banks.
After every 720 hours of charcoal adsorber operation by verifying d.
: 3.      Verifying that on a toxic gas isolation test signal, the syste-               .
within 31 days after removal that a laboratory analysis of a representative carbon sart.;:le obtained in a:cordance with Regulatory Position C.6.6 of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52 Revision 2, March 1978.
l
At least once per 18 months by:
              -                        automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.               l
e.
                                                                                                                      /
1.
: 4.      Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch W.G.
Verifying that the pressure drep across the combined HEPA filters and charcoal adsorber banks is less than 7.0 inches l,
      '.                                relative to the outside atmosphere during system operation in the emergency mode.
Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a g
: 5.      Verifying that the heaters dissipate 4.8 kw t 5% when.,
flow rate of 2050 2 150 cfm for the ventilation unit and e
tested in accordance with ANSI N510-1975.             9.,   ,  s.
35,485 cfm t 10% for the air conditioning unit.
3/4 7-14                AMENOMENT NO. 14 SAN ONOFRE-UNIT 2
M Verifying that on a control room isolation ?.est signal, the system automatically switches into the eme.cgency mode of operation with flow through the HEPA filters and charcoal adsorber banks.
                                                                                                        ._ . _ _ . _ l
Verifying that on a toxic gas isolation test signal, the syste-3.
automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.
/
Verifying that the system maintains the control room at a 4.
positive pressure of greater than or equal to 1/8 inch W.G.
relative to the outside atmosphere during system operation in the emergency mode.
Verifying that the heaters dissipate 4.8 kw t 5% when tested 5.
in accordance with ANSI N510-1975.
9.,
s.
AMENOMENT NO. 14 SAN ONOFRE-UNIT 2 3/4 7-14 l


ptANT SYSTEMS
ptANT SYSTEMS
      -              : p y y :. =. T i ~ ': .~ " i : _
: p y y :. =. T i ~ ':.~ " i :
r,,. .: .u, p
r,,..:.u, p Af ter each ccmplete or partial replacement of a HEPA filter bank by f.
: f. Af ter each ccmplete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050     150 cfm for the ventilation unit and 35,485 cfm : IC% for the   l air conditioning unit.                                                  .
verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : IC% for the l
: g. Af ter each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas
air conditioning unit.
                  '              when they are tested in place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050
Af ter each complete or partial replacement of a charcoal adsorber g.
* 150 cfm for the       l ventilation unit and 35,485 cfm 210% for the air conditioning unit.
bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050
                                  .i FEBi810R1 3/4 7-15           AMEN 0HENT NO. I' SAN ONOFRE-UNIT 2
* 150 cfm for the l
ventilation unit and 35,485 cfm 210% for the air conditioning unit.
.i FEBi810R1 SAN ONOFRE-UNIT 2 3/4 7-15 AMEN 0HENT NO. I'


1.-- m -          ,
1.--
9 e
m 9
EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT B UNIT 3 TS l
e EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT B
f
UNIT 3 TS f
                    -      e-p-
w e-p-M
                                        " - "  M


l*
l*
I        pt ANT SYSTEFS CONTROL RocM EMERGENCY AIR Ct.!ANUP SYSTEH" j
pt ANT SYSTEFS I
,][
CONTROL RocM EMERGENCY AIR Ct.!ANUP SYSTEH"
3 /.t . 7. 5
,][
          -        ggITING MITION FOR OP! RATION Two independent control room emergency air cleanup systems shall be 3.7.5 OPERA 8LE.
3 /.t. 7. 5 j
ALL M00E5 APPt.ICA31LITY_:
ggITING MITION FOR OP! RATION i
g:
Two independent control room emergency air cleanup systems shall be 3.7.5 OPERA 8LE.
APPt.ICA31LITY_: ALL M00E5 g:
Unit'2 or 3 in MODES 1. 2, 3 or 4:
Unit'2 or 3 in MODES 1. 2, 3 or 4:
With one control room emergency air cleanup systas inoperable, restore the                   i inoperable system to CPERA8LE status within 7 day
With one control room emergency air cleanup systas inoperable, restore the inoperable system to CPERA8LE status within 7 day i
{               30 hours.                                                                                   ;
{
[               Units 2 and 3 in HOOFS 5 or 6:                                                               I a.
30 hours.
With one contrer room emergency air cleanopr system inoperable,               l
[
      ;                              restore the inoperable system to OPERA 8LE status within 7 days or           '
Units 2 and 3 in HOOFS 5 or 6:
J                              initiate and maintain operation of the remaining QPERABLE control room emergency air cleanup system in the recirculation mode.
With one contrer room emergency air cleanopr system inoperable, restore the inoperable system to OPERA 8LE status within 7 days or a.
b.
initiate and maintain operation of the remaining QPERABLE control J
With both control room energency air cleanup systems inoperable, or with the OPERA 8LE control room emergency air cleanup system required
room emergency air cleanup system in the recirculation mode.
      !                              to be in the recirculation mode by ACTION (a), not capable of being f                              powered by an CPERASLE emergency power source, suspend all involving CORE ALTERATIONS or positive reactivity changes.
With both control room energency air cleanup systems inoperable, or with the OPERA 8LE control room emergency air cleanup system required b.
d,                         c. The provisions of Specification 3.0.3 are not applicable in MCOE 6.
to be in the recirculation mode by ACTION (a), not capable of being powered by an CPERASLE emergency power source, suspend all f
t               $URVEILLANCE REQUIREMENTS
involving CORE ALTERATIONS or positive reactivity changes.
      }
d, The provisions of Specification 3.0.3 are not applicable in MCOE 6.
4.7.5        Each control roca emergency air cleanup systes shall be demonstrated OPERA 8LE:                                                                                 j a.
c.
At least once per 12 hours by verifying that the control room air           j temperature is less than or equal to 110*F.
t
l
$URVEILLANCE REQUIREMENTS
: b. At least once per 31 days on a STAGGERO TEST 8 ASIS by initating,         !
}
      !                                free the control rosa, flow through tha NEPA filters and charcoal adsettlers and verifying that the- system operstas for at least 10 hours with the heaters on.
Each control roca emergency air cleanup systes shall be demonstrated 4.7.5 OPERA 8LE: At least once per 12 hours by verifying that the control room air j
c.. 'At,   least once per 18 months or (1) after any structural saintenance en the HEPA filter or charcoal adsorber housings, or (2) following-painting, fire or cheatcal release in any ventilation zone communicating with the system by:
j temperature is less than or equal to 110*F.
: 1. Verifying that with the syntaa operating at a flow rate of 35445. cfm f,105 for the air conditioning unit, and 2050 t 150 for the ventilation unit and recirculating through the respective ;
a.
HEPA filtars and charcoal adsorbers, leakage through the system diverting valves is less than or equal to 15 air conditioning     4 unit and 3X ventilation unit when the system is tested by admitting cold 00P at the respective intake.                     f f
At least once per 31 days on a STAGGERO TEST 8 ASIS by initating, free the control rosa, flow through tha NEPA filters and charcoal b.
adsettlers and verifying that the-system operstas for at least 10 hours with the heaters on.
c.. 'At, least once per 18 months or (1) after any structural saintenance en the HEPA filter or charcoal adsorber housings, or (2) following-painting, fire or cheatcal release in any ventilation zone communicating with the system by:
Verifying that with the syntaa operating at a flow rate of 35445. cfm f,105 for the air conditioning unit, and 2050 t 150 1.
for the ventilation unit and recirculating through the respective HEPA filtars and charcoal adsorbers, leakage through the system diverting valves is less than or equal to 15 air conditioning unit and 3X ventilation unit when the system is tested by 4
admitting cold 00P at the respective intake.
f f
(
(
R l
Shared system with San Onofre - Unit 2.
Shared system with San Onofre - Unit 2.                                               ,
R N D OMDC NO. 3 3/4 7-14 SAN ONOFRE-UNIT 3
N D OMDC NO. 3 3/4 7-14 SAN ONOFRE-UNIT 3


l l        i-                                                                                                         !
l i-l
l           >
(
(
PLANTSY53y5
PLANTSY53y5 sMVEIuaA'ct At001REMENTS (Continued 1
              )  sMVEIuaA'ct At001REMENTS (Continued 1
)
: 2.      Verifying that the cleanup system satisfies the O                            Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory t
Verifying that the cleanup system satisfies the 2.
Guide 1.52 Revision 2, March 1978, and the system flow rate\is.'
Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory O
I                            2050 2 150 cfm for the ventilation unit and 35,485 cfm e 10%
Guide 1.52 Revision 2, March 1978, and the system flow rate is.'
I                             for the air conditioning unit.
\\
f 3.
t cfm for the ventilation unit and 35,485 cfm e 10%
Verifying within 31 days after removal that a laboratory
I 2050 2 150 I
          '                          analysis of a representative carton sample ibt i
for the air conditioning unit.
Guide 1.52, Revision 2, March 1978, meets th
f Verifying within 31 days after removal that a laboratory analysis of a representative carton sample ibt 3.
(                            Guide 1.52, Revision 2, March 1978-                                       }
Guide 1.52, Revision 2, March 1978, meets th i
: 4.      Verifying a system flow rate of 2050
Guide 1.52, Revision 2, March 1978-
* 150 cfm for the
}
[                              ventilation unit and 35,485 cfa 2 105 for the air conditioning unit during system operation when tested in accordance with f]                             ANSI N510-1975.                                                              ,
(
g d.
2050
After every 720 hours of charcoal adsorber operation by verifyi!
* 150 cfm for the Verifying a system flow rate of ventilation unit and 35,485 cfa 2 105 for the air conditioning
[                      within 31 days after removal that a laboratory analysis of a 5
[
representative carton sample obtained in accordance with Re 6
4.
Position C.6.h of Regulatory Guide 1.52 Re 8
unit during system operation when tested in accordance with f]
of Regulatory Guide 1.52, Revision 2, March 1978.
ANSI N510-1975.
f                     At least once pir 18 months by:
After every 720 hours of charcoal adsorber operation by verifyi g
        !            e.
within 31 days after removal that a laboratory analysis of a
1.
[
Verifying that the pressure drop across the combined HEPA filtersGauge Water    and charcoal vent 11stien adsorber    banks unit and less than is 7.3less inches than  7.0 Water Gauge air conditioning unit while operating'the system at a flow   rate of 2050 s 150 cfm for the ventilation unit 35,445 cfm 2105 for the air conditioning unit.
d.
2.
representative carton sample obtained in accordance with Re Position C.6.h of Regulatory Guide 1.52 Re 5
Verifying that en a control rose isolation test signal, the system automatically switches into the                                     j f                              adsorter banks.
6 of Regulatory Guide 1.52, Revision 2, March 1978.
* i 1      Verifying that on a toxic gas isolation test signal, the sysj automatically switches into the isolation mode of operatio with flow through the NEPA filters and charcoal adsorbe 4.
8 f
Verifying that the system maintains the control reos at a positive pressure of greater than er equal ito 1/8               in inch relative to the outside atmosphere during system operat on the emergency mode.
At least once pir 18 months by:
5.
e.
Verifying that the heaters dissipate 4.8 kw * $5 when accordance with ANSI N510-1975.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.0 1.
Water Gauge vent 11stien unit and less than 7.3 inches Water Gauge air conditioning unit while operating'the system at a flow rate of 2050 s 150 cfm for the ventilation unit 35,445 cfm 2105 for the air conditioning unit.
Verifying that en a control rose isolation test signal, the system automatically switches into the 2.
j adsorter banks.
f Verifying that on a toxic gas isolation test signal, the sys i
automatically switches into the isolation mode of operatio j
1 with flow through the NEPA filters and charcoal adsorbe Verifying that the system maintains the control reos at a positive pressure of greater than er equal to 1/8 inch 4.
i in relative to the outside atmosphere during system operat on the emergency mode.
Verifying that the heaters dissipate 4.8 kw * $5 whe 5.
accordance with ANSI N510-1975.
ftB i 8190 AMENDMENT NO. 3 3/4 7-15 SAN ONOFRE-UNIT.3
ftB i 8190 AMENDMENT NO. 3 3/4 7-15 SAN ONOFRE-UNIT.3


pte:* Sv5'!"5 SugygILLANCE A!001 AEMENT5 (Continued, p- ._                                                                               l 2
pte:* Sv5'!"5 SugygILLANCE A!001 AEMENT5 (Continued, p-._
: f. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with
After each complete or partial replacement of a HEPA filter bank by 2
f.
verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with
[
[
AN5I N510-1975 while operating the system at a flow rate of
while operating the system at a flow rate of AN5I N510-1975 2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the
          '                    2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the   {i air conditioning unit.
{i air conditioning unit.
l t
After each conclete or' partial replacement of a charcoal edsorber t
g.
i bank by verifying that the charcoal adsorbers remove greater than or g.
After each conclete or' partial replacement of a charcoal edsorber       i bank by verifying that the charcoal adsorbers remove greater than or     l I
. I equal to 99.95% of a halogensted hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 lll
equal to 99.95% of a halogensted hydrocarbon refrigerant test gas l
- L' while operating the system at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm 2 10% for the air conditioning unit.
when they are tested in-place in accordance with ANSI N510-1975 L'
i i
i while operating the system at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm 2 10% for the air conditioning unit.
lll i
E l
E l
L i                                                                                                     .
L i
1
s
  >              .                                                                                    l
\\
: s
                                                                                                        \
l 1
j i
j i
i                                                                                                 !
i L
L                            a 1
a 1
l
l FE) 1 R FF'
                  .J                                                                    FE) 1 R FF' AMD O O T N0. 3 5AN ONOFRE-UNIT 3 3/4 7-16                                 j l
.J AMD O O T N0. 3 3/4 7-16 5AN ONOFRE-UNIT 3 j


i I
i I
PROPOSED TECHNICAL SPECIFICATIONS           <
PROPOSED TECHNICAL SPECIFICATIONS 1
1 1
l i
ATTACHMENT C l
l i
l i
ATTACHMENT C
l l
UNIT 2 TS 1
UNIT 2 TS 1
i i
i i
                                                    )
)
a l
a l
T                                                   !
T
$                                                  \
\\
.o 1
.o 1
1


g svs I"s           _
g svs I"s y,4,7,!
y,4,7,! CC'.?R '. R:04 E''IRGio A
CC'.?R '. R:04 E''IRGio A
* a c'.!:nJP $3 sige.
* a c'.!:nJP $3 sige.
      ,qins CC'CITICN FOR OPERATICN Two inde;endent control reem e ergency air cleanup systems shall te 3.7.5 C7 IRA 3LE-S 1::LIC .!!LITY:             ALL M*0E or del       AdemexV f hLetsdt'4/gg[uthaMcM MU ACTICN'                                                                                               1 Unit 2 or 3 in PODE 1, 2, 3 or 4:
,qins CC'CITICN FOR OPERATICN Two inde;endent control reem e ergency air cleanup systems shall te 3.7.5 C7 IRA 3LE-AdemexV f hLetsdt'4/gg[uthaMcM MU S
with one control room emergency air cleanup system inoperable, restore the l
1::LIC.!!LITY:
ino;erable system to OPERABLE status within 7 days or be in at least HOT                               j STA:CBY within the next 6 hours and in COLD SHUTD0'a*N within the following Ui             nc 3 in M00E 5 or 6                                                                   !
ALL M*0E or del ACTICN' Unit 2 or 3 in PODE 1, 2, 3 or 4:
: a.        With one control roem emergency air cleanup system inoperable, restore the inoperable system to OPERABLE status witnin 7 days or                     l initiate and maintain operatien of the remaining OPERABLE cor. trol l
with one control room emergency air cleanup system inoperable, restore the ino;erable system to OPERABLE status within 7 days or be in at least HOT STA:CBY within the next 6 hours and in COLD SHUTD0'a*N within the following j
roem emergency air cleanup system in the recirculation mode.                         I
Ui nc 3 in M00E 5 or 6 With one control roem emergency air cleanup system inoperable, a.
: b.        With both control room emergency air. cleanup systems inoperable, or i
restore the inoperable system to OPERABLE status witnin 7 days or initiate and maintain operatien of the remaining OPERABLE cor. trol roem emergency air cleanup system in the recirculation mode.
with the OPERABLE control roem emergency air cleanup system re::ui ed to be in the recirculation mode by ACTION (a), not capable of be# g                 l p:ve-ed by an OPERABLE emergency power source, suspend all c;erati: r A TONS     positive reactivity changes)3FE D e rm Lf s wa Wd  foRI Agasse;mb c-
I With both control room emergency air. cleanup systems inoperable, or b.
                              ~
with the OPERABLE control roem emergency air cleanup system re::ui ed to be in the recirculation mode by ACTION (a), not capable of be# g p:ve-ed by an OPERABLE emergency power source, suspend all c;erati: r A TONS positive reactivity changes)3FE D e rm Lf foRI Agasse;mb s wa Wd li la in M"E c-1_provls tiEn en.1.0.3 are
1_provls                 tiEn en.1.0.3 are         a li    la in M"E Mrob    w  .a mwwy toHecJ.o.4rdre   deF The proRs SUR                                      k?! M k W               F " W 4.7.5     Each control room emergency air cleanup system Thall be demenstratec OPERA 5LE:
~
: a.        At least once per 12 hours by verifying that the control reem air terparature is less than or equal to 110*F.
a mwwy The proRs toHecJ.o.4rdre deF Mrob w
: b.        At least once per 31 days on a STAGGERED TEST BASIS by initating, from the control room, flow through the HEPA filters and charcoal ads h ers and verifying that the system operates for at least 10 tours with the heaters on.
.a k?! M k W F " W SUR 4.7.5 Each control room emergency air cleanup system Thall be demenstratec OPERA 5LE:
: c.        At keest once per 18 months or (1) af ter any structural maintanar:e on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical. release in any ventilation Zone communicating with the system by:
At least once per 12 hours by verifying that the control reem air a.
: 1. Verifying that with the system ope-ating at a flow rate of 35415 cfm + 10% for the air conditioning unit, and 2050 : li; :'-*
terparature is less than or equal to 110*F.
for the ventilation unit and recirculating threagh sne res;e:P HEPA filters and charcoal adsorbers, leakage through the syt W
At least once per 31 days on a STAGGERED TEST BASIS by initating, b.
                    -          diverting valves is less than or equal to 1% sir conditioning unit and 1% ventilation unit when the system is tested by admitting cold 00P at the respective intake.
from the control room, flow through the HEPA filters and charcoal ads h ers and verifying that the system operates for at least 10 tours with the heaters on.
MM.161993 "Sr.arec system w uh San Onofre - Unit 3.                                   A'4E cy.E',T IC . ' i 5 3 0'.;*RE ';';;T 2                             3/4 7-13
At keest once per 18 months or (1) af ter any structural maintanar:e c.
on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical. release in any ventilation Zone communicating with the system by:
Verifying that with the system ope-ating at a flow rate of 1.
35415 cfm + 10% for the air conditioning unit, and 2050 : li; :'-
for the ventilation unit and recirculating threagh sne res;e:P HEPA filters and charcoal adsorbers, leakage through the syt W diverting valves is less than or equal to 1% sir conditioning unit and 1% ventilation unit when the system is tested by admitting cold 00P at the respective intake.
MM.161993 "Sr.arec system w uh San Onofre - Unit 3.
A'4E cy.E',T IC. ' i 5 3 0'.;*RE ';';;T 2 3/4 7-13


    -                                                                                                              l l
punt SYSTEMS
l punt SYSTEMS
\\
    \       n                                                                                                       1 syssnUNCE REQUIREMENTS (Continue:n                                                                 )
n syssnUNCE REQUIREMENTS (Continue:n
: 2.     Verifying that the cleanup system satisfies the in-pla:e testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a, C.S.c and C.5.d of Regulatory                       i l
)
Guide 1.52, Revision 2. March 1978, and the system flow rate is 2050       150 cfm for the ventilation unit and 35,485 cfm 10%           l for the air conditioning unit.
2.
: 3. Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in                         l accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
Verifying that the cleanup system satisfies the in-pla:e testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a, C.S.c and C.5.d of Regulatory i
4       Verifying a system flow rate of 2050 150 cfm for the                     l ventilation unit and 35,485 cfm t 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.
Guide 1.52, Revision 2. March 1978, and the system flow rate is 2050 150 cfm for the ventilation unit and 35,485 cfm 10%
: d. After every 720 hours of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sart:1e octained in a::.ordance with Regulato j
l for the air conditioning unit.
                          , Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.S.a of Regulatory Guide 1.52, Revision 2, March 1978.
Verifying within 31 days after removal that a laboratory 3.
: a. At least once per 18 months by:
analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
: 1. Verifying that the pressure drop across the combined HEPA l
4 Verifying a system flow rate of 2050 150 cfm for the l
filters and charcoal adsorber banks is less than 7.0 inches Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a               l flow rate of 2050
ventilation unit and 35,485 cfm t 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.
After every 720 hours of charcoal adsorber operation by verifying d.
within 31 days after removal that a laboratory analysis of a representative carbon sart:1e octained in a::.ordance with Regulato j
, Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.S.a of Regulatory Guide 1.52, Revision 2, March 1978.
At least once per 18 months by:
a.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.0 inches l
1.
Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a l
flow rate of 2050
* 150 cfm for the ventilation unit and 35,485 cfm
* 150 cfm for the ventilation unit and 35,485 cfm
* 10% for the air conditioning unit.
* 10% for the air conditioning unit.
Pg6    Verifying that on a control room isolation test signal, the system automatically switches into the emergency mode of operation with flow through the HEPA filters and charcoal adsorber banks, s
Verifying that on a control room isolation test signal, the Pg6 system automatically switches into the emergency mode of operation with flow through the HEPA filters and charcoal adsorber banks, Verifying that on a toxic gas isolation test signal, the syste-s 3.
: 3.      Verifying that on a toxic gas isolation test signal, the syste-automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.
automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.
: 4. Verifying that the system maintains the control room at a                   I positive pressure of greater than or equal to 1/8 inch W.G.
Verifying that the system maintains the control room at a 4.
        '                              relative to the outside atmosphere during system operation in the emergency mode.
positive pressure of greater than or equal to 1/8 inch W.G.
: 5.      Verifying that the heaters dissipate 4.8 kw i 5% when testec in accordance with ANSI N510-1975.               g.,
relative to the outside atmosphere during system operation in the emergency mode.
3/4 7-14                 AftEN0 MENT No. M SAN Ot:0FRE-UNIT 2                                                                             \
Verifying that the heaters dissipate 4.8 kw i 5% when testec 5.
in accordance with ANSI N510-1975.
g.,
AftEN0 MENT No. M 3/4 7-14 SAN Ot:0FRE-UNIT 2
\\


ptwT SYSTEMS E       c,-~.'';~.ti~ : ;. ~ "i - - t . : .
ptwT SYSTEMS E
                                                        .._,:)
c,-~.'';~.ti~ : ;. ~ "i - - t. :.
f.
..._,:)
After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than er equal to 99.95% of the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050   150 cfm for the ventilation unit and 35,485 cfm : IC% for the l air conditioning unit,
After each complete or partial replacement of a HEPA filter bank by f.
: g. After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas
verifying that the HEPA filter banks remove greater than er equal to 99.95% of the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : IC% for the l
                '            when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the     l ventilation unit and 35,485 cfm 10% for the air conditioning unit.
air conditioning unit, After each complete or partial replacement of a charcoal adsorber g.
bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the l
ventilation unit and 35,485 cfm 10% for the air conditioning unit.
e
e
    ' s. . . ,'
' s...,'
FEBi810" 3/4 7-15           AMENDMENT No. Il SAN ONOFRE-UNIT 2
FEBi810" AMENDMENT No. Il 3/4 7-15 SAN ONOFRE-UNIT 2


a2 - e--           . _ . - - - ,    m - -.-u- - -, .- ,  - --- - - ,,-
b a2 e--
b  -          - -
m
1 l
-.-u-1 I
l I
1 i
l 1
l PROPOSED TECHNICAL SPECIFICATIONS
i l
'l ATTACHMENT D
l PROPOSED TECHNICAL SPECIFICATIONS                                                     l
UNIT 3 TS
'l ATTACHMENT D I
UNIT 3             TS


i
i
  'h       plast SYSTEMS CONTROL ROOM EMga,gy Y AIR CLEANUP SYST!M" 3/4,7 $
'h plast SYSTEMS CONTROL ROOM EMga,gy Y AIR CLEANUP SYST!M" H[
H[
3/4,7 $
; PIT 1RG UnGITICM FOR OPERATION Two independent control room emergency air cleanup systems shall be 3.7.5
I
                                                                                        /    d5<$66ef b             p cA ILITY:           ALL HCDE
; PIT 1RG UnGITICM FOR OPERATION Two independent control room emergency air cleanup systems shall be 3.7.5 d5<$66ef
                                                                                      ~
/
                                                                                                      ~
b p cA ILITY:
ALL HCDE
~
~
g:
g:
J          unit 2 or 3 in MODES 1, 2, 3 or 4:
unit 2 or 3 in MODES 1, 2, 3 or 4:
With one control room emergency air cleanup system inoperable, restore the 4          inoperable system to OPERA 8LE status within 7 days or be in at least HOT STANOBY within the next 6 hours and in COLD SHUTDOWN within the follo
J With one control room emergency air cleanup system inoperable, restore the inoperable system to OPERA 8LE status within 7 days or be in at least HOT 4
                                                                  'k a % A M ' A lrf" -OmN S #' W
STANOBY within the next 6 hours and in COLD SHUTDOWN within the follo
* 'k a % A M ' A lrf" O N S #'
* y'5]
* y'5]
i         30 hours.
W i
* Units 2 and 3 in H00F5 5 or 6 or a.
30 hours.
With one contrer room emergency air cleanup system inopenble,
- m Units 2 and 3 in H00F5 5 or 6 or With one contrer room emergency air cleanup system inopenble, restore the inoperable system to OPERABLE status within 7 days or a.
:                        restore the inoperable system to OPERABLE status within 7 days or i                          initiate and saintain operation of the remaining CPERASLE control roce amargency air cleanup system in the recirculation mode.
initiate and saintain operation of the remaining CPERASLE control i
roce amargency air cleanup system in the recirculation mode.
With both control room emergency air cleanup systems inoperable, or with the OPERA 8LE control room amargency air cisanup systen require b.
to be in the recirculation mode by ACTION (a), not capable of being powered by an CPERABLE emergency power source, s f
{
kl f
ese 1 cable
~~
one fict Lion J._0.3__are no.
f{
e pro.
n ca dA a ie
' cons 7.6.tprew app /E**
E rkovdoen W
# %NM"M %
l CT-iiquTRDiiWi>
suRvEI Each control room emergency air cleanup systaa shall be demonstrated
 
====4.7.5 OPERABLE====
At least once per 12 hours by verifying that the control room air temperature is less than or equal to 110*F.
a.
At least once per 31 days on a STAGGERED TEST 5A$15 by initating from the control room, flow through the HEPA filtars and charcoal
~
b.
b.
With both control room emergency air cleanup systems inoperable, or with the OPERA 8LE control room amargency air cisanup systen require
adsorbers and verifying that the systaa operatas for at least F
      !                      to be in the recirculation mode by ACTION (a), not capable of being f
{                        powered by an CPERABLE emergency power source, s f                                            ese kl                                                ,,
                                                  ~~
1 cable f{                                e pro . n        one fict Lion J._0.3__are no. ca dA a        ie E rkovdoen W                  '#cons
                                                                %NM"M 7.6.tprew %app /E**
l          suRvEI CT-iiquTRDiiWi>                              _
4.7.5      Each control room emergency air cleanup systaa shall be demonstrated OPERABLE:
a.
At least once per 12 hours by verifying that the control room air temperature is less than or equal to 110*F.
: b. At least once per 31 days on a STAGGERED TEST 5A$15 by initating,
                                  ~
from the control room, flow through the HEPA filtars and charcoal adsorbers and verifying that the systaa operatas for at least F
10 hours with the heatars on.
10 hours with the heatars on.
: c. . At       least once per 18 months or (1) after any structural saintenance
At least once per 18 months or (1) after any structural saintenance
                              ~
~
en the HEFA filter or charcoal adsort>er housings, or (2) following
en the HEFA filter or charcoal adsort>er housings, or (2) following
    ,i painting, fire or chemical release in any ventilation zone casounicating with the systes by:
: c..
: 1. Verifying that with the system operating at a flow rate of2050 2 35445 cfa 1 10% for the air conditioning unit, and HEPA filtars and charcoal adsorbers, leakage through the system diverting valves i; Ws than or equal to 1% sir conditioning unit and 3% ventilation unit when the system is testati by admitting cold 00P at the respective intake.
,i painting, fire or chemical release in any ventilation zone casounicating with the systes by:
Verifying that with the system operating at a flow rate of2050 2 1.
35445 cfa 1 10% for the air conditioning unit, and HEPA filtars and charcoal adsorbers, leakage through the system diverting valves i; Ws than or equal to 1% sir conditioning unit and 3% ventilation unit when the system is testati by admitting cold 00P at the respective intake.
(
(
                  =
Shared system with San Onofre - Unit 2.
Shared system with San Onofre - Unit 2.
=
NID E U4T NO 3 3/4 7-14 SAN CHOFRE-UNIT 3
NID E U4T NO 3 3/4 7-14 SAN CHOFRE-UNIT 3


b 1
b 1
(
(
n
      '., , I  sugyEILLAsc1. 210UIREMENT5 (Continued)
[
[
i l      fc                                  2          Verifying that the cleanup systes satisfies the in l       y                                              Regulatory Positions C.5.a. C.S.c and C.5.6 of Regulatory     '
'.,, I sugyEILLAsc1. 210UIREMENT5 (Continued) n Verifying that the cleanup systes satisfies the i fc i
l      fr                                              Guide 1.52, Revision 2, March 1974, and the system flow rate       \ is 2050 a 150 cfm for the ventilation unit and 35,485 cfm c m for the air conditioning unit.
2 l
3.
Regulatory Positions C.5.a. C.S.c and C.5.6 of Regulatory
Verifying within 31 days after removal that a laboratory analysis of a representative ci.rson sample ibtained in accordance with Regulatory Position C.8.b of Regulatory Guide 1.52, Revision 2, March 1978, meets th
\\
            .                                              Guide 1.52, Revision 2, March 1974                                 \
Guide 1.52, Revision 2, March 1974, and the system flow rate is l
i                                                                                2050
y 2050 a 150 cfm for the ventilation unit and 35,485 cfm c m l
* 150 efs for the     i
fr for the air conditioning unit.
: 4.        Verifying a systas flow rate of ventilation unit and 35,485 cfs a 105 for the air condition ng f
Verifying within 31 days after removal that a laboratory analysis of a representative ci.rson sample ibtained in 3.
g unit during system operation when tested in accordance with i                                                 AM5! N510-1975.
accordance with Regulatory Position C.8.b of Regulatory Guide 1.52, Revision 2, March 1978, meets th Guide 1.52, Revision 2, March 1974
j                                      After every 720 hours of charcoal adsorber operation by verif
\\
: d.      within 31 days after removal that a laboratory analysis of a
2050
['
* 150 efs for the Verifying a systas flow rate of i
representative carton sample obtained in accordance                       with R
i ventilation unit and 35,485 cfs a 105 for the air condition ng 4.
          ;                                      Position C.E.b of Regulatory Guide 1.52, Revision                   6 2, March
f unit during system operation when tested in accordance with g
        ,                                        seats the laboratory testing criteria of Regulatory Position C.
i AM5! N510-1975.
After every 720 hours of charcoal adsorber operation by verif j
within 31 days after removal that a laboratory analysis of a
[
d.
representative carton sample obtained in accordance with Position C.E.b of Regulatory Guide 1.52, Revision 2, March 6
seats the laboratory testing criteria of Regulatory Position C.
o.' Regulatory Guide 1.52, Revision 2, March 1974.
o.' Regulatory Guide 1.52, Revision 2, March 1974.
f
f At least once per 18 months by:
: e.      At least once per 18 months by:
Verifying that the pressure drop across the combined HEPA e.
1.
filters and charcoal adsorber banks is less than 7 1.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7 Water Gauge ventilation unit and less tha flew   rate of 2060 e 150 cfm for the ventilation un 35,445 cfm
Water Gauge ventilation unit and less tha flew rate of 2060 e 150 cfm for the ventilation un 35,445 cfm
* 105 for the air conditioning unit.
* 105 for the air conditioning unit.
2.
Verifying that en a control rose isolation test signal, the system automatically switches into the 2.
Verifying that en a control rose isolation test signal, the system automatically switches into the adsetter banks.
adsetter banks.
Verifying that en a toxic gas isolatten test signal, the sy 1        asteestically switches into the isolatten sede of operati with flow through the NEPA f t1 tars and charcoal ads Verifying that the system maintains the centrol room         at a 4.
Verifying that en a toxic gas isolatten test signal, the sy asteestically switches into the isolatten sede of operati 1
positive pressure of greater than er equal toin 1/8 in relative to the outside atmosphere during system opera the emergency mode.
with flow through the NEPA f t1 tars and charcoal ads Verifying that the system maintains the centrol room at a positive pressure of greater than er equal to 1/8 in 4.
5.
in relative to the outside atmosphere during system opera the emergency mode.
Verifying that the heaters dissipate 4.8 kw t SX whe accordance with ANSI N510-1975.
Verifying that the heaters dissipate 4.8 kw t SX whe 5.
accordance with ANSI N510-1975.
FEB i 81#1 AM NDMENT MO. 3 3/4 7-15 SAN ONOFRE-UNIT.3
FEB i 81#1 AM NDMENT MO. 3 3/4 7-15 SAN ONOFRE-UNIT.3


p,y
p,y
* Sv5*E"1
* Sv5*E"1 SUgygILLANCE REQUIREMENTS (Continued
          ,N      SUgygILLANCE REQUIREMENTS (Continued                                   -            .-
,N
                    ~p         --
~p After each complete or partial r. placement of a HEPA filter bank by f.
: f.      After each complete or partial r. placement of a HEPA filter bank by verifying that the HEPA filter banks remove greater titan or equal to
verifying that the HEPA filter banks remove greater titan or equal to 99.95% of the 00P when they are tested in place in accordance with while operating the systes at a flow rate of ANSI N510-1975 cfa for the ventilation unit and 35,445 cfa 210% for the
            '                      99.95% of the 00P when they are tested in place in accordance with ANSI N510-1975  while operating the systes at a flow rate of 2050
{
* 150  cfa for the ventilation unit and 35,445 cfa 210% for the   {
2050
air conditioning unit.
* 150 air conditioning unit.
t t
t After each complete or' partial replacement of a charcoal adsorber t
: g.      After each complete or' partial replacement of a charcoal adsorber bank by verifying 'that the charcoal adsorbers remove greater than er equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with AM5! H510-1975 wnile operating the syates at a flow   rate of 2050 2 150 cfm for the   l ventilation unit and 35,a85 cfm 10% for the air conditioning unit.
bank by verifying 'that the charcoal adsorbers remove greater than er g.
equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with AM5! H510-1975 l
wnile operating the syates at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,a85 cfm 10% for the air conditioning unit.
1 l
1 l
i t
i t
e       %
e 9
9
6 NM3 3/4 7-16 1AN ONOFRE-UNIT 3
* 6 3/4 7-16               NM3 1AN ONOFRE-UNIT 3


                    ----------,,-,-n-,------,-,- -,---
----------,,-,-n-,------,-,-
l l                                                         l l .
l l
l ENCL 0SURE 2 l
l ENCL 0SURE 2
I I
I 1
1
'E l
      'E l
1 1
1 l
J
1 J


i PCN-299 (TSIP)
i PCN-299 (TSIP)
TECHNICAL SPECIFICATION 3.7.11 and BASES (with marked-up chanaes proposed by PCN-439)
TECHNICAL SPECIFICATION 3.7.11 and BASES (with marked-up chanaes proposed by PCN-439)
UNIT 2 l
UNIT 2 l
l l
f-t
f-t l
)
I
                                                  )


                                                                                          .i, 3.' ..
.i, ;
3,7 PLMT SYSTEMS Control Room Emergency Air Cleanup System (CREACUS) 3.7.11 LCO 3.7.11         Two CREACUS trains shall be OPERABLE.
3.'
MODES 1, 2, 3, 4, 5, and 6, APPLICABILITY:     During movement of irradiated fuel assemblies.
3,7 PLMT SYSTEMS Control Room Emergency Air Cleanup System (CREACUS) 3.7.11 LCO 3.7.11 Two CREACUS trains shall be OPERABLE.
ACTIONS
MODES 1, 2, 3, 4, 5, and 6, APPLICABILITY:
                                    ----------------------------NOTES---------------------------
During movement of irradiated fuel assemblies.
1x. seer            f. Each Unit shall enter applicable ACTIONS sepa
----------------------------NOTES---------------------------
                                  ~
: f. Each Unit shall enter applicable ACTIONS sepa ACTIONS 1x. seer I
I              CONDITION REQUIRED ACTION COMPLETION TIME Restore CREACUS train 7 days One CREACUS train           A.1 A.                                        to OPERABLE status.
~
REQUIRED ACTION COMPLETION TIME CONDITION A.
One CREACUS train A.1 Restore CREACUS train 7 days to OPERABLE status.
inoperable.
inoperable.
B.1     Be in M00E 3.         6 hours S. Required Action and associated Completion gg
S.
* Time of Condition A not met in MODE 1, 2,                                     36 hours B.2      Be in MODE 5.
Required Action and B.1 Be in M00E 3.
6 hours associated Completion Time of Condition A gg not met in MODE 1, 2,
: 3. or 4.
: 3. or 4.
Place OPERABLE Ismediately C. Required Action and         C.1 associated Coupletion               CREACUS train in emergency radiation Time of Condition A                 protection mode.
B.2 Be in MODE 5.
not met in MODES 5 or 6, or during movenset of irradiated     gg feel assashlies.                                .
36 hours C.
(continued)
Required Action and C.1 Place OPERABLE Ismediately associated Coupletion CREACUS train in Time of Condition A emergency radiation not met in MODES 5 protection mode.
                                                  -      f                                        ~
or 6, or during movenset of irradiated gg feel assashlies.
2.k povwns                        JC0 3.D.y are n/ gnyticoate 1
(continued) f
N k n en/eri
~
* s s;           or gue/ed cogurah'e, MENDMENT NO.
JC0 3.D.y are n/ gnyticoate 2.k povwns or gue/ed cogurah'e, 1
N k n en/eri s s; MENDMENT NO.
SAN ON0FRE--UNIT 2 3.7-25
SAN ON0FRE--UNIT 2 3.7-25


l ACTIONS
ACTIONS
      ~
~
REQUIRED ACTION       COMPLETICH TIME           l CON 0! TION l
CON 0! TION REQUIRED ACTION COMPLETICH TIME C.
C.2.1   Suspend CORE         Imediately               ;
(continued)~
C.  (continued)~                                                                          I ALTERATIONS.
C.2.1 Suspend CORE Imediately ALTERATIONS.
                                          !.EE Suspend movement of  Imediately C.2.2 irradiated fuel assemblies.
!.EE C.2.2 Suspend movement of Imediately irradiated fuel assemblies.
0.1     Enter LCO 3.0.3.       Imediately             i D. Two CREACUS trains inoperable in MODE 1, 2, 3, or 4.
D.
E.1     Suspend CORE           Imediately E. Two CREACUS trains inoperable in MODES 5                 ALTERATIONS.
Two CREACUS trains 0.1 Enter LCO 3.0.3.
or 6, or during movement of irradiated       8,HQ fuel assemblies.                                             Imediately E.2     Suspend movement of irradiated fuel assemblies.
Imediately i
1 SURVEILLANCE REQUIRDIENTS FREQUENCY SURVEILLANCE Operate each CREACUS train for               31 days on a SR 3.7.11.1                                                        STAGGERED TEST a 15 minutes.
inoperable in MODE 1, 2, 3, or 4.
BASIS (continued) l l
E.
3.7-26                   AMEN 0 MENT NO.
Two CREACUS trains E.1 Suspend CORE Imediately inoperable in MODES 5 ALTERATIONS.
SAN ONOFRE--UNIT 2 l
or 6, or during movement of irradiated 8,HQ fuel assemblies.
E.2 Suspend movement of Imediately irradiated fuel assemblies.
SURVEILLANCE REQUIRDIENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Operate each CREACUS train for 31 days on a STAGGERED TEST a 15 minutes.
BASIS (continued)
SAN ONOFRE--UNIT 2 3.7-26 AMEN 0 MENT NO.
l e
l e


I SURVEILLANCE REQUIREMENTS   (continued)
SURVEILLANCE REQUIREMENTS (continued)
FREQUENCY
SURVEILLANCE FREQUENCY SR 3.7.11.2 Perform required CREACUS filter testing in In accordance accordance with Ventilation Filter Testing with the VFTP Program (VFTP).
          #                            SURVEILLANCE Perform required CREACUS filter testing in In accordance SR 3.7.11.2                                                with the VFTP accordance with Ventilation Filter Testing Program (VFTP).
24 months SR 3.7.11.3 Verify each CREACUS train actuates on an actual or simulated actuation signal.
Verify each CREACUS train actuates on an  24 months SR 3.7.11.3     actual or simulated actuation signal.
SR 3.7.11.4 Verify one CREACUS train can maintain a 24 months on a positive pressure of n 0.125 inches water STAGGERED TEST gauge, relative to the atmosphere during BASIS the energency radiation state of the energency mode of operation.
Verify one CREACUS train can maintain a   24 months on a SR 3.7.11.4                                                STAGGERED TEST positive pressure of n 0.125 inches water gauge, relative to the atmosphere during   BASIS the energency radiation state of the energency mode of operation.
t 1
t l
\\
l 1
e d
                                                                                            \
SAN ONOFRE--UNIT 2 3.7-27 AMEN 0 MENT NO.
e AMEN 0 MENT NO.
i
d        SAN ONOFRE--UNIT 2                     3.7-27 i


l
.v 3 :.'..
                                                                                  .v   .
g 3.7 PLANT SYSTEMS B 3.7.11 Control Room Emergency Air Cleanup System (CREACUS)
3 :.' ..
BASES
g 3.7 PLANT SYSTEMS B 3.7.11 Control Room Emergency Air Cleanup System (CREACUS) 1 BASES
=
      =
BACKGROUND The CREACUS provides a protected environment from which operators can control the plant following an uncontroiled release of radioactivity.
BACKGROUND         The CREACUS provides a protected environment from which operators can control the plant following an uncontroiled release of radioactivity.
The CREACUS consists of two independent, redundant trains that recirculate and filter the control room air.
The CREACUS consists of two independent, redundant trains that recirculate and filter the control room air. Each CREACUS train consists of emergency air conditioning unit, emergency ventilation air supply unit, emergency isolation dampers, and cooling coils and two cabinet coolers per Unit.
Each CREACUS train consists of emergency air conditioning unit, emergency ventilation air supply unit, emergency isolation dampers, and cooling coils and two cabinet coolers per Unit.
Each emergency air conditioning unit includes a prefilter, a high efficiency particulate air (HEPA) filter, an activated carbon adsorber section for removal of gaseous activity (principally iodine), and a fan. A.second bank of HEPA filters follows the adsorber section to collect carbon fines. Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also form part of the system. Air and motor-operated dampers are provided for air volume control and system isolation purposes.
Each emergency air conditioning unit includes a prefilter, a high efficiency particulate air (HEPA) filter, an activated carbon adsorber section for removal of gaseous activity (principally iodine), and a fan. A.second bank of HEPA filters follows the adsorber section to collect carbon fines.
Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains. The prefilters remove any large particles in the air to prevent excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.
Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also form part of the system. Air and motor-operated dampers are provided for air volume control and system isolation purposes.
There are two CREACUS operational modes. Emergency mo'.e is an operational mode when the control room is isolated to protect operational personnel from radioactive expostre           l through the duration of any one of the postulated I'miting         i faultsdiscussedinChapter15UFSAR(Ref.2).           Isclation mode is an operational mode when the control room is isolated to protect operational personnel from toxic gasses         ,
Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains.
and smoke.                                                         l Actuation of the CREACUS places the system into either of           l two separate states of operation, depending on the                 ,
The prefilters remove any large particles in the air to prevent excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.
initiation signal. Actuation of the system to the emergency         l node of operation closes tne unfiltered-outside-air intake         !
There are two CREACUS operational modes. Emergency mo'.e is an operational mode when the control room is isolated to protect operational personnel from radioactive expostre through the duration of any one of the postulated I'miting i
(continued)
faultsdiscussedinChapter15UFSAR(Ref.2).
U-SANONOFRE--UNITg,                     B 3.7-62                   AMENDMENT NO.
Isclation mode is an operational mode when the control room is isolated to protect operational personnel from toxic gasses and smoke.
i
Actuation of the CREACUS places the system into either of two separate states of operation, depending on the initiation signal. Actuation of the system to the emergency node of operation closes tne unfiltered-outside-air intake (continued)
U-SANONOFRE--UNITg, B 3.7-62 AMENDMENT NO.


                                                                                        .D
. D '...
      ]   8ASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for -
]
recirculation of control room air through the redundant (continued) trains of HEPA and charcoal filters. The emergency mode initiates pressurization of the control room.
8ASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for -
Outside air is added to the air being recirculated from the control. room. Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.
(continued) recirculation of control room air through the redundant trains of HEPA and charcoal filters.
The emergency mode initiates pressurization of the control room.
Outside air is added to the air being recirculated from the control. room.
Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.
The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and -
The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and -
toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode'or isolation mode as required. The actions of the isolation mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.
toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode'or isolation mode as required. The actions of the isolation mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.
A single train will pressurize the control room to at least~
A single train will pressurize the control room to at least~
0.125 inches water gauge, and provides an air exchange rate                 ,
0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in j
in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in                       j t                  Reference 1.                                                               ,
Reference 1.
Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Nonnally-open isolation dampers are arranged in series pairs so that one' damper's failure to shut will not result 'in a breach of isolation. The CREACUS is designed in accordance with Seismic Category I requirements.                                                             ,
t Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Nonnally-open isolation dampers are arranged in series pairs so that one' damper's failure to shut will not result 'in a breach of isolation. The CREACUS is designed in accordance with Seismic Category I requirements.
The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem                     c whole-body dose.
The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem c
e APPLICABLE       The CREACUS components are arranged in redundant safety SAFETY ANALYSES   related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate supply-of filtered air to all areas requiring access.
whole-body dose.
e APPLICABLE The CREACUS components are arranged in redundant safety SAFETY ANALYSES related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate supply-of filtered air to all areas requiring access.
(continued)
(continued)
O                                           8 3.7-63                     AMENOMENT NO.
O SANONOFRE--UNIT 4 8 3.7-63 AMENOMENT NO.
SANONOFRE--UNIT 4 i
i i
i


  .        .            _ = . . .                                                       _        _
_ =...
                                                                                                  ^'
^'
2     --..
2 BASES APPLICABLE The CREACUS provides airborne radiological protection for SAFETY ANALYSES the control room operators, as demonstrated by the control (continued) room accident dose analyses for the most limiting design basis loss of coolant accident fission product release presented in the UFSAR, Chapter 15 (Ref. 2).
  ''          BASES
The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room following a toxic chemical release, as presented. in Reference 1.
_                                                                                              1 APPLICABLE                 The CREACUS provides airborne radiological protection for SAFETY ANALYSES the control room operators, as demonstrated by the control (continued) room accident dose analyses for the most limiting design           '
The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair I
l basis loss of coolant accident fission product release presented in the UFSAR, Chapter 15 (Ref. 2).
the ability of the system to perform its design function.
I The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room               l following a toxic chemical release, as presented. in Reference 1.
1 The CREACUS satisfies Criterion 3 of the NRC Policy Statement.
The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair         I the ability of the system to perform its design function.         l 1
LC0 Two independent and redundant trains of the CREACUS are required to.be OPERABLE to ensure that at least one is available, assuming that a single failure disables the other r
The CREACUS satisfies Criterion 3 of the NRC Policy Statement.
train. Total system failure could result in a control room operator receiving a dose Tn excess of 5 res in the event of
LC0                         Two independent and redundant trains of the CREACUS are required to.be OPERABLE to ensure that at least one is             ,
?
available, assuming that a single failure disables the other       l r                                 train. Total system failure could result in a control room
a large radioactive release.
      ?                                  operator receiving a dose Tn excess of 5 res in the event of a large radioactive release.
The CREACUS is considered OPERABLE when the individual components necessary to control operator exposure are OPERABLE in both trains. A CREACUS train is considered i
The CREACUS is considered OPERABLE when the individual components necessary to control operator exposure are OPERABLE in both trains. A CREACUS train is considered           i OPERABLE when the associated:
OPERABLE when the associated:
                                    - a.
- a.
y ..
Fan is OPERABLE; y..
Fan is OPERABLE;
: b..J.HfPK ~ filters and charcoal adsorber are not-eicessively
: b. .J.HfPK ~ filters and charcoal adsorber are not-eicessively
~-._;;?ms.tricting flow, and are capable of-performing their
:p      '; ~-._;;?ms.tricting flow, and are capable of-performing their
:p p S_:f'L ftRj ation functions; and
          ~
~
p S_:f'L ftRj ation functions; and
, c.
                                      , c. Ductwork, valves, and dampers are OPERABLE, and air
Ductwork, valves, and dampers are OPERABLE, and air
_ p [ ,". ~
_ p [,". ~
* circulation can be maintained.
* circulation can be maintained.
yp.      .
yp.
In addition, the control room boundary must be maintained, or administrative 1y controlled, including the integrity of     :
In addition, the control room boundary must be maintained, or administrative 1y controlled, including the integrity of the walls, floors, ceilings, ductwork.and access doors.
the walls, floors, ceilings, ductwork .and access doors.         !
me h
me h                                                                                           (continued)
(continued)
SANONOFRE--UNIT $                             B 3.7-64                   AMEN 0 MENT NO.
SANONOFRE--UNIT $
B 3.7-64 AMEN 0 MENT NO.


      ;    BASES (continued)
BASES (continued)
APPLICABILITY     In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to limit operator exposure during and following a OBA.
APPLICABILITY In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to limit operator exposure during and following a OBA.
In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.
In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.
During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.
During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.
ACTIONS         l ACTION statements are modified by a NOTE: "Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3. LC0 does not address the operational situation when the units are in different d.-M.Sd!47 [7 what    operational MODES. Without this NOTE it may not be clear ACTION should be taken.
ACTIONS l ACTION statements are modified by a NOTE:
A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days. In this Condition,         .
"Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3.
the remaining OPERABLE CREACUS subsystem is adequate to           l perform control room radiation protection function.               l Mowever, the overall reliability is reduced because a single failure in the OPERABLE CREACUS train could result in loss         ,
LC0 does not address the d.-M.Sd!47 [7 operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.
of CREACUS function. The 7 day Completion Time is based on         l the low probability of a DBA occurring during this time           l period, and the ability of the remaining train to provide         !
A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days.
J the required capability.
In this Condition, the remaining OPERABLE CREACUS subsystem is adequate to perform control room radiation protection function.
l Mowever, the overall reliability is reduced because a single failure in the OPERABLE CREACUS train could result in loss of CREACUS function. The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and the ability of the remaining train to provide J
the required capability.
B.1 and B.2
B.1 and B.2
                                                                                                    \
\\
l If the inoperable CREACUS cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the accident risk. To achieve this status, the unit must be           i i
If the inoperable CREACUS cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the accident risk. To achieve this status, the unit must be i
placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
(continued)
(continued)
B 3.7-65                  AMENOMENT NO.
SAN ONOFRE--UNIT 2.
SAN ONOFRE--UNIT 2.
B 3.7-65 AMENOMENT NO.


INSERT       "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately
INSERT "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately
* CREACUS is a shared system between Unit 2 and Unit 3. LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.
* CREACUS is a shared system between Unit 2 and Unit 3.
NOTE 2 reads: "The provisions af LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration." In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.
LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.
Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it. This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY. Therefore, this threshold can be excepted from LCO 3.0.4.
NOTE 2 reads: "The provisions af LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration."
In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.
Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it. This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY.
Therefore, this threshold can be excepted from LCO 3.0.4.
The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4.
The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4.
The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt. If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LC0 3.0.4 also.
The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt.
If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards.
Therefore, this MODE change can be excepted from LC0 3.0.4 also.
The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor
The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor
                                                        > 200*F to T 5 200aF by Coolant initiatingSystem  (RCS) shutdown    temperature from 350cF > TIf no irradiated E!el assemblies, ya cooling.
> 200*F to T 5 200aF by Coolant System (RCS) temperature from 350cF > TIf no irradiated E!el assemblies, ya initiating shutdown cooling.
moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4 also.
moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards.
Therefore, this MODE change can be excepted from LCO 3.0.4 also.


l i
i
*                                                                              ::i:. 5 3 3.'       ..
::i:. 5 3
BASES ACTICNS           C.I. C.2.1. and C.2.2 j
3.'
BASES ACTICNS C.I. C.2.1. and C.2.2 (continued) j In MCDE 5 or 6, or during movement of irradiated fuel assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency made of operation.
This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.
An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control room.
This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel assemblies to a safe position.
D.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended 1
function and the unit is in a condition outside the accident i
analyses. Therefore, LCO 3.0.3 must be entered imediately.
E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.
This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel to a safe position.
w SURVEIL SR 3.7.11.1 REQUIREMENTS l
Standby systems should be checkect periodically to ensure that they function properly. Sir.ce the environment and normal operating conditions on this system are not severe,
)
testing each train once every month provides an adequate check on this system.
(continued)
(continued)
In MCDE 5 or 6, or during movement of irradiated fuel                    )
SAN ONOFRE.--UNIT &
assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency made of                      ,
B 3.7-66 AMENDMENT NO.
operation. This action ensures that the remaining train is              !
OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.                                                                l An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control                l room. This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel assemblies to a safe position.
D.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended                1 function and the unit is in a condition outside the accident            i analyses. Therefore, LCO 3.0.3 must be entered imediately.
E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.
This places the unit in a condition that minimizes the                    l accident risk. This does not preclude the movement of fuel to a safe position.
w SURVEIL          SR 3.7.11.1 l
REQUIREMENTS Standby systems should be checkect periodically to ensure that they function properly. Sir.ce the environment and normal operating conditions on this system are not severe,            )
          ,              testing each train once every month provides an adequate                l check on this system.                                                  l
  <-                                                                        (continued)
SAN ONOFRE.--UNIT &                   B 3.7-66                   AMENDMENT NO.


e
- Uinf e
                                                                              - Uinf
1.s
                                                                              ; 1.s .L
.L
    ~,' BASES SURVEILLANCE   SR 3.7.11.1     (continued)
~,
BASES SURVEILLANCE SR 3.7.11.1 (continued)
REQUIREMENTS Systems not requiring humidity control need only be operated for t 15 minutes to demonstrate the function of the system.
REQUIREMENTS Systems not requiring humidity control need only be operated for t 15 minutes to demonstrate the function of the system.
The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.
The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.
SR 3.7.11.2 This SR verifies that the required CREACUS testing is performed in accordance with the Ventilation Filter Testing Program (VFTP). The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3). The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations). Specific test frequencies and additional infonnation are discussed in detail in the VFTP.
SR 3.7.11.2 This SR verifies that the required CREACUS testing is performed in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on     i an actual or simulated actuation signal. The Frequency of       l 24 months is consistent with that specified in Reference 3.     ;
The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3).
SR 3.7.11.4                                                     i This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control roce = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.                               ;
The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations).
  +
Specific test frequencies and additional infonnation are discussed in detail in the VFTP.
d.-                                                                       (continuer SAN ONOFRE--UNIT 1                 B 3.7-67                   AMENDNENT N0.
SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on i
 
an actual or simulated actuation signal. The Frequency of 24 months is consistent with that specified in Reference 3.
::i .'..
SR 3.7.11.4 This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control roce = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.
i 2.    ..
+
          ~
d.-
(continuer SAN ONOFRE--UNIT 1 B 3.7-67 AMENDNENT N0.
::i.'..
i 2.
~
BASES (continued)
BASES (continued)
REFERENCES       1. UFSAR. Section 9.4.
REFERENCES 1.
: 2. UFSAR, Chapter 15.
UFSAR. Section 9.4.
: 3. Regulatory Guide 1.52 (Rev. 2).
2.
UFSAR, Chapter 15.
3.
Regulatory Guide 1.52 (Rev. 2).
3 4
3 4
SAN ON0FRE--UNIT 1                 B 3.7-68             AMEN 0 MENT NO.
SAN ON0FRE--UNIT 1 B 3.7-68 AMEN 0 MENT NO.


l
)
                                                                )
PCN-299 (TSIP)
PCN-299 (TSIP)
TECHNICAL SPECIFICATION 3.7.11 and BASES                                       l (with wrked-up changes proposed by PCN-439)
TECHNICAL SPECIFICATION 3.7.11 and BASES (with wrked-up changes proposed by PCN-439)
UNIT 3 1
UNIT 3 1
i I
l I
l 1


        .                                                                                                              ..:. l.~
l.~
l 1
l 1
i i
i 3.7. PLANT SYSTEMS i
      ,                  3.7 . PLANT SYSTEMS l
Control Room Emergency Air Cleanup System (CREACUS)
          )                            Control Room Emergency Air Cleanup System (CREACUS)                                                   l 3.7.11                                                                                                             l Two CREACUS trains shall be OPERABLE.
)
LCO 3.7.11 M00 5 1         A 5 APPLICABILITY:                          g irra iated fuel assemblies.
l 3.7.11 LCO 3.7.11 Two CREACUS trains shall be OPERABLE.
APPLICABILITY:
M00 5 1 A 5 g irra iated fuel assemblies.
1
1
                                                  ----------------------------NOTE----------------------------
----------------------------NOTE----------------------------
                                                                                                            -.$$.5 $ b--------
ACTIONS MIT
ACTIONS                                                                          '
-.$$.5 $ b--------
MIT                                      -.
REQUIRED ACTION COMPLETION TIME CONDITION A.
COMPLETION TIME REQUIRED ACTION CONDITION Restore CREACUS train             7 days                        ,
One CREACUS train A.1 Restore CREACUS train 7 days to OPERABLE status.
A.1                                                                           l A. One CREACUS train                       to OPERABLE status.
inoperable.
inoperable.
I Be in M00E 3.                     6 hours Required Action and       8.1                                                                           l 8.
I 8.
associated Completion                                                                                     i
Required Action and 8.1 Be in M00E 3.
: t.                                                 Atgl
6 hours associated Completion t.
        "                            Time of Condition A not met in MODE 1, 2,                                                     36 hours B.2         Be in MODE 5.
Time of Condition A Atgl not met in MODE 1, 2, B.2 Be in MODE 5.
36 hours
: 3. or 4.
: 3. or 4.
Place OPERA 8tE Imediately Required Action and       C.1 C.                                          CREACUS train in associated Cagletion emergency radiation Time of Condition A                     protection mode.
C.
not met in NODES 5 i
Required Action and C.1 Place OPERA 8tE Imediately associated Cagletion CREACUS train in Time of Condition A emergency radiation not met in NODES 5 protection mode.
or 6, or during i                 anvemaet of irradiated     Q8 feel assemblies.
or 6, or during i
i anvemaet of irradiated Q8 feel assemblies.
(continued)
(continued)
                      )                                                                                                                 _
)
V-
V-
                                                                  -4 do 3.0.4i are 'c & */ W T " '
-4 do 3.0.4i are 'c & */ W T " '
2.7h           povisiexs $seG r6, oe n'efua/1e'*g'ahe, wA<n en4r44 p                                                                                       ,
2.7h povisiexs $seG r6, oe n'efua/1e'*g'ahe, wA<n en4r44 p AMENOMENT NO.
AMENOMENT NO.
3.7-25 SANONOFRE--UNITj
3.7-25
.s
          .s.
SANONOFRE--UNITj


ACT10N$_
ACT10N$_
REQUIRED ACTION             COMPLETION TIME CONDITION C.2.1   Sus;end CORE               Imediately C.  (continued)'                    ALTERATIONS.
REQUIRED ACTION COMPLETION TIME CONDITION C.
A10 Suspend movement of      Imediately C.2.2 irradiated fuel assemblies.
(continued)'
0.1     Enter LCO 3.0.3.           Imediately D. Two CREACUS trains inoperable in MODE 1, 2, 3, or 4.
C.2.1 Sus;end CORE Imediately ALTERATIONS.
E.1     Suspend CORE               Imediately E. Two CREACUS trains inoperable in MODES 5             ALTERATIONS.
A10 C.2.2 Suspend movement of Imediately irradiated fuel assemblies.
or 6, or during movement of irradiated   !!gl fuel assemblies.                                      .
D.
Immediately E.2     Suspend movement of irradiated fuel assemblies.
Two CREACUS trains 0.1 Enter LCO 3.0.3.
SURVEILLANCE REQUIREMENTS                                                                     .
Imediately inoperable in MODE 1, 2, 3, or 4.
SURVEILLANCE                                           FREQUENCY SR 3.7.12.E Operate each CREACUS train for                             31 days on a r a 15 minutes.                                             STAGGERED TEST BASIS i
E.
(continued) 3.7-26                                   ANENDNENT NO.
Two CREACUS trains E.1 Suspend CORE Imediately inoperable in MODES 5 ALTERATIONS.
SANON0FRE--UNITj
or 6, or during movement of irradiated
!!gl fuel assemblies.
Immediately E.2 Suspend movement of irradiated fuel assemblies.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.E Operate each CREACUS train for 31 days on a a 15 minutes.
STAGGERED TEST r
BASIS i
(continued)
SANON0FRE--UNITj 3.7-26 ANENDNENT NO.


                                                                                ..m (continued)                     FREQUENCY       ~
..m (continued)
S#URVEILLANCE                       REQUIREMENTS SURVEILLANCE In accordance s                                                    i    with the VFTP SR    3.7.11.2 Perfort required CREACUS filter testing                      _
FREQUENCY S#URVEILLANCE REQUIREMENTS
Program (VFTP).
~
l 24 months Verify each CREACUS trainl actuates on an SR  3.7.11.3   actual or simulated actuation signa .                        -
SURVEILLANCE In accordance Perfort required CREACUS filter testing with the VFTP s
24 months on a STAGGERED TEST Verify one CREACUS train can maintain   8 ASIS    a SR 3.7.11.4      positive pressure of e 0.125     inches water               '
i 3.7.11.2 SR Program (VFTP).
gauge, relative to the atmosphere h             during the emergency radiation state of t e emergency mode of operation.
l 24 months Verify each CREACUS train actuates on an l
actual or simulated actuation signa.
3.7.11.3 SR 24 months on a STAGGERED TEST Verify one CREACUS train can maintain a positive pressure of e 0.125 inches water 8 ASIS gauge, relative to the atmosphere during SR 3.7.11.4 h
the emergency radiation state of t e emergency mode of operation.
1 w
1 w
f AMENDMENT NO.
f AMENDMENT NO.
3.7-27 j              SANON0FRE--UNITJ
3.7-27 SANON0FRE--UNITJ j


5     ,.
5 B 3.7 PLANT SYSTEMS 2
B 3.7 PLANT SYSTEMS                                                                   ,
8 3.7.11 Control Room Emergency Air Cleanup System (CREACUS) i BASES BACKGROUND The CREACUS provides a protected environment from which j
2 8 3.7.11 Control Room Emergency Air Cleanup System (CREACUS) i BASES BACKGROUND         The CREACUS provides a protected environment from which           j operators can control the plant following an uncontrolled         1 release of radioactivity.                                         !
operators can control the plant following an uncontrolled release of radioactivity.
l The CREACUS consists of two independent, redundant trains         ,
The CREACUS consists of two independent, redundant trains that recirculate and filter the control room air.
that recirculate and filter the control room air.     Each       j CREACUS train consists of emergency air conditioning unit,         1 emergency ventilation air supply unit, emergency isolation         !
Each j
dampers, and cooling coils and two cabinet coolers per Unit.     l Each emergency air conditioning unit includes a prefilter, a       l high efficiency particulate air (HEPA) filter, an activated       l carbon adsorber section for removal of gaseous activity           i (principally iodine), and a fan. A second bank of HEPA filters follows the adsorber section to collect carbon fines. Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also fonn part       :
CREACUS train consists of emergency air conditioning unit, 1
of the system. Air and motor-operated dampers are provided       i for air volume control and system isolation purposes.             l Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains. The     ;
emergency ventilation air supply unit, emergency isolation dampers, and cooling coils and two cabinet coolers per Unit.
prefilters remove any large particles in the air to prevent       i excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.
Each emergency air conditioning unit includes a prefilter, a l
There are two CREACUS operational modes. Emergency mode is       !
high efficiency particulate air (HEPA) filter, an activated carbon adsorber section for removal of gaseous activity i
an operational mode when the control room is isolated to         '
(principally iodine), and a fan. A second bank of HEPA filters follows the adsorber section to collect carbon fines.
protect operational personnel from radioactive exposure through the duration of any one of the postulated limiting faultsdiscussedinChapter15UFSAR(Ref.2).           Isolation     1 mode is an operational mode when the control room is             ;
Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also fonn part of the system.
isolated to protect operational personnel from toxic gasses and smoke.
Air and motor-operated dampers are provided i
Actuation of the CREACUS places the system into either of two separate states of operation, depending on the initiation signal. Actuation of the system to the emergency mode of operation closes the unfiltered-outside-air intake (continued) b, 4          SAN ONOFRE--UNIT 3                     8 3.7-62                   AMENOMENT NO.
for air volume control and system isolation purposes.
Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains.
The prefilters remove any large particles in the air to prevent i
excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.
There are two CREACUS operational modes. Emergency mode is an operational mode when the control room is isolated to protect operational personnel from radioactive exposure through the duration of any one of the postulated limiting faultsdiscussedinChapter15UFSAR(Ref.2).
Isolation 1
mode is an operational mode when the control room is isolated to protect operational personnel from toxic gasses and smoke.
Actuation of the CREACUS places the system into either of two separate states of operation, depending on the initiation signal. Actuation of the system to the emergency mode of operation closes the unfiltered-outside-air intake (continued) b, SAN ONOFRE--UNIT 3 8 3.7-62 AMENOMENT NO.
4


    '. . BASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for recirculation of control room air through the redundant           I (continued) trains of HEPA and charcoal filters. The emergency mode           ,
BASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for (continued) recirculation of control room air through the redundant trains of HEPA and charcoal filters.
initiates pressurization of the control room.
The emergency mode initiates pressurization of the control room.
Outside air is added to the air being recirculated from the       I control room. Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.
Outside air is added to the air being recirculated from the control room. Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.
The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode or isolation mode as required. The actions of the isolation         !
The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode or isolation mode as required.
mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.
The actions of the isolation mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.
A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in Reference 1.
A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in Reference 1.
Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Normally-open isolation dampers are arranged in series pairs so that one damper's failure to shut will not result in a breach of isolation. The CREACUS is designed in accordance with Seismic Category I requi rements.
Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Normally-open isolation dampers are arranged in series pairs so that one damper's failure to shut will not result in a breach of isolation.
The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem           ,
The CREACUS is designed in accordance with Seismic Category I requi rements.
whole-body dose.                                               :
The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem whole-body dose.
APPLICABLE         The CREACUS components are arranged in redundant safety SAFETY ANALYSES   related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate     i supply of filtered air to all areas requiring access.
APPLICABLE The CREACUS components are arranged in redundant safety SAFETY ANALYSES related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate supply of filtered air to all areas requiring access.
(continued) f' i'
(continued) f' i
SAN ONOFRE--UNIT 3                   8 3.7-63                   AMENDMENT NO.
SAN ONOFRE--UNIT 3 8 3.7-63 AMENDMENT NO.
i
i


t
t
                        *                                                                            ::I       ..
::I 3 3. '. '..
3 3 . ' . '. .
BASES APPLICABLE The CREACUS provides airborne radiological protection for SAFETY ANALYSES the. control room operators, as demonstrated by the control (continued) room accident dose analyses for.the most limiting design basis loss of coolant accident fission procuct release presented in the UFSAR, Chapter 15 (Ref. 2).
        < '      BASES APPLICABLE The CREACUS provides airborne radiological protection for SAFETY ANALYSES the. control room operators, as demonstrated by the control room accident dose analyses for.the most limiting design (continued)          basis loss of coolant accident fission procuct release                     ;
The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room following a toxic chemical release, as presented in Reference 1.
presented in the UFSAR, Chapter 15 (Ref. 2) .                             l The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room following a toxic chemical release, as presented in Reference 1.                                                               1 The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair the ability of the system to perform its design function.
The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair the ability of the system to perform its design function.
The CREACUS satisfies Criterion 3 of the NRC Policy Statement.                                                               q LCO                     Two independent and redundant trains of the CREACUS are required to be OPERABLE to ensure that at least one is                   ,
The CREACUS satisfies Criterion 3 of the NRC Policy Statement.
l available, assuming that a. single failure disables the other r                          train. Total t,ystem failure could result in a control room               j
q LCO Two independent and redundant trains of the CREACUS are required to be OPERABLE to ensure that at least one is available, assuming that a. single failure disables the other train.
              .?                            operator receiving a doseln excess of 5 res in the event of a large radioactive release.
Total t,ystem failure could result in a control room j
h The CREACUS is considered OPERABLE'when the individual components necessary to control operator exposure are i
r operator receiving a doseln excess of 5 res in the event of
OPERABLE in both trains. A CREACUS train is considered                   '
.?
a large radioactive release.
The CREACUS is considered OPERABLE'when the individual h
components necessary to control operator exposure are OPERABLE in both trains. A CREACUS train is considered i
OPERABLE when the associated:
OPERABLE when the associated:
: a. - Fan is OPERABLE; l
: a. - Fan is OPERABLE; 5.
1
1
.                                                    5.
: b.,' HfPX ' filters and charcoal adsorber are not-ex'cessively
: b. ,' HfPX ' filters and charcoal adsorber are not-ex'cessively
' :ims.tricting flow, and are capable of-performing their
                                -s                ' :ims.tricting flow, and are capable of-performing their W ,,~,,,;,f w mfi Qration functions; and   -                              !
-s W,,~,,,;, w fi Qration functions; and m
_ c.        Ductwork, valves, and dampers are OPERABLE, and air             1 circulation can be maintained.                                 l 9 ,7,,f..'
f Ductwork, valves, and dampers are OPERABLE, and air
_ c.
9,7,,f..'
circulation can be maintained.
e In addition, the cor. trol room boundary must be maintained, or administratively controlled, including the integrity of the walls, floors, ceilings, ductwork,.and access doors.
e In addition, the cor. trol room boundary must be maintained, or administratively controlled, including the integrity of the walls, floors, ceilings, ductwork,.and access doors.
d 1
d (continued) 1 l
(continued)       l 8 3.7-64                 AMENOMENT NO.
SAN ONOFRE--UNIT 3 8 3.7-64 AMENOMENT NO.
SAN ONOFRE--UNIT 3


      -) BASES (continued)
-)
In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to APPLICABILITY limit operator exposure during and following a DBA.
BASES (continued)
APPLICABILITY In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to limit operator exposure during and following a DBA.
In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.
In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.
During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.
During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.
ACTIONS           ACTION statements are modified by a NOTE: "Each Unit shall
ACTIONS ACTION statements are modified by a NOTE:
                        ,  enter applicable ACTIONS separately." CREACUS is a shared LCO does not address tne ggg 7 "[m         system between Unit 2 and Unit 3.,ts are in different operational situation when the uni                               ,
"Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared LCO does not address tne ggg 7 "[m system between Unit 2 and Unit 3.,ts are in different operational situation when the uni operational MODES. Without this NOTE it may not be clear i
i operational MODES. Without this NOTE it may not be clear (whatACTIONshouldbetaken.j
(whatACTIONshouldbetaken.j
                            'A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days. In this Condition, the remaining OPERABLE CREACUS subsystem is adequate to perform control room radiation protection function.
'A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days.
However, the overall reliability is reduced because a single     i I
In this Condition, the remaining OPERABLE CREACUS subsystem is adequate to perform control room radiation protection function.
failure in the OPERABLE CREACUS train could result in loss of CREACUS function. The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and the ability of the remaining train to provide the required capability.
However, the overall reliability is reduced because a single i
B.1 and 8.2                                                     l i
I failure in the OPERABLE CREACUS train could result in loss of CREACUS function.
If the inoperable CREACUS cannot be restored to OPERABLE       l' status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the       l t     accident risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the recuired unit conditions from full power conditions in an orcerly manner and without challenging unit. systems.
The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and the ability of the remaining train to provide the required capability.
B.1 and 8.2 i
If the inoperable CREACUS cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the t
accident risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours.
The allowed Completion Times are reasonable, based on operating experience, to reach the recuired unit conditions from full power conditions in an orcerly manner and without challenging unit. systems.
(continued)
(continued)
B 3.7-65                   AMENOMENT NO.
SAN ONOFRE--UNIT 3 B 3.7-65 AMENOMENT NO.
SAN ONOFRE--UNIT 3


INSERT       "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3. LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.
INSERT "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3.
NOTE 2 reads: "The provisions of LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration." In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.
LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.
Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it. This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY. Therefore, this threshold can be excepted from LC0 3.0.4.
NOTE 2 reads: "The provisions of LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration."
The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LC0 3.0.4.
In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.
The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt. If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LC0 3.0.4 also.
Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it.
The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor Coolant System (RCS) temperature from 350af > T     > 200aF to T   5 200aF by initiating shutdown cooling. IfnoirradiatedE!elassemblies, yare being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4 also.
This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY.
Therefore, this threshold can be excepted from LC0 3.0.4.
The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards.
Therefore, this MODE change can be excepted from LC0 3.0.4.
The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt.
If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LC0 3.0.4 also.
The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor Coolant System (RCS) temperature from 350af > T
> 200aF to T 5 200aF by initiating shutdown cooling.
IfnoirradiatedE!elassemblies, yare being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4 also.
1 ap &Of Osh b
1 ap &Of Osh b
    ' -  - - - - ~ - - _ - _ - _ _ _ - _          _
- - - - ~ - - _ - _ - _ _ _ - _


                                                                                  .; i:..
. i:..
5 b.'   ..
5 b.'
BASES ACTIONS           C.I. C.2.1. and C.2.2 (continued)       In MODE 5 or 6, or during movement of irradiated fuel assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency mode of operation. This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.
BASES ACTIONS C.I. C.2.1. and C.2.2 (continued)
An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel cssemblies to a safe position.
In MODE 5 or 6, or during movement of irradiated fuel assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency mode of operation.
Q.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended function and the unit is in a condition outside the accident analyses. Therefore, LC0 3.0.3 must be entered immediately.
This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.
E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.       i This places the unit in a condition that minimizes the             l accident risk. This does not preclude the movement of fuel         I to a safe position.
An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control This places the unit in a condition that minimizes room.
SURVEILLAME         SR 3.7.11.1 REQUIREMENTS Standby systems should be checked periodically to ensure that they function properly. Since the environment and normal operating conditions on this system are not severe,
the accident risk.
          ,                testing each train once every month provides an adequate check on this system.
This does not preclude the movement of fuel cssemblies to a safe position.
Q.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended function and the unit is in a condition outside the accident analyses.
Therefore, LC0 3.0.3 must be entered immediately.
E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.
This places the unit in a condition that minimizes the accident risk.
This does not preclude the movement of fuel to a safe position.
SURVEILLAME SR 3.7.11.1 REQUIREMENTS Standby systems should be checked periodically to ensure that they function properly. Since the environment and normal operating conditions on this system are not severe, testing each train once every month provides an adequate check on this system.
(continued)
(continued)
U<-
U<-
SAN ONOFRE.--UNIT 3                   B 3.7-66                 AMENOMENT NO.
SAN ONOFRE.--UNIT 3 B 3.7-66 AMENOMENT NO.


                                                                                .U..i :          1 3 3.7.ll 3 8ASES i
1
1 SURVEILLANCE     SR   3.7.11.1 (continued)
.U..i 3 3.7.ll 3
8ASES i
1 SURVEILLANCE SR 3.7.11.1 (continued)
REQUIREMENTS Systems not requiring humidity control need only be operated for a 15 minutes to demonstrate the function of the system.
REQUIREMENTS Systems not requiring humidity control need only be operated for a 15 minutes to demonstrate the function of the system.
The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.
The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.
SR 3.7.11.2 This SR verifies that the required CREACUS testing is perfonned in accordance with the Ventilation Filter Testing Program (VFTP) . The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3). The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations). Specific test frequencies and additional information are discussed in detail in the VFTP.
SR 3.7.11.2 This SR verifies that the required CREACUS testing is perfonned in accordance with the Ventilation Filter Testing Program (VFTP).
The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3).
The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations). Specific test frequencies and additional information are discussed in detail in the VFTP.
SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on an actual or simulated actuation signal. The Frequency of 24 months is consistent with that specified in Reference 3.
SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on an actual or simulated actuation signal. The Frequency of 24 months is consistent with that specified in Reference 3.
SR 3.7.11.4 This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the                   !
SR 3.7.11.4 This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control room = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.
emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control room = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.
b (continued)
b                                                                         (continued)
SAN ONOFRE--UNIT 3 8 3.7-67 AMENDMENT NO.
SAN ONOFRE--UNIT 3                   8 3.7-67                   AMENDMENT NO.


                                                                      ~
~
.                                                                    3 *   ..
3
      . BASES (continued)
* BASES (continued)
REFERENCES         1. UFSAR, Section 9.4.                               )
REFERENCES 1.
: 2. UFSAR, Chapter 15, i
UFSAR, Section 9.4.
: 3. Regulatory Guide 1.52 (Rev. 2).
2.
l l
UFSAR, Chapter 15, i
l 1
3.
I l
Regulatory Guide 1.52 (Rev. 2).
l l
1 SAN ONOFRE--UNIT 3 8 3.7-68 AMENDHENT NO.
SAN ONOFRE--UNIT 3               8 3.7-68           AMENDHENT NO.


l l
i 4
i 4
1 1
1 ENCL 0SURE 3
1 ENCL 0SURE 3 l l
i l
i l
1 l
l 1
l l
l l
1 l


EXISTING TECHNICAL SPECIFICATION                             I 3/4.7.5 and BASES                                         i (with marked-up changes proposed by pcn-407 and PCN-439) l UNIT 2 1
EXISTING TECHNICAL SPECIFICATION 3/4.7.5 and BASES (with marked-up changes proposed by pcn-407 and PCN-439)
1 l
UNIT 2 7
l 7
I l
--                                                                I


h:..;- Sv 5~ i''5 7, 5 C "'.~::t C 4 E''IRGEC A::t C'.! 'rJP Si sTE" s, w t . .q T I , , CO*!":ITICN % OPE:ATION                                                                         --
h:..;- Sv 5~ i''5 7, 5 C "'.~::t C 4 E''IRGEC A::t C'.! 'rJP Si sTE" w
7, 3,7.5 Two inde;ende                     c:ntrol recm e ergen:y air cleanup systems shall te
s, t..q T I,, CO*!":ITICN % OPE:ATION 7,
                                                                                                                          =
3,7.5 Two inde;ende c:ntrol recm e ergen:y air cleanup systems shall te N
N            CFERA3' E-
CFERA3' E-
=
:: t
:: t
* C f.3 ! L 1IY :     ALL hE cr clur//t /wa/cmex4 f FAtodd2kd[u(LaMcMhddf SLN                                                 EseW4f$/ heQ5'A*! ol6/d(E'R         OSS ANDNS tegos/tehg Unit 2 cr 3 in F0DE 1, 2, 3 er                       .
* C f.3 ! L 1IY :
With one centrol room emergency air cleanup system inoperable, restore the ine:erable system to OPER LE status within 7 days or be in at~least H0i A STAN:3Y within the next 6 urs and in COLD SHUTDOWN within the following x 30 h;ur5. ot*
ALL hE cr clur//t /wa/cmex4 f FAtodd2kd[u(LaMcMhddf SLN EseW4f$/ heQ5'A*! ol6/d(E'R OSS ANDNS Unit 2 cr 3 in F0DE 1, 2, 3 er tegos/tehg With one centrol room emergency air cleanup system inoperable, restore the ine:erable system to OPER LE status within 7 days or be in at~least H0i A STAN:3Y within the next 6 urs and in COLD SHUTDOWN within the following x 30 h;ur5. ot*
Units 2 a,
6[ MM" Units 2 3 in M00E 5 a,
3 in M00E 5         6[ MM" With one centr:1 reem emergency air cleanup system inoperable, restere the inoperable system to OPERABLE status witnin 7 cays er initiate and maintain operati:n of the remaining OPERABLE control rece emergency air cleanup system in the recirculation mode.
With one centr:1 reem emergency air cleanup system inoperable, restere the inoperable system to OPERABLE status witnin 7 cays er initiate and maintain operati:n of the remaining OPERABLE control rece emergency air cleanup system in the recirculation mode.
: b.     With both centrol roem emergency air. cleanup systems ineperable, er h                   with the OPERABLE centrol reem aergency air cleanup' system re:uire:
b.
* to be in the recirculatien mode by ACTION (a), net capable of bef ;
With both centrol roem emergency air. cleanup systems ineperable, er h
: 4)                   p:ve ed by an OPERABLE emergency power seur:e, suspend all c: era:i:
with the OPERABLE centrol reem aergency air cleanup' system re:uire:
r p sitive reactivity changes h e v1eLvmh ai
to be in the recirculatien mode by ACTION (a), net capable of bef ;
                                                  ;a_fJ1P te ~   a assema_ 4 W'      "s              fih   n.1       r     +
4) p:ve ed by an OPERABLE emergency power seur:e, suspend all c: era:i:
v1 Lv h ;a_fJ1P r p sitive reactivity changes h a assema_ 4 e m ai te ~
fih n.1 r
* if a le in M**E :
* if a le in M**E :
M                                    -
e
ntri~ig R                  The pecor'src            s   <  ta Hen. c. G re' n e a 9 9 ra p e w ,
+
                                                    ....T5NfC.~.k.fd M D,/f # M SURv                   : u 4.7.5         Each contrel roem emergency air cleanup system 1ha11 be demonstrate:
W' "s
M ta Hen. c.
G re' n e a 9 9 ra p e w,
ntri~ig R
The pecor'src s
....T5NfC.~.k.fd M D,/f # M SURv
: u 4.7.5 Each contrel roem emergency air cleanup system 1ha11 be demonstrate:
OPERABLE:
OPERABLE:
: a.      At least once per 12 hours by verifying that the centrol roem air terparature is less than or equal to 110*F.
At least once per 12 hours by verifying that the centrol roem air a.
b'             b.       At least once per 31 days on a STAGGERED TEST BASIS by initating, D                       from the control room, flow through the HEPA filters and char::ai b                         a*An ud verifyino that the system operates for at least 8
terparature is less than or equal to 110*F.
Mt1 tours with the heaters % /Smt'isu/dS.
b' b.
j      c.        At Isast once per 18 stonths or (1) af ter any structural r.aintenar:e on the HEPA filter or charcoal adsorber housings, or (2) fo11 ewing painting, fire or chemical release in any ventilation zone                                     n A
At least once per 31 days on a STAGGERED TEST BASIS by initating, D
coe.municating with the system by:                                                         _
from the control room, flow through the HEPA filters and char::ai b
                                            '~ Verifying that with the system ope-ating at a flow rate cf N'                                    1. N 35485 cfm + 10% for the air conditioning unit, and 2050 : 150 ~'-
a*An ud verifyino that the system operates for at least Mt1 tours with the heaters % /Smt'isu/dS.
for the ventilatien unit and recirculating thre.sgh the res;e:~- 'f g                    j HEPA filters and charcoal adsorbers, leakage through the syftt~
8 At Isast once per 18 stonths or (1) af ter any structural r.aintenar:e c.
I        '
j on the HEPA filter or charcoal adsorber housings, or (2) fo11 ewing painting, fire or chemical release in any ventilation zone n
diverting valves is less than or equal to 1% air conditiening unit and 1% ventilation unit when the system is tested by                         J j
A coe.municating with the system by:
'~ Verifying that with the system ope-ating at a flow rate cf
: 1. N 35485 cfm + 10% for the air conditioning unit, and 2050 : 150 ~'-
N' g for the ventilatien unit and recirculating thre.sgh the res;e:~- 'f I
j HEPA filters and charcoal adsorbers, leakage through the syftt~
diverting valves is less than or equal to 1% air conditiening unit and 1% ventilation unit when the system is tested by J
admittingcold00Pattherespectiveintake[
admittingcold00Pattherespectiveintake[
MAY.16190
j
                                            ~
~
                    "Starec sys:en with San Onofre - Unit 3.
MAY.16190 "Starec sys:en with San Onofre - Unit 3.
* S IN C'.",r RE LT,T 2                                 3/* 7-13                     A'.tE.CMENT    tc. " i
A'.tE.CMENT tc. " i S IN C'.",r RE LT,T 2 3/* 7-13


                .pttyi SYSTEMS t     i 4
.pttyi SYSTEMS t
i 4
5.y/EnL ANCE REOUIREMENTS (Continueel 1
5.y/EnL ANCE REOUIREMENTS (Continueel 1
: 2.         Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures cf Regulatory Positions C.S.a, C 5.c and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978, and the system flow rate is 2050 2 150 cfm for the ventilation unit and 35,485 cfm IC%             l' for the air conditioning unit.
2.
: 3.       Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures cf Regulatory Positions C.S.a, C 5.c and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978, and the system flow rate is 2050 2 150 cfm for the ventilation unit and 35,485 cfm IC%
4         Verifying a system flow rate of 2050 2 150 cfm for the                 l ventilation unit and 35,485 cfm 10% for the air conditioning unit during system operation when. tested in accordance witn               l ANSI H510-1975.
l' for the air conditioning unit.
: d. After every 720 hours of charcoal adsorber operation by verifying within 31 days after rem 0 val that a laboratory analysis of a re;tesentative carbon sam;1e obtained in a:ccrdance with Regulat: j
3.
                                , Position C.6.b of Regulat:ry Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
: e. At least once per 18 months by:
4 Verifying a system flow rate of 2050 2 150 cfm for the l
: 1.       Verifying that the pressure drop across the combined HEPA               l, filters and charcoal adsorber bank.s is less than 7.0 inches Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a             l flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm t 10% for the air conditioning unit.
ventilation unit and 35,485 cfm 10% for the air conditioning unit during system operation when. tested in accordance witn l
h       Verifying that on a control room isolation test signal, the system automatically switches into the emergency mode of operation'with flow through the HEPA filters and charcoal' adsorber banks.
ANSI H510-1975.
: 3.       Verifying that on a toxic gas isolation test signal, the sysce-automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.
d.
'                                    4.       Verifying that the system maintains the control room at a i
After every 720 hours of charcoal adsorber operation by verifying within 31 days after rem 0 val that a laboratory analysis of a re;tesentative carbon sam;1e obtained in a:ccrdance with Regulat: j
                          '                    positive pressure of greater than or equal to 1/8 inch W.G.
, Position C.6.b of Regulat:ry Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.
relative to the outside atmosphere during system operation in the emergency mode.
At least once per 18 months by:
W                                           .
e.
: 5.        Verifying that the heaters dissipate 4.8 kw t 5% when tested in accordance with ANSI H510-                 g.,      ,
1.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber bank.s is less than 7.0 inches l,
Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a l
flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm t 10% for the air conditioning unit.
h Verifying that on a control room isolation test signal, the system automatically switches into the emergency mode of operation'with flow through the HEPA filters and charcoal' adsorber banks.
3.
Verifying that on a toxic gas isolation test signal, the sysce-automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.
4.
Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch W.G.
relative to the outside atmosphere during system operation in i
the emergency mode.
W 5.
Verifying that the heaters dissipate 4.8 kw t 5% when tested in accordance with ANSI H510-g.,
a s
a s
3/4 7-14               AMENOMENT NO. Il san ol0FRE-UNIT 2
san ol0FRE-UNIT 2 3/4 7-14 AMENOMENT NO. Il


            .. . - . - ~ _ .                                                   ..-        -    .. - .-                  .  .-
... -. - ~ _.
                . pLui SYSTEM _S                                                                                                   J
. Lui SYSTEM _S J
  ;      }'       . .. . .      : . ::,
p
g- :,y .-
}'
                                                              ,, , . . , , n.
g-
                            . u ._ . .
:,y.-
e
,..,, n.
: f. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater _ than or ez'.:a1 to 99.95% of .the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of                                   ,
. u._..
2050       150 cfm for the       ventilation unit and 35,485 cfm : 10% for tr.e           l air conditioning unit.
e After each complete or partial replacement of a HEPA filter bank by f.
: g. After each complete or partial replace =ent of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than er equal to 99.95% of a halogenated hydrocarbon refrigerant test gas
verifying that the HEPA filter banks remove greater _ than or ez'.:a1 to 99.95% of.the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : 10% for tr.e l
                  '                  when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the                       j ventilation' unit and 35,485 cfm : 10% for the air conditioning unit.
air conditioning unit.
i l
After each complete or partial replace =ent of a charcoal adsorber g.
bank by verifying that the charcoal adsorbers remove greater than er equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the j
ventilation' unit and 35,485 cfm : 10% for the air conditioning unit.
i 1
. f-c i
a J
1
1
                                        . f-l c
' s....'
i a
q FEB1810M N
J 1
SAN-ONOFRE-UNIT 2 3/4 7-15 AMENOMENT NO.
    ' s. . . .'                                                                                                                   q FEB1810M               ;
N SAN-ONOFRE-UNIT 2                                     3/4 7-15               AMENOMENT NO.


9 PLANT SYSTEMS BASES 3/a.7.5 CONTROL ROCM EMERGENCY AIR CLEANUP SYSTEM frem which operat:rs can           4 The CREACUS provides a protected environment                                             i control the plant following an uncontrolled release of radioactivity, or toxic gas.                                                                             L The CREACUS consists of two independent,             redundant Each train consists     of atrains  that arecircu prefilter, and filter the control room air. (HEPA) filter, an activated charcoal high efficiency particulate airadsorber section for removal                 (for of a fan. A second bank of HEPA filter follows the adsorber section emergency air conditioning unit only) and is usedDuctwork,              to retain c downstream of carbon adsorber.
9 PLANT SYSTEMS r
includes prefilter, HEPA filter, charcoal adsorber, and fan.
BASES 3/a.7.5 CONTROL ROCM EMERGENCY AIR CLEANUP SYSTEM frem which operat:rs can The CREACUS provides a protected environment 4
i control the plant following an uncontrolled release of radioactivity, or toxic gas.
L The CREACUS consists of two independent, redundant trains that recircu Each train consists of a prefilter, a and filter the control room air.
(HEPA) filter, an activated charcoal high efficiency particulate airadsorber section for removal of (for A second bank of HEPA filter follows the adsorber section emergency air conditioning unit only) and is used to retain c a fan.
downstream of carbon adsorber.
: Ductwork, includes prefilter, HEPA filter, charcoal adsorber, and fan.
motor-operated dampers, and instrumentation als system isolation purposes.
motor-operated dampers, and instrumentation als system isolation purposes.
b       Upon receipt of the actuating signal, nonnal air supply to the co room is isolated, and the stream ofThe      ventilation prefiltersair is recirculated remove     any lar;e through the system's filter trains.
b Upon receipt of the actuating signal, nonnal air supply to the co room is isolated, and the stream of ventilation air is recirculated The prefilters remove any lar;e through the system's filter trains.
particles in the air toContinuous prevent excessive operation loading   of theforHEPA of each train             filters at least   15  ar g
particles in the air to prevent excessive loading of the HEPA filters ar 15 Continuous operation of each train for at least charcoal adsorbers.
charcoal adsorbers.
minutes per month verifie,s proper system operation.
minutes per month verifie,s proper system operation.
There are two CREACUS operational modes. Emergency mode is an mode when the control room is isolated to prevent operation personnel f the radioactive exposure through the duration of anyIsolation one of the mode postula is QN        limiting faults discussed in FSAR, Chapter 15 (Ref.2).
g There are two CREACUS operational modes. Emergency mode is an mode when the control room is isolated to prevent operation personnel f the radioactive exposure through the duration of any one of the postula Isolation mode is limiting faults discussed in FSAR, Chapter 15 (Ref.2).
an operational mode when control room is isolated to protect oper personnel from toxic gases and smoke.
Q an operational mode when control room is isolated to protect oper N
personnel from toxic gases and smoke.
Actuation of the CREACUS places the system into either of two separateA states of the operation, depending on the initiatio Outside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tne control room.
Actuation of the CREACUS places the system into either of two separateA states of the operation, depending on the initiatio Outside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tne control room.
control room.
control room.
Pressurization of the control room prevents infiltration of infiltered air from the surrounding areas of the building.
Pressurization of the control room prevents infiltration of infiltered air from the surrounding areas of the building.
The actions taken in the toxic gas isolation mode are the same, exceo that the signal switches control room ventilation to an isolation mcce, preventing outside air from entering the control room.
The actions taken in the toxic gas isolation mode are the same, exce that the signal switches control room ventilation to an isolation mcce preventing outside air from entering the control room.
SAN ONOFRE-UNIT 2,                    B 3/4.7-4
B 3/4.7-4 SAN ONOFRE-UNIT 2,


PLANT SYSTEMS BASES 3/4.7,5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM (continu The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectively.
PLANT SYSTEMS BASES 3/4.7,5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM (continu The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectively.
One detector _ output above the setpoint will cause     actuation of tne The actions of the toxic emergency mode or isolation mode as required. gas the emergency radiation mode. However, toxic gas and radiation events are not considered to occur concurrently.
above the setpoint will cause actuation of tne One detector _ output The actions of the toxic emergency mode or isolation mode as required. gas the emergency radiation mode. However, toxic gas and radiation events are not considered to occur concurrently.
g A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hou Redundant recirculation trains provide the required filtration should an. Nor excessive pressure drop develop across the other filter train.                 ;
A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per ho g
open isolation dampers are arranged in series pairs 50         The that the fail CREACUS one damper to shut will not result in a breach of isolation.
Redundant recirculation trains provide the required filtration should an. Nor excessive pressure drop develop across the other filter train.
open isolation dampers are arranged in series pairs 50 that the fai The CREACUS one damper to shut will not result in a breach of isolation.
is designed in accordance with Seismic Category 1. requirements.
is designed in accordance with Seismic Category 1. requirements.
The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) wi; exceeding a 5 rem whole body dose.                                             i SAN ONOFRE-UNIT 2                     3 3/4.7-4a
The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) wi; exceeding a 5 rem whole body dose.
i SAN ONOFRE-UNIT 2 3 3/4.7-4a
 
EXISTING TECHNICAL SPECIFICATION 3/4.7.5 and BASES (with marked-up changes proposed by pcn-407 and PCN-439)
UNIT 3 l


1 EXISTING TECHNICAL SPECIFICATION 3/4.7.5 and BASES (with marked-up changes proposed by pcn-407 and PCN-439) ;
'l g i SYSTEMS g CCNTROL RocM EMER0ENCY A* R c'.E ANUP SYSTEM" I
UNIT 3 i
LIMITING CDNOTTION WP optRATION q' -
l 1
~
l l
vi 3.7.5 Two independ control room emergency air cleanup systems anall be j
l
CPERAELE.
lE 4pptIcABILIU:
ALL DES e du, *,*c 4/unut / //mu60cdh asve5kg N
I le W
b k,d ACTION:
_b2dM[
or 3 in MODES 1, 2, 3 or 4:
h Unit With one control room eeer ency aiMeanup systra noperable, restore the inoperable system to OPE
.E status within 7 days or be in at least HOT 4
N STANOBy within the next 6 turs and in COLD SHUTOOWN within the following 3 in MODFS S fa i
moa emergency air cleancpr system inoperable, With one contrer restore the inoperable system to OPERASLE status within 7 days or a.
initiate and saintain operation of the remaining CPERABLE control I
roce amargency air cleanup system in the recirculation mode.
1 l
With both control room ecargency air cleanup systees inoperable, or I
with the OPERABLE control room amargency air cleanup systes required b.
E
)
4 to be in the recirculation mode by ACTION (a), not capable of being i
I D
powered by an OPERABLE energency power source, suspend all operatien i
4 volyi g. ElLTERAT1 NS or positive reactivity changes 2Wmmw w}i f
oreafi< c w?pueVm :>r<z akM'M*Ma% awns?4 t%"%%"MQ~
G j
SURVEI[
E1TTOUDERIST56# UM "N
* 2"MU'M f ach control room ansegency air cleanup systan shall be damonstrated


      'l
====4.7.5 OPERABLE====
  ,                                      g i SYSTEMS g CCNTROL RocM EMER0ENCY A* R c'.E ANUP SYSTEM" I                                                                optRATION q' -                                    LIMITING CDNOTTION WP
At leasi. Soca por 12 hours by verifying that the cootrol roca air a.
                                                  ~
terparature is less than or equal to 110*F.
vi
At least erw:e per 31 days on a STAGGERED TEST BASIS by initating, frca the control roca, flew through the HEPA filters and charcoal h.
        '                                                                      control room emergency air cleanup systems anall be 3.7.5 Two independ j                                      CPERAELE.
b.
DES e du, *    ,*c 4/unut / //mu60cdh asve5kg N                4pptIcABILIU:              ALL lE                                                                                                                              le W
4 adsorbers and verifying that the systaa operatas for at least O
ACTION:
$ #e w mm. vnn saa nowWon) /fm/ou/es k
I                                    _
~At leest once par 18 months or (1) after any structural naintenance on the )ffPA filtar or charcoal adsort>er housings, or (2) folleving
                                                                                                                      #                b k,d h                                      Unit          or 3 in MODES 1, 2, 3 or 4:        _b2dM[
: c..
4 With one control room eeer.Eency                  aiMeanup status          systra within 7 days  or benoperable, in at leastrestore HOT the inoperable system to OPE                turs and in COLD SHUTOOWN within the following N STANOBy within the next 6 fa i                3 in MODFS S moa emergency air cleancpr system inoperable,
l painting, fire or chemical release in any ventilation zone i
    ;                                                  a.      With one contrer restore the inoperable system to OPERASLE status within 7 days or I                                                          initiate and saintain operation of the remaining CPERABLE control 1
roce amargency air cleanup system in the recirculation mode.    .
l    ,
I b.
With both control room ecargency air cleanup systees inoperable, or E
4                with the OPERABLE control room amargency air cleanup systes required
    )                                                          to be in the recirculation mode by ACTION (a), not capable of being i  I                                        D 4                  powered by an OPERABLE energency power source, suspend all operatien i                                                              volyi g . ElLTERAT1 NS or positive reactivity changes 2Wmmw f                                                            oreafi< c w?pueVm :>r<z G
j                                        w}i akM'M*Ma% awns?4                                                t%"%%"MQ~
SURVEI[            E1TTOUDERIST56# UM "N
* 2"MU'M 4.7.5       f ach control room ansegency air cleanup systan shall be damonstrated OPERABLE:
: a.      At leasi. Soca por 12 hours by verifying that the cootrol roca air terparature is less than or equal to 110*F.
: b.      At least erw:e per 31 days on a STAGGERED TEST BASIS by initating,
: h.                  frca the control roca, flew through the HEPA filters and charcoal O
4                   adsorbers and verifying that the systaa operatas for at least
      ;                                      $ #e w mm.                   vnn saa nowWon) /fm/ou/es
                                                                  ~At leest once par 18 months or (1) after any structural naintenance
      !                                    k              c. .
on the )ffPA filtar or charcoal adsort>er housings, or (2) folleving               l i
painting, fire or chemical release in any ventilation zone               -
consunicating vpi systes by:
consunicating vpi systes by:
      ;                                                                  Verifying that with the system operating at a flow rate of l
l Verifying that with the system operating at a flow rate of g
N                        1.
g, 8gg 35485 cfm + 10% for the air conditioning unit, and 2 N
          ;                            g g, 8gg 35485                             cfm + 10%
1.
for the ventilation            for unit and    the air through recirculating    conditioning         unit, and 2 the respective P                              ,                              HEPA filters and charcoal adsorbers, leakage through the system g                               diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is testall by admitting cold 00P_ at the respective inta
for the ventilation unit and recirculating through the respective HEPA filters and charcoal adsorbers, leakage through the system P
      -(                                                                         _
,g diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is testall by admitting cold 00P_ at the respective inta
                                                    " Shared system with San Onofre - Unit 2.
- (
" Shared system with San Onofre - Unit 2.
N M EffT NO. 3 3/4 7-14 SAN CHOFRE-UNIT 3 5
N M EffT NO. 3 3/4 7-14 SAN CHOFRE-UNIT 3 5
i
i


5
5 6
* 6 m                                                                                                    _
C. I SMVEILLECI. RIOUIREMENTS (Continuedl m
C. I         SMVEILLECI. RIOUIREMENTS (Continuedl y
Virifying that the cleanup system satisfies the i y
c
: 2.      Virifying that the cleanup system satisfies the i                                 .
  !                                Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory                        l i
Guide 1.52, Revision 2, March 1978, and the system            IC: flow rate } is l
I                                2050 2 150 cfm for the ventilation unit and 35,485 cfm :
A                                for the air conditioning unit.
f j                                Verifying within 31 days after removal that a laboratory
: 3.                                                                                      l
  /
analysis of a restresentative carton sar:ple tb J
l 1
Guide 1.52, Revision 2, March 1978, asets the) i                                Guide.1.52, Revision 2, Karch 1971                                          }
l 2050
* 150 cfm for the                      i
: 4.      Verifying a systa:a flow rate of f                                  ventilation unit and 35,485 cfm 210% for the            airwith
                                                                                          'nce  oncitioning      l f                                  unit during system operation when tested in acco                              l j                                  ANSI H510-1975.
g d.
Af ter every 720 hours of charcoal adsorber operat' m by actry
[                        within 31 days after removal that a laboratory arQsis oft y                             ,
representative carbon sample obtained in accordance with % a 6
  ,                          Pesition C.S.b of Regulatory Guida 1.52, Re of Regulatoy Guide 1.52, Revision 2, March 1978.
f                          At least once per 18 months by:
  !                  e.                                                                                            '
1.
Verifying that the pressure drop across the combined HEPA flitarsGauge Vater    and charcoal        adsorber ventilation unit    and lessbanits than 7.3isinches less than Water 7.0l Gauge air conditioning unit while operating ~the systas at a cfm for the ventilation unit and flow rate of 2050 2 150 35,485 cfm 210% for the air conditioning unit.
2.
2.
Yorifying that on a control roce isolation test signal, the                 l systaa automatically switchos into the e) k                          .-:      sdsorber banks.
Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory c
: 3.      Verifying that on a toxic gas isolation test signal,k the sys l                                  autenatically switches into the isolation mode of operation               l
Guide 1.52, Revision 2, March 1978, and the system flow rate is
* with flow through the HEPA filters and charcoal adsorber                   !
}
l 4.
i IC:
Verifying that the system saintains the control roca inat a q              A  r                positive pressure of greater than or equali t.o V8 inch                   l relative to the outside atmosphere during system           ,    operat on
cfm for the ventilation unit and 35,485 cfm :
    !              g                     the emerge g nede.
I 2050 2 150 A
5.
for the air conditioning unit.
Verifying that the heaters dissipate 4.8 kw 2 5% whe
Verifying within 31 days after removal that a laboratory fj analysis of a restresentative carton sar:ple tb
_    ~
/
Q b                      accordance with ANSI H510-1975. s FEB i 8190 AMENDHENT NO. 3 I                                                    3/4 7-15 d         SAN ONOFRE-UNIT.3 5
3.
J Guide 1.52, Revision 2, March 1978, asets the
)
1i Guide.1.52, Revision 2, Karch 1971
}
2050
* 150 cfm for the Verifying a systa:a flow rate of i
ventilation unit and 35,485 cfm 210% for the air oncitioning f
4.
unit during system operation when tested in acco
'nce with f
ANSI H510-1975.
j Af ter every 720 hours of charcoal adsorber operat' m by actry g
within 31 days after removal that a laboratory arQsis of d.
[
t y representative carbon sample obtained in accordance with % a Pesition C.S.b of Regulatory Guida 1.52, R 6
of Regulatoy Guide 1.52, Revision 2, March 1978.
f At least once per 18 months by:
Verifying that the pressure drop across the combined HEPA e.
flitars and charcoal adsorber banits is less than 7.0 1.
Vater Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating ~the systas at a cfm for the ventilation unit and flow rate of 2050 2 150 35,485 cfm 210% for the air conditioning unit.
Yorifying that on a control roce isolation test signal, the systaa automatically switchos into the e 2.
sdsorber banks.
Verifying that on a toxic gas isolation test signal, the sys k
autenatically switches into the isolation mode of operation 3.
k with flow through the HEPA filters and charcoal adsorber l*
Verifying that the system saintains the control roca at a positive pressure of greater than or equal t.o V8 inch i
in 4.
l relative to the outside atmosphere during system operat on r
q A
g the emerge g nede.
Verifying that the heaters dissipate 4.8 kw 2 5% whe accordance with ANSI H510-1975.
~
Q 5.
s b
FEB i 8190 AMENDHENT NO. 3 3/4 7-15 I
d SAN ONOFRE-UNIT.3 5


e 3      g ILLANCE REQUIREMENTS (Centinued, i
e g ILLANCE REQUIREMENTS (Centinued, 3
: f.      After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to
After each complete or partial replacement of a HEPA filter bank by i
              '                                          99.95% of the DOP when they are tested in place in accorcance with M5I H510-1975 while operating the system at a flow rate of
f.
              '                                          2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the air conditioning unit.
verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in place in accorcance with M5I H510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the air conditioning unit.
t
Af ter each complete or' partial replacement of a charcoal adsorber t
: g.      Af ter each complete or' partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than er l
g.
            '                                            equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in . place in accordance with MSI HS10-1975 1
bank by verifying that the charcoal adsorbers remove greater than er l
while operating the syates at a flow rate of 2050 2 150 cfm for the                 l ventilation unit and 35,485 cfm 210% for the air conditioning unit.
equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in. place in accordance with MSI HS10-1975 l
while operating the syates at a flow rate of 2050 2 150 cfm for the 1
ventilation unit and 35,485 cfm 210% for the air conditioning unit.
I I
I I
L 9
L 9
Y
Y
    .s u
.s u
I 1
I 1
                'd
'd 3 g yp
                  '~
'~
3 g yp AMatOM M NO. 3 1AN ON0FRE-tmIT 3 3/4 7-16
AMatOM M NO. 3 3/4 7-16 1AN ON0FRE-tmIT 3


1 I
1 Pt h SYSTEMS f
Pt h SYSTEMS                                                                                 f BASES                                                                                         I 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM from which operators can The CREACUS provides a protected environment                                                 ;
r BASES 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM from which operators can The CREACUS provides a protected environment control the plant following an uncontrolled release of radioactivity, :r toxic gas.
control the plant following an uncontrolled release of radioactivity, :r                       )
The CREACUS consists of two independent, redundant trains and filter the control room air.
toxic gas.
filter, an activated chartcal high efficiency particulate air (HEPA) adsorber section for removal of gaseous activity (p i
The CREACUS consists of two independent, redundant trains and filter the control room air.             filter, an activated chartcal high efficiency particulate air (HEPA)                                                       i adsorber a fan.
emergency air conditioning unit only) and is used to retain c a fan.
section for removal of gaseous activity (p                                 l l
downstream of carbon adsorber.
emergency air conditioning unit only) and is usedDuctwork,                      to retain c j downstream of carbon adsorber.
: Ductwork, j
includes prefilter, HEPA filter, charcoal adsorber, and fan.                               i I
includes prefilter, HEPA filter, charcoal adsorber, and fan.
motor-operated dampers, and instrumentation al system isolation purposes.
i motor-operated dampers, and instrumentation al I
b       Upon receipt of the actuating signal, normal air supply room is isolated, and the stream ofThe      ventilation to the co recirculated prefiltersair remove   is    any lar;e through the system's filter trains.
system isolation purposes.
particles in the air to prevent excessive loading of the H g        charcoal adsorbers.
b Upon receipt of the actuating signal, normal air supply to the co recirculated room is isolated, and the stream of ventilation air is The prefilters remove any lar;e through the system's filter trains.
particles in the air to prevent excessive loading of the H charcoal adsorbers.
minutes per month verifies proptr system operation.
minutes per month verifies proptr system operation.
l There are two CREACUS operational modes. Emergency mode is a                               !
g There are two CREACUS operational modes. Emergency mode is a mode when the control room is isolated to prevent operation personn the radioactive exposure through the duration of any one of the postu Isolation mode is limiting faults discussed in FSAR, Chapter IS (Re personnel from toxic gases and smoke.
mode when the control room is isolated to prevent operation personn the radioactive exposure through the duration of any           Isolationone of theispostu mode
Actuation of the CREACUS places the system into either of two separat Actuation :f j
      %          limiting faults discussed in FSAR, Chapter IS (Refl l
s44tes of the operation, depending on the initiatio autside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tre control room.
personnel from toxic gases and smoke.
Actuation of the CREACUS places the system into eitherActuation            of two separat
:f j s44tes of the operation, depending on the initiatio autside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tre control room.
control room.
control room.
Pressurization of the control room prevents infiltration of infiltered from the surrounding areas of the building.
Pressurization of the control room prevents infiltration of infiltered from the surrounding areas of the building.
Line 945: Line 1,131:
8 3/4.7-4 SAN ONOFRE-UNIT 3
8 3/4.7-4 SAN ONOFRE-UNIT 3


A PLANT SYSTEMS BASES 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYS The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectiveis.the One detector output above the setpoint will cause     actuation of             l The actions of the toxic A        emergency mode or isolation mode as required.
A PLANT SYSTEMS BASES 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYS The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectiveis.the above the setpoint will cause actuation of One detector output The actions of the toxic emergency mode or isolation mode as required.
I'        gas isolation mode are more restrictive, and will override the actions the emergency radiation mode. However, toxic gas and radiation events are not considered to occur concurrently, l
gas isolation mode are more restrictive, and will override the actions A
g A single train will pressurize the control room to at least 0.125 inches l water gauge, and provides an air exchange rate in excess of 454 per hour.
the emergency radiation mode. However, toxic gas and radiation events are I'
f Redundant recirculation trains provide the required filtration should   an Normally     l excessive pressure drop develop across the other filter train.                 i open isolation dampers are arranged in series pairs so           that the failu The CREACUS one damper to shut will not result in a breach of isolation.
not considered to occur concurrently, A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 454 per hour g
f Redundant recirculation trains provide the required filtration should an Normally excessive pressure drop develop across the other filter train.
open isolation dampers are arranged in series pairs so that the failu i
The CREACUS one damper to shut will not result in a breach of isolation.
is designed in accordance with Seismic Category 1 requirements.
is designed in accordance with Seismic Category 1 requirements.
l The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) with exceeding a 5 rem whole body dose.                                             )
The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) with exceeding a 5 rem whole body dose.
l l
SAN ONOFRE-UNIT 3 3 3/4.7-4a}}
I SAN ONOFRE-UNIT 3                   3 3/4.7-4a}}

Latest revision as of 04:51, 15 December 2024

Proposed Tech Specs Providing LCO 3.0.4 Exception for Modes 5,6 or Defueled Configuration
ML20072M360
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/26/1994
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20072M352 List:
References
NUDOCS 9409010287
Download: ML20072M360 (51)


Text

..

EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT A i

l UNIT 2 TS I

1 i

l 1

f 9409010287 940826 PDR ADOCK 05000361 P

PDR w-N

-ww-

,v;- Sv57Eus 3,
,.3 C '.T; L R::M E"!;0Ee a R c'.!WJP $3 sigea I
t..!T!* ",, CC'QITION FOR OPERATION 3.7.5 Two inde;endent control rocm e ergency air cleanup systems shall te 07 ERA 3kE-a::LIC t.!!LITY:

ALL MCOES ACTION:

Unit 2 or 3 in M00E 1, 2, 3 or 4:

With one control room emergency air cleanup system inoperable, restore the ine;erable system to CPERABLE status within 7 days or be in at least HOT STA!;*SY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Units 2 and 3 in MODE 5 or 6:

With one control room emergency air cleanup system inoperable, a.

restore the inoperable system to OPERABLE status within 7 cays or initiate and maintain operatien of the remaining OPERABl.E contro*

rocm emergency air cleanup system in the recirculation mode.

b.

With both control room emergency air. cleanup systems inoperable, or with the OPERABLE control reem emergency air cleanup system re::uire:

to be in the recirculation mode by ACTION (a), not capable of be' ;

powe ed by an OPERABLE emergency power source, suspend all c;erati: s involving CORE ALTERATIONS or positive reactivity changes.

The provisions of Specification 3.0.3 are not applicable in MO:E 5.

c.

SURVEILLANCE REQUIREMENTS 4.7.5 Each control room emergency air cleanup system 1 hall be demonstra:ec OPERABLE:

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air a.

te parature is less than or equal to 110'F.

b.

At least once per 31 days on a STAGGERED TEST BASIS by initating, from the control room, flow through the HEPA filters and charcoal adsaf$ers and verifying that the system operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters on.

At $esst once per 18 months or (1) after any structural maintenarce c.

on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system by:

1.

Verifying that with the system operating at a flew rate of 35415 cfm + 10% for the air conditioning unit,.and 2050 = 150 for the ventilatien unit and recirculating threagh tne respec HEPA filters and charcoal adsorbers, leakage through the sys W diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is tested by admitting cold DOP at the respective intake.

MAY.161993 "S r.a re:: system with San Onofre - Unit 3.

SAN O*.0FRE ';N:T2 3/4 7-13 AMENOME!iT 10.'I

i punt SYSTEMS t

i i

_sg::vEnu.'CE REQUIREMENTS (Continueo i

2.

Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a. C.S.c and C.S.d of Regulatory Guide 1.52, Revision 2 March 1978, and the system flow rate is 2050 1 150 cfm for the ventilation unit and 35,485 cfm 1 1C%

l for the air conditioning unit.

3.

Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.

Verifying a system flow rate of 2050 1 150 cfm for the l

4 ventilation unit and 35,485 cfm i 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying d.

within 31 days after removal that a laboratory analysis of a representative carbon sart.;:le obtained in a:cordance with Regulatory Position C.6.6 of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52 Revision 2, March 1978.

At least once per 18 months by:

e.

1.

Verifying that the pressure drep across the combined HEPA filters and charcoal adsorber banks is less than 7.0 inches l,

Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a g

flow rate of 2050 2 150 cfm for the ventilation unit and e

35,485 cfm t 10% for the air conditioning unit.

M Verifying that on a control room isolation ?.est signal, the system automatically switches into the eme.cgency mode of operation with flow through the HEPA filters and charcoal adsorber banks.

Verifying that on a toxic gas isolation test signal, the syste-3.

automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.

/

Verifying that the system maintains the control room at a 4.

positive pressure of greater than or equal to 1/8 inch W.G.

relative to the outside atmosphere during system operation in the emergency mode.

Verifying that the heaters dissipate 4.8 kw t 5% when tested 5.

in accordance with ANSI N510-1975.

9.,

s.

AMENOMENT NO. 14 SAN ONOFRE-UNIT 2 3/4 7-14 l

ptANT SYSTEMS

p y y :. =. T i ~ ':.~ " i :

r,,..:.u, p Af ter each ccmplete or partial replacement of a HEPA filter bank by f.

verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : IC% for the l

air conditioning unit.

Af ter each complete or partial replacement of a charcoal adsorber g.

bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050

  • 150 cfm for the l

ventilation unit and 35,485 cfm 210% for the air conditioning unit.

.i FEBi810R1 SAN ONOFRE-UNIT 2 3/4 7-15 AMEN 0HENT NO. I'

1.--

m 9

e EXISTING TECHNICAL SPECIFICATIONS ATTACHMENT B

UNIT 3 TS f

w e-p-M

l*

pt ANT SYSTEFS I

CONTROL RocM EMERGENCY AIR Ct.!ANUP SYSTEH"

,][

3 /.t. 7. 5 j

ggITING MITION FOR OP! RATION i

Two independent control room emergency air cleanup systems shall be 3.7.5 OPERA 8LE.

APPt.ICA31LITY_: ALL M00E5 g:

Unit'2 or 3 in MODES 1. 2, 3 or 4:

With one control room emergency air cleanup systas inoperable, restore the inoperable system to CPERA8LE status within 7 day i

{

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

[

Units 2 and 3 in HOOFS 5 or 6:

With one contrer room emergency air cleanopr system inoperable, restore the inoperable system to OPERA 8LE status within 7 days or a.

initiate and maintain operation of the remaining QPERABLE control J

room emergency air cleanup system in the recirculation mode.

With both control room energency air cleanup systems inoperable, or with the OPERA 8LE control room emergency air cleanup system required b.

to be in the recirculation mode by ACTION (a), not capable of being powered by an CPERASLE emergency power source, suspend all f

involving CORE ALTERATIONS or positive reactivity changes.

d, The provisions of Specification 3.0.3 are not applicable in MCOE 6.

c.

t

$URVEILLANCE REQUIREMENTS

}

Each control roca emergency air cleanup systes shall be demonstrated 4.7.5 OPERA 8LE: At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air j

j temperature is less than or equal to 110*F.

a.

At least once per 31 days on a STAGGERO TEST 8 ASIS by initating, free the control rosa, flow through tha NEPA filters and charcoal b.

adsettlers and verifying that the-system operstas for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters on.

c.. 'At, least once per 18 months or (1) after any structural saintenance en the HEPA filter or charcoal adsorber housings, or (2) following-painting, fire or cheatcal release in any ventilation zone communicating with the system by:

Verifying that with the syntaa operating at a flow rate of 35445. cfm f,105 for the air conditioning unit, and 2050 t 150 1.

for the ventilation unit and recirculating through the respective HEPA filtars and charcoal adsorbers, leakage through the system diverting valves is less than or equal to 15 air conditioning unit and 3X ventilation unit when the system is tested by 4

admitting cold 00P at the respective intake.

f f

(

Shared system with San Onofre - Unit 2.

R N D OMDC NO. 3 3/4 7-14 SAN ONOFRE-UNIT 3

l i-l

(

PLANTSY53y5 sMVEIuaA'ct At001REMENTS (Continued 1

)

Verifying that the cleanup system satisfies the 2.

Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory O

Guide 1.52 Revision 2, March 1978, and the system flow rate is.'

\\

t cfm for the ventilation unit and 35,485 cfm e 10%

I 2050 2 150 I

for the air conditioning unit.

f Verifying within 31 days after removal that a laboratory analysis of a representative carton sample ibt 3.

Guide 1.52, Revision 2, March 1978, meets th i

Guide 1.52, Revision 2, March 1978-

}

(

2050

  • 150 cfm for the Verifying a system flow rate of ventilation unit and 35,485 cfa 2 105 for the air conditioning

[

4.

unit during system operation when tested in accordance with f]

ANSI N510-1975.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifyi g

within 31 days after removal that a laboratory analysis of a

[

d.

representative carton sample obtained in accordance with Re Position C.6.h of Regulatory Guide 1.52 Re 5

6 of Regulatory Guide 1.52, Revision 2, March 1978.

8 f

At least once pir 18 months by:

e.

Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.0 1.

Water Gauge vent 11stien unit and less than 7.3 inches Water Gauge air conditioning unit while operating'the system at a flow rate of 2050 s 150 cfm for the ventilation unit 35,445 cfm 2105 for the air conditioning unit.

Verifying that en a control rose isolation test signal, the system automatically switches into the 2.

j adsorter banks.

f Verifying that on a toxic gas isolation test signal, the sys i

automatically switches into the isolation mode of operatio j

1 with flow through the NEPA filters and charcoal adsorbe Verifying that the system maintains the control reos at a positive pressure of greater than er equal to 1/8 inch 4.

i in relative to the outside atmosphere during system operat on the emergency mode.

Verifying that the heaters dissipate 4.8 kw * $5 whe 5.

accordance with ANSI N510-1975.

ftB i 8190 AMENDMENT NO. 3 3/4 7-15 SAN ONOFRE-UNIT.3

pte:* Sv5'!"5 SugygILLANCE A!001 AEMENT5 (Continued, p-._

After each complete or partial replacement of a HEPA filter bank by 2

f.

verifying that the HEPA filter banks remove greater than or equal to 99.95% of the 00P when they are tested in place in accordance with

[

while operating the system at a flow rate of AN5I N510-1975 2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the

{i air conditioning unit.

After each conclete or' partial replacement of a charcoal edsorber t

i bank by verifying that the charcoal adsorbers remove greater than or g.

. I equal to 99.95% of a halogensted hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 lll

- L' while operating the system at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm 2 10% for the air conditioning unit.

i i

E l

L i

s

\\

j i

i L

a 1

l FE) 1 R FF'

.J AMD O O T N0. 3 3/4 7-16 5AN ONOFRE-UNIT 3 j

i I

PROPOSED TECHNICAL SPECIFICATIONS 1

l i

ATTACHMENT C

l l

UNIT 2 TS 1

i i

)

a l

T

\\

.o 1

g svs I"s y,4,7,!

CC'.?R '. R:04 EIRGio A

  • a c'.!:nJP $3 sige.

,qins CC'CITICN FOR OPERATICN Two inde;endent control reem e ergency air cleanup systems shall te 3.7.5 C7 IRA 3LE-AdemexV f hLetsdt'4/gg[uthaMcM MU S

1::LIC.!!LITY:

ALL M*0E or del ACTICN' Unit 2 or 3 in PODE 1, 2, 3 or 4:

with one control room emergency air cleanup system inoperable, restore the ino;erable system to OPERABLE status within 7 days or be in at least HOT STA:CBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTD0'a*N within the following j

Ui nc 3 in M00E 5 or 6 With one control roem emergency air cleanup system inoperable, a.

restore the inoperable system to OPERABLE status witnin 7 days or initiate and maintain operatien of the remaining OPERABLE cor. trol roem emergency air cleanup system in the recirculation mode.

I With both control room emergency air. cleanup systems inoperable, or b.

with the OPERABLE control roem emergency air cleanup system re::ui ed to be in the recirculation mode by ACTION (a), not capable of be# g p:ve-ed by an OPERABLE emergency power source, suspend all c;erati: r A TONS positive reactivity changes)3FE D e rm Lf foRI Agasse;mb s wa Wd li la in M"E c-1_provls tiEn en.1.0.3 are

~

a mwwy The proRs toHecJ.o.4rdre deF Mrob w

.a k?! M k W F " W SUR 4.7.5 Each control room emergency air cleanup system Thall be demenstratec OPERA 5LE:

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control reem air a.

terparature is less than or equal to 110*F.

At least once per 31 days on a STAGGERED TEST BASIS by initating, b.

from the control room, flow through the HEPA filters and charcoal ads h ers and verifying that the system operates for at least 10 tours with the heaters on.

At keest once per 18 months or (1) af ter any structural maintanar:e c.

on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical. release in any ventilation Zone communicating with the system by:

Verifying that with the system ope-ating at a flow rate of 1.

35415 cfm + 10% for the air conditioning unit, and 2050 : li; :'-

for the ventilation unit and recirculating threagh sne res;e:P HEPA filters and charcoal adsorbers, leakage through the syt W diverting valves is less than or equal to 1% sir conditioning unit and 1% ventilation unit when the system is tested by admitting cold 00P at the respective intake.

MM.161993 "Sr.arec system w uh San Onofre - Unit 3.

A'4E cy.E',T IC. ' i 5 3 0'.;*RE ';';;T 2 3/4 7-13

punt SYSTEMS

\\

n syssnUNCE REQUIREMENTS (Continue:n

)

2.

Verifying that the cleanup system satisfies the in-pla:e testing acceptance criteria and uses the test procedures of Regulatory Positions C.S.a, C.S.c and C.5.d of Regulatory i

Guide 1.52, Revision 2. March 1978, and the system flow rate is 2050 150 cfm for the ventilation unit and 35,485 cfm 10%

l for the air conditioning unit.

Verifying within 31 days after removal that a laboratory 3.

analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.

4 Verifying a system flow rate of 2050 150 cfm for the l

ventilation unit and 35,485 cfm t 10% for the air conditioning unit during system operation when tested in accordance witn ANSI N510-1975.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying d.

within 31 days after removal that a laboratory analysis of a representative carbon sart:1e octained in a::.ordance with Regulato j

, Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.S.a of Regulatory Guide 1.52, Revision 2, March 1978.

At least once per 18 months by:

a.

Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.0 inches l

1.

Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a l

flow rate of 2050

  • 150 cfm for the ventilation unit and 35,485 cfm
  • 10% for the air conditioning unit.

Verifying that on a control room isolation test signal, the Pg6 system automatically switches into the emergency mode of operation with flow through the HEPA filters and charcoal adsorber banks, Verifying that on a toxic gas isolation test signal, the syste-s 3.

automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.

Verifying that the system maintains the control room at a 4.

positive pressure of greater than or equal to 1/8 inch W.G.

relative to the outside atmosphere during system operation in the emergency mode.

Verifying that the heaters dissipate 4.8 kw i 5% when testec 5.

in accordance with ANSI N510-1975.

g.,

AftEN0 MENT No. M 3/4 7-14 SAN Ot:0FRE-UNIT 2

\\

ptwT SYSTEMS E

c,-~.;~.ti~ : ;. ~ "i - - t. :.

..._,:)

After each complete or partial replacement of a HEPA filter bank by f.

verifying that the HEPA filter banks remove greater than er equal to 99.95% of the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : IC% for the l

air conditioning unit, After each complete or partial replacement of a charcoal adsorber g.

bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the l

ventilation unit and 35,485 cfm 10% for the air conditioning unit.

e

' s...,'

FEBi810" AMENDMENT No. Il 3/4 7-15 SAN ONOFRE-UNIT 2

b a2 e--

m

-.-u-1 I

1 i

l PROPOSED TECHNICAL SPECIFICATIONS

'l ATTACHMENT D

UNIT 3 TS

i

'h plast SYSTEMS CONTROL ROOM EMga,gy Y AIR CLEANUP SYST!M" H[

3/4,7 $

I

PIT 1RG UnGITICM FOR OPERATION Two independent control room emergency air cleanup systems shall be 3.7.5 d5<$66ef

/

b p cA ILITY:

ALL HCDE

~

~

g:

unit 2 or 3 in MODES 1, 2, 3 or 4:

J With one control room emergency air cleanup system inoperable, restore the inoperable system to OPERA 8LE status within 7 days or be in at least HOT 4

STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the follo

  • 'k a % A M ' A lrf" O N S #'
  • y'5]

W i

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

- m Units 2 and 3 in H00F5 5 or 6 or With one contrer room emergency air cleanup system inopenble, restore the inoperable system to OPERABLE status within 7 days or a.

initiate and saintain operation of the remaining CPERASLE control i

roce amargency air cleanup system in the recirculation mode.

With both control room emergency air cleanup systems inoperable, or with the OPERA 8LE control room amargency air cisanup systen require b.

to be in the recirculation mode by ACTION (a), not capable of being powered by an CPERABLE emergency power source, s f

{

kl f

ese 1 cable

~~

one fict Lion J._0.3__are no.

f{

e pro.

n ca dA a ie

' cons 7.6.tprew app /E**

E rkovdoen W

  1. %NM"M %

l CT-iiquTRDiiWi>

suRvEI Each control room emergency air cleanup systaa shall be demonstrated

4.7.5 OPERABLE

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 110*F.

a.

At least once per 31 days on a STAGGERED TEST 5A$15 by initating from the control room, flow through the HEPA filtars and charcoal

~

b.

adsorbers and verifying that the systaa operatas for at least F

10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heatars on.

At least once per 18 months or (1) after any structural saintenance

~

en the HEFA filter or charcoal adsort>er housings, or (2) following

c..

,i painting, fire or chemical release in any ventilation zone casounicating with the systes by:

Verifying that with the system operating at a flow rate of2050 2 1.

35445 cfa 1 10% for the air conditioning unit, and HEPA filtars and charcoal adsorbers, leakage through the system diverting valves i; Ws than or equal to 1% sir conditioning unit and 3% ventilation unit when the system is testati by admitting cold 00P at the respective intake.

(

Shared system with San Onofre - Unit 2.

=

NID E U4T NO 3 3/4 7-14 SAN CHOFRE-UNIT 3

b 1

(

[

'.,, I sugyEILLAsc1. 210UIREMENT5 (Continued) n Verifying that the cleanup systes satisfies the i fc i

2 l

Regulatory Positions C.5.a. C.S.c and C.5.6 of Regulatory

\\

Guide 1.52, Revision 2, March 1974, and the system flow rate is l

y 2050 a 150 cfm for the ventilation unit and 35,485 cfm c m l

fr for the air conditioning unit.

Verifying within 31 days after removal that a laboratory analysis of a representative ci.rson sample ibtained in 3.

accordance with Regulatory Position C.8.b of Regulatory Guide 1.52, Revision 2, March 1978, meets th Guide 1.52, Revision 2, March 1974

\\

2050

  • 150 efs for the Verifying a systas flow rate of i

i ventilation unit and 35,485 cfs a 105 for the air condition ng 4.

f unit during system operation when tested in accordance with g

i AM5! N510-1975.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verif j

within 31 days after removal that a laboratory analysis of a

[

d.

representative carton sample obtained in accordance with Position C.E.b of Regulatory Guide 1.52, Revision 2, March 6

seats the laboratory testing criteria of Regulatory Position C.

o.' Regulatory Guide 1.52, Revision 2, March 1974.

f At least once per 18 months by:

Verifying that the pressure drop across the combined HEPA e.

filters and charcoal adsorber banks is less than 7 1.

Water Gauge ventilation unit and less tha flew rate of 2060 e 150 cfm for the ventilation un 35,445 cfm

  • 105 for the air conditioning unit.

Verifying that en a control rose isolation test signal, the system automatically switches into the 2.

adsetter banks.

Verifying that en a toxic gas isolatten test signal, the sy asteestically switches into the isolatten sede of operati 1

with flow through the NEPA f t1 tars and charcoal ads Verifying that the system maintains the centrol room at a positive pressure of greater than er equal to 1/8 in 4.

in relative to the outside atmosphere during system opera the emergency mode.

Verifying that the heaters dissipate 4.8 kw t SX whe 5.

accordance with ANSI N510-1975.

FEB i 81#1 AM NDMENT MO. 3 3/4 7-15 SAN ONOFRE-UNIT.3

p,y

  • Sv5*E"1 SUgygILLANCE REQUIREMENTS (Continued

,N

~p After each complete or partial r. placement of a HEPA filter bank by f.

verifying that the HEPA filter banks remove greater titan or equal to 99.95% of the 00P when they are tested in place in accordance with while operating the systes at a flow rate of ANSI N510-1975 cfa for the ventilation unit and 35,445 cfa 210% for the

{

2050

  • 150 air conditioning unit.

t After each complete or' partial replacement of a charcoal adsorber t

bank by verifying 'that the charcoal adsorbers remove greater than er g.

equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with AM5! H510-1975 l

wnile operating the syates at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,a85 cfm 10% for the air conditioning unit.

1 l

i t

e 9

6 NM3 3/4 7-16 1AN ONOFRE-UNIT 3


,,-,-n-,------,-,-

l l

l ENCL 0SURE 2

I 1

'E l

1 1

J

i PCN-299 (TSIP)

TECHNICAL SPECIFICATION 3.7.11 and BASES (with marked-up chanaes proposed by PCN-439)

UNIT 2 l

f-t

)

.i, ;

3.'

3,7 PLMT SYSTEMS Control Room Emergency Air Cleanup System (CREACUS) 3.7.11 LCO 3.7.11 Two CREACUS trains shall be OPERABLE.

MODES 1, 2, 3, 4, 5, and 6, APPLICABILITY:

During movement of irradiated fuel assemblies.


NOTES---------------------------

f. Each Unit shall enter applicable ACTIONS sepa ACTIONS 1x. seer I

~

REQUIRED ACTION COMPLETION TIME CONDITION A.

One CREACUS train A.1 Restore CREACUS train 7 days to OPERABLE status.

inoperable.

S.

Required Action and B.1 Be in M00E 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A gg not met in MODE 1, 2,

3. or 4.

B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.

Required Action and C.1 Place OPERABLE Ismediately associated Coupletion CREACUS train in Time of Condition A emergency radiation not met in MODES 5 protection mode.

or 6, or during movenset of irradiated gg feel assashlies.

(continued) f

~

JC0 3.D.y are n/ gnyticoate 2.k povwns or gue/ed cogurah'e, 1

N k n en/eri s s; MENDMENT NO.

SAN ON0FRE--UNIT 2 3.7-25

ACTIONS

~

CON 0! TION REQUIRED ACTION COMPLETICH TIME C.

(continued)~

C.2.1 Suspend CORE Imediately ALTERATIONS.

!.EE C.2.2 Suspend movement of Imediately irradiated fuel assemblies.

D.

Two CREACUS trains 0.1 Enter LCO 3.0.3.

Imediately i

inoperable in MODE 1, 2, 3, or 4.

E.

Two CREACUS trains E.1 Suspend CORE Imediately inoperable in MODES 5 ALTERATIONS.

or 6, or during movement of irradiated 8,HQ fuel assemblies.

E.2 Suspend movement of Imediately irradiated fuel assemblies.

SURVEILLANCE REQUIRDIENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Operate each CREACUS train for 31 days on a STAGGERED TEST a 15 minutes.

BASIS (continued)

SAN ONOFRE--UNIT 2 3.7-26 AMEN 0 MENT NO.

l e

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.11.2 Perform required CREACUS filter testing in In accordance accordance with Ventilation Filter Testing with the VFTP Program (VFTP).

24 months SR 3.7.11.3 Verify each CREACUS train actuates on an actual or simulated actuation signal.

SR 3.7.11.4 Verify one CREACUS train can maintain a 24 months on a positive pressure of n 0.125 inches water STAGGERED TEST gauge, relative to the atmosphere during BASIS the energency radiation state of the energency mode of operation.

t 1

\\

e d

SAN ONOFRE--UNIT 2 3.7-27 AMEN 0 MENT NO.

i

.v 3 :.'..

g 3.7 PLANT SYSTEMS B 3.7.11 Control Room Emergency Air Cleanup System (CREACUS)

BASES

=

BACKGROUND The CREACUS provides a protected environment from which operators can control the plant following an uncontroiled release of radioactivity.

The CREACUS consists of two independent, redundant trains that recirculate and filter the control room air.

Each CREACUS train consists of emergency air conditioning unit, emergency ventilation air supply unit, emergency isolation dampers, and cooling coils and two cabinet coolers per Unit.

Each emergency air conditioning unit includes a prefilter, a high efficiency particulate air (HEPA) filter, an activated carbon adsorber section for removal of gaseous activity (principally iodine), and a fan. A.second bank of HEPA filters follows the adsorber section to collect carbon fines.

Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also form part of the system. Air and motor-operated dampers are provided for air volume control and system isolation purposes.

Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains.

The prefilters remove any large particles in the air to prevent excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.

There are two CREACUS operational modes. Emergency mo'.e is an operational mode when the control room is isolated to protect operational personnel from radioactive expostre through the duration of any one of the postulated I'miting i

faultsdiscussedinChapter15UFSAR(Ref.2).

Isclation mode is an operational mode when the control room is isolated to protect operational personnel from toxic gasses and smoke.

Actuation of the CREACUS places the system into either of two separate states of operation, depending on the initiation signal. Actuation of the system to the emergency node of operation closes tne unfiltered-outside-air intake (continued)

U-SANONOFRE--UNITg, B 3.7-62 AMENDMENT NO.

. D '...

]

8ASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for -

(continued) recirculation of control room air through the redundant trains of HEPA and charcoal filters.

The emergency mode initiates pressurization of the control room.

Outside air is added to the air being recirculated from the control. room.

Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.

The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and -

toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode'or isolation mode as required. The actions of the isolation mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.

A single train will pressurize the control room to at least~

0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in j

Reference 1.

t Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Nonnally-open isolation dampers are arranged in series pairs so that one' damper's failure to shut will not result 'in a breach of isolation. The CREACUS is designed in accordance with Seismic Category I requirements.

The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem c

whole-body dose.

e APPLICABLE The CREACUS components are arranged in redundant safety SAFETY ANALYSES related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate supply-of filtered air to all areas requiring access.

(continued)

O SANONOFRE--UNIT 4 8 3.7-63 AMENOMENT NO.

i i

_ =...

^'

2 BASES APPLICABLE The CREACUS provides airborne radiological protection for SAFETY ANALYSES the control room operators, as demonstrated by the control (continued) room accident dose analyses for the most limiting design basis loss of coolant accident fission product release presented in the UFSAR, Chapter 15 (Ref. 2).

The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room following a toxic chemical release, as presented. in Reference 1.

The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair I

the ability of the system to perform its design function.

1 The CREACUS satisfies Criterion 3 of the NRC Policy Statement.

LC0 Two independent and redundant trains of the CREACUS are required to.be OPERABLE to ensure that at least one is available, assuming that a single failure disables the other r

train. Total system failure could result in a control room operator receiving a dose Tn excess of 5 res in the event of

?

a large radioactive release.

The CREACUS is considered OPERABLE when the individual components necessary to control operator exposure are OPERABLE in both trains. A CREACUS train is considered i

OPERABLE when the associated:

- a.

Fan is OPERABLE; y..

b..J.HfPK ~ filters and charcoal adsorber are not-eicessively

~-._;;?ms.tricting flow, and are capable of-performing their

p p S_:f'L ftRj ation functions; and

~

, c.

Ductwork, valves, and dampers are OPERABLE, and air

_ p [,". ~

  • circulation can be maintained.

yp.

In addition, the control room boundary must be maintained, or administrative 1y controlled, including the integrity of the walls, floors, ceilings, ductwork.and access doors.

me h

(continued)

SANONOFRE--UNIT $

B 3.7-64 AMEN 0 MENT NO.

BASES (continued)

APPLICABILITY In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to limit operator exposure during and following a OBA.

In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.

During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.

ACTIONS l ACTION statements are modified by a NOTE:

"Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3.

LC0 does not address the d.-M.Sd!47 [7 operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.

A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days.

In this Condition, the remaining OPERABLE CREACUS subsystem is adequate to perform control room radiation protection function.

l Mowever, the overall reliability is reduced because a single failure in the OPERABLE CREACUS train could result in loss of CREACUS function. The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and the ability of the remaining train to provide J

the required capability.

B.1 and B.2

\\

If the inoperable CREACUS cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the accident risk. To achieve this status, the unit must be i

placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

(continued)

SAN ONOFRE--UNIT 2.

B 3.7-65 AMENOMENT NO.

INSERT "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately

  • CREACUS is a shared system between Unit 2 and Unit 3.

LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.

NOTE 2 reads: "The provisions af LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration."

In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.

Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it. This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY.

Therefore, this threshold can be excepted from LCO 3.0.4.

The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4.

The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt.

If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards.

Therefore, this MODE change can be excepted from LC0 3.0.4 also.

The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor

> 200*F to T 5 200aF by Coolant System (RCS) temperature from 350cF > TIf no irradiated E!el assemblies, ya initiating shutdown cooling.

moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards.

Therefore, this MODE change can be excepted from LCO 3.0.4 also.

i

i:. 5 3

3.'

BASES ACTICNS C.I. C.2.1. and C.2.2 (continued) j In MCDE 5 or 6, or during movement of irradiated fuel assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency made of operation.

This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.

An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control room.

This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel assemblies to a safe position.

D.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended 1

function and the unit is in a condition outside the accident i

analyses. Therefore, LCO 3.0.3 must be entered imediately.

E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.

This places the unit in a condition that minimizes the accident risk. This does not preclude the movement of fuel to a safe position.

w SURVEIL SR 3.7.11.1 REQUIREMENTS l

Standby systems should be checkect periodically to ensure that they function properly. Sir.ce the environment and normal operating conditions on this system are not severe,

)

testing each train once every month provides an adequate check on this system.

(continued)

SAN ONOFRE.--UNIT &

B 3.7-66 AMENDMENT NO.

- Uinf e

1.s

.L

~,

BASES SURVEILLANCE SR 3.7.11.1 (continued)

REQUIREMENTS Systems not requiring humidity control need only be operated for t 15 minutes to demonstrate the function of the system.

The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.

SR 3.7.11.2 This SR verifies that the required CREACUS testing is performed in accordance with the Ventilation Filter Testing Program (VFTP).

The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3).

The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations).

Specific test frequencies and additional infonnation are discussed in detail in the VFTP.

SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on i

an actual or simulated actuation signal. The Frequency of 24 months is consistent with that specified in Reference 3.

SR 3.7.11.4 This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control roce = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.

+

d.-

(continuer SAN ONOFRE--UNIT 1 B 3.7-67 AMENDNENT N0.

i.'..

i 2.

~

BASES (continued)

REFERENCES 1.

UFSAR. Section 9.4.

2.

UFSAR, Chapter 15.

3.

Regulatory Guide 1.52 (Rev. 2).

3 4

SAN ON0FRE--UNIT 1 B 3.7-68 AMEN 0 MENT NO.

)

PCN-299 (TSIP)

TECHNICAL SPECIFICATION 3.7.11 and BASES (with wrked-up changes proposed by PCN-439)

UNIT 3 1

l.~

l 1

i 3.7. PLANT SYSTEMS i

Control Room Emergency Air Cleanup System (CREACUS)

)

l 3.7.11 LCO 3.7.11 Two CREACUS trains shall be OPERABLE.

APPLICABILITY:

M00 5 1 A 5 g irra iated fuel assemblies.

1


NOTE----------------------------

ACTIONS MIT

-.$$.5 $ b--------

REQUIRED ACTION COMPLETION TIME CONDITION A.

One CREACUS train A.1 Restore CREACUS train 7 days to OPERABLE status.

inoperable.

I 8.

Required Action and 8.1 Be in M00E 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion t.

Time of Condition A Atgl not met in MODE 1, 2, B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

3. or 4.

C.

Required Action and C.1 Place OPERA 8tE Imediately associated Cagletion CREACUS train in Time of Condition A emergency radiation not met in NODES 5 protection mode.

or 6, or during i

i anvemaet of irradiated Q8 feel assemblies.

(continued)

)

V-

-4 do 3.0.4i are 'c & */ W T " '

2.7h povisiexs $seG r6, oe n'efua/1e'*g'ahe, wA<n en4r44 p AMENOMENT NO.

3.7-25 SANONOFRE--UNITj

.s

ACT10N$_

REQUIRED ACTION COMPLETION TIME CONDITION C.

(continued)'

C.2.1 Sus;end CORE Imediately ALTERATIONS.

A10 C.2.2 Suspend movement of Imediately irradiated fuel assemblies.

D.

Two CREACUS trains 0.1 Enter LCO 3.0.3.

Imediately inoperable in MODE 1, 2, 3, or 4.

E.

Two CREACUS trains E.1 Suspend CORE Imediately inoperable in MODES 5 ALTERATIONS.

or 6, or during movement of irradiated

!!gl fuel assemblies.

Immediately E.2 Suspend movement of irradiated fuel assemblies.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.E Operate each CREACUS train for 31 days on a a 15 minutes.

STAGGERED TEST r

BASIS i

(continued)

SANON0FRE--UNITj 3.7-26 ANENDNENT NO.

..m (continued)

FREQUENCY S#URVEILLANCE REQUIREMENTS

~

SURVEILLANCE In accordance Perfort required CREACUS filter testing with the VFTP s

i 3.7.11.2 SR Program (VFTP).

l 24 months Verify each CREACUS train actuates on an l

actual or simulated actuation signa.

3.7.11.3 SR 24 months on a STAGGERED TEST Verify one CREACUS train can maintain a positive pressure of e 0.125 inches water 8 ASIS gauge, relative to the atmosphere during SR 3.7.11.4 h

the emergency radiation state of t e emergency mode of operation.

1 w

f AMENDMENT NO.

3.7-27 SANON0FRE--UNITJ j

5 B 3.7 PLANT SYSTEMS 2

8 3.7.11 Control Room Emergency Air Cleanup System (CREACUS) i BASES BACKGROUND The CREACUS provides a protected environment from which j

operators can control the plant following an uncontrolled release of radioactivity.

The CREACUS consists of two independent, redundant trains that recirculate and filter the control room air.

Each j

CREACUS train consists of emergency air conditioning unit, 1

emergency ventilation air supply unit, emergency isolation dampers, and cooling coils and two cabinet coolers per Unit.

Each emergency air conditioning unit includes a prefilter, a l

high efficiency particulate air (HEPA) filter, an activated carbon adsorber section for removal of gaseous activity i

(principally iodine), and a fan. A second bank of HEPA filters follows the adsorber section to collect carbon fines.

Each emergency ventilation air supply unit includes prefilter, HEPA filter, carbon adsorber and fan. Ductwork, motor-operated dampers, and instrumentation also fonn part of the system.

Air and motor-operated dampers are provided i

for air volume control and system isolation purposes.

Upon receipt of the actuating signal, normal air supply to the control room is isolated, and the stream of ventilation air is recirculated through the ' system's filter trains.

The prefilters remove any large particles in the air to prevent i

excessive loading of the HEPA filters and charcoal adsorbers. Continuous operation of each train for at least 15 minutes per month verifies proper system operability.

There are two CREACUS operational modes. Emergency mode is an operational mode when the control room is isolated to protect operational personnel from radioactive exposure through the duration of any one of the postulated limiting faultsdiscussedinChapter15UFSAR(Ref.2).

Isolation 1

mode is an operational mode when the control room is isolated to protect operational personnel from toxic gasses and smoke.

Actuation of the CREACUS places the system into either of two separate states of operation, depending on the initiation signal. Actuation of the system to the emergency mode of operation closes the unfiltered-outside-air intake (continued) b, SAN ONOFRE--UNIT 3 8 3.7-62 AMENOMENT NO.

4

BASES BACKGROUND and unfiltered exhaust dampers, and aligns the system for (continued) recirculation of control room air through the redundant trains of HEPA and charcoal filters.

The emergency mode initiates pressurization of the control room.

Outside air is added to the air being recirculated from the control room. Pressurization of the control room prevents infiltration of unfiltered air from the surrounding areas of the building.

The control room supply and the outside air supply of the nonnal control room HVAC are monitored by radiation and toxic-gas detectors respectively. One detector output above the setpoint will cause actuation of the emergency mode or isolation mode as required.

The actions of the isolation mode are more restrictive, and will override the actions of the emergency mode of operation. However, toxic gas and radiation events are not considered to occur concurrently.

A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per hour. The CREACUS operation in maintaining the control room habitable is discussed in Reference 1.

Redundant recirculation trains provide the required filtration should an excessive pressure drop develop across the other filter train. Normally-open isolation dampers are arranged in series pairs so that one damper's failure to shut will not result in a breach of isolation.

The CREACUS is designed in accordance with Seismic Category I requi rements.

The CREACUS is designed to maintain the control room environment for 30 days of continuous occupancy after a Design Basis Accident (DBA) without exceeding a 5-rem whole-body dose.

APPLICABLE The CREACUS components are arranged in redundant safety SAFETY ANALYSES related ventilation trains. The location of components and ducting within the control room envelope ensures an adequate supply of filtered air to all areas requiring access.

(continued) f' i

SAN ONOFRE--UNIT 3 8 3.7-63 AMENDMENT NO.

i

t

I 3 3. '. '..

BASES APPLICABLE The CREACUS provides airborne radiological protection for SAFETY ANALYSES the. control room operators, as demonstrated by the control (continued) room accident dose analyses for.the most limiting design basis loss of coolant accident fission procuct release presented in the UFSAR, Chapter 15 (Ref. 2).

The analysis of toxic gas releases demonstrates that the toxicity limits are not exceeded in the control room following a toxic chemical release, as presented in Reference 1.

The worst case single active failure of a component of the CREACUS, assuming a loss of offsite power, does not impair the ability of the system to perform its design function.

The CREACUS satisfies Criterion 3 of the NRC Policy Statement.

q LCO Two independent and redundant trains of the CREACUS are required to be OPERABLE to ensure that at least one is available, assuming that a. single failure disables the other train.

Total t,ystem failure could result in a control room j

r operator receiving a doseln excess of 5 res in the event of

.?

a large radioactive release.

The CREACUS is considered OPERABLE'when the individual h

components necessary to control operator exposure are OPERABLE in both trains. A CREACUS train is considered i

OPERABLE when the associated:

a. - Fan is OPERABLE; 5.

1

b.,' HfPX ' filters and charcoal adsorber are not-ex'cessively

' :ims.tricting flow, and are capable of-performing their

-s W,,~,,,;, w fi Qration functions; and m

f Ductwork, valves, and dampers are OPERABLE, and air

_ c.

9,7,,f..'

circulation can be maintained.

e In addition, the cor. trol room boundary must be maintained, or administratively controlled, including the integrity of the walls, floors, ceilings, ductwork,.and access doors.

d (continued) 1 l

SAN ONOFRE--UNIT 3 8 3.7-64 AMENOMENT NO.

-)

BASES (continued)

APPLICABILITY In MODES 1, 2, 3, and 4, the CREACUS must be OPERABLE to limit operator exposure during and following a DBA.

In MODES 5 and 6, the CREACUS is required to cope with the release from a rupture of an outside waste gas tank.

During movement of irradiated fuel assemblies, the CREACUS must be OPERABLE to cope with the release from a fuel handling accident.

ACTIONS ACTION statements are modified by a NOTE:

"Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared LCO does not address tne ggg 7 "[m system between Unit 2 and Unit 3.,ts are in different operational situation when the uni operational MODES. Without this NOTE it may not be clear i

(whatACTIONshouldbetaken.j

'A.1 With one CREACUS train inoperable, action must be taken to restore OPERABLE status within 7 days.

In this Condition, the remaining OPERABLE CREACUS subsystem is adequate to perform control room radiation protection function.

However, the overall reliability is reduced because a single i

I failure in the OPERABLE CREACUS train could result in loss of CREACUS function.

The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and the ability of the remaining train to provide the required capability.

B.1 and 8.2 i

If the inoperable CREACUS cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a MODE that minimizes the t

accident risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

The allowed Completion Times are reasonable, based on operating experience, to reach the recuired unit conditions from full power conditions in an orcerly manner and without challenging unit. systems.

(continued)

SAN ONOFRE--UNIT 3 B 3.7-65 AMENOMENT NO.

INSERT "A" ACTIONS statements are modified by two NOTES. NOTE 1 reads: "Each Unit shall enter applicable ACTIONS separately." CREACUS is a shared system between Unit 2 and Unit 3.

LC0 does not address the operational situation when the units are in different operational MODES. Without this NOTE it may not be clear what ACTION should be taken.

NOTE 2 reads: "The provisions of LC0 3.0.4 are not applicable when entering MODES 5, 6, or defueled configuration."

In accordance with the APPLICABILITY statement "or during movement of irradiated fuel assemblies", OPERABILITY of the CREACUS will be ensured prior to movement of irradiated fuel assemblies.

Therefore, the only threshold between defueled configuration and MODE 6 is the position of the first irradiated fuel assembly--whether it is in the reactor vessel or external to it.

This threshold has no safety significance because the only credible event during the transition from a defueled configuration to MODE 6 and from MODE 6 to defueled configuration is a Design Basis Fuel Handling Accident which is covered by the LC0 APPLICABILITY.

Therefore, this threshold can be excepted from LC0 3.0.4.

The threshold of entering MODE 5 from MODE 6 consists of fully tightening the last reactor vessel head closure bolt. This evolution has no safety significance from the point of view of isolating the control room from external hazards.

Therefore, this MODE change can be excepted from LC0 3.0.4.

The threshold of entering MODE 6 from MODE 5 consists of untightening at least one reactor vessel head closure bolt.

If no irradiated fuel assemblies are being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LC0 3.0.4 also.

The threshold of entering MODE 5 from MODE 4 consists of decreasing Reactor Coolant System (RCS) temperature from 350af > T

> 200aF to T 5 200aF by initiating shutdown cooling.

IfnoirradiatedE!elassemblies, yare being moved, this evolution has no safety significance from the point of view of isolating the control room from external hazards. Therefore, this MODE change can be excepted from LCO 3.0.4 also.

1 ap &Of Osh b

- - - - ~ - - _ - _ - _ _ _ - _

. i:..

5 b.'

BASES ACTIONS C.I. C.2.1. and C.2.2 (continued)

In MODE 5 or 6, or during movement of irradiated fuel assemblies, if Required Action A.1 cannot be completedwithin the required Completion Time, the OPERABLE CREACUS train must be imediately placed in the emergency mode of operation.

This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that any active failure will be readily detected.

An alternative to Required Action C.1 is to imediately suspend activities that could result in a release of radioactivity that might require isolation of the control This places the unit in a condition that minimizes room.

the accident risk.

This does not preclude the movement of fuel cssemblies to a safe position.

Q.d If both CREACUS trains are inoperable in MODE 1, 2, 3, or 4, the CREACUS may not be capable of performing the intended function and the unit is in a condition outside the accident analyses.

Therefore, LC0 3.0.3 must be entered immediately.

E.1 and E.2 When in MODES 5 or 6, or during movement of irradiated fuel assemblies with two trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might enter the control room.

This places the unit in a condition that minimizes the accident risk.

This does not preclude the movement of fuel to a safe position.

SURVEILLAME SR 3.7.11.1 REQUIREMENTS Standby systems should be checked periodically to ensure that they function properly. Since the environment and normal operating conditions on this system are not severe, testing each train once every month provides an adequate check on this system.

(continued)

U<-

SAN ONOFRE.--UNIT 3 B 3.7-66 AMENOMENT NO.

1

.U..i 3 3.7.ll 3

8ASES i

1 SURVEILLANCE SR 3.7.11.1 (continued)

REQUIREMENTS Systems not requiring humidity control need only be operated for a 15 minutes to demonstrate the function of the system.

The 31 day on a STAGGERED TEST BASIS Frequency is based on the known reliability of the equipment, and the two train redundancy available.

SR 3.7.11.2 This SR verifies that the required CREACUS testing is perfonned in accordance with the Ventilation Filter Testing Program (VFTP).

The CREACUS filter tests are based on Regulatory Guide 1.52 (Ref. 3).

The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations). Specific test frequencies and additional information are discussed in detail in the VFTP.

SR 3.7.11.3 This SR verifies each CREACUS train starts and operates on an actual or simulated actuation signal. The Frequency of 24 months is consistent with that specified in Reference 3.

SR 3.7.11.4 This SR verifies the integrity of the control room enclosure and the assumed inleakage rates of potentially contaminated air. The control room positive pressure, with respect to potentially contaminated atmosphere, is periodically tested to verify proper function of the CREACUS. During the emergency radiation state of the emergency mode of operation, the CREACUS is designed to pressurize the control room = 0.125 inches water gauge positive pressure with respect to the atmosphere in order to prevent unfiltered inleakage. The CREACUS is designed to maintain this positive pressure with one train.

b (continued)

SAN ONOFRE--UNIT 3 8 3.7-67 AMENDMENT NO.

~

3

  • BASES (continued)

REFERENCES 1.

UFSAR, Section 9.4.

2.

UFSAR, Chapter 15, i

3.

Regulatory Guide 1.52 (Rev. 2).

1 SAN ONOFRE--UNIT 3 8 3.7-68 AMENDHENT NO.

i 4

1 ENCL 0SURE 3

i l

l 1

EXISTING TECHNICAL SPECIFICATION 3/4.7.5 and BASES (with marked-up changes proposed by pcn-407 and PCN-439)

UNIT 2 7

h:..;- Sv 5~ i5 7, 5 C "'.~::t C 4 EIRGEC A::t C'.! 'rJP Si sTE" w

s, t..q T I,, CO*!":ITICN % OPE:ATION 7,

3,7.5 Two inde;ende c:ntrol recm e ergen:y air cleanup systems shall te N

CFERA3' E-

=

t
  • C f.3 ! L 1IY :

ALL hE cr clur//t /wa/cmex4 f FAtodd2kd[u(LaMcMhddf SLN EseW4f$/ heQ5'A*! ol6/d(E'R OSS ANDNS Unit 2 cr 3 in F0DE 1, 2, 3 er tegos/tehg With one centrol room emergency air cleanup system inoperable, restore the ine:erable system to OPER LE status within 7 days or be in at~least H0i A STAN:3Y within the next 6 urs and in COLD SHUTDOWN within the following x 30 h;ur5. ot*

6[ MM" Units 2 3 in M00E 5 a,

With one centr:1 reem emergency air cleanup system inoperable, restere the inoperable system to OPERABLE status witnin 7 cays er initiate and maintain operati:n of the remaining OPERABLE control rece emergency air cleanup system in the recirculation mode.

b.

With both centrol roem emergency air. cleanup systems ineperable, er h

with the OPERABLE centrol reem aergency air cleanup' system re:uire:

to be in the recirculatien mode by ACTION (a), net capable of bef ;

4) p:ve ed by an OPERABLE emergency power seur:e, suspend all c: era:i:

v1 Lv h ;a_fJ1P r p sitive reactivity changes h a assema_ 4 e m ai te ~

fih n.1 r

  • if a le in M**E :

e

+

W' "s

M ta Hen. c.

G re' n e a 9 9 ra p e w,

ntri~ig R

The pecor'src s

....T5NfC.~.k.fd M D,/f # M SURv

u 4.7.5 Each contrel roem emergency air cleanup system 1ha11 be demonstrate:

OPERABLE:

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the centrol roem air a.

terparature is less than or equal to 110*F.

b' b.

At least once per 31 days on a STAGGERED TEST BASIS by initating, D

from the control room, flow through the HEPA filters and char::ai b

a*An ud verifyino that the system operates for at least Mt1 tours with the heaters % /Smt'isu/dS.

8 At Isast once per 18 stonths or (1) af ter any structural r.aintenar:e c.

j on the HEPA filter or charcoal adsorber housings, or (2) fo11 ewing painting, fire or chemical release in any ventilation zone n

A coe.municating with the system by:

'~ Verifying that with the system ope-ating at a flow rate cf

1. N 35485 cfm + 10% for the air conditioning unit, and 2050 : 150 ~'-

N' g for the ventilatien unit and recirculating thre.sgh the res;e:~- 'f I

j HEPA filters and charcoal adsorbers, leakage through the syftt~

diverting valves is less than or equal to 1% air conditiening unit and 1% ventilation unit when the system is tested by J

admittingcold00Pattherespectiveintake[

j

~

MAY.16190 "Starec sys:en with San Onofre - Unit 3.

A'.tE.CMENT tc. " i S IN C'.",r RE LT,T 2 3/* 7-13

.pttyi SYSTEMS t

i 4

5.y/EnL ANCE REOUIREMENTS (Continueel 1

2.

Verifying that the cleanup system satisfies the in place testing acceptance criteria and uses the test procedures cf Regulatory Positions C.S.a, C 5.c and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978, and the system flow rate is 2050 2 150 cfm for the ventilation unit and 35,485 cfm IC%

l' for the air conditioning unit.

3.

Verifying within 31 days af ter removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.

4 Verifying a system flow rate of 2050 2 150 cfm for the l

ventilation unit and 35,485 cfm 10% for the air conditioning unit during system operation when. tested in accordance witn l

ANSI H510-1975.

d.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after rem 0 val that a laboratory analysis of a re;tesentative carbon sam;1e obtained in a:ccrdance with Regulat: j

, Position C.6.b of Regulat:ry Guide 1.52, Revision 2, March 1975, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978.

At least once per 18 months by:

e.

1.

Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber bank.s is less than 7.0 inches l,

Water Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating the system at a l

flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm t 10% for the air conditioning unit.

h Verifying that on a control room isolation test signal, the system automatically switches into the emergency mode of operation'with flow through the HEPA filters and charcoal' adsorber banks.

3.

Verifying that on a toxic gas isolation test signal, the sysce-automatically switches into the isolation mode of operation with flow through the HEPA filters and charcoal adsorber banks.

4.

Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch W.G.

relative to the outside atmosphere during system operation in i

the emergency mode.

W 5.

Verifying that the heaters dissipate 4.8 kw t 5% when tested in accordance with ANSI H510-g.,

a s

san ol0FRE-UNIT 2 3/4 7-14 AMENOMENT NO. Il

... -. - ~ _.

. Lui SYSTEM _S J

p

}'

g-

,y.-

,..,, n.

. u._..

e After each complete or partial replacement of a HEPA filter bank by f.

verifying that the HEPA filter banks remove greater _ than or ez'.:a1 to 99.95% of.the DOP when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 150 cfm for the ventilation unit and 35,485 cfm : 10% for tr.e l

air conditioning unit.

After each complete or partial replace =ent of a charcoal adsorber g.

bank by verifying that the charcoal adsorbers remove greater than er equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in place in accordance with ANSI H510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the j

ventilation' unit and 35,485 cfm : 10% for the air conditioning unit.

i 1

. f-c i

a J

1

' s....'

q FEB1810M N

SAN-ONOFRE-UNIT 2 3/4 7-15 AMENOMENT NO.

9 PLANT SYSTEMS r

BASES 3/a.7.5 CONTROL ROCM EMERGENCY AIR CLEANUP SYSTEM frem which operat:rs can The CREACUS provides a protected environment 4

i control the plant following an uncontrolled release of radioactivity, or toxic gas.

L The CREACUS consists of two independent, redundant trains that recircu Each train consists of a prefilter, a and filter the control room air.

(HEPA) filter, an activated charcoal high efficiency particulate airadsorber section for removal of (for A second bank of HEPA filter follows the adsorber section emergency air conditioning unit only) and is used to retain c a fan.

downstream of carbon adsorber.

Ductwork, includes prefilter, HEPA filter, charcoal adsorber, and fan.

motor-operated dampers, and instrumentation als system isolation purposes.

b Upon receipt of the actuating signal, nonnal air supply to the co room is isolated, and the stream of ventilation air is recirculated The prefilters remove any lar;e through the system's filter trains.

particles in the air to prevent excessive loading of the HEPA filters ar 15 Continuous operation of each train for at least charcoal adsorbers.

minutes per month verifie,s proper system operation.

g There are two CREACUS operational modes. Emergency mode is an mode when the control room is isolated to prevent operation personnel f the radioactive exposure through the duration of any one of the postula Isolation mode is limiting faults discussed in FSAR, Chapter 15 (Ref.2).

Q an operational mode when control room is isolated to protect oper N

personnel from toxic gases and smoke.

Actuation of the CREACUS places the system into either of two separateA states of the operation, depending on the initiatio Outside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tne control room.

control room.

Pressurization of the control room prevents infiltration of infiltered air from the surrounding areas of the building.

The actions taken in the toxic gas isolation mode are the same, exce that the signal switches control room ventilation to an isolation mcce preventing outside air from entering the control room.

B 3/4.7-4 SAN ONOFRE-UNIT 2,

PLANT SYSTEMS BASES 3/4.7,5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM (continu The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectively.

above the setpoint will cause actuation of tne One detector _ output The actions of the toxic emergency mode or isolation mode as required. gas the emergency radiation mode. However, toxic gas and radiation events are not considered to occur concurrently.

A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 45% per ho g

Redundant recirculation trains provide the required filtration should an. Nor excessive pressure drop develop across the other filter train.

open isolation dampers are arranged in series pairs 50 that the fai The CREACUS one damper to shut will not result in a breach of isolation.

is designed in accordance with Seismic Category 1. requirements.

The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) wi; exceeding a 5 rem whole body dose.

i SAN ONOFRE-UNIT 2 3 3/4.7-4a

EXISTING TECHNICAL SPECIFICATION 3/4.7.5 and BASES (with marked-up changes proposed by pcn-407 and PCN-439)

UNIT 3 l

'l g i SYSTEMS g CCNTROL RocM EMER0ENCY A* R c'.E ANUP SYSTEM" I

LIMITING CDNOTTION WP optRATION q' -

~

vi 3.7.5 Two independ control room emergency air cleanup systems anall be j

CPERAELE.

lE 4pptIcABILIU:

ALL DES e du, *,*c 4/unut / //mu60cdh asve5kg N

I le W

b k,d ACTION:

_b2dM[

or 3 in MODES 1, 2, 3 or 4:

h Unit With one control room eeer ency aiMeanup systra noperable, restore the inoperable system to OPE

.E status within 7 days or be in at least HOT 4

N STANOBy within the next 6 turs and in COLD SHUTOOWN within the following 3 in MODFS S fa i

moa emergency air cleancpr system inoperable, With one contrer restore the inoperable system to OPERASLE status within 7 days or a.

initiate and saintain operation of the remaining CPERABLE control I

roce amargency air cleanup system in the recirculation mode.

1 l

With both control room ecargency air cleanup systees inoperable, or I

with the OPERABLE control room amargency air cleanup systes required b.

E

)

4 to be in the recirculation mode by ACTION (a), not capable of being i

I D

powered by an OPERABLE energency power source, suspend all operatien i

4 volyi g. ElLTERAT1 NS or positive reactivity changes 2Wmmw w}i f

oreafi< c w?pueVm :>r<z akM'M*Ma% awns?4 t%"%%"MQ~

G j

SURVEI[

E1TTOUDERIST56# UM "N

  • 2"MU'M f ach control room ansegency air cleanup systan shall be damonstrated

4.7.5 OPERABLE

At leasi. Soca por 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the cootrol roca air a.

terparature is less than or equal to 110*F.

At least erw:e per 31 days on a STAGGERED TEST BASIS by initating, frca the control roca, flew through the HEPA filters and charcoal h.

b.

4 adsorbers and verifying that the systaa operatas for at least O

$ #e w mm. vnn saa nowWon) /fm/ou/es k

~At leest once par 18 months or (1) after any structural naintenance on the )ffPA filtar or charcoal adsort>er housings, or (2) folleving

c..

l painting, fire or chemical release in any ventilation zone i

consunicating vpi systes by:

l Verifying that with the system operating at a flow rate of g

g, 8gg 35485 cfm + 10% for the air conditioning unit, and 2 N

1.

for the ventilation unit and recirculating through the respective HEPA filters and charcoal adsorbers, leakage through the system P

,g diverting valves is less than or equal to 1% air conditioning unit and 1% ventilation unit when the system is testall by admitting cold 00P_ at the respective inta

- (

" Shared system with San Onofre - Unit 2.

N M EffT NO. 3 3/4 7-14 SAN CHOFRE-UNIT 3 5

i

5 6

C. I SMVEILLECI. RIOUIREMENTS (Continuedl m

Virifying that the cleanup system satisfies the i y

2.

Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory c

Guide 1.52, Revision 2, March 1978, and the system flow rate is

}

i IC:

cfm for the ventilation unit and 35,485 cfm :

I 2050 2 150 A

for the air conditioning unit.

Verifying within 31 days after removal that a laboratory fj analysis of a restresentative carton sar:ple tb

/

3.

J Guide 1.52, Revision 2, March 1978, asets the

)

1i Guide.1.52, Revision 2, Karch 1971

}

2050

  • 150 cfm for the Verifying a systa:a flow rate of i

ventilation unit and 35,485 cfm 210% for the air oncitioning f

4.

unit during system operation when tested in acco

'nce with f

ANSI H510-1975.

j Af ter every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operat' m by actry g

within 31 days after removal that a laboratory arQsis of d.

[

t y representative carbon sample obtained in accordance with % a Pesition C.S.b of Regulatory Guida 1.52, R 6

of Regulatoy Guide 1.52, Revision 2, March 1978.

f At least once per 18 months by:

Verifying that the pressure drop across the combined HEPA e.

flitars and charcoal adsorber banits is less than 7.0 1.

Vater Gauge ventilation unit and less than 7.3 inches Water Gauge air conditioning unit while operating ~the systas at a cfm for the ventilation unit and flow rate of 2050 2 150 35,485 cfm 210% for the air conditioning unit.

Yorifying that on a control roce isolation test signal, the systaa automatically switchos into the e 2.

sdsorber banks.

Verifying that on a toxic gas isolation test signal, the sys k

autenatically switches into the isolation mode of operation 3.

k with flow through the HEPA filters and charcoal adsorber l*

Verifying that the system saintains the control roca at a positive pressure of greater than or equal t.o V8 inch i

in 4.

l relative to the outside atmosphere during system operat on r

q A

g the emerge g nede. Verifying that the heaters dissipate 4.8 kw 2 5% whe accordance with ANSI H510-1975.

~

Q 5.

s b

FEB i 8190 AMENDHENT NO. 3 3/4 7-15 I

d SAN ONOFRE-UNIT.3 5

e g ILLANCE REQUIREMENTS (Centinued, 3

After each complete or partial replacement of a HEPA filter bank by i

f.

verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in place in accorcance with M5I H510-1975 while operating the system at a flow rate of 2050 2 150 cfm for the ventilation unit and 35,485 cfm 210% for the air conditioning unit.

Af ter each complete or' partial replacement of a charcoal adsorber t

g.

bank by verifying that the charcoal adsorbers remove greater than er l

equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in. place in accordance with MSI HS10-1975 l

while operating the syates at a flow rate of 2050 2 150 cfm for the 1

ventilation unit and 35,485 cfm 210% for the air conditioning unit.

I I

L 9

Y

.s u

I 1

'd 3 g yp

'~

AMatOM M NO. 3 3/4 7-16 1AN ON0FRE-tmIT 3

1 Pt h SYSTEMS f

r BASES 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYSTEM from which operators can The CREACUS provides a protected environment control the plant following an uncontrolled release of radioactivity, :r toxic gas.

The CREACUS consists of two independent, redundant trains and filter the control room air.

filter, an activated chartcal high efficiency particulate air (HEPA) adsorber section for removal of gaseous activity (p i

emergency air conditioning unit only) and is used to retain c a fan.

downstream of carbon adsorber.

Ductwork, j

includes prefilter, HEPA filter, charcoal adsorber, and fan.

i motor-operated dampers, and instrumentation al I

system isolation purposes.

b Upon receipt of the actuating signal, normal air supply to the co recirculated room is isolated, and the stream of ventilation air is The prefilters remove any lar;e through the system's filter trains.

particles in the air to prevent excessive loading of the H charcoal adsorbers.

minutes per month verifies proptr system operation.

g There are two CREACUS operational modes. Emergency mode is a mode when the control room is isolated to prevent operation personn the radioactive exposure through the duration of any one of the postu Isolation mode is limiting faults discussed in FSAR, Chapter IS (Re personnel from toxic gases and smoke.

Actuation of the CREACUS places the system into either of two separat Actuation :f j

s44tes of the operation, depending on the initiatio autside-air intake and exhaust dampers and aligns the system f:r recirculation of control room air through the redundan charcoal filters.Outside air is added to the air being recirculated frem tre control room.

control room.

Pressurization of the control room prevents infiltration of infiltered from the surrounding areas of the building.

The actions taken in the toxic gas isolation mode are the same, exc that the signal switches control room ventilation to an isolation mec preventing outside air from entering the control room.

8 3/4.7-4 SAN ONOFRE-UNIT 3

A PLANT SYSTEMS BASES 3/4.7.5 CONTROL ROOM EMERGENCY AIR CLEANUP SYS The control room supply and the outside air supply of the normal control room HVAC is monitored by radiation and toxic-gas detectors respectiveis.the above the setpoint will cause actuation of One detector output The actions of the toxic emergency mode or isolation mode as required.

gas isolation mode are more restrictive, and will override the actions A

the emergency radiation mode. However, toxic gas and radiation events are I'

not considered to occur concurrently, A single train will pressurize the control room to at least 0.125 inches water gauge, and provides an air exchange rate in excess of 454 per hour g

f Redundant recirculation trains provide the required filtration should an Normally excessive pressure drop develop across the other filter train.

open isolation dampers are arranged in series pairs so that the failu i

The CREACUS one damper to shut will not result in a breach of isolation.

is designed in accordance with Seismic Category 1 requirements.

The CREACUS is designed to maintain the control room environment for 3 days of continuous occupancy after a Design Basis Accident (OBA) with exceeding a 5 rem whole body dose.

SAN ONOFRE-UNIT 3 3 3/4.7-4a