ML20132B085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20132B085
| number = ML20132B085
| issue date = 12/11/1996
| issue date = 12/11/1996
| title = Responds to 960905 Ltr Re Request That Portions of Document Be Withheld from Public Disclosure Pursuant to 10CFR2.790. Subj Info Will Be Withheld from Public Disclosure
| title = Responds to Re Request That Portions of Document Be Withheld from Public Disclosure Pursuant to 10CFR2.790. Subj Info Will Be Withheld from Public Disclosure
| author name = Donohew J
| author name = Donohew J
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = TAC-M95385, NUDOCS 9612170040
| document report number = TAC-M95385, NUDOCS 9612170040
| title reference date = 09-05-1996
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:M95385
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:__. _ . . .        _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ ~                             _ _ _    _ . - . _ . _ _ _ _ . _
{{#Wiki_filter:__.
                                                                                                                ~
_ _ _ _ _ _ _. _ _. _ _ _ _ _ _ _ ~
gr"%*g3 i '
~
UNITED STATES 5
r"%*g i '
g UNITED STATES 3
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION
' /                         I                                     WASHINGTON, D.C. 3000H001
' /
          *s.,*****/
5 I
)                                                                   December 11, 1996 l
WASHINGTON, D.C. 3000H001
4 i                 Mr. Joseph J. Hagan l                 Vice President, Operations GGNS Entergy Operations, Inc.
*s.,*****/
;                P. O. Box 756 j                 Port Gibson, MS 39150 i
)
December 11, 1996 l
4 i
Mr. Joseph J. Hagan l
Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 j
Port Gibson, MS 39150 i


==SUBJECT:==
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE IN A j
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE IN A j
MATTER FOR GRAND GULF NUCLEAR STATION, UNIT I (TAC NO. M95385) l l                
MATTER FOR GRAND GULF NUCLEAR STATION, UNIT I (TAC NO. M95385) l l


==Dear Mr. Hagan:==
==Dear Mr. Hagan:==
 
I By your {{letter dated|date=September 5, 1996|text=letter dated September 5,1996}}, and the General Electric Company (GE) affidavit dated August 30, 1996, executed by Ralph J. Reda, you submitted GE 4
I                 By your letter dated September 5,1996, and the General Electric Company (GE) 4 affidavit dated August 30, 1996, executed by Ralph J. Reda, you submitted GE document, " Responses to NRC Request for Additional Information (RAI) Regarding i                 GGNS Proposed Amendment to the Operating Limit" dated August 30, 1996, and
document, " Responses to NRC Request for Additional Information (RAI) Regarding i
!                requested that portions of the document indicated by " brackets" drawn in the i                 margin of the text be withheld from public disclosure pursuant to l                 10 CFR 2.790.
GGNS Proposed Amendment to the Operating Limit" dated August 30, 1996, and requested that portions of the document indicated by " brackets" drawn in the i
margin of the text be withheld from public disclosure pursuant to l
10 CFR 2.790.
l In the affidavit, GE stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
l In the affidavit, GE stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
l                       "Some examples of categories of information which fit into the I
l "Some examples of categories of information which fit into the I
definition of proprietary information are:
definition of proprietary information are:
4
4 Information that discloses a process, method, or apparatus, a.
;                      a.          Information that discloses a process, method, or apparatus,
)
)                                   including supporting data and analyses, where prevention of
including supporting data and analyses, where prevention of its use by General Electric's competitors without license i
!                                  its use by General Electric's competitors without license                                       ,
from General Electric constitutes a competitive economic l
i                                  from General Electric constitutes a competitive economic                                         l l                                  advantage over other companies l                       b.         Information which, if used by a competitor, would reduce his i
advantage over other companies l
'                                  expenditure of resources or improve his competitive position                                     !
b.
in the design, manufacture, shipment, installation, assurance j                                 of quality, or licensing of a similar product;"
Information which, if used by a competitor, would reduce his i
i j               In addition:
expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance j
I                       "The information identified in (the GE report above) is classified                       .
of quality, or licensing of a similar product;"
{                       as proprietary because it contains details of GE's Safety Limit
i j
!                      MCPR analysis and the corresponding results which GE has applied
In addition:
!                      to GGNS's actual core design with GE's Gell fuel.                                                           i
I "The information identified in (the GE report above) is classified
;                      The development of the methods used in these analysis, along with                                         _D 1
{
the testing, development and approval of the supporting critical                                   \
as proprietary because it contains details of GE's Safety Limit MCPR analysis and the corresponding results which GE has applied to GGNS's actual core design with GE's Gell fuel.
power correlation was achieved at a significant cost, on the order l                     of several million dollars, to GE."
The development of the methods used in these analysis, along with
i                                                                                     NRC FEE CENTER COPY
_D 1
!            9612170040 961211 PDR     ADOCK 0500 4 6                                                                                               i i
the testing, development and approval of the supporting critical
\\
power correlation was achieved at a significant cost, on the order l
of several million dollars, to GE."
i NRC FEE CENTER COPY 9612170040 961211 PDR ADOCK 0500 4 6 i
i


f Mr. Joseph J. Hagan                               We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.
f Mr. Joseph J. Hagan We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the applicable portions of the document marked as proprietary will   I be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and
Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
,          Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
1 Withholding from public disclosure shall not affect the right, if any, of       '
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
;          persons properly and directly concerned to inspect the document. If the need     l arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.                     l If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review situations, if the NRC makes a determination adverse to the above, you will be   I notified in advance of any public disclosure.                                   l Sincerely, k     %
If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC).
i                                               Jack N. Donohew, Senior Project Manager
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.
.                                                Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
:          cc: See next page i
Sincerely, k
i Jack N. Donohew, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page i
4
4


i
i
[.                                                                                                                               j
[.
<      t
j t
!          .Mr. Joseph J. Hagan                                                                 December 11, 1996 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.
.Mr. Joseph J. Hagan December 11, 1996 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public disclosure shall not affect the right, if any, of                                           :
Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
persons properly and directly concerned to inspect the document. If the need                                         ;
If the need arises, we inay send copies of this information to our consultants working in i
arises, we inay send copies of this information to our consultants working in                                       i this area. We will, of course, ensure that the consultants have signed the                                           '
this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
appropriate agreements for handling proprietary information.                                                         )
If the basis for withholding this information from public disclosure should change in the future such.that the information could then be made available l
If the basis for withholding this information from public disclosure should                                         l change in the future such.that the information could then be made available                                         l for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review situations, if the NRC makes a determination adverse to the above, you will be                                       1 notified in advance of any public disclosure.
for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.
                                                                                                                                  ]
In all review situations, if the NRC makes a determination adverse to the above, you will be 1
n erel yJack            w'
notified in advance of any public disclosure.
                                                                                          .Donqoew,SeniorProjectManager           l Project Directorate IV-1                     l Division of Reactor Projects III/IV           i Office of Nuclear Reactor Regulation           l Docket No. 50-416 cc:         See next page                                                                                           i DISTRIBUTION:
]
Docket File                                                 PUBLIC               PD4-1 r/f J. Roe                                                     E. Adensam (EGA1)     J. Donohew J. Dyer, RIV                                               W. Beckner           M. Siemien 0GC (15B18)
n erel w'
            -C. Hawes                                                   L. Phillips           T. Huang Document Name: M95385.PR3                                                 ,,
y
d 0FC           PM/PDO                           LA/PDO\l,         S[hXkSSA         OGC       40   Sig M NAME           JQot      N                      CHM             YPb1Yps           MSiemien N0 JD6MM DATE           O/h/96                             O/15/96         /l/(@96         /0 1} 96       IN1196
.Donqoew,SeniorProjectManager Jack Project Directorate IV-1 l
                                                                                                                      /
Division of Reactor Projects III/IV i
COPY         h0                                 YES/N0           YES/N0         kES)NO 0FFkIALRECORDCOPY
Office of Nuclear Reactor Regulation Docket No. 50-416 cc:
See next page i
DISTRIBUTION:
Docket File PUBLIC PD4-1 r/f J. Roe E. Adensam (EGA1)
J. Donohew J. Dyer, RIV W. Beckner M. Siemien 0GC (15B18)
-C.
Hawes L. Phillips T. Huang Document Name: M95385.PR3 d
0FC PM/PDO LA/PDO\\l, S[hXkSSA Sig M OGC 40 NAME JQotN CHM YPb1Yps MSiemienN0 JD6MM DATE O/h/96 O/15/96
/l/(@96
/0 1} 96 IN1196
/
COPY h0 YES/N0 YES/N0 kES)NO 0FFkIALRECORDCOPY


0 Mr. Joseph J. Hagan                                                                     l d           Entergy Operations, Inc.                   Grand Gulf Nuclear Station                   ;
0 Mr. Joseph J. Hagan d
1 I
Entergy Operations, Inc.
cc:                                                                                     l Executive Vice President                   General Manager, GGNS
Grand Gulf Nuclear Station 1
                & Chief Operating Officer               Entergy Operations, Inc.
cc:
Entergy Operations, Inc.                   P. O. Box 756 P. O. Box 31995                           Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caraway             Department of Justice P. O. Box 651                             State of Louisiana Jackson, MS 39205                         P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn l             1400 L Street, N.W. - 12th Floor           State Health Officer                         '
Executive Vice President General Manager, GGNS
l            Washington, DC 20005-3502                 State Board of Health P. O. Box 1700
& Chief Operating Officer Entergy Operations, Inc.
!            Director                                   Jackson, MS 39205 Division of Solid Waste Management                                                       ,
Entergy Operations, Inc.
t            Mississippi Department of Natural         Office of the Governor                       '
P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn l
l               Resources                               State of Mississippi i             P. O. Box 10385                           Jackson, MS 39201                             1 l             Jackson, MS 39209                                                                       l Attorney General President                                 Asst. Attorney General Claiborne County Board of Supervisors     State of Mississippi l             Port Gibson, MS 39150                     P. O. Box 22947 l                                                        Jackson, MS 39225 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission         Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000           Entergy Operations, Inc.
1400 L Street, N.W. - 12th Floor State Health Officer l
Arlington, TX 76011                       P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Commission       Director, Nuclear Safety Route 2, Box 399                               and Regulatory Affairs Port Gibson, MS 39150                       Entergy Operations, Inc.
Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor t
P.O. Box 756 Nuclear Operating Plant Services           Port Gibson, MS 39150 Bechtel Power Corporation 9801 Washington Boulevard Gaithersburg, E 20878 I
l Resources State of Mississippi i
P. O. Box 10385 Jackson, MS 39201 1
l Jackson, MS 39209 Attorney General President Asst. Attorney General Claiborne County Board of Supervisors State of Mississippi l
Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 l
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.
Arlington, TX 76011 P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Commission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.
P.O. Box 756 Nuclear Operating Plant Services Port Gibson, MS 39150 Bechtel Power Corporation 9801 Washington Boulevard Gaithersburg, E 20878 I
I
I
_        _}}
.}}

Latest revision as of 10:29, 12 December 2024

Responds to Re Request That Portions of Document Be Withheld from Public Disclosure Pursuant to 10CFR2.790. Subj Info Will Be Withheld from Public Disclosure
ML20132B085
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/11/1996
From: Donohew J
NRC (Affiliation Not Assigned)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
TAC-M95385, NUDOCS 9612170040
Download: ML20132B085 (4)


Text

__.

_ _ _ _ _ _ _. _ _. _ _ _ _ _ _ _ ~

~

r"%*g i '

g UNITED STATES 3

NUCLEAR REGULATORY COMMISSION

' /

5 I

WASHINGTON, D.C. 3000H001

  • s.,*****/

)

December 11, 1996 l

4 i

Mr. Joseph J. Hagan l

Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 j

Port Gibson, MS 39150 i

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE IN A j

MATTER FOR GRAND GULF NUCLEAR STATION, UNIT I (TAC NO. M95385) l l

Dear Mr. Hagan:

I By your letter dated September 5,1996, and the General Electric Company (GE) affidavit dated August 30, 1996, executed by Ralph J. Reda, you submitted GE 4

document, " Responses to NRC Request for Additional Information (RAI) Regarding i

GGNS Proposed Amendment to the Operating Limit" dated August 30, 1996, and requested that portions of the document indicated by " brackets" drawn in the i

margin of the text be withheld from public disclosure pursuant to l

10 CFR 2.790.

l In the affidavit, GE stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

l "Some examples of categories of information which fit into the I

definition of proprietary information are:

4 Information that discloses a process, method, or apparatus, a.

)

including supporting data and analyses, where prevention of its use by General Electric's competitors without license i

from General Electric constitutes a competitive economic l

advantage over other companies l

b.

Information which, if used by a competitor, would reduce his i

expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance j

of quality, or licensing of a similar product;"

i j

In addition:

I "The information identified in (the GE report above) is classified

{

as proprietary because it contains details of GE's Safety Limit MCPR analysis and the corresponding results which GE has applied to GGNS's actual core design with GE's Gell fuel.

The development of the methods used in these analysis, along with

_D 1

the testing, development and approval of the supporting critical

\\

power correlation was achieved at a significant cost, on the order l

of several million dollars, to GE."

i NRC FEE CENTER COPY 9612170040 961211 PDR ADOCK 0500 4 6 i

i

f Mr. Joseph J. Hagan We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC).

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, k

i Jack N. Donohew, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page i

4

i

[.

j t

.Mr. Joseph J. Hagan December 11, 1996 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we inay send copies of this information to our consultants working in i

this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public disclosure should change in the future such.that the information could then be made available l

for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.

In all review situations, if the NRC makes a determination adverse to the above, you will be 1

notified in advance of any public disclosure.

]

n erel w'

y

.Donqoew,SeniorProjectManager Jack Project Directorate IV-1 l

Division of Reactor Projects III/IV i

Office of Nuclear Reactor Regulation Docket No. 50-416 cc:

See next page i

DISTRIBUTION:

Docket File PUBLIC PD4-1 r/f J. Roe E. Adensam (EGA1)

J. Donohew J. Dyer, RIV W. Beckner M. Siemien 0GC (15B18)

-C.

Hawes L. Phillips T. Huang Document Name: M95385.PR3 d

0FC PM/PDO LA/PDO\\l, S[hXkSSA Sig M OGC 40 NAME JQotN CHM YPb1Yps MSiemienN0 JD6MM DATE O/h/96 O/15/96

/l/(@96

/0 1} 96 IN1196

/

COPY h0 YES/N0 YES/N0 kES)NO 0FFkIALRECORDCOPY

0 Mr. Joseph J. Hagan d

Entergy Operations, Inc.

Grand Gulf Nuclear Station 1

cc:

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn l

1400 L Street, N.W. - 12th Floor State Health Officer l

Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor t

l Resources State of Mississippi i

P. O. Box 10385 Jackson, MS 39201 1

l Jackson, MS 39209 Attorney General President Asst. Attorney General Claiborne County Board of Supervisors State of Mississippi l

Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 l

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.

Arlington, TX 76011 P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Commission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.

P.O. Box 756 Nuclear Operating Plant Services Port Gibson, MS 39150 Bechtel Power Corporation 9801 Washington Boulevard Gaithersburg, E 20878 I

I

.