ML20132B003

From kanterella
Jump to navigation Jump to search

Responds to Re Request That Portions of GE Rept, GGNS Cycle 9 SL MCPR Analysis, J11-02863SLMCPR Rev 0,dtd May 1996,be Withheld from Public Disclosure.Nrc Determined That Portions Marked as Proprietary Will Be Withheld
ML20132B003
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/11/1996
From: Donohew J
NRC (Affiliation Not Assigned)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
TAC-M95385, NUDOCS 9612160415
Download: ML20132B003 (4)


Text

_ _.. _.

Q-l- ( h l

-.%k UNITED STATES g

NUCLEAR REGULATORY COMMISSION I

E WASHINGTON, D.C. 3088H001 i

\\ *****/

j December 11, 1996 i

i

)

Mr. Joseph J. Hagan Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 i

SUBJECT:

REQUEST FOR WITiiHOLDING INFORMATION FROM PUBLIC DISCLOSURE IN A

]

MATTER FOR GPAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. M95385) 4 j

Dear Mr. Hagan:

By your letter dated May 9,1996, and the General Electric Company (GE) l affidavit dated May 7, 1996, executed by Ralph J. Reda, you submitted GE report, "GGNS Cycle 9. Safety Limit MCPR Analysis" Jll-02863SLMCPR Revision 0, j

dated May 1996, and requested that portions of the report indicated by

" brackets" drawn in the margin of the text be withheld from public disclosure l

. pursuant to 10 CFR 2.790.

4 i

In the affidavit, GE stated that the submitted information should be i

considered exempt from mandatory public disclosure for the following reasons:

4 i

"Some examples of categories of information which fit into the definition of proprietary information are:

Information that discloses a process, method, or apparatus, a.

including supporting data and analyses, where prevention of 4

l its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; i

b.

Information which, if used by a competitor, would reduce his i

expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;"

i In addition:

1 "The information identified in (the GE report above] is classified j

as proprietary because it contains details of GE's Safety Limit

^

MCPR analysis and the corresponding results which GE has applied [3[9(

to GGNS's actual core design with GE's Gell fuel.

i The development of the methods used in these analysis, along with b-the testing, development and approval of the supporting critical

)

i power correlation was achieved at a significant cost, on the order

)

of several million dollars, to GE."

1 i

MC RE CENTER COPY 9612160415 961211 PDR ADOCK 05000416 i,

P PDR 1

Mr. Joseph J. Hagan i We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your 1etter, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public disclosure should l

change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to t

i review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, i

h ack N. Donohew, Senior Project Manager Project Directorate IV-1 Wivision of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page

e 4

Mr. Joseph J. Hagan December ti, 1996 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of the statements in your letter, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, the applicable portions of the document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC).

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

ncerely, Ja k N.

nohew, Senior Project Manager

! Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-416 cc:

Seenextpa@e DISTRIBUTION:

Docket File PUBLIC PD4-1 r/f J. Roe E. Adensam (EGAl)-

J. Donohew J. Dyer, RIV W. Beckner M. Siemien 0GC (15B18)

C. Hawes L. Phillips T. Huang Document Name:

M95385.PRI N

Sigliatlire PM/RDh LAAPDhh S.CISRXB/DSSA OGC 0FC NAME JDM.h CHAM [1b l1ips MSiemien' JDol1N I

II M '96 i hl/96 O k96 NlT/96 h /lol/96 L/

DATE

/

/

(flS)NO YES/N0 YES/N0 YES)N0 COPY S

0FFICIAL RECORD COPY

e Mr. Joseph J. Hagan Entergy Operations, Inc.

Grand Gulf Nuclear Station cc:

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286 1995 Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attorney General President Asst. Attorney General Claiborne County Board of Supervisors State of Mississippi Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.

Arlington, TX 76011 P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Comission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.

P.O. Box 756 Nuclear Operating Plant Services Port Gibson, MS 39150 Bechtel Power Corporation 9801 Washington Boulevard Gaithersburg, MD 20878