{{#Wiki_filter:June 2, 2020 MEMORANDUM TO:               Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM:                         Necota L. Staples, Senior Project Engineer /RA/
{{#Wiki_filter:June 2, 2020 MEMORANDUM TO:
Reactor Projects Branch 2 Division of Reactor Projects
Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM:
Necota L. Staples, Senior Project Engineer /RA/
Reactor Projects Branch 2 Division of Reactor Projects  


==SUBJECT:==
==SUBJECT:==
Line 27: Line 29:
The meeting was conducted from 4:00 PM to 5:30 PM eastern time. There were 21 attendees.
The meeting was conducted from 4:00 PM to 5:30 PM eastern time. There were 21 attendees.
In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, and members of the public. Due to the nature of the meeting no official list of attendees is included. NRC staff were available for questions for half an hour. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System (PMFS) under Meeting Code (20200353) and upon submittal of this memo there were no public responses to the meeting.
In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, and members of the public. Due to the nature of the meeting no official list of attendees is included. NRC staff were available for questions for half an hour. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System (PMFS) under Meeting Code (20200353) and upon submittal of this memo there were no public responses to the meeting.
Docket No.: 50-321, 50-366 License No.: DPR-57 and NPF-5 Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 CONTACT: Necota Staples, RII/DRP 404-997-4644
Docket No.:
50-321, 50-366 License No.: DPR-57 and NPF-5 Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 CONTACT: Necota Staples, RII/DRP 404-997-4644


ML20154K724 OFFICE        RII:DRP NAME          N. Staples DATE          6/2/2020}}
ML20154K724}}

Latest revision as of 00:16, 11 December 2024

EOC Meeting Summary
ML20154K724
Person / Time
Site: Hatch, Farley  Southern Nuclear icon.png
Issue date: 06/02/2020
From: Necota Staples
NRC/RGN-II/DRP/RPB2
To: Alan Blamey
NRC/RGN-II/DRP/RPB2
References
Download: ML20154K724 (2)


Text

June 2, 2020 MEMORANDUM TO:

Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM:

Necota L. Staples, Senior Project Engineer /RA/

Reactor Projects Branch 2 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2, EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, DOCKET NO. 50-348, 50-364, 50-321, 50-366, MEETING NUMBER ML20101K849 On April 21, 2020, the Nuclear Regulatory Commission (NRC) conducted an online virtual meeting concerning Joseph M. Farley Nuclear Plant Units 1 and 2, and Edwin I. Hatch Nuclear Plant Units 1 and 2. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2019 - December 31, 2019.

In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing the meeting was held remotely through the Skype for Business application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML20101K849), Joseph M. Farley Nuclear Plant Annual Assessment Letter (ML20063K834) and Edwin I. Hatch Nuclear Plant Annual Assessment Letter (ML20063L515),

Assessment Meeting Presentation (ML20101K658).

The meeting was conducted from 4:00 PM to 5:30 PM eastern time. There were 21 attendees.

In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, and members of the public. Due to the nature of the meeting no official list of attendees is included. NRC staff were available for questions for half an hour. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System (PMFS) under Meeting Code (20200353) and upon submittal of this memo there were no public responses to the meeting.

Docket No.:

50-321, 50-366 License No.: DPR-57 and NPF-5 Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 CONTACT: Necota Staples, RII/DRP 404-997-4644

ML20154K724