                                          January 21, 1998
January 21, 1998
    Mr. Lew W. Myers
Mr. Lew W. Myers
    Vice President - Nuclear
Vice President - Nuclear
    Centerior Service Company
Centerior Service Company
    P.O. Box 97, A200
P.O. Box 97, A200
    Perry, OH 44081
Perry, OH 44081
    SUBJECT:       NRC EMERGENCY PREPAREDNESS INSPECTION REPORT
SUBJECT:
                    50-440/97017(DRS)
NRC EMERGENCY PREPAREDNESS INSPECTION REPORT
    Dear Mr. Myers:
50-440/97017(DRS)
    On December 18,1997, the NRC completed an inspection of the Perry Nuclear Power Plant.
Dear Mr. Myers:
    The inspector evaluated your emergency preparedness program the week of November 7,
On December 18,1997, the NRC completed an inspection of the Perry Nuclear Power Plant.
    1997. The onsite effort was supplemented by an in office review. The overall results of the
The inspector evaluated your emergency preparedness program the week of November 7,
    NRC's evaluation were communicated to your staff by phone on December 18,1997. The
1997. The onsite effort was supplemented by an in office review. The overall results of the
    enclosed report presents the results of that inspection.
NRC's evaluation were communicated to your staff by phone on December 18,1997. The
    Areas examined within your emergency preparedness program are identified in the report.
enclosed report presents the results of that inspection.
    Within those areas, the inspection consisted of a selective examination of procedures and
Areas examined within your emergency preparedness program are identified in the report.
    representative records, interviews with personnel, and observation of activities in progress. The
Within those areas, the inspection consisted of a selective examination of procedures and
    objective of the inspection effort was to determine whether activities authorized by the license
representative records, interviews with personnel, and observation of activities in progress. The
    were conducted safely and in accordr,nce with NRC requirements.
objective of the inspection effort was to determine whether activities authorized by the license
    Based on the results of this inspection, no violations of NRC requirements were identified.
were conducted safely and in accordr,nce with NRC requirements.
    During this inspection our observation of your activities showed the emergency preparedness
Based on the results of this inspection, no violations of NRC requirements were identified.
    program to be effectively implemented. In particular, the emergency response facilities,
During this inspection our observation of your activities showed the emergency preparedness
    equipment, and supplies had been well maintained, management support to the program was
program to be effectively implemented. In particular, the emergency response facilities,
    strong, and interviewed key emergency response personnel demonstrated competent
equipment, and supplies had been well maintained, management support to the program was
    knowledge of responsibilities and emergency procedures. We will monitor the potential impact
strong, and interviewed key emergency response personnel demonstrated competent
    on your program of the recent notable reduction in your emergency preparedness program
knowledge of responsibilities and emergency procedures. We will monitor the potential impact
    staff.
on your program of the recent notable reduction in your emergency preparedness program
    9901270126 990121                 f                                                                   t
staff.
    PDR   ADOCK 0S000440                                                                                 J
9901270126 990121
    G                     PDR       ,
f
                                                                                                        s
t
                                                                                                      3
PDR
                                                                                                $j1 %<
ADOCK 0S000440
                                                                                                    .
J
                                                  I.llLlIl,IC.ID...
G
                                                                    !will."l
PDR
s
,
$j1 %<
.
3
I.llLlIl,IC.ID. !will."l
..


                                                            - -_.                 -     -           _. _   -
- -_.
-
-
_.
_
-
*
.
.
      *
l
                                                                                                              l
t
                                                                                                              t
L W. Myers
  L W. Myers                                       2                                     January 21, 1998   j
2
                                                                                                              1
January 21, 1998
  in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice ' a copy of this lettsr and
j
  enclosure will be placed in the *'ItC Public Document Room (PDR),
1
                                            Sincerely,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice ' a copy of this lettsr and
                                            original Signed by J. A, Grobe                                   l
enclosure will be placed in the *'ItC Public Document Room (PDR),
                                                                                                              l
Sincerely,
                                            John A. Grobe, Director                                           i
original Signed by J. A, Grobe
                                            Division of Reactor Safety                                         r
l
  Docket No. 50-440
l
  License No. NPF-58                                                                                           i
John A. Grobe, Director
  Enclosure:     Inspection Report 50-400/97017(DRS)
i
  cc w/ encl:   H. L. Hegrat, Manager, Regulatory Affairs
Division of Reactor Safety
                T. S. Rausch, Director, Quality and                                                           !
r
                  Personnel Development
Docket No. 50-440
                R. W. Schrauder, Director, Perry
License No. NPF-58
                  Nuclear Engineering Department
i
                W. R. Kanda, General Manager,
Enclosure:
                  Nuclear Power Plant Department
Inspection Report 50-400/97017(DRS)
                N. L. Bonner, Director, Nuclear                                                               t
cc w/ encl:
                  Maintenance Department
H. L. Hegrat, Manager, Regulatory Affairs
                H. W. Bergendahl, Director, Nuclear
!
                  Services Department
T. S. Rausch, Director, Quality and
                State Liaison Officer, State of Ohio
Personnel Development
                Robert E. Owen, Ohio Department of Health
R. W. Schrauder, Director, Perry
                C. A. Glazer, State of Ohio                                                                   '
Nuclear Engineering Department
                  Public Utilities Commission
W. R. Kanda, General Manager,
  Distnbutlor)
Nuclear Power Plant Department
  Docket File w/ encl               Rlli PRR w/ encl                         Rlll Enf. Coordinator w/enct
N. L. Bonner, Director, Nuclear
  PUBLIC IE 35 w/enct               SRl, Perry w/enct                         TSS w/enci
t
  LPM, NRR w/enci                   J. L. Caldwell, Rill w/enci               DOCDESK w/enel
Maintenance Department
  DRP w/ encl                       A. B. Beach, Rlli w/enci                 CAA1 w/enci
H. W. Bergendahl, Director, Nuclear
  DRS w/enci
Services Department
  DOCUMENT NAME: G:DRS\PER97017.DRS
State Liaison Officer, State of Ohio
  t.     .. .       - i             e co a.n           r,e . - v =ce                 /
Robert E. Owen, Ohio Department of Health
  ~dFFICE     Rlli-           l-       R_lllb ,       lw Rlil                     tJ Rlli   .A
C. A. Glazer, State of Ohio
    NAME-     RJickling:sd/jpg JtpqEst'gdl M a%. TKozak-rf                             JGrob(yd
'
                                  "                        '
Public Utilities Commission
    DATE      1/7 /98                 1/W/98                   1/ /3 /98 "             1/h/94           _
Distnbutlor)
                                          OFFICIAL RECORD COPY
Docket File w/ encl
Rlli PRR w/ encl
Rlll Enf. Coordinator w/enct
PUBLIC IE 35 w/enct
SRl, Perry w/enct
TSS w/enci
LPM, NRR w/enci
J. L. Caldwell, Rill w/enci
DOCDESK w/enel
DRP w/ encl
A. B. Beach, Rlli w/enci
CAA1 w/enci
DRS w/enci
DOCUMENT NAME: G:DRS\\PER97017.DRS
t.
.. .
- i
e co a.n
r,e . - v =ce
/
~dFFICE
Rlli-
l-
R_lllb ,
lw
Rlil
tJ
Rlli
.A
NAME-
RJickling:sd/jpg
JtpqEst'gdl M a%. TKozak-rf
JGrob(yd
DATE
1/7 /98
1/W/98
1/ /3 /98 "
1/h/94
_
"
'
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 08:53, 10 December 2024

Forwards NRC Emergency Preparedness Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Identified.During Insp Observation of Activities Showed EP Program to Be Effectively Implemented.Staff Reduction Will Be Monitored
ML20199A123
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/21/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20199A128 List:
References
50-440-97-17, NUDOCS 9801270126
Download: ML20199A123 (2)


See also: IR 05000440/1997017

Text

..

,

t

January 21, 1998

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORT

50-440/97017(DRS)

Dear Mr. Myers:

On December 18,1997, the NRC completed an inspection of the Perry Nuclear Power Plant.

The inspector evaluated your emergency preparedness program the week of November 7,

1997. The onsite effort was supplemented by an in office review. The overall results of the

NRC's evaluation were communicated to your staff by phone on December 18,1997. The

enclosed report presents the results of that inspection.

Areas examined within your emergency preparedness program are identified in the report.

Within those areas, the inspection consisted of a selective examination of procedures and

representative records, interviews with personnel, and observation of activities in progress. The

objective of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordr,nce with NRC requirements.

Based on the results of this inspection, no violations of NRC requirements were identified.

During this inspection our observation of your activities showed the emergency preparedness

program to be effectively implemented. In particular, the emergency response facilities,

equipment, and supplies had been well maintained, management support to the program was

strong, and interviewed key emergency response personnel demonstrated competent

knowledge of responsibilities and emergency procedures. We will monitor the potential impact

on your program of the recent notable reduction in your emergency preparedness program

staff.

9901270126 990121

f

t

PDR

ADOCK 0S000440

J

G

PDR

s

,

$j1 %<

.

3

I.llLlIl,IC.ID. !will."l

..

- -_.

-

-

_.

_

-

.

l

t

L W. Myers

2

January 21, 1998

j

1

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice ' a copy of this lettsr and

enclosure will be placed in the *'ItC Public Document Room (PDR),

Sincerely,

original Signed by J. A, Grobe

l

l

John A. Grobe, Director

i

Division of Reactor Safety

r

Docket No. 50-440

License No. NPF-58

i

Enclosure:

Inspection Report 50-400/97017(DRS)

cc w/ encl:

H. L. Hegrat, Manager, Regulatory Affairs

!

T. S. Rausch, Director, Quality and

Personnel Development

R. W. Schrauder, Director, Perry

Nuclear Engineering Department

W. R. Kanda, General Manager,

Nuclear Power Plant Department

N. L. Bonner, Director, Nuclear

t

Maintenance Department

H. W. Bergendahl, Director, Nuclear

Services Department

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

'

Public Utilities Commission

Distnbutlor)

Docket File w/ encl

Rlli PRR w/ encl

Rlll Enf. Coordinator w/enct

PUBLIC IE 35 w/enct

SRl, Perry w/enct

TSS w/enci

LPM, NRR w/enci

J. L. Caldwell, Rill w/enci

DOCDESK w/enel

DRP w/ encl

A. B. Beach, Rlli w/enci

CAA1 w/enci

DRS w/enci

DOCUMENT NAME: G:DRS\\PER97017.DRS

t.

.. .

- i

e co a.n

r,e . - v =ce

/

~dFFICE

Rlli-

l-

R_lllb ,

lw

Rlil

tJ

Rlli

.A

NAME-

RJickling:sd/jpg

JtpqEst'gdl M a%. TKozak-rf

JGrob(yd

DATE

1/7 /98

1/W/98

1/ /3 /98 "

1/h/94

_

"

'

OFFICIAL RECORD COPY