Forwards NRC Emergency Preparedness Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Identified.During Insp Observation of Activities Showed EP Program to Be Effectively Implemented.Staff Reduction Will Be Monitored
ML20199A123
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/21/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20199A128 List:
References
50-440-97-17, NUDOCS 9801270126
Download: ML20199A123 (2)


See also: IR 05000440/1997017

Text

..

,

t

January 21, 1998

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORT

50-440/97017(DRS)

Dear Mr. Myers:

On December 18,1997, the NRC completed an inspection of the Perry Nuclear Power Plant.

The inspector evaluated your emergency preparedness program the week of November 7,

1997. The onsite effort was supplemented by an in office review. The overall results of the

NRC's evaluation were communicated to your staff by phone on December 18,1997. The

enclosed report presents the results of that inspection.

Areas examined within your emergency preparedness program are identified in the report.

Within those areas, the inspection consisted of a selective examination of procedures and

representative records, interviews with personnel, and observation of activities in progress. The

objective of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordr,nce with NRC requirements.

Based on the results of this inspection, no violations of NRC requirements were identified.

During this inspection our observation of your activities showed the emergency preparedness

program to be effectively implemented. In particular, the emergency response facilities,

equipment, and supplies had been well maintained, management support to the program was

strong, and interviewed key emergency response personnel demonstrated competent

knowledge of responsibilities and emergency procedures. We will monitor the potential impact

on your program of the recent notable reduction in your emergency preparedness program

staff.

9901270126 990121

f

t

PDR

ADOCK 0S000440

J

G

PDR

s

,

$j1 %<

.

3

I.llLlIl,IC.ID. !will."l

..

- -_.

-

-

_.

_

-

.

l

t

L W. Myers

2

January 21, 1998

j

1

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice ' a copy of this lettsr and

enclosure will be placed in the *'ItC Public Document Room (PDR),

Sincerely,

original Signed by J. A, Grobe

l

l

John A. Grobe, Director

i

Division of Reactor Safety

r

Docket No. 50-440

License No. NPF-58

i

Enclosure:

Inspection Report 50-400/97017(DRS)

cc w/ encl:

H. L. Hegrat, Manager, Regulatory Affairs

!

T. S. Rausch, Director, Quality and

Personnel Development

R. W. Schrauder, Director, Perry

Nuclear Engineering Department

W. R. Kanda, General Manager,

Nuclear Power Plant Department

N. L. Bonner, Director, Nuclear

t

Maintenance Department

H. W. Bergendahl, Director, Nuclear

Services Department

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

'

Public Utilities Commission

Distnbutlor)

Docket File w/ encl

Rlli PRR w/ encl

Rlll Enf. Coordinator w/enct

PUBLIC IE 35 w/enct

SRl, Perry w/enct

TSS w/enci

LPM, NRR w/enci

J. L. Caldwell, Rill w/enci

DOCDESK w/enel

DRP w/ encl

A. B. Beach, Rlli w/enci

CAA1 w/enci

DRS w/enci

DOCUMENT NAME: G:DRS\\PER97017.DRS

t.

.. .

- i

e co a.n

r,e . - v =ce

/

~dFFICE

Rlli-

l-

R_lllb ,

lw

Rlil

tJ

Rlli

.A

NAME-

RJickling:sd/jpg

JtpqEst'gdl M a%. TKozak-rf

JGrob(yd

DATE

1/7 /98

1/W/98

1/ /3 /98 "

1/h/94

_

"

'

OFFICIAL RECORD COPY