ML20199E281: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 27
| page count = 27
}}
}}
See also: [[followed by::IR 07100001/2012031]]


=Text=
=Text=
{{#Wiki_filter:._
{{#Wiki_filter:._
t   .
t
.
.
000000000 00000000000000
000000000 00000000000000
    .                                                                           8     RELEASED TO THE PDR o.
*.
E*,p,,,,g\                   .
8
lNi          $
RELEASED TO THE PDR
i                                .._ }l$Q)9 V
,p,,,,g\\
                                                                .)                       a               was         :
.
POLICY ISSUE (Information)
o.
Januan/ 23.1998                                                               SECY-98-012 EQB:           The Commissioners EROM.         L. Joseph Callar.
.
$
.._ }l$Q)9 V
lNi
$
E*
i
.)
a
was
:
......... ........
.....
POLICY ISSUE
(Information)
Januan/ 23.1998
SECY-98-012
EQB:
The Commissioners
EROM.
L. Joseph Callar.
Executive Director for Operations
Executive Director for Operations
SUBJECT:
QUARTERLY STATUS REPORT ON THE PROBABILISTIC RISK
ASSESSMENT IMPLEMENTATION PLAN
PURPOSE:
To report the status of the Probabilistic Risk Assessment (PRA) Implementation Plan for the
period of October 1 to December 31,1997, and to respond to a Staff Requirements
Memorandum dated May 28,1997, which relates to staff plans for using Individual Plant
Examination (IPE) results to assess regulatory effectiveness.
SUMMARY:
This paper describes accomplishments and changes to the staffs PRA Implementation Plan for
the period of October 1,1997 to December 31,1997, The principal accomplishments include
preparation of the final versions of Regulatory Guide (RG) 1.174 (formerly draft guide DG 1061)
and Standard Review Plan (SRP) Chapter 19, which provide general guidance on the use of
PRA in risk informed decisions for changes in a reactor current licensing basis, completion of the
South Texas graded quality assurance pilot program, publication (for public comment) of the
draft RG and SRP on risk-informed inservice inspection, and the development of the staffs plan
to use IPE results to assess regulatory effectiveness in resolving major safety issues. The
principal change is the delay of the application-specific regulatory guides and Standard Review
Plan sections from December 1997 to March 1998, to permit the incorporation of the policy
decisions associated with the finalization of RG 1.174.
CONTACT:
NOTE:
TO BE MADE PUBLICLY AVAILABLE
g
IN 5 WORKING DAYS FROM THE DATE OF
Ol
Ashok Thaaani, OEDO
THIS PAPER
'1
Ii
415-1705
g
,
W!00G8
p ; p a s . 3. ? - A
N,k3[][${[]]
tv #
3
e _ , ,, > m y
9002020120 400123
O a + "
'e
5
*
\\
-
'
_
PDR __
-01


==SUBJECT:==
. _ _ . _ _ ____ ---_ _.
 
_______
QUARTERLY STATUS REPORT ON THE PROBABILISTIC RISK ASSESSMENT IMPLEMENTATION PLAN PURPOSE:
_ _ _ . _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _
To report the status of the Probabilistic Risk Assessment (PRA) Implementation Plan for the period of October 1 to December 31,1997, and to respond to a Staff Requirements Memorandum dated May 28,1997, which relates to staff plans for using Individual Plant Examination (IPE) results to assess regulatory effectiveness.
!
 
,
==SUMMARY==
,
This paper describes accomplishments and changes to the staffs PRA Implementation Plan for the period of October 1,1997 to December 31,1997, The principal accomplishments include preparation of the final versions of Regulatory Guide (RG) 1.174 (formerly draft guide DG 1061) and Standard Review Plan (SRP) Chapter 19, which provide general guidance on the use of PRA in risk informed decisions for changes in a reactor current licensing basis, completion of the South Texas graded quality assurance pilot program, publication (for public comment) of the draft RG and SRP on risk-informed inservice inspection, and the development of the staffs plan to use IPE results to assess regulatory effectiveness in resolving major safety issues. The principal change is the delay of the application-specific regulatory guides and Standard Review Plan sections from December 1997 to March 1998, to permit the incorporation of the policy decisions associated with the finalization of RG 1.174.
*
CONTACT:                                                NOTE:  TO BE MADE PUBLICLY AVAILABLE                g IN 5 WORKING DAYS FROM THE DATE OF Ashok Thaaani, OEDO                                    THIS PAPER                                        Ol
The Commissioners
                                                                                                                , '1    Ii 415-1705                                                                                      g W!00G8                                                                  p ; p a s . 3. ? - A N,k3[][${[))                  3    e _ , ,, > m y    tv #
2
9002020120 400123                                                                5 -
BACKGROUND:
Oa+"    'e  '  *   \
'
              -01                PDR __
In a memorandum dated January C .1996, from the t!xecutive Director for Operations to
 
Chairman Jackson, the staff committed to submitting quarterly reports on the status of its
The Commissioners                                     2 BACKGROUND:
development of risk informed standards and guidance. Previous quarterly reports were
In a memorandum dated January C .1996, from the t!xecutive Director for Operations to Chairman Jackson, the staff committed to submitting quarterly reports on the status of its development of risk informed standards and guidance. Previous quarterly reports were provided to the Commission on March 26, June 20, and October 11,1996, and on January 13, April 3, July 22, and October 14,1997. This quarterly report covers the period from October 1, 1997 to December 31,1997.
provided to the Commission on March 26, June 20, and October 11,1996, and on January 13,
April 3, July 22, and October 14,1997. This quarterly report covers the period from October 1,
1997 to December 31,1997.
DISCUSSION:
DISCUSSION:
The significant accomplishments and changes to the PRA Implementation Plan in the past quarter are summarized below.' More detailed information is provided in Attachment 1.
The significant accomplishments and changes to the PRA Implementation Plan in the past
quarter are summarized below.' More detailed information is provided in Attachment 1.
Significant achievements during the past quarter include:
Significant achievements during the past quarter include:
Section 1: Reactor Regulation (NRR) 1.1 Develop Standard Review Plans for Risk Informed Regulation NRR and RES staff met with ACRS and CRGR to discuss the final versions of the general guidance on use of PRA in risk informed decision making in changes to the plant specific current licensing basis; Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide 1.174 (RES lead). A Commission paper providing the final versions of these documents will be provided to the Commission in the near future.
Section 1: Reactor Regulation (NRR)
Draft Standard Review Flan 3.9.8 (NRR lead) and Regulatory Guide DG-1063 (RES lead) on risk informed inservice inspection of piping were published for public comment and the subjects of a public workshop on November 20 and 21,1997, The workshop was well attended by industry representatives who offered a number of constructive comments, some criticisms, and some suggestions for changing the guidance. Overall, the comments indicated strong support for pursuing risk informed inservice inspection (RI-ISI) but in a manner which would necessitate some modifications to the draft guidance.
1.1 Develop Standard Review Plans for Risk Informed Regulation
1.2 Pilot Applications for Risk informed Regulatory Initiatives The staff evaluation of the South Texas Project risk informed graded quality assurance (QA) implementation plan was transmitted to the Commission via SECY 97-229 on October 6,1997.
NRR and RES staff met with ACRS and CRGR to discuss the final versions of the general
I The staff has modified the format of the PRA Implementation Plan to reduce redundancy and improve readability. This revised format consists of the body of the Commission paper, which now provides a summary of accomplishments and changes to the plan for the past quarter, and the Plan's table (Attachment 1), modified to explicitly show where milestones have been added, completed, or changed. Such changes are discussed and additional information provided in endnotes to the table.
guidance on use of PRA in risk informed decision making in changes to the plant specific
current licensing basis; Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide
1.174 (RES lead). A Commission paper providing the final versions of these documents will be
provided to the Commission in the near future.
Draft Standard Review Flan 3.9.8 (NRR lead) and Regulatory Guide DG-1063 (RES lead) on
risk informed inservice inspection of piping were published for public comment and the subjects
of a public workshop on November 20 and 21,1997, The workshop was well attended by
industry representatives who offered a number of constructive comments, some criticisms, and
some suggestions for changing the guidance. Overall, the comments indicated strong support
for pursuing risk informed inservice inspection (RI-ISI) but in a manner which would necessitate
some modifications to the draft guidance.
1.2 Pilot Applications for Risk informed Regulatory Initiatives
The staff evaluation of the South Texas Project risk informed graded quality assurance (QA)
implementation plan was transmitted to the Commission via SECY 97-229 on October 6,1997.
I The staff has modified the format of the PRA Implementation Plan to reduce
redundancy and improve readability. This revised format consists of the body of the
Commission paper, which now provides a summary of accomplishments and changes to the
plan for the past quarter, and the Plan's table (Attachment 1), modified to explicitly show where
milestones have been added, completed, or changed. Such changes are discussed and
additional information provided in endnotes to the table.
- , - - -
- , . --
.-
-
- . .
- - , .
_ .
- - .


The Commissioners                                       3 By SRM dated October 30,1997, the staff was informed that the Commission had no objection to the issuance of the South Texas graded QA safety evaluation report. By letter dated November 6,1997, the licensee was informed that the staff had approved the graded QA change and was provided with the associated staff safety evaluation.                                                     ,
-
The staff has received risk informed inservice inspection pilot submittals from Surry 1, ANO 2, and Vermont Yankee which are currerstly being reviewed for completeness. The staff will develop a review schedule if the submittals are determined to be complete and in conformance with the DG 1061 and DG 1063 submittal guidance. The staff is also developing schedules and priorities for the review of other RI ISI pilot submittals as well as submittals expected subsequent to the pilot RI ISI program approvals.
- - . - - - . - - . - . - - . - _ . - - - - . .
1.3 Inspections The staff completed nine additional maintenance rule baseline inspections during this quarter, which included inspection of licensee methods for using PRA in maintenance programs and inspection of safety assessments performed by licensees when removing equipment from service for maintenance in accordance with Paragraph (a)(3) of the Maintenance Rule. As of December 31,1997, the staff has completed a total of 45 inspections.
_ . - . - - - . . -
Section 2: Reactor Safety Research (RES) 2.1 Develop Regulatory Guides As discussed above, NRR and RES staff met with ACRS and CRGR to discuss the final versions of Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide 1.174 (RES lead). A Commission paper en policy issues was forwarded to the Commission as SECY               287, dated December 12,1997. A Commission paper providing the final versions of these documents will be provided in the near future.
,
2.4 Methods Development and Demonstration A demonstration at the Seabrook nuclear power plant of the human reliability analysis method ATHEANA (A Technique for Human Event Analys;s) has been completed. A medium break LOCA scenario, including inappropriate termination of makeup (an error of commission), was selected for analysis and simulator exercise. The ATHEANA demonstration helped plant personnelidentify safety-related weaknesses in plant barriers and design. Specifically, the exercise identified weaknesses in the use of well planned and tested emergency procedures as well as identifying improvements needed in the draft ATHEANA documentation.
*
,
.
'
The Commissioners
3
By SRM dated October 30,1997, the staff was informed that the Commission had no objection
to the issuance of the South Texas graded QA safety evaluation report. By letter dated
November 6,1997, the licensee was informed that the staff had approved the graded QA
change and was provided with the associated staff safety evaluation.
,
The staff has received risk informed inservice inspection pilot submittals from Surry 1, ANO 2,
and Vermont Yankee which are currerstly being reviewed for completeness. The staff will
develop a review schedule if the submittals are determined to be complete and in conformance
with the DG 1061 and DG 1063 submittal guidance. The staff is also developing schedules and
priorities for the review of other RI ISI pilot submittals as well as submittals expected
subsequent to the pilot RI ISI program approvals.
.
1.3 Inspections
The staff completed nine additional maintenance rule baseline inspections during this quarter,
which included inspection of licensee methods for using PRA in maintenance programs and
inspection of safety assessments performed by licensees when removing equipment from
service for maintenance in accordance with Paragraph (a)(3) of the Maintenance Rule. As of
December 31,1997, the staff has completed a total of 45 inspections.
Section 2: Reactor Safety Research (RES)
2.1 Develop Regulatory Guides
As discussed above, NRR and RES staff met with ACRS and CRGR to discuss the final
versions of Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide 1.174 (RES
lead). A Commission paper en policy issues was forwarded to the Commission as SECY-97-
287, dated December 12,1997. A Commission paper providing the final versions of these
documents will be provided in the near future.
2.4 Methods Development and Demonstration
A demonstration at the Seabrook nuclear power plant of the human reliability analysis method
ATHEANA (A Technique for Human Event Analys;s) has been completed. A medium break
LOCA scenario, including inappropriate termination of makeup (an error of commission), was
selected for analysis and simulator exercise. The ATHEANA demonstration helped plant
personnelidentify safety-related weaknesses in plant barriers and design. Specifically, the
exercise identified weaknesses in the use of well planned and tested emergency procedures as
well as identifying improvements needed in the draft ATHEANA documentation.
2.5 IPE and IPEEE Reviews
2.5 IPE and IPEEE Reviews
            - The final version of NUREG-1560, *lPE Program: Perspectives on Reactor Saf9ty and Plant Performance," has been submitted for publication. This report was initially issued in late 1996 for public comment. l Based on the comments received, the report was revised, with an addrtional appendix written discussing the comments received and staff responses.                                         '
- The final version of NUREG-1560, *lPE Program: Perspectives on Reactor Saf9ty and Plant
Performance," has been submitted for publication. This report was initially issued in late 1996
for public comment. l Based on the comments received, the report was revised, with an
addrtional appendix written discussing the comments received and staff responses.
'
---.
-
- .
- . - -
. . .,
--
-
- - -.
.
- _ _ - . , - . .
--


9 The Commissioners                                 4 The first IPEEE staff evaluation report, for the Diablo Canyon Power Plant, was completed and issued to the licensee on December 4,1997, in addition, requests for additionalinformation on fifteen IPEEE submittals were prepared to send to licensees.
-
An interim report has been developed that provides preliminary IPEEE perspectives and summarizes the information presented in the first 24 IPEEE submittals reviewed by the staff.
.
This interim report will be sent to the Commission in the near future. (A summary of the significant preliminary perspectives from the first 24 IPEEE reviews was provided to the Commission in Attachment 7 to SECY 97 234.)
--
Sectinn 3: Analysis and Evaluation of Operating Experience and Training (AtiOD) 3.1 Risk Based Trends and Patterns Analysis Letters are in the concurret.ce process to distribute the common cause failure (CCF) database and associated technical report to all U.S. nuclear utilities for their use. The database contains CCF events from 1980 through 1995.
..
3.2 Accident Sequence Precursor (ASP) Program All 1996 precursor analyses have been finalized, with the 1996 ASP report now in publication.
. - _
Three preliminary analyses of 1997 events are being reviewed. The annual Commission paper describing the ASP program in more detail was sent to the Commission on December 23,1997 (SECY 97 296).
-
3.6 Staff Training Development activities for the PRA Technology and Regulatory Perspectives (P 111) course were comploted during this quarter. The first course presentation will be January 26 - February 6,1998. The staff has established a goal of having one Resident inspector at each she complete the course by the end of 1998.
.
*
,
.
9
The Commissioners
4
The first IPEEE staff evaluation report, for the Diablo Canyon Power Plant, was completed and
issued to the licensee on December 4,1997, in addition, requests for additionalinformation on
fifteen IPEEE submittals were prepared to send to licensees.
An interim report has been developed that provides preliminary IPEEE perspectives and
summarizes the information presented in the first 24 IPEEE submittals reviewed by the staff.
This interim report will be sent to the Commission in the near future. (A summary of the
significant preliminary perspectives from the first 24 IPEEE reviews was provided to the
Commission in Attachment 7 to SECY 97 234.)
Sectinn 3: Analysis and Evaluation of Operating Experience and Training (AtiOD)
3.1 Risk Based Trends and Patterns Analysis
Letters are in the concurret.ce process to distribute the common cause failure (CCF) database
and associated technical report to all U.S. nuclear utilities for their use. The database contains
CCF events from 1980 through 1995.
3.2 Accident Sequence Precursor (ASP) Program
All 1996 precursor analyses have been finalized, with the 1996 ASP report now in publication.
Three preliminary analyses of 1997 events are being reviewed. The annual Commission paper
describing the ASP program in more detail was sent to the Commission on December 23,1997
(SECY 97 296).
3.6 Staff Training
Development activities for the PRA Technology and Regulatory Perspectives (P 111) course
were comploted during this quarter. The first course presentation will be January 26 - February
6,1998. The staff has established a goal of having one Resident inspector at each she
complete the course by the end of 1998.
Significant changes made to the implementation Plan during the last quarter include:
Significant changes made to the implementation Plan during the last quarter include:
Section 1: Reac'or Regulation (NRR) 1.1 Develop Standard Review Plans for Risk-Informed Regulation As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in plant-specific current licensing basis changes will be transmitted to the Commission in the near future. To permit efficient incorporation of the resolution of policy issues contained in these I       documents into the application-specific SRP sections on inservice testing and technical l
Section 1: Reac'or Regulation (NRR)
specifications, completion of these SRP sections has been delayed until March 31,1998, a change from their previous completion date of December 31,1997.
1.1 Develop Standard Review Plans for Risk-Informed Regulation
As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in
plant-specific current licensing basis changes will be transmitted to the Commission in the near
future. To permit efficient incorporation of the resolution of policy issues contained in these
I
documents into the application-specific SRP sections on inservice testing and technical
specifications, completion of these SRP sections has been delayed until March 31,1998, a
l
l
change from their previous completion date of December 31,1997.
l
!
. .
.
.
. .


The Commissioners                                               5 i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _
l 1.2 Pilot Applications for Risk Informed Regulatory initiatives The staff is currently developing a draft safety evaluation report (SER) for the Comanche Peak     1 risk informed inservice testing program (Rl IST) program. The licensee (TU Electric) is currently developing a program that is sufficiently detailed and consistent with DG 1062. TU Electric has indicated that it intends to complete a draft revision to their program description by the end of January 1998. Assuming that the program is finalized by mid February, the staff anticipates having a completed Comanche Peak Rl IST SER to the Commission in March 1998, rather than December 31,1997.
*
The completion date for the graded quality assurance (GQA) pilot interactions has been revised from March 1998 to July 1998 to reflect the anticipated issuance date of the final GOA inspection guidance.
.
The staff received a supplemental amendment request from the San Onofre Nuclear Generating Station (SONGS) in early January 1998 to put the configuration risk management program description into the SONGS technical specif cations. SONGS has recently become i
.
the lead plant for this Combustion Engineering Owner's Group (CEOG) activity, when the originallead plant decided not to pursue risk-informed TS changes at this time. With receipt of l       the SONGS supplen etal request, the staff anticipates completing the SONGS review as the l       lead pilot plant and isung the license amendment by March 31,1998. This is a change from the previous date of December 31,1997.
'
1.3 Inspections The NRR Inspection Program Branch (P'PB) proposals for revising core inspection procedures have been transmitted to the appropriate NRR technical branches having responsibility for specific core inspection procedures. Due to the large number of branches involved, completing all individual branch concurrences is anticipated to take an additional two months. The revised completion date for th!s task is February 1998, a chan9e from the previous date of October 1997.
The Commissioners
1.6 Evaluate Use of PRA in Resolution of Generic issues As part of the IPE follow-up program, the staff is in the process of identifying generic issues to be audited. These issues are those which have been explicitly identified and addressed by the licensee as part of the IPE process.
5
A report that identifies the above generic issues and staff views on the adequacy of the proposed resolution k. In preparation. The report will provide the basis for the selection of generic safety issues to be audited. The staff has moved the completion date for this milestone to March 1998, in order to utilize the report in the audit process.
i
In addition to the above issues, RCP seal LOCA had been identified as a dominant contributor to core damage in many PWR IPEs. The staff has a separate ongoing activity in RES to address this issue under Generic issue 23, and will utilize IPti insights in the proposed resolution.
l
1.2 Pilot Applications for Risk Informed Regulatory initiatives
The staff is currently developing a draft safety evaluation report (SER) for the Comanche Peak
1
risk informed inservice testing program (Rl IST) program. The licensee (TU Electric) is
currently developing a program that is sufficiently detailed and consistent with DG 1062. TU
Electric has indicated that it intends to complete a draft revision to their program description by
the end of January 1998. Assuming that the program is finalized by mid February, the staff
anticipates having a completed Comanche Peak Rl IST SER to the Commission in March 1998,
rather than December 31,1997.
The completion date for the graded quality assurance (GQA) pilot interactions has been revised
from March 1998 to July 1998 to reflect the anticipated issuance date of the final GOA
inspection guidance.
The staff received a supplemental amendment request from the San Onofre Nuclear
Generating Station (SONGS) in early January 1998 to put the configuration risk management
program description into the SONGS technical specif cations. SONGS has recently become
the lead plant for this Combustion Engineering Owner's Group (CEOG) activity, when the
,
i
originallead plant decided not to pursue risk-informed TS changes at this time. With receipt of
l
the SONGS supplen etal request, the staff anticipates completing the SONGS review as the
l
lead pilot plant and isung the license amendment by March 31,1998. This is a change from
'
the previous date of December 31,1997.
1.3 Inspections
The NRR Inspection Program Branch (P'PB) proposals for revising core inspection procedures
have been transmitted to the appropriate NRR technical branches having responsibility for
specific core inspection procedures. Due to the large number of branches involved, completing
all individual branch concurrences is anticipated to take an additional two months. The revised
completion date for th!s task is February 1998, a chan9e from the previous date of October
1997.
1.6 Evaluate Use of PRA in Resolution of Generic issues
As part of the IPE follow-up program, the staff is in the process of identifying generic issues to
be audited. These issues are those which have been explicitly identified and addressed by the
licensee as part of the IPE process.
A report that identifies the above generic issues and staff views on the adequacy of the
proposed resolution k. In preparation. The report will provide the basis for the selection of
generic safety issues to be audited. The staff has moved the completion date for this milestone
to March 1998, in order to utilize the report in the audit process.
In addition to the above issues, RCP seal LOCA had been identified as a dominant contributor
to core damage in many PWR IPEs. The staff has a separate ongoing activity in RES to
address this issue under Generic issue 23, and will utilize IPti insights in the proposed
resolution.


The Commissioners                                       6 1.7 Regulatory Effectiveness Evaluation in a Staff Requirements Memorandum dated May 28,1997 (Attachment 2), the Commission requested that the staff provide the scope and schedule of activities relatad to using IPE results to assess regulatory effectiveness in resolving major safety issues. With respect to scope, the staff identified three major safety issues for assessment. The selection had been based on both the potential risk significance of the issue, and the fact that probabilistic techniques were used extensively in the resolution process. These issues include:
- _ _ _ . _ _- .-
_
__
..
'
.
.
"
The Commissioners
6
1.7 Regulatory Effectiveness Evaluation
in a Staff Requirements Memorandum dated May 28,1997 (Attachment 2), the Commission
requested that the staff provide the scope and schedule of activities relatad to using IPE results
to assess regulatory effectiveness in resolving major safety issues. With respect to scope, the
staff identified three major safety issues for assessment. The selection had been based on
both the potential risk significance of the issue, and the fact that probabilistic techniques were
used extensively in the resolution process. These issues include:
1, Resolution of USl A-44 Station Blackout at Nuclear Power Plants
1, Resolution of USl A-44 Station Blackout at Nuclear Power Plants
: 2. Resolution of USl A-45 Decay Heat Removal Reliability
2. Resolution of USl A-45 Decay Heat Removal Reliability
: 3. Resolution of USl A 09 Anticipated Transient Without Scram To evaluate the three major issues, the staff will utilizJ both representative plants, and information contained in NUREG 1560, to audit and draw conclusions regarding regulatory effectiveness. Information generated under Task 1.6, as deteribed above, and Task 1.10, as described below, will also be integrated into the assessment process. These tasks may expar!d the staff's consideration of other cafety issues and effectiveness of the regulatory process. The staff will inform the Commission of any additional safety issues that come under consideration.
3. Resolution of USl A 09 Anticipated Transient Without Scram
The staff plans to complete Task 1.7 by the end of December 1998, and will recommend at that time any additional staff action.
To evaluate the three major issues, the staff will utilizJ both representative plants, and
1.8 Advanced Reactor Reviews Doe to personnel being assigned to higher priority activities, such as risk-informed pilot initiatives and IPE followup activities, the staff is reassessing their position regarding the development of an SRP, especially since there are no new advanced design certification submittals anticipated. We will provide the results of this reassessment in a future update of the PRA implementation Plan.
information contained in NUREG 1560, to audit and draw conclusions regarding regulatory
1.10 Evaluation of IPE Insights The staff has developed an IPE followup plan (Attachment 3) which describes those actions to be taken to ensure that plant improvements warranted by 'he IPE results are, in fact, made.
effectiveness. Information generated under Task 1.6, as deteribed above, and Task 1.10, as
This plan consists of a number of items and its implementation involves NRR, RES, and the Regions, as described in the plan.
described below, will also be integrated into the assessment process. These tasks may expar!d
Section 2: Reactor Safety Research (RES) 2,1 Develop Regulatory Guides As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in risk informed decision making for plant specific current licensing basis charges will be transmitted to the Commission in the near future. To permit efficient incorporation of the resolution of policy issues contained in these documents into the application-specific regulatory guides on inservice testing, graded quality ascurance, and technical specifications, completion
the staff's consideration of other cafety issues and effectiveness of the regulatory process. The
staff will inform the Commission of any additional safety issues that come under consideration.
The staff plans to complete Task 1.7 by the end of December 1998, and will recommend at that
time any additional staff action.
1.8 Advanced Reactor Reviews
Doe to personnel being assigned to higher priority activities, such as risk-informed pilot
initiatives and IPE followup activities, the staff is reassessing their position regarding the
development of an SRP, especially since there are no new advanced design certification
submittals anticipated. We will provide the results of this reassessment in a future update of
the PRA implementation Plan.
1.10 Evaluation of IPE Insights
The staff has developed an IPE followup plan (Attachment 3) which describes those actions to
be taken to ensure that plant improvements warranted by 'he IPE results are, in fact, made.
This plan consists of a number of items and its implementation involves NRR, RES, and the
Regions, as described in the plan.
Section 2: Reactor Safety Research (RES)
2,1 Develop Regulatory Guides
As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in
risk informed decision making for plant specific current licensing basis charges will be
transmitted to the Commission in the near future. To permit efficient incorporation of the
resolution of policy issues contained in these documents into the application-specific regulatory
guides on inservice testing, graded quality ascurance, and technical specifications, completion


The Commissioners,                               7 of these guides has been delayed until March 31,1998, a change from their previous completion date of December 31,1997.
_ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _
2.5 IPE and IPEEE Reviews The staff has reviewed all the 76 IPE submittals and issued staff evaluatiun reports (SERs) on their findings to each licensee, in three of the SERs, it is indicated to the licensees that the staff was not able to conclude that the licensee met the intent of Generic Letter 88 20 for their plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and Browns Ferry 3.
_ _ _ . _ _
The licensee for Crystal River 3 has indicated their intention to submit an updated analysis (February 1998) addressing the staff's concerns. It is anticipated that the review of this new IPE submittal will be concluded in June 1998. Discussions are still ongoing with licensees regarding Susquehanna 182 and Browns Ferry 3.
.
Section 3: Analysis and Evaluation of Operating Experience and Training (AEOD) 3.6 Staff Training Eight PRA for Regulatory Applications courses are now planned for FY 1998 and FY 1999 to meet the needs of the technical staff. Funding for these courses was obtained by reducing the number of SRA series from two to one per year. Modifications to the PRA Basics for Regulatory Applications, PRA for Technical Managers, and PRA Technology and Regulatory Perspectives courses have been made to 'alude the final draft R.G.1.174 and SRP, Chapter
,
: 19. Seven PRA for Technical Managers courses are planned for FY 1998, which will allow two -
,
.
'
The Commissioners,
7
of these guides has been delayed until March 31,1998, a change from their previous
completion date of December 31,1997.
2.5 IPE and IPEEE Reviews
The staff has reviewed all the 76 IPE submittals and issued staff evaluatiun reports (SERs) on
their findings to each licensee, in three of the SERs, it is indicated to the licensees that the
staff was not able to conclude that the licensee met the intent of Generic Letter 88 20 for their
plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and Browns Ferry 3.
The licensee for Crystal River 3 has indicated their intention to submit an updated analysis
(February 1998) addressing the staff's concerns. It is anticipated that the review of this new
IPE submittal will be concluded in June 1998. Discussions are still ongoing with licensees
regarding Susquehanna 182 and Browns Ferry 3.
Section 3: Analysis and Evaluation of Operating Experience and Training (AEOD)
3.6 Staff Training
Eight PRA for Regulatory Applications courses are now planned for FY 1998 and FY 1999 to
meet the needs of the technical staff. Funding for these courses was obtained by reducing the
number of SRA series from two to one per year. Modifications to the PRA Basics for
Regulatory Applications, PRA for Technical Managers, and PRA Technology and Regulatory
Perspectives courses have been made to 'alude the final draft R.G.1.174 and SRP, Chapter
19. Seven PRA for Technical Managers courses are planned for FY 1998, which will allow two -
thirds of agency technical managers to attend.
thirds of agency technical managers to attend.
Procurement actions for acquisition of risk monitor software are in process. The EPRI Risk and Reliability (R&R) Workstation is the current industry standard for risk monitors Current plans are to integrate the R&R workstation into the reactor technology and PRA technology curricula to improve student understanding of configuration management, the importance of plant operations to the risk profile of the plants, and use of the tool to provide insights regarding the use of risk informed applications by the industry. The workstation will also be used to demonstrato the capabilities and limits of this and simi!ar tools as they are being used by the industry.
Procurement actions for acquisition of risk monitor software are in process. The EPRI Risk and
4 Section 4: Nuclear Materials and Low Level Waste Safety and Safeguards Regulation (NMSS) 44         Risk Assessment of Material Una The target schedule for the work to develop and demonstrate a risk assessment for industrial -
Reliability (R&R) Workstation is the current industry standard for risk monitors Current plans
gauges containing cesium 137 and cobalt-60 using PRA (and other related techniques) has been extended from July 1998 to September 1998. The extension is due to difficulties in obtaining data from non-licensees related to actual and potential doses to the public resulting               >
are to integrate the R&R workstation into the reactor technology and PRA technology curricula
to improve student understanding of configuration management, the importance of plant
operations to the risk profile of the plants, and use of the tool to provide insights regarding the
use of risk informed applications by the industry. The workstation will also be used to
demonstrato the capabilities and limits of this and simi!ar tools as they are being used by the
industry.
4
Section 4: Nuclear Materials and Low Level Waste Safety and Safeguards Regulation (NMSS)
44
Risk Assessment of Material Una
The target schedule for the work to develop and demonstrate a risk assessment for industrial -
gauges containing cesium 137 and cobalt-60 using PRA (and other related techniques) has
been extended from July 1998 to September 1998. The extension is due to difficulties in
obtaining data from non-licensees related to actual and potential doses to the public resulting
>
from gauges which enter the scrap metal cycle.
from gauges which enter the scrap metal cycle.
  -               . - - - - --                 ___                    _ _ , _                   ~   _   _         _ _ _ _ _         _ ,
-
. - - - - --
_ _ , _
~
_
_
_ _ _ _ _
_
,


e 1
'
8 The tar 9et schedule for the work to develop and demonstrate risk assessment methods for application to medical and industrial licensee activities has been determined to be September 1998 based on scheduling of a planned Commission paper on the topic.
,
4.5 -   Framework for Use of PRA in'Reauintina Nuclear Materials The target schedule for providing a p'' for developing a framework has been extended from October 1997 to January 1998 to permit interoffice coordination.
e
1
8
The tar 9et schedule for the work to develop and demonstrate risk assessment methods for
application to medical and industrial licensee activities has been determined to be September
1998 based on scheduling of a planned Commission paper on the topic.
4.5 -
Framework for Use of PRA in'Reauintina Nuclear Materials
The target schedule for providing a p''
for developing a framework has been extended from
October 1997 to January 1998 to permit interoffice coordination.
COORDINATION:
COORDINATION:
The Office of the General Counsel has reviewed this paper and has no legal objections to its issuance.
The Office of the General Counsel has reviewed this paper and has no legal objections to its
M G (/
issuance.
* L. Jclseph Callan Executive Dire VOperations -
M G (/ *
L. Jclseph Callan
Executive Dire
VOperations -
Attachments:
Attachments:
As stated DISTRIBUTION:
As stated
Commissioners OGC OIG OPA OCA                                                                                         !
DISTRIBUTION:
ACRS ACNW CIO CFO EDO REGIONS SECY
Commissioners
OGC
OIG
OPA
OCA
!
ACRS
ACNW
CIO
CFO
EDO
REGIONS
SECY


  '                                                                        ATTACHMENT 1 PRA IYPLEMENTATION PLAN TASK TABLE (December 1997) 1.0 REACTOR REGULATION Cegulatory Activity                       Objectives                         Methods             Target   iend           Status (tNs Schedule   Offee(s)         queder) 1.1     DEVELOP                   Standard revew plans for NRC       ' Evaluate available industry           NRR STANDAHL                 staff to use in rak 6nformed       guidance.                               /RES REV!EW PLANS             regulatory decison making FOR RISK.
._
* Develop a broad sco INF ORM* D                                                   standard rewew plan ( ,RP)
_
REGULAtlON                                                   chapters and a senes of applicaton specife standard revew plan chapters that correspond to industry initiatives.
__
* These SRPs will be consistent with the Regulatory Guides developed for the industry.
.
* Draft SRPs transmitted to Commisson to issue for puble comment G,neral           497C' IS T             497C ISI               E97C TS               497C
.
* Final SRP transmitted to Commmagin for approval General           1/98                 in final renew IST               393                   Changed (Note 1)
ATTACHMENT 1
ISt               498 TS                 398                   Changed (Note 1) la     PILOT
'
PRA IYPLEMENTATION PLAN TASK TABLE (December 1997)
1.0 REACTOR REGULATION
Cegulatory Activity
Objectives
Methods
Target
iend
Status (tNs
Schedule
Offee(s)
queder)
1.1
DEVELOP
Standard revew plans for NRC
' Evaluate available industry
NRR
STANDAHL
staff to use in rak 6nformed
guidance.
/RES
REV!EW PLANS
regulatory decison making
FOR RISK.
* Develop a broad sco
INF ORM* D
standard rewew plan ( ,RP)
REGULAtlON
chapters and a senes of
applicaton specife standard
revew plan chapters that
correspond to industry
initiatives.
* These SRPs will be
consistent with the Regulatory
Guides developed for the
industry.
* Draft SRPs transmitted to
Commisson to issue for
puble comment
G,neral
497C'
IS T
497C
ISI
E97C
TS
497C
* Final SRP transmitted to
Commmagin for approval
General
1/98
in final renew
IST
393
Changed (Note 1)
ISt
498
TS
398
Changed (Note 1)
la
PILOT
* Evaluate the PRA methodology
* Evaluate the PRA methodology
* Interface with Industry                 NRR/RES APPLICATIONS             ond deveksp staff positons on     groups FOR RISK.                 emerging, rak informed INFORMED                 Initiatives enciuding those
* Interface with Industry
* Evaluaten of appropnate REGUL ATORY               essociated with                   documentaton te g .10 CFR.
NRR/RES
INITIATIVES                                                 SRP. Reg Guides, mspecten
APPLICATIONS
: 1. Motor operated vatves           procedures. and industry       1. 2,96C codes) to edentify elements 2 IST requirements                 entcal to acheving the entent 2a Comanche Peak                 of extsting requrements.       2a 398                 Changed (Note 2) 2b Paio Verde                                                   20.TDD
ond deveksp staff positons on
                                                                        ' Evaluaton of industry 3 ISirequirements                   proposain.                     3 TBD 4 Graded quality assurance.
groups
* Evaluaton of industry pilot   4. 7/98               Changed (Note 3) program implementaten.
FOR RISK.
5 Maintenance Rule                                                 5 E95C
emerging, rak informed
                                                                        ' As appropnate, complete 6 Techncalspecifcatons             pilot revews and tasue staff 6a Commisstun Approval         findings on regulatory         6a 597C 6b. Pilot Amendments issued     requests.                       6b.198               Changed (Note 4)
INFORMED
: 7. Other appleatens to be identifed later (apphcations related to desel generator start times and hydrogen control are expected) 1 C = Tash prewousy comp 6eted 1
Initiatives enciuding those
* Evaluaten of appropnate
REGUL ATORY
essociated with
documentaton te g .10 CFR.
INITIATIVES
SRP. Reg Guides, mspecten
1. Motor operated vatves
procedures. and industry
1. 2,96C
codes) to edentify elements
2 IST requirements
entcal to acheving the entent
2a Comanche Peak
of extsting requrements.
2a 398
Changed (Note 2)
2b Paio Verde
20.TDD
' Evaluaton of industry
3 ISirequirements
proposain.
3 TBD
4 Graded quality assurance.
* Evaluaton of industry pilot
4. 7/98
Changed (Note 3)
program implementaten.
5 Maintenance Rule
5 E95C
' As appropnate, complete
6 Techncalspecifcatons
pilot revews and tasue staff
6a Commisstun Approval
findings on regulatory
6a 597C
6b. Pilot Amendments issued
requests.
6b.198
Changed (Note 4)
7. Other appleatens to be
identifed later (apphcations
related to desel generator start
times and hydrogen control are
expected)
1 C = Tash prewousy comp 6eted
1
_.
._


  - -. .               . - _ . ~ . - . -   - .
- -. .
                                                          . -   . -         _ - - - - -                                     ~ . - ~ - . - .             . - . - . - - - -         -
. - _ . ~ . - . -
4 Cegulatory ActMty                             Obrectrves                                 Methods                 Target           lead               Status (this
- .
_,                                                                                                            Schedule         Offee(s)               quener) 1.3         lNSl%',TIONS
. -
. -
_ - - - - -
~ . - ~ - . - .
. - . - . - - - -
-
,
4
Cegulatory ActMty
Obrectrves
Methods
Target
lead
Status (this
Schedule
Offee(s)
quener)
_,
1.3
lNSl%',TIONS
* Provide guidance on the use of
* Provide guidance on the use of
* Develop IC #00 technical     697C               NRR plant-specife and genene                 guidance on the use of PRAs enformaton from IFEs and other           in the power reactor inspecten plant specife PRAs.                       program.
* Develop IC #00 technical
* Revse IC 25t$ Appendix C       7/g7 C on the use of PRAs in the power reactor inspecton program.
697C
* Propose guklance options       t097                               Completed forint ton procedures totot to 60 59 t,stuntons and regular rnanntenance observatens.
NRR
* Review core inspecten         1697                               Completed procedures and propose PRA guidance where needed
plant-specife and genene
* Complete revision to propened core .nspecten         2/98                               Changed (Note 5) procedures
guidance on the use of PRAs
* losue dran Graded OA Inspecten Procedure             498                               Changed (Note 6)
enformaton from IFEs and other
* lasue final Graded QA inspecton Procedure             7/98                               C%nged (Note 6)
in the power reactor inspecten
plant specife PRAs.
program.
* Revse IC 25t$ Appendix C
7/g7 C
on the use of PRAs in the
power reactor inspecton
program.
* Propose guklance options
t097
Completed
forint ton procedures
totot to 60 59 t,stuntons
and regular rnanntenance
observatens.
* Review core inspecten
1697
Completed
procedures and propose PRA
guidance where needed
* Complete revision to
propened core .nspecten
2/98
Changed (Note 5)
procedures
* losue dran Graded OA
Inspecten Procedure
498
Changed (Note 6)
* lasue final Graded QA
inspecton Procedure
7/98
C%nged (Note 6)
* Provide PRA training for
* Provide PRA training for
* Identify inspector functons   7/96C             NRR inspen. tors                             whch should utilize PRA methods as input to AEOD/TTO for their development and refinement of PRA trairung for inspectors
* Identify inspector functons
* Develop consolidated and comprehensive 2 3 week PRA       1697               NRR/             Completed for regulatory ap                                   AEOD tranng course. picatens
7/96C
                                                  ' Provide PRA training for Senior Reactor Analysts (SRA)
NRR
* Conduct training for Mantenance Rule baseline         &960               NRR inspectons
inspen. tors
                                                                                          ' Conduct training courses according to SRA training         Ongoing           AEOD programs
whch should utilize PRA
* Rotatonal assignments for SRAs to gain working             Ongoing           NRR/RES exponence
methods as input to
                                                ' Continue to provide expertise in
AEOD/TTO for their
* Monitor the use of nsk in       Ongoing           NTIR risk assessment to support               inspecten reports.
development and refinement
regionalinspection activites and to communcate inspecten
of PRA trairung for inspectors
* Develop new methodologes program guidance and                     and communcate appropnate examples of its implementatort           uses of nsk insights to regional offces
'
* Update inspecten procedures as needed
* Develop consolidated and
* Asset regional offces as needed
comprehensive 2 3 week PRA
* Conduct Maintenance Rule baseline inspectons               7/98 2
1697
NRR/
Completed
for regulatory ap
AEOD
tranng course. picatens
' Provide PRA training for Senior
Reactor Analysts (SRA)
* Conduct training for
Mantenance Rule baseline
&960
NRR
inspectons
' Conduct training courses
according to SRA training
Ongoing
AEOD
programs
* Rotatonal assignments for
SRAs to gain working
Ongoing
NRR/RES
exponence
' Continue to provide expertise in
* Monitor the use of nsk in
Ongoing
NTIR
risk assessment to support
inspecten reports.
regionalinspection activites and
to communcate inspecten
* Develop new methodologes
program guidance and
and communcate appropnate
examples of its implementatort
uses of nsk insights to
regional offces
* Update inspecten
procedures as needed
* Asset regional offces as
needed
* Conduct Maintenance Rule
baseline inspectons
7/98
2
__
--
.-
.
.
. .
._
_


Cogulatory ActNi'y                 Objectwos                                                   Methods               Lead TarDet              Status (this Scheoute   Offce(s)     quarter) 14     OPERATOR         Monstry insf.;s from HRAs and
- _ _ - _ _ . _ - _ - _ _ _ _ _ - _
* Reese the Knowiedge and               &95C UCENSING NRR PRAs (including IPEs and                   Atwides (K/A) Cataicos IPEEEs) and operating                       (NUREGs 1122 and 1123) to 1                         e ronce to ioentify possible               encorporate operating .
.
e ncements for inclusaon an                 exponence and nok 6nsghts planned revisions to guidance for operator licensing actuttes (rvtal
.
* Revise the Examiner                   197C and requahfcation)                         Standards (NUREG-1021), as needed to reflect PRA Insights 19     EVENT             ' Continue to conduct quantitative         ' Continue to evaluate 50 72           Ongoing ASSESSMENT                                                                                                     NRR event assessments of reactor               events using ASP models events while at. power and dunng low power and shutdown conddions
Cogulatory ActNi'y
Objectwos
Methods
TarDet
Lead
Status (this
Scheoute
Offce(s)
quarter)
14
OPERATOR
Monstry insf.;s from HRAs and
* Reese the Knowiedge and
&95C
NRR
UCENSING
PRAs (including IPEs and
Atwides (K/A) Cataicos
IPEEEs) and operating
(NUREGs 1122 and 1123) to
1
e ronce to ioentify possible
encorporate operating .
e ncements for inclusaon an
exponence and nok 6nsghts
planned revisions to guidance for
operator licensing actuttes (rvtal
* Revise the Examiner
197C
and requahfcation)
Standards (NUREG-1021), as
needed to reflect PRA
Insights
19
EVENT
' Continue to conduct quantitative
' Continue to evaluate 50 72
Ongoing
NRR
ASSESSMENT
event assessments of reactor
events using ASP models
events while at. power and dunng
low power and shutdown
conddions
* Assess the desirab6ldy and
* Assess the desirab6ldy and
* Define the current use of risk       TBD       NRR feasibihty of conducting                   analysis methods and insights quantitafive nok assessments on             in current event assessments non-power reactor events
* Define the current use of risk
* Assess the reasibility of developing appropnate not; assessment models
TBD
* Develop recommendations an the feasitulity and desirabihty of conducting quantitative risk asses!,ments.
NRR
1C     EVALUATE USE
feasibihty of conducting
* Audit the adequacy of hcensee OF PRA IN
analysis methods and insights
* Identrry genere safety issues         198       NRR/RES   Changed (Note 7) analyses in IPEs and IPEEEs to           to be audited RECOLUTION OF     identify plant-specifc apphcability GENERIC ISSUES   of genene issues closed out
quantitafive nok assessments on
* Select plants to be sudded             398 i                                                                                                                                        Changed (Note 7) based on IPE and IPEEE                     for each issue.
in current event assessments
non-power reactor events
* Assess the easibility of
r
developing appropnate not;
assessment models
* Develop recommendations
an the feasitulity and
desirabihty of conducting
quantitative risk asses!,ments.
1C
EVALUATE USE
* Audit the adequacy of hcensee
* Identrry genere safety issues
198
NRR/RES
Changed (Note 7)
OF PRA IN
analyses in IPEs and IPEEEs to
to be audited
RECOLUTION OF
identify plant-specifc apphcability
GENERIC ISSUES
of genene issues closed out
* Select plants to be sudded
398
Changed (Note 7)
i
based on IPE and IPEEE
for each issue.
programs.
programs.
* Desende and discuss                   TBD l                                                                           licensees
* Desende and discuss
* onetyses supporting i
TBD
l
licensees * onetyses supporting
i
issue resolution.
issue resolution.
* Evaluate results to determine         TBD regulatory response; i e., no action, additional acids, or regulatory accon.
* Evaluate results to determine
1.7   REGULATORY
TBD
regulatory response; i e., no
action, additional acids, or
regulatory accon.
1.7
REGULATORY
* Assess the effectiveness of
* Assess the effectiveness of
* Develop process / guidance             ongoing   NRRIRES EFFECTNENESS     maior safety resue resolution             for assessing regulatory EVALUATION       afforts for reducing nsk to pubic         effectiveness.
* Develop process / guidance
ongoing
NRRIRES
EFFECTNENESS
maior safety resue resolution
for assessing regulatory
EVALUATION
afforts for reducing nsk to pubic
effectiveness.
health and safety.
health and safety.
* Apply method to essess                 ongoing reduction in nsk.
* Apply method to essess
Note Work in this actuity will be Integrated with broader agency
ongoing
* Evaluate resulting                     12,98 efforts in response to DSI 23                                                                           Changed (Note B) effectmeness of station blackout and ATWS rules and Unresolved Safety issue A-45.
reduction in nsk.
* Propose modifications to               TBD                 Changed (Note 8) resolution approaches, as needed (SBO rule imp' ament.h vi and RCP seal assue).
Note Work in this actuity will be
* Identify othe Swes for                 ongoing             Changed (Note 8) assessment 9 4;y:gnate.
Integrated with broader agency
* Evaluate resulting
12,98
Changed (Note B)
efforts in response to DSI 23
effectmeness of station
blackout and ATWS rules and
Unresolved Safety issue A-45.
* Propose modifications to
TBD
Changed (Note 8)
resolution approaches, as
needed (SBO rule
imp' ament.h vi and RCP seal
assue).
* Identify othe Swes for
ongoing
Changed (Note 8)
assessment 9 4;y:gnate.
)
)
3
3
,
.
.
.
.
.
.
-.


_ _ _ _ _ _ _ _ _ _ _ _ _ -
.
4
4
  ^
^
Regulatory Activity             Objectrves                                               Methods             Target       Lead       Status (this Schedule   Offee(s)         quader) 1.8     ADVANCED         ' Contnue staff reviews of PRAs
Regulatory Activity
* Continue to apph current       ongoing   NRR REACTOR         for design certifcation                               staff review process REVIEWS         appicatens
Objectrves
Methods
Target
Lead
Status (this
Schedule
Offee(s)
quader)
1.8
ADVANCED
' Contnue staff reviews of PRAs
* Continue to apph current
ongoing
NRR
REACTOR
for design certifcation
staff review process
REVIEWS
appicatens
-
* Devehp SRP to support revww
* Devehp SRP to support revww
* Develop draft SRP to tech     TBD       NRR of PRAs for design certifcatic.a                                                                               Changed (Note g) staff for rev ew and reviews of evolutonary reactors                       corcurrence (ABWR and System 80+)
* Develop draft SRP to tech
* rrialize SRP.                 TBD
TBD
* Develop indeper. dent technical                     ' Reevaluate nsk-based           12/96C analyses and critena for                                                                           NRR/ RES aspects of the techncal bases evaluating tndustry initiatives and                   for EP (NUREG4396) using petitons regarding sirnphfcaten                       Inssghts from NUREG-1150 of Emergency Preparedness                             the new source term (EP) regulations.                                     Informat.m from NUREG-1465. and available plant design and PRA informaton for the passive and evolutonary reactor designs.
NRR
1.g     ACCIDENT
Changed (Note g)
of PRAs for design certifcatic.a
staff for rev ew and
reviews of evolutonary reactors
corcurrence
(ABWR and System 80+)
* rrialize SRP.
TBD
* Develop indeper. dent technical
' Reevaluate nsk-based
12/96C
NRR/ RES
analyses and critena for
aspects of the techncal bases
evaluating tndustry initiatives and
for EP (NUREG4396) using
petitons regarding sirnphfcaten
Inssghts from NUREG-1150
of Emergency Preparedness
the new source term
(EP) regulations.
Informat.m from NUREG-
1465. and available plant
design and PRA informaton
for the passive and
evolutonary reactor designs.
1.g
ACCIDENT
* Develop generic and plant
* Develop generic and plant
* Deveioo plant-specife A!M       TBD       NRR/RES MANAGEMENT       specife nsk ins s to support                         insghtsinformaton for staff auditsof                         accident     selected plants to serve as a management                             programs at   basis for assessing selected plants                                       cor p6eteness of utihty A/M program elements (e g ,
* Deveioo plant-specife A!M
severe accident training) 1,10   EVALUATING IPE
TBD
* Use insights from the staff                         ' Reyww the report *1PE           E97C       NRR/RES INSIGHTS TO     review of IPEs to idert.N                             Program Perspectives on DETERMINF       potental safety,                                     Reactor Safet NECESSARf        technical ssues,topolicy,             determineanden Performance *y     and and   Plant the identify FOLLOW UP       appropnate course of action to                       initiallist of required staff and ACTIVnIES       resolve tnese potentialissues,                       industry actions (if an )
NRR/RES
and to identify possible safety                       including insghts on         _
MANAGEMENT
specife nsk ins s to support
insghtsinformaton for
staff auditsof
accident
selected plants to serve as a
management
programs at
basis for assessing
selected plants
cor p6eteness of utihty A/M
program elements (e g ,
severe accident training)
1,10
EVALUATING IPE
* Use insights from the staff
' Reyww the report *1PE
E97C
NRR/RES
INSIGHTS TO
review of IPEs to idert.N
Program Perspectives on
DETERMINF
potental safety,
Reactor Safet
technical ssues, policy, and
Performance *y and Plant
NECESSARf
to determine en
and identify the
FOLLOW UP
appropnate course of action to
initiallist of required staff and
ACTIVnIES
resolve tnese potentialissues,
industry actions (if an )
and to identify possible safety
including insghts on
_
enhancements.
enhancements.
* Revww IPE results and         6/99       NRR/RES     Changed (see interact with heensees.
* Revww IPE results and
6/99
NRR/RES
Changed (see
interact with heensees.
Attachment 3)
Attachment 3)
* Determine appropnate
* Determine appropnate
* Complete backfit analysis       12<99     NRR approach for tracks tne                                                                                         Changed (see and actions.
* Complete backfit analysis
regulatory uses of 1                         PEEE                                                             Attachment 3) results
12<99
* Followup on accident           SSB                                                       i NRR/         Changed (see management programs and                     regions Iconsee-stated actions.                                   Attachment 3)
NRR
* If sopropriate develop         1298       NRR/ RES a         h for hnking i     PEEE data bases.
Changed (see
approach for tracks tne
and actions.
regulatory uses of 1
PEEE
Attachment 3)
results
* Followup on accident
SSB
NRR/
Changed (see
i
management programs and
regions
Attachment 3)
Iconsee-stated actions.
* If sopropriate develop
1298
NRR/ RES
a
h for hnking
i
PEEE data bases.
4
4
.
.
.
..
.
. - -
- - - - - _
,


20 REACTOR SAFE *Y RESEARCH Cogulatory Adivty             Objectives                                                             Methnos               Target     Lead             Status (this Schedule   Offee(s)             quarter) 11     DEVELOP         Regulatory Guides for industry to
. _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
* Draft PRA Regulatory I
.
REGULATORY                                                                                                                        RES/NRR use in rak informed regulaton                                         3uides transnuttedto l             GUIDES                                                                               ;ommesson for aproval to                                                       ,
.
j issue for pubic comment.
20 REACTOR SAFE *Y RESEARCH
l General               C l                                                                                                               IST                   C t
Cogulatory Adivty
ISI                   C GOA                   C TS                   C
Objectives
* Forwl PRA Regulatory 3uides transmitted to                                                         l Commission for approval.,
Methnos
Genersi             1/98                                         [
Target
in final revww IST                 398                       Changed (Note 1) isi                 498 GOA                 396                       Changed (Note 1)
Lead
TS                   398                       Changed (Note 1) 33     TECHNICAL
Status (this
Schedule
Offee(s)
quarter)
,
11
DEVELOP
Regulatory Guides for industry to
* Draft PRA Regulatory
RES/NRR
<
I
REGULATORY
use in rak informed regulaton
3uides transnuttedto
,
l
GUIDES
;ommesson for aproval to
j
issue for pubic comment.
l
General
C
l
IST
C
t
ISI
C
GOA
C
TS
C
* Forwl PRA Regulatory
3uides transmitted to
l
Commission for approval.,
[
Genersi
1/98
in final revww
IST
398
Changed (Note 1)
isi
498
GOA
396
Changed (Note 1)
TS
398
Changed (Note 1)
33
TECHNICAL
* Provide techn. cal support to
* Provide techn. cal support to
* Continue to provide ad hoc   Continuing SUPPORT       agency users of risk                                                                                               RES technical support to agency assesernent in the form of                                           PRA users support for nak based
* Continue to provide ad hoc
}                             regulaten activitwo, techncal
Continuing
* Expand the database of PRA Continuing reviews, essue nok                                                   nodels available for staff use, assessments, statist. cal                                             expand the scope of avadabie analyses, and aevelop                                                 'nodels to include external event guidance for agency uses of nok                                       and low power and shutdown assessment                                                           accidents, and refine the tools weded to use these models, and
RES
:ontinue maintenance and user w         for SAPHIRE and CS computer codes
SUPPORT
agency users of risk
technical support to agency
assesernent in the form of
PRA users
support for nak based
}
regulaten activitwo, techncal
* Expand the database of PRA
Continuing
reviews, essue nok
nodels available for staff use,
assessments, statist. cal
expand the scope of avadabie
analyses, and aevelop
'nodels to include external event
guidance for agency uses of nok
and low power and shutdown
assessment
accidents, and refine the tools
weded to use these models, and
:ontinue maintenance and user
w
for SAPHIRE and
CS computer codes
* Support agency efforts in
* Support agency efforts in
                                                                                                    'eactor safety improvements in   Continuing
;
                                                                                                    'ormer Soviet Union countnes.
'eactor safety improvements in
3.3   SUPPORT FOR     ' Modify 10 CFR 52 and develop
Continuing
* Develop draft guidance and NRf1 STANDARD                                                                                                          5/98       RES
'ormer Soviet Union countnes.
                                . Mance on the use of updated                                       'une.
3.3
REACTOR PRA     ". tAs beyond denen cenirmation REVIEWS       (as desenbod in SECY 93487).
SUPPORT FOR
* Solett pubic comment.         11/98
' Modify 10 CFR 52 and develop
* Finales staff guidance and   12,99
* Develop draft guidance and
                                                                                                    'ulo =
5/98
24     METHODS
RES
NRf1 STANDARD
. Mance on the use of updated
'une.
REACTOR PRA
". tAs beyond denen cenirmation
REVIEWS
(as desenbod in SECY 93487).
* Solett pubic comment.
11/98
* Finales staff guidance and
12,99
'ulo =
,
24
METHODS
* Devoiop, demonstrate, maintain.
* Devoiop, demonstrate, maintain.
* Develoo and demonstrate                                             9/98 DEVELOPMENT   and ensure the quality of                                                                                         RES AND                                                                                  Tiethods for including aging methods for performina,                                               effects in PRAs.
* Develoo and demonstrate
DEMONSTRATION revww1ng, and ussng F4tAs and related techniques for
9/98
* Develop and demonstrate       9<98 existing reactor designs.                                             Tethods for including human errors of commissen in PRAs.
RES
* Develop and comonstrate       TBD netfods to incorporate gnaational performance into
DEVELOPMENT
* Develop and demonstrate       9/96 methods for flru nsk analysis.
and ensure the quality of
* Develop and demonstrate       6/99 nothods for assessing
Tiethods for including aging
                                                                                                    'ehability/nsk of digital systems 5
AND
methods for performina,
effects in PRAs.
DEMONSTRATION
revww1ng, and ussng F4tAs
and related techniques for
* Develop and demonstrate
9<98
,
existing reactor designs.
Tethods for including human
errors of commissen in PRAs.
* Develop and comonstrate
TBD
netfods to incorporate
gnaational performance into
* Develop and demonstrate
9/96
methods for flru nsk analysis.
* Develop and demonstrate
6/99
nothods for assessing
'ehability/nsk of digital
systems
5
,.
.
. .. .
.


Cegulatory Actrvity               Objectives                                                                                 Methods           Target     Lead           Status (this Schedule   Office (s)       quarter) 15       IPE ANDIPEEE
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
.
Cegulatory Actrvity
Objectives
Methods
Target
Lead
Status (this
'
Schedule
Office (s)
quarter)
15
IPE ANDIPEEE
* To evaluate IPE/IEEE
* To evaluate IPE/IEEE
* Complete revews of IPE       TBD REV?EWS                                                                                                                                              RES         Changed (Note 10) submittats to obtain reasonable                                                         6ubmittals.
* Complete revews of IPE
assurance that the hcensee has adequately anatyzed the
TBD
* Complete reviews of IPEEE   699 piant desgn and operations to                                                           bubmrttais discovervulnersbees andto document the sgnificant safety
RES
* Continue regionat IPE       C insghts resulting from                                                                   yesentations IPEstPEEEs
Changed (Note 10)
                                                                                                                            'lasue IPE insghts report for 10/96C xiblic comment.
REV?EWS
* FinalIPE 6nsghts report     9S7                     Completed
submittats to obtain reasonable
* losue prehminary IPEEE     1/98                   in final review insghts report                                                           =,
6ubmittals.
* Initiate revew of eight     6/98                   New milestone additionalIPEEE submittals
assurance that the hcensee has
* Comp 6ete contractor       6,98                   New milestone avsluations on twelve IPEEE wbmittals
adequately anatyzed the
* lasue draft IPEEE insghts   699                     New milestone report for comment
* Complete reviews of IPEEE
* lasue final IPEEE insghts   1299 oport 2.6     GENERIC ISSUES     ' To conduct genene safety issue
699
* Continue to pnortize and PROGRAM           ma                                                                                                                       Continuing RES ment activites,                                                                 eserve genenc issues inct ing pnorit&tation, resolution, and documentation, for issues relating to currently                                               rating reactors. for                                                           need reactors as appropnate, and for development or revtsion of associated r ulat and standards 6n me a 17       NEl INITIATIVE TO
piant desgn and operations to
bubmrttais
discovervulnersbees andto
document the sgnificant safety
* Continue regionat IPE
C
insghts resulting from
yesentations
IPEstPEEEs
'lasue IPE insghts report for
10/96C
xiblic comment.
* FinalIPE 6nsghts report
9S7
Completed
* losue prehminary IPEEE
1/98
in final review
insghts report
=,
* Initiate revew of eight
6/98
New milestone
additionalIPEEE submittals
* Comp 6ete contractor
6,98
New milestone
avsluations on twelve IPEEE
wbmittals
* lasue draft IPEEE insghts
699
New milestone
report for comment
* lasue final IPEEE insghts
1299
oport
2.6
GENERIC ISSUES
' To conduct genene safety issue
* Continue to pnortize and
Continuing
RES
PROGRAM
ma
ment activites,
eserve genenc issues
inct ing pnorit&tation, resolution,
and documentation, for issues
relating to currently
rating
reactors. for
need
reactors as appropnate, and for
development or revtsion of
associated r ulat and
standards 6n me a
17
NEl INITIATIVE TO
* Review NElinstetive to conduct
* Review NElinstetive to conduct
* Agree on ground rules for CONDUCT           three pilot "whole                                                   plant" 198        RES/NRR study.
* Agree on ground rules for
              "WHOLE PLANT
198
* nsk intormed studes of RISK STUDY       requirements vs nsk and cost
RES/NRR
* Complete study             TBD 2.8     PRA STANDARDS
CONDUCT
three pilot "whole
plant"
study.
"WHOLE PLANT *
nsk intormed studes of
RISK STUDY
requirements vs nsk and cost
* Complete study
TBD
2.8
PRA STANDARDS
* work with industry to develop
* work with industry to develop
* Initiate actrvity.         9S7C       RES DEVELOPMENT       national consensus standard for PRA scope and quality
* Initiate actrvity.
* Finalize standard.         TBD 19       LOW POWER AND
9S7C
RES
DEVELOPMENT
national consensus standard for
PRA scope and quality
* Finalize standard.
TBD
19
LOW POWER AND
* Collect studes of LP&S nsk as
* Collect studes of LP&S nsk as
* Collect and review existing SHUTDOWN                                                                                                                                    9S8       RES a benchmark for assessi the                                                               .P&S nsk information (domestic BENCHMARK         need for further staff                                                               es   and foregn).
* Collect and review existing
9S8
RES
SHUTDOWN
a benchmark for assessi the
.P&S nsk information (domestic
BENCHMARK
need for further staff
es
and foregn).
RISK STUDY
RISK STUDY
                                                                                                                            *Instete additional work. 10S8 l
*Instete additional work.
l     110     SAFETY OOAL       'Assesa need to revtse REVISION          Commissiorfs Safety Goalto                                                                *Initete disct=sion with ACRS 2/98       RES l
10S8
i make core damage frequency a
l
* Recommendation to           198
l
;                                fundame ital goal and make other Dmmission changer,,
110
l 6
SAFETY OOAL
'Assesa need to revtse
*Initete disct=sion with ACRS
2/98
RES
l
REVISION
Commissiorfs Safety Goalto
i
make core damage frequency a
* Recommendation to
198
l
fundame ital goal and make other Dmmission
;
changer,,
l
6
,


3 0 ANALYSIS AND EVALUATION OF OPERATING EXPERIENCE, AND TRAINING Regulatory                                           Otyctives                                           Methods                   Target       Lead   Status (t*us Activity                                                                                                                         Schedule       Offee   quarter) 3.9   RISK BASED
_ _ _ _ _ - _ _ - _ _ - _ _ _ _ - _ _ - _ - _ - - _ - _ _ _ - - - _
.-.
.
.. .
. . .
.
.
'
,
.
3 0 ANALYSIS AND EVALUATION OF OPERATING EXPERIENCE, AND TRAINING
*
Regulatory
Otyctives
Methods
Target
Lead
Status (t*us
Activity
Schedule
Offee
quarter)
3.9
RISK BASED
* Use reactor opeisting
* Use reactor opeisting
* Trend performance of nsk.         1198         AEOD TRENDS AND   exponence data to assess the                                                   important components PATTERNS     trends and pottems in ooiapment, ANALYSIS     systems, inrtistire " .. hurrun
* Trend performance of nsk.
* Trend performance of nsk.         1Z98 performance, s.                                                         ant   important systems.
1198
AEOD
TRENDS AND
exponence data to assess the
important components
PATTERNS
trends and pottems in ooiapment,
ANALYSIS
systems, inrtistire " .. hurrun
* Trend performance of nsk.
1Z98
performance, s.
ant
important systems.
.
accxlent sequence.
accxlent sequence.
l
l
* Trend fr           of nsk.       3,98                                     !
* Trend fr
6mportant           events
of nsk.
* Trend human performance           TBD for rehatuity charactenstes
3,98
!
6mportant
events
* Trend human performance
TBD
for rehatuity charactenstes
* Evaluate the effectiveness of
* Evaluate the effectiveness of
* Trend reactor operating           As Needed     AEOD teensee actons taken to                                                       exponence associated with resolve nok signifcant safety                                                 specife safety issues and losues                                                                         assess nsk impications as a measure of safety performance
* Trend reactor operating
As Needed
AEOD
teensee actons taken to
exponence associated with
resolve nok signifcant safety
specife safety issues and
losues
assess nsk impications as a
measure of safety
performance
* Develop trending methods and
* Develop trending methods and
* Develop standard trending         C             AEOD special databases for use in                                                   and statistical anatysis AEOD trending activttes and for                                               procedures for 6dentified areas PRA ap                                                                       for rehatulity and statistcal offees. pications in other NRC                                                 apphcations.
* Develop standard trending
* Develop special software         CCF.C and databases (e g common         Penode cause failure)for use in           updates trending analys,s and PRA studies 32   ACCIDENT
C
AEOD
special databases for use in
and statistical anatysis
AEOD trending activttes and for
procedures for 6dentified areas
PRA ap
offees. pications in other NRC
for rehatulity and statistcal
apphcations.
* Develop special software
CCF.C
and databases (e g common
Penode
cause failure)for use in
updates
trending analys,s and PRA
studies
32
ACCIDENT
* Ide, tify and rank nsk
* Ide, tify and rank nsk
* Screen and analyze LERs,         Ongoing       AEOD SEQUENCE       sgnifcance of operatonal                                                     AITs, llTs. and events PRECURSOR     events                                                                         identifed from etner sources (ASP) PROGRAM                                                                               to obtain ASP events.
* Screen and analyze LERs,
* Perform independent revew       Annual       AEOD of each ASP analyses,             report, Licensees and NRC staff peer       Ongoing review of each analysis.
Ongoing
* Complete quauty assurance of Rev. 2 simphred piant           3,97C         RES specife models
AEOD
* Complete feasitxl tudy for low         and shut               11/96C       RES
SEQUENCE
* Complete initial containment performance and                   C             RES consequence models.
sgnifcance of operatonal
* Compte development of the Level 43 models                   7/99         RES
AITs, llTs. and events
                                                                                                          *s Comge plant the Rev. 3 specirc           11K)1       RES
PRECURSOR
* Complete extemal event models for fire and earthquake     TBD           RES
events
* Complete low power / shutdown models TBD           RES
identifed from etner sources
(ASP) PROGRAM
to obtain ASP events.
* Perform independent revew
Annual
AEOD
of each ASP analyses,
report,
Licensees and NRC staff peer
Ongoing
review of each analysis.
* Complete quauty assurance
of Rev. 2 simphred piant
3,97C
RES
specife models
* Complete feasitxl tudy for
low
and shut
11/96C
RES
* Complete initial containment
performance and
C
RES
consequence models.
* Compte development of the
Level 43 models
7/99
RES
* Comge the Rev. 3
s
plant specirc
11K)1
RES
* Complete extemal event
models for fire and earthquake
TBD
RES
* Complete low
power / shutdown models
TBD
RES
* Provide supplemental
* Provide supplemental
* Share ASP analyses and           Annual rpt   AEOD information on plant specife                                                   insights with other NRC performance.                                                                   offces and Regions.
* Share ASP analyses and
7 e                               x
Annual rpt
AEOD
information on plant specife
insights with other NRC
performance.
offces and Regions.
,
7
e
x


Regulatory                 Objectives                             Aethods               Target   Lead ActMtf                                                                                                Status (this Schedule   Offee   guarter) 33   tNDUSTRY 8t!SK
*
.
.
Regulatory
Objectives
Aethods
Target
Lead
Status (this
ActMtf
Schedule
Offee
guarter)
33
tNDUSTRY 8t!SK
* Provide a rnessure of industry
* Provide a rnessure of industry
* Develop program plan whch       C         AEOD TRENDS         nsk that es as complete as           integrates NRR, RES and possible to oetermine whether       AEOD actMties whch use not is increasing. decreasing, or   desgn and operating remaining constant over time         exponence to assess the emphed level of rtsk and how ll es changing
* Develop program plan whch
* Update plan for nsk based                         Changed ana!yss of reactor operating                       (Note 11) exponence
C
* Imp 6ement program plan         6/99 elements whch willinclude piard. specifc models and insghts from IPEs, component and system relaatulity data, and other nsa.
AEOD
important :;esgn and operational data in an integrated frame work to scally evaluate industry 30   RISK BASED     ' Estabish a comprehenstve set
TRENDS
* Identify new or improved       C PERFORMANCE   of performance indicators and                                                   AEOD nsk-based Pls whch use INDICATORS     supplementary cerformance           component aN system rneasures whch are more             rehabdity models & human and clow*e related to nsk ar.d provide   organizational performance bolo e. sty indcation and           evaluation methods con 9mation of plant performance problems.
nsk that es as complete as
* Develop and test candidate Pis/ performance measurts.       900
integrates NRR, RES and
* Implement nak-based Pts with Commission approval         101 35   COMPILE
possible to oetermine whether
AEOD actMties whch use
not is increasing. decreasing, or
desgn and operating
remaining constant over time
exponence to assess the
emphed level of rtsk and how ll
es changing
* Update plan for nsk based
Changed
ana!yss of reactor operating
(Note 11)
exponence
* Imp 6ement program plan
6/99
elements whch willinclude
piard. specifc models and
insghts from IPEs,
component and system
relaatulity data, and other nsa.
important :;esgn and
operational data in an
integrated frame work to
scally evaluate industry
30
RISK BASED
' Estabish a comprehenstve set
* Identify new or improved
C
AEOD
PERFORMANCE
of performance indicators and
nsk-based Pls whch use
INDICATORS
supplementary cerformance
component aN system
rneasures whch are more
rehabdity models & human and
clow*e related to nsk ar.d provide
organizational performance
bolo e. sty indcation and
evaluation methods
con 9mation of plant performance
problems.
* Develop and test candidate
Pis/ performance measurts.
900
* Implement nak-based Pts
with Commission approval
101
35
COMPILE
* Compile operating exponence
* Compile operating exponence
* Manage and maintain SCSS OPERATING                                                                            Ongoing   AEOD lnformation In database systems     and the PI data base, provice EXPERIENCE     suitable for uantitative rehatxlity oversjght and access to DATA           and rak ana is appications.         NPRUS/ EPIX, obtain INPO's Information       Id be scrutable   SSPl, compile IPE failure to the source at the event level to data, collect plant-specife i                        the exter.t practical and be         rehability and availatxiety data.
* Manage and maintain SCSS
suffcient for estimatino reinatxlity and avestatxhty parameters for
Ongoing
* Develop, manage, and           Ongoing NRC appleations                     maintain agency ostabases for rahatxutyravailatulity data (equipment performance initiating events, CCF, AhP, and human performance data).
AEOD
* Determine need to revise       698 LER rule to eliminate unnecessary and less safety.
OPERATING
lnformation In database systems
and the PI data base, provice
EXPERIENCE
suitable for uantitative rehatxlity
oversjght and access to
DATA
and rak ana is appications.
NPRUS/ EPIX, obtain INPO's
Information
Id be scrutable
SSPl, compile IPE failure
to the source at the event level to
data, collect plant-specife
the exter.t practical and be
rehability and availatxiety data.
i
!
suffcient for estimatino reinatxlity
and avestatxhty parameters for
* Develop, manage, and
Ongoing
NRC appleations
maintain agency ostabases for
rahatxutyravailatulity data
(equipment performance
initiating events, CCF, AhP,
and human performance
data).
* Determine need to revise
698
LER rule to eliminate
unnecessary and less safety.
sgnifcant reporting
sgnifcant reporting
* Determine need to revise         6/98 reporting rules and to better capture ASP, CCF, and human performance events.
* Determine need to revise
* Pubhsh revised LER rule.       10/9C 8
6/98
s                 2   -,                                       -
reporting rules and to better
capture ASP, CCF, and
human performance events.
* Pubhsh revised LER rule.
10/9C
8
s
2
-,
-


Regulatory                   Obrectrves                                             Methods               Target   Lead Actrvey                                                                                                                  Status Ohis ,
_
Schedule   Offce   quarter)   t i
____ ____ ___ _ _ _ __ _ _ _
36   STAFF TRAINING ' Present PRA cumculum as
.'
* Continue current cWacts to     Ongoing   AEOD presently scheduled for FY                             present courses es 1998                                                   scheduled.
.
* Maintain current reactor technology courses that include PMA ensghts and apphcations courses wa
__
* Rowew cunent PRA course matenal to ensure consistency wth Appendix C
Regulatory
Obrectrves
Methods
Target
Lead
Status Ohis
Actrvey
Schedule
Offce
quarter)
t
,
i
36
STAFF TRAINING
' Present PRA cumculum as
* Continue current cWacts to
Ongoing
AEOD
presently scheduled for FY
present courses es
1998
scheduled.
* Maintain current reactor
technology courses that
include PMA ensghts and
apphcations
*
courses wa
* Rowew cunent PRA course
matenal to ensure consistency
wth Appendix C
* Develop and present Appendix
* Develop and present Appendix
* Prepare course materal         C         RES/AEOD C training courses                                     based on Appendix C.
* Prepare course materal
* Present courses on             C Appendir C
C
RES/AEOD
C training courses
based on Appendix C.
* Present courses on
C
Appendir C
* Determine staff requirements
* Determine staff requirements
* Review JTAs performed to       C         AEOD for traini} retuding                                   date.
* Review JTAs performed to
ty t                     a
C
* Perform re seentatrve JTAs     C for staff     ens (JTA Pilot Program .
AEOD
* Evaluate staff trainino       C requirements as identiTod in the PRA im mentation Plan and the Tec       I Training Needs Survey (Phase 2) and incorporate them into the training requerernents analysis.
for traini} retuding
* Analyze the results of the JTA Pilot Program and           C determine requirements for additional JTAs.
date.
* Complete JTAs for other staff posatons as needed.       C
ty t
* Sohcit a review of the proposed training               C requirements
a
* Perform re seentatrve JTAs
C
for staff
ens (JTA Pilot
Program .
* Evaluate staff trainino
C
requirements as identiTod in
the PRA im mentation Plan
and the Tec
I Training
Needs Survey (Phase 2) and
incorporate them into the
training requerernents analysis.
* Analyze the results of the
JTA Pilot Program and
C
determine requirements for
additional JTAs.
* Complete JTAs for other
staff posatons as needed.
C
* Sohcit a review of the
proposed training
C
requirements
* FAalize the requirements.
* FAalize the requirements.
C
C
* Reese current PRA cumculum
* Reese current PRA cumculum
* Prepare new courses to         Ongoing   AEOD and develop new training                               meet identified needs.
* Prepare new courses to
program to fulfill 6dentifed staff neeos.
Ongoing
* Rewse current PRA courses     Ongoing i
AEOD
and develop new training
meet identified needs.
program to fulfill 6dentifed staff
neeos.
* Rewse current PRA courses
Ongoing
i
to meet identifed needs.
to meet identifed needs.
f
f
* Rewse current and New PRA course to include Reg -     9/97C Guide and SRP information
* Rewse current and New
* Revise current reactor technology courses as           Ongoing ,
PRA course to include Reg -
necessary to include additional PRA Insigtds and applications
9/97C
Guide and SRP information
* Revise current reactor
technology courses as
Ongoing ,
necessary to include
additional PRA Insigtds and
applications
* Present revised PRA training
* Present revised PRA training
* Estabirah contracts for       Ongoing   AEOD curnculum.                                             presentata:.of new PRA curnculum.
* Estabirah contracts for
* Present revised reactor       Ongoing technoicgy courses.
Ongoing
rove courses based on     Ongoing 9
AEOD
curnculum.
presentata:.of new PRA
curnculum.
* Present revised reactor
Ongoing
technoicgy courses.
*
rove courses based on
Ongoing
9


4 0 NUCLEAR MATERIALS AND LOW. LEVEL WASTE SAFETY AND SAFEGUARDS REGULATION Regulatory ActMty                   Objectives                                                         Methods             Target     Lead   Status (this Schecale Offee(s) quarter) 4.1   VAllDATE RISK
- - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - - _ _ -
.
.
4 0 NUCLEAR MATERIALS AND LOW. LEVEL WASTE SAFETY AND SAFEGUARDS REGULATION
*
Regulatory ActMty
Objectives
Methods
Target
Lead
Status (this
Schecale
Offee(s)
quarter)
4.1
VAllDATE RISK
* Validate nsk anatysis
* Validate nsk anatysis
* Hold a workshop consisting     BS4       NMSS ANALYSIS           metxx3 ology developed to assess                               of experte si PRA and HRA to     C METHODOLOGY         the relative profile or most hkoty                               examine existing work and to DEVELOPEDTO         contnbutors to misedministration                                 provide recommendations for                                           )
* Hold a workshop consisting
I ASSESS MOST         for the gamma stereotecte dence                                 further methodologea!                                                   I LIKELY FAILURE     (gemma knife)                                                   development.
BS4
MODES AND HUMAN
NMSS
* Examine the use of Monte       9/95 PERFORMANCE                                                                         Carlo simulaten and its         C IN THE USE OF                                                                       apphcation to relative nsk INDUSTRIAL AND                                                                     profding MEDICAL RADIATION
ANALYSIS
* Examins the use of expert     SSS DEVICES                                                                             judgement in developing error   C rates and consequence measures
metxx3 ology developed to assess
of experte si PRA and HRA to
C
METHODOLOGY
the relative profile or most hkoty
examine existing work and to
DEVELOPEDTO
contnbutors to misedministration
provide recommendations for
)
I
ASSESS MOST
for the gamma stereotecte dence
further methodologea!
I
LIKELY FAILURE
(gemma knife)
development.
MODES AND
HUMAN
* Examine the use of Monte
9/95
PERFORMANCE
Carlo simulaten and its
C
IN THE USE OF
apphcation to relative nsk
INDUSTRIAL AND
profding
MEDICAL
RADIATION
* Examins the use of expert
SSS
DEVICES
judgement in developing error
C
rates and consequence
measures
* Continue the development of
* Continue the development of
* Develop functionalty based     TBD       RES/
* Develop functionalty based
the relative nsk methodology, with                             genene event trees                         NMSS the additen of event tree modehng of the trachvtherapy remote after loader '
TBD
* Extend the appicaten of the                                   ' Develop genere nsk             TBD metnodology and as further                                                                                 RES/
RES/
approaches.                                 NMSS development into additional devees. including teletherspy and the pulsed high dose rate after loader
the relative nsk methodology, with
!     48     CONTINUE USE
genene event trees
NMSS
the additen of event tree
modehng of the trachvtherapy
remote after loader '
* Extend the appicaten of the
' Develop genere nsk
TBD
RES/
metnodology and as further
approaches.
NMSS
development into additional
devees. including teletherspy
and the pulsed high dose rate
after loader
!
48
CONTINUE USE
* Develop decisen enterna to
* Develop decisen enterna to
* Conduct enhanced OF RISK                                                                                                              BS4 PR     RES/NMSS support reculatory decision                                   partcipatory rulemaking to       C ASSESSMENT OF       making tha't incorporates both                                 establish radmiogeal entena ALLOWABLE                                                                                                            Final Rule determaste end nsbbesed                                       for decon.missoning nuclear       Pubhshed RADIATION           engineenng judgement.                                         sites; techncal e"prart for RELEASES AND                                                                                                        7/97 C rulemaking includtri DOSES                                                                             comprehenstve nskbood ASSOCIATED                                                                         assessment of resittual WITH LOW LEVEL                                                                     contamination.
* Conduct enhanced
RADIOACTIVE WASTE AND
BS4 PR
* Develop uidance for REstDUAL                                                                                                            2/98 ACTMTY.
RES/NMSS
I               ng the radologeal er ena for iconse terminston..
OF RISK
* Work wtth DOE and EPA to the extent practcable to         Ongoing develop common approaches, assumptons, and models for evaluating nsks and attemative remediaton methodologies (nsk harmontraton) 4.3   DEVELOP
support reculatory decision
partcipatory rulemaking to
C
ASSESSMENT OF
making tha't incorporates both
establish radmiogeal entena
Final Rule
ALLOWABLE
determaste end nsbbesed
for decon.missoning nuclear
Pubhshed
RADIATION
engineenng judgement.
sites; techncal e"prart for
7/97 C
RELEASES AND
rulemaking includtri
DOSES
comprehenstve nskbood
ASSOCIATED
assessment of resittual
WITH LOW LEVEL
contamination.
RADIOACTIVE
WASTE AND
* Develop uidance for
2/98
REstDUAL
I
ng the radologeal
ACTMTY.
er ena for iconse terminston..
* Work wtth DOE and EPA to
the extent practcable to
Ongoing
develop common approaches,
assumptons, and models for
evaluating nsks and attemative
remediaton methodologies
(nsk harmontraton)
4.3
DEVELOP
* Develop a Branch Techncal
* Develop a Branch Techncal
* Solicit pubhc comments         5/97 C. NMSS/RES GUIDANCE FOR         Positen on conducting a THE REVIEW OF       Performance Assessment of a RISK                 LLW disposal facdity
* Solicit pubhc comments
* Pubhsh final Branch             TBD, ASSOCIATED                                                                         Techncal Positen WITH WASTE                                                                                                           Dependent REPOSITORIES                                                                                                         on Resources 10
5/97 C.
NMSS/RES
GUIDANCE FOR
Positen on conducting a
THE REVIEW OF
Performance Assessment of a
RISK
LLW disposal facdity
* Pubhsh final Branch
TBD,
ASSOCIATED
Techncal Positen
Dependent
WITH WASTE
REPOSITORIES
on
Resources
10
.
.
.
.
.
.
. . .


RegulWory ActMty                       Obrectrves                             Methods             Target   Lead     Status (tfus Schedule Offee(s)     cuarter) 44       RISK
_.
. _ _ _ _ _
. _ _ _ _ _ _ _ _ _ _ - _ _ _ .
.
.
..
.
.
RegulWory ActMty
Obrectrves
Methods
Target
Lead
Status (tfus
Schedule
Offee(s)
cuarter)
44
RISK
* Develop and demonstrate a nsk
* Develop and demonstrate a nsk
* Develop and demonstrate ASSESSMENT OF                                                                                B98                 Changed (Note 12) assessment for Industnal gauges               methods for determining the MATERIAL USES   containing cessum-137 and                     nok associated with industnli cobalt-60 using PRA and other                 gauges containing cessum..J7 related techrwques                           and cobalt 60
* Develop and demonstrate
B98
Changed (Note 12)
ASSESSMENT OF
assessment for Industnal gauges
methods for determining the
MATERIAL USES
containing cessum-137 and
nok associated with industnli
cobalt-60 using PRA and other
gauges containing cessum..J7
related techrwques
and cobalt 60
* The assessment should allow
* The assessment should allow
* Fnal report as NUREG       12s96 for mcdfcaton based on                                                                          Changed (Note 12) changes m regulatory
* Fnal report as NUREG
* Wcrkin0 Group with           &96 requrements                                                                                    Changed (Note 13) contractor assetance to identify and document a
12s96
* Use empircal data as much as               t.achnical basis for a risk.
Changed (Note 12)
practcatde                                   informed approach to the regulaton of nuclear
for mcdfcaton based on
* Develop and demonstrate nsk                 byproduct matenal, and to assessment rnethods for                       develop plans for a graded appicaten to medcal and                       approach to nuclear byproduct industnel heensee actmtes                     matenal regulation based on nsk mformaton 45     FRAMEWORK
changes m regulatory
* Wcrkin0 Group with
&96
Changed (Note 13)
requrements
contractor assetance to
identify and document a
* Use empircal data as much as
t.achnical basis for a risk.
practcatde
informed approach to the
regulaton of nuclear
* Develop and demonstrate nsk
byproduct matenal, and to
assessment rnethods for
develop plans for a graded
appicaten to medcal and
approach to nuclear byproduct
industnel heensee actmtes
matenal regulation based on
nsk mformaton
45
FRAMEWORK
* develop a framework for
* develop a framework for
* Provxkt plan for developing 1/98     NMSS     Changed (Note 14)
* Provxkt plan for developing
FOR USE OF PRA   applying PRA to nuclear matenal               framework IN REGULATING     uses, similar to the one NUCLEAR           deve g'ed for reactor regulation
1/98
* Complete framework MATERIALS                                                                                     TBD (SECY-95-280), where appropnate.
NMSS
1 11
Changed (Note 14)
FOR USE OF PRA
applying PRA to nuclear matenal
framework
IN REGULATING
uses, similar to the one
NUCLEAR
deve g'ed for reactor regulation
* Complete framework
TBD
MATERIALS
(SECY-95-280), where
appropnate.
!
'
1
11
.


  ,                                    5.0 HIGH LEVEL NUCLEAR WASTE REGULATION Cogulatory ActNRy                 ObjectNes                                                               Methods                   Target     Lead   Status (this Schedule     Offee(s) cuarter) 51     REGULATION OF
_ _ _ - _ _ _ _ _ - - _ _ - - - _ - _ - - _ -
- - - -
.
.
5.0 HIGH LEVEL NUCLEAR WASTE REGULATION
,
Cogulatory ActNRy
ObjectNes
Methods
Target
Lead
Status (this
Schedule
Offee(s)
cuarter)
51
REGULATION OF
* Develop guidance for the NRC
* Develop guidance for the NRC
* Assist the staff in pre-       Ongoing       NMSS                   {
* Assist the staff in pre-
HIGH-LEVEL WASTE   and CNWRA staffs in the use of                                         hcensing actNtes and in PA to evaluate the safety of HLW                                       Icense appicaten revews programs
Ongoing
* Develop a techncal assessment capattityin totab system and subsystem PA for use in hcensing and pre-                                               j licensing revews.
NMSS
* Combine specialized techncal drsciplines (earth scences and engineer )
{
with those of s,ystem__       rs                                       ,
HIGH-LEVEL WASTE
i to improve ...u my.
and CNWRA staffs in the use of
hcensing actNtes and in
PA to evaluate the safety of HLW
Icense appicaten revews
programs
* Develop a techncal
assessment capattityin totab
system and subsystem PA for
use in hcensing and pre-
j
licensing revews.
-
* Combine specialized
techncal drsciplines (earth
scences and engineer )
with those of s,ystem__
i
,
_
rs
to improve ...u my.
* Idenhfy agnifcant events,
* Idenhfy agnifcant events,
* Perform sensitNtty studes       Ongoing       NMSS processes, and parameters                                               of key techncallasues ussng effecting total system                                                   iterative performance performance assessment (IPA)
* Perform sensitNtty studes
Ongoing
NMSS
processes, and parameters
of key techncallasues ussng
effecting total system
iterative performance
performance
assessment (IPA)
* Use PA and PSA methods,
* Use PA and PSA methods,
* Assist the staff to maintain   Ongoing results and insignts to evaluate                                                                                         NMSS and to refine the regulatory proposed change s to regulatons                                         structure in HLW disposal gove       the ootential repository                                     regulaticas that pertain to PA.
* Assist the staff to maintain
at Yucca       ntain.
Ongoing
NMSS
results and insignts to evaluate
and to refine the regulatory
proposed change s to regulatons
structure in HLW disposal
gove
the ootential repository
regulaticas that pertain to PA.
at Yucca
ntain.
* Apply IPA analyses to advise
i
i
* Apply IPA analyses to advise EPA in its development of a l                                                                                                        Yucca Mountain regulaten 1
l
EPA in its development of a
Yucca Mountain regulaten
1
[
[
;~
;~
* Apply IPA enalyses to develop a site-specife regulation for a Yucca Mountain site
* Apply IPA enalyses to
develop a site-specife
regulation for a Yucca
Mountain site
* Continue PA activites dunng
* Continue PA activites dunng
* Provide guidance to the         Ongr ng       NMSS interactions with DOE dunng the                                         DOE on site charactenzation pre-heensing phase of repository                                       requirements ongoing oesign development, site                                                       work, and hcensing issues charactenzaton, and repository                                           important to the DOE's design.                                                                 development of a complete t
* Provide guidance to the
and high-quality license appleation.
Ongr ng
* Compare results of NRC's Iterstrve performance assessment to DOE's VA to identify major differences /rssues.
NMSS
3.3     APPLY PRA TO
interactions with DOE dunng the
DOE on site charactenzation
pre-heensing phase of repository
requirements ongoing oesign
development, site
work, and hcensing issues
charactenzaton, and repository
important to the DOE's
design.
development of a complete
t
and high-quality license
,
appleation.
* Compare results of NRC's
Iterstrve performance
assessment to DOE's VA to
identify major
differences /rssues.
3.3
APPLY PRA TO
* Demonstrate methods for PRA
* Demonstrate methods for PRA
* P opere user needs letter to SPENT FUEL       of spent fuel storage facihtes.                                                                             497C          RUS/NMSS RES.
* P opere user needs letter to
STORAGE FACILITIES
497C
* Conduct PRA of dry cask         9<99 storage.
RUS/NMSS
3.3     CONTINUE USE OF
SPENT FUEL
* Use PRA methods, results, and
of spent fuel storage facihtes.
* t,pdate the database on RISK ASSESSMENT                                                                                                              End cf FY     NMSS insights to evaluate regulations                                         transportation of raccactive       99 IN SUPPORT OF     governing the transportation of RADICACTIVE                                                                                matenals for future radcactive matenal.                                                     appications MATERIAL TRANSPC9TATION
RES.
* Revalidate the results of       &99 NUREG-0170 for spent fuel shipment nsk estimates.
STORAGE
12 v                                                                                                   '
FACILITIES
* Conduct PRA of dry cask
9<99
storage.
3.3
CONTINUE USE OF
Use PRA methods, results, and
* t,pdate the database on
End cf FY
NMSS
*
RISK ASSESSMENT
insights to evaluate regulations
transportation of raccactive
99
IN SUPPORT OF
governing the transportation of
matenals for future
RADICACTIVE
radcactive matenal.
MATERIAL
appications
TRANSPC9TATION
* Revalidate the results of
&99
NUREG-0170 for spent fuel
shipment nsk estimates.
12
v
'
A
A


_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
'
.
4
4
    ,                                               Notes
Notes
: 1. The general regulatory guide and btandard Review Plan for use of PRA in plant-specific current licensing basis changes will be transmitted to the Commission in the near future, To permit efficient incorporation of the resolution of policy issues contained in these documents into the application-specific regulatory guides and SRP sections, completion of these guides and sections has been delayed until March 31,1998, a change from their previous completion date of December 31,1997.
,
: 2. The staffs RI IST team is currently working on a draft SE for the Comanche Peak RI-IST program. The staff and TU Electric have been actively interacting through meetings and discussions as the licensee develops a RI IST program description that is sufficiently detailed and consistent with the draft Rl IST guidance provided in DG 1062. TU Electric has indicated that it would be able to complete a daft revision to their RI IST Program Description by the end of January 1998. The staff will continue to develop a draft SE based on the licensee's responses to the staffs RAls and discussions with the licensee.
1.
Assuming TU Electric finalizes its RI IST Program Description by mid February 1998, the staff anticipates having a completed SE to the Commission on the proposed RI IST program for Comanche Peak in March 1998.
The general regulatory guide and btandard Review Plan for use of PRA in plant-specific
: 3. The completion date for the Graded Quality Assurance pilot application has been revised to July 1998 to reflect the anticipated issuance date of the final GOA inspection guidance.
current licensing basis changes will be transmitted to the Commission in the near future,
: 4. With respect to the risk-informed TS pilot program, the staf' received a supplemental amendment request from SONGS in early January 1998 tc put the configuration risk management program (CRMP) description into the SONGS TS. The staff will review the CRMP and, if acceptable, issue the risk-informed TS amendments for SONGS. Once similar supplemental amendment requests are received frora the remaining pilot licensees, the staff willissue those pilot plant amendments. Based on information from the CEOG, the staff expects to receive the majority of the supplemental pilot amendment requests in the first quarter of 1998. With receipt of the SONGS supplemental request, the staff anticipates completing the SONGS review as the lead pilot plar:t and issue the amendment by March 31,1998. This is a change from the previous date of December 31,1997, for issuance of the lead pilot plant amendment, because of the decision by the originallead plant not to oursue risk-informed TS changes at this time.
To permit efficient incorporation of the resolution of policy issues contained in these
: 5. The NRR Intipection Program Branch proposals for revising core inspection procedures have been transmitted to the appropriate NRR technical branches having responsibility for l         specific core inspection procedures. Due to the large number of branches involved, completing all indivi :ual branch concunences is anticipated to take an additional two months. The revised completion date for this task is February 1998.
documents into the application-specific regulatory guides and SRP sections, completion of
6 A deci ion has been reached to generate the risk-informed regulatory documents in a sequential manner, with the application specific guidance following the general regulatory guide and standard review plan. Under this schedule, the regulatory guide for graded QA will be finalized by the end of March 1998. Since the graded QA inspection procedure will be dependent upon the technical content of the companion regulatory guide, the draft graded QA Inspection Procedure will be prepared by April 1998 and finalized in July 1998 after having received appropriate NRC reviews.
these guides and sections has been delayed until March 31,1998, a change from their
13 a
previous completion date of December 31,1997.
2.
The staffs RI IST team is currently working on a draft SE for the Comanche Peak RI-IST
program. The staff and TU Electric have been actively interacting through meetings and
discussions as the licensee develops a RI IST program description that is sufficiently
detailed and consistent with the draft Rl IST guidance provided in DG 1062. TU Electric
has indicated that it would be able to complete a daft revision to their RI IST Program
Description by the end of January 1998. The staff will continue to develop a draft SE
based on the licensee's responses to the staffs RAls and discussions with the licensee.
Assuming TU Electric finalizes its RI IST Program Description by mid February 1998, the
staff anticipates having a completed SE to the Commission on the proposed RI IST
program for Comanche Peak in March 1998.
3.
The completion date for the Graded Quality Assurance pilot application has been revised to
July 1998 to reflect the anticipated issuance date of the final GOA inspection guidance.
4.
With respect to the risk-informed TS pilot program, the staf' received a supplemental
amendment request from SONGS in early January 1998 tc put the configuration risk
management program (CRMP) description into the SONGS TS. The staff will review the
CRMP and, if acceptable, issue the risk-informed TS amendments for SONGS. Once
similar supplemental amendment requests are received frora the remaining pilot licensees,
the staff willissue those pilot plant amendments. Based on information from the CEOG,
the staff expects to receive the majority of the supplemental pilot amendment requests in
the first quarter of 1998. With receipt of the SONGS supplemental request, the staff
anticipates completing the SONGS review as the lead pilot plar:t and issue the amendment
by March 31,1998. This is a change from the previous date of December 31,1997, for
issuance of the lead pilot plant amendment, because of the decision by the originallead
plant not to oursue risk-informed TS changes at this time.
5.
The NRR Intipection Program Branch proposals for revising core inspection procedures
have been transmitted to the appropriate NRR technical branches having responsibility for
l
specific core inspection procedures. Due to the large number of branches involved,
completing all indivi :ual branch concunences is anticipated to take an additional two
months. The revised completion date for this task is February 1998.
6
A deci ion has been reached to generate the risk-informed regulatory documents in a
sequential manner, with the application specific guidance following the general regulatory
guide and standard review plan. Under this schedule, the regulatory guide for graded QA
will be finalized by the end of March 1998. Since the graded QA inspection procedure will
be dependent upon the technical content of the companion regulatory guide, the draft
graded QA Inspection Procedure will be prepared by April 1998 and finalized in July 1998
after having received appropriate NRC reviews.
13
,
a


- _ _ - _ _ _ _ _ _ _ _ .
-.
.
7.
7.
    '      As part of the IPE follow-up program, the staff is in the process of identifying generic issues to be audited. These issues will be those which have been explic.itly identified and addressed by the licensee as part of the IPE process.
As part of the IPE follow-up program, the staff is in the process of identifying generic issues
A report that identifies the above generic issues and staff views on the adequar.,y of the proposed resolution is under preparation. The report will provide the basis for the selection of generic safety issues to be audited and selected plants. The staff has moved the completion date for this milestone to March 1998, in order to utilize the report in the audit process.
'
In addition to the .uove issues, RCP seal LOCA had been identified as a dominant contributor to core damage frequency in many PWR IPEs. The staff has a separate ongoing activity in RES to address this issue under Generic Safety issue 23, and will utilize IPE insights in the proposed resolution.
to be audited. These issues will be those which have been explic.itly identified and
: 8. In at SRM (9700207) datsd May 28,1997, the Commission requested that the staff proviie the scooe and Nhedule of activities related to using IPE results to assess regulatory effectianc.s in resolving major safety issues. . lith respect to scope, the staff identified three major safety issues for assessment. The selection had been based on both the potential nsk significance of the issue, and the fact that probabilistic techniques were used extensively in the resolution process. These issues include:
addressed by the licensee as part of the IPE process.
: 1. Resolution of USI A-44 Station Blackout at Nuclear Power Plants
A report that identifies the above generic issues and staff views on the adequar.,y of the
: 2. Resolution of USI A-45 Decay Heat Removal Reliability
proposed resolution is under preparation. The report will provide the basis for the selection
: 3. Resolution of USI A-09 Anticipated Transient Without Scram To evaluate the three major issues, the staff will utilize both representative plants, and information contained in NUREG-1560, to audit and draw conclusions regarding regulatory effectiveness. Information generated under Task 1.6 and Task 1.10 will also be integrated into the assessment process. In particular, the RCP seal LOCA and station blackout issues are closely related; the station bisckout analysis in this activity willincorporate the results of the RES seal LOCA analysis discussed in Note 7.
of generic safety issues to be audited and selected plants. The staff has moved the
These tasks may expand the staff's consideration cf other safety issues and effectiveness of the regulatory process. The staff willinform the Commission of any additional safety issues that come under consideration. The staff plans to complete it analysin of the three issues by the end of December 1998, and will recommend ai that time any additional staff action.
completion date for this milestone to March 1998, in order to utilize the report in the audit
process.
In addition to the .uove issues, RCP seal LOCA had been identified as a dominant
contributor to core damage frequency in many PWR IPEs. The staff has a separate
ongoing activity in RES to address this issue under Generic Safety issue 23, and will utilize
IPE insights in the proposed resolution.
8.
In at SRM (9700207) datsd May 28,1997, the Commission requested that the staff
proviie the scooe and Nhedule of activities related to using IPE results to assess
regulatory effectianc.s in resolving major safety issues. . lith respect to scope, the staff
identified three major safety issues for assessment. The selection had been based on both
the potential nsk significance of the issue, and the fact that probabilistic techniques were
!
used extensively in the resolution process. These issues include:
1. Resolution of USI A-44 Station Blackout at Nuclear Power Plants
2. Resolution of USI A-45 Decay Heat Removal Reliability
3. Resolution of USI A-09 Anticipated Transient Without Scram
To evaluate the three major issues, the staff will utilize both representative plants, and
information contained in NUREG-1560, to audit and draw conclusions regarding regulatory
effectiveness. Information generated under Task 1.6 and Task 1.10 will also be integrated
into the assessment process. In particular, the RCP seal LOCA and station blackout
issues are closely related; the station bisckout analysis in this activity willincorporate the
results of the RES seal LOCA analysis discussed in Note 7.
These tasks may expand the staff's consideration cf other safety issues and effectiveness
of the regulatory process. The staff willinform the Commission of any additional safety
issues that come under consideration. The staff plans to complete it analysin of the three
issues by the end of December 1998, and will recommend ai that time any additional staff
action.
9.
9.
Due to personnel being assigned to higher priority activities, such as risk-informed pilot initiatives and IPE followup activities, the staff is reassessing their position regarding the development of an SRP, especially since there are no new advanced design certification submittals anticipated.
Due to personnel being assigned to higher priority activities, such as risk-informed pilot
initiatives and IPE followup activities, the staff is reassessing their position regarding the
development of an SRP, especially since there are no new advanced design certification
submittals anticipated.
10.
10.
The staff has reviewed all the 76 IPE submittals and issued staff evaluation reports (SERs) on their findings to each licensee. In three of the SERs, it is indicated to the licensees that the staff was not able to conclude that the licensee met the intent of Generic Letter 88-20 for their plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and Browns Ferry 3. The licensee for Crystal River 3 nas indicated their intention to submit an updated analysis (February ;998) addressing the staffs concerns, it is anticipated that the 14
The staff has reviewed all the 76 IPE submittals and issued staff evaluation reports (SERs)
on their findings to each licensee. In three of the SERs, it is indicated to the licensees that
the staff was not able to conclude that the licensee met the intent of Generic Letter 88-20
for their plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and
Browns Ferry 3. The licensee for Crystal River 3 nas indicated their intention to submit an
updated analysis (February ;998) addressing the staffs concerns, it is anticipated that the
14


t review of this new IPE submittal will be concluded in June 1998. Discussions are still ongoing wit! licensees regarding Susquehanna 1&2 and Browns Ferry 3.
___ - _ __- ____ _ ___ _____
: 11. This 'ask has been subsumed into the office operating plan, which is periodically updated.
.
: 12. The target schedule for the work to develop and demonstrate a risk assessment for industrial gauges containing ces;um 137 and cobalt-60 using PRA (and other related techniques) has been extended from July 1998 to September 1998. The extension is due to difficulties in obtaining data from non-licensees related to actual and potential doses to the public resulting from gauges which enter the scrap metal cycle.
t
: 13. The target schedule for the work to develop and demonstrate risk assessment methods for app!ication to medical and industrial licensee activities has been determined to be September 1998 based on scheduling of a planned Commission paper on the topic.
review of this new IPE submittal will be concluded in June 1998. Discussions are still
: 14. The target schedule for providing a plan for developing a framework has been extended from October 1997 to December 1997 to permit interoffice coordination.
ongoing wit! licensees regarding Susquehanna 1&2 and Browns Ferry 3.
l I
.
11.
This 'ask has been subsumed into the office operating plan, which is periodically updated.
12.
The target schedule for the work to develop and demonstrate a risk assessment for
industrial gauges containing ces;um 137 and cobalt-60 using PRA (and other related
techniques) has been extended from July 1998 to September 1998. The extension is due
to difficulties in obtaining data from non-licensees related to actual and potential doses to
the public resulting from gauges which enter the scrap metal cycle.
13.
The target schedule for the work to develop and demonstrate risk assessment methods for
app!ication to medical and industrial licensee activities has been determined to be
September 1998 based on scheduling of a planned Commission paper on the topic.
14.
The target schedule for providing a plan for developing a framework has been extended
from October 1997 to December 1997 to permit interoffice coordination.
l
I
15
15
.
-
,
-


4 Attachment 2 Sta# Requirements Memorandum dated May 28,1997 i
*
i P
.
.
4
Attachment 2
Sta# Requirements Memorandum
dated May 28,1997
i
i
P


        /.ES/ DST                 TEL 301-415-5062                       Jur. 03'97     11:15 No.007 P.03 Acticn (Morrison, Nu/
/.ES/ DST
TEL 301-415-5062
Jur. 03'97
11:15 No.007 P.03
Acticn (Morrison, Nu/
.
Collins. NRR
Collins. NRR
                ***t UNffED 5MES                     Cygg ,Cg))gn g                               NUCLEAR Rt0UL.AT0ftY C04mm8840N                 Jon]en y                                     *ApesGTon.or same                         Thotpson
.
        %                                                                       AN RESvuNse, FLk:AbE
***t
( -
*
May 28, 1997                       REFER TO g g 70507 Blahe Ross, AE0D MEMORANDUM 70:           L. Joseph Callan                                                     .
UNffED 5MES
Exec # iv' Director for Operationa FROM:
Cygg ,Cg]]gn
k(%
g
NUCLEAR Rt0UL.AT0ftY C04mm8840N
Jon]en
-
y
*ApesGTon.or same
Thotpson
%
AN RESvuNse, FLk:AbE
(
May 28, 1997
REFER TO g g 70507
Blahe
-
Ross, AE0D
!
MEMORANDUM 70:
L. Joseph Callan
.
Director for Operationa
Exec # iv' k(%
:
FROM:
Johr v. Hoyle, Secretary
Johr v. Hoyle, Secretary
                                                                            ~
~
 
SUBJECT:
==SUBJECT:==
STAFF REQUIREMENTS - ERIEFING ON IPE INSIGHT
STAFF REQUIREMENTS - ERIEFING ON IPE INSIGHT REPORT, 2:00 P.M         WEDNESn&V, M&V 7,           1997.
REPORT, 2:00 P.M
COMMISSIOhT.RS' CCNFERENCE ROOM, ONE WHITE FLINT NORTH, ROCXV:LLE, MARYLAND (OPEN To PUBLIC ATTENDANCE)
WEDNESn&V, M&V 7,
The countiwmivu was briefed by the NRC stef f en the Individual Flant Examination (IPE) insight report.             The Comission asked the st a:l' to expedite activhium in .Le !vilu lug areas:                     (U using IPE results to prioritize inspection activities: (2) improving regional capabilities for the use of PRA and risk insights; and (3) providin           ted inspecttr training, fEDO)   MES)j                   iSECT suspense:               wu'p3o             9700206 The Commission asked the stait to provice tne scopte anc scr.edule of activities relar.ed to using IPE results to assess regulatory effectiveness in resolving r.ager safety issues.                     The comissien stacifically reqv.2ted that the staff provide an estimate cf the average cost to respond to the Staticn Blackout. rule per persen-rem averted 1.n achieving an average reduction in core damage frequency of 2E-5/RY. These activities should be coordinated with the regulatory effettiveness organization, fEBO-) (NRR)                     (SECY suspense:               6/27/97)           9700207 After the IPE database has been placed on the Internet, the staff should consider allowing licensees to update their IDES voluntarily to reflect changer i.a plant configuration.
1997.
COMMISSIOhT.RS' CCNFERENCE ROOM, ONE WHITE
FLINT NORTH, ROCXV:LLE, MARYLAND (OPEN To
PUBLIC ATTENDANCE)
-
.-
The countiwmivu was briefed by the NRC stef f en the Individual
Flant Examination (IPE) insight report.
The Comission asked the
st a:l'
to expedite activhium in .Le !vilu lug areas:
(U using
IPE results to prioritize inspection activities: (2) improving
regional capabilities for the use of PRA and risk insights; and
(3) providin
ted inspecttr training,
fEDO)
MES)j
iSECT suspense:
wu'p3o
9700206
The Commission asked the stait to provice tne scopte anc scr.edule
of activities relar.ed to using IPE results to assess regulatory
effectiveness in resolving r.ager safety issues.
The comissien
stacifically reqv.2ted that the staff provide an estimate cf the
average cost to respond to the Staticn Blackout. rule per persen-
rem averted 1.n achieving an average reduction in core damage
frequency of 2E-5/RY.
These activities should be coordinated
with the regulatory effettiveness organization,
fEBO-)
(NRR)
(SECY suspense:
6/27/97)
9700207
After the IPE database has been placed on the Internet, the staff
should consider allowing licensees to update their IDES
voluntarily to reflect changer i.a plant configuration.
(RES)
(RES)
-
,
.
*
.
.
.
, , .
-


  -d Attachment 3 lPE Follo36222matarn The IPE program was initiated to have licensees evaluato the;r plants for vulnerabilities to severe accidents and to take actions to correct these vulnerabilities, where appropriate. In this process it was recognized that licensees would gain an appreciation of their plant's overall susceptibility to severe accidents which would help in developing accident management tirategies and programs. In this regard the IPE pregam was principally for the benefit o' licensees. Now, however, as a result of completion of the IPE reviews (except for the three plants where comn!stion is still under discussion) and insights report (NUREG-1560), the staff is now in a position to utilize these results to follow up and see if:
_ _ _ _ _
any additional plant specific improvements are warranted, licensees have followed through on the actions they indicated they were taking as a result of their IPE, and any additional generic regulatory activities should be undertaken.
_ - _ _ _ _ _ _ _ _ _ _
To accomplish this the staff has developed an IPE followup program which willinvolve the efforts of RES, NRR and the Regions. The followup program will consist of the following sctivities:
..
.
-d
Attachment 3
lPE Follo36222matarn
The IPE program was initiated to have licensees evaluato the;r plants for vulnerabilities to
severe accidents and to take actions to correct these vulnerabilities, where appropriate. In this
process it was recognized that licensees would gain an appreciation of their plant's overall
susceptibility to severe accidents which would help in developing accident management
tirategies and programs. In this regard the IPE pregam was principally for the benefit o'
licensees. Now, however, as a result of completion of the IPE reviews (except for the three
plants where comn!stion is still under discussion) and insights report (NUREG-1560), the staff is
now in a position to utilize these results to follow up and see if:
any additional plant specific improvements are warranted,
-
licensees have followed through on the actions they indicated they were taking as a
-
result of their IPE, and
any additional generic regulatory activities should be undertaken.
-
To accomplish this the staff has developed an IPE followup program which willinvolve the
efforts of RES, NRR and the Regions. The followup program will consist of the following
sctivities:
1
1
: 1)       reviewing the iPE results for risk significant items that may warrant further attention.
1)
Examples of the screening criteria for selection of plants and items for additional followup are as follows:
reviewing the iPE results for risk significant items that may warrant further attention.
any contributor with a aCDF' >10-5/ RY or any contributor with a 6LERF2 >104/RY
Examples of the screening criteria for selection of plants and items for additional
: 2)       reviewing the IPE results for similar plants and whether or not actions taken by some l'
followup are as follows:
any contributor with a aCDF' >10-5 RY or
/
-
any contributor with a 6LERF2 >104/RY
-
2)
reviewing the IPE results for similar plants and whether or not actions taken by some
l'
plants are applicable to other plants of similar design,
plants are applicable to other plants of similar design,
{
{
: 3)       reviewing licensee responses to specific containment performance improvement items identified in the IPE generic letter supplements to see if additional actions are warranted,
3)
: 4)       reviewing the basis for very low risk contributors that appear to be out of line with other plants (i.e., was the analysis overly optimistic and should further action be taken?),
reviewing licensee responses to specific containment performance improvement items
: 5)       assessing licensee stated actions (e.g., safety enhancements) resulting from their IPE to see if, in fact, they have been completed,
identified in the IPE generic letter supplements to see if additional actions are
                  ' Core Damage Frequency 8 Large Early Release Frequency 1
warranted,
4)
reviewing the basis for very low risk contributors that appear to be out of line with other
plants (i.e., was the analysis overly optimistic and should further action be taken?),
5)
assessing licensee stated actions (e.g., safety enhancements) resulting from their IPE to
see if, in fact, they have been completed,
' Core Damage Frequency
8 Large Early Release Frequency
1


9 2
. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ .
: 6)       assessing licensee accident management programs to see if, in fact, they reflect the results, assumptions and actions from the IPE. This action will be carried out through the staff assessment of the licensee's Severe Accident Management Guidelines (SAMG).
*
: 7)       assessing the results for their implications for the resolution of generic safety issues or other major safety issues.
,
These activities are in addition to actions already underway to incorporate '.ne IPE insights into the NRC inspection program.
9
Implementation of this program will consist of RES providing to NRR information related tc activities 1 through 4 above with NRR then discussing with licensees the appropriateness of additional actions. This will provide licensees an opportunity to provide updated information related to these activities and ultimatcly for NRR to take regulatory action, if such action is warranted and can be justified by the backfit rule. Activities 5 and 6 will be performed by NRR,       ,
'
with Regional followup as necessary. Activity 7 is addressed by items 1.6 and 1.7 of the PRA Implementation Plan.
2
6)
assessing licensee accident management programs to see if, in fact, they reflect the
results, assumptions and actions from the IPE. This action will be carried out through
the staff assessment of the licensee's Severe Accident Management Guidelines
(SAMG).
7)
assessing the results for their implications for the resolution of generic safety issues or
other major safety issues.
These activities are in addition to actions already underway to incorporate '.ne IPE insights into
the NRC inspection program.
Implementation of this program will consist of RES providing to NRR information related tc
activities 1 through 4 above with NRR then discussing with licensees the appropriateness of
additional actions. This will provide licensees an opportunity to provide updated information
related to these activities and ultimatcly for NRR to take regulatory action, if such action is
warranted and can be justified by the backfit rule. Activities 5 and 6 will be performed by NRR,
,
with Regional followup as necessary. Activity 7 is addressed by items 1.6 and 1.7 of the PRA
Implementation Plan.
High priority issues identified in the screening process will be pursued as they are identified.
High priority issues identified in the screening process will be pursued as they are identified.
Dates for accomplishing these activities relative to IPE followup are:
Dates for accomplishing these activities relative to IPE followup are:
RES supply information to NRR on items 1-4                                   12/98 NRR interact with licensees on appropriateness                               6/99 of additional actions for items 1-4 Backfit analysis and actions complete                                         12/99 Item 5, identify items for Regional followup                                 9/98 Item 6, identification of IPE insights for Se'. sre Accident                 9/98 Management Guidelines The specific IPEEE followup schedule will be developed following the completion of the IPEEE             4 reviews.
RES supply information to NRR on items 1-4
                                                                          .                               -}}
12/98
.
NRR interact with licensees on appropriateness
6/99
.
of additional actions for items 1-4
Backfit analysis and actions complete
12/99
.
Item 5, identify items for Regional followup
9/98
.
Item 6, identification of IPE insights for Se'. sre Accident
9/98
.
Management Guidelines
The specific IPEEE followup schedule will be developed following the completion of the IPEEE
4
reviews.
.
-
}}

Latest revision as of 08:00, 10 December 2024

Reports Status of PRA Implementation Plan for Period of 971001-1231.Responds to Srm,Dtd 970528,which Related to Staff Plans for Using IPE Result to Assess Regulatory Effectiveness
ML20199E281
Person / Time
Issue date: 01/23/1998
From: Callan L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
References
SECY-98-012, SECY-98-012-01, SECY-98-012-R, SECY-98-12, SECY-98-12-1, SECY-98-12-R, NUDOCS 9802020120
Download: ML20199E281 (27)


See also: IR 07100001/2012031

Text

._

t

.

.

000000000 00000000000000

  • .

8

RELEASED TO THE PDR

,p,,,,g\\

.

o.

.

$

.._ }l$Q)9 V

lNi

$

E*

i

.)

a

was

......... ........

.....

POLICY ISSUE

(Information)

Januan/ 23.1998

SECY-98-012

EQB:

The Commissioners

EROM.

L. Joseph Callar.

Executive Director for Operations

SUBJECT:

QUARTERLY STATUS REPORT ON THE PROBABILISTIC RISK

ASSESSMENT IMPLEMENTATION PLAN

PURPOSE:

To report the status of the Probabilistic Risk Assessment (PRA) Implementation Plan for the

period of October 1 to December 31,1997, and to respond to a Staff Requirements

Memorandum dated May 28,1997, which relates to staff plans for using Individual Plant

Examination (IPE) results to assess regulatory effectiveness.

SUMMARY:

This paper describes accomplishments and changes to the staffs PRA Implementation Plan for

the period of October 1,1997 to December 31,1997, The principal accomplishments include

preparation of the final versions of Regulatory Guide (RG) 1.174 (formerly draft guide DG 1061)

and Standard Review Plan (SRP) Chapter 19, which provide general guidance on the use of

PRA in risk informed decisions for changes in a reactor current licensing basis, completion of the

South Texas graded quality assurance pilot program, publication (for public comment) of the

draft RG and SRP on risk-informed inservice inspection, and the development of the staffs plan

to use IPE results to assess regulatory effectiveness in resolving major safety issues. The

principal change is the delay of the application-specific regulatory guides and Standard Review

Plan sections from December 1997 to March 1998, to permit the incorporation of the policy

decisions associated with the finalization of RG 1.174.

CONTACT:

NOTE:

TO BE MADE PUBLICLY AVAILABLE

g

IN 5 WORKING DAYS FROM THE DATE OF

Ol

Ashok Thaaani, OEDO

THIS PAPER

'1

Ii

415-1705

g

,

W!00G8

p ; p a s . 3. ? - A

N,k3[][${[]]

tv #

3

e _ , ,, > m y

9002020120 400123

O a + "

'e

5

\\

-

'

_

PDR __

-01

. _ _ . _ _ ____ ---_ _.

_______

_ _ _ . _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _

!

,

,

The Commissioners

2

BACKGROUND:

'

In a memorandum dated January C .1996, from the t!xecutive Director for Operations to

Chairman Jackson, the staff committed to submitting quarterly reports on the status of its

development of risk informed standards and guidance. Previous quarterly reports were

provided to the Commission on March 26, June 20, and October 11,1996, and on January 13,

April 3, July 22, and October 14,1997. This quarterly report covers the period from October 1,

1997 to December 31,1997.

DISCUSSION:

The significant accomplishments and changes to the PRA Implementation Plan in the past

quarter are summarized below.' More detailed information is provided in Attachment 1.

Significant achievements during the past quarter include:

Section 1: Reactor Regulation (NRR)

1.1 Develop Standard Review Plans for Risk Informed Regulation

NRR and RES staff met with ACRS and CRGR to discuss the final versions of the general

guidance on use of PRA in risk informed decision making in changes to the plant specific

current licensing basis; Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide 1.174 (RES lead). A Commission paper providing the final versions of these documents will be

provided to the Commission in the near future.

Draft Standard Review Flan 3.9.8 (NRR lead) and Regulatory Guide DG-1063 (RES lead) on

risk informed inservice inspection of piping were published for public comment and the subjects

of a public workshop on November 20 and 21,1997, The workshop was well attended by

industry representatives who offered a number of constructive comments, some criticisms, and

some suggestions for changing the guidance. Overall, the comments indicated strong support

for pursuing risk informed inservice inspection (RI-ISI) but in a manner which would necessitate

some modifications to the draft guidance.

1.2 Pilot Applications for Risk informed Regulatory Initiatives

The staff evaluation of the South Texas Project risk informed graded quality assurance (QA)

implementation plan was transmitted to the Commission via SECY 97-229 on October 6,1997.

I The staff has modified the format of the PRA Implementation Plan to reduce

redundancy and improve readability. This revised format consists of the body of the

Commission paper, which now provides a summary of accomplishments and changes to the

plan for the past quarter, and the Plan's table (Attachment 1), modified to explicitly show where

milestones have been added, completed, or changed. Such changes are discussed and

additional information provided in endnotes to the table.

- , - - -

- , . --

.-

-

- . .

- - , .

_ .

- - .

-

- - . - - - . - - . - . - - . - _ . - - - - . .

_ . - . - - - . . -

,

,

.

'

The Commissioners

3

By SRM dated October 30,1997, the staff was informed that the Commission had no objection

to the issuance of the South Texas graded QA safety evaluation report. By letter dated

November 6,1997, the licensee was informed that the staff had approved the graded QA

change and was provided with the associated staff safety evaluation.

,

The staff has received risk informed inservice inspection pilot submittals from Surry 1, ANO 2,

and Vermont Yankee which are currerstly being reviewed for completeness. The staff will

develop a review schedule if the submittals are determined to be complete and in conformance

with the DG 1061 and DG 1063 submittal guidance. The staff is also developing schedules and

priorities for the review of other RI ISI pilot submittals as well as submittals expected

subsequent to the pilot RI ISI program approvals.

.

1.3 Inspections

The staff completed nine additional maintenance rule baseline inspections during this quarter,

which included inspection of licensee methods for using PRA in maintenance programs and

inspection of safety assessments performed by licensees when removing equipment from

service for maintenance in accordance with Paragraph (a)(3) of the Maintenance Rule. As of

December 31,1997, the staff has completed a total of 45 inspections.

Section 2: Reactor Safety Research (RES)

2.1 Develop Regulatory Guides

As discussed above, NRR and RES staff met with ACRS and CRGR to discuss the final

versions of Standard Review Plan Chapter 19 (NRR lead) and Regulatory Guide 1.174 (RES

lead). A Commission paper en policy issues was forwarded to the Commission as SECY-97-

287, dated December 12,1997. A Commission paper providing the final versions of these

documents will be provided in the near future.

2.4 Methods Development and Demonstration

A demonstration at the Seabrook nuclear power plant of the human reliability analysis method

ATHEANA (A Technique for Human Event Analys;s) has been completed. A medium break

LOCA scenario, including inappropriate termination of makeup (an error of commission), was

selected for analysis and simulator exercise. The ATHEANA demonstration helped plant

personnelidentify safety-related weaknesses in plant barriers and design. Specifically, the

exercise identified weaknesses in the use of well planned and tested emergency procedures as

well as identifying improvements needed in the draft ATHEANA documentation.

2.5 IPE and IPEEE Reviews

- The final version of NUREG-1560, *lPE Program: Perspectives on Reactor Saf9ty and Plant

Performance," has been submitted for publication. This report was initially issued in late 1996

for public comment. l Based on the comments received, the report was revised, with an

addrtional appendix written discussing the comments received and staff responses.

'

---.

-

- .

- . - -

. . .,

--

-

- - -.

.

- _ _ - . , - . .

--

-

.

--

..

. - _

-

.

,

.

9

The Commissioners

4

The first IPEEE staff evaluation report, for the Diablo Canyon Power Plant, was completed and

issued to the licensee on December 4,1997, in addition, requests for additionalinformation on

fifteen IPEEE submittals were prepared to send to licensees.

An interim report has been developed that provides preliminary IPEEE perspectives and

summarizes the information presented in the first 24 IPEEE submittals reviewed by the staff.

This interim report will be sent to the Commission in the near future. (A summary of the

significant preliminary perspectives from the first 24 IPEEE reviews was provided to the

Commission in Attachment 7 to SECY 97 234.)

Sectinn 3: Analysis and Evaluation of Operating Experience and Training (AtiOD)

3.1 Risk Based Trends and Patterns Analysis

Letters are in the concurret.ce process to distribute the common cause failure (CCF) database

and associated technical report to all U.S. nuclear utilities for their use. The database contains

CCF events from 1980 through 1995.

3.2 Accident Sequence Precursor (ASP) Program

All 1996 precursor analyses have been finalized, with the 1996 ASP report now in publication.

Three preliminary analyses of 1997 events are being reviewed. The annual Commission paper

describing the ASP program in more detail was sent to the Commission on December 23,1997

(SECY 97 296).

3.6 Staff Training

Development activities for the PRA Technology and Regulatory Perspectives (P 111) course

were comploted during this quarter. The first course presentation will be January 26 - February

6,1998. The staff has established a goal of having one Resident inspector at each she

complete the course by the end of 1998.

Significant changes made to the implementation Plan during the last quarter include:

Section 1: Reac'or Regulation (NRR)

1.1 Develop Standard Review Plans for Risk-Informed Regulation

As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in

plant-specific current licensing basis changes will be transmitted to the Commission in the near

future. To permit efficient incorporation of the resolution of policy issues contained in these

I

documents into the application-specific SRP sections on inservice testing and technical

specifications, completion of these SRP sections has been delayed until March 31,1998, a

l

change from their previous completion date of December 31,1997.

l

!

. .

.

.

. .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _

.

.

'

The Commissioners

5

i

l

1.2 Pilot Applications for Risk Informed Regulatory initiatives

The staff is currently developing a draft safety evaluation report (SER) for the Comanche Peak

1

risk informed inservice testing program (Rl IST) program. The licensee (TU Electric) is

currently developing a program that is sufficiently detailed and consistent with DG 1062. TU

Electric has indicated that it intends to complete a draft revision to their program description by

the end of January 1998. Assuming that the program is finalized by mid February, the staff

anticipates having a completed Comanche Peak Rl IST SER to the Commission in March 1998,

rather than December 31,1997.

The completion date for the graded quality assurance (GQA) pilot interactions has been revised

from March 1998 to July 1998 to reflect the anticipated issuance date of the final GOA

inspection guidance.

The staff received a supplemental amendment request from the San Onofre Nuclear

Generating Station (SONGS) in early January 1998 to put the configuration risk management

program description into the SONGS technical specif cations. SONGS has recently become

the lead plant for this Combustion Engineering Owner's Group (CEOG) activity, when the

,

i

originallead plant decided not to pursue risk-informed TS changes at this time. With receipt of

l

the SONGS supplen etal request, the staff anticipates completing the SONGS review as the

l

lead pilot plant and isung the license amendment by March 31,1998. This is a change from

'

the previous date of December 31,1997.

1.3 Inspections

The NRR Inspection Program Branch (P'PB) proposals for revising core inspection procedures

have been transmitted to the appropriate NRR technical branches having responsibility for

specific core inspection procedures. Due to the large number of branches involved, completing

all individual branch concurrences is anticipated to take an additional two months. The revised

completion date for th!s task is February 1998, a chan9e from the previous date of October

1997.

1.6 Evaluate Use of PRA in Resolution of Generic issues

As part of the IPE follow-up program, the staff is in the process of identifying generic issues to

be audited. These issues are those which have been explicitly identified and addressed by the

licensee as part of the IPE process.

A report that identifies the above generic issues and staff views on the adequacy of the

proposed resolution k. In preparation. The report will provide the basis for the selection of

generic safety issues to be audited. The staff has moved the completion date for this milestone

to March 1998, in order to utilize the report in the audit process.

In addition to the above issues, RCP seal LOCA had been identified as a dominant contributor

to core damage in many PWR IPEs. The staff has a separate ongoing activity in RES to

address this issue under Generic issue 23, and will utilize IPti insights in the proposed

resolution.

- _ _ _ . _ _- .-

_

__

..

'

.

.

"

The Commissioners

6

1.7 Regulatory Effectiveness Evaluation

in a Staff Requirements Memorandum dated May 28,1997 (Attachment 2), the Commission

requested that the staff provide the scope and schedule of activities relatad to using IPE results

to assess regulatory effectiveness in resolving major safety issues. With respect to scope, the

staff identified three major safety issues for assessment. The selection had been based on

both the potential risk significance of the issue, and the fact that probabilistic techniques were

used extensively in the resolution process. These issues include:

1, Resolution of USl A-44 Station Blackout at Nuclear Power Plants

2. Resolution of USl A-45 Decay Heat Removal Reliability

3. Resolution of USl A 09 Anticipated Transient Without Scram

To evaluate the three major issues, the staff will utilizJ both representative plants, and

information contained in NUREG 1560, to audit and draw conclusions regarding regulatory

effectiveness. Information generated under Task 1.6, as deteribed above, and Task 1.10, as

described below, will also be integrated into the assessment process. These tasks may expar!d

the staff's consideration of other cafety issues and effectiveness of the regulatory process. The

staff will inform the Commission of any additional safety issues that come under consideration.

The staff plans to complete Task 1.7 by the end of December 1998, and will recommend at that

time any additional staff action.

1.8 Advanced Reactor Reviews

Doe to personnel being assigned to higher priority activities, such as risk-informed pilot

initiatives and IPE followup activities, the staff is reassessing their position regarding the

development of an SRP, especially since there are no new advanced design certification

submittals anticipated. We will provide the results of this reassessment in a future update of

the PRA implementation Plan.

1.10 Evaluation of IPE Insights

The staff has developed an IPE followup plan (Attachment 3) which describes those actions to

be taken to ensure that plant improvements warranted by 'he IPE results are, in fact, made.

This plan consists of a number of items and its implementation involves NRR, RES, and the

Regions, as described in the plan.

Section 2: Reactor Safety Research (RES)

2,1 Develop Regulatory Guides

As discussed above, the general regulatory guide and Standard Review Plan for use of PRA in

risk informed decision making for plant specific current licensing basis charges will be

transmitted to the Commission in the near future. To permit efficient incorporation of the

resolution of policy issues contained in these documents into the application-specific regulatory

guides on inservice testing, graded quality ascurance, and technical specifications, completion

_ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _

_ _ _ . _ _

.

,

,

.

'

The Commissioners,

7

of these guides has been delayed until March 31,1998, a change from their previous

completion date of December 31,1997.

2.5 IPE and IPEEE Reviews

The staff has reviewed all the 76 IPE submittals and issued staff evaluatiun reports (SERs) on

their findings to each licensee, in three of the SERs, it is indicated to the licensees that the

staff was not able to conclude that the licensee met the intent of Generic Letter 88 20 for their

plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and Browns Ferry 3.

The licensee for Crystal River 3 has indicated their intention to submit an updated analysis

(February 1998) addressing the staff's concerns. It is anticipated that the review of this new

IPE submittal will be concluded in June 1998. Discussions are still ongoing with licensees

regarding Susquehanna 182 and Browns Ferry 3.

Section 3: Analysis and Evaluation of Operating Experience and Training (AEOD)

3.6 Staff Training

Eight PRA for Regulatory Applications courses are now planned for FY 1998 and FY 1999 to

meet the needs of the technical staff. Funding for these courses was obtained by reducing the

number of SRA series from two to one per year. Modifications to the PRA Basics for

Regulatory Applications, PRA for Technical Managers, and PRA Technology and Regulatory

Perspectives courses have been made to 'alude the final draft R.G.1.174 and SRP, Chapter

19. Seven PRA for Technical Managers courses are planned for FY 1998, which will allow two -

thirds of agency technical managers to attend.

Procurement actions for acquisition of risk monitor software are in process. The EPRI Risk and

Reliability (R&R) Workstation is the current industry standard for risk monitors Current plans

are to integrate the R&R workstation into the reactor technology and PRA technology curricula

to improve student understanding of configuration management, the importance of plant

operations to the risk profile of the plants, and use of the tool to provide insights regarding the

use of risk informed applications by the industry. The workstation will also be used to

demonstrato the capabilities and limits of this and simi!ar tools as they are being used by the

industry.

4

Section 4: Nuclear Materials and Low Level Waste Safety and Safeguards Regulation (NMSS)

44

Risk Assessment of Material Una

The target schedule for the work to develop and demonstrate a risk assessment for industrial -

gauges containing cesium 137 and cobalt-60 using PRA (and other related techniques) has

been extended from July 1998 to September 1998. The extension is due to difficulties in

obtaining data from non-licensees related to actual and potential doses to the public resulting

>

from gauges which enter the scrap metal cycle.

-

. - - - - --

_ _ , _

~

_

_

_ _ _ _ _

_

,

'

,

e

1

8

The tar 9et schedule for the work to develop and demonstrate risk assessment methods for

application to medical and industrial licensee activities has been determined to be September

1998 based on scheduling of a planned Commission paper on the topic.

4.5 -

Framework for Use of PRA in'Reauintina Nuclear Materials

The target schedule for providing a p

for developing a framework has been extended from

October 1997 to January 1998 to permit interoffice coordination.

COORDINATION:

The Office of the General Counsel has reviewed this paper and has no legal objections to its

issuance.

M G (/ *

L. Jclseph Callan

Executive Dire

VOperations -

Attachments:

As stated

DISTRIBUTION:

Commissioners

OGC

OIG

OPA

OCA

!

ACRS

ACNW

CIO

CFO

EDO

REGIONS

SECY

._

_

__

.

.

ATTACHMENT 1

'

PRA IYPLEMENTATION PLAN TASK TABLE (December 1997)

1.0 REACTOR REGULATION

Cegulatory Activity

Objectives

Methods

Target

iend

Status (tNs

Schedule

Offee(s)

queder)

1.1

DEVELOP

Standard revew plans for NRC

' Evaluate available industry

NRR

STANDAHL

staff to use in rak 6nformed

guidance.

/RES

REV!EW PLANS

regulatory decison making

FOR RISK.

  • Develop a broad sco

INF ORM* D

standard rewew plan ( ,RP)

REGULAtlON

chapters and a senes of

applicaton specife standard

revew plan chapters that

correspond to industry

initiatives.

consistent with the Regulatory

Guides developed for the

industry.

  • Draft SRPs transmitted to

Commisson to issue for

puble comment

G,neral

497C'

IS T

497C

ISI

E97C

TS

497C

  • Final SRP transmitted to

Commmagin for approval

General

1/98

in final renew

IST

393

Changed (Note 1)

ISt

498

TS

398

Changed (Note 1)

la

PILOT

  • Evaluate the PRA methodology
  • Interface with Industry

NRR/RES

APPLICATIONS

ond deveksp staff positons on

groups

FOR RISK.

emerging, rak informed

INFORMED

Initiatives enciuding those

  • Evaluaten of appropnate

REGUL ATORY

essociated with

documentaton te g .10 CFR.

INITIATIVES

SRP. Reg Guides, mspecten

1. Motor operated vatves

procedures. and industry

1. 2,96C

codes) to edentify elements

2 IST requirements

entcal to acheving the entent

2a Comanche Peak

of extsting requrements.

2a 398

Changed (Note 2)

2b Paio Verde

20.TDD

' Evaluaton of industry

3 ISirequirements

proposain.

3 TBD

4 Graded quality assurance.

  • Evaluaton of industry pilot

4. 7/98

Changed (Note 3)

program implementaten.

5 Maintenance Rule

5 E95C

' As appropnate, complete

6 Techncalspecifcatons

pilot revews and tasue staff

6a Commisstun Approval

findings on regulatory

6a 597C

6b. Pilot Amendments issued

requests.

6b.198

Changed (Note 4)

7. Other appleatens to be

identifed later (apphcations

related to desel generator start

times and hydrogen control are

expected)

1 C = Tash prewousy comp 6eted

1

_.

._

- -. .

. - _ . ~ . - . -

- .

. -

. -

_ - - - - -

~ . - ~ - . - .

. - . - . - - - -

-

,

4

Cegulatory ActMty

Obrectrves

Methods

Target

lead

Status (this

Schedule

Offee(s)

quener)

_,

1.3

lNSl%',TIONS

  • Provide guidance on the use of
  • Develop IC #00 technical

697C

NRR

plant-specife and genene

guidance on the use of PRAs

enformaton from IFEs and other

in the power reactor inspecten

plant specife PRAs.

program.

  • Revse IC 25t$ Appendix C

7/g7 C

on the use of PRAs in the

power reactor inspecton

program.

  • Propose guklance options

t097

Completed

forint ton procedures

totot to 60 59 t,stuntons

and regular rnanntenance

observatens.

  • Review core inspecten

1697

Completed

procedures and propose PRA

guidance where needed

  • Complete revision to

propened core .nspecten

2/98

Changed (Note 5)

procedures

  • losue dran Graded OA

Inspecten Procedure

498

Changed (Note 6)

  • lasue final Graded QA

inspecton Procedure

7/98

C%nged (Note 6)

  • Provide PRA training for
  • Identify inspector functons

7/96C

NRR

inspen. tors

whch should utilize PRA

methods as input to

AEOD/TTO for their

development and refinement

of PRA trairung for inspectors

'

  • Develop consolidated and

comprehensive 2 3 week PRA

1697

NRR/

Completed

for regulatory ap

AEOD

tranng course. picatens

' Provide PRA training for Senior

Reactor Analysts (SRA)

  • Conduct training for

Mantenance Rule baseline

&960

NRR

inspectons

' Conduct training courses

according to SRA training

Ongoing

AEOD

programs

  • Rotatonal assignments for

SRAs to gain working

Ongoing

NRR/RES

exponence

' Continue to provide expertise in

  • Monitor the use of nsk in

Ongoing

NTIR

risk assessment to support

inspecten reports.

regionalinspection activites and

to communcate inspecten

  • Develop new methodologes

program guidance and

and communcate appropnate

examples of its implementatort

uses of nsk insights to

regional offces

  • Update inspecten

procedures as needed

  • Asset regional offces as

needed

  • Conduct Maintenance Rule

baseline inspectons

7/98

2

__

--

.-

.

.

. .

._

_

- _ _ - _ _ . _ - _ - _ _ _ _ _ - _

.

.

Cogulatory ActNi'y

Objectwos

Methods

TarDet

Lead

Status (this

Scheoute

Offce(s)

quarter)

14

OPERATOR

Monstry insf.;s from HRAs and

  • Reese the Knowiedge and

&95C

NRR

UCENSING

PRAs (including IPEs and

Atwides (K/A) Cataicos

IPEEEs) and operating

(NUREGs 1122 and 1123) to

1

e ronce to ioentify possible

encorporate operating .

e ncements for inclusaon an

exponence and nok 6nsghts

planned revisions to guidance for

operator licensing actuttes (rvtal

  • Revise the Examiner

197C

and requahfcation)

Standards (NUREG-1021), as

needed to reflect PRA

Insights

19

EVENT

' Continue to conduct quantitative

' Continue to evaluate 50 72

Ongoing

NRR

ASSESSMENT

event assessments of reactor

events using ASP models

events while at. power and dunng

low power and shutdown

conddions

  • Assess the desirab6ldy and
  • Define the current use of risk

TBD

NRR

feasibihty of conducting

analysis methods and insights

quantitafive nok assessments on

in current event assessments

non-power reactor events

  • Assess the easibility of

r

developing appropnate not;

assessment models

  • Develop recommendations

an the feasitulity and

desirabihty of conducting

quantitative risk asses!,ments.

1C

EVALUATE USE

  • Audit the adequacy of hcensee
  • Identrry genere safety issues

198

NRR/RES

Changed (Note 7)

OF PRA IN

analyses in IPEs and IPEEEs to

to be audited

RECOLUTION OF

identify plant-specifc apphcability

GENERIC ISSUES

of genene issues closed out

  • Select plants to be sudded

398

Changed (Note 7)

i

based on IPE and IPEEE

for each issue.

programs.

  • Desende and discuss

TBD

l

licensees * onetyses supporting

i

issue resolution.

  • Evaluate results to determine

TBD

regulatory response; i e., no

action, additional acids, or

regulatory accon.

1.7

REGULATORY

  • Assess the effectiveness of
  • Develop process / guidance

ongoing

NRRIRES

EFFECTNENESS

maior safety resue resolution

for assessing regulatory

EVALUATION

afforts for reducing nsk to pubic

effectiveness.

health and safety.

  • Apply method to essess

ongoing

reduction in nsk.

Note Work in this actuity will be

Integrated with broader agency

  • Evaluate resulting

12,98

Changed (Note B)

efforts in response to DSI 23

effectmeness of station

blackout and ATWS rules and

Unresolved Safety issue A-45.

  • Propose modifications to

TBD

Changed (Note 8)

resolution approaches, as

needed (SBO rule

imp' ament.h vi and RCP seal

assue).

  • Identify othe Swes for

ongoing

Changed (Note 8)

assessment 9 4;y:gnate.

)

3

,

.

.

.

.

.

.

-.

_ _ _ _ _ _ _ _ _ _ _ _ _ -

.

4

^

Regulatory Activity

Objectrves

Methods

Target

Lead

Status (this

Schedule

Offee(s)

quader)

1.8

ADVANCED

' Contnue staff reviews of PRAs

  • Continue to apph current

ongoing

NRR

REACTOR

for design certifcation

staff review process

REVIEWS

appicatens

-

  • Devehp SRP to support revww
  • Develop draft SRP to tech

TBD

NRR

Changed (Note g)

of PRAs for design certifcatic.a

staff for rev ew and

reviews of evolutonary reactors

corcurrence

(ABWR and System 80+)

TBD

  • Develop indeper. dent technical

' Reevaluate nsk-based

12/96C

NRR/ RES

analyses and critena for

aspects of the techncal bases

evaluating tndustry initiatives and

for EP (NUREG4396) using

petitons regarding sirnphfcaten

Inssghts from NUREG-1150

of Emergency Preparedness

the new source term

(EP) regulations.

Informat.m from NUREG-

1465. and available plant

design and PRA informaton

for the passive and

evolutonary reactor designs.

1.g

ACCIDENT

  • Develop generic and plant
  • Deveioo plant-specife A!M

TBD

NRR/RES

MANAGEMENT

specife nsk ins s to support

insghtsinformaton for

staff auditsof

accident

selected plants to serve as a

management

programs at

basis for assessing

selected plants

cor p6eteness of utihty A/M

program elements (e g ,

severe accident training)

1,10

EVALUATING IPE

  • Use insights from the staff

' Reyww the report *1PE

E97C

NRR/RES

INSIGHTS TO

review of IPEs to idert.N

Program Perspectives on

DETERMINF

potental safety,

Reactor Safet

technical ssues, policy, and

Performance *y and Plant

NECESSARf

to determine en

and identify the

FOLLOW UP

appropnate course of action to

initiallist of required staff and

ACTIVnIES

resolve tnese potentialissues,

industry actions (if an )

and to identify possible safety

including insghts on

_

enhancements.

  • Revww IPE results and

6/99

NRR/RES

Changed (see

interact with heensees.

Attachment 3)

  • Determine appropnate

12<99

NRR

Changed (see

approach for tracks tne

and actions.

regulatory uses of 1

PEEE

Attachment 3)

results

  • Followup on accident

SSB

NRR/

Changed (see

i

management programs and

regions

Attachment 3)

Iconsee-stated actions.

  • If sopropriate develop

1298

NRR/ RES

a

h for hnking

i

PEEE data bases.

4

.

.

.

..

.

. - -

- - - - - _

,

. _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

20 REACTOR SAFE *Y RESEARCH

Cogulatory Adivty

Objectives

Methnos

Target

Lead

Status (this

Schedule

Offee(s)

quarter)

,

11

DEVELOP

Regulatory Guides for industry to

  • Draft PRA Regulatory

RES/NRR

<

I

REGULATORY

use in rak informed regulaton

3uides transnuttedto

,

l

GUIDES

ommesson for aproval to

j

issue for pubic comment.

l

General

C

l

IST

C

t

ISI

C

GOA

C

TS

C

  • Forwl PRA Regulatory

3uides transmitted to

l

Commission for approval.,

[

Genersi

1/98

in final revww

IST

398

Changed (Note 1)

isi

498

GOA

396

Changed (Note 1)

TS

398

Changed (Note 1)

33

TECHNICAL

  • Provide techn. cal support to
  • Continue to provide ad hoc

Continuing

RES

SUPPORT

agency users of risk

technical support to agency

assesernent in the form of

PRA users

support for nak based

}

regulaten activitwo, techncal

  • Expand the database of PRA

Continuing

reviews, essue nok

nodels available for staff use,

assessments, statist. cal

expand the scope of avadabie

analyses, and aevelop

'nodels to include external event

guidance for agency uses of nok

and low power and shutdown

assessment

accidents, and refine the tools

weded to use these models, and

ontinue maintenance and user

w

for SAPHIRE and

CS computer codes

  • Support agency efforts in

'eactor safety improvements in

Continuing

'ormer Soviet Union countnes.

3.3

SUPPORT FOR

' Modify 10 CFR 52 and develop

  • Develop draft guidance and

5/98

RES

NRf1 STANDARD

. Mance on the use of updated

'une.

REACTOR PRA

". tAs beyond denen cenirmation

REVIEWS

(as desenbod in SECY 93487).

  • Solett pubic comment.

11/98

  • Finales staff guidance and

12,99

'ulo =

,

24

METHODS

  • Devoiop, demonstrate, maintain.
  • Develoo and demonstrate

9/98

RES

DEVELOPMENT

and ensure the quality of

Tiethods for including aging

AND

methods for performina,

effects in PRAs.

DEMONSTRATION

revww1ng, and ussng F4tAs

and related techniques for

  • Develop and demonstrate

9<98

,

existing reactor designs.

Tethods for including human

errors of commissen in PRAs.

  • Develop and comonstrate

TBD

netfods to incorporate

gnaational performance into

  • Develop and demonstrate

9/96

methods for flru nsk analysis.

  • Develop and demonstrate

6/99

nothods for assessing

'ehability/nsk of digital

systems

5

,.

.

. .. .

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

.

Cegulatory Actrvity

Objectives

Methods

Target

Lead

Status (this

'

Schedule

Office (s)

quarter)

15

IPE ANDIPEEE

  • To evaluate IPE/IEEE
  • Complete revews of IPE

TBD

RES

Changed (Note 10)

REV?EWS

submittats to obtain reasonable

6ubmittals.

assurance that the hcensee has

adequately anatyzed the

  • Complete reviews of IPEEE

699

piant desgn and operations to

bubmrttais

discovervulnersbees andto

document the sgnificant safety

  • Continue regionat IPE

C

insghts resulting from

yesentations

IPEstPEEEs

'lasue IPE insghts report for

10/96C

xiblic comment.

  • FinalIPE 6nsghts report

9S7

Completed

1/98

in final review

insghts report

=,

  • Initiate revew of eight

6/98

New milestone

additionalIPEEE submittals

  • Comp 6ete contractor

6,98

New milestone

avsluations on twelve IPEEE

wbmittals

  • lasue draft IPEEE insghts

699

New milestone

report for comment

  • lasue final IPEEE insghts

1299

oport

2.6

GENERIC ISSUES

' To conduct genene safety issue

  • Continue to pnortize and

Continuing

RES

PROGRAM

ma

ment activites,

eserve genenc issues

inct ing pnorit&tation, resolution,

and documentation, for issues

relating to currently

rating

reactors. for

need

reactors as appropnate, and for

development or revtsion of

associated r ulat and

standards 6n me a

17

NEl INITIATIVE TO

  • Review NElinstetive to conduct
  • Agree on ground rules for

198

RES/NRR

CONDUCT

three pilot "whole

plant"

study.

"WHOLE PLANT *

nsk intormed studes of

RISK STUDY

requirements vs nsk and cost

  • Complete study

TBD

2.8

PRA STANDARDS

  • work with industry to develop
  • Initiate actrvity.

9S7C

RES

DEVELOPMENT

national consensus standard for

PRA scope and quality

  • Finalize standard.

TBD

19

LOW POWER AND

  • Collect studes of LP&S nsk as
  • Collect and review existing

9S8

RES

SHUTDOWN

a benchmark for assessi the

.P&S nsk information (domestic

BENCHMARK

need for further staff

es

and foregn).

RISK STUDY

  • Instete additional work.

10S8

l

l

110

SAFETY OOAL

'Assesa need to revtse

  • Initete disct=sion with ACRS

2/98

RES

l

REVISION

Commissiorfs Safety Goalto

i

make core damage frequency a

  • Recommendation to

198

l

fundame ital goal and make other Dmmission

changer,,

l

6

,

_ _ _ _ _ - _ _ - _ _ - _ _ _ _ - _ _ - _ - _ - - _ - _ _ _ - - - _

.-.

.

.. .

. . .

.

.

'

,

.

3 0 ANALYSIS AND EVALUATION OF OPERATING EXPERIENCE, AND TRAINING

Regulatory

Otyctives

Methods

Target

Lead

Status (t*us

Activity

Schedule

Offee

quarter)

3.9

RISK BASED

  • Use reactor opeisting
  • Trend performance of nsk.

1198

AEOD

TRENDS AND

exponence data to assess the

important components

PATTERNS

trends and pottems in ooiapment,

ANALYSIS

systems, inrtistire " .. hurrun

  • Trend performance of nsk.

1Z98

performance, s.

ant

important systems.

.

accxlent sequence.

l

  • Trend fr

of nsk.

3,98

!

6mportant

events

  • Trend human performance

TBD

for rehatuity charactenstes

  • Evaluate the effectiveness of
  • Trend reactor operating

As Needed

AEOD

teensee actons taken to

exponence associated with

resolve nok signifcant safety

specife safety issues and

losues

assess nsk impications as a

measure of safety

performance

  • Develop trending methods and
  • Develop standard trending

C

AEOD

special databases for use in

and statistical anatysis

AEOD trending activttes and for

procedures for 6dentified areas

PRA ap

offees. pications in other NRC

for rehatulity and statistcal

apphcations.

  • Develop special software

CCF.C

and databases (e g common

Penode

cause failure)for use in

updates

trending analys,s and PRA

studies

32

ACCIDENT

  • Ide, tify and rank nsk
  • Screen and analyze LERs,

Ongoing

AEOD

SEQUENCE

sgnifcance of operatonal

AITs, llTs. and events

PRECURSOR

events

identifed from etner sources

(ASP) PROGRAM

to obtain ASP events.

  • Perform independent revew

Annual

AEOD

of each ASP analyses,

report,

Licensees and NRC staff peer

Ongoing

review of each analysis.

  • Complete quauty assurance

of Rev. 2 simphred piant

3,97C

RES

specife models

  • Complete feasitxl tudy for

low

and shut

11/96C

RES

  • Complete initial containment

performance and

C

RES

consequence models.

  • Compte development of the

Level 43 models

7/99

RES

  • Comge the Rev. 3

s

plant specirc

11K)1

RES

  • Complete extemal event

models for fire and earthquake

TBD

RES

  • Complete low

power / shutdown models

TBD

RES

  • Provide supplemental
  • Share ASP analyses and

Annual rpt

AEOD

information on plant specife

insights with other NRC

performance.

offces and Regions.

,

7

e

x

.

.

Regulatory

Objectives

Aethods

Target

Lead

Status (this

ActMtf

Schedule

Offee

guarter)

33

tNDUSTRY 8t!SK

  • Provide a rnessure of industry
  • Develop program plan whch

C

AEOD

TRENDS

nsk that es as complete as

integrates NRR, RES and

possible to oetermine whether

AEOD actMties whch use

not is increasing. decreasing, or

desgn and operating

remaining constant over time

exponence to assess the

emphed level of rtsk and how ll

es changing

  • Update plan for nsk based

Changed

ana!yss of reactor operating

(Note 11)

exponence

  • Imp 6ement program plan

6/99

elements whch willinclude

piard. specifc models and

insghts from IPEs,

component and system

relaatulity data, and other nsa.

important :;esgn and

operational data in an

integrated frame work to

scally evaluate industry

30

RISK BASED

' Estabish a comprehenstve set

  • Identify new or improved

C

AEOD

PERFORMANCE

of performance indicators and

nsk-based Pls whch use

INDICATORS

supplementary cerformance

component aN system

rneasures whch are more

rehabdity models & human and

clow*e related to nsk ar.d provide

organizational performance

bolo e. sty indcation and

evaluation methods

con 9mation of plant performance

problems.

  • Develop and test candidate

Pis/ performance measurts.

900

  • Implement nak-based Pts

with Commission approval

101

35

COMPILE

  • Compile operating exponence
  • Manage and maintain SCSS

Ongoing

AEOD

OPERATING

lnformation In database systems

and the PI data base, provice

EXPERIENCE

suitable for uantitative rehatxlity

oversjght and access to

DATA

and rak ana is appications.

NPRUS/ EPIX, obtain INPO's

Information

Id be scrutable

SSPl, compile IPE failure

to the source at the event level to

data, collect plant-specife

the exter.t practical and be

rehability and availatxiety data.

i

!

suffcient for estimatino reinatxlity

and avestatxhty parameters for

  • Develop, manage, and

Ongoing

NRC appleations

maintain agency ostabases for

rahatxutyravailatulity data

(equipment performance

initiating events, CCF, AhP,

and human performance

data).

  • Determine need to revise

698

LER rule to eliminate

unnecessary and less safety.

sgnifcant reporting

  • Determine need to revise

6/98

reporting rules and to better

capture ASP, CCF, and

human performance events.

  • Pubhsh revised LER rule.

10/9C

8

s

2

-,

-

_

____ ____ ___ _ _ _ __ _ _ _

.'

.

__

Regulatory

Obrectrves

Methods

Target

Lead

Status Ohis

Actrvey

Schedule

Offce

quarter)

t

,

i

36

STAFF TRAINING

' Present PRA cumculum as

  • Continue current cWacts to

Ongoing

AEOD

presently scheduled for FY

present courses es

1998

scheduled.

  • Maintain current reactor

technology courses that

include PMA ensghts and

apphcations

courses wa

  • Rowew cunent PRA course

matenal to ensure consistency

wth Appendix C

  • Develop and present Appendix
  • Prepare course materal

C

RES/AEOD

C training courses

based on Appendix C.

  • Present courses on

C

Appendir C

  • Determine staff requirements
  • Review JTAs performed to

C

AEOD

for traini} retuding

date.

ty t

a

  • Perform re seentatrve JTAs

C

for staff

ens (JTA Pilot

Program .

  • Evaluate staff trainino

C

requirements as identiTod in

the PRA im mentation Plan

and the Tec

I Training

Needs Survey (Phase 2) and

incorporate them into the

training requerernents analysis.

  • Analyze the results of the

JTA Pilot Program and

C

determine requirements for

additional JTAs.

  • Complete JTAs for other

staff posatons as needed.

C

  • Sohcit a review of the

proposed training

C

requirements

  • FAalize the requirements.

C

  • Reese current PRA cumculum
  • Prepare new courses to

Ongoing

AEOD

and develop new training

meet identified needs.

program to fulfill 6dentifed staff

neeos.

  • Rewse current PRA courses

Ongoing

i

to meet identifed needs.

f

  • Rewse current and New

PRA course to include Reg -

9/97C

Guide and SRP information

  • Revise current reactor

technology courses as

Ongoing ,

necessary to include

additional PRA Insigtds and

applications

  • Present revised PRA training
  • Estabirah contracts for

Ongoing

AEOD

curnculum.

presentata:.of new PRA

curnculum.

  • Present revised reactor

Ongoing

technoicgy courses.

rove courses based on

Ongoing

9

- - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - - _ _ -

.

.

4 0 NUCLEAR MATERIALS AND LOW. LEVEL WASTE SAFETY AND SAFEGUARDS REGULATION

Regulatory ActMty

Objectives

Methods

Target

Lead

Status (this

Schecale

Offee(s)

quarter)

4.1

VAllDATE RISK

  • Validate nsk anatysis
  • Hold a workshop consisting

BS4

NMSS

ANALYSIS

metxx3 ology developed to assess

of experte si PRA and HRA to

C

METHODOLOGY

the relative profile or most hkoty

examine existing work and to

DEVELOPEDTO

contnbutors to misedministration

provide recommendations for

)

I

ASSESS MOST

for the gamma stereotecte dence

further methodologea!

I

LIKELY FAILURE

(gemma knife)

development.

MODES AND

HUMAN

  • Examine the use of Monte

9/95

PERFORMANCE

Carlo simulaten and its

C

IN THE USE OF

apphcation to relative nsk

INDUSTRIAL AND

profding

MEDICAL

RADIATION

  • Examins the use of expert

SSS

DEVICES

judgement in developing error

C

rates and consequence

measures

  • Continue the development of
  • Develop functionalty based

TBD

RES/

the relative nsk methodology, with

genene event trees

NMSS

the additen of event tree

modehng of the trachvtherapy

remote after loader '

  • Extend the appicaten of the

' Develop genere nsk

TBD

RES/

metnodology and as further

approaches.

NMSS

development into additional

devees. including teletherspy

and the pulsed high dose rate

after loader

!

48

CONTINUE USE

  • Develop decisen enterna to
  • Conduct enhanced

BS4 PR

RES/NMSS

OF RISK

support reculatory decision

partcipatory rulemaking to

C

ASSESSMENT OF

making tha't incorporates both

establish radmiogeal entena

Final Rule

ALLOWABLE

determaste end nsbbesed

for decon.missoning nuclear

Pubhshed

RADIATION

engineenng judgement.

sites; techncal e"prart for

7/97 C

RELEASES AND

rulemaking includtri

DOSES

comprehenstve nskbood

ASSOCIATED

assessment of resittual

WITH LOW LEVEL

contamination.

RADIOACTIVE

WASTE AND

  • Develop uidance for

2/98

REstDUAL

I

ng the radologeal

ACTMTY.

er ena for iconse terminston..

the extent practcable to

Ongoing

develop common approaches,

assumptons, and models for

evaluating nsks and attemative

remediaton methodologies

(nsk harmontraton)

4.3

DEVELOP

  • Develop a Branch Techncal
  • Solicit pubhc comments

5/97 C.

NMSS/RES

GUIDANCE FOR

Positen on conducting a

THE REVIEW OF

Performance Assessment of a

RISK

LLW disposal facdity

  • Pubhsh final Branch

TBD,

ASSOCIATED

Techncal Positen

Dependent

WITH WASTE

REPOSITORIES

on

Resources

10

.

.

.

.

.

.

. . .

_.

. _ _ _ _ _

. _ _ _ _ _ _ _ _ _ _ - _ _ _ .

.

.

..

.

.

RegulWory ActMty

Obrectrves

Methods

Target

Lead

Status (tfus

Schedule

Offee(s)

cuarter)

44

RISK

  • Develop and demonstrate a nsk
  • Develop and demonstrate

B98

Changed (Note 12)

ASSESSMENT OF

assessment for Industnal gauges

methods for determining the

MATERIAL USES

containing cessum-137 and

nok associated with industnli

cobalt-60 using PRA and other

gauges containing cessum..J7

related techrwques

and cobalt 60

  • The assessment should allow

Changed (Note 12)

for mcdfcaton based on

changes m regulatory

  • Wcrkin0 Group with

&96

Changed (Note 13)

requrements

contractor assetance to

identify and document a

  • Use empircal data as much as

t.achnical basis for a risk.

practcatde

informed approach to the

regulaton of nuclear

  • Develop and demonstrate nsk

byproduct matenal, and to

assessment rnethods for

develop plans for a graded

appicaten to medcal and

approach to nuclear byproduct

industnel heensee actmtes

matenal regulation based on

nsk mformaton

45

FRAMEWORK

  • develop a framework for
  • Provxkt plan for developing

1/98

NMSS

Changed (Note 14)

FOR USE OF PRA

applying PRA to nuclear matenal

framework

IN REGULATING

uses, similar to the one

NUCLEAR

deve g'ed for reactor regulation

  • Complete framework

TBD

MATERIALS

(SECY-95-280), where

appropnate.

!

'

1

11

.

_ _ _ - _ _ _ _ _ - - _ _ - - - _ - _ - - _ -

- - - -

.

.

5.0 HIGH LEVEL NUCLEAR WASTE REGULATION

,

Cogulatory ActNRy

ObjectNes

Methods

Target

Lead

Status (this

Schedule

Offee(s)

cuarter)

51

REGULATION OF

  • Develop guidance for the NRC
  • Assist the staff in pre-

Ongoing

NMSS

{

HIGH-LEVEL WASTE

and CNWRA staffs in the use of

hcensing actNtes and in

PA to evaluate the safety of HLW

Icense appicaten revews

programs

  • Develop a techncal

assessment capattityin totab

system and subsystem PA for

use in hcensing and pre-

j

licensing revews.

-

  • Combine specialized

techncal drsciplines (earth

scences and engineer )

with those of s,ystem__

i

,

_

rs

to improve ...u my.

  • Idenhfy agnifcant events,
  • Perform sensitNtty studes

Ongoing

NMSS

processes, and parameters

of key techncallasues ussng

effecting total system

iterative performance

performance

assessment (IPA)

  • Assist the staff to maintain

Ongoing

NMSS

results and insignts to evaluate

and to refine the regulatory

proposed change s to regulatons

structure in HLW disposal

gove

the ootential repository

regulaticas that pertain to PA.

at Yucca

ntain.

  • Apply IPA analyses to advise

i

l

EPA in its development of a

Yucca Mountain regulaten

1

[

~
  • Apply IPA enalyses to

develop a site-specife

regulation for a Yucca

Mountain site

  • Continue PA activites dunng
  • Provide guidance to the

Ongr ng

NMSS

interactions with DOE dunng the

DOE on site charactenzation

pre-heensing phase of repository

requirements ongoing oesign

development, site

work, and hcensing issues

charactenzaton, and repository

important to the DOE's

design.

development of a complete

t

and high-quality license

,

appleation.

  • Compare results of NRC's

Iterstrve performance

assessment to DOE's VA to

identify major

differences /rssues.

3.3

APPLY PRA TO

  • Demonstrate methods for PRA
  • P opere user needs letter to

497C

RUS/NMSS

SPENT FUEL

of spent fuel storage facihtes.

RES.

STORAGE

FACILITIES

  • Conduct PRA of dry cask

9<99

storage.

3.3

CONTINUE USE OF

Use PRA methods, results, and

  • t,pdate the database on

End cf FY

NMSS

RISK ASSESSMENT

insights to evaluate regulations

transportation of raccactive

99

IN SUPPORT OF

governing the transportation of

matenals for future

RADICACTIVE

radcactive matenal.

MATERIAL

appications

TRANSPC9TATION

  • Revalidate the results of

&99

NUREG-0170 for spent fuel

shipment nsk estimates.

12

v

'

A

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

'

.

4

Notes

,

1.

The general regulatory guide and btandard Review Plan for use of PRA in plant-specific

current licensing basis changes will be transmitted to the Commission in the near future,

To permit efficient incorporation of the resolution of policy issues contained in these

documents into the application-specific regulatory guides and SRP sections, completion of

these guides and sections has been delayed until March 31,1998, a change from their

previous completion date of December 31,1997.

2.

The staffs RI IST team is currently working on a draft SE for the Comanche Peak RI-IST

program. The staff and TU Electric have been actively interacting through meetings and

discussions as the licensee develops a RI IST program description that is sufficiently

detailed and consistent with the draft Rl IST guidance provided in DG 1062. TU Electric

has indicated that it would be able to complete a daft revision to their RI IST Program

Description by the end of January 1998. The staff will continue to develop a draft SE

based on the licensee's responses to the staffs RAls and discussions with the licensee.

Assuming TU Electric finalizes its RI IST Program Description by mid February 1998, the

staff anticipates having a completed SE to the Commission on the proposed RI IST

program for Comanche Peak in March 1998.

3.

The completion date for the Graded Quality Assurance pilot application has been revised to

July 1998 to reflect the anticipated issuance date of the final GOA inspection guidance.

4.

With respect to the risk-informed TS pilot program, the staf' received a supplemental

amendment request from SONGS in early January 1998 tc put the configuration risk

management program (CRMP) description into the SONGS TS. The staff will review the

CRMP and, if acceptable, issue the risk-informed TS amendments for SONGS. Once

similar supplemental amendment requests are received frora the remaining pilot licensees,

the staff willissue those pilot plant amendments. Based on information from the CEOG,

the staff expects to receive the majority of the supplemental pilot amendment requests in

the first quarter of 1998. With receipt of the SONGS supplemental request, the staff

anticipates completing the SONGS review as the lead pilot plar:t and issue the amendment

by March 31,1998. This is a change from the previous date of December 31,1997, for

issuance of the lead pilot plant amendment, because of the decision by the originallead

plant not to oursue risk-informed TS changes at this time.

5.

The NRR Intipection Program Branch proposals for revising core inspection procedures

have been transmitted to the appropriate NRR technical branches having responsibility for

l

specific core inspection procedures. Due to the large number of branches involved,

completing all indivi :ual branch concunences is anticipated to take an additional two

months. The revised completion date for this task is February 1998.

6

A deci ion has been reached to generate the risk-informed regulatory documents in a

sequential manner, with the application specific guidance following the general regulatory

guide and standard review plan. Under this schedule, the regulatory guide for graded QA

will be finalized by the end of March 1998. Since the graded QA inspection procedure will

be dependent upon the technical content of the companion regulatory guide, the draft

graded QA Inspection Procedure will be prepared by April 1998 and finalized in July 1998

after having received appropriate NRC reviews.

13

,

a

- _ _ - _ _ _ _ _ _ _ _ .

-.

.

7.

As part of the IPE follow-up program, the staff is in the process of identifying generic issues

'

to be audited. These issues will be those which have been explic.itly identified and

addressed by the licensee as part of the IPE process.

A report that identifies the above generic issues and staff views on the adequar.,y of the

proposed resolution is under preparation. The report will provide the basis for the selection

of generic safety issues to be audited and selected plants. The staff has moved the

completion date for this milestone to March 1998, in order to utilize the report in the audit

process.

In addition to the .uove issues, RCP seal LOCA had been identified as a dominant

contributor to core damage frequency in many PWR IPEs. The staff has a separate

ongoing activity in RES to address this issue under Generic Safety issue 23, and will utilize

IPE insights in the proposed resolution.

8.

In at SRM (9700207) datsd May 28,1997, the Commission requested that the staff

proviie the scooe and Nhedule of activities related to using IPE results to assess

regulatory effectianc.s in resolving major safety issues. . lith respect to scope, the staff

identified three major safety issues for assessment. The selection had been based on both

the potential nsk significance of the issue, and the fact that probabilistic techniques were

!

used extensively in the resolution process. These issues include:

1. Resolution of USI A-44 Station Blackout at Nuclear Power Plants

2. Resolution of USI A-45 Decay Heat Removal Reliability

3. Resolution of USI A-09 Anticipated Transient Without Scram

To evaluate the three major issues, the staff will utilize both representative plants, and

information contained in NUREG-1560, to audit and draw conclusions regarding regulatory

effectiveness. Information generated under Task 1.6 and Task 1.10 will also be integrated

into the assessment process. In particular, the RCP seal LOCA and station blackout

issues are closely related; the station bisckout analysis in this activity willincorporate the

results of the RES seal LOCA analysis discussed in Note 7.

These tasks may expand the staff's consideration cf other safety issues and effectiveness

of the regulatory process. The staff willinform the Commission of any additional safety

issues that come under consideration. The staff plans to complete it analysin of the three

issues by the end of December 1998, and will recommend ai that time any additional staff

action.

9.

Due to personnel being assigned to higher priority activities, such as risk-informed pilot

initiatives and IPE followup activities, the staff is reassessing their position regarding the

development of an SRP, especially since there are no new advanced design certification

submittals anticipated.

10.

The staff has reviewed all the 76 IPE submittals and issued staff evaluation reports (SERs)

on their findings to each licensee. In three of the SERs, it is indicated to the licensees that

the staff was not able to conclude that the licensee met the intent of Generic Letter 88-20

for their plant (s). These three IPEs include Crystal River 3, Susquehanna 1&2, and

Browns Ferry 3. The licensee for Crystal River 3 nas indicated their intention to submit an

updated analysis (February ;998) addressing the staffs concerns, it is anticipated that the

14

___ - _ __- ____ _ ___ _____

.

t

review of this new IPE submittal will be concluded in June 1998. Discussions are still

ongoing wit! licensees regarding Susquehanna 1&2 and Browns Ferry 3.

.

11.

This 'ask has been subsumed into the office operating plan, which is periodically updated.

12.

The target schedule for the work to develop and demonstrate a risk assessment for

industrial gauges containing ces;um 137 and cobalt-60 using PRA (and other related

techniques) has been extended from July 1998 to September 1998. The extension is due

to difficulties in obtaining data from non-licensees related to actual and potential doses to

the public resulting from gauges which enter the scrap metal cycle.

13.

The target schedule for the work to develop and demonstrate risk assessment methods for

app!ication to medical and industrial licensee activities has been determined to be

September 1998 based on scheduling of a planned Commission paper on the topic.

14.

The target schedule for providing a plan for developing a framework has been extended

from October 1997 to December 1997 to permit interoffice coordination.

l

I

15

.

-

,

-

.

.

4

Attachment 2

Sta# Requirements Memorandum

dated May 28,1997

i

i

P

/.ES/ DST

TEL 301-415-5062

Jur. 03'97

11:15 No.007 P.03

Acticn (Morrison, Nu/

.

Collins. NRR

.

      • t

UNffED 5MES

Cygg ,Cg]]gn

g

NUCLEAR Rt0UL.AT0ftY C04mm8840N

Jon]en

-

y

  • ApesGTon.or same

Thotpson

%

AN RESvuNse, FLk:AbE

(

May 28, 1997

REFER TO g g 70507

Blahe

-

Ross, AE0D

!

MEMORANDUM 70:

L. Joseph Callan

.

Director for Operationa

Exec # iv' k(%

FROM:

Johr v. Hoyle, Secretary

~

SUBJECT:

STAFF REQUIREMENTS - ERIEFING ON IPE INSIGHT

REPORT, 2:00 P.M

WEDNESn&V, M&V 7,

1997.

COMMISSIOhT.RS' CCNFERENCE ROOM, ONE WHITE

FLINT NORTH, ROCXV:LLE, MARYLAND (OPEN To

PUBLIC ATTENDANCE)

-

.-

The countiwmivu was briefed by the NRC stef f en the Individual

Flant Examination (IPE) insight report.

The Comission asked the

st a:l'

to expedite activhium in .Le !vilu lug areas:

(U using

IPE results to prioritize inspection activities: (2) improving

regional capabilities for the use of PRA and risk insights; and

(3) providin

ted inspecttr training,

fEDO)

MES)j

iSECT suspense:

wu'p3o

9700206

The Commission asked the stait to provice tne scopte anc scr.edule

of activities relar.ed to using IPE results to assess regulatory

effectiveness in resolving r.ager safety issues.

The comissien

stacifically reqv.2ted that the staff provide an estimate cf the

average cost to respond to the Staticn Blackout. rule per persen-

rem averted 1.n achieving an average reduction in core damage

frequency of 2E-5/RY.

These activities should be coordinated

with the regulatory effettiveness organization,

fEBO-)

(NRR)

(SECY suspense:

6/27/97)

9700207

After the IPE database has been placed on the Internet, the staff

should consider allowing licensees to update their IDES

voluntarily to reflect changer i.a plant configuration.

(RES)

-

,

.

.

.

.

, , .

-

_ _ _ _ _

_ - _ _ _ _ _ _ _ _ _ _

..

.

-d

Attachment 3

lPE Follo36222matarn

The IPE program was initiated to have licensees evaluato the;r plants for vulnerabilities to

severe accidents and to take actions to correct these vulnerabilities, where appropriate. In this

process it was recognized that licensees would gain an appreciation of their plant's overall

susceptibility to severe accidents which would help in developing accident management

tirategies and programs. In this regard the IPE pregam was principally for the benefit o'

licensees. Now, however, as a result of completion of the IPE reviews (except for the three

plants where comn!stion is still under discussion) and insights report (NUREG-1560), the staff is

now in a position to utilize these results to follow up and see if:

any additional plant specific improvements are warranted,

-

licensees have followed through on the actions they indicated they were taking as a

-

result of their IPE, and

any additional generic regulatory activities should be undertaken.

-

To accomplish this the staff has developed an IPE followup program which willinvolve the

efforts of RES, NRR and the Regions. The followup program will consist of the following

sctivities:

1

1)

reviewing the iPE results for risk significant items that may warrant further attention.

Examples of the screening criteria for selection of plants and items for additional

followup are as follows:

any contributor with a aCDF' >10-5 RY or

/

-

any contributor with a 6LERF2 >104/RY

-

2)

reviewing the IPE results for similar plants and whether or not actions taken by some

l'

plants are applicable to other plants of similar design,

{

3)

reviewing licensee responses to specific containment performance improvement items

identified in the IPE generic letter supplements to see if additional actions are

warranted,

4)

reviewing the basis for very low risk contributors that appear to be out of line with other

plants (i.e., was the analysis overly optimistic and should further action be taken?),

5)

assessing licensee stated actions (e.g., safety enhancements) resulting from their IPE to

see if, in fact, they have been completed,

' Core Damage Frequency

8 Large Early Release Frequency

1

. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ .

,

9

'

2

6)

assessing licensee accident management programs to see if, in fact, they reflect the

results, assumptions and actions from the IPE. This action will be carried out through

the staff assessment of the licensee's Severe Accident Management Guidelines

(SAMG).

7)

assessing the results for their implications for the resolution of generic safety issues or

other major safety issues.

These activities are in addition to actions already underway to incorporate '.ne IPE insights into

the NRC inspection program.

Implementation of this program will consist of RES providing to NRR information related tc

activities 1 through 4 above with NRR then discussing with licensees the appropriateness of

additional actions. This will provide licensees an opportunity to provide updated information

related to these activities and ultimatcly for NRR to take regulatory action, if such action is

warranted and can be justified by the backfit rule. Activities 5 and 6 will be performed by NRR,

,

with Regional followup as necessary. Activity 7 is addressed by items 1.6 and 1.7 of the PRA

Implementation Plan.

High priority issues identified in the screening process will be pursued as they are identified.

Dates for accomplishing these activities relative to IPE followup are:

RES supply information to NRR on items 1-4

12/98

.

NRR interact with licensees on appropriateness

6/99

.

of additional actions for items 1-4

Backfit analysis and actions complete

12/99

.

Item 5, identify items for Regional followup

9/98

.

Item 6, identification of IPE insights for Se'. sre Accident

9/98

.

Management Guidelines

The specific IPEEE followup schedule will be developed following the completion of the IPEEE