ML20206F455: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:f         5
{{#Wiki_filter:f
    ,~     .,
5
  )-
,~
  p
.,
                                                            April ^30, 1999
)-
              Mr. R. P. Necci, Vice President
p
                Nuclear Oversight and Regulatory Affairs
April ^30, 1999
                                                '
Mr. R. P. Necci, Vice President
              e/o Mr. D. A. Smith, Manager - Regulatory Affairs
Nuclear Oversight and Regulatory Affairs
              Northeast Nuclear Energy Company
e/o Mr. D. A. Smith, Manager - Regulatory Affairs
              PO Box 128
'
              Waterfoid, CT 06385                                                                                     l
Northeast Nuclear Energy Company
                                                                                                                        l
PO Box 128
              SUBJECT:         NRC OPERATIONAL SAFETY TEAM INSPECTION (OSTI) REPORT NO.                               I
Waterfoid, CT 06385
                                50-336/99-04                                                                           l
SUBJECT:
                                                                                                                        1
NRC OPERATIONAL SAFETY TEAM INSPECTION (OSTI) REPORT NO.
              Dear Mr. Necci;                                                                                         j
50-336/99-04
                                                                                                                        i
1
              This letter transmits the report of the U.S. Nuclear Regulatory Commission (NRC) Operational
Dear Mr. Necci;
                                                                                                                        l
j
        , % Safety Team Inspection (OSTI), conducted from March 15-31,1999, of activities authorized by                 i
i
        \ NRC operating license DPR-65, at your Millstone Unit 2 facility. On April 7,1999, the inspection             I
This letter transmits the report of the U.S. Nuclear Regulatory Commission (NRC) Operational
            N findir)gs were discussed with you and members of the Millstone Unit 2 staff at an inspection exit
, % Safety Team Inspection (OSTI), conducted from March 15-31,1999, of activities authorized by
              meeting that was open for observation by members of the public.                                         ;
i
                                                                                                                        ;
\\ NRC operating license DPR-65, at your Millstone Unit 2 facility. On April 7,1999, the inspection
            ._The OSTl performed an independent, broad scope assessment of management controls,                       l
N findir)gs were discussed with you and members of the Millstone Unit 2 staff at an inspection exit
              administrative programs, equipment, personnel and their readiness to support restart and safe           ,
meeting that was open for observation by members of the public.
              operation of the Millstone Unit 2 facility. The OSTI focused on the areas of management                 I
;
              programs and independent oversight; operations; maintenance and surveillance; and
._The OSTl performed an independent, broad scope assessment of management controls,
              engineering and technical support. Within these areas, the inspection consisted of selective
administrative programs, equipment, personnel and their readiness to support restart and safe
              examinations of documents, direct observation of plant equipment and activities, and interviews
,
    N
operation of the Millstone Unit 2 facility. The OSTI focused on the areas of management
              with plant personnel.
programs and independent oversight; operations; maintenance and surveillance; and
              The team noted that significant progress had been made in enhancing overall station
engineering and technical support. Within these areas, the inspection consisted of selective
              performance. In particular, the team observed effective management oversight of plant
examinations of documents, direct observation of plant equipment and activities, and interviews
              activities; an intrusive and independent quality assurance organization; and an improved
N
              corrective action program. The operational evolutions observed during this inspection were all
with plant personnel.
              conducted in a safe and controlled manner. The maintenance and engineering departments
The team noted that significant progress had been made in enhancing overall station
              provided timely and effective support in resolving emergent plant issues. The OSTI did not
performance. In particular, the team observed effective management oversight of plant
              identify any issues,'in addition to those already on your restart item list, that require your
activities; an intrusive and independent quality assurance organization; and an improved
              attention prior to plant restart.
corrective action program. The operational evolutions observed during this inspection were all
              Based on the observations documented in the attached inspection report, the team has
conducted in a safe and controlled manner. The maintenance and engineering departments
                      _
provided timely and effective support in resolving emergent plant issues. The OSTI did not
                                                                                                                  j
identify any issues,'in addition to those already on your restart item list, that require your
              concluded that, pending the completion of the restart issues identified in your tracking system,       j
attention prior to plant restart.
              the plant equipment, staff, management, programs and processes are in place to support a safe
Based on the observations documented in the attached inspection report, the team has
              restart and continued operation of Millstone Unit 2.
j
                                                                                                                    'D\
_
                                                  ""
concluded that, pending the completion of the restart issues identified in your tracking system,
                990506o12e 99o43o
j
                PDR
the plant equipment, staff, management, programs and processes are in place to support a safe
                G
restart and continued operation of Millstone Unit 2.
                        ADOCK 0500o336
'D\\
                                        PDR
/(kl
                                                                                                                /(kl
""
                                                                                                                /
990506o12e 99o43o
PDR
ADOCK 0500o336
G
PDR
/


  *
*
      .
.
.
.
    .
.
-
-
      Mr. R. P. Necci                                   2
Mr. R. P. Necci
    The NRC has also determined that one violation of NRC requirements occurred. This violation
2
      is being treated as Non-Cited Violation (NCV), consistent with Appendix C of the NRC
The NRC has also determined that one violation of NRC requirements occurred. This violation
      Enforcement Policy. This NCV is described in the enclosed inspection report. If you contest the
is being treated as Non-Cited Violation (NCV), consistent with Appendix C of the NRC
      violation or severity level of the NCV, you should provide a response within 30 days of this
Enforcement Policy. This NCV is described in the enclosed inspection report. If you contest the
      inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
violation or severity level of the NCV, you should provide a response within 30 days of this
      Document Control Desk, Washington, DC 20555-0001, with copies to the Regional
inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
    Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear
Document Control Desk, Washington, DC 20555-0001, with copies to the Regional
      Regulatory Commission, Washington, DC 20555-0001.
Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
Regulatory Commission, Washington, DC 20555-0001.
      enclosures will be placed in the NRC Public Document Room (PDR).
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
                                                    Sincerely,
enclosures will be placed in the NRC Public Document Room (PDR).
                                                    ORIGINAL SIGNED BY:
Sincerely,
                                                    Wayne D. Lanning, Director
ORIGINAL SIGNED BY:
                                                    Division of Reactor Safety, Region i
Wayne D. Lanning, Director
      Docket Nos.: 50-336
Division of Reactor Safety, Region i
      License Nos: DPR-65
Docket Nos.: 50-336
      Enclosure: Inspection Report 50-336/99-04
License Nos: DPR-65
                                                                                                      I
Enclosure: Inspection Report 50-336/99-04
                                                                                                      l
I
                                                                                                      1
1
                                                                                                      4
4
                                                                                                      l
)
                                                                                                      )


7     .
7
    '
.
  ..
'
        ,
..
  -
,
            Mr. R. P. Necci                                 3
Mr. R. P. Necci
            cc w/ encl:
3
            B. D. Kenyon, President - Generation Group .
-
          ' L: J. Olivier, Senior Vice President & Chief Nuclear Officer
cc w/ encl:
            M. H. Brothers, Vice Preside'nt - Operations
B. D. Kenyon, President - Generation Group .
            F. C. Rothen, Vice President - Nuclear Work Services
' L: J. Olivier, Senior Vice President & Chief Nuclear Officer
            D. Amerine, Vice President - Engineering Services
M. H. Brothers, Vice Preside'nt - Operations
          . J. T. Carlin, Vice President - Human Services
F. C. Rothen, Vice President - Nuclear Work Services
            G. D. Hicks, Director - Nuclear Training Services (CT)
D. Amerine, Vice President - Engineering Services
            C. J. Schwarz, Director - Unit 3 Operations
. J. T. Carlin, Vice President - Human Services
            J. A. Price,- Director - Unit 2 Operations
G. D. Hicks, Director - Nuclear Training Services (CT)
            E. J. Harkness, Director - Unit 1 Operations
C. J. Schwarz, Director - Unit 3 Operations
            L. M Cuoco, Senior Nuclear Counsel
J. A. Price,- Director - Unit 2 Operations
          - J.' R. Egan, Esquire
E. J. Harkness, Director - Unit 1 Operations
            N. Burton, Esquire
L. M Cuoco, Senior Nuclear Counsel
            V. Juliano, Waterford Library
- J.' R. Egan, Esquire
          . J. Buckingham, Department of Public Utility Control
N. Burton, Esquire
            S. B. Comley, We The People
V. Juliano, Waterford Library
          ' State of Connecticut SLO Designee
. J. Buckingham, Department of Public Utility Control
            First Selectmen, Town of Waterford
S. B. Comley, We The People
            D. Katz, Citizens Awareness Network (CAN)
' State of Connecticut SLO Designee
            T. Concannon, Co-Chair for NEAC
First Selectmen, Town of Waterford
            R. Bassilakis, CAN
D. Katz, Citizens Awareness Network (CAN)
            J. M. Block, Attorney, CAN
T. Concannon, Co-Chair for NEAC
            S. P. Luxton, Citizens Regulatory Commission (CRC)
R. Bassilakis, CAN
            E. Woollacott, Co-Chairman, NEAC
J. M. Block, Attorney, CAN
                                                                        i
S. P. Luxton, Citizens Regulatory Commission (CRC)
                                                                        4
E. Woollacott, Co-Chairman, NEAC
                                                                        i
i
                                                                        l
4
                                                                        !
i
                                                                        )
l
!
)


                                                                                                                  -    ..             ---  -  ---
, , . . ,
                                                                                            . .
.
,,..,      .         .   .     ..   .             . . . . . . . . .       . . . .                     .
.
                    .
.
      ..
..
                  -
.
                                                                                                                                                              ,
. . . . . . . . .
      -
. . . .
                    Mr. R. P. Necci                                                   4
. .
                    Distribution w/ encl:
.
                    Region l Docket Room (with.go_p.y of concurrences)
-
                    Nuclear Safety Information Center (NSIC)                                                                                                )
..
                                                                                                                                                              :
---
                    PUBLIC                                                                                                                                   l
-
                    FILE CENTER, NRR (with Oriainal concurrences)                                                                                           i
---
                    Millstone inspection Directorate Secretarial File, Region i                                                                             I
.
                    NRC Resident inspector
..
                    H. Miller, Regional Administrator, RI
-
                    J. Wiggins, Deputy Regional Administrator, RI
,
                    W. Lanning, DRS
Mr. R. P. Necci
                    B. Davis, PIMB/ DISP
4
                    J. Linville, Millstone Inspection Directorate, RI
-
                    D. Screnci, PAO
Distribution w/ encl:
                    DRS File
Region l Docket Room (with.go_p.y of concurrences)
                    Distribution w/enci <VIA E-MAIL >:
)
                    R. Eaton, PM, NRR                                                                                                                       !
Nuclear Safety Information Center (NSIC)
                    T. Madden, OCA
:
                    R. Correia, NRR
PUBLIC
                    M. Tschilitz, OEDO
l
                    J. Nakoski, PM, NRR
FILE CENTER, NRR (with Oriainal concurrences)
                    W. Dean, Chief, inspection Programs Branch, NRR
i
                    E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR
Millstone inspection Directorate Secretarial File, Region i
                    P. Koltay, Chief, ICAVP Oversight, SPO, NRR
I
                    Inspection Program Branch <lPAS>
NRC Resident inspector
                    DOCDESK (Inspection Reports ONLY)
H. Miller, Regional Administrator, RI
                                                                                                                                                              i
J. Wiggins, Deputy Regional Administrator, RI
                                                                                                                                                              !
W. Lanning, DRS
                                                                                                                                                              l
B. Davis, PIMB/ DISP
                                                                                                                                                              !
J. Linville, Millstone Inspection Directorate, RI
                                                                                                                                                              i
D. Screnci, PAO
                                                                                                                                                              i
DRS File
                                                                                                                                                              c
Distribution w/enci <VIA E-MAIL >:
                                                                                                                                                              l
R. Eaton, PM, NRR
                                                                                                                                                              1
!
      DOCUMENT NAME: G:\ DIRECTOR \TRAPP\MS99-04.WPD
T. Madden, OCA
      TA receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
R. Correia, NRR
        OFFICE         Rl/DRS               O Rl/DRP                 3,l         Rl/D,Rjf ,                                                         l   l
M. Tschilitz, OEDO
        NAME           JTrapp     h$1,4 JLinville Q[/(                             WLMning
J. Nakoski, PM, NRR
                                    "                                 '
W. Dean, Chief, inspection Programs Branch, NRR
                                                                        '
E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR
        DATE           04/27/99                   04/)R99                           048//99                                                                 ,
P. Koltay, Chief, ICAVP Oversight, SPO, NRR
                                                                                        '
Inspection Program Branch <lPAS>
                                                                                                                                                              l
DOCDESK (Inspection Reports ONLY)
                                                                      OFFICIAL RECORD COPY
i
                                                                                                                                                              1
l
i
i
c
l
1
DOCUMENT NAME: G:\\ DIRECTOR \\TRAPP\\MS99-04.WPD
TA receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DRS
O
Rl/DRP
3,l
Rl/D,Rjf ,
l
l
NAME
JTrapp
h$1,4 JLinville Q[/(
WLMning
"
'
DATE
04/27/99
04/)R99
048//99
,
'
'
OFFICIAL RECORD COPY
1
}}
}}

Latest revision as of 01:30, 7 December 2024

Forwards Operational Safety Team Insp Rept 50-336/99-04 on 990315-31.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of NRC Enforcement Policy
ML20206F455
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/30/1999
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Necci R
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20206F457 List:
References
50-336-99-04, 50-336-99-4, NUDOCS 9905060128
Download: ML20206F455 (4)


See also: IR 05000336/1999004

Text

f

5

,~

.,

)-

p

April ^30, 1999

Mr. R. P. Necci, Vice President

Nuclear Oversight and Regulatory Affairs

e/o Mr. D. A. Smith, Manager - Regulatory Affairs

'

Northeast Nuclear Energy Company

PO Box 128

Waterfoid, CT 06385

SUBJECT:

NRC OPERATIONAL SAFETY TEAM INSPECTION (OSTI) REPORT NO.

50-336/99-04

1

Dear Mr. Necci;

j

i

This letter transmits the report of the U.S. Nuclear Regulatory Commission (NRC) Operational

, % Safety Team Inspection (OSTI), conducted from March 15-31,1999, of activities authorized by

i

\\ NRC operating license DPR-65, at your Millstone Unit 2 facility. On April 7,1999, the inspection

N findir)gs were discussed with you and members of the Millstone Unit 2 staff at an inspection exit

meeting that was open for observation by members of the public.

._The OSTl performed an independent, broad scope assessment of management controls,

administrative programs, equipment, personnel and their readiness to support restart and safe

,

operation of the Millstone Unit 2 facility. The OSTI focused on the areas of management

programs and independent oversight; operations; maintenance and surveillance; and

engineering and technical support. Within these areas, the inspection consisted of selective

examinations of documents, direct observation of plant equipment and activities, and interviews

N

with plant personnel.

The team noted that significant progress had been made in enhancing overall station

performance. In particular, the team observed effective management oversight of plant

activities; an intrusive and independent quality assurance organization; and an improved

corrective action program. The operational evolutions observed during this inspection were all

conducted in a safe and controlled manner. The maintenance and engineering departments

provided timely and effective support in resolving emergent plant issues. The OSTI did not

identify any issues,'in addition to those already on your restart item list, that require your

attention prior to plant restart.

Based on the observations documented in the attached inspection report, the team has

j

_

concluded that, pending the completion of the restart issues identified in your tracking system,

j

the plant equipment, staff, management, programs and processes are in place to support a safe

restart and continued operation of Millstone Unit 2.

'D\\

/(kl

""

990506o12e 99o43o

PDR

ADOCK 0500o336

G

PDR

/

.

.

.

-

Mr. R. P. Necci

2

The NRC has also determined that one violation of NRC requirements occurred. This violation

is being treated as Non-Cited Violation (NCV), consistent with Appendix C of the NRC

Enforcement Policy. This NCV is described in the enclosed inspection report. If you contest the

violation or severity level of the NCV, you should provide a response within 30 days of this

inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001, with copies to the Regional

Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear

Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

ORIGINAL SIGNED BY:

Wayne D. Lanning, Director

Division of Reactor Safety, Region i

Docket Nos.: 50-336

License Nos: DPR-65

Enclosure: Inspection Report 50-336/99-04

I

1

4

)

7

.

'

..

,

Mr. R. P. Necci

3

-

cc w/ encl:

B. D. Kenyon, President - Generation Group .

' L: J. Olivier, Senior Vice President & Chief Nuclear Officer

M. H. Brothers, Vice Preside'nt - Operations

F. C. Rothen, Vice President - Nuclear Work Services

D. Amerine, Vice President - Engineering Services

. J. T. Carlin, Vice President - Human Services

G. D. Hicks, Director - Nuclear Training Services (CT)

C. J. Schwarz, Director - Unit 3 Operations

J. A. Price,- Director - Unit 2 Operations

E. J. Harkness, Director - Unit 1 Operations

L. M Cuoco, Senior Nuclear Counsel

- J.' R. Egan, Esquire

N. Burton, Esquire

V. Juliano, Waterford Library

. J. Buckingham, Department of Public Utility Control

S. B. Comley, We The People

' State of Connecticut SLO Designee

First Selectmen, Town of Waterford

D. Katz, Citizens Awareness Network (CAN)

T. Concannon, Co-Chair for NEAC

R. Bassilakis, CAN

J. M. Block, Attorney, CAN

S. P. Luxton, Citizens Regulatory Commission (CRC)

E. Woollacott, Co-Chairman, NEAC

i

4

i

l

!

)

, , . . ,

.

.

.

..

.

. . . . . . . . .

. . . .

. .

.

-

..

---

-

---

.

..

-

,

Mr. R. P. Necci

4

-

Distribution w/ encl:

Region l Docket Room (with.go_p.y of concurrences)

)

Nuclear Safety Information Center (NSIC)

PUBLIC

l

FILE CENTER, NRR (with Oriainal concurrences)

i

Millstone inspection Directorate Secretarial File, Region i

I

NRC Resident inspector

H. Miller, Regional Administrator, RI

J. Wiggins, Deputy Regional Administrator, RI

W. Lanning, DRS

B. Davis, PIMB/ DISP

J. Linville, Millstone Inspection Directorate, RI

D. Screnci, PAO

DRS File

Distribution w/enci <VIA E-MAIL >:

R. Eaton, PM, NRR

!

T. Madden, OCA

R. Correia, NRR

M. Tschilitz, OEDO

J. Nakoski, PM, NRR

W. Dean, Chief, inspection Programs Branch, NRR

E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR

P. Koltay, Chief, ICAVP Oversight, SPO, NRR

Inspection Program Branch <lPAS>

DOCDESK (Inspection Reports ONLY)

i

l

i

i

c

l

1

DOCUMENT NAME: G:\\ DIRECTOR \\TRAPP\\MS99-04.WPD

TA receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRS

O

Rl/DRP

3,l

Rl/D,Rjf ,

l

l

NAME

JTrapp

h$1,4 JLinville Q[/(

WLMning

"

'

DATE

04/27/99

04/)R99

048//99

,

'

'

OFFICIAL RECORD COPY

1