ML20210B935: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.- | {{#Wiki_filter:.- | ||
DUKE POWER COMPANY | .- =_. | ||
DUKE POWER COMPANY CATAWB A NUCLEAR STATION | |||
( | |||
po sox ass CLOVER S C. 2ntic tstsp oric | |||
<eosi sat-atea l | |||
. August 27, 1986 eV '..,,~ 7 : - | |||
if. | |||
t | ,w e | ||
t/ | .t | ||
U. S. NRC - Region II | ~ | ||
t | |||
101 Marietta Street. N.W. | ,!Qh; M 'i ( | ||
Atlanta, GA 30323 | t/ | ||
CUME wq . . | l Mr. John Munro Operator Licensing Section | ||
~ | |||
'i I | |||
U. S. NRC - Region II | |||
<c "p | |||
'l 101 Marietta Street. N.W. | |||
[ | |||
Atlanta, GA 30323 t | |||
CUME wq.. | |||
==SUBJECT:== | ==SUBJECT:== | ||
Catawba Nuclear Station | Catawba Nuclear Station tiegsf.;5'O. | ||
Operator Licensing Program | / | ||
Operator Licensing Program T | |||
T. S. Ramseur File No.: | ,1 4 | ||
time of R0 licensing. | K. W. Beaver l | ||
T. S. Ramseur 4 | |||
l | File No.: | ||
1 | CN-9/.0.00 Attached are detailed descriptions of K. W. Beaver and T. S. Ramseur, summarizing I | ||
their job duties and participation in training programs from July,1983 to the time of R0 licensing. | |||
PCM/atm | ( | ||
l Please contact Pam McAnuity with any questions. | |||
1 f | |||
D. Tower i | ''lk l | ||
G. G. Barrett | t l | ||
J. W. Hampton, Manager Catawba Nucicar Station I | |||
PCM/atm Attachments i | |||
cc: | |||
H. B. Barron D. Tower i | |||
.J. Knuti P. C. McAnuity i | |||
G. G. Barrett l | |||
W.11. Barron T. Rogers, NRC l | |||
i 8609180203 860912 PDR ADOCK 03000413 p | |||
PDR 1 | |||
t l | t l | ||
....-.,,__.__.-___.._..J | |||
b | b | ||
K. W. Beaver Docket # 55-20254 License # OP-20176-1 License Date: | ( | ||
* Control Reom 07/11/83 - 08/05/83 | K. W. Beaver Docket # 55-20254 License # OP-20176-1 License Date: | ||
* Control Room 09/05/83 - 09/23/83 | 5/31/86 Initial License Date: 5/31/84 DATE WORK ASSIGN'4ENT TRAINING HOURS 07/01/83 - 07/10/83 | ||
* Control ~ Room 10/17/83 - 11/15/83 | * Control Reom 07/11/83 - 08/05/83 Cold License Preparatory 160 (Classroom) 08/06/83 - 09/04/83 | ||
* Cold License Preparatory | * Control Room 09/05/83 - 09/23/83 Cold License Preparatory 82 (Simulator) 09/24/83 - 10/'6/83 | ||
* Control ~ Room 1 | |||
11/16/83 - 01/01/84 | 10/17/83 - 11/15/83 | ||
* Cold License Preparatory 174 (Classroom) | |||
{ | |||
11/16/83 - 01/01/84 | |||
* Control Room 01/02/84 - 03/20/84 Cold License Preparatory 446 (Classroom & SI:nulator) | |||
* Control Room 03/21/84 - 05/31/84 Schedule does not reflect days off, holidays, or vacation time. | |||
* Control Room Duties : | * Control Room Duties : | ||
: 1) Performed applicable step 3 in Operating Precedures, Periodic Test Procedures, Pre-critical Test Procedures, and other precedures as required from the Control Room. | : 1) Performed applicable step 3 in Operating Precedures, Periodic Test Procedures, Pre-critical Test Procedures, and other precedures as required from the Control Room. | ||
| Line 70: | Line 87: | ||
: 3) Maintained Control Roon Logbooks, Diesel Generator Logbooks, ar.d other logo as required. | : 3) Maintained Control Roon Logbooks, Diesel Generator Logbooks, ar.d other logo as required. | ||
: 4) Coardinated with all other plant groups any activitJes effecting Control Hoom indications. | : 4) Coardinated with all other plant groups any activitJes effecting Control Hoom indications. | ||
: 5) Operated all plant systens as uccessary fro.n control Rcom. | : 5) Operated all plant systens as uccessary fro.n control Rcom. | ||
( | |||
~- | |||
t | t | ||
. s T. i. Pamseur Docket # 55-20452 Liccise# 05-2023S License Date: | |||
Docket # 55-20452 Liccise# 05-2023S License Date: 10/2-/34 DATE | 10/2-/34 DATE 10t)ng AfSIG? DIE?iT TRAU;tNG 110ERS 07/01/81 - OS/07/83 | ||
* Centrol Room 03/08/33 - 09/02/83 | * Centrol Room 03/08/33 - 09/02/83 Cold License Prsparatory 160 (Classroom) 09/03/S3 | ||
,09/15,/g3 | |||
* C.)ntrol Room | * C.)ntrol Room | ||
{ | { | ||
09/?6/83 - 10/14/83 | 09/?6/83 - 10/14/83 Cold Lir.ense Preparatory 82 (Siculator) 10/15/83 - 11/20/83 | ||
* Contr:1 Roen 06/04/84 - 69/14/84 | : Contrel Room 11/21/83 - 12/23/83 Cold License Preparatory 174 (Classroon) 12/i4/83 - C'6/03/84 | ||
* Control Room | * Contr:1 Roen 06/04/84 - 69/14/84 Cold Licenne Preparatory 534 Procedure Wall-Thru, Simulator, & Exams 09/13/84 - 10/24/84 | ||
Schecule does not reficct days off, holidays, or vacation tima. | * Control Room Schecule does not reficct days off, holidays, or vacation tima. | ||
Control Koor. Duties: | |||
: 1) ' Performed applicable steps in Operating Procccures, Pcciodic Test Proctduras, Ptc-critical Test Procedurcs, and other esocedures as required frcm the Control Room. | : 1) ' Performed applicable steps in Operating Procccures, Pcciodic Test Proctduras, Ptc-critical Test Procedurcs, and other esocedures as required frcm the Control Room. | ||
: 2) .ionitot ed systems / plant statue continuously using Control Loom indic,tions. | : 2).ionitot ed systems / plant statue continuously using Control Loom indic,tions. | ||
3) | |||
and other loc,3 as re:1uired. | M;1ptainad Control Room Logbooks, Dicael Geacratar Logbool;s, and other loc,3 as re:1uired. | ||
: 4) Coordibaten with :211 other plant i;roups any activitian ef fecting Control hoon indications. | : 4) Coordibaten with :211 other plant i;roups any activitian ef fecting Control hoon indications. | ||
: 5) Operated all 91aiit systems as necessary tron Control F.oom. | t | ||
: 5) Operated all 91aiit systems as necessary tron Control F.oom. | |||
I i | I i | ||
p. | |||
,}} | |||
Latest revision as of 16:56, 6 December 2024
| ML20210B935 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/27/1986 |
| From: | Hampton J DUKE POWER CO. |
| To: | Munro J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20210B912 | List: |
| References | |
| NUDOCS 8609180203 | |
| Download: ML20210B935 (3) | |
Text
.-
.- =_.
DUKE POWER COMPANY CATAWB A NUCLEAR STATION
(
po sox ass CLOVER S C. 2ntic tstsp oric
<eosi sat-atea l
. August 27, 1986 eV '..,,~ 7 : -
if.
,w e
.t
~
t
,!Qh; M 'i (
t/
l Mr. John Munro Operator Licensing Section
~
'i I
U. S. NRC - Region II
<c "p
'l 101 Marietta Street. N.W.
[
Atlanta, GA 30323 t
CUME wq..
SUBJECT:
Catawba Nuclear Station tiegsf.;5'O.
/
Operator Licensing Program T
,1 4
K. W. Beaver l
T. S. Ramseur 4
File No.:
CN-9/.0.00 Attached are detailed descriptions of K. W. Beaver and T. S. Ramseur, summarizing I
their job duties and participation in training programs from July,1983 to the time of R0 licensing.
(
l Please contact Pam McAnuity with any questions.
1 f
lk l
t l
J. W. Hampton, Manager Catawba Nucicar Station I
PCM/atm Attachments i
cc:
H. B. Barron D. Tower i
.J. Knuti P. C. McAnuity i
G. G. Barrett l
W.11. Barron T. Rogers, NRC l
i 8609180203 860912 PDR ADOCK 03000413 p
PDR 1
t l
....-.,,__.__.-___.._..J
b
(
K. W. Beaver Docket # 55-20254 License # OP-20176-1 License Date:
5/31/86 Initial License Date: 5/31/84 DATE WORK ASSIGN'4ENT TRAINING HOURS 07/01/83 - 07/10/83
- Control Reom 07/11/83 - 08/05/83 Cold License Preparatory 160 (Classroom) 08/06/83 - 09/04/83
- Control Room 09/05/83 - 09/23/83 Cold License Preparatory 82 (Simulator) 09/24/83 - 10/'6/83
- Control ~ Room 1
10/17/83 - 11/15/83
- Cold License Preparatory 174 (Classroom)
{
11/16/83 - 01/01/84
- Control Room 01/02/84 - 03/20/84 Cold License Preparatory 446 (Classroom & SI:nulator)
- Control Room 03/21/84 - 05/31/84 Schedule does not reflect days off, holidays, or vacation time.
- Control Room Duties :
- 1) Performed applicable step 3 in Operating Precedures, Periodic Test Procedures, Pre-critical Test Procedures, and other precedures as required from the Control Room.
- 2) Monitored systems / plant status continuously using Control Room indications.
4
- 3) Maintained Control Roon Logbooks, Diesel Generator Logbooks, ar.d other logo as required.
- 4) Coardinated with all other plant groups any activitJes effecting Control Hoom indications.
- 5) Operated all plant systens as uccessary fro.n control Rcom.
(
~-
t
. s T. i. Pamseur Docket # 55-20452 Liccise# 05-2023S License Date:
10/2-/34 DATE 10t)ng AfSIG? DIE?iT TRAU;tNG 110ERS 07/01/81 - OS/07/83
- Centrol Room 03/08/33 - 09/02/83 Cold License Prsparatory 160 (Classroom) 09/03/S3
,09/15,/g3
- C.)ntrol Room
{
09/?6/83 - 10/14/83 Cold Lir.ense Preparatory 82 (Siculator) 10/15/83 - 11/20/83
- Contrel Room 11/21/83 - 12/23/83 Cold License Preparatory 174 (Classroon) 12/i4/83 - C'6/03/84
- Contr:1 Roen 06/04/84 - 69/14/84 Cold Licenne Preparatory 534 Procedure Wall-Thru, Simulator, & Exams 09/13/84 - 10/24/84
- Control Room Schecule does not reficct days off, holidays, or vacation tima.
Control Koor. Duties:
- 1) ' Performed applicable steps in Operating Procccures, Pcciodic Test Proctduras, Ptc-critical Test Procedurcs, and other esocedures as required frcm the Control Room.
- 2).ionitot ed systems / plant statue continuously using Control Loom indic,tions.
3)
M;1ptainad Control Room Logbooks, Dicael Geacratar Logbool;s, and other loc,3 as re:1uired.
- 4) Coordibaten with :211 other plant i;roups any activitian ef fecting Control hoon indications.
t
- 5) Operated all 91aiit systems as necessary tron Control F.oom.
I i
p.
,