ML20210B935
| ML20210B935 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/27/1986 |
| From: | Hampton J DUKE POWER CO. |
| To: | Munro J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20210B912 | List: |
| References | |
| NUDOCS 8609180203 | |
| Download: ML20210B935 (3) | |
Text
.-
.- =_.
DUKE POWER COMPANY CATAWB A NUCLEAR STATION
(
po sox ass CLOVER S C. 2ntic tstsp oric
<eosi sat-atea l
. August 27, 1986 eV '..,,~ 7 : -
if.
,w e
.t
~
t
,!Qh; M 'i (
t/
l Mr. John Munro Operator Licensing Section
~
'i I
U. S. NRC - Region II
<c "p
'l 101 Marietta Street. N.W.
[
Atlanta, GA 30323 t
CUME wq..
SUBJECT:
Catawba Nuclear Station tiegsf.;5'O.
/
Operator Licensing Program T
,1 4
K. W. Beaver l
T. S. Ramseur 4
File No.:
CN-9/.0.00 Attached are detailed descriptions of K. W. Beaver and T. S. Ramseur, summarizing I
their job duties and participation in training programs from July,1983 to the time of R0 licensing.
(
l Please contact Pam McAnuity with any questions.
1 f
lk l
t l
J. W. Hampton, Manager Catawba Nucicar Station I
PCM/atm Attachments i
cc:
H. B. Barron D. Tower i
.J. Knuti P. C. McAnuity i
G. G. Barrett l
W.11. Barron T. Rogers, NRC l
i 8609180203 860912 PDR ADOCK 03000413 p
PDR 1
t l
....-.,,__.__.-___.._..J
b
(
K. W. Beaver Docket # 55-20254 License # OP-20176-1 License Date:
5/31/86 Initial License Date: 5/31/84 DATE WORK ASSIGN'4ENT TRAINING HOURS 07/01/83 - 07/10/83
- Control Reom 07/11/83 - 08/05/83 Cold License Preparatory 160 (Classroom) 08/06/83 - 09/04/83
- Control Room 09/05/83 - 09/23/83 Cold License Preparatory 82 (Simulator) 09/24/83 - 10/'6/83
- Control ~ Room 1
10/17/83 - 11/15/83
- Cold License Preparatory 174 (Classroom)
{
11/16/83 - 01/01/84
- Control Room 01/02/84 - 03/20/84 Cold License Preparatory 446 (Classroom & SI:nulator)
- Control Room 03/21/84 - 05/31/84 Schedule does not reflect days off, holidays, or vacation time.
- Control Room Duties :
- 1) Performed applicable step 3 in Operating Precedures, Periodic Test Procedures, Pre-critical Test Procedures, and other precedures as required from the Control Room.
- 2) Monitored systems / plant status continuously using Control Room indications.
4
- 3) Maintained Control Roon Logbooks, Diesel Generator Logbooks, ar.d other logo as required.
- 4) Coardinated with all other plant groups any activitJes effecting Control Hoom indications.
- 5) Operated all plant systens as uccessary fro.n control Rcom.
(
~-
t
. s T. i. Pamseur Docket # 55-20452 Liccise# 05-2023S License Date:
10/2-/34 DATE 10t)ng AfSIG? DIE?iT TRAU;tNG 110ERS 07/01/81 - OS/07/83
- Centrol Room 03/08/33 - 09/02/83 Cold License Prsparatory 160 (Classroom) 09/03/S3
,09/15,/g3
- C.)ntrol Room
{
09/?6/83 - 10/14/83 Cold Lir.ense Preparatory 82 (Siculator) 10/15/83 - 11/20/83
- Contrel Room 11/21/83 - 12/23/83 Cold License Preparatory 174 (Classroon) 12/i4/83 - C'6/03/84
- Contr:1 Roen 06/04/84 - 69/14/84 Cold Licenne Preparatory 534 Procedure Wall-Thru, Simulator, & Exams 09/13/84 - 10/24/84
- Control Room Schecule does not reficct days off, holidays, or vacation tima.
Control Koor. Duties:
- 1) ' Performed applicable steps in Operating Procccures, Pcciodic Test Proctduras, Ptc-critical Test Procedurcs, and other esocedures as required frcm the Control Room.
- 2).ionitot ed systems / plant statue continuously using Control Loom indic,tions.
3)
M;1ptainad Control Room Logbooks, Dicael Geacratar Logbool;s, and other loc,3 as re:1uired.
- 4) Coordibaten with :211 other plant i;roups any activitian ef fecting Control hoon indications.
t
- 5) Operated all 91aiit systems as necessary tron Control F.oom.
I i
p.
,