ML20216G674: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 22: | Line 22: | ||
l k | l k | ||
l_ | l_ | ||
l | l | ||
e | |||
i | i | ||
March 11,1998 | |||
EA No. 98-141 | |||
Mr. D. M. Smith, President | |||
PECO Nuclear | |||
Nuclear Group Headquarters | |||
Correspondence Control Desk | |||
P. O. Box 195 | |||
Wayne, PA 19087-0195 | |||
SUBJECT: | |||
NRC INSPECTION REPORT 50-353/97-09 | |||
Dear Mr. Smith: | |||
This letter refers to the inspection conducted on October 10,1997, through January 16, | |||
1998, at your Limerick Unit 2 reactor facility. The inspectors responded to the fire in the | |||
D21 Emergency Diesel Generator (EDG) to evaluate your response to the event, root cause | |||
analysis, repair activities, and retest. The inspectors reviewed the extensive root cause | |||
determination completed by PECO on October 24,1997. The inspectors interviewed PECO . | |||
staff, attended meetings at Limerick Generating Station and Valley Forge Labs, reviewed | |||
maintenance practices, and applicable documents. The enclosed report presents the results | |||
of this inspection. | |||
Based on the results of this inspection, the NRC has determined that an apparent corrective | |||
action violation occurred. In inspection report 98-02, other corrective action issues will be | |||
identified. We will notify you of our proposed action for this apparent violation at a later | |||
date. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, | |||
its enclosures,~and your response will be placed in the NRC Public Document Room (PDR). | |||
If you have any questions, please call me at (610) 337-5376. | |||
Sincerely, | |||
' | |||
ORIGINAL SIGNED BY: | |||
\\ | |||
L | I | ||
L | |||
James T. Wiggins, Director | |||
i | |||
Division of Reactor Safety | |||
Docket Nos: 50-352,50-353 | |||
License Nos: NPF-39, NPF-85 | |||
~ | |||
Enclosure: NRC Inspection Report 50-353/97-09 | |||
l | |||
9003200063 980311 | |||
'C | |||
l | l | ||
DR | |||
ADOCK 05000353 | |||
s_ | |||
PDR | |||
__ | |||
. | |||
s | |||
Mr. D. M. Smith | |||
2 | |||
cc w/uncl: | |||
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing | |||
W. MacFarland, Vice President - Limerick Generating Station | |||
l | J. L. Kantner, Manager, Experience Assessment | ||
l | l | ||
Secretary, Nuclear Committee of the Board | |||
l | |||
Commonwealth of Pennsylvania | |||
l | l | ||
I | I | ||
1 | |||
l | |||
l | |||
i | |||
l | |||
1 | |||
j | |||
4 | |||
l | l | ||
, | , | ||
Mr. D. M. Smith | |||
3 | |||
l | l | ||
Distribution w/eragh: | |||
Region i Docket Room (with concurrences) | |||
H. Miller, RA/W. Axelson, DRA | |||
C. Anderson, DRP | |||
P. Bonnett, DRP | |||
A. Linde, DRP | |||
NRC Resident inspector | |||
l | |||
Nuclear Safety Information Center (NSIC) | |||
PUBLIC | |||
' | ' | ||
C. Miskey, DRS | |||
Distribution w/encts: (Via E-Mail) | |||
B. McCabe, OEDO | |||
! | ! | ||
F. Rinaldi, NRR | |||
l | |||
i | J. Stolz, PDI-2, NRR | ||
i | |||
inspection Program Branch, NRR (IPAS) | |||
R. Correia, NRR | |||
F. Talbot, NRR | |||
D. Screnci, PAO | |||
DOCDESK | |||
< | < | ||
l | l | ||
DOCUMENT NAME: A:\\ LIM 9709.lNS | |||
' | |||
Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure | |||
'E' = Copy with attachment / enclosure | |||
'N"= | |||
No copy | |||
I | |||
OFFICE | |||
Rl/DRS | |||
l | |||
Rl/DRP | |||
l | |||
Rl/DRS | |||
[C- RI/DRS | |||
l | |||
n | |||
NAME | |||
CCahill | |||
CAnderson ($ | |||
WRu!anG/j[C Jiliggins W | |||
' | |||
/ | |||
DATE | |||
O2/02/98 | |||
02/3 /98 | |||
0g////98 | |||
03/jl /98 | |||
' | ' | ||
02/ /98 | |||
OFFICIAL RECORD COPY | |||
I | I | ||
}} | }} | ||
Latest revision as of 10:13, 3 December 2024
| ML20216G674 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/11/1998 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20216G678 | List: |
| References | |
| 50-353-97-09, 50-353-97-9, EA-98-141, NUDOCS 9803200063 | |
| Download: ML20216G674 (3) | |
See also: IR 05000353/1997009
Text
i
l
l k
l_
l
e
i
March 11,1998
Mr. D. M. Smith, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INSPECTION REPORT 50-353/97-09
Dear Mr. Smith:
This letter refers to the inspection conducted on October 10,1997, through January 16,
1998, at your Limerick Unit 2 reactor facility. The inspectors responded to the fire in the
D21 Emergency Diesel Generator (EDG) to evaluate your response to the event, root cause
analysis, repair activities, and retest. The inspectors reviewed the extensive root cause
determination completed by PECO on October 24,1997. The inspectors interviewed PECO .
staff, attended meetings at Limerick Generating Station and Valley Forge Labs, reviewed
maintenance practices, and applicable documents. The enclosed report presents the results
of this inspection.
Based on the results of this inspection, the NRC has determined that an apparent corrective
action violation occurred. In inspection report 98-02, other corrective action issues will be
identified. We will notify you of our proposed action for this apparent violation at a later
date.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures,~and your response will be placed in the NRC Public Document Room (PDR).
If you have any questions, please call me at (610) 337-5376.
Sincerely,
'
ORIGINAL SIGNED BY:
\\
I
L
James T. Wiggins, Director
i
Division of Reactor Safety
Docket Nos: 50-352,50-353
~
Enclosure: NRC Inspection Report 50-353/97-09
l
9003200063 980311
'C
l
DR
ADOCK 05000353
s_
__
.
s
Mr. D. M. Smith
2
cc w/uncl:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
W. MacFarland, Vice President - Limerick Generating Station
J. L. Kantner, Manager, Experience Assessment
l
Secretary, Nuclear Committee of the Board
l
Commonwealth of Pennsylvania
l
I
1
l
l
i
l
1
j
4
l
,
Mr. D. M. Smith
3
l
Distribution w/eragh:
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA
C. Anderson, DRP
P. Bonnett, DRP
A. Linde, DRP
NRC Resident inspector
l
Nuclear Safety Information Center (NSIC)
PUBLIC
'
C. Miskey, DRS
Distribution w/encts: (Via E-Mail)
B. McCabe, OEDO
!
F. Rinaldi, NRR
l
J. Stolz, PDI-2, NRR
i
inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
D. Screnci, PAO
DOCDESK
<
l
DOCUMENT NAME: A:\\ LIM 9709.lNS
'
Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E' = Copy with attachment / enclosure
'N"=
No copy
I
OFFICE
Rl/DRS
l
Rl/DRP
l
Rl/DRS
[C- RI/DRS
l
n
NAME
CCahill
CAnderson ($
WRu!anG/j[C Jiliggins W
'
/
DATE
O2/02/98
02/3 /98
0g////98
03/jl /98
'
02/ /98
OFFICIAL RECORD COPY
I