                                                  March 11,1998
March 11,1998
      EA No. 98-141
EA No. 98-141
      Mr. D. M. Smith, President
Mr. D. M. Smith, President
    PECO Nuclear
PECO Nuclear
    Nuclear Group Headquarters
Nuclear Group Headquarters
    Correspondence Control Desk
Correspondence Control Desk
    P. O. Box 195
P. O. Box 195
    Wayne, PA 19087-0195
Wayne, PA 19087-0195
    SUBJECT:       NRC INSPECTION REPORT 50-353/97-09
SUBJECT:
    Dear Mr. Smith:
NRC INSPECTION REPORT 50-353/97-09
    This letter refers to the inspection conducted on October 10,1997, through January 16,
Dear Mr. Smith:
      1998, at your Limerick Unit 2 reactor facility. The inspectors responded to the fire in the
This letter refers to the inspection conducted on October 10,1997, through January 16,
    D21 Emergency Diesel Generator (EDG) to evaluate your response to the event, root cause
1998, at your Limerick Unit 2 reactor facility. The inspectors responded to the fire in the
    analysis, repair activities, and retest. The inspectors reviewed the extensive root cause
D21 Emergency Diesel Generator (EDG) to evaluate your response to the event, root cause
    determination completed by PECO on October 24,1997. The inspectors interviewed PECO .
analysis, repair activities, and retest. The inspectors reviewed the extensive root cause
    staff, attended meetings at Limerick Generating Station and Valley Forge Labs, reviewed
determination completed by PECO on October 24,1997. The inspectors interviewed PECO .
    maintenance practices, and applicable documents. The enclosed report presents the results
staff, attended meetings at Limerick Generating Station and Valley Forge Labs, reviewed
    of this inspection.
maintenance practices, and applicable documents. The enclosed report presents the results
    Based on the results of this inspection, the NRC has determined that an apparent corrective
of this inspection.
    action violation occurred. In inspection report 98-02, other corrective action issues will be
Based on the results of this inspection, the NRC has determined that an apparent corrective
    identified. We will notify you of our proposed action for this apparent violation at a later
action violation occurred. In inspection report 98-02, other corrective action issues will be
    date.
identified. We will notify you of our proposed action for this apparent violation at a later
    In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
date.
    its enclosures,~and your response will be placed in the NRC Public Document Room (PDR).
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
    If you have any questions, please call me at (610) 337-5376.
its enclosures,~and your response will be placed in the NRC Public Document Room (PDR).
                                                  Sincerely,
If you have any questions, please call me at (610) 337-5376.
                                                                                                    '
Sincerely,
                                                  ORIGINAL SIGNED BY:
'
                                                                                                  \
ORIGINAL SIGNED BY:
                                                                                                      I
\\
L                                                 James T. Wiggins, Director                       i
I
                                                  Division of Reactor Safety
L
    Docket Nos: 50-352,50-353
James T. Wiggins, Director
    License Nos: NPF-39, NPF-85
i
                                                                                            ~
Division of Reactor Safety
    Enclosure: NRC Inspection Report 50-353/97-09
Docket Nos: 50-352,50-353
License Nos: NPF-39, NPF-85
~
Enclosure: NRC Inspection Report 50-353/97-09
l
9003200063 980311
'C
l
l
    9003200063
DR
      DR
ADOCK 05000353
                    980311                                                              'C
s_
              ADOCK 05000353                                                             s_           l
PDR
                            PDR         __
__


  .
.
  s
s
    Mr. D. M. Smith                             2
Mr. D. M. Smith
    cc w/uncl:
2
    G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
cc w/uncl:
    W. MacFarland, Vice President - Limerick Generating Station
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
    J. L. Kantner, Manager, Experience Assessment
W. MacFarland, Vice President - Limerick Generating Station
l   Secretary, Nuclear Committee of the Board
J. L. Kantner, Manager, Experience Assessment
l   Commonwealth of Pennsylvania
l
Secretary, Nuclear Committee of the Board
l
Commonwealth of Pennsylvania
l
l
I
I
                                                                                1
1
                                                                                l
l
                                                                                l
l
                                                                                l
i
                                                                                i
l
                                                                                l
1
                                                                                l
j
                                                                                1
                                                                                j


  4
4
l
l
,
,
                  Mr. D. M. Smith                                             3
Mr. D. M. Smith
l                Distribution w/eragh:
3
                  Region i Docket Room (with concurrences)
                  H. Miller, RA/W. Axelson, DRA
                  C. Anderson, DRP
                  P. Bonnett, DRP
                A. Linde, DRP
                  NRC Resident inspector
l
l
                  Nuclear Safety Information Center (NSIC)
Distribution w/eragh:
                  PUBLIC
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA
C. Anderson, DRP
P. Bonnett, DRP
A. Linde, DRP
NRC Resident inspector
l
Nuclear Safety Information Center (NSIC)
PUBLIC
'
'
                  C. Miskey, DRS
C. Miskey, DRS
                  Distribution w/encts: (Via E-Mail)
Distribution w/encts: (Via E-Mail)
                  B. McCabe, OEDO
B. McCabe, OEDO
!
!
                  F. Rinaldi, NRR                                                                                                                 l
F. Rinaldi, NRR
                J. Stolz, PDI-2, NRR
l
i                 inspection Program Branch, NRR (IPAS)
J. Stolz, PDI-2, NRR
                  R. Correia, NRR
i
                  F. Talbot, NRR
inspection Program Branch, NRR (IPAS)
                  D. Screnci, PAO
R. Correia, NRR
                  DOCDESK
F. Talbot, NRR
D. Screnci, PAO
DOCDESK
<
<
l
l
DOCUMENT NAME: A:\\ LIM 9709.lNS
'
Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E' = Copy with attachment / enclosure
'N"=
No copy
I
OFFICE
Rl/DRS
l
Rl/DRP
l
Rl/DRS
[C- RI/DRS
l
n
NAME
CCahill
CAnderson ($
WRu!anG/j[C Jiliggins W
'
/
DATE
O2/02/98
02/3 /98
0g////98
03/jl /98
'
'
    DOCUMENT NAME: A:\ LIM 9709.lNS
02/ /98
    Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure 'E' = Copy with attachment / enclosure 'N"=
OFFICIAL RECORD COPY
    No copy
I
I
    OFFICE        Rl/DRS                l      Rl/DRP            l      Rl/DRS            [C-    RI/DRS        n                          l
    NAME          CCahill                      CAnderson ($            WRu!anG/j[C                Jiliggins W
                                                                                                                    '
    DATE          O2/02/98                    02/3 /98          '
                                                                          0g////98          /
                                                                                                      03/jl /98              02/ /98
                                                              OFFICIAL RECORD COPY
                                                                                                                                                  I
}}
}}

Latest revision as of 10:13, 3 December 2024

Forwards Insp Rept 50-353/97-09 on 971010-980116.Apparent Corrective Action Violation Occurred.In Insp Rept 50-353/98-02 Other Corrective Action Issues Will Be Identified
ML20216G674
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/11/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20216G678 List:
References
50-353-97-09, 50-353-97-9, EA-98-141, NUDOCS 9803200063
Download: ML20216G674 (3)


See also: IR 05000353/1997009

Text

i

l

l k

l_

l

e

i

March 11,1998

EA No.98-141

Mr. D. M. Smith, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

SUBJECT:

NRC INSPECTION REPORT 50-353/97-09

Dear Mr. Smith:

This letter refers to the inspection conducted on October 10,1997, through January 16,

1998, at your Limerick Unit 2 reactor facility. The inspectors responded to the fire in the

D21 Emergency Diesel Generator (EDG) to evaluate your response to the event, root cause

analysis, repair activities, and retest. The inspectors reviewed the extensive root cause

determination completed by PECO on October 24,1997. The inspectors interviewed PECO .

staff, attended meetings at Limerick Generating Station and Valley Forge Labs, reviewed

maintenance practices, and applicable documents. The enclosed report presents the results

of this inspection.

Based on the results of this inspection, the NRC has determined that an apparent corrective

action violation occurred. In inspection report 98-02, other corrective action issues will be

identified. We will notify you of our proposed action for this apparent violation at a later

date.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures,~and your response will be placed in the NRC Public Document Room (PDR).

If you have any questions, please call me at (610) 337-5376.

Sincerely,

'

ORIGINAL SIGNED BY:

\\

I

L

James T. Wiggins, Director

i

Division of Reactor Safety

Docket Nos: 50-352,50-353

License Nos: NPF-39, NPF-85

~

Enclosure: NRC Inspection Report 50-353/97-09

l

9003200063 980311

'C

l

DR

ADOCK 05000353

s_

PDR

__

.

s

Mr. D. M. Smith

2

cc w/uncl:

G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing

W. MacFarland, Vice President - Limerick Generating Station

J. L. Kantner, Manager, Experience Assessment

l

Secretary, Nuclear Committee of the Board

l

Commonwealth of Pennsylvania

l

I

1

l

l

i

l

1

j

4

l

,

Mr. D. M. Smith

3

l

Distribution w/eragh:

Region i Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA

C. Anderson, DRP

P. Bonnett, DRP

A. Linde, DRP

NRC Resident inspector

l

Nuclear Safety Information Center (NSIC)

PUBLIC

'

C. Miskey, DRS

Distribution w/encts: (Via E-Mail)

B. McCabe, OEDO

!

F. Rinaldi, NRR

l

J. Stolz, PDI-2, NRR

i

inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

D. Screnci, PAO

DOCDESK

<

l

DOCUMENT NAME: A:\\ LIM 9709.lNS

'

Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure

'E' = Copy with attachment / enclosure

'N"=

No copy

I

OFFICE

Rl/DRS

l

Rl/DRP

l

Rl/DRS

[C- RI/DRS

l

n

NAME

CCahill

CAnderson ($

WRu!anG/j[C Jiliggins W

'

/

DATE

O2/02/98

02/3 /98

0g////98

03/jl /98

'

02/ /98

OFFICIAL RECORD COPY