IR 05000313/2020002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 30: Line 30:
If you contest the violations or the significance of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you contest the violations or the significance of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, John L. Digitally signed by John L. Dixon Dixon Date: 2020.08.05 13:43:33 -05'00'
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects  
John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6
 
Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000313 and 05000368 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2020002 and 05000368/2020002 Enterprise Identifier: I-2020-002-0003 Licensee: Entergy Operations, Inc.
Docket Numbers:
05000313 and 05000368  
 
License Numbers:
DPR-51 and NPF-6  
 
Report Numbers:
05000313/2020002 and 05000368/2020002  
 
Enterprise Identifier: I-2020-002-0003  
 
Licensee:
Entergy Operations, Inc.  
 
Facility:
Arkansas Nuclear One
 
Location:
Russellville, AR
 
Inspection Dates:
April 1, 2020 to June 30, 2020
 
Inspectors:
I. Anchondo, Reactor Inspector
 
R. Azua, Senior Reactor Inspector


Facility: Arkansas Nuclear One Location: Russellville, AR Inspection Dates: April 1, 2020 to June 30, 2020 Inspectors: I. Anchondo, Reactor Inspector R. Azua, Senior Reactor Inspector T. DeBey, Resident Inspector C. Henderson, Senior Resident Inspector J. O'Donnell, Senior Health Physicist T. Sullivan, Resident Inspector Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Enclosure
T. DeBey, Resident Inspector  
 
C. Henderson, Senior Resident Inspector  
 
J. O'Donnell, Senior Health Physicist  
 
T. Sullivan, Resident Inspector  
 
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 45: Line 83:


===List of Findings and Violations===
===List of Findings and Violations===
 
Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313/2020002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes.
Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone           Significance                               Cross-Cutting     Report Aspect            Section Mitigating             Green                                       None              71111.15 Systems                NCV 05000313/2020002-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes.


Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.
Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.


Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone           Significance                               Cross-Cutting     Report Aspect            Section Mitigating             Green                                       None              71152 Systems                NCV 05000368/2020002-02 Open/Closed The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.
Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2020002-02 Open/Closed None 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.


===Additional Tracking Items===
===Additional Tracking Items===
Line 73: Line 110:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection Impending Severe Weather Sample (IP Section 03.02) ==
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
: (1) Unit 1 and Unit 2 impending weather preparation for Tropical Depression Cristobal on June 8, 2020
: (1) Unit 1 and Unit 2 impending weather preparation for Tropical Depression Cristobal on June 8, 2020


==71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01) ==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=4}}
===Partial Walkdown Sample (IP Section 03.01) (4 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 2 pressurizer spray line train A on April 12, 2020
: (1) Unit 2 pressurizer spray line train A on April 12, 2020
Line 87: Line 122:
: (4) Unit 1 penetration room ventilation system train A on April 30, 2020
: (4) Unit 1 penetration room ventilation system train A on April 30, 2020


==71111.05 - Fire Protection Fire Area Walkdown and Inspection Sample (IP Section 03.01) ==
==71111.05 - Fire Protection==
{{IP sample|IP=IP 71111.05|count=6}}
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)===
 
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Unit 1 upper north electrical penetration room, hot mechanic shop, and decon room, Fire Zone 149-E, Fire Area B-1, on April 8, 2020
: (1) Unit 1 upper north electrical penetration room, hot mechanic shop, and decon room, Fire Zone 149-E, Fire Area B-1, on April 8, 2020
Line 96: Line 130:
: (4) Unit 2 emergency safeguard room A, Fire Zone 2014-LL, Fire Area B-6, on April 24, 2020
: (4) Unit 2 emergency safeguard room A, Fire Zone 2014-LL, Fire Area B-6, on April 24, 2020
: (5) Unit 2 vital switchgear room 2A4, Fire Zone 2100-Z, Fire Area SS, on May 6, 2020
: (5) Unit 2 vital switchgear room 2A4, Fire Zone 2100-Z, Fire Area SS, on May 6, 2020
: (6) Unit 2 electrical switchgear room 2B53, Fire Zone 2091-BB, Fire Area B-3, on
: (6) Unit 2 electrical switchgear room 2B53, Fire Zone 2091-BB, Fire Area B-3, on May 12, 2020


===May 12, 2020 Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) Unit 2 fire drill for a fire in the emergency diesel generator 1 room, Fire Zone 2093-P, Fire Area KK, on June 15, 2020
: (1) Unit 2 fire drill for a fire in the emergency diesel generator 1 room, Fire Zone 2093-P, Fire Area KK, on June 15, 2020  


===71111.08P - Inservice Inspection Activities (PWR)     PWR Inservice Inspection Activities Sample (IP Section 03.01) ===
===71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)===
{{IP sample|IP=IP 71111.08|count=1}}
{{IP sample|IP=IP 71111.08|count=1}}
: (1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from March 19, 2020, to June 22, 2020:
: (1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from March 19, 2020, to June 22, 2020:  
 
03.01.a - Nondestructive Examination and Welding Activities:
03.01.a - Nondestructive Examination and Welding Activities:
* Eddy Current Examination, Vessel Head Vent Line
* Eddy Current Examination, Vessel Head Vent Line
Line 109: Line 144:
* Visual Examination 2, Bolted Connection associated with Electrical Penetration 2E-66
* Visual Examination 2, Bolted Connection associated with Electrical Penetration 2E-66
* Liquid Penetrant Examination, Control Element Drive Mechanism Motor Housing Lower Weld 02-W-057
* Liquid Penetrant Examination, Control Element Drive Mechanism Motor Housing Lower Weld 02-W-057
* Liquid Penetrant Examination, Control Element Drive Mechanism Motor Housing Lower Weld 02-W-069 03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities:
* Liquid Penetrant Examination, Control Element Drive Mechanism Motor Housing Lower Weld 02-W-069  
* Visual Examination 3, Reactor Vessel Head Instrumentation Nozzle and Vent Line 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities:
 
* 2R27 Boric Acid Corrosion Control Evaluation Problem Identification and Resolution:
03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities:
* The inspector reviewed 12 condition reports associated with inservice and operating experience issues and concluded that NDE/ISI related issues and operating experience are put into the corrective action program at low levels to ensure conditions and problems are identified
* Visual Examination 3, Reactor Vessel Head Instrumentation Nozzle and Vent Line  
 
03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities:  
*  
 
{{a|2R27}}
 
==2R27 Boric Acid Corrosion Control Evaluation Problem Identification and Resolution:  
*==
The inspector reviewed 12 condition reports associated with inservice and operating experience issues and concluded that NDE/ISI related issues and operating experience are put into the corrective action program at low levels to ensure conditions and problems are identified


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
: (1) Unit 2 reactor startup from Refueling Outage 2R27 on April 20, 2020  
(1 Sample)
: (1) Unit 2 reactor startup from Refueling Outage 2R27 on April 20, 2020


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated the Unit 1 licensed operator simulator         evaluation scenario on June 10, 2020.
: (1) The inspectors observed and evaluated the Unit 1 licensed operator simulator evaluation scenario on June 10, 2020.
 
==71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) ==
{{IP sample|IP=IP 71111.12|count=3}}


==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (3 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Unit 1 and Unit 2 Alternating Current diesel generator unavailability hours near the 50.65(a)(1) threshold on April 28, 2020
: (1) Unit 1 and Unit 2 Alternating Current diesel generator unavailability hours near the 50.65(a)(1) threshold on April 28, 2020
: (2) Unit 1 emergency feedwater initiation and control system instrumentation Channel C multiple power supply failures on May 21, 2020
: (2) Unit 1 emergency feedwater initiation and control system instrumentation Channel C multiple power supply failures on May 21, 2020
: (3) Unit 2 low pressure safety injection system on June 5, 2020
: (3) Unit 2 low pressure safety injection system on June 5, 2020  


===Quality Control (IP Section 03.02) (1 Sample)===
===Quality Control (IP Section 03.02) (1 Sample)===
Line 136: Line 177:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 147: Line 187:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 157: Line 196:


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
 
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Unit 2 pressurizer spray line train A snubber pin permanent modification on April 20, 2020
: (1) Unit 2 pressurizer spray line train A snubber pin permanent modification on April 20, 2020
: (2) Unit 2 reactor coolant speed probe replacement modification on May 22, 2020
: (2) Unit 2 reactor coolant speed probe replacement modification on May 22, 2020  


===Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)===
===Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)===
: (1) Unit 1 and Unit 2 severe accident management guidelines update on April 21, 2020
: (1) Unit 1 and Unit 2 severe accident management guidelines update on April 21, 2020


==71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01) ==
==71111.19 - Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=9}}
===Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)===
 
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
: (1) Unit 1 and Unit 2 auto transformer restoration following startup transformer 3 breaker B0126 replacement on April 13, 2020
: (1) Unit 1 and Unit 2 auto transformer restoration following startup transformer 3 breaker B0126 replacement on April 13, 2020
Line 181: Line 217:
: (9) Unit 2 containment isolation and actuation signal relay failure replacement on June 11, 2020
: (9) Unit 2 containment isolation and actuation signal relay failure replacement on June 11, 2020


==71111.20 - Refueling and Other Outage Activities Refueling/Other Outage Sample (IP Section 03.01) ==
==71111.20 - Refueling and Other Outage Activities==
{{IP sample|IP=IP 71111.20|count=1}}
===Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated Unit 2 Refueling Outage 2R27 activities from March 13 to April 21, 2020.
: (1) The inspectors evaluated Unit 2 Refueling Outage 2R27 activities from March 13 to April 21, 2020.


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:  


===Surveillance Tests (other) (IP Section 03.01) (4 Samples)===
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=4}}
: (1) Unit 1 penetration room ventilation system surveillance testing on April 23, 2020
: (1) Unit 1 penetration room ventilation system surveillance testing on April 23, 2020
: (2) Unit 2 control element assembly drop time testing surveillance testing on April 24, 2020
: (2) Unit 2 control element assembly drop time testing surveillance testing on April 24, 2020
: (3) Unit 2 emergency diesel generator 2 buried fuel oil piping pressure testing on May 1, 2020
: (3) Unit 2 emergency diesel generator 2 buried fuel oil piping pressure testing on May 1, 2020
: (4) Unit 2 swing charging pump C local operation surveillance testing on May 28, 2020
: (4) Unit 2 swing charging pump C local operation surveillance testing on May 28, 2020  


===RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
===RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 1 and Unit 2 reactor coolant system leakage surveillance on June 2, 2020
: (1) Unit 1 and Unit 2 reactor coolant system leakage surveillance on June 2, 2020  


===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)===
===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 2 hot leg primary sample line containment isolation valve 2SV-5833-1 on             April 27, 2020
: (1) Unit 2 hot leg primary sample line containment isolation valve 2SV-5833-1 on April 27, 2020
 
==71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02) ==
{{IP sample|IP=IP 71114.06|count=1}}


==71114.06 - Drill Evaluation==
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
The inspectors evaluated:
The inspectors evaluated:
: (1) Unit 2 annual dynamic simulator exam with drill and exercise performance indication opportunity on June 24,
: (1) Unit 2 annual dynamic simulator exam with drill and exercise performance indication opportunity on June 24,


==RADIATION SAFETY==
==RADIATION SAFETY==
 
==71124.05 - Radiation Monitoring Instrumentation==
==71124.05 - Radiation Monitoring Instrumentation Walkdowns and Observations (IP Section 03.01) ==
===Walkdowns and Observations (IP Section 03.01) (9 Samples)===
{{IP sample|IP=IP 71124.05|count=9}}
 
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
: (1) SPING radiation monitors in Unit 1
: (1) SPING radiation monitors in Unit 1
: (2) SPING radiation monitors in Unit 2
: (2) SPING radiation monitors in Unit 2 (3)2RE8911, Area Radiation Monitor (ARM) in Health Physics (HP) Area - 386 foot elevation (4)2RE8914, ARM in Cask Washdown Area - 404 foot elevation
: (3) 2RE8911, Area Radiation Monitor (ARM) in Health Physics (HP) Area - 386 foot elevation
: (4) 2RE8914, ARM in Cask Washdown Area - 404 foot elevation
: (5) Portable friskers used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
: (5) Portable friskers used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
: (6) Survey meters ready for use in HP instrumentation room
: (6) Survey meters ready for use in HP instrumentation room
: (7) Telepole survey tools ready for use, HR-DR-348 and HR-DR-355
: (7) Telepole survey tools ready for use, HR-DR-348 and HR-DR-355
: (8) Personnel contamination monitors used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
: (8) Personnel contamination monitors used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
: (9) Small article monitors used at the exit to the Unit 1 radiologically controlled area
: (9) Small article monitors used at the exit to the Unit 1 radiologically controlled area  


===Calibration and Testing Program (IP Section 03.02) (11 Samples)===
===Calibration and Testing Program (IP Section 03.02) (11 Samples)===
Line 233: Line 266:
: (9) Gamma Scintillation Tool Monitor (SAM11), GSAM-007, 12/17/2018
: (9) Gamma Scintillation Tool Monitor (SAM11), GSAM-007, 12/17/2018
: (10) Ludlum-177 Frisker, CHP-DR-156, 10/14/2019
: (10) Ludlum-177 Frisker, CHP-DR-156, 10/14/2019
: (11) ARGOS-5AB, ARGOS-001, 07/14/2019 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)
: (11) ARGOS-5AB, ARGOS-001, 07/14/2019  
 
Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
: (1) Work Order (WO) 52804554, Unit 1 Effluent Process Radiation Monitor, RE-4642, 09/26/2019
: (1) Work Order (WO) 52804554, Unit 1 Effluent Process Radiation Monitor, RE-4642, 09/26/2019
: (2) WO 52834502, Unit 1 SPING 3 Radiation Monitor, RX-9830, 03/06/2020
: (2) WO 52834502, Unit 1 SPING 3 Radiation Monitor, RX-9830, 03/06/2020


==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Walkdowns and Observations (IP Section 03.01) ==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
{{IP sample|IP=IP 71124.06|count=4}}
===Walkdowns and Observations (IP Section 03.01) (4 Samples)===
 
The inspectors evaluated the following radioactive effluent systems during walkdowns:
The inspectors evaluated the following radioactive effluent systems during walkdowns:
: (1) Unit 1 Reactor Building Purge Exhaust System
: (1) Unit 1 Reactor Building Purge Exhaust System
: (2) Unit 1 Liquid Radioactive Waste Systems
: (2) Unit 1 Liquid Radioactive Waste Systems
: (3) Unit 1 Fuel Handling Area Exhaust System
: (3) Unit 1 Fuel Handling Area Exhaust System
: (4) Unit 1 Gaseous Radioactive Waste System
: (4) Unit 1 Gaseous Radioactive Waste System  


===Sampling and Analysis (IP Section 03.02) (4 Samples)===
===Sampling and Analysis (IP Section 03.02) (4 Samples)===
Line 251: Line 285:
: (2) March 6, 2020, Liquid Effluent Sample, Neutralizing Tank
: (2) March 6, 2020, Liquid Effluent Sample, Neutralizing Tank
: (3) April 26, 2019 - May 2, 2019, Liquid Effluent Sample, Unit 2 Turbine Building Sump
: (3) April 26, 2019 - May 2, 2019, Liquid Effluent Sample, Unit 2 Turbine Building Sump
: (4) February 8, 2018, Gaseous Effluent Sample, Charcoal and Gas, SPING 3, Unit 1
: (4) February 8, 2018, Gaseous Effluent Sample, Charcoal and Gas, SPING 3, Unit 1 Fuel Handling Area


===Fuel Handling Area Dose Calculations (IP Section 03.03) (2 Samples)===
===Dose Calculations (IP Section 03.03) (2 Samples)===
The inspectors evaluated the following dose calculations:
The inspectors evaluated the following dose calculations:
: (1) Dose Calculations Associated with Liquid Radioactive Waste Permits:
: (1) Dose Calculations Associated with Liquid Radioactive Waste Permits:
1LR2018-0030, 2LR2019-0006, 1LR2020-0012
1LR2018-0030, 2LR2019-0006, 1LR2020-0012
: (2) Dose Calculations Associated with Gaseous Radioactive Waste Permits:
: (2) Dose Calculations Associated with Gaseous Radioactive Waste Permits:
1GR2018-0005, 1GR-2019-0050, 2GR2020-0009
1GR2018-0005, 1GR-2019-0050, 2GR2020-0009  


===Abnormal Discharges (IP Section 03.04) (1 Sample)===
===Abnormal Discharges (IP Section 03.04) (1 Sample)===
Line 264: Line 298:


==71124.07 - Radiological Environmental Monitoring Program==
==71124.07 - Radiological Environmental Monitoring Program==
===Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)===
===Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated environmental monitoring equipment and observed           collection of environmental samples.
: (1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.


===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the implementation of the licensees radiological           environmental monitoring program.
: (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.


===Groundwater Protection Initiative Implementation (IP Section 03.03) (1 Sample)===
===Groundwater Protection Initiative Implementation (IP Section 03.03) (1 Sample)===
: (1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative (GPI) program to identify incomplete or discontinued program elements. There were no incomplete or discontinued program elements identified.
: (1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative (GPI) program to identify incomplete or discontinued program elements. There were no incomplete or discontinued program elements identified.


==71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation==
==71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &==
Transportation


===Radioactive Material Storage and Control (IP Section 03.01) (3 Samples)===
===Radioactive Material Storage and Control (IP Section 03.01) (3 Samples)===
Line 288: Line 322:
The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality for:
The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality for:
: (1) New and Old Radwaste Buildings
: (1) New and Old Radwaste Buildings
: (2) Spent Resin Transfer System
: (2) Spent Resin Transfer System  


===Waste Characterization and Classification (IP Section 03.03) (3 Samples)===
===Waste Characterization and Classification (IP Section 03.03) (3 Samples)===
Line 294: Line 328:
: (1) F-3 reactor coolant system filters
: (1) F-3 reactor coolant system filters
: (2) F-4 spent fuel pool filters
: (2) F-4 spent fuel pool filters
: (3) Dry active waste
: (3) Dry active waste  


===Shipment Preparation (IP Section 03.04) (1 Sample)===
===Shipment Preparation (IP Section 03.04) (1 Sample)===
Line 308: Line 342:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)  
 
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)  


===BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)===
===BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)===
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (1) Unit 1 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)
: (2) Unit 2 (April 1, 2019 - March 31, 2020)  
 
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
: (1) October 1, 2019 - December 31, 2019
: (1) October 1, 2019 - December 31, 2019


==71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02) ==
==71152 - Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=1}}
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
: (1) Unit 1 and Unit 2 obsolete equipment/parts management on June 26, 2020
: (1) Unit 1 and Unit 2 obsolete equipment/parts management on June 26, 2020  


===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
Line 333: Line 369:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone           Significance                               Cross-Cutting     Report Aspect            Section Mitigating             Green                                     None              71111.15 Systems                NCV 05000313/2020002-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50), Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes. Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.
Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
 
Green NCV 05000313/2020002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50), Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes. Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.


=====Description:=====
=====Description:=====
Line 347: Line 385:
Corrective Actions: The licensee initiated a procedure improvement form, PIF-1-20-0130, to update Procedure OP-1104.027 to implement additional monitoring when a room temperature high alarm is received and will not clear. Additionally, the licensee initiated a design change to create a reflash capability for the electrical equipment room temperature high alarm.
Corrective Actions: The licensee initiated a procedure improvement form, PIF-1-20-0130, to update Procedure OP-1104.027 to implement additional monitoring when a room temperature high alarm is received and will not clear. Additionally, the licensee initiated a design change to create a reflash capability for the electrical equipment room temperature high alarm.


Corrective Action References: Condition Report CR-ANO-1-2020-00668
Corrective Action References: Condition Report CR-ANO-1-2020-00668  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 371: Line 409:
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.


Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone           Significance                               Cross-Cutting     Report Aspect            Section Mitigating             Green                                     None              71152 Systems                NCV 05000368/2020002-02 Open/Closed The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.
Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
 
Green NCV 05000368/2020002-02 Open/Closed None 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.


=====Description:=====
=====Description:=====
Line 404: Line 444:
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.


Observation: Semiannual Trend Review                                                   71152 The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation available to help identify performance trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address the identified adverse trends. The inspectors did not review any cross-cutting themes because none existed at the site.
Observation: Semiannual Trend Review 71152 The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation available to help identify performance trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address the identified adverse trends. The inspectors did not review any cross-cutting themes because none existed at the site.


To verify that the licensee was taking corrective actions to address identified adverse trends that might indicate the existence of a more significant safety issue, the inspectors reviewed the corrective action program documentation associated with a potential adverse trend in management of obsolete equipment from the time period of December 2019 through June 2020. Selected examples of these events included:
To verify that the licensee was taking corrective actions to address identified adverse trends that might indicate the existence of a more significant safety issue, the inspectors reviewed the corrective action program documentation associated with a potential adverse trend in management of obsolete equipment from the time period of December 2019 through June 2020. Selected examples of these events included:
Line 420: Line 460:
* ANO site engineering has identified equipment obsolescence as an area that needs increased attention. An effort has been initiated to determine the safety significance of obsolescent equipment and to develop a bridging or replacement strategy. The sites goal is to have the affected Tier 1 equipment identified and prioritized by the end of July 2020.
* ANO site engineering has identified equipment obsolescence as an area that needs increased attention. An effort has been initiated to determine the safety significance of obsolescent equipment and to develop a bridging or replacement strategy. The sites goal is to have the affected Tier 1 equipment identified and prioritized by the end of July 2020.


The inspectors noted the following:
The inspectors noted the following:  
1. The licensees immediate actions have not been in effect long enough to know whether they will reduce the number of obsolete equipment issues that are happening at the site.


2. Planning for replacement of obsolete components has resulted in the determination of equivalence when it actually did not exist. This has caused the inability to complete work orders and the necessity to defer that work until suitable parts can be identified and obtained.
===1. The licensees immediate actions have not been in effect long enough to know===
whether they will reduce the number of obsolete equipment issues that are happening at the site.


3. Continued aging of the plants will result in additional items becoming obsolete and may challenge the sites ability to prevent future operability and functionality concerns.
===2. Planning for replacement of obsolete components has resulted in the determination of===
equivalence when it actually did not exist. This has caused the inability to complete work orders and the necessity to defer that work until suitable parts can be identified and obtained.


4. The sites method of dealing with obsolescence issues has been more reactive than proactive, but that is being changed with a new initiative in the engineering department. Obsolescent components exist in both safety and nonsafety systems with a potential increasing site risk to initiating events and unplanned unavailability of systems needed to mitigate design basis events. Many potential benefits can be realized from a proactive response to addressing obsolescence issues, such as it will potentially reduce site risk due to obsolescent equipment.
===3. Continued aging of the plants will result in additional items becoming obsolete and===
may challenge the sites ability to prevent future operability and functionality concerns.


5. The site has identified multiple instances of their equipment database not being updated after obsolete components were replaced with new, equivalent components (Condition Report CR-ANO-2-2019-03085). This weakness has a negative effect on work planning and parts inventory. A rollup Engineering Change (EC-84307) was performed to ensure that current equipment information is captured in the sites Asset Suite database. In the EC, 13 condition reports written in 2019 were identified with issues involving accuracy of the sites equipment database, drawings, or Asset Suite database. It is unclear if an attempt was made to identify similar issues prior to 2019, so database errors may still exist.
===4. The sites method of dealing with obsolescence issues has been more reactive than===
proactive, but that is being changed with a new initiative in the engineering department. Obsolescent components exist in both safety and nonsafety systems with a potential increasing site risk to initiating events and unplanned unavailability of systems needed to mitigate design basis events. Many potential benefits can be realized from a proactive response to addressing obsolescence issues, such as it will potentially reduce site risk due to obsolescent equipment.
 
===5. The site has identified multiple instances of their equipment database not being===
updated after obsolete components were replaced with new, equivalent components (Condition Report CR-ANO-2-2019-03085). This weakness has a negative effect on work planning and parts inventory. A rollup Engineering Change (EC-84307) was performed to ensure that current equipment information is captured in the sites Asset Suite database. In the EC, 13 condition reports written in 2019 were identified with issues involving accuracy of the sites equipment database, drawings, or Asset Suite database. It is unclear if an attempt was made to identify similar issues prior to 2019, so database errors may still exist.


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
Line 439: Line 485:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation     Description or Title                                         Revision or
Inspection
Procedure                                                                                                Date
Procedure
71111.01   Corrective Action CR-ANO-        C-2011-02952
Type
Designation
Description or Title
Revision or
Date
71111.01
Corrective Action
Documents
Documents
Procedures       OP-1203.025     Natural Emergencies                                         73
CR-ANO-
OP-2203.008     Natural Emergencies                                         53
C-2011-02952
OP-2203.054     Abnormal Grid                                               4
Procedures
71111.04   Calculations     CALC-2CCA-13-   Pipe Support CALC System Reactor Misc System                4
OP-1203.025
Natural Emergencies
OP-2203.008
Natural Emergencies
OP-2203.054
Abnormal Grid
71111.04
Calculations
CALC-2CCA-13-
H4
H4
CALC-2CCA-15-   Support Qual for 2CCA-15-H60                                6
Pipe Support CALC System Reactor Misc System
CALC-2CCA-15-
H60
H60
CALC-80-D-     Room 111 Heat Load Assessment                                1
Support Qual for 2CCA-15-H60
CALC-80-D-
1083A-01
1083A-01
CALC-84-D-1069- Room 105 Heat Load Assessment and HVAC Evaluation           2
Room 111 Heat Load Assessment
CALC-91-E-0090- ANO-1 4160V Switchgear HVAC Evaluation                       2
CALC-84-D-1069-
CALC-91-E-0090- ANO-1 North Electrical Room 149 HVAC Evaluation             4
Room 105 Heat Load Assessment and HVAC Evaluation
CALC-93-R-1040- ANO-1 AB Limiting Component Qualification Temperatures       4
CALC-91-E-0090-
CALC-E-0090-06 Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109, 7
ANO-1 4160V Switchgear HVAC Evaluation
CALC-91-E-0090-
ANO-1 North Electrical Room 149 HVAC Evaluation
CALC-93-R-1040-
ANO-1 AB Limiting Component Qualification Temperatures
CALC-E-0090-06
Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109,
110, 149 for Post-Accident Cooling and Appendix R
110, 149 for Post-Accident Cooling and Appendix R
Corrective Action CR-ANO-         1-2007-00339, 1-2020-00541, 2-2020-00629, 2-2020-00720,
Corrective Action
Documents                        2-2020-00755, 2-2020-00764, 2-2020-00823, 2-2020-01514,
Documents
CR-ANO-
1-2007-00339, 1-2020-00541, 2-2020-00629, 2-2020-00720,
2-2020-00755, 2-2020-00764, 2-2020-00823, 2-2020-01514,
2-2020-01523, 2-2020-01673
2-2020-01523, 2-2020-01673
Corrective Action CR-ANO-        1-2020-00643, 2-2020-01923, 2-2020-02197, 2-2020-02198,
Corrective Action
Documents                         2-2020-02199, 2-2020-02203
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings         2CCA-13-1       Large Pipe Isometric Reactor Coolant System                 16
CR-ANO-
2CCA-13-H4     Hanger Detail Reactor Coolant System                         8
1-2020-00643, 2-2020-01923, 2-2020-02197, 2-2020-02198,
2CCA-15-4       Large Pipe Isometric Pressurizer Spray System               11
2-2020-02199, 2-2020-02203
2CCA-15-H60     Pipe Support Detail Pressurizer Spray System                 5
Drawings
Inspection Type             Designation     Description or Title                                         Revision or
2CCA-13-1
Procedure                                                                                                Date
Large Pipe Isometric Reactor Coolant System
M-2230, Sheet 1 Piping and Instrument Diagram Reactor Coolant System         80
2CCA-13-H4
M-2230, Sheet 2 Piping and Instrument Diagram Reactor Coolant System         46
Hanger Detail Reactor Coolant System
M-2231, Sheet 1 Piping and Instrument Diagram Chemical and Volume Control   148
2CCA-15-4
Large Pipe Isometric Pressurizer Spray System
2CCA-15-H60
Pipe Support Detail Pressurizer Spray System  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
M-2230, Sheet 1
Piping and Instrument Diagram Reactor Coolant System
M-2230, Sheet 2
Piping and Instrument Diagram Reactor Coolant System
M-2231, Sheet 1
Piping and Instrument Diagram Chemical and Volume Control
System
System
Engineering       EC-13704       Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02       0
148
Changes                          (RM 1050, and CALC-80-D-1083A-01 (RM 111) to Incorporate
Engineering
Changes
EC-13704
Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02  
(RM 1050, and CALC-80-D-1083A-01 (RM 111) to Incorporate
Cable Heat Losses
Cable Heat Losses
EC-86288       Enhance Supports 2CCA-13-H4, 2CCA-13-1-H5, 2CCA-14-1-       0
EC-86288
Enhance Supports 2CCA-13-H4, 2CCA-13-1-H5, 2CCA-14-1-
H3 and 2CCA-15-H60 As a Result of CR-ANO-2-2020-0720,
H3 and 2CCA-15-H60 As a Result of CR-ANO-2-2020-0720,
CR-ANO-2-2020-1633, CR-ANO-2-2020-1655, and CR-ANO-
CR-ANO-2-2020-1633, CR-ANO-2-2020-1655, and CR-ANO-
2-2020-0755
2-2020-0755
Miscellaneous     ULD-1-SYS-23   ANO Unit 1 Penetration Room Ventilation System               5
Miscellaneous
Procedures       OP-1104.027     Battery and Switchgear Emergency Cooling System             51
ULD-1-SYS-23
OP-1104.043     Penetration Room Ventilation System                         31
ANO Unit 1 Penetration Room Ventilation System
OP-1203.012N   Annunciator K16 Corrective Action                           49
Procedures
OP-5120.417     In-Place Testing of the Unit 1 Penetration Filtration System 10
OP-1104.027
Work Orders       WO             541943, 516094, 52841004
Battery and Switchgear Emergency Cooling System
71111.05   Calculations     CALC-95-R-0024- Basic Requirements for Component Database on Station         16
OP-1104.043
Penetration Room Ventilation System
OP-1203.012N
Annunciator K16 Corrective Action
OP-5120.417
In-Place Testing of the Unit 1 Penetration Filtration System
Work Orders
WO
541943, 516094, 52841004
71111.05
Calculations
CALC-95-R-0024-
Basic Requirements for Component Database on Station
Doors and Hatches
Doors and Hatches
Corrective Action CR-ANO-         2-2016-03077, 2-2020-01542, 2-2020-01691, 2-2020-02333,
Corrective Action
Documents                        2-2020-02334, C-2020-01033
Documents
Drawings         FP-102         Fire Operating Floor Plan EL 386'-0"                         35
CR-ANO-
Miscellaneous     3167           Fire Impairment
2-2016-03077, 2-2020-01542, 2-2020-01691, 2-2020-02333,
FBDRL 2020-08   Fire Pre-drill Brief Document
2-2020-02334, C-2020-01033
FHA             Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and       19
Drawings
FP-102
Fire Operating Floor Plan EL 386'-0"
Miscellaneous
3167
Fire Impairment
FBDRL 2020-08
Fire Pre-drill Brief Document
FHA
Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and
Unit 2
Unit 2
Procedures       OP-1000.120     ANO Fire Impairment Program                                 25
Procedures
OP-1203.049     Fires in Areas Affecting Safe Shutdown                       15
OP-1000.120
OP-2203.049     Fires in Areas Affecting Safe Shutdown Technical Guidelines 18
ANO Fire Impairment Program
Work Orders       WO             481231
OP-1203.049
71111.08P Corrective Action CR-ANO-         2-2018-01069, 2-2019-00180, 2-2019-03046, 2-2019-03127,
Fires in Areas Affecting Safe Shutdown
Documents                        2-2019-03209, 2-2020-00003, 2-2020-00325, 2-2020-00996,
OP-2203.049
Fires in Areas Affecting Safe Shutdown Technical Guidelines
Work Orders
WO
481231
71111.08P
Corrective Action
Documents
CR-ANO-
2-2018-01069, 2-2019-00180, 2-2019-03046, 2-2019-03127,
2-2019-03209, 2-2020-00003, 2-2020-00325, 2-2020-00996,
2-2020-01205, 2-2020-01390, 2-2020-01427, 2-2020-01449
2-2020-01205, 2-2020-01390, 2-2020-01427, 2-2020-01449
NDE Reports                       Arkansas Nuclear One Unit 2 2R26, 10 Year Reactor Vessel     08/27/2018
NDE Reports
Inspection Type             Designation     Description or Title                                       Revision or
Arkansas Nuclear One Unit 2 2R26, 10 Year Reactor Vessel
Procedure                                                                                              Date
08/27/2018  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Examination, October 2018
Examination, October 2018
Procedures       CEP-BAC-001     Boric Acid Corrosion Control (BACC) Program Plan           2
Procedures
CEP-NDE-0400   Ultrasonic Examination                                     7
CEP-BAC-001
CEP-NDE-0477   Manual Ultrasonic Examination of Austenitic and Ferritic   5
Boric Acid Corrosion Control (BACC) Program Plan
CEP-NDE-0400
Ultrasonic Examination
CEP-NDE-0477
Manual Ultrasonic Examination of Austenitic and Ferritic
Vessels Not Greater than 2" in Thickness (ASME XI)
Vessels Not Greater than 2" in Thickness (ASME XI)
CEP-NDE-0641   Liquid Penetrant Examination (PT) for ASME Section XI     9
CEP-NDE-0641
CEP-NDE-0902   VT-2 Examination                                           9
Liquid Penetrant Examination (PT) for ASME Section XI
CEP-NDE-0903   VT-3 Examination                                           6
CEP-NDE-0902
CEP-NDE-0955   Visual Examination (VE) of Bare-Metal Surfaces             307
VT-2 Examination
CEP-WP-GWS-1 General Welding Standard ASME/ANSI                           2
CEP-NDE-0903
EN-DC-319       Boric Acid Corrosion Control Program (BACCP)               12
VT-3 Examination
SEP-CISI-ANO-   Program Section for ASME Section XI, Division 1, ANO-2     1
CEP-NDE-0955
105            Containment Inservice Inspection Program
Visual Examination (VE) of Bare-Metal Surfaces
SEP-ISI-ANO2-   Program Section for ASME Section XI, Division 1, ANO-2     6
307
105            Inservice Inspection Program
CEP-WP-GWS-1
SEP-PT-ANO-001 Arkansas Nuclear One ASME Section XI Inservice Inspection   5
General Welding Standard ASME/ANSI
EN-DC-319
Boric Acid Corrosion Control Program (BACCP)
SEP-CISI-ANO-
105
Program Section for ASME Section XI, Division 1, ANO-2
Containment Inservice Inspection Program
SEP-ISI-ANO2-
105
Program Section for ASME Section XI, Division 1, ANO-2
Inservice Inspection Program
SEP-PT-ANO-001 Arkansas Nuclear One ASME Section XI Inservice Inspection
Pressure Testing (PT) Program Section
Pressure Testing (PT) Program Section
Self-Assessments LO-ALO-2019-   Arkansas Nuclear One, Pre-NRC 2R27 ISI Activities Self-   12/03/2019
Self-Assessments LO-ALO-2019-
00083 CA 2      Assessment Report
00083 CA 2
71111.11Q Procedures         EN-RE-302       PWR Reactivity Maneuver                                   5
Arkansas Nuclear One, Pre-NRC 2R27 ISI Activities Self-
OP-2102.016     Reactor Startup                                           28
Assessment Report
71111.12   Calculations     CALC-92-D-2011- AAC Generator Building Heating and Ventilation and AC Eval 1
2/03/2019
Corrective Action CR-ANO-         1-2019-00292, 1-2020-00260, 1-2020-00445, 1-2020-00462,
71111.11Q Procedures
Documents                        1-2020-00571, 1-2020-00598, 2-1989-00092, 2-2000-00929,
EN-RE-302
PWR Reactivity Maneuver
OP-2102.016
Reactor Startup
71111.12
Calculations
CALC-92-D-2011-
AAC Generator Building Heating and Ventilation and AC Eval
Corrective Action
Documents
CR-ANO-
1-2019-00292, 1-2020-00260, 1-2020-00445, 1-2020-00462,
1-2020-00571, 1-2020-00598, 2-1989-00092, 2-2000-00929,
2-2006-01238, 2-2011-00792, 2-2013-00691, 2-2016-04340,
2-2006-01238, 2-2011-00792, 2-2013-00691, 2-2016-04340,
2-2017-02321, 2-2017-03337, 2-2017-03355, 2-2017-03388,
2-2017-02321, 2-2017-03337, 2-2017-03355, 2-2017-03388,
Line 539: Line 698:
2-2019-01003, 2-2019-01153, 2-2019-01314, 2-2019-01452,
2-2019-01003, 2-2019-01153, 2-2019-01314, 2-2019-01452,
2-2019-01751, 2-2019-01752, 2-2019-02104, 2-2019-02154,
2-2019-01751, 2-2019-01752, 2-2019-02104, 2-2019-02154,
2-2019-02253, 2-2019-02549, 2-2020-00513, 2-2020-00968,
2-2019-02253, 2-2019-02549, 2-2020-00513, 2-2020-00968,  
Inspection Type             Designation     Description or Title                                       Revision or
 
Procedure                                                                                                Date
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2-2020-01078, 2-2020-01234, 2-2020-01395, 2-2020-01424,
2-2020-01078, 2-2020-01234, 2-2020-01395, 2-2020-01424,
2-2020-01447, 2-2020-01486, 2-2020-01611, 2-2020-01615,
2-2020-01447, 2-2020-01486, 2-2020-01611, 2-2020-01615,
Line 549: Line 714:
2-2020-02199, 2-2020-02203, C-2006-00682, C-2019-02209,
2-2020-02199, 2-2020-02203, C-2006-00682, C-2019-02209,
C-2019-02571, C-2020-00456, C-2020-00624, C-2020-00636
C-2019-02571, C-2020-00456, C-2020-00624, C-2020-00636
Corrective Action CR-ANO-        C-2020-01557
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings         E-2005, Sheet 1 Single Line Meter and Relay Diagram 4160 Volt System       31
CR-ANO-
C-2020-01557
Drawings
E-2005, Sheet 1
Single Line Meter and Relay Diagram 4160 Volt System
Engineering System Features
Engineering System Features
E-2005, Sheet 2 Single Line Meter and Relay Diagram AAC Generator System   1
E-2005, Sheet 2
Single Line Meter and Relay Diagram AAC Generator System
4.16 kV Generator and Switchgear
4.16 kV Generator and Switchgear
Engineering       EC-13191       Evaluate the Operational Requirements to Take Either One of 0
Engineering
Changes                          the Three AACG Engine Room Rans Out of Service for
Changes
EC-13191
Evaluate the Operational Requirements to Take Either One of
the Three AACG Engine Room Rans Out of Service for
Maintenance
Maintenance
Miscellaneous     STM 2-33       Alternate AC Diesel Generator                               28
Miscellaneous
ULD-0-SYS-19   ANO Unit 1 and Unit 2 Alternate AC Generator System (AAC)   2
STM 2-33
Procedures       EN-DC-205       Maintenance Rule Monitoring                                 7
Alternate AC Diesel Generator
OP-1107.002     ES Electrical System Operation                             48
ULD-0-SYS-19
OP-1202.008     Blackout                                                   18
ANO Unit 1 and Unit 2 Alternate AC Generator System (AAC)
OP-1416.050     Unit 1 and 2 ICA51A and IAC51B Relay Test Instructions     5
Procedures
OP-1416.053     Unit 1 and 2 IAC77 Relay Test Instructions                 7
EN-DC-205
OP-1416.084     Basler BE1-51 Relay Test Instructions                       2
Maintenance Rule Monitoring
OP-2104.037     Alternate AC Diesel Generator Operations                   34
OP-1107.002
OP-6030.110     Termination Splicing and Soldering of Cable and Wires       25
ES Electrical System Operation
Work Orders       WO             507265, 525148, 525878, 527408, 531333, 50236653,
OP-1202.008
Blackout
OP-1416.050
Unit 1 and 2 ICA51A and IAC51B Relay Test Instructions
OP-1416.053
Unit 1 and 2 IAC77 Relay Test Instructions
OP-1416.084
Basler BE1-51 Relay Test Instructions
OP-2104.037
Alternate AC Diesel Generator Operations
OP-6030.110
Termination Splicing and Soldering of Cable and Wires
Work Orders
WO
507265, 525148, 525878, 527408, 531333, 50236653,
2410511, 52617453, 52798794, 52803494, 52868761
2410511, 52617453, 52798794, 52803494, 52868761
71111.13   Calculations     CALC-09-E-0002- ANO-1 Start-Up 2 Fast and Manual Transfer Capability       4
71111.13
Corrective Action CR-ANO-         2-2020-00642, 2-2020-00651, 2-2020-00657, 2-2020-00650,
Calculations
Documents                        2-2020-02122, 2-2020-02153, 2-2020-02171, 2-2020-02193,
CALC-09-E-0002-
Inspection Type             Designation     Description or Title                                         Revision or
ANO-1 Start-Up 2 Fast and Manual Transfer Capability
Procedure                                                                                                Date
Corrective Action
Documents
CR-ANO-
2-2020-00642, 2-2020-00651, 2-2020-00657, 2-2020-00650,
2-2020-02122, 2-2020-02153, 2-2020-02171, 2-2020-02193,  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2-2020-02194, 2-2020-02282, 2-2020-02285, 2-2020-02319,
2-2020-02194, 2-2020-02282, 2-2020-02285, 2-2020-02319,
2-2020-02446, 2-2020-02451, 2-2020-02458
2-2020-02446, 2-2020-02451, 2-2020-02458
Miscellaneous     FHA             Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and       19
Miscellaneous
FHA
Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and
Unit 2
Unit 2
Procedures       EN-MA-125       Troubleshooting Control of Maintenance Activities           25
Procedures
EN-OP-119       Protected Equipment Posting                                 12
EN-MA-125
EN-WM-104       On Line Risk Assessment                                     21
Troubleshooting Control of Maintenance Activities
EN-WM-104       On Line Risk Assessment                                     22
EN-OP-119
EN-WM-104       On Line Risk Assessment                                     22
Protected Equipment Posting
OP-1107.001     Electrical System Operations                                 131
EN-WM-104
OP-1203.003     Control Rod Drive Malfunction Action                         32
On Line Risk Assessment
OP-2105.009     CEDM Control System Operation                               43
EN-WM-104
OP-2107.001     Electrical System Operation                                 131
On Line Risk Assessment
OP-2203.049     Fires in Areas Affecting Safe Shutdown                       20
EN-WM-104
Work Orders       MWO             50236324
On Line Risk Assessment
WO             543225, 543542, 543584, 545045
OP-1107.001
71111.15   Calculations     CALC-91-E-0090- Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109, 7
Electrical System Operations
131
OP-1203.003
Control Rod Drive Malfunction Action
OP-2105.009
CEDM Control System Operation
OP-2107.001
Electrical System Operation
131
OP-2203.049
Fires in Areas Affecting Safe Shutdown
Work Orders
MWO
236324
WO
543225, 543542, 543584, 545045
71111.15
Calculations
CALC-91-E-0090-
Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109,
110, 149 for Post Accident Cooling and Appendix R
110, 149 for Post Accident Cooling and Appendix R
CALC-91-E-0090- ANO-1 4160V Switchgear HVAC Evaluation                       2
CALC-91-E-0090-
CALC-91-E-0090- ANO-1 North Electrical Room 149 HVAC Evaluation             4
ANO-1 4160V Switchgear HVAC Evaluation
CALC-92-E-0103- ANO-1 Switchgear, Battery, DC, and Corridor 98 HVAC         5
CALC-91-E-0090-
ANO-1 North Electrical Room 149 HVAC Evaluation
CALC-92-E-0103-
ANO-1 Switchgear, Battery, DC, and Corridor 98 HVAC
Evaluation
Evaluation
CALC-93-R-1040- ANO-1 AB Limiting Component Qualification Temperatures       4
CALC-93-R-1040-
CALC-95-R-0024- Basic Requirements for the Component Database on Station     16
ANO-1 AB Limiting Component Qualification Temperatures
CALC-95-R-0024-
Basic Requirements for the Component Database on Station
Doors and Hatches
Doors and Hatches
CALC-ANOC-CS-   ANO Flood Protection Design Basis                            8
CALC-ANOC-CS-
15-00003
15-00003
CALC-ANOC-CS-   ANO Flood Protection Room Evaluations - Units 1 and 2        2
ANO Flood Protection Design Basis
CALC-ANOC-CS-
15-00012
15-00012
Corrective Action CR-ANO-         1-2020-00507, 1-2020-00541,1-2020-00585, 2-2019-02219, 2-
ANO Flood Protection Room Evaluations - Units 1 and 2
Documents                        2020-00220, 2-2020-00629, 2-2020-01491, 2-2020-01643, 2-
Corrective Action
Inspection Type             Designation Description or Title                                         Revision or
Documents
Procedure                                                                                              Date
CR-ANO-
1-2020-00507, 1-2020-00541,1-2020-00585, 2-2019-02219, 2-
20-00220, 2-2020-00629, 2-2020-01491, 2-2020-01643, 2-
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
20-01706, 2-2020-01743, 2-2020-01954, 2-2020-01972, 2-
20-01706, 2-2020-01743, 2-2020-01954, 2-2020-01972, 2-
20-02000, 2-2020-02113, 2-2020-02115, 2-2020-02187, 2-
20-02000, 2-2020-02113, 2-2020-02115, 2-2020-02187, 2-
20-02192, 2-2020-02296
20-02192, 2-2020-02296
Corrective Action CR-ANO-      1-2020-00668, 1-2020-00669, 2-2020-02264
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Engineering       EC-59915     Reduced Latching Requirements for Watertight Doors - Units 1 0
CR-ANO-
Changes                        and 2
1-2020-00668, 1-2020-00669, 2-2020-02264
EC-86248     Operability Input for CR-ANO-1-2020-00507                   0
Engineering
Miscellaneous     ER-ANO-2006- Evaluate Use of Manually Substituted RCP Speed Inputs to     0
Changes
0308        COLSS
EC-59915
ULD-1-SYS-16 4.16 kV System                                               6
Reduced Latching Requirements for Watertight Doors - Units 1
Work Orders       WO           481231, 506581, 513857
and 2
71111.18   Corrective Action CR-ANO-     2-2020-01688, 2-2020-01761, 2-2020-01788, 2-2020-01878,
EC-86248
Documents                      2-2020-01917, 2-2020-01923, 2-2020-00720, 2-2020-00755,
Operability Input for CR-ANO-1-2020-00507
Miscellaneous
ER-ANO-2006-
0308
Evaluate Use of Manually Substituted RCP Speed Inputs to
COLSS
ULD-1-SYS-16
4.16 kV System
Work Orders
WO
481231, 506581, 513857
71111.18
Corrective Action
Documents
CR-ANO-
2-2020-01688, 2-2020-01761, 2-2020-01788, 2-2020-01878,
2-2020-01917, 2-2020-01923, 2-2020-00720, 2-2020-00755,
2-2020-00764, 2-2020-00823
2-2020-00764, 2-2020-00823
Engineering       EC-35597     Evaluation for Wireless Vibe Data Equipment in Unit 2       0
Engineering
Changes                        Containment and Wireless Access Point
Changes
EC-86288     Enhance Supports 2CCA-13-H4, 2CCA-13-H005, 2CCA-14-1-       0
EC-35597
Evaluation for Wireless Vibe Data Equipment in Unit 2
Containment and Wireless Access Point
EC-86288
Enhance Supports 2CCA-13-H4, 2CCA-13-H005, 2CCA-14-1-
H003, and 2CCA-15-H60 As A Result of CR-ANO-2-2020-
H003, and 2CCA-15-H60 As A Result of CR-ANO-2-2020-
00720, CR-ANO-2-2020-01633, CR-ANO-2-2020-01655, and
00720, CR-ANO-2-2020-01633, CR-ANO-2-2020-01655, and
CR-ANO-2-2020-00755
CR-ANO-2-2020-00755
EC-86606     2CCA-13-H4 Load Pin Configuration Compliance                 0
EC-86606
Miscellaneous     1(2)DPG-001 Diagnostic Process Guideline
2CCA-13-H4 Load Pin Configuration Compliance
1(2)SAG-001 Initial Response
Miscellaneous
1(2)SAG-002 TSC Recommending Strategies
1(2)DPG-001
1(2)SAG-003 Inject into Steam Generators
Diagnostic Process Guideline
1(2)SAG-004 Depressurize RCS
1(2)SAG-001
1(2)SAG-005 Inject into RCS
Initial Response
1(2)SAG-006 inject into containment
1(2)SAG-002
1(2)SAG-007 Reduce Containment Hydrogen
TSC Recommending Strategies
1(2)SAG-008 Control Containment Pressure
1(2)SAG-003
1(2)SAG-009 Mitigate Fission Product Release
Inject into Steam Generators
Inspection Type             Designation     Description or Title                                     Revision or
1(2)SAG-004
Procedure                                                                                              Date
Depressurize RCS
1(2)SAG-010     Control SFP Level
1(2)SAG-005
1(2)TSG-001     Instrumentation
Inject into RCS
1(2)TSG-004     Benefit Consequence
1(2)SAG-006
ER-ANO-2006-   Evaluate Use of Manually Substituted RCP Speed Inputs to 0
inject into containment
0308            COLSS
1(2)SAG-007
Procedures       EN-DC-106       Temporary Installation of Measurement and Test Equipment 1
Reduce Containment Hydrogen
                                            (M&TE)
1(2)SAG-008
Work Orders       WO             516094, 541684, 541685, 52810939, 52814416
Control Containment Pressure
71111.19   Corrective Action CR-ANO-         2-2020-00629, 2-2020-00720, 2-2020-00755, 2-2020-00764,
1(2)SAG-009
Documents                        2-2020-00823, 2-2020-01030, 2-2020-01060, 2-2020-01061,
Mitigate Fission Product Release  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1(2)SAG-010
Control SFP Level
1(2)TSG-001
Instrumentation
1(2)TSG-004
Benefit Consequence
ER-ANO-2006-
0308
Evaluate Use of Manually Substituted RCP Speed Inputs to
COLSS
Procedures
EN-DC-106
Temporary Installation of Measurement and Test Equipment  
(M&TE)
Work Orders
WO
516094, 541684, 541685, 52810939, 52814416
71111.19
Corrective Action
Documents
CR-ANO-
2-2020-00629, 2-2020-00720, 2-2020-00755, 2-2020-00764,
2-2020-00823, 2-2020-01030, 2-2020-01060, 2-2020-01061,
2-2020-01076, 2-2020-01081, 2-2020-01174, 2-2020-01235,
2-2020-01076, 2-2020-01081, 2-2020-01174, 2-2020-01235,
2-2020-01236, 2-2020-01322, 2-2020-01375, 2-2020-01381,
2-2020-01236, 2-2020-01322, 2-2020-01375, 2-2020-01381,
Line 663: Line 950:
2-2020-01987, 2-2020-01991, 2-2020-02035, 2-2020-02048,
2-2020-01987, 2-2020-01991, 2-2020-02035, 2-2020-02048,
C-2020-01245
C-2020-01245
Engineering       EC-74216       Replacement of B0126 22kV Supply Breaker for SRT (Startup 0
Engineering
Changes                          Transformer #3 Voltage Regulator)
Changes
EC-86302       Pipe Surface Abrasion/Scratch on 2CCA-15-4", 2CCA-47-1"   0
EC-74216
Replacement of B0126 22kV Supply Breaker for SRT (Startup
Transformer #3 Voltage Regulator)
EC-86302
Pipe Surface Abrasion/Scratch on 2CCA-15-4", 2CCA-47-1"
and 2CCA-13-3"
and 2CCA-13-3"
EC-86348       Establish New Reference Values for 2CV-5612-1 and 2CV-   0
EC-86348
Establish New Reference Values for 2CV-5612-1 and 2CV-
5613-2
5613-2
EC-86403       Replace Corroded Sections of the 2VUC-6B Room Cooler     0
EC-86403
Replace Corroded Sections of the 2VUC-6B Room Cooler
Housing
Housing
EC-86428       Evaluation of Indications on PZR Spray Line               0
EC-86428
Miscellaneous     2-BOP-UT-20-035
Evaluation of Indications on PZR Spray Line
2-BOP-UT-20-057
Miscellaneous
EN-CS-S-008-   Pipe Wall Thinning Structural Evaluation                  2
2-BOP-UT-20-035  
 
2-BOP-UT-20-057  
 
EN-CS-S-008-
MULTI
MULTI
NCIG-05         Guidelines for Piping System Reconciliation
Pipe Wall Thinning Structural Evaluation
Procedures       OP-2104.005     Containment Spray                                         84, 86
NCIG-05
OP-2305.017     Local Leak Rate Testing                                   37
Guidelines for Piping System Reconciliation
OP-2305.054     Offsite Power Transfer Test                               13
Procedures
Inspection Type             Designation     Description or Title                                       Revision or
OP-2104.005
Procedure                                                                                              Date
Containment Spray
OP-3305.001     OPS System Alignment Tests                                 1
84, 86
Work Orders       WO             429657, 478111, 506581, 516094, 518796, 519374, 525675,
OP-2305.017
Local Leak Rate Testing
OP-2305.054
Offsite Power Transfer Test  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP-3305.001
OPS System Alignment Tests
Work Orders
WO
29657, 478111, 506581, 516094, 518796, 519374, 525675,
541387, 541519, 541821, 542787, 52864390
541387, 541519, 541821, 542787, 52864390
71111.20   Calculations     CALC-07-E-0016- Accountability of Unit 2 Containment Sump Strainers       3
71111.20
Calculations
CALC-07-E-0016-
Accountability of Unit 2 Containment Sump Strainers
Sacrificial Surface Area
Sacrificial Surface Area
CALC-94-D-6007- Pipe Stress and Support Evaluation of ISO 2CCB-51-1       0
CALC-94-D-6007-
Corrective Action CR-ANO-         2-2020-01439, 2-2020-00948, 2-2020-00755, 2-2020-01587,
Pipe Stress and Support Evaluation of ISO 2CCB-51-1
Documents                        2-2020-01590, 2-2020-01683, 2-2020-01710, 2-2020-01711,
Corrective Action
Documents
CR-ANO-
2-2020-01439, 2-2020-00948, 2-2020-00755, 2-2020-01587,
2-2020-01590, 2-2020-01683, 2-2020-01710, 2-2020-01711,
2-2020-01824, 2-2020-00979, 2-2020-01115, 2-2020-01836,
2-2020-01824, 2-2020-00979, 2-2020-01115, 2-2020-01836,
2-2020-01843, 2-2020-01846, 2-2020-01860, 2-2020-01861,
2-2020-01843, 2-2020-01846, 2-2020-01860, 2-2020-01861,
2-2020-01892, 2-2020-01893, 2-2020-01745, 2-2020-01896,
2-2020-01892, 2-2020-01893, 2-2020-01745, 2-2020-01896,
2-2020-01899
2-2020-01899
Corrective Action CR-ANO-        2-2020-01229, 2-2020-01908, C-2020-01446
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Engineering       EC-18260       GSI-191 Program Document Updates                           0
CR-ANO-
Changes          EC-47217       Spent Fuel Pool Cooling Pump Alternate Power Source       0
2-2020-01229, 2-2020-01908, C-2020-01446
Engineering
Changes
EC-18260
GSI-191 Program Document Updates
EC-47217
Spent Fuel Pool Cooling Pump Alternate Power Source
Connection
Connection
EC-85563       Evaluate and Provide Guidance for Providing Temp Power to 0
EC-85563
Evaluate and Provide Guidance for Providing Temp Power to
Both U2 SFP Cooling Pumps
Both U2 SFP Cooling Pumps
Procedures       MRS-SSP-3156   Waterford 3 and ANO 2 Fuel Reconstitution 16x16 CE NFG     3
Procedures
MRS-SSP-3156
Waterford 3 and ANO 2 Fuel Reconstitution 16x16 CE NFG
Fuel Assemblies
Fuel Assemblies
NF-ANO-19-049   Core Loading Plan for Arkansas Nuclear One Unit 2 Cycle 28 0, 1
NF-ANO-19-049
OP-1015.036     Containment Building Closeout                             56, 57
Core Loading Plan for Arkansas Nuclear One Unit 2 Cycle 28
OP-2203.002     Spent Fuel Pool Emergencies                               19
0, 1
OP-2302.049     ANO-2 Fuel Assembly Reconstitution                         13
OP-1015.036
OP-2503.003     Operation of Fuel Handling Equipment                       81
Containment Building Closeout
OP-6030.110     Termination Splicing and Soldering of Cable and Wire       25
56, 57
Work Orders       WO             52863684, 540856, 363443, 363443, 365081, 524119
OP-2203.002
71111.22   Calculations     CALC-90-E-0116- ANO-2 EOP Setpoint Basis Document                         15
Spent Fuel Pool Emergencies
CALC-91-E-0090- ANO-1 North Electrical Room 149 HVAC Evaluation           2
OP-2302.049
Inspection Type             Designation     Description or Title                                         Revision or
ANO-2 Fuel Assembly Reconstitution
Procedure                                                                                                  Date
OP-2503.003
Corrective Action CR-ANO-         1-2009-00894, 2-2020-00960, 2-2020-01301, 2-2020-01305,
Operation of Fuel Handling Equipment
Documents                        2-2020-01307, 2-2020-01410, 2-2020-01462, 2-2020-01463,
OP-6030.110
Termination Splicing and Soldering of Cable and Wire
Work Orders
WO
2863684, 540856, 363443, 363443, 365081, 524119
71111.22
Calculations
CALC-90-E-0116-
ANO-2 EOP Setpoint Basis Document
CALC-91-E-0090-
ANO-1 North Electrical Room 149 HVAC Evaluation  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-ANO-
1-2009-00894, 2-2020-00960, 2-2020-01301, 2-2020-01305,
2-2020-01307, 2-2020-01410, 2-2020-01462, 2-2020-01463,
2-2020-01591, 2-2020-01794, 2-2020-01795, 2-2020-01796,
2-2020-01591, 2-2020-01794, 2-2020-01795, 2-2020-01796,
2-2020-01797, 2-2020-02058, 2-2020-02068, 2-2020-02315,
2-2020-01797, 2-2020-02058, 2-2020-02068, 2-2020-02315,
C-2016-03493, C-2020-00965, C-2020-00974, C-2020-01030
C-2016-03493, C-2020-00965, C-2020-00974, C-2020-01030
Corrective Action CR-ANO-        2-2020-02308
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings         M-2217, Sheet 1 P&ID Emergency Diesel Generator Fuel Oil System               64
CR-ANO-
Engineering       EC-13704       Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02         0
2-2020-02308
Changes                          (RM 105), and CALC-80-D-1083A-01 (RM 111) to Incorporate
Drawings
M-2217, Sheet 1
P&ID Emergency Diesel Generator Fuel Oil System
Engineering
Changes
EC-13704
Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02  
(RM 105), and CALC-80-D-1083A-01 (RM 111) to Incorporate
Cable Heat Losses
Cable Heat Losses
Miscellaneous     TP-5120.403     Unit 2 Primary Containment Leak Rate Running Total           11
Miscellaneous
Procedures       EN-MA-125       Troubleshooting Control of Maintenance Activities             25
TP-5120.403
EN-RE-327       PWR Startup Critical Predictions and Evaluation Process       4
Unit 2 Primary Containment Leak Rate Running Total  
OP-1104.043     Penetration Room Ventilation System                           31
 
OP-1618.035     Sampling and Analyzing Diesel Fuel Oil from Diesel Fuel Oil   23
Procedures
EN-MA-125
Troubleshooting Control of Maintenance Activities
EN-RE-327
PWR Startup Critical Predictions and Evaluation Process
OP-1104.043
Penetration Room Ventilation System
OP-1618.035
Sampling and Analyzing Diesel Fuel Oil from Diesel Fuel Oil
Transports
Transports
OP-2104.002     Chemical and Volume Control                                   91
OP-2104.002
OP-2104.033     Containment Atmosphere Control                               80
Chemical and Volume Control
OP-2302.046     CEA Drop Time Test                                           19
OP-2104.033
OP-2304.112     Plant Protection System Response Time Test Channel A         31
Containment Atmosphere Control
OP-2304.113     Plant Protection System Response Time Test Channel B         31
OP-2302.046
OP-2304.114     Plant Protection System Response Time Test Channel C         30
CEA Drop Time Test
OP-2304.115     Plant Protection System Response Time Test Channel D         24
OP-2304.112
OP-2305.016     Remote Features Periodic Testing                             29
Plant Protection System Response Time Test Channel A
OP-5120.417     In-Place Testing of the Unit 1 Penetration Filtration Systems 10
OP-2304.113
Work Orders       WO             512883, 517477, 52616755, 52661106, 52714799, 52713821,
Plant Protection System Response Time Test Channel B
OP-2304.114
Plant Protection System Response Time Test Channel C
OP-2304.115
Plant Protection System Response Time Test Channel D
OP-2305.016
Remote Features Periodic Testing
OP-5120.417
In-Place Testing of the Unit 1 Penetration Filtration Systems
Work Orders
WO
2883, 517477, 52616755, 52661106, 52714799, 52713821,
2751177, 52807705, 52856733
2751177, 52807705, 52856733
71114.06   Miscellaneous                     SES-2-031 Scenario
71114.06
71124.05   Calibration       ARGOS-003       ARGOS-5AB Personnel Contamination Monitor Calibration         07/31/2019
Miscellaneous
April 2020 Records          CHP-CR-067     Ludlum-177 Frisker Calibration                               02/06/2020
SES-2-031 Scenario
Inspection Type             Designation   Description or Title                                       Revision or
71124.05
Procedure                                                                                            Date
April 2020
CHP-DR-156   Ludlum-177 Frisker Calibration                             10/14/2019
Calibration
EPM-001       Eberline PM-7 Gamma Portal Monitor                         03/31/2020
Records
FASTSCAN-1   Canberra FASTSCAN Whole Body Counting System               05/05/2020
ARGOS-003
ARGOS-5AB Personnel Contamination Monitor Calibration
07/31/2019
CHP-CR-067
Ludlum-177 Frisker Calibration
2/06/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CHP-DR-156
Ludlum-177 Frisker Calibration
10/14/2019
EPM-001
Eberline PM-7 Gamma Portal Monitor
03/31/2020
FASTSCAN-1
Canberra FASTSCAN Whole Body Counting System
Calibration
Calibration
GEM-002       Canberra GEM-5 Portal Monitor Calibration                 05/20/2019
05/05/2020
GEM-008       Canberra GEM-5 Portal Monitor Calibration                 05/22/2019
GEM-002
GSAM-007     Gamma Scintillation Tool Monitor Calibration               12/17/2018
Canberra GEM-5 Portal Monitor Calibration
HP-DR-348     WR Telepole Calibration                                   01/27/2020
05/20/2019
PCM-013       Eberline Personal Contamination Monitor PCM-1B Calibration 08/31/2019
GEM-008
Corrective Action CR-ANO-       1-2019-00839, 1-2019-02394, 1-2019-04103, 1-2019-04740,
Canberra GEM-5 Portal Monitor Calibration
Documents                      2-2018-01529, 2-2018-01694, 2-2018-02545, 2-2019-01326,
05/22/2019
GSAM-007
Gamma Scintillation Tool Monitor Calibration
2/17/2018
HP-DR-348
WR Telepole Calibration
01/27/2020
PCM-013
Eberline Personal Contamination Monitor PCM-1B Calibration
08/31/2019
Corrective Action
Documents
CR-ANO-
1-2019-00839, 1-2019-02394, 1-2019-04103, 1-2019-04740,
2-2018-01529, 2-2018-01694, 2-2018-02545, 2-2019-01326,
2-2019-02272, C-2019-01052, C-2019-03356, C-2020-00039,
2-2019-02272, C-2019-01052, C-2019-03356, C-2020-00039,
HQN-2019-02578
HQN-2019-02578
Corrective Action CR-ANO-      C-2020-01755
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous     12-00023     Primary Calibration Report for Noble Gas Monitor NGM 203   2
CR-ANO-
EP-CALC-ANO- ANO Radiological Effluent EAL Values                      1
C-2020-01755
Miscellaneous
2-00023
Primary Calibration Report for Noble Gas Monitor NGM 203
EP-CALC-ANO-
1701
1701
ODCM         ANO Offsite Dose Calculation Manual                       29
ANO Radiological Effluent EAL Values
Procedures       EN-CY-102     Laboratory Analytical Quality Control                     14
ODCM
EN-FAP-RP-007 Operation of the Radiation Protection Central Calibration 2
ANO Offsite Dose Calculation Manual
Procedures
EN-CY-102
Laboratory Analytical Quality Control
EN-FAP-RP-007
Operation of the Radiation Protection Central Calibration
Facility
Facility
EN-RP-153     Radiation Protection Fundamentals Program                 1
EN-RP-153
EN-RP-208     Whole Body Counting / In-Vitro Bioassay                   7
Radiation Protection Fundamentals Program
EN-RP-210     Area Monitoring Program                                   1
EN-RP-208
EN-RP-301     Radiation Protection Instrument Control                   12
Whole Body Counting / In-Vitro Bioassay
EN-RP-302     Operation of Radiation Protection Instrumentation         6
EN-RP-210
EN-RP-303     Source Checking of Radiation Protection Instrumentation   4
Area Monitoring Program
EN-RP-304     Operation of Counting Equipment                           6
EN-RP-301
EN-RP-317     Central Calibration Facility                               2
Radiation Protection Instrument Control
Self-Assessments LO-ALO-2019- Radiation Protection - Pre-NRC FSA Radiation Safety -     02/26/2020
EN-RP-302
Inspection Type             Designation Description or Title                                         Revision or
Operation of Radiation Protection Instrumentation
Procedure                                                                                              Date
EN-RP-303
00086       Monitoring Instrumentation, Effluent Treatment, Environmental
Source Checking of Radiation Protection Instrumentation
EN-RP-304
Operation of Counting Equipment
EN-RP-317
Central Calibration Facility
Self-Assessments LO-ALO-2019-
Radiation Protection - Pre-NRC FSA Radiation Safety -
2/26/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
00086
Monitoring Instrumentation, Effluent Treatment, Environmental
Monitoring and Solid Waste & Material Handling
Monitoring and Solid Waste & Material Handling
NQ-2019-028 QA Audit Report QA-14/15-2019-ANO-1, 2019 QA Audit of         10/24/2019
NQ-2019-028
Radiation Protection/Radwaste at Arkansas Nuclear One
QA Audit Report QA-14/15-2019-ANO-1, 2019 QA Audit of
                                          (ANO)
Radiation Protection/Radwaste at Arkansas Nuclear One  
Work Orders       52804554    18 Month Calibration of Unit 1 Effluent Process Radiation     09/26/2019
(ANO)
10/24/2019
Work Orders
2804554
Month Calibration of Unit 1 Effluent Process Radiation
Monitor, RE-4642
Monitor, RE-4642
2806735     78 Week Calibration of Unit 2 Gaseous Process Radiation       01/03/2020
09/26/2019
2806735
Week Calibration of Unit 2 Gaseous Process Radiation
Monitor, RE-8271
Monitor, RE-8271
2834502     18 Month Unit 1 SPING 2 Radiation Monitor, RE-9830           03/06/2020
01/03/2020
2862864     Unit 2 Containment High Range Radiation Monitor, 2RE-8925     03/30/2020
2834502
2866230     18 Month Calibration of Unit 1 Main Steam Line Radiation     04/16/2020
Month Unit 1 SPING 2 Radiation Monitor, RE-9830
03/06/2020
2862864
Unit 2 Containment High Range Radiation Monitor, 2RE-8925
03/30/2020
2866230
Month Calibration of Unit 1 Main Steam Line Radiation
Monitor, RE-2681
Monitor, RE-2681
71124.06   Calculations     1GR2018-0005 Gaseous Radioactive Waste Permit                             02/05/2018
04/16/2020
April 2020                  1LR2018-0030 Liquid Radioactive Waste Permit                               03/29/2018
71124.06
1LR2020-0012 Liquid Radioactive Waste Release Permit                       03/07/2020
April 2020
2GR2019-0050 Gaseous Radioactive Waste Release Permit                     07/11/2019
Calculations
2GR2020-0009 Gaseous Radioactive Release Permit                           01/21/2020
1GR2018-0005
2LR2019-0006 Liquid Radioactive Waste Release Permit                       04/25/2019
Gaseous Radioactive Waste Permit
EN-RW-104   Scaling Factors                                               10/24/2019
2/05/2018
Corrective Action CR-ANO-     1-2018-04561, 1-2019-01326, 1-2019-01515, 2-2018-01418,
1LR2018-0030
Documents                      2-2018-01529, 2-2018-01644, 2-2018-03171, 2-2019-01056,
Liquid Radioactive Waste Permit
03/29/2018
1LR2020-0012
Liquid Radioactive Waste Release Permit
03/07/2020
2GR2019-0050
Gaseous Radioactive Waste Release Permit
07/11/2019
2GR2020-0009
Gaseous Radioactive Release Permit
01/21/2020
2LR2019-0006
Liquid Radioactive Waste Release Permit
04/25/2019
EN-RW-104
Scaling Factors
10/24/2019
Corrective Action
Documents
CR-ANO-
1-2018-04561, 1-2019-01326, 1-2019-01515, 2-2018-01418,
2-2018-01529, 2-2018-01644, 2-2018-03171, 2-2019-01056,
2-2020-01477, C-2020-00982, C-2020-01184
2-2020-01477, C-2020-00982, C-2020-01184
Miscellaneous                 Annual Radioactive Effluent Release Report for 2018           04/25/2019
Miscellaneous
Annual Radioactive Effluent Release Report for 2019           04/27/2020
Annual Radioactive Effluent Release Report for 2018
Results of Radiochemistry Cross Check Program                 05/14/2020
04/25/2019
Results of Radiochemistry Cross Check Program                 10/20/2019
Annual Radioactive Effluent Release Report for 2019
Operability       1604.016    Analysis of Gaseous Waste Decay Tanks                        16
04/27/2020
Results of Radiochemistry Cross Check Program
05/14/2020
Results of Radiochemistry Cross Check Program
10/20/2019
Operability
Evaluations
Evaluations
Procedures       1604.014     Reactor Building Purge Analysis                               28
1604.016
1604.015     Analysis of Unit Vents                                       26
Analysis of Gaseous Waste Decay Tanks
1604.017     Analysis of Liquid Waste                                     33
Procedures
1607.009     Sampling the Treated Waste Monitor Tanks (T-16A/B)           16
1604.014
Inspection Type             Designation   Description or Title                                         Revision or
Reactor Building Purge Analysis
Procedure                                                                                                Date
1604.015
1607.010       Sampling of Unit Vents                                       35
Analysis of Unit Vents
1618.011       Sampling the Unit 1 Neutralizing Tank                         9
1604.017
HES-06         Ventilation/Filtration Testing Program                       9
Analysis of Liquid Waste
Self-Assessments LO-ALO-2019-   Radiation Protection - Pre-NRC FSA Radiation Safety -         02/06/2020
1607.009
00086          Monitoring Instrumentation, Effluent Treatment, Environmental
Sampling the Treated Waste Monitor Tanks (T-16A/B)  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1607.010
Sampling of Unit Vents
1618.011
Sampling the Unit 1 Neutralizing Tank
HES-06
Ventilation/Filtration Testing Program
Self-Assessments LO-ALO-2019-
00086
Radiation Protection - Pre-NRC FSA Radiation Safety -
Monitoring Instrumentation, Effluent Treatment, Environmental
Monitoring and Solid Waste & Material Handling
Monitoring and Solid Waste & Material Handling
QA-2/6-2019-   Quality Assurance Audit Report; Chemistry, Effluent and       09/26/2019
2/06/2020
ANO-1          Environmental Monitoring
QA-2/6-2019-
WT-WTANO-     ANO Control Room Habitability Assessment                      10/07/2019
ANO-1
Quality Assurance Audit Report; Chemistry, Effluent and
Environmental Monitoring
09/26/2019
WT-WTANO-
2013-00057 CA
2013-00057 CA
71124.07   Calibration       CRO-023       Air Station #1, Rotometer Calibration                         03/27/2020
ANO Control Room Habitability Assessment
April 2020 Records          CRO-025       Air Station #56, Rotometer Calibration                       03/27/2020
10/07/2019
CRO-042       Air Station #2, Rotometer Calibration                         03/27/2020
71124.07
Corrective Action CR-ANO-       2-2019-02068, C-2018-01068, C-2018-03464, C-2018-04141,
April 2020
Documents                        C-2018-04299, C-2018-04646, C-2018-04709, C-2019-00081,
Calibration
Records
CRO-023
Air Station #1, Rotometer Calibration
03/27/2020
CRO-025
Air Station #56, Rotometer Calibration
03/27/2020
CRO-042
Air Station #2, Rotometer Calibration
03/27/2020
Corrective Action
Documents
CR-ANO-
2-2019-02068, C-2018-01068, C-2018-03464, C-2018-04141,
C-2018-04299, C-2018-04646, C-2018-04709, C-2019-00081,
C-2019-00489, C-2019-01469, C-2019-01578, C-2019-02058,
C-2019-00489, C-2019-01469, C-2019-01578, C-2019-02058,
C-2019-02564, C-2019-03149, C-2019-04560, C-2019-04568,
C-2019-02564, C-2019-03149, C-2019-04560, C-2019-04568,
C-2019-04671
C-2019-04671
Miscellaneous                   Land Use Census 2019                                         09/03/2019
Miscellaneous
Land Use Census 2019
09/03/2019
Analytics Environmental Radioactivity Cross Check Program
Analytics Environmental Radioactivity Cross Check Program
2019
2019  
Groundwater Protection Plan Arkansas Nuclear One             7
 
0CAN051901     Annual Radiological Environmental Operating Report for 2018   05/13/2019
Groundwater Protection Plan Arkansas Nuclear One
0CAN052001     Annual Radiological Environmental Operating Report for 2019   05/19/2020
0CAN051901
ANO1 TRM       Technical Requirements Manual                                 71
Annual Radiological Environmental Operating Report for 2018
SAR Figure No. Monitored Ventilation Exhaust Release Points
05/13/2019
0CAN052001
Annual Radiological Environmental Operating Report for 2019
05/19/2020
ANO1 TRM
Technical Requirements Manual
SAR Figure No.
11.2-2
11.2-2
Procedures       EN-CY-111     Radiological Groundwater Protection Program                   10
Monitored Ventilation Exhaust Release Points
EN-CY-127     Land Use Census                                               1
Procedures
EN-CY-130-01   Radiological Environmental Monitoring Program (REMP)         0
EN-CY-111
Radiological Groundwater Protection Program
EN-CY-127
Land Use Census
EN-CY-130-01
Radiological Environmental Monitoring Program (REMP)
Arkansas Nuclear One
Arkansas Nuclear One
EN-RP-113     Response to Contaminated Spills/Leak                         9
EN-RP-113
OP-1304.062   Meteorological Monitoring System Calibration                 16
Response to Contaminated Spills/Leak
Inspection Type             Designation Description or Title                                         Revision or
OP-1304.062
Procedure                                                                                              Date
Meteorological Monitoring System Calibration  
Self-Assessments 2019 NUPIC   Radioanalytical Laboratory Audit Report                     05/09/2019
 
Audit Report
Inspection
                            #24791
Procedure
NAQA-17-0038 Audit Report 17-007 for the Audit of Environmental Dosimetry 09/01/2017
Type
Designation
Description or Title
Revision or
Date
Self-Assessments 2019 NUPIC
Audit Report
#24791
Radioanalytical Laboratory Audit Report
05/09/2019
NAQA-17-0038
Audit Report 17-007 for the Audit of Environmental Dosimetry
Company
Company
Work Orders       WO-52823676 Semi-Annual Meteorological Monitoring Calibration           06/03/2019
09/01/2017
WO-52855008 Semi-Annual Meteorological Monitoring Calibration           11/25/2019
Work Orders
71124.08   Corrective Action CR-ANO-     2-2018-03171, 2-2020-00444, C-2018-02840, C-2018-02871,
WO-52823676
April 2020 Documents                      C-2018-03001, C-2018-03959, C-2019-00542, C-2019-00663,
Semi-Annual Meteorological Monitoring Calibration
06/03/2019
WO-52855008
Semi-Annual Meteorological Monitoring Calibration
11/25/2019
71124.08
April 2020
Corrective Action
Documents
CR-ANO-
2-2018-03171, 2-2020-00444, C-2018-02840, C-2018-02871,
C-2018-03001, C-2018-03959, C-2019-00542, C-2019-00663,
C-2019-02020, C-2019-03880, C-2019-04122, C-2019-04770,
C-2019-02020, C-2019-03880, C-2019-04122, C-2019-04770,
C-2020-00754
C-2020-00754
CR-HQN-     2019-01094 2019-02856
CR-HQN-
Corrective Action CR-ANO-      C-2020-01762
2019-01094 2019-02856
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous                 Annual Inventory of Radioactive Material Containers         05/26/2020
CR-ANO-
ANO Part 37 Security Plan for the Protection of Category 1   01/26/2016
C-2020-01762
Miscellaneous
Annual Inventory of Radioactive Material Containers
05/26/2020
ANO Part 37 Security Plan for the Protection of Category 1
and 2 Quantities of Radioactive Material
and 2 Quantities of Radioactive Material
2019 Sealed Source Leak Test                                 08/12/2019
01/26/2016
20 Sealed Source Leak Test                                 04/12/2020
2019 Sealed Source Leak Test
17-03187     10 CFR Part 61 Waste Stream Sample Screening and             08/01/2017
08/12/2019
20 Sealed Source Leak Test
04/12/2020
17-03187
CFR Part 61 Waste Stream Sample Screening and
Evaluation: Dry Active Waste
Evaluation: Dry Active Waste
18-11420     10 CFR Part 61 Waste Stream Sample Screening and             05/21/2019
08/01/2017
18-11420
CFR Part 61 Waste Stream Sample Screening and
Evaluation: Dry Active Waste
Evaluation: Dry Active Waste
18-12412     10 CFR Part 61 Waste Stream Sample Screening and             05/21/2019
05/21/2019
18-12412
CFR Part 61 Waste Stream Sample Screening and
Evaluation: 2F3/U2 Reactor Coolant System Filters
Evaluation: 2F3/U2 Reactor Coolant System Filters
19-05931     10 CFR Part 61 Waste Stream Sample Screening and             10/27/2019
05/21/2019
19-05931
CFR Part 61 Waste Stream Sample Screening and
Evaluation: Unit 1 Secondary Resin
Evaluation: Unit 1 Secondary Resin
19-09120     10 CFR Part 61 Waste Stream Sample Screening and             02/10/2020
10/27/2019
19-09120
CFR Part 61 Waste Stream Sample Screening and
Evaluation: Dry Active Waste
Evaluation: Dry Active Waste
19-09121     10 CFR Part 61 Waste Stream Sample Screening and             03/03/2020
2/10/2020
19-09121
CFR Part 61 Waste Stream Sample Screening and
Evaluation: 1F4 /U1 Spent Fuel Pool Filters
Evaluation: 1F4 /U1 Spent Fuel Pool Filters
19-09123     10 CFR Part 61 Waste Stream Sample Screening and             03/03/2020
03/03/2020
Inspection Type             Designation   Description or Title                                         Revision or
19-09123
Procedure                                                                                                Date
CFR Part 61 Waste Stream Sample Screening and
03/03/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluation: 2F4 /U2 Spent Fuel Pool Filters
Evaluation: 2F4 /U2 Spent Fuel Pool Filters
19-09124       10 CFR Part 61 Waste Stream Sample Screening and             03/03/2020
19-09124
CFR Part 61 Waste Stream Sample Screening and
Evaluation: 1F3/U1 Reactor Coolant System Filters
Evaluation: 1F3/U1 Reactor Coolant System Filters
Procedures       1601.502       Radioactive Material Control at Radwaste                     9
03/03/2020
EN-MP-120     Material Receipt                                             15
Procedures
EN-RP-100     Radiation Worker Expectations                                 12
1601.502
EN-RP-121     Radioactive Material Control                                 17
Radioactive Material Control at Radwaste
EN-RW-101     Radioactive Waste Management                                 3
EN-MP-120
EN-RW-102     Radioactive Shipping Procedure                               18
Material Receipt
EN-RW-103     Radioactive Waste Tracking Procedure                         4
EN-RP-100
EN-RW-104     Scaling Factors                                               13
Radiation Worker Expectations
EN-RW-105     Process Control Program                                       5
EN-RP-121
EN-RW-106     Integrated Transportation Security Plan                       6
Radioactive Material Control
EN-RW-108     Radioactive Shipment Accident Response                       3
EN-RW-101
Self-Assessments                 Annual Access Authorization and Security Programs             12/11/2019
Radioactive Waste Management
EN-RW-102
Radioactive Shipping Procedure
EN-RW-103
Radioactive Waste Tracking Procedure
EN-RW-104
Scaling Factors
EN-RW-105
Process Control Program
EN-RW-106
Integrated Transportation Security Plan
EN-RW-108
Radioactive Shipment Accident Response
Self-Assessments
Annual Access Authorization and Security Programs
Pertaining to Part 37
Pertaining to Part 37
LO-ALO-2019-   Radiation Protection - Pre-NRC FSA Radiation Safety -         02/06/2020
2/11/2019
00086          Monitoring Instrumentation, Effluent Treatment, Environmental
LO-ALO-2019-
00086
Radiation Protection - Pre-NRC FSA Radiation Safety -
Monitoring Instrumentation, Effluent Treatment, Environmental
Monitoring and Solid Waste & Material Handling
Monitoring and Solid Waste & Material Handling
NQ-2019-030   QA Audit: Audit of Security Including Cyber Security at       12/09/2019
2/06/2020
NQ-2019-030
QA Audit: Audit of Security Including Cyber Security at
Arkansas Nuclear One
Arkansas Nuclear One
QA-1-2019-ANO- QA Audit: Fitness for Duty and Access Authorization           08/09/2019
2/09/2019
QA-14/15-2019- 2019 QA Audit of Radiation Protection/Radwaste at Arkansas   10/24/2019
QA-1-2019-ANO-
ANO-1          Nuclear One (ANO)
QA Audit: Fitness for Duty and Access Authorization
Work Orders       489482         GEL Laboratories Ni-63 Analysis                               10/04/2019
08/09/2019
506544         GEL Laboratories Ni-63 Analysis                               04/03/2020
QA-14/15-2019-
71151     Corrective Action CR-ANO-        C-2020-01230
ANO-1
2019 QA Audit of Radiation Protection/Radwaste at Arkansas
Nuclear One (ANO)
10/24/2019
Work Orders
489482
GEL Laboratories Ni-63 Analysis
10/04/2019
506544
GEL Laboratories Ni-63 Analysis
04/03/2020
71151
Corrective Action
Documents
Documents
71152     Calculations     6600-M-2119   Technical Specification for Pipe Hangers, Supports, and       5
CR-ANO-
C-2020-01230
71152
Calculations
6600-M-2119
Technical Specification for Pipe Hangers, Supports, and
Restraints for a Nuclear Power Plant for the Arkansas Nuclear
Restraints for a Nuclear Power Plant for the Arkansas Nuclear
One - Unit 2
One - Unit 2
ANO-C-2443     Technical Specification for the Design of Q/Non-Q Pipe       0
ANO-C-2443
Support for ANO 1 & 2
Technical Specification for the Design of Q/Non-Q Pipe
Inspection Type             Designation     Description or Title                                       Revision or
Support for ANO 1 & 2  
Procedure                                                                                              Date
 
ANO-M-2410     Installation, Modification, Inspection, & Documentation of 5
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
ANO-M-2410
Installation, Modification, Inspection, & Documentation of
Piping Systems & Pipe, Supports, Hangers & Restrains
Piping Systems & Pipe, Supports, Hangers & Restrains
SES-22         Snubber Design Criteria                                   2
SES-22
Corrective Action CR-ANO-         2-2009-02376, 2-2013-02242, 2-2020-00678, 2-2020-00681,
Snubber Design Criteria
Documents                        2-2020-00701, 2-2020-00703, 2-2020-00710, 2-2020-00720,
Corrective Action
Documents
CR-ANO-
2-2009-02376, 2-2013-02242, 2-2020-00678, 2-2020-00681,
2-2020-00701, 2-2020-00703, 2-2020-00710, 2-2020-00720,
2-2020-00755, 2-2020-00867, 2-2020-01544, 2-2020-01648,
2-2020-00755, 2-2020-00867, 2-2020-01544, 2-2020-01648,
2-2020-01655, 2-2020-02243
2-2020-01655, 2-2020-02243
Corrective Action CR-ANO-        2-2020-02243
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings         1801558-03     Rear Bracket                                               08/1976
CR-ANO-
2CCA-13-H4     Pipe Support Detail Reactor Coolant System                 8
2-2020-02243
2CCA-15-H60     Pipe Support Detail Pressurizer Spray System               4
Drawings
Miscellaneous     CD30-349       Design Report Summary                                     0
1801558-03
CD35-209       Design Report Summary                                     1
Rear Bracket
LF200515-LR-005 Train A Pressurizer Spray Line Support 2CCA-15-H60         0
08/1976
2CCA-13-H4
Pipe Support Detail Reactor Coolant System
2CCA-15-H60
Pipe Support Detail Pressurizer Spray System
Miscellaneous
CD30-349
Design Report Summary
CD35-209
Design Report Summary
LF200515-LR-005 Train A Pressurizer Spray Line Support 2CCA-15-H60
Structural End Attachment Opening - ANO Unit 2
Structural End Attachment Opening - ANO Unit 2
Procedures       OP-1306.003     Visual Inspection (VT-3) of Snubbers                       37
Procedures
Work Orders       WO             513466, 516086, 516094, 540955, 51665737, 51667491,
OP-1306.003
Visual Inspection (VT-3) of Snubbers
Work Orders
WO
513466, 516086, 516094, 540955, 51665737, 51667491,
51674080, 52240727, 52863040
51674080, 52240727, 52863040
34
}}
}}

Latest revision as of 07:17, 3 December 2024

Integrated Inspection Report 05000313/2020002 and 05000368/2020002
ML20218A442
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/05/2020
From: John Dixon
NRC/RGN-IV/DRP/RPB-D
To: Dinelli J
Entergy Operations
References
IR 2020002
Download: ML20218A442 (37)


Text

August 5, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE - INTEGRATED INSPECTION REPORT 05000313/2020002 AND 05000368/2020002

Dear Mr. Dinelli:

On June 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. On July 8, 2020, the NRC inspectors discussed the results of this inspection with Mr. J. Sullivan, General Manager of Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. Both findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects

Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313 and 05000368

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2020002 and 05000368/2020002

Enterprise Identifier: I-2020-002-0003

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

April 1, 2020 to June 30, 2020

Inspectors:

I. Anchondo, Reactor Inspector

R. Azua, Senior Reactor Inspector

T. DeBey, Resident Inspector

C. Henderson, Senior Resident Inspector

J. O'Donnell, Senior Health Physicist

T. Sullivan, Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313/2020002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes.

Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.

Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2020002-02 Open/Closed None 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at full power. On April 1, 2020, power was lowered to 80 percent as requested by the transmission system operator to support the 500 kV Mabelvale line maintenance outage. The unit was returned to full power on April 3, 2020.

Unit 2 began the inspection period in shutdown for Refueling Outage 2R27, which started on March 13, 2020. On April 20, 2020, Unit 2 commenced a reactor startup and the reactor was made critical. The unit was returned to full power on April 26, 2020.

On May 23, 2020, Unit 1 and Unit 2 power was lowered to 71 percent as requested by the transmission system operator to facilitate repairs on the 500 kV Mabelvale line. Unit 1 and Unit 2 were returned to full power on May 24, 2020.

On June 1, 2020, Unit 1 power was lowered to 30 percent to perform main generator voltage regulator power supply replacement and turbine governor valve stroke testing, and then the unit was returned to full power where it remained for the rest of the reporting period except for minor power reductions to support scheduled surveillances.

On June 2, 2020, Unit 2 power was lowered to 70 percent to perform circulation pump B bearing repairs. The unit was returned to full power on June 6, 2020, where it remained for the rest of the reporting period except for minor power reductions to support scheduled surveillances.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) Unit 1 and Unit 2 impending weather preparation for Tropical Depression Cristobal on June 8, 2020

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 pressurizer spray line train A on April 12, 2020
(2) Unit 1 electrical equipment room emergency chiller system train B for upper north electrical penetration room on April 20, 2020
(3) Unit 2 low pressure safety injection system train B on April 24, 2020
(4) Unit 1 penetration room ventilation system train A on April 30, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 upper north electrical penetration room, hot mechanic shop, and decon room, Fire Zone 149-E, Fire Area B-1, on April 8, 2020
(2) Unit 2 new core protection calculator room, Fire Zone 2098C, Fire Area G, on April 20, 2020
(3) Unit 2 emergency safeguard room B, Fire Zone 2007-LL, Fire Area AA, on April 24, 2020
(4) Unit 2 emergency safeguard room A, Fire Zone 2014-LL, Fire Area B-6, on April 24, 2020
(5) Unit 2 vital switchgear room 2A4, Fire Zone 2100-Z, Fire Area SS, on May 6, 2020
(6) Unit 2 electrical switchgear room 2B53, Fire Zone 2091-BB, Fire Area B-3, on May 12, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) Unit 2 fire drill for a fire in the emergency diesel generator 1 room, Fire Zone 2093-P, Fire Area KK, on June 15, 2020

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from March 19, 2020, to June 22, 2020:

03.01.a - Nondestructive Examination and Welding Activities:

  • Eddy Current Examination, Vessel Head Vent Line
  • Ultrasonic Examination, Shutdown Cooling Heat Exchanger Channel Inlet Nozzle (N1)/2E-35A
  • Visual Examination 2, Bolted Connection associated with Electrical Penetration 2E-66

03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities:

  • Visual Examination 3, Reactor Vessel Head Instrumentation Nozzle and Vent Line

03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities:

==2R27 Boric Acid Corrosion Control Evaluation Problem Identification and Resolution:

  • ==

The inspector reviewed 12 condition reports associated with inservice and operating experience issues and concluded that NDE/ISI related issues and operating experience are put into the corrective action program at low levels to ensure conditions and problems are identified

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) Unit 2 reactor startup from Refueling Outage 2R27 on April 20, 2020

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the Unit 1 licensed operator simulator evaluation scenario on June 10, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 1 and Unit 2 Alternating Current diesel generator unavailability hours near the 50.65(a)(1) threshold on April 28, 2020
(2) Unit 1 emergency feedwater initiation and control system instrumentation Channel C multiple power supply failures on May 21, 2020
(3) Unit 2 low pressure safety injection system on June 5, 2020

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Unit 2 pressurizer spray line train A snubber H-4 on April 20, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 startup transformer 3 breaker B126 planned outage replacement activities causing unavailability of the Unit 1 technical specification required 500 kV offsite circuit on April 1, 2020
(2) Unit 2 emergent work activities for control element assembly calculator Channel 1 and 2 failures on April 28, 2020
(3) Unit 2 emergent work activities for the swing charging pump C failure due to an oil leak on May 13, 2020
(4) Unit 1 emergent work activities control rod drive cooling pump B failure on May 26, 2020
(5) Unit 2 emergent work activities and unplanned 72-hour limiting condition for operation entry for emergency feedwater system train B steam generator B discharge valve 2CV-1039-1 failing closed on May 27, 2020
(6) Unit 2 emergent work for service water pump A failed to start during quarterly surveillance testing on June 9, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 safety-related switchgear and electrical rooms nonconservative heat load values for a failed fan coil unit single failure operability determination on April 8, 2020
(2) Unit 2 engineering safety feature train B room Door 206 chalk test failure operability determination on April 24, 2020
(3) Unit 2 containment spray train A header isolation valve 2CV-5612-1 seat leakage operability determination on May 5, 2020
(4) Unit 2 pressurizer spray line train A snubber failure past operability and increased vibration levels operability determination on May 13, 2020
(5) Unit 2 reactor coolant pump speed probe failures operability determination on May 20, 2020

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 pressurizer spray line train A snubber pin permanent modification on April 20, 2020
(2) Unit 2 reactor coolant speed probe replacement modification on May 22, 2020

Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)

(1) Unit 1 and Unit 2 severe accident management guidelines update on April 21, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Unit 1 and Unit 2 auto transformer restoration following startup transformer 3 breaker B0126 replacement on April 13, 2020
(2) Unit 2 containment spray header motor operated valve 2CV-5612-1 and 2CV-5613-2 valve seat corrective maintenance on April 16, 2020
(3) Unit 2 pressurizer spray line train A weld repair for locations 2CCA-47-1 and 2CCA-15-3 on May 5, 2020
(4) Unit 2 containment sump isolation valve 2CV-5648-2 corrective maintenance on May 5, 2020
(5) Unit 2 pressurizer spray line train A buffing flaw repair on May 13, 2020
(6) Unit 2 in core instrument flange number 2, 4, and 6 corrective maintenance on May 13, 2020
(7) Unit 2 containment penetration 2P68 failed local leak rate testing repair on June 1, 2020
(8) Unit 2 emergency feedwater motor drive pump room unit cooler leak repair on June 2, 2020
(9) Unit 2 containment isolation and actuation signal relay failure replacement on June 11, 2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Unit 2 Refueling Outage 2R27 activities from March 13 to April 21, 2020.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 1 penetration room ventilation system surveillance testing on April 23, 2020
(2) Unit 2 control element assembly drop time testing surveillance testing on April 24, 2020
(3) Unit 2 emergency diesel generator 2 buried fuel oil piping pressure testing on May 1, 2020
(4) Unit 2 swing charging pump C local operation surveillance testing on May 28, 2020

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Unit 1 and Unit 2 reactor coolant system leakage surveillance on June 2, 2020

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Unit 2 hot leg primary sample line containment isolation valve 2SV-5833-1 on April 27, 2020

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Unit 2 annual dynamic simulator exam with drill and exercise performance indication opportunity on June 24,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (9 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) SPING radiation monitors in Unit 1
(2) SPING radiation monitors in Unit 2 (3)2RE8911, Area Radiation Monitor (ARM) in Health Physics (HP) Area - 386 foot elevation (4)2RE8914, ARM in Cask Washdown Area - 404 foot elevation
(5) Portable friskers used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
(6) Survey meters ready for use in HP instrumentation room
(7) Telepole survey tools ready for use, HR-DR-348 and HR-DR-355
(8) Personnel contamination monitors used at the exit to the Unit 1 and Unit 2 radiologically controlled areas
(9) Small article monitors used at the exit to the Unit 1 radiologically controlled area

Calibration and Testing Program (IP Section 03.02) (11 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) FASTSCAN-1 Whole Body Counting System, 05/05/2020
(2) Ludlum-177 Frisker, CHP-CR-067, 02/06/2020
(3) Telepole WR, HP-DR-348, 01/27/2020
(4) ARGOS-5AB, ARGOS-003, 07/31/2019
(5) Canberra GEM-5, GEM-002, 05/20/2019
(6) Canberra GEM-5, GEM-008, 05/22/2019
(7) Eberline PCM-1B, PCM-013, 08/31/2019
(8) Eberline PM-7, EPM-001, 03/31/2020
(9) Gamma Scintillation Tool Monitor (SAM11), GSAM-007, 12/17/2018
(10) Ludlum-177 Frisker, CHP-DR-156, 10/14/2019
(11) ARGOS-5AB, ARGOS-001, 07/14/2019

Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Work Order (WO) 52804554, Unit 1 Effluent Process Radiation Monitor, RE-4642, 09/26/2019
(2) WO 52834502, Unit 1 SPING 3 Radiation Monitor, RX-9830, 03/06/2020

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Unit 1 Reactor Building Purge Exhaust System
(2) Unit 1 Liquid Radioactive Waste Systems
(3) Unit 1 Fuel Handling Area Exhaust System
(4) Unit 1 Gaseous Radioactive Waste System

Sampling and Analysis (IP Section 03.02) (4 Samples)

(1) June 18, 2020, Gaseous Effluent Filter, Gas and Charcoal Samples, Unit 2 Auxiliary Building Extension
(2) March 6, 2020, Liquid Effluent Sample, Neutralizing Tank
(3) April 26, 2019 - May 2, 2019, Liquid Effluent Sample, Unit 2 Turbine Building Sump
(4) February 8, 2018, Gaseous Effluent Sample, Charcoal and Gas, SPING 3, Unit 1 Fuel Handling Area

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) Dose Calculations Associated with Liquid Radioactive Waste Permits:

1LR2018-0030, 2LR2019-0006, 1LR2020-0012

(2) Dose Calculations Associated with Gaseous Radioactive Waste Permits:

1GR2018-0005, 1GR-2019-0050, 2GR2020-0009

Abnormal Discharges (IP Section 03.04) (1 Sample)

(1) There were no abnormal discharges during the monitoring period.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

Groundwater Protection Initiative Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative (GPI) program to identify incomplete or discontinued program elements. There were no incomplete or discontinued program elements identified.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage and Control (IP Section 03.01) (3 Samples)

Inspectors evaluated the licensees performance in controlling, labeling, and securing radioactive materials:

(1) The inspectors walked down the old and new Radwaste Buildings and Sealand Storage (O/S South) and observed the following containers integrity, labeling, and security from unauthorized access:
  • B-25 Box - EQ-116 containing Unit 1 Nozzle Dams
  • Sealand - EQ-015 containing Aux/Rx Building Scaffold
  • 55-gallon drums containing secondary resins
(2) The inspectors verified selected sealed sources, Source Identification Numbers 48, 171, 917, 1014, 1015, 1210 and 1211, were labeled, secured, and leak tested. The inspectors reviewed the licensees records regarding leak testing of sources in inventory and transactions in accordance with 10 CFR 20.2207.
(3) The inspectors reviewed the licensee's 10 CFR Part 37 security plan and associated annual program audits and assessments for program deficiencies regarding access controls and security for subject radioactive material.

Solid Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality for:

(1) New and Old Radwaste Buildings
(2) Spent Resin Transfer System

Waste Characterization and Classification (IP Section 03.03) (3 Samples)

The inspectors evaluated the licensees characterization and classification of radioactive waste. The inspectors reviewed the following selected 10 CFR Part 61 waste stream analyses:

(1) F-3 reactor coolant system filters
(2) F-4 spent fuel pool filters
(3) Dry active waste

Shipment Preparation (IP Section 03.04) (1 Sample)

(1) The inspectors observed the preparation and shipment of a non-excepted, low specific activity (LSA) dry active waste (DAW) radioactive material shipment, RSR-20-069. The shipment was classified as a LSA I shipment.

Shipping Records (IP Section 03.05) (5 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1) RSR-18-047: LSA II of DAW
(2) RSR-18-167: LSA II of DAW
(3) RSR-19-138: LSA II of DAW and chillers
(4) RSR-20-023: LSA II of DAW
(5) RSR-20-047: LSA II of DAW

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2019 - March 31, 2020)
(2) Unit 2 (April 1, 2019 - March 31, 2020)

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)

(1) Unit 1 (April 1, 2019 - March 31, 2020)
(2) Unit 2 (April 1, 2019 - March 31, 2020)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 1 (April 1, 2019 - March 31, 2020)
(2) Unit 2 (April 1, 2019 - March 31, 2020)

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) October 1, 2019 - December 31, 2019

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) Unit 1 and Unit 2 obsolete equipment/parts management on June 26, 2020

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 2 pressurizer spray line A snubber failures and reactor coolant system piping defects extent of condition review on May 27,

INSPECTION RESULTS

Failure to Design Alarm Chassis with Reflash Capability with Multiple Inputs Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000313/2020002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50), Appendix B, Criterion III, Design Control, for the licensees failure to assure that the applicable design basis requirements, associated with the Unit 1 safety-related electrical equipment room high temperature alarm chassis, were reviewed for suitability of application of materials, parts, equipment, and processes. Specifically, the licensee failed to ensure an alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a loss of coolant accident.

Description:

The inspectors reviewed the current license and design basis associated with the safety-related electrical equipment room emergency chiller system, Procedure OP-1203.012-N, Annunciator K16 Corrective Action, Revision 49, and Procedure OP-1104.027, Battery and Switchgear Emergency Cooling System, Revision 51. From this review, the inspectors identified the following:

  • Unit 1 Safety Analysis Report: The electrical equipment room emergency chillers are designed to maintain a maximum temperature of 120 degrees Fahrenheit (F) in the safety-related 4160 V switchgear rooms, the electrical equipment rooms, and the battery/DC rooms during a loss of coolant accident (LOCA). Long-term operator actions may be required to open doors to the south electrical room (Room 104) to maintain temperatures within limits. The long-term operator actions were established in 2007 when it was identified by the licensee that during worst-case accident/ambient conditions, even if the south emergency switchgear room chiller VCH-4B and the south electrical equipment room emergency unit cooler VUC-14D are operating as designed, action was required to maintain operability of electrical equipment in the room. Additionally, Calculation CALC-91-E-0090-10, ANO-1 North Electrical Room 149 HVAC Evaluation, Revision 4, determined that the maximum temperature of north electrical equipment room (Room 149) was 118.4 degrees F during a LOCA.

Room 149s maximum temperature occurs with the north emergency switchgear room chiller VCH-4A and north equipment room emergency unit cooler VUC-14B are operating as designed.

  • Procedure OP-1203.012-N: The safety-related electrical equipment room temperature high alarm setpoint was 104 degrees F and has multiple inputs from temperature switches in safety-related electrical equipment rooms and does not have reflash capability. The purpose of this alarm is to warn control room operators of a degraded condition with the safety-related electrical equipment room emergency chiller system. Additionally, if the alarm is received during a LOCA, Procedure OP-1203.012-N instructs operators to perform actions in accordance with Procedure OP-1104.027.
  • Procedure OP-1104.027: In the worst-case LOCA ambient conditions, the following actions are needed as soon as 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> after the accident, but they are taken promptly whenever a room high temperature alarm (104 degrees F) is received, even if the south emergency switchgear room chiller VCH-4B and south electrical equipment room emergency unit cooler VUC-14D are operating as designed. The operator action is to open and hold open the door for the electrical equipment room (Door 49) and the missile door for the electrical equipment room (Door 62) as soon as practicable and within 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br />. The inspectors did not identify any procedural requirement to monitor the temperatures of unaffected safety-related electrical equipment rooms, once a safety-related electrical equipment room high temperature alarm has been received during LOCA for Room 104 or Room 149.

From the information above, the inspectors concluded without reflash capability of the safety-related electrical equipment room temperature high alarm or additional monitoring of the unaffected safety-related electrical rooms, operators would not be able to identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate alarm card corrective actions during a LOCA. The licensee entered this deficiency into the corrective action program as Condition Report CR-ANO-1-2020-00668.

Corrective Actions: The licensee initiated a procedure improvement form, PIF-1-20-0130, to update Procedure OP-1104.027 to implement additional monitoring when a room temperature high alarm is received and will not clear. Additionally, the licensee initiated a design change to create a reflash capability for the electrical equipment room temperature high alarm.

Corrective Action References: Condition Report CR-ANO-1-2020-00668

Performance Assessment:

Performance Deficiency: The licensees failure to design an alarm chassis with multiple safety-related electrical room high temperature alarms with reflash capability was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensees failure to design an alarm chassis with multiple safety-related electrical room high temperature alarms with reflash capability would prevent operators from identifying a degraded condition associated with the safety-related electrical equipment room emergency chiller system and from performing appropriate alarm card corrective actions during a LOCA.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was determined to be of very low safety significance (Green) because it

(1) was not a design deficiency or qualification impacting operability or probabilistic risk assessment (PRA)functionality,
(2) did not represent a loss of system and/or function,
(3) did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time,
(4) did not represent a loss of the probability risk analysis function of two separate technical specification systems for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
(5) did not represent a loss of probability risk analysis system and/or function for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
(6) did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-Cutting Aspect: None. A cross-cutting aspect was not assigned to this finding because the performance deficiency occurred in 2007 and, therefore, is not indicative of current licensee performance.

Enforcement:

Violation: As required, in part, by 10 CFR Part 50, Appendix B, Criterion III, Design Control, measures shall be established to assure that applicable regulatory requirements and the design basis, as defined in 50.2 and as specified in the licensee application, for those structures, systems, and components to which this appendix applies. Measures shall also be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems, and components.

Contrary to the above, from April 2007 to April 2020, the licensee failed to establish measures to assure that applicable regulatory requirements and the design basis, as defined in 50.2 and as specified in the licensee application that for those structures, systems, and components to which this appendix applies. Measures shall also be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems, and components for the Unit 1 safety-related electrical equipment room high temperature alarm chassis. Specifically, the licensee failed to ensure this alarm chassis with multiple inputs had alarm reflash capability to ensure operators would identify a degraded condition associated with the safety-related electrical equipment room emergency chiller system and take appropriate operator action during a LOCA.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Take Corrective Actions for Conditions Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000368/2020002-02 Open/Closed None 71152 The inspectors reviewed a self-revealed, Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to assure that conditions adverse to quality, such as, defective material and equipment are corrected. Specifically, the licensee identified through a visual examination (VT-3) of a Unit 2 safety-related snubber and associated attachments identified multiple degraded conditions, but failed to take corrective actions to correct the defective material, a condition adverse to quality. Consequently, the failure to correct the adverse condition contributed to the failure of the snubber.

Description:

During the 2020 Unit 2 spring refueling outage, a Lisega hydraulic snubber, 2CCA-15-H60, was found fully disconnected on the reactor building floor during the initial walkdown performed. During walkdowns to identify the source of the disconnected snubber, snubber 2CCA-13-H4 was also identified as disconnected at the pipe clamp. The snubber remained within the degraded pipe clamps, but the load pin could not be located. This condition prompted the licensee to complete a stress analysis to assure that the structural integrity of the piping system remained within design. The licensee concluded that after snubber 2CCA-13-H4 lost its load pin at the pipe clamp, the added vibration experienced in the system resulted in the failure of snubber 2CCA-15-H60. Prior to plant start-up, the inspectors reviewed the vibration analysis and did not identify any issues with continued operation of the pressurizer spray line system.

A review of the past maintenance history for snubber 2CCA-13-H4 revealed that in 2009, snubber 2CCA-13-H4 had been visually examined (VT-3) twice during maintenance activities per WO 51667491. The work was completed using Procedure 1306.003, Visual Inspection, VT-3 & Limited Operability Testing of Snubbers, Revision 28. During the initial VT-3 examination, the licensee documented multiple degraded conditions detailed as spherical bearing damaged, load stud worn and deformed, extension worn down in pipe clamp, excessive clearance from worn extension and bearing damage, and an unacceptable clearance on the structure clevis. The non-destructive examination (NDE) report referenced Condition Report CR-ANO-2-2009-02376 as a corrective action. The inspectors reviewed this condition report and noted that it was closed to Work Order WO 51667491, which performed the removal and installation of several snubbers in accordance with Procedure 1402.130, Snubber Removal and Installation, Revision 51. As required by the procedure, the licensee performed a second VT-3 examination on snubber 2CCA-13-H4 after its maintenance had been completed. The inspectors noted that the second NDE report documented the following degraded conditions: extension paddle has excessive wear, bearing does not have enough surface contact with paddle, pipe clamp has excessive wear from extension paddle rubbing in pipe clamp. The NDE report did not reference any additional corrective actions. The inspectors reviewed the Adverse Condition Analysis (ACA)report as documented in Condition Report CR-ANO-2-2020-0867. The inspectors concluded that no additional corrective actions (i.e., condition reports, work orders, evaluations, etc.) had been taken subsequent to the second VT-3 examination of snubber 2CCA-13-H4.

Corrective Actions: The licensee replaced snubber 2CCA-13-H4 and repaired the degraded pipe clamps.

Corrective Action References: Condition Reports CR-ANO-2-2020-00867, ANO-2-2020-02243, and ANO-2-2020-02797.

Performance Assessment:

Performance Deficiency: The licensees failure to take corrective actions following the identification of multiple degraded conditions during a VT-3 examination of snubber 2CCA-13-H4 was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to correct the condition adverse to quality resulted in the failure of snubber 2CCA-13-H4.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was determined to be of very low safety significance (Green) because it

(1) was not a design deficiency or qualification impacting operability or PRA functionality,
(2) did not represent a loss of system and/or function,
(3) did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time,
(4) did not represent a loss of the probability risk analysis function of two separate technical specification systems for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
(5) did not represent a loss of probability risk analysis system and/or function for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and
(6) did not result in the loss of a high safety-significant, nontechnical specification train.

Cross-Cutting Aspect: None. A cross-cutting aspect was not assigned to this finding because the performance deficiency occurred in 2009 and, therefore, is not indicative of current licensee performance.

Enforcement:

Violation: As required, in part, by 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are corrected.

Contrary to the above, from August 15, 2009 to March 14, 2020, the licensee failed to correct a condition adverse to quality associated with snubber 2CCA-13-H4 defective material and equipment. Specifically, the VT-3 examination identified structural degradation of the extension paddle and pipe clamp of snubber 2CCA-13-H4, but failed to correct or evaluate these conditions adverse to quality.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Observation: Semiannual Trend Review 71152 The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation available to help identify performance trends that might indicate the existence of a more significant safety issue. The inspectors verified that the licensee was taking corrective actions to address the identified adverse trends. The inspectors did not review any cross-cutting themes because none existed at the site.

To verify that the licensee was taking corrective actions to address identified adverse trends that might indicate the existence of a more significant safety issue, the inspectors reviewed the corrective action program documentation associated with a potential adverse trend in management of obsolete equipment from the time period of December 2019 through June 2020. Selected examples of these events included:

  • CR-ANO-1-2020-0363: There are 27 overcurrent relays associated with the 4160 Vac safety-related motors that are scheduled for setting changes during the spring 2021 Unit 1 refueling outage. These overcurrent relays are obsolete and replacements are not available. The inspectors did not identify a bridging strategy or an equivalent replacement relay. Unavailability of these relay replacements could extend the outage time and result in a vulnerability of safety systems.
  • CR-ANO-2-2020-2602: The emergency diesel generator B heat exchanger drain valve (2SW-1125) was leaking and the handwheel slipped when valve tightening was attempted. Work Order 542027 was issued to repair the valve, but after the valve was disassembled it was determined that parts were unavailable and cannot be purchased because of obsolescence. The valve was reinstalled in the as-found condition and was externally watertight. An equivalent replacement will need to be identified and procured to repair the drain valve leakage. Leakage through this valve could potentially cause a loss of flow to the heat exchanger and threaten the inventory of the emergency cooling pond during situations where it is the source of service water.
  • CR-ANO-2-2020-1060: During performance of Procedure OP-2305.003, Emergency Safety Feature Response Time Test, Revision 41, it was determined that relay 2C40-K210B in the containment isolation actuation system (CIAS) had failed.

Work Order 541387 was written to replace the failed relay, but an exact replacement was not available, and an equivalency review was needed before the relay could be replaced. Although a replacement relay was identified and used, the licensee determined that neither the original relay nor the replacement relay were still being manufactured and that spare parts were in very limited supply. The failed relay was kept and designated to be rebuilt or refurbished so it could be reused. A similar issue was identified with another model of CIAS relay in Condition Report CR-ANO-2-2020-1235. Failure of a CIAS relay could result in an uncontrolled radiological release from containment.

  • CR-ANO-2-2020-1786, 1944, 1968, 1970, 2142, and 2143: During performance of Work Order 52864561 to calibrate the steam dump and bypass control system, a valve did not stroke as expected. Subsequent actions ultimately resulted in multiple control system cards needing to be replaced. However, replacement cards were not available and emergent repair of failed cards was necessary. This event delayed the return of Unit 2 to power following Refueling Outage 2R27. Condition Report CR-ANO-2-01944 stated, This event highlighted the obsolescence vulnerability of the SDBC system. Planned replacement of this system is scheduled for the fall 2024 Refueling Outage 2R30, but an adequate bridging strategy was not identified by the inspectors. Failure of the steam dump and bypass control system could cause a significant transient to the reactor and could negatively impact the ability of the plant to be cooled through the steam generators after a plant trip.
  • CR-ANO-2-2020-2200: Alarms received in the control room for the alternate AC diesel generator flame detectors prompted troubleshooting that revealed that both the engine flame detectors had failed. These items are obsolete, and no replacements are on site for the repairs. An upgrade of the fire detection system is planned for the 2024-2028 timeframe, but it is not acceptable to have the alarms locked in until that work is done. A work request was generated to resolve this issue. Failure of these flame detectors reduces the ability of the alternate AC diesel generator fire protection system to detect and respond to system fires.

The licensees immediate corrective actions for the recent potential adverse trend in equipment obsolescence included:

  • Discussions have occurred among the site engineering staff relative to the sites program for managing obsolescence issues.
  • The ANO equipment reliability team has initiated tasks to identify critical spares, document the risk significance of limited spares, and prioritize efforts to address the identified vulnerabilities.
  • ANO site engineering has identified equipment obsolescence as an area that needs increased attention. An effort has been initiated to determine the safety significance of obsolescent equipment and to develop a bridging or replacement strategy. The sites goal is to have the affected Tier 1 equipment identified and prioritized by the end of July 2020.

The inspectors noted the following:

1. The licensees immediate actions have not been in effect long enough to know

whether they will reduce the number of obsolete equipment issues that are happening at the site.

2. Planning for replacement of obsolete components has resulted in the determination of

equivalence when it actually did not exist. This has caused the inability to complete work orders and the necessity to defer that work until suitable parts can be identified and obtained.

3. Continued aging of the plants will result in additional items becoming obsolete and

may challenge the sites ability to prevent future operability and functionality concerns.

4. The sites method of dealing with obsolescence issues has been more reactive than

proactive, but that is being changed with a new initiative in the engineering department. Obsolescent components exist in both safety and nonsafety systems with a potential increasing site risk to initiating events and unplanned unavailability of systems needed to mitigate design basis events. Many potential benefits can be realized from a proactive response to addressing obsolescence issues, such as it will potentially reduce site risk due to obsolescent equipment.

5. The site has identified multiple instances of their equipment database not being

updated after obsolete components were replaced with new, equivalent components (Condition Report CR-ANO-2-2019-03085). This weakness has a negative effect on work planning and parts inventory. A rollup Engineering Change (EC-84307) was performed to ensure that current equipment information is captured in the sites Asset Suite database. In the EC, 13 condition reports written in 2019 were identified with issues involving accuracy of the sites equipment database, drawings, or Asset Suite database. It is unclear if an attempt was made to identify similar issues prior to 2019, so database errors may still exist.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 19, 2020, the inspectors presented the public radiation safety inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
  • On June 22, 2020, the inspectors presented the inservice inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
  • On July 8, 2020, the inspectors presented the integrated inspection results to Mr. J. Sullivan, General Manager of Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

CR-ANO-

C-2011-02952

Procedures

OP-1203.025

Natural Emergencies

OP-2203.008

Natural Emergencies

OP-2203.054

Abnormal Grid

71111.04

Calculations

CALC-2CCA-13-

H4

Pipe Support CALC System Reactor Misc System

CALC-2CCA-15-

H60

Support Qual for 2CCA-15-H60

CALC-80-D-

1083A-01

Room 111 Heat Load Assessment

CALC-84-D-1069-

Room 105 Heat Load Assessment and HVAC Evaluation

CALC-91-E-0090-

ANO-1 4160V Switchgear HVAC Evaluation

CALC-91-E-0090-

ANO-1 North Electrical Room 149 HVAC Evaluation

CALC-93-R-1040-

ANO-1 AB Limiting Component Qualification Temperatures

CALC-E-0090-06

Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109,

110, 149 for Post-Accident Cooling and Appendix R

Corrective Action

Documents

CR-ANO-

1-2007-00339, 1-2020-00541, 2-2020-00629, 2-2020-00720,

2-2020-00755, 2-2020-00764, 2-2020-00823, 2-2020-01514,

2-2020-01523, 2-2020-01673

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

1-2020-00643, 2-2020-01923, 2-2020-02197, 2-2020-02198,

2-2020-02199, 2-2020-02203

Drawings

2CCA-13-1

Large Pipe Isometric Reactor Coolant System

2CCA-13-H4

Hanger Detail Reactor Coolant System

2CCA-15-4

Large Pipe Isometric Pressurizer Spray System

2CCA-15-H60

Pipe Support Detail Pressurizer Spray System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

M-2230, Sheet 1

Piping and Instrument Diagram Reactor Coolant System

M-2230, Sheet 2

Piping and Instrument Diagram Reactor Coolant System

M-2231, Sheet 1

Piping and Instrument Diagram Chemical and Volume Control

System

148

Engineering

Changes

EC-13704

Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02

(RM 1050, and CALC-80-D-1083A-01 (RM 111) to Incorporate

Cable Heat Losses

EC-86288

Enhance Supports 2CCA-13-H4, 2CCA-13-1-H5, 2CCA-14-1-

H3 and 2CCA-15-H60 As a Result of CR-ANO-2-2020-0720,

CR-ANO-2-2020-1633, CR-ANO-2-2020-1655, and CR-ANO-

2-2020-0755

Miscellaneous

ULD-1-SYS-23

ANO Unit 1 Penetration Room Ventilation System

Procedures

OP-1104.027

Battery and Switchgear Emergency Cooling System

OP-1104.043

Penetration Room Ventilation System

OP-1203.012N

Annunciator K16 Corrective Action

OP-5120.417

In-Place Testing of the Unit 1 Penetration Filtration System

Work Orders

WO 541943, 516094, 52841004

71111.05

Calculations

CALC-95-R-0024-

Basic Requirements for Component Database on Station

Doors and Hatches

Corrective Action

Documents

CR-ANO-

2-2016-03077, 2-2020-01542, 2-2020-01691, 2-2020-02333,

2-2020-02334, C-2020-01033

Drawings

FP-102

Fire Operating Floor Plan EL 386'-0"

Miscellaneous

3167

Fire Impairment

FBDRL 2020-08

Fire Pre-drill Brief Document

FHA

Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and

Unit 2

Procedures

OP-1000.120

ANO Fire Impairment Program

OP-1203.049

Fires in Areas Affecting Safe Shutdown

OP-2203.049

Fires in Areas Affecting Safe Shutdown Technical Guidelines

Work Orders

WO 481231

71111.08P

Corrective Action

Documents

CR-ANO-

2-2018-01069, 2-2019-00180, 2-2019-03046, 2-2019-03127,

2-2019-03209, 2-2020-00003, 2-2020-00325, 2-2020-00996,

2-2020-01205, 2-2020-01390, 2-2020-01427, 2-2020-01449

NDE Reports

Arkansas Nuclear One Unit 2 2R26, 10 Year Reactor Vessel

08/27/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Examination, October 2018

Procedures

CEP-BAC-001

Boric Acid Corrosion Control (BACC) Program Plan

CEP-NDE-0400

Ultrasonic Examination

CEP-NDE-0477

Manual Ultrasonic Examination of Austenitic and Ferritic

Vessels Not Greater than 2" in Thickness (ASME XI)

CEP-NDE-0641

Liquid Penetrant Examination (PT) for ASME Section XI

CEP-NDE-0902

VT-2 Examination

CEP-NDE-0903

VT-3 Examination

CEP-NDE-0955

Visual Examination (VE) of Bare-Metal Surfaces

307

CEP-WP-GWS-1

General Welding Standard ASME/ANSI

EN-DC-319

Boric Acid Corrosion Control Program (BACCP)

SEP-CISI-ANO-

105

Program Section for ASME Section XI, Division 1, ANO-2

Containment Inservice Inspection Program

SEP-ISI-ANO2-

105

Program Section for ASME Section XI, Division 1, ANO-2

Inservice Inspection Program

SEP-PT-ANO-001 Arkansas Nuclear One ASME Section XI Inservice Inspection

Pressure Testing (PT) Program Section

Self-Assessments LO-ALO-2019-

00083 CA 2

Arkansas Nuclear One, Pre-NRC 2R27 ISI Activities Self-

Assessment Report

2/03/2019

71111.11Q Procedures

EN-RE-302

PWR Reactivity Maneuver

OP-2102.016

Reactor Startup

71111.12

Calculations

CALC-92-D-2011-

AAC Generator Building Heating and Ventilation and AC Eval

Corrective Action

Documents

CR-ANO-

1-2019-00292, 1-2020-00260, 1-2020-00445, 1-2020-00462,

1-2020-00571, 1-2020-00598, 2-1989-00092, 2-2000-00929,

2-2006-01238, 2-2011-00792, 2-2013-00691, 2-2016-04340,

2-2017-02321, 2-2017-03337, 2-2017-03355, 2-2017-03388,

2-2017-03410, 2-2017-03411, 2-2017-03616, 2-2017-03656,

2-2017-03700, 2-2017-03740, 2-2017-03977, 2-2017-04353,

2-2017-04354, 2-2017-04355, 2-2017-05087, 2-2018-00653,

2-2018-02583, 2-2018-04175, 2-2019-00125, 2-2019-00328,

2-2019-01003, 2-2019-01153, 2-2019-01314, 2-2019-01452,

2-2019-01751, 2-2019-01752, 2-2019-02104, 2-2019-02154,

2-2019-02253, 2-2019-02549, 2-2020-00513, 2-2020-00968,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-2020-01078, 2-2020-01234, 2-2020-01395, 2-2020-01424,

2-2020-01447, 2-2020-01486, 2-2020-01611, 2-2020-01615,

2-2020-01633, 2-2020-01642, 2-2020-01658, 2-2020-01665,

2-2020-01673, 2-2020-01682, 2-2020-01709, 2-2020-01731,

2-2020-01802, 2-2020-02104, 2-2020-02197, 2-2020-02198,

2-2020-02199, 2-2020-02203, C-2006-00682, C-2019-02209,

C-2019-02571, C-2020-00456, C-2020-00624, C-2020-00636

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2020-01557

Drawings

E-2005, Sheet 1

Single Line Meter and Relay Diagram 4160 Volt System

Engineering System Features

E-2005, Sheet 2

Single Line Meter and Relay Diagram AAC Generator System

4.16 kV Generator and Switchgear

Engineering

Changes

EC-13191

Evaluate the Operational Requirements to Take Either One of

the Three AACG Engine Room Rans Out of Service for

Maintenance

Miscellaneous

STM 2-33

Alternate AC Diesel Generator

ULD-0-SYS-19

ANO Unit 1 and Unit 2 Alternate AC Generator System (AAC)

Procedures

EN-DC-205

Maintenance Rule Monitoring

OP-1107.002

ES Electrical System Operation

OP-1202.008

Blackout

OP-1416.050

Unit 1 and 2 ICA51A and IAC51B Relay Test Instructions

OP-1416.053

Unit 1 and 2 IAC77 Relay Test Instructions

OP-1416.084

Basler BE1-51 Relay Test Instructions

OP-2104.037

Alternate AC Diesel Generator Operations

OP-6030.110

Termination Splicing and Soldering of Cable and Wires

Work Orders

WO 507265, 525148, 525878, 527408, 531333, 50236653,

2410511, 52617453, 52798794, 52803494, 52868761

71111.13

Calculations

CALC-09-E-0002-

ANO-1 Start-Up 2 Fast and Manual Transfer Capability

Corrective Action

Documents

CR-ANO-

2-2020-00642, 2-2020-00651, 2-2020-00657, 2-2020-00650,

2-2020-02122, 2-2020-02153, 2-2020-02171, 2-2020-02193,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-2020-02194, 2-2020-02282, 2-2020-02285, 2-2020-02319,

2-2020-02446, 2-2020-02451, 2-2020-02458

Miscellaneous

FHA

Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and

Unit 2

Procedures

EN-MA-125

Troubleshooting Control of Maintenance Activities

EN-OP-119

Protected Equipment Posting

EN-WM-104

On Line Risk Assessment

EN-WM-104

On Line Risk Assessment

EN-WM-104

On Line Risk Assessment

OP-1107.001

Electrical System Operations

131

OP-1203.003

Control Rod Drive Malfunction Action

OP-2105.009

CEDM Control System Operation

OP-2107.001

Electrical System Operation

131

OP-2203.049

Fires in Areas Affecting Safe Shutdown

Work Orders

MWO

236324

WO 543225, 543542, 543584, 545045

71111.15

Calculations

CALC-91-E-0090-

Heat Load Determination for Rooms 95, 98, 99, 100, 104, 109,

110, 149 for Post Accident Cooling and Appendix R

CALC-91-E-0090-

ANO-1 4160V Switchgear HVAC Evaluation

CALC-91-E-0090-

ANO-1 North Electrical Room 149 HVAC Evaluation

CALC-92-E-0103-

ANO-1 Switchgear, Battery, DC, and Corridor 98 HVAC

Evaluation

CALC-93-R-1040-

ANO-1 AB Limiting Component Qualification Temperatures

CALC-95-R-0024-

Basic Requirements for the Component Database on Station

Doors and Hatches

CALC-ANOC-CS-

15-00003

ANO Flood Protection Design Basis

CALC-ANOC-CS-

15-00012

ANO Flood Protection Room Evaluations - Units 1 and 2

Corrective Action

Documents

CR-ANO-

1-2020-00507, 1-2020-00541,1-2020-00585, 2-2019-02219, 2-

20-00220, 2-2020-00629, 2-2020-01491, 2-2020-01643, 2-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20-01706, 2-2020-01743, 2-2020-01954, 2-2020-01972, 2-

20-02000, 2-2020-02113, 2-2020-02115, 2-2020-02187, 2-

20-02192, 2-2020-02296

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

1-2020-00668, 1-2020-00669, 2-2020-02264

Engineering

Changes

EC-59915

Reduced Latching Requirements for Watertight Doors - Units 1

and 2

EC-86248

Operability Input for CR-ANO-1-2020-00507

Miscellaneous

ER-ANO-2006-

0308

Evaluate Use of Manually Substituted RCP Speed Inputs to

COLSS

ULD-1-SYS-16

4.16 kV System

Work Orders

WO 481231, 506581, 513857

71111.18

Corrective Action

Documents

CR-ANO-

2-2020-01688, 2-2020-01761, 2-2020-01788, 2-2020-01878,

2-2020-01917, 2-2020-01923, 2-2020-00720, 2-2020-00755,

2-2020-00764, 2-2020-00823

Engineering

Changes

EC-35597

Evaluation for Wireless Vibe Data Equipment in Unit 2

Containment and Wireless Access Point

EC-86288

Enhance Supports 2CCA-13-H4, 2CCA-13-H005, 2CCA-14-1-

H003, and 2CCA-15-H60 As A Result of CR-ANO-2-2020-

00720, CR-ANO-2-2020-01633, CR-ANO-2-2020-01655, and

CR-ANO-2-2020-00755

EC-86606

2CCA-13-H4 Load Pin Configuration Compliance

Miscellaneous

1(2)DPG-001

Diagnostic Process Guideline

1(2)SAG-001

Initial Response

1(2)SAG-002

TSC Recommending Strategies

1(2)SAG-003

Inject into Steam Generators

1(2)SAG-004

Depressurize RCS

1(2)SAG-005

Inject into RCS

1(2)SAG-006

inject into containment

1(2)SAG-007

Reduce Containment Hydrogen

1(2)SAG-008

Control Containment Pressure

1(2)SAG-009

Mitigate Fission Product Release

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1(2)SAG-010

Control SFP Level

1(2)TSG-001

Instrumentation

1(2)TSG-004

Benefit Consequence

ER-ANO-2006-

0308

Evaluate Use of Manually Substituted RCP Speed Inputs to

COLSS

Procedures

EN-DC-106

Temporary Installation of Measurement and Test Equipment

(M&TE)

Work Orders

WO 516094, 541684, 541685, 52810939, 52814416

71111.19

Corrective Action

Documents

CR-ANO-

2-2020-00629, 2-2020-00720, 2-2020-00755, 2-2020-00764,

2-2020-00823, 2-2020-01030, 2-2020-01060, 2-2020-01061,

2-2020-01076, 2-2020-01081, 2-2020-01174, 2-2020-01235,

2-2020-01236, 2-2020-01322, 2-2020-01375, 2-2020-01381,

2-2020-01410, 2-2020-01412, 2-2020-01454, 2-2020-01519,

2-2020-01573, 2-2020-01589, 2-2020-01595, 2-2020-01572,

2-2020-01670, 2-2020-01871, 2-2020-01872, 2-2020-01928,

2-2020-01987, 2-2020-01991, 2-2020-02035, 2-2020-02048,

C-2020-01245

Engineering

Changes

EC-74216

Replacement of B0126 22kV Supply Breaker for SRT (Startup

Transformer #3 Voltage Regulator)

EC-86302

Pipe Surface Abrasion/Scratch on 2CCA-15-4", 2CCA-47-1"

and 2CCA-13-3"

EC-86348

Establish New Reference Values for 2CV-5612-1 and 2CV-

5613-2

EC-86403

Replace Corroded Sections of the 2VUC-6B Room Cooler

Housing

EC-86428

Evaluation of Indications on PZR Spray Line

Miscellaneous

2-BOP-UT-20-035

2-BOP-UT-20-057

EN-CS-S-008-

MULTI

Pipe Wall Thinning Structural Evaluation

NCIG-05

Guidelines for Piping System Reconciliation

Procedures

OP-2104.005

Containment Spray

84, 86

OP-2305.017

Local Leak Rate Testing

OP-2305.054

Offsite Power Transfer Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OP-3305.001

OPS System Alignment Tests

Work Orders

WO 29657, 478111, 506581, 516094, 518796, 519374, 525675,

541387, 541519, 541821, 542787, 52864390

71111.20

Calculations

CALC-07-E-0016-

Accountability of Unit 2 Containment Sump Strainers

Sacrificial Surface Area

CALC-94-D-6007-

Pipe Stress and Support Evaluation of ISO 2CCB-51-1

Corrective Action

Documents

CR-ANO-

2-2020-01439, 2-2020-00948, 2-2020-00755, 2-2020-01587,

2-2020-01590, 2-2020-01683, 2-2020-01710, 2-2020-01711,

2-2020-01824, 2-2020-00979, 2-2020-01115, 2-2020-01836,

2-2020-01843, 2-2020-01846, 2-2020-01860, 2-2020-01861,

2-2020-01892, 2-2020-01893, 2-2020-01745, 2-2020-01896,

2-2020-01899

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

2-2020-01229, 2-2020-01908, C-2020-01446

Engineering

Changes

EC-18260

GSI-191 Program Document Updates

EC-47217

Spent Fuel Pool Cooling Pump Alternate Power Source

Connection

EC-85563

Evaluate and Provide Guidance for Providing Temp Power to

Both U2 SFP Cooling Pumps

Procedures

MRS-SSP-3156

Waterford 3 and ANO 2 Fuel Reconstitution 16x16 CE NFG

Fuel Assemblies

NF-ANO-19-049

Core Loading Plan for Arkansas Nuclear One Unit 2 Cycle 28

0, 1

OP-1015.036

Containment Building Closeout

56, 57

OP-2203.002

Spent Fuel Pool Emergencies

OP-2302.049

ANO-2 Fuel Assembly Reconstitution

OP-2503.003

Operation of Fuel Handling Equipment

OP-6030.110

Termination Splicing and Soldering of Cable and Wire

Work Orders

WO 2863684, 540856, 363443, 363443, 365081, 524119

71111.22

Calculations

CALC-90-E-0116-

ANO-2 EOP Setpoint Basis Document

CALC-91-E-0090-

ANO-1 North Electrical Room 149 HVAC Evaluation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-ANO-

1-2009-00894, 2-2020-00960, 2-2020-01301, 2-2020-01305,

2-2020-01307, 2-2020-01410, 2-2020-01462, 2-2020-01463,

2-2020-01591, 2-2020-01794, 2-2020-01795, 2-2020-01796,

2-2020-01797, 2-2020-02058, 2-2020-02068, 2-2020-02315,

C-2016-03493, C-2020-00965, C-2020-00974, C-2020-01030

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

2-2020-02308

Drawings

M-2217, Sheet 1

P&ID Emergency Diesel Generator Fuel Oil System

Engineering

Changes

EC-13704

Updated CALC-91-E-01334-01 (RM 79), CALC-84-D-1069-02

(RM 105), and CALC-80-D-1083A-01 (RM 111) to Incorporate

Cable Heat Losses

Miscellaneous

TP-5120.403

Unit 2 Primary Containment Leak Rate Running Total

Procedures

EN-MA-125

Troubleshooting Control of Maintenance Activities

EN-RE-327

PWR Startup Critical Predictions and Evaluation Process

OP-1104.043

Penetration Room Ventilation System

OP-1618.035

Sampling and Analyzing Diesel Fuel Oil from Diesel Fuel Oil

Transports

OP-2104.002

Chemical and Volume Control

OP-2104.033

Containment Atmosphere Control

OP-2302.046

CEA Drop Time Test

OP-2304.112

Plant Protection System Response Time Test Channel A

OP-2304.113

Plant Protection System Response Time Test Channel B

OP-2304.114

Plant Protection System Response Time Test Channel C

OP-2304.115

Plant Protection System Response Time Test Channel D

OP-2305.016

Remote Features Periodic Testing

OP-5120.417

In-Place Testing of the Unit 1 Penetration Filtration Systems

Work Orders

WO 2883, 517477, 52616755, 52661106, 52714799, 52713821,

2751177, 52807705, 52856733

71114.06

Miscellaneous

SES-2-031 Scenario

71124.05

April 2020

Calibration

Records

ARGOS-003

ARGOS-5AB Personnel Contamination Monitor Calibration

07/31/2019

CHP-CR-067

Ludlum-177 Frisker Calibration

2/06/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CHP-DR-156

Ludlum-177 Frisker Calibration

10/14/2019

EPM-001

Eberline PM-7 Gamma Portal Monitor

03/31/2020

FASTSCAN-1

Canberra FASTSCAN Whole Body Counting System

Calibration

05/05/2020

GEM-002

Canberra GEM-5 Portal Monitor Calibration

05/20/2019

GEM-008

Canberra GEM-5 Portal Monitor Calibration

05/22/2019

GSAM-007

Gamma Scintillation Tool Monitor Calibration

2/17/2018

HP-DR-348

WR Telepole Calibration

01/27/2020

PCM-013

Eberline Personal Contamination Monitor PCM-1B Calibration

08/31/2019

Corrective Action

Documents

CR-ANO-

1-2019-00839, 1-2019-02394, 1-2019-04103, 1-2019-04740,

2-2018-01529, 2-2018-01694, 2-2018-02545, 2-2019-01326,

2-2019-02272, C-2019-01052, C-2019-03356, C-2020-00039,

HQN-2019-02578

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2020-01755

Miscellaneous

2-00023

Primary Calibration Report for Noble Gas Monitor NGM 203

EP-CALC-ANO-

1701

ANO Radiological Effluent EAL Values

ODCM

ANO Offsite Dose Calculation Manual

Procedures

EN-CY-102

Laboratory Analytical Quality Control

EN-FAP-RP-007

Operation of the Radiation Protection Central Calibration

Facility

EN-RP-153

Radiation Protection Fundamentals Program

EN-RP-208

Whole Body Counting / In-Vitro Bioassay

EN-RP-210

Area Monitoring Program

EN-RP-301

Radiation Protection Instrument Control

EN-RP-302

Operation of Radiation Protection Instrumentation

EN-RP-303

Source Checking of Radiation Protection Instrumentation

EN-RP-304

Operation of Counting Equipment

EN-RP-317

Central Calibration Facility

Self-Assessments LO-ALO-2019-

Radiation Protection - Pre-NRC FSA Radiation Safety -

2/26/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

00086

Monitoring Instrumentation, Effluent Treatment, Environmental

Monitoring and Solid Waste & Material Handling

NQ-2019-028

QA Audit Report QA-14/15-2019-ANO-1, 2019 QA Audit of

Radiation Protection/Radwaste at Arkansas Nuclear One

(ANO)

10/24/2019

Work Orders

2804554

Month Calibration of Unit 1 Effluent Process Radiation

Monitor, RE-4642

09/26/2019

2806735

Week Calibration of Unit 2 Gaseous Process Radiation

Monitor, RE-8271

01/03/2020

2834502

Month Unit 1 SPING 2 Radiation Monitor, RE-9830

03/06/2020

2862864

Unit 2 Containment High Range Radiation Monitor, 2RE-8925

03/30/2020

2866230

Month Calibration of Unit 1 Main Steam Line Radiation

Monitor, RE-2681

04/16/2020

71124.06

April 2020

Calculations

1GR2018-0005

Gaseous Radioactive Waste Permit

2/05/2018

1LR2018-0030

Liquid Radioactive Waste Permit

03/29/2018

1LR2020-0012

Liquid Radioactive Waste Release Permit

03/07/2020

2GR2019-0050

Gaseous Radioactive Waste Release Permit

07/11/2019

2GR2020-0009

Gaseous Radioactive Release Permit

01/21/2020

2LR2019-0006

Liquid Radioactive Waste Release Permit

04/25/2019

EN-RW-104

Scaling Factors

10/24/2019

Corrective Action

Documents

CR-ANO-

1-2018-04561, 1-2019-01326, 1-2019-01515, 2-2018-01418,

2-2018-01529, 2-2018-01644, 2-2018-03171, 2-2019-01056,

2-2020-01477, C-2020-00982, C-2020-01184

Miscellaneous

Annual Radioactive Effluent Release Report for 2018

04/25/2019

Annual Radioactive Effluent Release Report for 2019

04/27/2020

Results of Radiochemistry Cross Check Program

05/14/2020

Results of Radiochemistry Cross Check Program

10/20/2019

Operability

Evaluations

1604.016

Analysis of Gaseous Waste Decay Tanks

Procedures

1604.014

Reactor Building Purge Analysis

1604.015

Analysis of Unit Vents

1604.017

Analysis of Liquid Waste

1607.009

Sampling the Treated Waste Monitor Tanks (T-16A/B)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1607.010

Sampling of Unit Vents

1618.011

Sampling the Unit 1 Neutralizing Tank

HES-06

Ventilation/Filtration Testing Program

Self-Assessments LO-ALO-2019-

00086

Radiation Protection - Pre-NRC FSA Radiation Safety -

Monitoring Instrumentation, Effluent Treatment, Environmental

Monitoring and Solid Waste & Material Handling

2/06/2020

QA-2/6-2019-

ANO-1

Quality Assurance Audit Report; Chemistry, Effluent and

Environmental Monitoring

09/26/2019

WT-WTANO-

2013-00057 CA

ANO Control Room Habitability Assessment

10/07/2019

71124.07

April 2020

Calibration

Records

CRO-023

Air Station #1, Rotometer Calibration

03/27/2020

CRO-025

Air Station #56, Rotometer Calibration

03/27/2020

CRO-042

Air Station #2, Rotometer Calibration

03/27/2020

Corrective Action

Documents

CR-ANO-

2-2019-02068, C-2018-01068, C-2018-03464, C-2018-04141,

C-2018-04299, C-2018-04646, C-2018-04709, C-2019-00081,

C-2019-00489, C-2019-01469, C-2019-01578, C-2019-02058,

C-2019-02564, C-2019-03149, C-2019-04560, C-2019-04568,

C-2019-04671

Miscellaneous

Land Use Census 2019

09/03/2019

Analytics Environmental Radioactivity Cross Check Program

2019

Groundwater Protection Plan Arkansas Nuclear One

0CAN051901

Annual Radiological Environmental Operating Report for 2018

05/13/2019

0CAN052001

Annual Radiological Environmental Operating Report for 2019

05/19/2020

ANO1 TRM

Technical Requirements Manual

SAR Figure No.

11.2-2

Monitored Ventilation Exhaust Release Points

Procedures

EN-CY-111

Radiological Groundwater Protection Program

EN-CY-127

Land Use Census

EN-CY-130-01

Radiological Environmental Monitoring Program (REMP)

Arkansas Nuclear One

EN-RP-113

Response to Contaminated Spills/Leak

OP-1304.062

Meteorological Monitoring System Calibration

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Self-Assessments 2019 NUPIC

Audit Report

  1. 24791

Radioanalytical Laboratory Audit Report

05/09/2019

NAQA-17-0038

Audit Report 17-007 for the Audit of Environmental Dosimetry

Company

09/01/2017

Work Orders

WO-52823676

Semi-Annual Meteorological Monitoring Calibration

06/03/2019

WO-52855008

Semi-Annual Meteorological Monitoring Calibration

11/25/2019

71124.08

April 2020

Corrective Action

Documents

CR-ANO-

2-2018-03171, 2-2020-00444, C-2018-02840, C-2018-02871,

C-2018-03001, C-2018-03959, C-2019-00542, C-2019-00663,

C-2019-02020, C-2019-03880, C-2019-04122, C-2019-04770,

C-2020-00754

CR-HQN-

2019-01094 2019-02856

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2020-01762

Miscellaneous

Annual Inventory of Radioactive Material Containers

05/26/2020

ANO Part 37 Security Plan for the Protection of Category 1

and 2 Quantities of Radioactive Material

01/26/2016

2019 Sealed Source Leak Test

08/12/2019

20 Sealed Source Leak Test

04/12/2020

17-03187

CFR Part 61 Waste Stream Sample Screening and

Evaluation: Dry Active Waste

08/01/2017

18-11420

CFR Part 61 Waste Stream Sample Screening and

Evaluation: Dry Active Waste

05/21/2019

18-12412

CFR Part 61 Waste Stream Sample Screening and

Evaluation: 2F3/U2 Reactor Coolant System Filters

05/21/2019

19-05931

CFR Part 61 Waste Stream Sample Screening and

Evaluation: Unit 1 Secondary Resin

10/27/2019

19-09120

CFR Part 61 Waste Stream Sample Screening and

Evaluation: Dry Active Waste

2/10/2020

19-09121

CFR Part 61 Waste Stream Sample Screening and

Evaluation: 1F4 /U1 Spent Fuel Pool Filters

03/03/2020

19-09123

CFR Part 61 Waste Stream Sample Screening and

03/03/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Evaluation: 2F4 /U2 Spent Fuel Pool Filters

19-09124

CFR Part 61 Waste Stream Sample Screening and

Evaluation: 1F3/U1 Reactor Coolant System Filters

03/03/2020

Procedures

1601.502

Radioactive Material Control at Radwaste

EN-MP-120

Material Receipt

EN-RP-100

Radiation Worker Expectations

EN-RP-121

Radioactive Material Control

EN-RW-101

Radioactive Waste Management

EN-RW-102

Radioactive Shipping Procedure

EN-RW-103

Radioactive Waste Tracking Procedure

EN-RW-104

Scaling Factors

EN-RW-105

Process Control Program

EN-RW-106

Integrated Transportation Security Plan

EN-RW-108

Radioactive Shipment Accident Response

Self-Assessments

Annual Access Authorization and Security Programs

Pertaining to Part 37

2/11/2019

LO-ALO-2019-

00086

Radiation Protection - Pre-NRC FSA Radiation Safety -

Monitoring Instrumentation, Effluent Treatment, Environmental

Monitoring and Solid Waste & Material Handling

2/06/2020

NQ-2019-030

QA Audit: Audit of Security Including Cyber Security at

Arkansas Nuclear One

2/09/2019

QA-1-2019-ANO-

QA Audit: Fitness for Duty and Access Authorization

08/09/2019

QA-14/15-2019-

ANO-1

2019 QA Audit of Radiation Protection/Radwaste at Arkansas

Nuclear One (ANO)

10/24/2019

Work Orders

489482

GEL Laboratories Ni-63 Analysis

10/04/2019

506544

GEL Laboratories Ni-63 Analysis

04/03/2020

71151

Corrective Action

Documents

CR-ANO-

C-2020-01230

71152

Calculations

6600-M-2119

Technical Specification for Pipe Hangers, Supports, and

Restraints for a Nuclear Power Plant for the Arkansas Nuclear

One - Unit 2

ANO-C-2443

Technical Specification for the Design of Q/Non-Q Pipe

Support for ANO 1 & 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ANO-M-2410

Installation, Modification, Inspection, & Documentation of

Piping Systems & Pipe, Supports, Hangers & Restrains

SES-22

Snubber Design Criteria

Corrective Action

Documents

CR-ANO-

2-2009-02376, 2-2013-02242, 2-2020-00678, 2-2020-00681,

2-2020-00701, 2-2020-00703, 2-2020-00710, 2-2020-00720,

2-2020-00755, 2-2020-00867, 2-2020-01544, 2-2020-01648,

2-2020-01655, 2-2020-02243

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

2-2020-02243

Drawings

1801558-03

Rear Bracket

08/1976

2CCA-13-H4

Pipe Support Detail Reactor Coolant System

2CCA-15-H60

Pipe Support Detail Pressurizer Spray System

Miscellaneous

CD30-349

Design Report Summary

CD35-209

Design Report Summary

LF200515-LR-005 Train A Pressurizer Spray Line Support 2CCA-15-H60

Structural End Attachment Opening - ANO Unit 2

Procedures

OP-1306.003

Visual Inspection (VT-3) of Snubbers

Work Orders

WO 513466, 516086, 516094, 540955, 51665737, 51667491,

51674080, 52240727, 52863040