Signed by: Daniel L. Schroeder Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 05000286 License No. DPR-64
Signed by: Daniel L. Schroeder
 
Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects  
 
Docket No. 05000286 License No. DPR-64  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 05000286 License Number: DPR-64 Report Number: 05000286/2020003 Enterprise Identifier: I-2020-003-0073 Licensee: Entergy Nuclear Operations, Inc.
Docket Number:
05000286  
 
License Number:
DPR-64  


Facility: Indian Point Energy Center, Unit 3 Location: 450 Broadway, Generation Support Building Buchanan, NY 10511-0249 Inspection Dates: July 1, 2020, to September 30, 2020 Inspectors: N. Floyd, Senior Resident Inspector S. Obadina, Resident Inspector K. Warner, Senior Health Physicist Approved By: Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure
Report Number:
05000286/2020003
 
Enterprise Identifier: I-2020-003-0073
 
Licensee:
Entergy Nuclear Operations, Inc.
 
Facility:
Indian Point Energy Center, Unit 3  
 
Location:
450 Broadway, Generation Support Building  
 
Buchanan, NY 10511-0249  
 
Inspection Dates:
July 1, 2020, to September 30, 2020  
 
Inspectors:
N. Floyd, Senior Resident Inspector  
 
S. Obadina, Resident Inspector  
 
K. Warner, Senior Health Physicist  
 
Approved By:
Daniel L. Schroeder, Chief
Reactor Projects Branch 2
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 49: Line 86:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 63: Line 99:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Tropical Storm Isaias on August 4, 2020.
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Tropical Storm Isaias on August 4, 2020.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:


===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
(1)32 safety injection pump after maintenance and testing on July 10, 2020 (2)32 emergency diesel generator after maintenance and testing on August 11, 2020 (3)32 component cooling water pump after maintenance and testing on September 28, 2020  
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) 32 safety injection pump after maintenance and testing on July 10, 2020
: (2) 32 emergency diesel generator after maintenance and testing on August 11, 2020
: (3) 32 component cooling water pump after maintenance and testing on September 28, 2020


===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated system configurations during a complete walkdown of           the auxiliary feedwater system on September 1, 2020.
: (1) The inspectors evaluated system configurations during a complete walkdown of the auxiliary feedwater system on September 1, 2020.


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Fuel storage building (pre-fire plans PFP-315 and PFP-316) on July 15, 2020
: (1) Fuel storage building (pre-fire plans PFP-315 and PFP-316) on July 15, 2020  


===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the onsite fire brigade training and performance during an           announced fire drill on July 20, 2020, and an unannounced drill on August 17, 2020.
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on July 20, 2020, and an unannounced drill on August 17, 2020.


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
===Cable Degradation (IP Section 03.02) (1 Sample)===
===Cable Degradation (IP Section 03.02) (1 Sample)===
The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
Line 96: Line 126:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated operator performance during a licensed           operator requalification examination on August 31, 2020.
: (1) The inspectors observed and evaluated operator performance during a licensed operator requalification examination on August 31, 2020.


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
Line 107: Line 135:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 114: Line 141:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:


===Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)===
(1)  
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(CR-IP3-2020-01711) City water technical specification surveillance requirement SR 3.7.7.1 identified as potentially non-conservative on July 23, 2020 (2)  
    (1)    (CR-IP3-2020-01711) City water technical specification surveillance requirement SR 3.7.7.1 identified as potentially non-conservative on July 23, 2020 (2)   (CR-IP3-2020-02053) CH-FCV-111B (blender outlet to volume control tank) leakby on August 27, 2020
(CR-IP3-2020-02053) CH-FCV-111B (blender outlet to volume control tank) leakby on August 27, 2020


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)


Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) EC-86073, installation of temporary air compressor in place of Unit 3 instrument air compressor due to air-to-water leak
: (1) EC-86073, installation of temporary air compressor in place of Unit 3 instrument air compressor due to air-to-water leak


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)===
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
: (1) Diesel driven fire pump test after engine rebuilt on July 1, 2020
: (1) Diesel driven fire pump test after engine rebuilt on July 1, 2020 (2)31 battery charger full load test after preventative replacement of control card and diodes on July 30, 2020 (3)31 instrument air compressor after maintenance and testing to repair an air-to-water leak on August 10, 2020 (4)32 emergency diesel generator after maintenance and testing to repair emergency output breaker on August 11, 2020
: (2) 31 battery charger full load test after preventative replacement of control card and diodes on July 30, 2020
: (5) Appendix R diesel generator functional test after preventative maintenance on August 24, 2020 (6)31 emergency diesel generator functional test after repair of engine lube oil filter housing leak on September 1, 2020 (7)32 auxiliary feedwater pump after planned maintenance and testing on September 21, 2020 (8)32 component cooling water pump after seal replacement on September 24, 2020 (9)33 emergency diesel generator fuel oil day tank level limit switches after replacement on September 28, 2020
: (3) 31 instrument air compressor after maintenance and testing to repair an air-to-water leak on August 10, 2020
: (4) 32 emergency diesel generator after maintenance and testing to repair emergency output breaker on August 11, 2020
: (5) Appendix R diesel generator functional test after preventative maintenance on August 24, 2020
: (6) 31 emergency diesel generator functional test after repair of engine lube oil filter housing leak on September 1, 2020
: (7) 32 auxiliary feedwater pump after planned maintenance and testing on September 21, 2020
: (8) 32 component cooling water pump after seal replacement on September 24, 2020
: (9) 33 emergency diesel generator fuel oil day tank level limit switches after replacement on September 28, 2020


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
: (1) The inspectors evaluated the conduct of a routine emergency preparedness drill on September 23, 2020.
: (1) The inspectors evaluated the conduct of a routine emergency preparedness drill on September 23, 2020.


Line 151: Line 169:


==RADIATION SAFETY==
==RADIATION SAFETY==
==71124.01 - Radiological Hazard Assessment and Exposure Controls==
==71124.01 - Radiological Hazard Assessment and Exposure Controls==
The inspectors previously performed portions of the inspection procedure and documented it in Indian Point Integrated Inspection Report 05000247/2020002 and 05000286/2020002 (Agencywide Documents Access and Management System (ADAMS) Accession No.
The inspectors previously performed portions of the inspection procedure and documented it in Indian Point Integrated Inspection Report 05000247/2020002 and 05000286/2020002 (Agencywide Documents Access and Management System (ADAMS) Accession No.


Line 174: Line 190:
: (2) The inspectors observed pre-job briefs and work inspecting fuel bundles in the fuel storage building. This involved work in the spent fuel pool.
: (2) The inspectors observed pre-job briefs and work inspecting fuel bundles in the fuel storage building. This involved work in the spent fuel pool.


High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)
High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)  
The inspectors evaluated licensee controls of the following high radiation areas and very high radiation areas:
 
: (1) 31 waste hold-up tank room
The inspectors evaluated licensee controls of the following high radiation areas and very high radiation areas:  
 
(1)31 waste hold-up tank room
: (2) Reviewed procedural changes since the last inspection to determine the adequacy of access controls for high radiation areas and very high radiation areas
: (2) Reviewed procedural changes since the last inspection to determine the adequacy of access controls for high radiation areas and very high radiation areas
: (3) Evaluated the adequacy of a locked high radiation area brief and controls Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
: (3) Evaluated the adequacy of a locked high radiation area brief and controls  
 
Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
: (1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.
: (1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
The inspectors verified licensee performance indicators submittals listed below:  
MS06: Emergency AC Power Systems (IP Section 02.05) ===
 
MS06: Emergency AC Power Systems (IP Section 02.05)===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) July 1, 2019, through June 30, 2020
: (1) July 1, 2019, through June 30, 2020  


===MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)===
===MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)===
: (1) July 1, 2019, through June 30, 2020
: (1) July 1, 2019, through June 30, 2020  


===MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)===
===MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)===
: (1) July 1, 2019, through June 30, 2020
: (1) July 1, 2019, through June 30, 2020  


===MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)===
===MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)===
: (1) July 1, 2019, through June 30, 2020
: (1) July 1, 2019, through June 30, 2020  


===MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)===
===MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)===
Line 201: Line 223:


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL  


===92702 CONF - Enforcement Related Order Follow-Up-Only Enforcement Related Order Follow-Up-Only ===
===92702 CONF - Enforcement Related Order Follow-Up-Only Enforcement Related Order Follow-Up-Only===
{{IP sample|IP=IP 92702|count=1}}
{{IP sample|IP=IP 92702|count=1}}
: (1) Verify Grand Gulf Confirmatory Order EA-17-132/153 Commitments (ADAMS Accession No. ML18072A191):
: (1) Verify Grand Gulf Confirmatory Order EA-17-132/153 Commitments (ADAMS Accession No. ML18072A191):
Line 211: Line 233:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Licensee-Identified Non-Cited Violation                                             71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Licensee-Identified Non-Cited Violation 71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.


Violation: Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion XVI, Corrective Action, states in part that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Violation: Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion XVI, Corrective Action, states in part that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Line 219: Line 241:
Significance/Severity: Green. The inspectors evaluated this finding in accordance with NRCs IMC 0609, Appendix A, Significance Determination Process for Findings At-Power, and determined the finding to be of very low safety significance (Green) because the city water tank had maintained its functionality based on a review of past tank level measurements.
Significance/Severity: Green. The inspectors evaluated this finding in accordance with NRCs IMC 0609, Appendix A, Significance Determination Process for Findings At-Power, and determined the finding to be of very low safety significance (Green) because the city water tank had maintained its functionality based on a review of past tank level measurements.


Corrective Action References: CR-IP3-2020-01711 and CR-IP3-2020-01949 Observation: Verification of Confirmatory Order EA-17-132/153                           92702 CONF Confirmatory Order EA-17-132 and EA-17-153, ADAMS Accession No. ML18072A191, was issued on March 12, 2018, which contained actions to be implemented fleet-wide by Entergy Operations, Inc. as agreed upon during an alternate dispute resolution process. These actions included commitments to conduct fleet-wide communications to employees at all Entergy sites, training, causal evaluations, and organizational health surveys.
Corrective Action References: CR-IP3-2020-01711 and CR-IP3-2020-01949  
 
Observation: Verification of Confirmatory Order EA-17-132/153 92702 CONF Confirmatory Order EA-17-132 and EA-17-153, ADAMS Accession No. ML18072A191, was issued on March 12, 2018, which contained actions to be implemented fleet-wide by Entergy Operations, Inc. as agreed upon during an alternate dispute resolution process. These actions included commitments to conduct fleet-wide communications to employees at all Entergy sites, training, causal evaluations, and organizational health surveys.


The inspectors verified the corrective actions committed to in alternate dispute resolution Confirmatory Order EA-17-132/153 for Indian Point as of September 30, 2020. These actions included:
The inspectors verified the corrective actions committed to in alternate dispute resolution Confirmatory Order EA-17-132/153 for Indian Point as of September 30, 2020. These actions included:
Line 237: Line 261:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                 Revision or
Inspection
Procedure                                                                                            Date
Procedure
71111.01   Procedures       0-SOP-WEATHER-   Severe Weather Preparations                          Revision 2
Type
Designation
Description or Title
Revision or
Date
71111.01
Procedures
0-SOP-WEATHER-
2
2
71111.05   Calculations     IP3-CALC-FP-02795 Combustible Loading Calculation for IP3 Fire Hazards Revision 2
Severe Weather Preparations
Revision 2
71111.05
Calculations
IP3-CALC-FP-02795
Combustible Loading Calculation for IP3 Fire Hazards
Analysis
Analysis
Miscellaneous     SEP-FPP-IP-001   IPEC Fire Protection Program Plan                     Revision 6
Revision 2
Procedures       EN-DC-161         Control of Combustibles                               Revision 21
Miscellaneous
EN-TQ-125         Fire Brigade Drills                                   Revision 10
SEP-FPP-IP-001
71111.06   Corrective Action CR-IP3-2015-515
IPEC Fire Protection Program Plan
Revision 6
Procedures
EN-DC-161
Control of Combustibles
Revision 21
EN-TQ-125
Fire Brigade Drills
Revision 10
71111.06
Corrective Action
Documents
Documents
Engineering       EC 15481          Remove Corroded Cable Supports in Manhole 31A        06/11/2009
CR-IP3-2015-515
 
Engineering
Changes
Changes
Procedures       0-ELC-418-GEN     Manhole Inspections                                   Revision 8
EC 15481
Work Orders       52944107
Remove Corroded Cable Supports in Manhole 31A
71111.12   Corrective Action CR-IP3-2020-0741
06/11/2009
Procedures
0-ELC-418-GEN
Manhole Inspections
Revision 8
Work Orders
2944107
 
71111.12
Corrective Action
Documents
Documents
Miscellaneous     EN-DC-153         Preventive Maintenance Component Classification       Revision 21
CR-IP3-2020-0741
Work Orders       541612
 
71111.15   Procedures       2-Graph-TC-29     City Water Storage Tank Level                         Revision 3
Miscellaneous
71111.19   Corrective Action CR-IP3-2020-2120
EN-DC-153
Documents        CR-IP3-2020-2268
Preventive Maintenance Component Classification
71111.19   Procedures       0-PMP-427-CCW     Inspection/Repair of the Component Cooling Water Pump Revision 3
Revision 21
3-IC-PM-I-E-31BC 31 Battery Charger Preventative Maintenance           Revision 8
Work Orders
3-PT-M042B       Diesel Fire Pump Test                                 Revision 13
541612  
3-PT-Q139         Appendix R Diesel Generator Functional Test           Revision 3
 
Work Orders       00550388
71111.15
2822910
Procedures
2912935
2-Graph-TC-29
2921944
City Water Storage Tank Level
00550986
Revision 3
71124.01   Procedures       EN-RP-100         Radiation Worker Expectations                         Revision 12
71111.19
EN-RP-108         Radiation Protection Posting                         Revision 22
Corrective Action
Inspection Type             Designation       Description or Title                                 Revision or
Documents
Procedure                                                                                          Date
CR-IP3-2020-2120  
2702     Corrective Action CR-HQN-2017-01968
 
CONF      Documents        CR-HQN-2018-00578
CR-IP3-2020-2268  
Miscellaneous     LO-HQNLO-2020-   Pre-NRC Inspection Assessment for Confirmatory Order September 17,
 
00007            EA-17-132/EA-17-153                                 2020
71111.19
11
Procedures
0-PMP-427-CCW
Inspection/Repair of the Component Cooling Water Pump
Revision 3
3-IC-PM-I-E-31BC
Battery Charger Preventative Maintenance
Revision 8
3-PT-M042B
Diesel Fire Pump Test
Revision 13
3-PT-Q139
Appendix R Diesel Generator Functional Test
Revision 3
Work Orders
00550388  
 
2822910  
 
2912935  
 
2921944  
 
00550986  
 
71124.01
Procedures
EN-RP-100
Radiation Worker Expectations
Revision 12
EN-RP-108
Radiation Protection Posting
Revision 22  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2702
CONF
Corrective Action
Documents
CR-HQN-2017-01968  
 
CR-HQN-2018-00578  
 
Miscellaneous
LO-HQNLO-2020-
00007
Pre-NRC Inspection Assessment for Confirmatory Order
EA-17-132/EA-17-153
September 17,
20
}}
}}

Latest revision as of 14:33, 29 November 2024

Integrated Inspection Report 05000286/2020003
ML20303A069
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/28/2020
From: Daniel Schroeder
Reactor Projects Branch 2
To: Vitale A
Entergy Nuclear Operations
Schroeder D
References
IR 2020003
Download: ML20303A069 (14)


Text

October 28, 2020

SUBJECT:

INDIAN POINT ENERGY CENTER, UNIT 3 - INTEGRATED INSPECTION REPORT 05000286/2020003

Dear Mr. Vitale:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Energy Center, Unit 3. On October 15, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at Indian Point Energy Center, Unit 3. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Daniel L. Schroeder

Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket No. 05000286 License No. DPR-64

Enclosure:

As stated

Inspection Report

Docket Number:

05000286

License Number:

DPR-64

Report Number:

05000286/2020003

Enterprise Identifier: I-2020-003-0073

Licensee:

Entergy Nuclear Operations, Inc.

Facility:

Indian Point Energy Center, Unit 3

Location:

450 Broadway, Generation Support Building

Buchanan, NY 10511-0249

Inspection Dates:

July 1, 2020, to September 30, 2020

Inspectors:

N. Floyd, Senior Resident Inspector

S. Obadina, Resident Inspector

K. Warner, Senior Health Physicist

Approved By:

Daniel L. Schroeder, Chief

Reactor Projects Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Indian Point Energy Center, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report section 71111.1

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 3 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted. As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather associated with Tropical Storm Isaias on August 4, 2020.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)32 safety injection pump after maintenance and testing on July 10, 2020 (2)32 emergency diesel generator after maintenance and testing on August 11, 2020 (3)32 component cooling water pump after maintenance and testing on September 28, 2020

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the auxiliary feedwater system on September 1, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fuel storage building (pre-fire plans PFP-315 and PFP-316) on July 15, 2020

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on July 20, 2020, and an unannounced drill on August 17, 2020.

71111.06 - Flood Protection Measures

Cable Degradation (IP Section 03.02) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) 31, 31A, and 31B electrical manholes on September 15, 2020

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operator performance during a licensed operator requalification examination on August 31, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Chemical volume and control system on August 5, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Elevated risk due to 32 safety injection pump maintenance and testing on July 8, 2020
(2) Yellow risk due to 32 auxiliary feedwater pump maintenance and testing on September 21, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)

(CR-IP3-2020-01711) City water technical specification surveillance requirement SR 3.7.7.1 identified as potentially non-conservative on July 23, 2020 (2)

(CR-IP3-2020-02053) CH-FCV-111B (blender outlet to volume control tank) leakby on August 27, 2020

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) EC-86073, installation of temporary air compressor in place of Unit 3 instrument air compressor due to air-to-water leak

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Diesel driven fire pump test after engine rebuilt on July 1, 2020 (2)31 battery charger full load test after preventative replacement of control card and diodes on July 30, 2020 (3)31 instrument air compressor after maintenance and testing to repair an air-to-water leak on August 10, 2020 (4)32 emergency diesel generator after maintenance and testing to repair emergency output breaker on August 11, 2020
(5) Appendix R diesel generator functional test after preventative maintenance on August 24, 2020 (6)31 emergency diesel generator functional test after repair of engine lube oil filter housing leak on September 1, 2020 (7)32 auxiliary feedwater pump after planned maintenance and testing on September 21, 2020 (8)32 component cooling water pump after seal replacement on September 24, 2020 (9)33 emergency diesel generator fuel oil day tank level limit switches after replacement on September 28, 2020

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the conduct of a routine emergency preparedness drill on September 23, 2020.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Conduct of an emergency preparedness tabletop drill on August 19,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

The inspectors previously performed portions of the inspection procedure and documented it in Indian Point Integrated Inspection Report 05000247/2020002 and 05000286/2020002 (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML20223A284) dated August 10, 2020. During this inspection, the inspectors completed all required portions of the inspection procedure to credit sample completion.

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated radiological protection-related instructions to plant workers.

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) The inspectors evaluated the licensee's physical and programmatic controls for highly activated or contaminated materials (non-fuel) stored within the spent fuel.
(2) The inspectors evaluated licensee controls when exiting contaminated areas and the radiological controlled area.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (2 Samples)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) The inspectors evaluated in-plant radiological conditions and controls during facility walkdowns, including entry into an infrequently accessed area.
(2) The inspectors observed pre-job briefs and work inspecting fuel bundles in the fuel storage building. This involved work in the spent fuel pool.

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)

The inspectors evaluated licensee controls of the following high radiation areas and very high radiation areas:

(1)31 waste hold-up tank room

(2) Reviewed procedural changes since the last inspection to determine the adequacy of access controls for high radiation areas and very high radiation areas
(3) Evaluated the adequacy of a locked high radiation area brief and controls

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) July 1, 2019, through June 30, 2020

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) July 1, 2019, through June 30, 2020

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) July 1, 2019, through June 30, 2020

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) July 1, 2019, through June 30, 2020

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) July 1, 2019, through June 30,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

92702 CONF - Enforcement Related Order Follow-Up-Only Enforcement Related Order Follow-Up-Only

(1) Verify Grand Gulf Confirmatory Order EA-17-132/153 Commitments (ADAMS Accession No. ML18072A191):
  • Element B: Verified Entergy conducted annual training for all Indian Point workers in 2020 emphasizing that willfulness will not be tolerated.
  • Element D: Verified Entergy planned to complete annual effectiveness reviews at Indian Point in 2020.
  • Element H: Verified Entergy conducted an organizational health survey at Indian Point in

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion XVI, Corrective Action, states in part that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.

Contrary to the above, from November 7, 2000, to present, the licensee did not promptly identify and correct a non-conservative technical specification associated with the city water surveillance requirement SR 3.7.7.1, which was a condition adverse to quality that impacted the safety function of the city water system. Specifically, the surveillance requirement to verify city water header pressure was insufficient to assure that an adequate volume of city water remained available as a back-up source for the auxiliary feedwater system under certain accident conditions.

Significance/Severity: Green. The inspectors evaluated this finding in accordance with NRCs IMC 0609, Appendix A, Significance Determination Process for Findings At-Power, and determined the finding to be of very low safety significance (Green) because the city water tank had maintained its functionality based on a review of past tank level measurements.

Corrective Action References: CR-IP3-2020-01711 and CR-IP3-2020-01949

Observation: Verification of Confirmatory Order EA-17-132/153 92702 CONF Confirmatory Order EA-17-132 and EA-17-153, ADAMS Accession No. ML18072A191, was issued on March 12, 2018, which contained actions to be implemented fleet-wide by Entergy Operations, Inc. as agreed upon during an alternate dispute resolution process. These actions included commitments to conduct fleet-wide communications to employees at all Entergy sites, training, causal evaluations, and organizational health surveys.

The inspectors verified the corrective actions committed to in alternate dispute resolution Confirmatory Order EA-17-132/153 for Indian Point as of September 30, 2020. These actions included:

  • Element B: Entergy conducted annual training on the intolerance of willful misconduct for 2020. A computer-based-training course (FCBT-ADM-INTGRT) was previously developed and assigned to all Indian Point personnel. Entergy deployed an annual refresher training for all Indian Point workers in 2020. The completion status was at 88 percent in August, which exceeded the 80 percent effectiveness review criteria for the end of year. Indian Point wrote two condition reports (CR-IP3-2020-02221 and -02030) to address multiple discrepancies associated with an error in how the training was being assigned to staff using the fleet procedure EN-TQ-107, General Employee Training. These discrepancies were captured as part of a self-assessment completed in September 2020 and corrective actions were initiated to clarify the procedure.
  • Element D: Entergy planned to complete the required annual effectiveness reviews for corrective actions in 2020 at Indian Point. Indian Point performed a follow-up assessment of its corrective action program in June 2020 and concluded that it was effective. The annual effectiveness review is due in December 2020. The inspectors verified that Entergy had actions in place to complete this review at Indian Point and will include those results in an annual letter to the Region I Administrator.
  • Element H: An organizational health survey was conducted in September 2020 for all station personnel that provided insights into the organizational health at Indian Point. The survey results showed a generally improving trend overall; however, there were a few departments with declines in response to specific questions. Entergy is giving these departments priority for follow-up to better understand the survey results.

Indian Point confirmed readiness to close the Confirmatory Order except for the remaining open actions for the effectiveness review and notifications to the NRC. The inspectors determined that integrity concerns were not pervasive within the Indian Point workforce and did not significantly impact plant safety.

The inspectors concluded that Indian Point was complying with the requirements of confirmatory order EA-17-132/153 in

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 23, 2020, the inspectors presented the radiological hazard assessment and exposure controls inspection results to Robert Walpole, Regulatory and Performance Improvement Director, and other members of the licensee staff.
  • On October 15, 2020, the inspectors presented the integrated inspection results to Anthony J. Vitale, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

0-SOP-WEATHER-

2

Severe Weather Preparations

Revision 2

71111.05

Calculations

IP3-CALC-FP-02795

Combustible Loading Calculation for IP3 Fire Hazards

Analysis

Revision 2

Miscellaneous

SEP-FPP-IP-001

IPEC Fire Protection Program Plan

Revision 6

Procedures

EN-DC-161

Control of Combustibles

Revision 21

EN-TQ-125

Fire Brigade Drills

Revision 10

71111.06

Corrective Action

Documents

CR-IP3-2015-515

Engineering

Changes

EC 15481

Remove Corroded Cable Supports in Manhole 31A

06/11/2009

Procedures

0-ELC-418-GEN

Manhole Inspections

Revision 8

Work Orders

2944107

71111.12

Corrective Action

Documents

CR-IP3-2020-0741

Miscellaneous

EN-DC-153

Preventive Maintenance Component Classification

Revision 21

Work Orders

541612

71111.15

Procedures

2-Graph-TC-29

City Water Storage Tank Level

Revision 3

71111.19

Corrective Action

Documents

CR-IP3-2020-2120

CR-IP3-2020-2268

71111.19

Procedures

0-PMP-427-CCW

Inspection/Repair of the Component Cooling Water Pump

Revision 3

3-IC-PM-I-E-31BC

Battery Charger Preventative Maintenance

Revision 8

3-PT-M042B

Diesel Fire Pump Test

Revision 13

3-PT-Q139

Appendix R Diesel Generator Functional Test

Revision 3

Work Orders

00550388

2822910

2912935

2921944

00550986

71124.01

Procedures

EN-RP-100

Radiation Worker Expectations

Revision 12

EN-RP-108

Radiation Protection Posting

Revision 22

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2702

CONF

Corrective Action

Documents

CR-HQN-2017-01968

CR-HQN-2018-00578

Miscellaneous

LO-HQNLO-2020-

00007

Pre-NRC Inspection Assessment for Confirmatory Order

EA-17-132/EA-17-153

September 17,