IR 05000313/2020004: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 32: | Line 32: | ||
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects | ||
John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6 | |||
Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated | As stated | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Numbers: 05000313 and 05000368 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2020004 and 05000368/2020004 Enterprise Identifier: I-2020-004-0003 Licensee: Entergy Operations, Inc. | Docket Numbers: | ||
05000313 and 05000368 | |||
License Numbers: | |||
DPR-51 and NPF-6 | |||
Report Numbers: | |||
05000313/2020004 and 05000368/2020004 | |||
Enterprise Identifier: I-2020-004-0003 | |||
Licensee: | |||
Entergy Operations, Inc. | |||
Facility: | |||
Arkansas Nuclear One | |||
Location: | |||
Russellville, AR | |||
Inspection Dates: | |||
October 1, 2020 to December 31, 2020 | |||
Inspectors: | |||
N. Brown, Resident Inspector | |||
R. Bywater, Senior Resident Inspector | |||
T. DeBey, Resident Inspector | |||
J. Melfi, Acting Senior Resident Inspector | |||
T. Sullivan, Senior Reactor Technology Instructor | |||
Approved By: | |||
John L. Dixon, Jr., Chief | |||
Reactor Projects Branch D | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
| Line 47: | Line 83: | ||
===List of Findings and Violations=== | ===List of Findings and Violations=== | ||
Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000368/2020004-01 Open/Closed | |||
Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone | [H.5] - Work Management 71153 A self-revealed, Green finding was identified for the licensees failure to follow Work Order 52770426 and associated Procedure EN-WM-102, Work Implementation and Closeout, Revision 12, which states that coordination and control of work activities will be performed by the implementing work group supervisors/team leaders or designees in accordance with Procedure EN-MA-101, Conduct of Maintenance. Specifically, during the fall 2018 refueling outage, supplemental maintenance workers installed the wrong gaskets on the Unit 2 high-pressure feedwater heaters (2E-1B and 2E-2B) contrary to work order requirements. This failure resulted in a leak in the 2E-2B feedwater heater and required a rapid unit shutdown and forced outage on November 1, 2020, to replace the gaskets. | ||
===Additional Tracking Items=== | ===Additional Tracking Items=== | ||
| Line 67: | Line 103: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71111.01 - Adverse Weather Protection== | |||
==71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.01) == | ===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)=== | ||
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems: | : (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems: | ||
* Unit 2 auxiliary building ventilation equipment room on October 8, 2020 | * Unit 2 auxiliary building ventilation equipment room on October 8, 2020 | ||
* Unit 2 turbine building switchgear area ventilation systems on October 8, 2020 | * Unit 2 turbine building switchgear area ventilation systems on October 8, 2020 | ||
==71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01) == | ==71111.04 - Equipment Alignment== | ||
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | ||
: (1) Unit 2 service water system intake structure for both trains on November 13, 2020 | : (1) Unit 2 service water system intake structure for both trains on November 13, 2020 | ||
| Line 82: | Line 116: | ||
: (3) Unit 1 service water pump A and pump B on December 9, 2020 | : (3) Unit 1 service water pump A and pump B on December 9, 2020 | ||
==71111.05 - Fire Protection Fire Area Walkdown and Inspection Sample (IP Section 03.01) == | ==71111.05 - Fire Protection== | ||
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)=== | |||
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas: | The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas: | ||
: (1) Unit 2 high-pressure safety injection pump C room, Fire Zone 2010, on November 13, 2020 | : (1) Unit 2 high-pressure safety injection pump C room, Fire Zone 2010, on November 13, 2020 | ||
| Line 90: | Line 123: | ||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples) | |||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) | |||
(2 Samples) | |||
: (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the feedwater heater 2E-2B leak forced outage on November 3, 2020. | : (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the feedwater heater 2E-2B leak forced outage on November 3, 2020. | ||
: (2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the main feedwater control system forced outage on December 13, 2020. | : (2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the main feedwater control system forced outage on December 13, 2020. | ||
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | ===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | ||
: (1) The inspectors observed and evaluated a Unit 2 simulator scenario for the loss of | : (1) The inspectors observed and evaluated a Unit 2 simulator scenario for the loss of main feedwater pump abnormal operating procedure on November 13, 2020. | ||
==71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) == | ==71111.12 - Maintenance Effectiveness== | ||
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)=== | |||
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function: | |||
: (1) Unit 1 emergency feedwater initiation and control, Channel C, PS-2 failure on November 9, 2020 | |||
Aging Management (IP Section 03.03) | |||
: (1) There were no inspections or tests of passive long-lived SSCs that did not pass their acceptance criteria on Unit 1 or Unit 2. | : (1) There were no inspections or tests of passive long-lived SSCs that did not pass their acceptance criteria on Unit 1 or Unit 2. | ||
==71111.15 - Operability Determinations and Functionality Assessments== | ==71111.15 - Operability Determinations and Functionality Assessments== | ||
===Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)=== | ===Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)=== | ||
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments: | The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments: | ||
| Line 114: | Line 145: | ||
: (3) Unit 2 service water 2P-4B after motor replacement on December 22, 2020 | : (3) Unit 2 service water 2P-4B after motor replacement on December 22, 2020 | ||
==71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01) == | ==71111.19 - Post-Maintenance Testing== | ||
===Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality: | The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality: | ||
: (1) Unit 1 post-repair testing of 125 V safety-related battery charger D04A on October 12, 2020 | : (1) Unit 1 post-repair testing of 125 V safety-related battery charger D04A on October 12, 2020 | ||
| Line 122: | Line 152: | ||
: (3) Unit 2 post-maintenance testing of service water B shutdown cooling heat exchanger inlet valve 2CV-1426-2 on November 17, 2020 | : (3) Unit 2 post-maintenance testing of service water B shutdown cooling heat exchanger inlet valve 2CV-1426-2 on November 17, 2020 | ||
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: | ==71111.22 - Surveillance Testing== | ||
The inspectors evaluated the following surveillance tests: | |||
===Surveillance Tests (other) (IP Section 03.01) | ===Surveillance Tests (other) (IP Section 03.01)=== | ||
: (1) Unit 1 emergency feedwater initiation and control, Channel D, surveillance on | {{IP sample|IP=IP 71111.22|count=1}} | ||
: (1) Unit 1 emergency feedwater initiation and control, Channel D, surveillance on December 23, 2020 | |||
=== | ===Inservice Testing (IP Section 03.01) (1 Sample)=== | ||
: (1) Inservice testing of Unit 2 valves 2CV-1039-1 (emergency feedwater motor-operated valve), 2CV-5612-1 (containment spray check valve), and 2CV-5613-2 (containment spray check valve), on November 12, 2020 | : (1) Inservice testing of Unit 2 valves 2CV-1039-1 (emergency feedwater motor-operated valve), 2CV-5612-1 (containment spray check valve), and 2CV-5613-2 (containment spray check valve), on November 12, 2020 | ||
===FLEX Testing (IP Section 03.02) (1 Sample)=== | ===FLEX Testing (IP Section 03.02) (1 Sample)=== | ||
| Line 134: | Line 166: | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | |||
MS09: Residual Heat Removal Systems (IP Section 02.08)=== | |||
MS09: Residual Heat Removal Systems (IP Section 02.08) === | |||
{{IP sample|IP=IP 71151|count=2}} | {{IP sample|IP=IP 71151|count=2}} | ||
: (1) Unit 1 (October 1, 2019, through September 30, 2020) | : (1) Unit 1 (October 1, 2019, through September 30, 2020) | ||
: (2) Unit 2 (October 1, 2019, through September 30, 2020) | : (2) Unit 2 (October 1, 2019, through September 30, 2020) | ||
===MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)=== | ===MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)=== | ||
| Line 145: | Line 177: | ||
: (2) Unit 2 (October 1, 2019, through September 30, 2020) | : (2) Unit 2 (October 1, 2019, through September 30, 2020) | ||
==71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02) == | ==71152 - Problem Identification and Resolution== | ||
===Semiannual Trend Review (IP Section 02.02) (1 Sample)=== | |||
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in maintenance that might be indicative of a more significant safety issue. | : (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in maintenance that might be indicative of a more significant safety issue. | ||
===71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01) === | ===71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)=== | ||
{{IP sample|IP=IP 71153|count=2}} | {{IP sample|IP=IP 71153|count=2}} | ||
: (1) The inspectors evaluated the unplanned shutdown of Unit 2 for the feedwater heater 2E-2B leak and the licensees response on November 6, 2020. | : (1) The inspectors evaluated the unplanned shutdown of Unit 2 for the feedwater heater 2E-2B leak and the licensees response on November 6, 2020. | ||
| Line 158: | Line 190: | ||
==INSPECTION RESULTS== | ==INSPECTION RESULTS== | ||
Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone | Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events | ||
Green FIN 05000368/2020004-01 Open/Closed | |||
[H.5] - Work Management 71153 A self-revealed, Green finding was identified for the licensees failure to follow Work Order 52770426 and associated Procedure EN-WM-102, Work Implementation and Closeout, Revision 12, which states that coordination and control of work activities will be performed by the implementing work group supervisors/team leaders or designees in accordance with Procedure EN-MA-101, Conduct of Maintenance. Specifically, during the fall 2018 refueling outage, supplemental maintenance workers installed the wrong gaskets on the Unit 2 high-pressure feedwater heaters (2E-1B and 2E-2B) contrary to work order requirements. This failure resulted in a leak in the 2E-2B feedwater heater and required a rapid unit shutdown and forced outage on November 1, 2020, to replace the gaskets. | |||
=====Description:===== | =====Description:===== | ||
| Line 169: | Line 204: | ||
Corrective Actions: Unit 2 high-pressure feedwater heater gaskets (2E-1B and 2E-2B) were replaced during the forced outage. | Corrective Actions: Unit 2 high-pressure feedwater heater gaskets (2E-1B and 2E-2B) were replaced during the forced outage. | ||
Corrective Action References: Condition Reports CR-ANO-2-2020-03546 and CR-ANO-2-2020-03556 | Corrective Action References: Condition Reports CR-ANO-2-2020-03546 and CR-ANO-2-2020-03556 | ||
=====Performance Assessment:===== | =====Performance Assessment:===== | ||
| Line 189: | Line 224: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type | Inspection | ||
Procedure | |||
71111.01 | Type | ||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.01 | |||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
2-2020-03330, 2-2020-03331 | |||
Procedures | |||
2106.032 | |||
Unit 2 Freeze Protection Guide | |||
EN-FAP-WM-016 | |||
Seasonal Reliability | |||
71111.04 | |||
Corrective Action | |||
Documents | Documents | ||
CR-ANO- | |||
1-2020-00123, 1-2020-00958, 1-2020-00961, 1-2020- | |||
01346, 1-2020-01347, 2-2020-00287, 2-2020-01307, 2- | |||
20-01684, 2-2020-03099, 2-2020-03660, 2-2020-03664 | 20-01684, 2-2020-03099, 2-2020-03660, 2-2020-03664 | ||
Procedures | Procedures | ||
OP-1104.050 | OP-1104.029 | ||
Service Water and Auxiliary Cooling System | |||
21 | |||
OP-1104.050 | |||
Turbine Building, Intake Structure and Miscellaneous | |||
Ventilation | Ventilation | ||
OP-2106.006 | OP-2106.006 | ||
STM 2-42 | Emergency Feedwater System Operations | ||
ULD-2-SYS-10 | 104 | ||
Work Orders | STM 2-42 | ||
71111.05 | SW and ACW Systems | ||
Fire Plans | ULD-2-SYS-10 | ||
Unit 2 Pre-Fire Plan | Unit-2 Service Water System | ||
Miscellaneous | Work Orders | ||
WO | |||
2767294, 52879593, 52895491, 52928200 | |||
71111.05 | |||
Calculations | |||
CALC-85-E-0053- | |||
Combustible Loading Calc for Fire Area E | |||
Fire Plans | |||
Unit 1 Pre-Fire Plan | |||
Unit 2 Pre-Fire Plan | |||
Miscellaneous | |||
FHA | |||
Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and | |||
Unit 2 | Unit 2 | ||
Procedures | Procedures | ||
71111.11Q Miscellaneous | OP-2203.049 | ||
Procedures | Fires in Areas Affecting Safe Shutdown | ||
OP-2102.004 | 71111.11Q Miscellaneous | ||
OP-2102.016 | A2SPGLOR210302 Unannounced Causalities 2 | ||
OP-2106.006 | Procedures | ||
OP-2106.007 | EN-RE-302 | ||
OP-2106.010 | PWR Reactivity Maneuver | ||
OP-2203.027 | OP-2102.004 | ||
71111.12 | Power Operation | ||
68, 69 | |||
2017-01565, 1-2017-02543, 1-2019-00292, 1-2019-04637, | OP-2102.016 | ||
Inspection Type | Reactor Startup | ||
OP-2106.006 | |||
Emergency Feedwater System Operation | |||
104 | |||
OP-2106.007 | |||
Main Feedwater Pump and FWCS Operation | |||
OP-2106.010 | |||
Condenser Vacuum System | |||
OP-2203.027 | |||
Loss of Main Feedwater Pump | |||
71111.12 | |||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
1-2010-03755, 1-2011-01554, 1-2012-01677, 1-2015- | |||
03742, 1-2016-02847, 1-2016-05281, 1-2017-00143, 1- | |||
2017-01565, 1-2017-02543, 1-2019-00292, 1-2019-04637, | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
1-2020-00260, 1-2020-00445, 1-2020-00462, 1-2020- | 1-2020-00260, 1-2020-00445, 1-2020-00462, 1-2020- | ||
00571, 1-2020-00598, 1-2020-01124, 1-2020-01317, 1- | 00571, 1-2020-00598, 1-2020-01124, 1-2020-01317, 1- | ||
20-01479, 1-2020-01663, 1-2020-01667, | 20-01479, 1-2020-01663, 1-2020-01667, | ||
Drawings | Drawings | ||
E-22 | 58526-083 | ||
Power Supply Assembly | |||
E-22 | |||
Engineered Safeguards and 125 Volt DC Distribution | |||
Panels | Panels | ||
E-258 | E-258 | ||
Miscellaneous | EFIC Wiring Diagram | ||
Miscellaneous | |||
IEEE 308 | |||
Standard Criteria for Class 1E Power Systems for Nuclear | |||
Power Generating Stations | Power Generating Stations | ||
STM 1-66 | 1971 | ||
Procedures | STM 1-66 | ||
71111.15 | Emergency Feedwater Initiation and Control | ||
Procedures | |||
ULD-1-SYS-08 | |||
Emergency Feedwater Initiation and Control System | |||
71111.15 | |||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
2-2020-02854, 2-2020-02865, 2-2020-03480, 2-2020- | |||
03487, 2-2020-03488, 2-2020-03489, 2-2020-03498, 2- | |||
20-03502, 2-2020-03759, C-2020-02837 | 20-03502, 2-2020-03759, C-2020-02837 | ||
Procedures | Procedures | ||
OP-1403.191 | OP-1104.029 | ||
OP-1411.084 | Service Water and Auxiliary Cooling System | ||
OP-2403.004 | 20 | ||
OP-1403.191 | |||
Motor Testing Using MCE/EMAX | |||
OP-1411.084 | |||
Unit 1 Sluice Gate and SW Bay Cleaning and Inspection | |||
OP-2403.004 | |||
Unit 2 - 2P-4A, B & C Service Water Pump Motor | |||
Maintenance and Testing | Maintenance and Testing | ||
OP-6030.211 | OP-6030.211 | ||
Work Orders | Motor Run Test | ||
Work Orders | |||
WO | |||
2610, 552944, 50237135, 52652306, 52830108, | |||
2875953 | 2875953 | ||
71111.19 | 71111.19 | ||
Corrective Action | |||
Drawings | Documents | ||
CR-ANO- | |||
1-2020-01690, 1-2020-01691, 2-2020-03686, 2-2020- | |||
03717, 2-2020-03502 | |||
Drawings | |||
A5-E-17, Sheet 1A | |||
Green Train Vital AC and 125VDC Single Line and | |||
Distribution | Distribution | ||
E-18-59, Sheet 1 | E-18-59, Sheet 1 | ||
Schematic 500A Battery Charger 125VDC, 480VAC, 3PH, | |||
60Hz | 60Hz | ||
Miscellaneous | Miscellaneous | ||
ECR-24917 | 481292 | ||
Regulatory | Work Request | ||
ECR-24917 | |||
Engineering Change Request | |||
Regulatory | |||
Guide 1.152 | |||
Design, Inspection, and Testing Criteria for Air Filtration | |||
and Adsorption Units of Post-Accident Engineered-Safety- | |||
Feature Atmosphere Cleanup Systems in Light-Water- | Feature Atmosphere Cleanup Systems in Light-Water- | ||
Cooled Nuclear Power Plants | Cooled Nuclear Power Plants | ||
Inspection Type | 06/1973 | ||
Regulatory | Inspection | ||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Regulatory | |||
Guide 1.197 | |||
Demonstrating Control Room Envelope Integrity at Nuclear | |||
Power Reactors | |||
05/2003 | |||
Procedures | |||
EN-MA-148 | |||
Use of VIPER or VOTES Infinity Motor Operated Valve | |||
Diagnostics | Diagnostics | ||
OP-1000.120 | OP-1000.120 | ||
OP-2104.007 | Fire Impairment Program | ||
OP-2104.007 | |||
Control Room Emergency Air Conditioning and Ventilation | |||
System | System | ||
OP-5120.523 | OP-5120.523 | ||
Work Orders | Control Room Envelope Habitability Program | ||
71111.22 | Work Orders | ||
WO | |||
2838-01, 548443-02, 552232-01, 552610, 52874668-01 | |||
71111.22 | |||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
1-2020-02057, 2-2020-01305, 2-2020-01307, 2-2020- | |||
01410, 2-2020-01459, 2-2020-01462, 2-2020-01463, 2- | |||
20-01591, 2-2020-01871, 2-2020-01991, 2-2020-02232, | 20-01591, 2-2020-01871, 2-2020-01991, 2-2020-02232, | ||
2-2020-02451, 2-2020-02467, 2-2020-02668, 2-2020- | 2-2020-02451, 2-2020-02467, 2-2020-02668, 2-2020- | ||
03067, C-2020-00902, C-2020-01030 | 03067, C-2020-00902, C-2020-01030 | ||
Procedures | Procedures | ||
OP-1304.208 | OP-1101.008 | ||
Surveillance Frequency Control Program | |||
OP-1304.208 | |||
Unit 1 EFIC Channel D Monthly Test, ST Pressure Greater | |||
Than 750 PSIG | Than 750 PSIG | ||
OP-2104.005 | OP-2104.005 | ||
Work Orders | Containment Spray | ||
Work Orders | |||
WO | |||
506581, 525675, 544751, 545045, 555551, 52864675, | |||
2885796, 52913133, 52915211 | 2885796, 52913133, 52915211 | ||
71151 | 71151 | ||
1Q20 MSPI T-Sheets RHR-CWS | Miscellaneous | ||
2Q20 MSPI T-Sheets RHR-CWS | 4Q19 MSPI T-Sheets RHR-CWS | ||
1Q20 MSPI T-Sheets RHR-CWS | |||
2Q20 MSPI T-Sheets RHR-CWS | |||
3Q20 MSPI T-Sheets RHR-CWS | 3Q20 MSPI T-Sheets RHR-CWS | ||
71152 | 71152 | ||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
1-2020-01492, 1-2020-01624, 1-2020-01690, 1-2020- | |||
01691, 2-2018-02328, 2-2020-02968, 2-2020-03061, 2- | |||
20-03456, 2-2020-03629, C-2020-02247, C-2020-02663 | 20-03456, 2-2020-03629, C-2020-02247, C-2020-02663 | ||
Miscellaneous | Miscellaneous | ||
Audit | |||
Nuclear Independent Oversight Functional Area | |||
Performance Report | Performance Report | ||
QA Audit Report 2019 QA Audit of Operations and Technical Specifications 07/19/2019 | 10/30/2020 | ||
QA Audit Report | |||
QA Audit Report | NQ-2019-020 | ||
2019 QA Audit of Operations and Technical Specifications | |||
at Arkansas Nuclear One | |||
07/19/2019 | |||
QA Audit Report | |||
NQ-2020- 027 | NQ-2020- 027 | ||
QA Audit Report | ANO Maintenance Audit Report QA-10-2020-ANO-1 | ||
Inspection Type | 07/17/2020 | ||
QA Audit Report | |||
QA-10-2020-ANO- Nuclear One (ANO) | 20 QA Audit of Maintenance Program at Arkansas | ||
System Health | 07/14/2020 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
QA-10-2020-ANO- | |||
Nuclear One (ANO) | |||
System Health | |||
Report Q2-2020 | Report Q2-2020 | ||
ANO l Unit 1 l CS, HD - Condensate, Heater Drains | |||
System Health | |||
Report Q2-2020 | Report Q2-2020 | ||
ANO l Unit 1 l FW - Main Feed Water | |||
System Health | |||
report Q2-2020 | report Q2-2020 | ||
ANO l Unit 2 l FW - Main Feed Water | |||
System Health | |||
Report Q2-2020 | Report Q2-2020 | ||
71153 | ANO l Unit 2 l SWC - Stator Water Cooling (Mechanical) | ||
71153 | |||
Corrective Action | |||
Documents | |||
CR-ANO- | |||
2-2020-03546, 2-2020-03547, 2-2020-03553, 2-2020- | |||
03554, 2-2020-03555, 2-2020-03556, 2-2020-03570, 2- | |||
20-03672, 2-2020-03840, 2-2020-03841, 2-2020-03842, | 20-03672, 2-2020-03840, 2-2020-03841, 2-2020-03842, | ||
2-2020-03843, 2-2020-03844, 2-2020-03845 | 2-2020-03843, 2-2020-03844, 2-2020-03845 | ||
Miscellaneous | Miscellaneous | ||
Work Orders | EN-LI-118 Recollection Forms | ||
2/10/2020 | |||
Work Orders | |||
WO | |||
333180, 553180 | |||
}} | }} | ||
Latest revision as of 11:16, 29 November 2024
| ML21034A418 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/03/2021 |
| From: | John Dixon NRC/RGN-IV/DRP |
| To: | Dinelli J Entergy Operations |
| References | |
| IR 2020004 | |
| Download: ML21034A418 (16) | |
Text
February 3, 2021
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000313/2020004 AND 05000368/2020004
Dear Mr. Dinelli:
On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2. On January 14, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.
On September 23, 2020, the NRC issued NOTICE OF VIOLATION; NRC INSPECTION REPORT 05000313/2020404 and 05000368/2020404; and NRC Investigation Report 4-2019-009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20267A403), which documented the results of NRC Office of Investigations Report 4-2019-009 and included a Severity Level III Notice of Violation for willful misconduct related to the control of prohibited items in the protected area. Region IV staff reviewed the corrective actions associated with the violation and determined that no additional follow-up actions are planned or necessary as delineated by Inspection Procedure 92702. The basis for this determination is documented in the enclosed report.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects
Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000313 and 05000368
License Numbers:
Report Numbers:
05000313/2020004 and 05000368/2020004
Enterprise Identifier: I-2020-004-0003
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One
Location:
Russellville, AR
Inspection Dates:
October 1, 2020 to December 31, 2020
Inspectors:
N. Brown, Resident Inspector
R. Bywater, Senior Resident Inspector
T. DeBey, Resident Inspector
J. Melfi, Acting Senior Resident Inspector
T. Sullivan, Senior Reactor Technology Instructor
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000368/2020004-01 Open/Closed
[H.5] - Work Management 71153 A self-revealed, Green finding was identified for the licensees failure to follow Work Order 52770426 and associated Procedure EN-WM-102, Work Implementation and Closeout, Revision 12, which states that coordination and control of work activities will be performed by the implementing work group supervisors/team leaders or designees in accordance with Procedure EN-MA-101, Conduct of Maintenance. Specifically, during the fall 2018 refueling outage, supplemental maintenance workers installed the wrong gaskets on the Unit 2 high-pressure feedwater heaters (2E-1B and 2E-2B) contrary to work order requirements. This failure resulted in a leak in the 2E-2B feedwater heater and required a rapid unit shutdown and forced outage on November 1, 2020, to replace the gaskets.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period at full power and remained at full power until November 19, 2020, when operators reduced power to 85 percent power to perform turbine valve testing. The unit was returned to full power the same day, where it remained for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.
Unit 2 began the inspection period at full power and remained at full power until November 1, 2020, when operators performed a rapid power reduction and shut down the reactor due to a leaking feedwater heater manway gasket on feedwater heater 2E-2B.
Following repairs, the reactor was made critical on November 3, 2020, and the unit was returned to full power on November 5, 2020. On December 10, 2020, Unit 2 automatically tripped from 100 percent power following a failure involving the main feedwater pump A control system. After repairs, the reactor was made critical on December 13, 2020, and the unit was returned to full power on December 14, 2020. Unit 2 remained at full power for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19),resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
- Unit 2 auxiliary building ventilation equipment room on October 8, 2020
- Unit 2 turbine building switchgear area ventilation systems on October 8, 2020
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 service water system intake structure for both trains on November 13, 2020
- (2) Unit 2 emergency feedwater train A on December 1, 2020
- (3) Unit 1 service water pump A and pump B on December 9, 2020
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2 high-pressure safety injection pump C room, Fire Zone 2010, on November 13, 2020
- (2) Unit 1 vital switchgear Room A3, Fire Zone 100-N, on December 16, 2020
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the feedwater heater 2E-2B leak forced outage on November 3, 2020.
- (2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 startup after the main feedwater control system forced outage on December 13, 2020.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a Unit 2 simulator scenario for the loss of main feedwater pump abnormal operating procedure on November 13, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 1 emergency feedwater initiation and control, Channel C, PS-2 failure on November 9, 2020
Aging Management (IP Section 03.03)
- (1) There were no inspections or tests of passive long-lived SSCs that did not pass their acceptance criteria on Unit 1 or Unit 2.
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (2) Unit 1 service water P-4C pump/bay after bay outage on December 17, 2020
- (3) Unit 2 service water 2P-4B after motor replacement on December 22, 2020
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) Unit 1 post-repair testing of 125 V safety-related battery charger D04A on October 12, 2020
- (3) Unit 2 post-maintenance testing of service water B shutdown cooling heat exchanger inlet valve 2CV-1426-2 on November 17, 2020
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Unit 1 emergency feedwater initiation and control, Channel D, surveillance on December 23, 2020
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Inservice testing of Unit 2 valves 2CV-1039-1 (emergency feedwater motor-operated valve), 2CV-5612-1 (containment spray check valve), and 2CV-5613-2 (containment spray check valve), on November 12, 2020
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) FLEX diesel-driven pump surveillance activities on December 9,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS09: Residual Heat Removal Systems (IP Section 02.08)===
- (1) Unit 1 (October 1, 2019, through September 30, 2020)
- (2) Unit 2 (October 1, 2019, through September 30, 2020)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2019, through September 30, 2020)
- (2) Unit 2 (October 1, 2019, through September 30, 2020)
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in maintenance that might be indicative of a more significant safety issue.
71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)
- (1) The inspectors evaluated the unplanned shutdown of Unit 2 for the feedwater heater 2E-2B leak and the licensees response on November 6, 2020.
- (2) The inspectors evaluated the trip of Unit 2 due to the loss of main feed pump A and the licensees response on December 10,
OTHER ACTIVITIES
- ADDITIONAL REVIEWS On September 23, 2020, the NRC issued ANO Inspection Report 05000313/2020404 and 05000368/2020404 (ADAMS Accession No. ML20267A403), which documented the results of NRC Office of Investigations Report 4-2019-009 and included a Notice of Violation (NOV) for willful misconduct related to the control of prohibited items in the protected area. Region IV staff reviewed the licensees corrective actions associated with the NOV. The staff determined that the licensee took appropriate corrective actions once they learned of the issue, including investigation of the issue, taking disciplinary actions against the individuals involved, and implementing additional corrective actions to inform contract personnel of the impact of any willful actions on their part. Additionally, the staff considered that the willful actions taken by the contractor staff occurred while the licensee was in the process of implementing a Confirmatory Order issued to Entergy to correct willful actions. The Agency has stated that, the NRC has confidence that the corrective actions taken or planned by Entergy will correct the problems and there has been substantial NRC involvement to ensure that Entergy adequately implements those actions. Therefore, based on the corrective actions taken by Entergy to address willful action across the fleet, and specifically the corrective actions taken by the licensee for this specific incident, Region IV staff have determined that no additional follow-up actions are planned or necessary as delineated by Inspection Procedure 92702 for this escalated enforcement action.
INSPECTION RESULTS
Incorrect Gasket Installed on High-Pressure Feedwater Heater 2E-2B Results in Forced Shutdown Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events
Green FIN 05000368/2020004-01 Open/Closed
[H.5] - Work Management 71153 A self-revealed, Green finding was identified for the licensees failure to follow Work Order 52770426 and associated Procedure EN-WM-102, Work Implementation and Closeout, Revision 12, which states that coordination and control of work activities will be performed by the implementing work group supervisors/team leaders or designees in accordance with Procedure EN-MA-101, Conduct of Maintenance. Specifically, during the fall 2018 refueling outage, supplemental maintenance workers installed the wrong gaskets on the Unit 2 high-pressure feedwater heaters (2E-1B and 2E-2B) contrary to work order requirements. This failure resulted in a leak in the 2E-2B feedwater heater and required a rapid unit shutdown and forced outage on November 1, 2020, to replace the gaskets.
Description:
On November 1, 2020, site personnel observed high temperature water/steam spraying from the 2E-2B feedwater heater in the Unit 2 turbine building. The degrading conditions of the leak and safety concerns for personnel and nearby equipment led the site to shut down the reactor on that same day, November 1, 2020, by use of their Abnormal Operating Procedure 2203.053, for Rapid Power Reduction. The site wrote Condition Report CR-ANO-2-2020-03546 and performed an investigation of the event. The investigation revealed that supplemental maintenance workers had failed to install the correct gasket during maintenance on the 2E-2B feedwater heater. During an extent of condition review of the other high-pressure feedwater heaters, the licensee identified that the 2E-1B feedwater heater also had an incorrect gasket installed.
The sites causal analysis concluded that the maintenance workers likely switched gaskets between high-pressure heaters and low-pressure heaters that were opened during the same maintenance window in 2018. During that maintenance window, three high-pressure feedwater heaters and four low-pressure feedwater heaters were opened, providing the opportunity for gasket mix-up. Additionally, the 2E-2A gasket was replaced at the end of the 2018 outage due to leakage during system pressurization. At the time of this inspection, the site had not yet verified that the low-pressure heaters contained gaskets designated for high-pressure heaters because that condition would result in stronger gaskets than necessary for the application and would not represent a failure vulnerability. The site did verify that sufficient amounts of the proper type and number of heater gaskets were provided to maintenance workers for the feedwater heater maintenance window. Although there are similarities between the low-pressure gaskets and high-pressure gaskets, the gaskets were labeled with part numbers and there were also differences that should have been apparent to skilled workers.
The site missed an opportunity for early detection of the gasket mix-up when a gasket leak occurred on the 2E-2A high-pressure feedwater heater as it was being pressurized after the maintenance window in November 2018. That gasket was replaced without documenting whether the leaking gasket was the correct material. The condition report (CR) written in 2018 recommended checking the manway covers on the other feedwater heaters that had been worked on, but there was no documentation for those checks. The causal analysis stated that the addition of a gasket verification step in the work order would have prevented the installation of the incorrect gaskets.
Corrective Actions: Unit 2 high-pressure feedwater heater gaskets (2E-1B and 2E-2B) were replaced during the forced outage.
Corrective Action References: Condition Reports CR-ANO-2-2020-03546 and CR-ANO-2-2020-03556
Performance Assessment:
Performance Deficiency: The licensees failure to follow instructions in Work Order 52770426 and Procedure EN-WM-102 when installing gaskets on the Unit 2 high-pressure feedwater heater manway covers during the fall 2018 refueling outage was a performance deficiency.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Human Performance attribute of the Initiating Events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the installation errors caused a feedwater heater gasket failure and required an emergent, unplanned plant shutdown in order to replace the gaskets.
Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding had very low safety significance (Green) because it did not cause a reactor trip AND the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition (Exhibit 1, Section B).
Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the licensee did not implement a process for appropriate control and execution of work activities performed by the supplemental workers. As a result, the wrong gasket material was used for two (and potentially three) high-pressure feedwater heater covers.
Enforcement:
Inspectors did not identify a violation of regulatory requirements associated with this finding.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 14, 2021, the inspectors presented the integrated inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-ANO-
2-2020-03330, 2-2020-03331
Procedures
2106.032
Unit 2 Freeze Protection Guide
EN-FAP-WM-016
Seasonal Reliability
Corrective Action
Documents
CR-ANO-
1-2020-00123, 1-2020-00958, 1-2020-00961, 1-2020-
01346, 1-2020-01347, 2-2020-00287, 2-2020-01307, 2-
20-01684, 2-2020-03099, 2-2020-03660, 2-2020-03664
Procedures
OP-1104.029
Service Water and Auxiliary Cooling System
21
OP-1104.050
Turbine Building, Intake Structure and Miscellaneous
Ventilation
OP-2106.006
Emergency Feedwater System Operations
104
STM 2-42
SW and ACW Systems
ULD-2-SYS-10
Unit-2 Service Water System
Work Orders
WO 2767294, 52879593, 52895491, 52928200
Calculations
CALC-85-E-0053-
Combustible Loading Calc for Fire Area E
Fire Plans
Unit 1 Pre-Fire Plan
Unit 2 Pre-Fire Plan
Miscellaneous
Fire Hazard Analysis Arkansas Nuclear One - Unit 1 and
Unit 2
Procedures
OP-2203.049
Fires in Areas Affecting Safe Shutdown
71111.11Q Miscellaneous
A2SPGLOR210302 Unannounced Causalities 2
Procedures
PWR Reactivity Maneuver
OP-2102.004
Power Operation
68, 69
OP-2102.016
Reactor Startup
OP-2106.006
Emergency Feedwater System Operation
104
OP-2106.007
Main Feedwater Pump and FWCS Operation
OP-2106.010
Condenser Vacuum System
OP-2203.027
Loss of Main Feedwater Pump
Corrective Action
Documents
CR-ANO-
1-2010-03755, 1-2011-01554, 1-2012-01677, 1-2015-
03742, 1-2016-02847, 1-2016-05281, 1-2017-00143, 1-
2017-01565, 1-2017-02543, 1-2019-00292, 1-2019-04637,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1-2020-00260, 1-2020-00445, 1-2020-00462, 1-2020-
00571, 1-2020-00598, 1-2020-01124, 1-2020-01317, 1-
20-01479, 1-2020-01663, 1-2020-01667,
Drawings
58526-083
Power Supply Assembly
E-22
Engineered Safeguards and 125 Volt DC Distribution
Panels
E-258
EFIC Wiring Diagram
Miscellaneous
Standard Criteria for Class 1E Power Systems for Nuclear
Power Generating Stations
1971
STM 1-66
Emergency Feedwater Initiation and Control
Procedures
ULD-1-SYS-08
Emergency Feedwater Initiation and Control System
Corrective Action
Documents
CR-ANO-
2-2020-02854, 2-2020-02865, 2-2020-03480, 2-2020-
03487, 2-2020-03488, 2-2020-03489, 2-2020-03498, 2-
20-03502, 2-2020-03759, C-2020-02837
Procedures
OP-1104.029
Service Water and Auxiliary Cooling System
20
OP-1403.191
Motor Testing Using MCE/EMAX
OP-1411.084
Unit 1 Sluice Gate and SW Bay Cleaning and Inspection
OP-2403.004
Unit 2 - 2P-4A, B & C Service Water Pump Motor
Maintenance and Testing
OP-6030.211
Motor Run Test
Work Orders
WO 2610, 552944, 50237135, 52652306, 52830108,
2875953
Corrective Action
Documents
CR-ANO-
1-2020-01690, 1-2020-01691, 2-2020-03686, 2-2020-
03717, 2-2020-03502
Drawings
A5-E-17, Sheet 1A
Green Train Vital AC and 125VDC Single Line and
Distribution
E-18-59, Sheet 1
Schematic 500A Battery Charger 125VDC, 480VAC, 3PH,
60Hz
Miscellaneous
481292
Work Request
ECR-24917
Engineering Change Request
Regulatory
Guide 1.152
Design, Inspection, and Testing Criteria for Air Filtration
and Adsorption Units of Post-Accident Engineered-Safety-
Feature Atmosphere Cleanup Systems in Light-Water-
Cooled Nuclear Power Plants
06/1973
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Regulatory
Guide 1.197
Demonstrating Control Room Envelope Integrity at Nuclear
Power Reactors
05/2003
Procedures
Use of VIPER or VOTES Infinity Motor Operated Valve
Diagnostics
OP-1000.120
Fire Impairment Program
OP-2104.007
Control Room Emergency Air Conditioning and Ventilation
System
OP-5120.523
Control Room Envelope Habitability Program
Work Orders
WO 2838-01, 548443-02, 552232-01, 552610, 52874668-01
Corrective Action
Documents
CR-ANO-
1-2020-02057, 2-2020-01305, 2-2020-01307, 2-2020-
01410, 2-2020-01459, 2-2020-01462, 2-2020-01463, 2-
20-01591, 2-2020-01871, 2-2020-01991, 2-2020-02232,
2-2020-02451, 2-2020-02467, 2-2020-02668, 2-2020-
03067, C-2020-00902, C-2020-01030
Procedures
OP-1101.008
Surveillance Frequency Control Program
OP-1304.208
Unit 1 EFIC Channel D Monthly Test, ST Pressure Greater
Than 750 PSIG
OP-2104.005
Work Orders
WO 506581, 525675, 544751, 545045, 555551, 52864675,
2885796, 52913133, 52915211
71151
Miscellaneous
4Q19 MSPI T-Sheets RHR-CWS
1Q20 MSPI T-Sheets RHR-CWS
2Q20 MSPI T-Sheets RHR-CWS
3Q20 MSPI T-Sheets RHR-CWS
Corrective Action
Documents
CR-ANO-
1-2020-01492, 1-2020-01624, 1-2020-01690, 1-2020-
01691, 2-2018-02328, 2-2020-02968, 2-2020-03061, 2-
20-03456, 2-2020-03629, C-2020-02247, C-2020-02663
Miscellaneous
Audit
Nuclear Independent Oversight Functional Area
Performance Report
10/30/2020
QA Audit Report
NQ-2019-020
2019 QA Audit of Operations and Technical Specifications
at Arkansas Nuclear One
07/19/2019
QA Audit Report
NQ-2020- 027
ANO Maintenance Audit Report QA-10-2020-ANO-1
07/17/2020
QA Audit Report
20 QA Audit of Maintenance Program at Arkansas
07/14/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
QA-10-2020-ANO-
Nuclear One (ANO)
System Health
Report Q2-2020
ANO l Unit 1 l CS, HD - Condensate, Heater Drains
System Health
Report Q2-2020
ANO l Unit 1 l FW - Main Feed Water
System Health
report Q2-2020
ANO l Unit 2 l FW - Main Feed Water
System Health
Report Q2-2020
ANO l Unit 2 l SWC - Stator Water Cooling (Mechanical)
Corrective Action
Documents
CR-ANO-
2-2020-03546, 2-2020-03547, 2-2020-03553, 2-2020-
03554, 2-2020-03555, 2-2020-03556, 2-2020-03570, 2-
20-03672, 2-2020-03840, 2-2020-03841, 2-2020-03842,
2-2020-03843, 2-2020-03844, 2-2020-03845
Miscellaneous
EN-LI-118 Recollection Forms
2/10/2020
Work Orders
WO 333180, 553180