{{#Wiki_filter:March 30, 2021
{{#Wiki_filter:March 30, 2021  
Mr. Joel P. Gebbie
Senior VP and Chief Nuclear Officer
Mr. Joel P. Gebbie  
Indiana Michigan Power Company
Senior VP and Chief Nuclear Officer  
Nuclear Generation Group
Indiana Michigan Power Company  
One Cook Place
Nuclear Generation Group  
Bridgman, MI 49106
One Cook Place  
SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN
Bridgman, MI 49106  
            BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
            INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011
SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN  
Dear Mr. Gebbie:
BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR  
On August 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011  
Design Bases Assurance Inspection (Programs) at Donald C. Cook Nuclear Plant. This
inspection will be performed in accordance with NRC Baseline Inspection Procedure
Dear Mr. Gebbie:  
71111.21N, Design Bases Assurance Inspection (Programs), Attachment 2, Design-Basis
Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements.
On August 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
This inspection will evaluate the reliability, functional capability, and design basis of
Design Bases Assurance Inspection (Programs) at Donald C. Cook Nuclear Plant. This  
risk-important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable
inspection will be performed in accordance with NRC Baseline Inspection Procedure  
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the
71111.21N, Design Bases Assurance Inspection (Programs), Attachment 2, Design-Basis  
team will select risk-important POVs used to prevent and mitigate the consequences of a design
Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements.  
basis accident.
The inspection will include two weeks of onsite inspection. The inspection team will consist of
This inspection will evaluate the reliability, functional capability, and design basis of
three NRC inspectors. The current inspection schedule is as follows:
risk-important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable  
    *   Preparation week: August 2 - 6, 2021
10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the  
    *   Onsite weeks: August 9 - 13, 2021, and August 23 - 27, 2021
team will select risk-important POVs used to prevent and mitigate the consequences of a design  
Experience with previous baseline engineering inspections of similar depth and length has
basis accident.  
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and
the licensee staff. In order to minimize the inspection impact on the site and to ensure a
The inspection will include two weeks of onsite inspection. The inspection team will consist of  
productive inspection for both parties, we have enclosed a request for information needed for
three NRC inspectors. The current inspection schedule is as follows:  
the inspection. It is important that all of these documents are up-to-date and complete in order
to minimize the number of additional documents requested during the preparation and/or the
*  
onsite portions of the inspection. Insofar as possible, this information should be provided
Preparation week: August 2 - 6, 2021  
electronically to the lead inspector. The information request has been divided into four groups:
*  
Onsite weeks: August 9 - 13, 2021, and August 23 - 27, 2021  
Experience with previous baseline engineering inspections of similar depth and length has  
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and  
the licensee staff. In order to minimize the inspection impact on the site and to ensure a  
productive inspection for both parties, we have enclosed a request for information needed for  
the inspection. It is important that all of these documents are up-to-date and complete in order  
to minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection. Insofar as possible, this information should be provided  
electronically to the lead inspector. The information request has been divided into four groups:  


J. Gebbie                                         -2-
J. Gebbie  
    *   The first group lists information necessary for our initial risk-informed scoping activities.
-2-  
        This information should be provided to the lead inspector no later than April 16, 2021.
*  
    *   The second group lists information necessary for our initial inspection scoping activities.
The first group lists information necessary for our initial risk-informed scoping activities.
        This information should be provided to the lead inspector no later than June 4, 2021. By
This information should be provided to the lead inspector no later than April 16, 2021.  
        June 28, 2021, the lead inspector will communicate the initial selected samples and any
        additional information needed to support the in-office preparation activities.
*  
    *   The third group of documents requested are those items needed to support our in-office
The second group lists information necessary for our initial inspection scoping activities.
        preparation activities. This set of documents should be provided to the lead inspector no
This information should be provided to the lead inspector no later than June 4, 2021. By  
        later than July 23, 2021. During the preparation activities, the team may identify
June 28, 2021, the lead inspector will communicate the initial selected samples and any  
        additional information needed to support the inspection.
additional information needed to support the in-office preparation activities.  
    *   The fourth group includes the additional information above as well as plant-specific
        reference material. This information should be available to the team onsite on
*  
        August 9, 2021. It is also requested that corrective action documents and answers to
The third group of documents requested are those items needed to support our in-office  
        questions developed during the inspection be provided to the lead inspector as the
preparation activities. This set of documents should be provided to the lead inspector no  
        documents are generated.
later than July 23, 2021. During the preparation activities, the team may identify  
In addition, the enclosure includes information and requests addressing inspection logistics.
additional information needed to support the inspection.  
These items are requested be provided to the lead inspector by July 16, 2021.
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing
*  
contact for this inspection is Mr. M. Ellet of your organization. If there are any questions about
The fourth group includes the additional information above as well as plant-specific  
the inspection or the material requested in the enclosure, contact the lead inspector at
reference material. This information should be available to the team onsite on  
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
August 9, 2021. It is also requested that corrective action documents and answers to  
This letter does not contain new or amended information collection requirements subject to
questions developed during the inspection be provided to the lead inspector as the  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
documents are generated.  
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
In addition, the enclosure includes information and requests addressing inspection logistics.
respond to, a request for information or an information collection requirement unless the
These items are requested be provided to the lead inspector by July 16, 2021.  
requesting document displays a currently valid Office of Management and Budget Control
Number.
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing  
contact for this inspection is Mr. M. Ellet of your organization. If there are any questions about  
the inspection or the material requested in the enclosure, contact the lead inspector at  
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.  
This letter does not contain new or amended information collection requirements subject to  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.  


J. Gebbie                                       -3-
J. Gebbie  
This letter and its enclosure will be made available for public inspection and copying at
-3-  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
This letter and its enclosure will be made available for public inspection and copying at  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                            Sincerely,
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                            /RA/
                                            Jorge Corujo-Sandin, Senior Reactor Inspector
Sincerely,  
                                            Engineering Branch 2
                                            Division of Reactor Safety
/RA/  
Docket Nos. 50-315 and 50-316
License Nos. DPR-58 and DPR-74
Enclosure:
Jorge Corujo-Sandin, Senior Reactor Inspector  
Design Bases Assurance Inspection
Engineering Branch 2  
(Programs)Document Request
Division of Reactor Safety  
cc: Distribution via LISTSERV
Docket Nos. 50-315 and 50-316  
License Nos. DPR-58 and DPR-74  
Enclosure:  
Design Bases Assurance Inspection  
  (Programs)Document Request  
cc: Distribution via LISTSERV  


J. Gebbie                                     -4-
J. Gebbie  
Letter to Joel P. Gebbie from Jorge Corujo-Sandin dated March 30, 2021.
-4-  
SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN
            BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR
Letter to Joel P. Gebbie from Jorge Corujo-Sandin dated March 30, 2021.  
            INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011
DISTRIBUTION:
SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN  
Brett Titus
BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR  
Mark Haire
INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011  
RidsNrrDorlLpl3
RidsNrrPMDCCook Resource
DISTRIBUTION:  
RidsNrrDroIrib Resource
Brett Titus  
John Giessner
Mark Haire  
Kenneth OBrien
RidsNrrDorlLpl3  
Jamnes Cameron
RidsNrrPMDCCook Resource  
Allan Barker
RidsNrrDroIrib Resource  
DRPIII
John Giessner  
DRSIII
Kenneth OBrien  
ADAMS Accession Number: ML21089A156
Jamnes Cameron  
    Publicly Available       Non-Publicly Available       Sensitive     Non-Sensitive
Allan Barker  
OFFICE       RIII                 RIII
DRPIII  
  NAME         JHanna:mb           JCorujo-Sandin
DRSIII  
              via e-mail           via e-mail
  DATE         03/30/2021           03/30/2021
                                  OFFICIAL RECORD COPY
ADAMS Accession Number: ML21089A156  
Publicly Available  
Non-Publicly Available
Sensitive  
Non-Sensitive  
OFFICE  
RIII  
RIII  
   
NAME  
JHanna:mb  
via e-mail  
JCorujo-Sandin
via e-mail  
   
DATE  
03/30/2021  
03/30/2021  
OFFICIAL RECORD COPY  


                DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
                                REQUEST FOR INFORMATION
I.   ADMINISTRATIVE INSPECTION INFORMATION
  Inspection Report Number:     05000315/2021011; 05000316/2021011
Enclosure
  Onsite Inspection Dates:       August 9 - 13, 2021, and August 23 - 27, 2021
DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM  
                                IP 71111.21N, Design Bases Assurance Inspection
REQUEST FOR INFORMATION  
  Inspection Procedure:          (Programs), Attachment 2, Design-Basis Capability of
                                Power-Operated Valves Under 10 CFR 50.55a Requirements
                                Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS
I.  
  Lead Inspector:                630-829-9741
ADMINISTRATIVE INSPECTION INFORMATION  
                                Jorge.Corujo-Sandin@nrc.gov
                                Kevin Barclay, Reactor Inspector, RIII/DRS
Inspection Report Number:  
  Teammate Inspectors:
05000315/2021011; 05000316/2021011  
                                Michael Jones, Reactor Inspector, RIII/DRS
Onsite Inspection Dates:  
II. LOGISTICS
August 9 - 13, 2021, and August 23 - 27, 2021  
Email the following inspection logistics to the lead inspector by July 16, 2021, or sooner:
Inspection Procedure:
1. Inspection room name/number, directions from the main access facility, and phone number;
IP 71111.21N, Design Bases Assurance Inspection  
2. Interview room name/number;
(Programs), Attachment 2, Design-Basis Capability of  
3. Response team contact information (names and phone numbers) and team roles (e.g.,
Power-Operated Valves Under 10 CFR 50.55a Requirements  
    management sponsor, lead, inspector counterpart);
Lead Inspector:
4. Any site access/badging actions needed for each inspector;
Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS  
5. Any dosimetry actions needed for each inspector;
630-829-9741  
6. Entrance meeting time and location;
Jorge.Corujo-Sandin@nrc.gov  
7. Confirmation that the team will have access to a licensee computer with a nearby printer;
Teammate Inspectors:
8. Confirmation that the team will have Wi-Fi access;
Kevin Barclay, Reactor Inspector, RIII/DRS  
9. Cafeteria location and hours;
Michael Jones, Reactor Inspector, RIII/DRS  
10. Inspection response team normal working hours; and
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff
    meetings).
II. LOGISTICS  
                                                                                  Enclosure
Email the following inspection logistics to the lead inspector by July 16, 2021, or sooner:  
1. Inspection room name/number, directions from the main access facility, and phone number;  
2. Interview room name/number;  
3. Response team contact information (names and phone numbers) and team roles (e.g.,  
management sponsor, lead, inspector counterpart);  
4. Any site access/badging actions needed for each inspector;  
5. Any dosimetry actions needed for each inspector;  
6. Entrance meeting time and location;  
7. Confirmation that the team will have access to a licensee computer with a nearby printer;  
8. Confirmation that the team will have Wi-Fi access;  
9. Cafeteria location and hours;  
10. Inspection response team normal working hours; and  
11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff  
meetings).


III. INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this
information request. Provide the information electronically in searchable formats, if possible.
2
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
III. INFORMATION REQUEST  
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
Contact the lead inspector as soon as possible if you have any questions regarding this  
Important Note: For the purpose of this inspection, POVs are valves with power actuators.
information request. Provide the information electronically in searchable formats, if possible.
Examples include motor-operated valves (MOVs), air-operated valves (AOVs),
The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of  
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated
use. Information in lists should contain enough information to be easily understood by  
valves (e.g., squib valves).
someone who has knowledge of light water reactor technology.  
1. Information Requested to Support Risk Informed Selections
    The following information is requested by April 16, 2021, or sooner, to facilitate the initial
Important Note: For the purpose of this inspection, POVs are valves with power actuators.
    sample selection.
Examples include motor-operated valves (MOVs), air-operated valves (AOVs),  
    1.1. List of systems, system numbers/designators, and corresponding system names.
hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated  
    1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
valves (e.g., squib valves).  
          document.
    1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).
1. Information Requested to Support Risk Informed Selections  
          Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley
          (as applicable). The list should include (a) component identification number, including
The following information is requested by April 16, 2021, or sooner, to facilitate the initial  
          noun name (i.e. descriptive name); (b) applicable plant system; (c) ASME Boiler and
sample selection.  
          Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related
          classification; (e) valve type, size, and manufacturer; and (f) actuator type, size, and
1.1. List of systems, system numbers/designators, and corresponding system names.  
          manufacturer. If the NRC has granted a license amendment to categorize structures,
          systems, and component in accordance with 10 CFR 50.69, please provide the Risk
1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary  
          Informed Safety Category of the component. (Please provide in Excel.)
document.  
    1.4. List of corrective action documents related to the POV programs for the last 5 years,
          including the document identifier and brief description. Provide a separate list for each
1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).
          POV program.
Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley  
    1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list
(as applicable). The list should include (a) component identification number, including  
          should include a brief description of the surrounding circumstances.
noun name (i.e. descriptive name); (b) applicable plant system; (c) ASME Boiler and  
2. Information Requested for Initial Inspection Scoping Activities
Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related  
    The following information is requested by June 4, 2021, or sooner, to facilitate the initial
classification; (e) valve type, size, and manufacturer; and (f) actuator type, size, and  
    sample selection.
manufacturer. If the NRC has granted a license amendment to categorize structures,  
    2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program
systems, and component in accordance with 10 CFR 50.69, please provide the Risk  
          and relief and alternative requests submitted in accordance with 10 CFR 50.55a for
Informed Safety Category of the component. (Please provide in Excel.)  
          POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power
          Plants (OM Code) that is the Code of record for the current 10-year IST Program
1.4. List of corrective action documents related to the POV programs for the last 5 years,  
          interval, as well as any self-imposed standards related to the IST Program elements
including the document identifier and brief description. Provide a separate list for each  
          applicable to POVs.
POV program.  
                                                  2
1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list  
should include a brief description of the surrounding circumstances.  
2. Information Requested for Initial Inspection Scoping Activities  
The following information is requested by June 4, 2021, or sooner, to facilitate the initial  
sample selection.  
2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program  
and relief and alternative requests submitted in accordance with 10 CFR 50.55a for  
POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power  
Plants (OM Code) that is the Code of record for the current 10-year IST Program  
interval, as well as any self-imposed standards related to the IST Program elements  
applicable to POVs.


  2.2. IST Program documents, including implementing procedures, IST plan, and the
        document that identifies the in-scope valves and the associated IST Program
        requirements for each valve (e.g., IST valve table identifying category, active/passive
3
        function).
2.2. IST Program documents, including implementing procedures, IST plan, and the  
  2.3. Site (and corporate if applicable) procedures associated with implementation of the
document that identifies the in-scope valves and the associated IST Program  
        POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory
requirements for each valve (e.g., IST valve table identifying category, active/passive  
        Appendix III.
function).  
  2.4. Joint Owners Group (JOG) MOV program classification evaluation.
  2.5. List of any valve removed from a POV program and basis for removal.
2.3. Site (and corporate if applicable) procedures associated with implementation of the  
  2.6. Current list of operator workarounds.
POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory  
  2.7. List of open operability evaluations related to POVs.
Appendix III.  
  2.8. List of permanent plant modifications to POVs completed in the last 5 years. For the
        purpose of this inspection, permanent plant modifications include permanent: plant
2.4. Joint Owners Group (JOG) MOV program classification evaluation.  
        changes, design changes, set point changes, equivalency evaluations, suitability
        analyses, and commercial grade dedications. The list should contain the modification
2.5. List of any valve removed from a POV program and basis for removal.  
        identifier, title, revision/date, the affected system, completion date, and a brief
        modification description.
2.6. Current list of operator workarounds.  
  2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.
  2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications, Technical
2.7. List of open operability evaluations related to POVs.  
        Specifications Bases, and Technical Requirements Manual.
  2.11. The lead inspector will deliver forms to the licensee point of contact identified in the
2.8. List of permanent plant modifications to POVs completed in the last 5 years. For the  
        letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It
purpose of this inspection, permanent plant modifications include permanent: plant  
        is possible that not all fields can be completed. For those fields that cannot be filled,
changes, design changes, set point changes, equivalency evaluations, suitability  
        leave the fields blank.
analyses, and commercial grade dedications. The list should contain the modification  
  2.12. Current management and engineering organizational chart.
identifier, title, revision/date, the affected system, completion date, and a brief  
3. Information Requested to Support Inspection Preparation Activities
modification description.  
  The following information is requested by July 23, 2021, or sooner, to facilitate the final
  inspection preparation.
2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.  
  3.1. All corrective action documents, evaluations, and NRC correspondence, including any
        associated NRC requests for additional information (RAIs) and Safety Evaluation
2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications, Technical  
        Report(s), generated in response to the NRC communications listed below. Also, any
Specifications Bases, and Technical Requirements Manual.  
        NRC inspection reports that were conducted to close out the sites associated
        responses.
2.11. The lead inspector will deliver forms to the licensee point of contact identified in the  
        3.1.1. Generic Letter (GL) 89-10;
letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It  
        3.1.2. GL 96-05;
is possible that not all fields can be completed. For those fields that cannot be filled,  
                                                    3
leave the fields blank.  
2.12. Current management and engineering organizational chart.  
3. Information Requested to Support Inspection Preparation Activities  
The following information is requested by July 23, 2021, or sooner, to facilitate the final  
inspection preparation.  
3.1. All corrective action documents, evaluations, and NRC correspondence, including any  
associated NRC requests for additional information (RAIs) and Safety Evaluation  
Report(s), generated in response to the NRC communications listed below. Also, any  
NRC inspection reports that were conducted to close out the sites associated  
responses.  
3.1.1. Generic Letter (GL) 89-10;  
3.1.2. GL 96-05;  


    3.1.3. GL 95-07;
    3.1.4. Bulletin 85-03;
    3.1.5. Regulatory Issue Summary (RIS) 2000-03; and
4
    3.1.6. GL 88-14.
3.1.3. GL 95-07;  
3.2. Any NRC correspondence regarding the stations POV programs other than the IST
    Program, including any associated NRC RAIs and any NRC Safety Evaluation
3.1.4. Bulletin 85-03;  
    Report(s). Identify any self-imposed standards related to these programs.
3.3. Preventive Maintenance (PM) Program document, implementing procedures, and PM
3.1.5. Regulatory Issue Summary (RIS) 2000-03; and  
    templates applicable to POVs.
3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.
3.1.6. GL 88-14.  
3.5. Corrective Action Program procedures, including the operability/functionality
    determination procedure.
3.2. Any NRC correspondence regarding the stations POV programs other than the IST  
3.6. Quality Assurance Program document.
Program, including any associated NRC RAIs and any NRC Safety Evaluation  
3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.
Report(s). Identify any self-imposed standards related to these programs.  
3.8. All emergency and abnormal operating procedures
3.9. For each selected POV, including its actuator (the response should be separated by
3.3. Preventive Maintenance (PM) Program document, implementing procedures, and PM  
    POV such as by creating a folder for each valve that includes the associated
templates applicable to POVs.  
    documents):
    3.9.1.   Procurement and design specifications, and Certificate of Conformance.
3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.  
    3.9.2.   Vendor documents addressing installation, operation, and maintenance.
    3.9.3.   Piping and instrumentation drawings (PI&Ds) for the associated system.
3.5. Corrective Action Program procedures, including the operability/functionality  
    3.9.4.   Electrical diagrams, including control logic diagrams.
determination procedure.  
    3.9.5.   Valve and actuator component drawings.
    3.9.6.   System description and/or training documents associated with the POV.
3.6. Quality Assurance Program document.  
    3.9.7.   Operations procedures that direct operators to control the valve, including
              alarm response procedures.
3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.  
    3.9.8.   Applicable Maintenance Rule scoping document and the Maintenance Rule
              performance criteria which would cause the system or component to be
3.8. All emergency and abnormal operating procedures  
              moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective
              action and work orders) associated with any instance the POV was placed in
3.9. For each selected POV, including its actuator (the response should be separated by  
              (a)(1) status during the last 5 years.
POV such as by creating a folder for each valve that includes the associated  
                                              4
documents):  
3.9.1.  
Procurement and design specifications, and Certificate of Conformance.  
3.9.2.  
Vendor documents addressing installation, operation, and maintenance.  
3.9.3.  
Piping and instrumentation drawings (PI&Ds) for the associated system.  
3.9.4.  
Electrical diagrams, including control logic diagrams.  
3.9.5.  
Valve and actuator component drawings.  
3.9.6.  
System description and/or training documents associated with the POV.  
3.9.7.  
Operations procedures that direct operators to control the valve, including  
alarm response procedures.  
3.9.8.  
Applicable Maintenance Rule scoping document and the Maintenance Rule  
performance criteria which would cause the system or component to be  
moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective  
action and work orders) associated with any instance the POV was placed in  
(a)(1) status during the last 5 years.  


3.9.9. List of tests, including technical specification surveillances. The list should
        identify the test periodicity and test procedure identifier.
3.9.10. Completed tests and surveillances performed during the last 5 years. For
5
        those tests and surveillances performed at a periodicity of less than 1 year or
3.9.9.  
        greater than 5 years, provide the latest three performed. Include the
List of tests, including technical specification surveillances. The list should  
        associated acceptance criteria basis calculations.
identify the test periodicity and test procedure identifier.  
3.9.11. Completed preservice testing (PST).
3.9.12. List of applicable PMs. The list should identify the PM periodicity and last
3.9.10. Completed tests and surveillances performed during the last 5 years. For  
        completion date, and briefly describe the PM.
those tests and surveillances performed at a periodicity of less than 1 year or  
3.9.13. Completed PMs performed during the last 5 years, including any post
greater than 5 years, provide the latest three performed. Include the  
        maintenance testing. For those PMs performed at a periodicity of less than
associated acceptance criteria basis calculations.  
        1 year or greater than 5 years, provide the latest three performed.
3.9.14. Corrective maintenance work orders performed on the POV during the last
3.9.11. Completed preservice testing (PST).  
        5 years, including any post maintenance testing.
3.9.15. An all-inclusive list of calculation revisions in effect associated with the POV.
3.9.12. List of applicable PMs. The list should identify the PM periodicity and last  
        The list should include the document identifier, title, and revision number.
completion date, and briefly describe the PM.  
3.9.16. Calculations associated with the POV. Data files may be excluded.
        Calculation examples include (as applicable):
3.9.13. Completed PMs performed during the last 5 years, including any post  
        *   Minimum available and required voltage at transient and steady state;
maintenance testing. For those PMs performed at a periodicity of less than  
        *   Thermal overload sizing evaluation;
1 year or greater than 5 years, provide the latest three performed.  
        *   Critical setpoint calculations (e.g., limit switch settings);
        *   Required thrust/torque;
3.9.14. Corrective maintenance work orders performed on the POV during the last  
        *   Maximum allowed leakage;
5 years, including any post maintenance testing.  
        *   Maximum differential pressure;
        *   Ambient room temperature under normal and accident conditions;
3.9.15. An all-inclusive list of calculation revisions in effect associated with the POV.
        *   Environmental qualification (EQ) file;
The list should include the document identifier, title, and revision number.  
        *   (For AOVs) Pneumatic supply sizing and setpoint calculations;
        *   System hydraulic calculations;
3.9.16. Calculations associated with the POV. Data files may be excluded.
        *   Pressure locking/thermal binding evaluations; and
Calculation examples include (as applicable):  
        *   Valve weak link/seismic weak link analysis.
3.9.17. History of permanent modifications performed on the POV since installation.
*  
        Include modification identifier and brief modification description.
Minimum available and required voltage at transient and steady state;  
3.9.18. List of corrective action documents associated with the POV for the last
*  
        5 years. The list should include the document identifier, brief description, and
Thermal overload sizing evaluation;  
        status (e.g., open or completed).
*  
3.9.19. Open and closed operability evaluations originated during the last 5 years.
Critical setpoint calculations (e.g., limit switch settings);  
                                        5
*  
Required thrust/torque;  
*  
Maximum allowed leakage;  
*  
Maximum differential pressure;  
*  
Ambient room temperature under normal and accident conditions;  
*  
Environmental qualification (EQ) file;  
*  
(For AOVs) Pneumatic supply sizing and setpoint calculations;  
*  
System hydraulic calculations;  
*  
Pressure locking/thermal binding evaluations; and  
*  
Valve weak link/seismic weak link analysis.  
3.9.17. History of permanent modifications performed on the POV since installation.
Include modification identifier and brief modification description.  
3.9.18. List of corrective action documents associated with the POV for the last  
5 years. The list should include the document identifier, brief description, and  
status (e.g., open or completed).  
3.9.19. Open and closed operability evaluations originated during the last 5 years.  


4. Additional Information to Be Provided Onsite
  4.1. During the in-office preparation activities, the team may identify additional information
        needed to support the inspection. The lead inspector may provide a list of the
6
        additional information needed during the week of August 2, 2021.
4. Additional Information to Be Provided Onsite  
  4.2. Information requested to be provided throughout the inspection:
        4.2.1.   Any corrective action documents generated as a result of the teams
4.1. During the in-office preparation activities, the team may identify additional information  
                questions during this inspection as the documents are generated.
needed to support the inspection. The lead inspector may provide a list of the  
        4.2.2.   List of questions and/or document requests submitted by the team and their
additional information needed during the week of August 2, 2021.  
                status (e.g., open, closed) sorted by inspector. Provide to each inspector
                daily 1.5 hours prior to the daily debrief. It is recommended to provide the
4.2. Information requested to be provided throughout the inspection:  
                team leader with a master list sorted by inspector and each inspector with a
                list containing only the items originated by that inspector.
4.2.1.  
        4.2.3.   If available in hardcopy form, one complete set of P&IDs and simplified
Any corrective action documents generated as a result of the teams  
                drawings (e.g., training schematics). If any of these documents is not
questions during this inspection as the documents are generated.  
                available in hardcopy form, contact the lead inspector.
                                                6
4.2.2.  
List of questions and/or document requests submitted by the team and their  
status (e.g., open, closed) sorted by inspector. Provide to each inspector  
daily 1.5 hours prior to the daily debrief. It is recommended to provide the  
team leader with a master list sorted by inspector and each inspector with a  
list containing only the items originated by that inspector.  
4.2.3.  
If available in hardcopy form, one complete set of P&IDs and simplified  
drawings (e.g., training schematics). If any of these documents is not  
available in hardcopy form, contact the lead inspector.
}}
}}

Revision as of 10:00, 29 November 2024

Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000315/2021011; 05000316/2021011
ML21089A156
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/30/2021
From: Jorge Corujo-Sandin
NRC/RGN-III/DRS/EB2
To: Gebbie J
Indiana Michigan Power Co
References
IR 2021011
Download: ML21089A156 (10)


See also: IR 05000315/2021011

Text

March 30, 2021

Mr. Joel P. Gebbie

Senior VP and Chief Nuclear Officer

Indiana Michigan Power Company

Nuclear Generation Group

One Cook Place

Bridgman, MI 49106

SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN

BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR

INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011

Dear Mr. Gebbie:

On August 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

Design Bases Assurance Inspection (Programs) at Donald C. Cook Nuclear Plant. This

inspection will be performed in accordance with NRC Baseline Inspection Procedure

71111.21N, Design Bases Assurance Inspection (Programs), Attachment 2, Design-Basis

Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements.

This inspection will evaluate the reliability, functional capability, and design basis of

risk-important power-operated valves (POVs) as required by 10 CFR 50.55a and applicable

10 CFR Part 50, Appendix A and Appendix B, requirements. In conducting this inspection, the

team will select risk-important POVs used to prevent and mitigate the consequences of a design

basis accident.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: August 2 - 6, 2021

Onsite weeks: August 9 - 13, 2021, and August 23 - 27, 2021

Experience with previous baseline engineering inspections of similar depth and length has

shown this type of inspection is extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection. It is important that all of these documents are up-to-date and complete in order

to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection. Insofar as possible, this information should be provided

electronically to the lead inspector. The information request has been divided into four groups:

J. Gebbie

-2-

The first group lists information necessary for our initial risk-informed scoping activities.

This information should be provided to the lead inspector no later than April 16, 2021.

The second group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than June 4, 2021. By

June 28, 2021, the lead inspector will communicate the initial selected samples and any

additional information needed to support the in-office preparation activities.

The third group of documents requested are those items needed to support our in-office

preparation activities. This set of documents should be provided to the lead inspector no

later than July 23, 2021. During the preparation activities, the team may identify

additional information needed to support the inspection.

The fourth group includes the additional information above as well as plant-specific

reference material. This information should be available to the team onsite on

August 9, 2021. It is also requested that corrective action documents and answers to

questions developed during the inspection be provided to the lead inspector as the

documents are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

These items are requested be provided to the lead inspector by July 16, 2021.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Mr. M. Ellet of your organization. If there are any questions about

the inspection or the material requested in the enclosure, contact the lead inspector at

630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

J. Gebbie

-3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jorge Corujo-Sandin, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-315 and 50-316

License Nos. DPR-58 and DPR-74

Enclosure:

Design Bases Assurance Inspection

(Programs)Document Request

cc: Distribution via LISTSERV

J. Gebbie

-4-

Letter to Joel P. Gebbie from Jorge Corujo-Sandin dated March 30, 2021.

SUBJECT: DONALD C. COOK NUCLEAR PLANT - NOTIFICATION OF NRC DESIGN

BASES ASSURANCE INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR

INFORMATION: INSPECTION REPORT 05000315/2021011; 05000316/2021011

DISTRIBUTION:

Brett Titus

Mark Haire

RidsNrrDorlLpl3

RidsNrrPMDCCook Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21089A156

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

RIII

NAME

JHanna:mb

via e-mail

JCorujo-Sandin

via e-mail

DATE

03/30/2021

03/30/2021

OFFICIAL RECORD COPY

Enclosure

DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM

REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000315/2021011; 05000316/2021011

Onsite Inspection Dates:

August 9 - 13, 2021, and August 23 - 27, 2021

Inspection Procedure:

IP 71111.21N, Design Bases Assurance Inspection

(Programs), Attachment 2, Design-Basis Capability of

Power-Operated Valves Under 10 CFR 50.55a Requirements

Lead Inspector:

Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS

630-829-9741

Jorge.Corujo-Sandin@nrc.gov

Teammate Inspectors:

Kevin Barclay, Reactor Inspector, RIII/DRS

Michael Jones, Reactor Inspector, RIII/DRS

II. LOGISTICS

Email the following inspection logistics to the lead inspector by July 16, 2021, or sooner:

1. Inspection room name/number, directions from the main access facility, and phone number;

2. Interview room name/number;

3. Response team contact information (names and phone numbers) and team roles (e.g.,

management sponsor, lead, inspector counterpart);

4. Any site access/badging actions needed for each inspector;

5. Any dosimetry actions needed for each inspector;

6. Entrance meeting time and location;

7. Confirmation that the team will have access to a licensee computer with a nearby printer;

8. Confirmation that the team will have Wi-Fi access;

9. Cafeteria location and hours;

10. Inspection response team normal working hours; and

11. Any potential resource conflicts during the inspection (e.g., emergency drills and all-staff

meetings).

2

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in searchable formats, if possible.

The files should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

Important Note: For the purpose of this inspection, POVs are valves with power actuators.

Examples include motor-operated valves (MOVs), air-operated valves (AOVs),

hydraulic-operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated

valves (e.g., squib valves).

1. Information Requested to Support Risk Informed Selections

The following information is requested by April 16, 2021, or sooner, to facilitate the initial

sample selection.

1.1. List of systems, system numbers/designators, and corresponding system names.

1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary

document.

1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth (RAW).

Include values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley

(as applicable). The list should include (a) component identification number, including

noun name (i.e. descriptive name); (b) applicable plant system; (c) ASME Boiler and

Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related

classification; (e) valve type, size, and manufacturer; and (f) actuator type, size, and

manufacturer. If the NRC has granted a license amendment to categorize structures,

systems, and component in accordance with 10 CFR 50.69, please provide the Risk

Informed Safety Category of the component. (Please provide in Excel.)

1.4. List of corrective action documents related to the POV programs for the last 5 years,

including the document identifier and brief description. Provide a separate list for each

POV program.

1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list

should include a brief description of the surrounding circumstances.

2. Information Requested for Initial Inspection Scoping Activities

The following information is requested by June 4, 2021, or sooner, to facilitate the initial

sample selection.

2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST) Program

and relief and alternative requests submitted in accordance with 10 CFR 50.55a for

POVs. Identify the edition of the ASME Operation and Maintenance of Nuclear Power

Plants (OM Code) that is the Code of record for the current 10-year IST Program

interval, as well as any self-imposed standards related to the IST Program elements

applicable to POVs.

3

2.2. IST Program documents, including implementing procedures, IST plan, and the

document that identifies the in-scope valves and the associated IST Program

requirements for each valve (e.g., IST valve table identifying category, active/passive

function).

2.3. Site (and corporate if applicable) procedures associated with implementation of the

POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code Mandatory

Appendix III.

2.4. Joint Owners Group (JOG) MOV program classification evaluation.

2.5. List of any valve removed from a POV program and basis for removal.

2.6. Current list of operator workarounds.

2.7. List of open operability evaluations related to POVs.

2.8. List of permanent plant modifications to POVs completed in the last 5 years. For the

purpose of this inspection, permanent plant modifications include permanent: plant

changes, design changes, set point changes, equivalency evaluations, suitability

analyses, and commercial grade dedications. The list should contain the modification

identifier, title, revision/date, the affected system, completion date, and a brief

modification description.

2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.

2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications, Technical

Specifications Bases, and Technical Requirements Manual.

2.11. The lead inspector will deliver forms to the licensee point of contact identified in the

letter for approximately 30 valves. Fill out the valve characteristics in the form fields. It

is possible that not all fields can be completed. For those fields that cannot be filled,

leave the fields blank.

2.12. Current management and engineering organizational chart.

3. Information Requested to Support Inspection Preparation Activities

The following information is requested by July 23, 2021, or sooner, to facilitate the final

inspection preparation.

3.1. All corrective action documents, evaluations, and NRC correspondence, including any

associated NRC requests for additional information (RAIs) and Safety Evaluation

Report(s), generated in response to the NRC communications listed below. Also, any

NRC inspection reports that were conducted to close out the sites associated

responses.

3.1.1. Generic Letter (GL) 89-10;

3.1.2. GL 96-05;

4

3.1.3. GL 95-07;

3.1.4.Bulletin 85-03;

3.1.5. Regulatory Issue Summary (RIS) 2000-03; and

3.1.6. GL 88-14.

3.2. Any NRC correspondence regarding the stations POV programs other than the IST

Program, including any associated NRC RAIs and any NRC Safety Evaluation

Report(s). Identify any self-imposed standards related to these programs.

3.3. Preventive Maintenance (PM) Program document, implementing procedures, and PM

templates applicable to POVs.

3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.

3.5. Corrective Action Program procedures, including the operability/functionality

determination procedure.

3.6. Quality Assurance Program document.

3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.

3.8. All emergency and abnormal operating procedures

3.9. For each selected POV, including its actuator (the response should be separated by

POV such as by creating a folder for each valve that includes the associated

documents):

3.9.1.

Procurement and design specifications, and Certificate of Conformance.

3.9.2.

Vendor documents addressing installation, operation, and maintenance.

3.9.3.

Piping and instrumentation drawings (PI&Ds) for the associated system.

3.9.4.

Electrical diagrams, including control logic diagrams.

3.9.5.

Valve and actuator component drawings.

3.9.6.

System description and/or training documents associated with the POV.

3.9.7.

Operations procedures that direct operators to control the valve, including

alarm response procedures.

3.9.8.

Applicable Maintenance Rule scoping document and the Maintenance Rule

performance criteria which would cause the system or component to be

moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective

action and work orders) associated with any instance the POV was placed in

(a)(1) status during the last 5 years.

5

3.9.9.

List of tests, including technical specification surveillances. The list should

identify the test periodicity and test procedure identifier.

3.9.10. Completed tests and surveillances performed during the last 5 years. For

those tests and surveillances performed at a periodicity of less than 1 year or

greater than 5 years, provide the latest three performed. Include the

associated acceptance criteria basis calculations.

3.9.11. Completed preservice testing (PST).

3.9.12. List of applicable PMs. The list should identify the PM periodicity and last

completion date, and briefly describe the PM.

3.9.13. Completed PMs performed during the last 5 years, including any post

maintenance testing. For those PMs performed at a periodicity of less than

1 year or greater than 5 years, provide the latest three performed.

3.9.14. Corrective maintenance work orders performed on the POV during the last

5 years, including any post maintenance testing.

3.9.15. An all-inclusive list of calculation revisions in effect associated with the POV.

The list should include the document identifier, title, and revision number.

3.9.16. Calculations associated with the POV. Data files may be excluded.

Calculation examples include (as applicable):

Minimum available and required voltage at transient and steady state;

Thermal overload sizing evaluation;

Critical setpoint calculations (e.g., limit switch settings);

Required thrust/torque;

Maximum allowed leakage;

Maximum differential pressure;

Ambient room temperature under normal and accident conditions;

Environmental qualification (EQ) file;

(For AOVs) Pneumatic supply sizing and setpoint calculations;

System hydraulic calculations;

Pressure locking/thermal binding evaluations; and

Valve weak link/seismic weak link analysis.

3.9.17. History of permanent modifications performed on the POV since installation.

Include modification identifier and brief modification description.

3.9.18. List of corrective action documents associated with the POV for the last

5 years. The list should include the document identifier, brief description, and

status (e.g., open or completed).

3.9.19. Open and closed operability evaluations originated during the last 5 years.

6

4. Additional Information to Be Provided Onsite

4.1. During the in-office preparation activities, the team may identify additional information

needed to support the inspection. The lead inspector may provide a list of the

additional information needed during the week of August 2, 2021.

4.2. Information requested to be provided throughout the inspection:

4.2.1.

Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

4.2.2.

List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide to each inspector

daily 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> prior to the daily debrief. It is recommended to provide the

team leader with a master list sorted by inspector and each inspector with a

list containing only the items originated by that inspector.

4.2.3.

If available in hardcopy form, one complete set of P&IDs and simplified

drawings (e.g., training schematics). If any of these documents is not

available in hardcopy form, contact the lead inspector.