{{#Wiki_filter:m                                                                             EntergyOperations, inc.
{{#Wiki_filter:m Entergy Operations, inc.
Q           @
Q RiverBendStation 5485U.S.Highway 61N StFrancisville, LA70775 Tel225-381-4374 Kentscott General Manager Plant Operations RBG-48084 April 15,2021 ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, DC20555-0001
RiverBendStation 5485U.S.Highway 61N LA70775 StFrancisville, Tel225-381-4374 Kentscott GeneralManager PlantOperations RBG-48084 15,2021 April ATTN:Document ControlDesk U.S.     Regulatory Nuclear        Commission DC20555-0001 Washington,


==Subject:==
==Subject:==
Reply   toa NoticeofViolation;   2021010-03 River BendStation -
Reply toaNotice ofViolation; 2021010-03 River BendStation
Unit 1 NRCDocket   Nos. 50-458 Renewed  Facility Operating   License   No. NPF-47
- Unit 1
NRCDocket Nos.50-458 RenewedFacility Operating License No.
NPF-47


==Reference:==
==Reference:==
NRCLetter toEntergy, "River   BendStation Biennial ProblemIdentification andResolution Inspection Report   05000458/2021010     andNotice   ofViolation" dated March18,2021(ADAMS       Accession   Number ML21064A220)
NRCLetter toEntergy, "River BendStation Biennial ProblemIdentification andResolution Inspection Report 05000458/2021010 andNotice ofViolation" dated March18,2021(ADAMS Accession Number ML21064A220)
On March18,2021,theNRCtransmitted a Notice    ofViolation   toEntergy Operations, ine (Entergy).
OnMarch18,2021,theNRCtransmitted aNotice ofViolation toEntergy Operations, ine(Entergy).
Thecited     wasfor violation     Technical Specification   5.4.1.a for failuretomaintain procedures required Guide byRegulatory          Revision 1.33,       2,Appendix     A.Specifically,   theNRCissued a violation for failure tomaintain adequate proceduresfor feedwater    system   operationonApril29, 2020, andthe failed licensee  torestore compliance withina reasonable      amount  oftime.
Thecited violation wasforTechnical Specification 5.4.1.a forfailure tomaintain procedures required byRegulatory Guide 1.33, Revision 2,Appendix A.Specifically, theNRCissued aviolation for failure tomaintain adequate procedures forfeedwater system operation onApril29,
TheEnclosureprovidesEntergy'sresponse  totheNotice     ofViolation. This informationis provided inaccordance with10CFR2.201.
: 2020, andthe licensee failed torestore compliance within areasonable amountoftime.
Thisletter contains nonewregulatory   commitments.
TheEnclosure provides Entergy's response totheNotice ofViolation.
Shouldyouhaveany please questions,      contact   Mr. TimSchenk,     Regulatory Assurance Manager,   at 225-381-4177.         /
This informationis provided inaccordance with 10CFR2.201.
Thisletter contains nonewregulatory commitments.
Should youhaveanyquestions, please contact Mr.TimSchenk, Regulatory Assurance
: Manager, at 225-381-4177.
/
Respectfully, KS/blj
Respectfully, KS/blj


==Enclosure:==
==Enclosure:==
Reply     toNoticeofViolation; 2021010-03 cc:         NRCRegional   Administrator -
Reply toNotice ofViolation; 2021010-03 cc:
Region   IV NRCSenior   Resident Inspector   -
NRCRegional Administrator
River   BendStation
- Region IV NRCSenior Resident Inspector
- River BendStation


Enclosure RBG-48084 toa Notice Reply        ofViolation; 2021010-03
Enclosure RBG-48084 ReplytoaNotice ofViolation; 2021010-03


RBG-48084 Enclosure Page   1of2 Entergy     Operations,     Inc.
RBG-48084 Enclosure Page 1of2 Entergy Operations, Inc.
Reply  toa Notice      ofViolation;   2021010-03 Byletter  dated March 18,   2021toEntergy        Operations,     Inc. (Entergy),
ReplytoaNotice ofViolation; 2021010-03 By{{letter dated|date=March 18, 2021|text=letter dated March 18,2021}}toEntergy Operations, Inc.
theNuclear   Regulatory Commission     (NRC) issued   "River  Bend    Station  -
(Entergy),
Biennial   Problem Identification and  Resolution Inspection   Report 05000458/2021010         andNotice     ofViolation"   (ADAMS Accession   Number ML21064A220).
theNuclear Regulatory Commission (NRC)issued "RiverBendStation
Entergy   concurswith  the violation   ascitedinthe      Notice              (NOV) ofViolation      regarding Technical Specification 5.4.1.a forfailure  to maintain procedures required         byRegulatory Guide 1.33, Revision   2,Appendix   A.Specifically, the NRCissued             aviolation forfailuretomaintain adequate   procedures   for feedwater   system operation         onApril 29,2020, andthe  licensee  failed torestore               within compliance a reasonable              amount   of time.
- Biennial Problem Identification andResolution Inspection Report 05000458/2021010 andNotice ofViolation" (ADAMS Accession Number ML21064A220).
Inaccordance   with  10CFR2.201,       this enclosure   provides   Entergy'sreply totheNotice   of Violation.
Entergy concurs with the violation ascitedintheNotice ofViolation (NOV) regarding Technical Specification 5.4.1.a for failure to maintain procedures required byRegulatory Guide 1.33, Revision 2,Appendix A.Specifically, the NRCissued aviolation forfailure tomaintain adequate procedures for feedwater system operation onApril 29,2020,andthelicensee failed torestore compliance within areasonable amount oftime.
M During   anNRCinspection     conducted     from  January    25through February 12,2021,     a violationof NRCrequirements     wasidentified.     Inaccordance       with   the NRCEnforcement Policy,   theviolation islisted   below:
Inaccordance with10CFR2.201, this enclosure provides Entergy's reply totheNotice of Violation.
Technical Specification     5.4.1.a, requires,   inpart,   thatprocedures shall beestablished, implemented,   andmaintained       covering   theapplicable     procedures recommended       in Appendix A ofRegulatory      Guide   1.33, Revision     2.Section 4.oofAppendix A to Regulatory Guide   1.33,   Revision   2,requires   instructions fortheoperation of the feedwater system.
M During anNRCinspection conducted fromJanuary 25through February 12,2021,aviolation of NRCrequirements wasidentified.
Contrarytotheabove,       from June1,2019,       toFebruary     10,2021,thelicensee   failed to establish,implement,     and  maintain    applicable     procedures recommended   inAppendix A ofRegulatory   Guide Revision 1 .33,           2, Section   4.o fortheoperation  ofthe feedwater system. Specifically,   thelicensee     established     Procedures SOP-0009,   "Reactor Feedwater System     (SYS   #107),"   Revision   80 82,andOSP-0053, "Emergency   and Transient Response      Support  Procedure,"    Revision    27and28,tomeet    theRegulatory Guide 1.33 requirement,      andthe    licensee  failed    tomaintainthese procedures  for feedwater operation    toinclude    necessary    precautions    toprevent operation  ofthesystem inanimproper    lineup.
Inaccordance with theNRCEnforcement
This  violation isassociated    with  a Green    SDPfinding.
: Policy, theviolation islisted below:
Reason.for..the  Violatio.n OnApril    29,2020  theNRCissued        "River  BendStation      -
Technical Specification 5.4.1.a,
IntegratedInspection Report 05000458/2020001."      Theinspection      report  documented      a non-citedviolation (NCV  2020001-
: requires, inpart, that procedures shall beestablished, implemented, andmaintained covering theapplicable procedures recommended in Appendix AofRegulatory Guide 1.33, Revision 2.Section 4.oofAppendix Ato Regulatory Guide 1.33, Revision 2,requires instructions fortheoperation of the feedwater system.
: 03) for  failure to maintain  adequate    procedures      forf  eedwater  system operation  because    ofthe inspectors  review ofa reactor    scram  that  occurred  onMay31,2019.      Additional details  were
Contrary totheabove, fromJune1,2019,toFebruary 10,2021,thelicensee failed to establish, implement, andmaintain applicable procedures recommended inAppendix A
ofRegulatory Guide1.33, Revision 2,Section 4.ofortheoperation ofthefeedwater system.
Specifically, thelicensee established Procedures SOP-0009, "Reactor Feedwater System(SYS
#107),"
Revision 80
- 82,andOSP-0053, "Emergency and Transient


RBG-48084 Enclosure Page   2of2 provided intheinspectionreport       thattheNRCconcerns      werespecific   toSOP-0009,     "Reactor Feedwater   System,"   andOSP-0053,       "Emergency   andTransient   Response     Support   Procedure."
===Response===
Although the violation   was  documented    initially inthe Corrective  Action   Program   (CR-RBS-2020-00965)   the   condition   report wasclosed tothetwoactions     taken   under  CR-RBS-2019-03891    that addressed     the  causal  evaluation forthereactor   scram. All  corrective actions were closed       to NRC issuing inspection priorthe                                report05000458/2020001.
Support Procedure,"
Uponreceipt   oftheinspection report, RegulatoryAssurance           personnel   didnotrecognize   that a newcondition   report needed to begenerated toensure         theadditional   details associated with  the NCVwereadequately           addressed   asrequired byEntergy     procedure EN-Ll-123,   "NRCInspection Support." Asa result      correctiveactions werenot  developed    inaccordance   with EN-LI-102, "Corrective Action   Program,"   toadequately address correcting     theSOP-0009     andOSP-0053 procedures.
Revision 27and28,tomeettheRegulatory Guide1.33requirement, andthelicensee failed tomaintain these procedures for feedwater operation toinclude necessary precautions toprevent operation ofthesystem inanimproper lineup.
Theidentified   condition   wasentered   into Entergy'scorrective   action program   (CR-RBS-2021-00644).
Thisviolation isassociated with aGreenSDPfinding.
Thefollowing   corrective     actions were taken:
Reason.for..the Violatio.n OnApril 29,2020theNRCissued "River BendStation
Action 1:       Revised   OSP-0053,   Emergency andTransient Response Support         Procedure, hard  card  toensure  Operators understand   therequirements    that atleast one LowPressure       Heater Stringisinservice    whenrestarting feedwater pumps.
- Integrated Inspection Report 05000458/2020001."
Action 2:       Revised     SOP-0009,   Reactor Feedwater     System, toadd a precaution and limitation statement tonot attempt tostart   a Reactor  FeedPump unless at least   oneLowPressure     Heaterstring  isvalved into service on the condensate     side.
Theinspection report documented anon-cited violation (NCV 2020001-03) forfailure tomaintain adequate procedures forfeedwater system operation because ofthe inspectors review ofareactor scramthat occurred onMay31,2019.Additional details were
Asa result  ofthe    corrective  actions taken, Entergycompleted    the required  changes   tothe affected procedures, addressing therefore,               the issueof  concern  and  resulted  in restoringfull compliance.
 
M Noadditional   corrective   actions havebeenidentified.
RBG-48084 Enclosure Page 2of2 provided intheinspectionreport that theNRCconcerns werespecific toSOP-0009, "Reactor Feedwater System,"
Entergy restored   fullcompliance    onFebruary   10,2021}}
andOSP-0053, "Emergency andTransient
 
===Response===
Support Procedure."
Although the violation wasdocumentedinitially intheCorrective Action Program (CR-RBS-2020-00965) the condition report wasclosed tothetwoactions taken underCR-RBS-2019-03891that addressed thecausalevaluation forthereactor scram.
Allcorrective actions were closed prior tothe NRC issuing inspectionreport 05000458/2020001.
Uponreceipt oftheinspection
: report, RegulatoryAssurance personnel didnotrecognize that a
newcondition report needed to begenerated toensure theadditional details associated withthe NCVwereadequately addressed asrequired byEntergy procedure EN-Ll-123, "NRCInspection Support."
Asaresult correctiveactions werenotdeveloped inaccordance with EN-LI-102, "Corrective Action Program,"
toadequately address correcting theSOP-0009 andOSP-0053 procedures.
Theidentified condition wasentered into Entergy'scorrective action program (CR-RBS-2021-00644).
Thefollowing corrective actions weretaken:
Action 1:
Revised OSP-0053, Emergency andTransient
 
===Response===
Support Procedure, hardcardtoensure Operators understand the requirements that atleast one LowPressure Heater String isinservice whenrestarting feedwater pumps.
Action 2:
Revised SOP-0009, Reactor Feedwater
: System, toadda precaution and limitation statement tonotattempt tostart aReactor FeedPump unless at least oneLowPressure Heater string isvalved into service on the condensate side.
Asaresult ofthecorrective actions
: taken, Entergy completed therequired changes tothe affected procedures, therefore, addressing theissue ofconcern andresulted inrestoringfull compliance.
M Noadditional corrective actions havebeenidentified.
Entergy restored full compliance onFebruary 10,2021}}

Latest revision as of 09:46, 29 November 2024

Reply to Notice of Violation
ML21105A419
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/15/2021
From: Karenina Scott
Entergy Operations
To:
Document Control Desk, NRC Region 4
References
RBG-480
Download: ML21105A419 (4)


Text

m Entergy Operations, inc.

Q RiverBendStation 5485U.S.Highway 61N StFrancisville, LA70775 Tel225-381-4374 Kentscott General Manager Plant Operations RBG-48084 April 15,2021 ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, DC20555-0001

Subject:

Reply toaNotice ofViolation; 2021010-03 River BendStation

- Unit 1

NRCDocket Nos.50-458 RenewedFacility Operating License No.

NPF-47

Reference:

NRCLetter toEntergy, "River BendStation Biennial ProblemIdentification andResolution Inspection Report 05000458/2021010 andNotice ofViolation" dated March18,2021(ADAMS Accession Number ML21064A220)

OnMarch18,2021,theNRCtransmitted aNotice ofViolation toEntergy Operations, ine(Entergy).

Thecited violation wasforTechnical Specification 5.4.1.a forfailure tomaintain procedures required byRegulatory Guide 1.33, Revision 2,Appendix A.Specifically, theNRCissued aviolation for failure tomaintain adequate procedures forfeedwater system operation onApril29,

2020, andthe licensee failed torestore compliance within areasonable amountoftime.

TheEnclosure provides Entergy's response totheNotice ofViolation.

This informationis provided inaccordance with 10CFR2.201.

Thisletter contains nonewregulatory commitments.

Should youhaveanyquestions, please contact Mr.TimSchenk, Regulatory Assurance

Manager, at 225-381-4177.

/

Respectfully, KS/blj

Enclosure:

Reply toNotice ofViolation; 2021010-03 cc:

NRCRegional Administrator

- Region IV NRCSenior Resident Inspector

- River BendStation

Enclosure RBG-48084 ReplytoaNotice ofViolation; 2021010-03

RBG-48084 Enclosure Page 1of2 Entergy Operations, Inc.

ReplytoaNotice ofViolation; 2021010-03 Byletter dated March 18,2021toEntergy Operations, Inc.

(Entergy),

theNuclear Regulatory Commission (NRC)issued "RiverBendStation

- Biennial Problem Identification andResolution Inspection Report 05000458/2021010 andNotice ofViolation" (ADAMS Accession Number ML21064A220).

Entergy concurs with the violation ascitedintheNotice ofViolation (NOV) regarding Technical Specification 5.4.1.a for failure to maintain procedures required byRegulatory Guide 1.33, Revision 2,Appendix A.Specifically, the NRCissued aviolation forfailure tomaintain adequate procedures for feedwater system operation onApril 29,2020,andthelicensee failed torestore compliance within areasonable amount oftime.

Inaccordance with10CFR2.201, this enclosure provides Entergy's reply totheNotice of Violation.

M During anNRCinspection conducted fromJanuary 25through February 12,2021,aviolation of NRCrequirements wasidentified.

Inaccordance with theNRCEnforcement

Policy, theviolation islisted below:

Technical Specification 5.4.1.a,

requires, inpart, that procedures shall beestablished, implemented, andmaintained covering theapplicable procedures recommended in Appendix AofRegulatory Guide 1.33, Revision 2.Section 4.oofAppendix Ato Regulatory Guide 1.33, Revision 2,requires instructions fortheoperation of the feedwater system.

Contrary totheabove, fromJune1,2019,toFebruary 10,2021,thelicensee failed to establish, implement, andmaintain applicable procedures recommended inAppendix A

ofRegulatory Guide1.33, Revision 2,Section 4.ofortheoperation ofthefeedwater system.

Specifically, thelicensee established Procedures SOP-0009, "Reactor Feedwater System(SYS

  1. 107),"

Revision 80

- 82,andOSP-0053, "Emergency and Transient

Response

Support Procedure,"

Revision 27and28,tomeettheRegulatory Guide1.33requirement, andthelicensee failed tomaintain these procedures for feedwater operation toinclude necessary precautions toprevent operation ofthesystem inanimproper lineup.

Thisviolation isassociated with aGreenSDPfinding.

Reason.for..the Violatio.n OnApril 29,2020theNRCissued "River BendStation

- Integrated Inspection Report 05000458/2020001."

Theinspection report documented anon-cited violation (NCV 2020001-03) forfailure tomaintain adequate procedures forfeedwater system operation because ofthe inspectors review ofareactor scramthat occurred onMay31,2019.Additional details were

RBG-48084 Enclosure Page 2of2 provided intheinspectionreport that theNRCconcerns werespecific toSOP-0009, "Reactor Feedwater System,"

andOSP-0053, "Emergency andTransient

Response

Support Procedure."

Although the violation wasdocumentedinitially intheCorrective Action Program (CR-RBS-2020-00965) the condition report wasclosed tothetwoactions taken underCR-RBS-2019-03891that addressed thecausalevaluation forthereactor scram.

Allcorrective actions were closed prior tothe NRC issuing inspectionreport 05000458/2020001.

Uponreceipt oftheinspection

report, RegulatoryAssurance personnel didnotrecognize that a

newcondition report needed to begenerated toensure theadditional details associated withthe NCVwereadequately addressed asrequired byEntergy procedure EN-Ll-123, "NRCInspection Support."

Asaresult correctiveactions werenotdeveloped inaccordance with EN-LI-102, "Corrective Action Program,"

toadequately address correcting theSOP-0009 andOSP-0053 procedures.

Theidentified condition wasentered into Entergy'scorrective action program (CR-RBS-2021-00644).

Thefollowing corrective actions weretaken:

Action 1:

Revised OSP-0053, Emergency andTransient

Response

Support Procedure, hardcardtoensure Operators understand the requirements that atleast one LowPressure Heater String isinservice whenrestarting feedwater pumps.

Action 2:

Revised SOP-0009, Reactor Feedwater

System, toadda precaution and limitation statement tonotattempt tostart aReactor FeedPump unless at least oneLowPressure Heater string isvalved into service on the condensate side.

Asaresult ofthecorrective actions

taken, Entergy completed therequired changes tothe affected procedures, therefore, addressing theissue ofconcern andresulted inrestoringfull compliance.

M Noadditional corrective actions havebeenidentified.

Entergy restored full compliance onFebruary 10,2021