==Inspection Report==
==Inspection Report==
Docket Numbers: 05000321 and 05000366
Docket Numbers:
 
05000321 and 05000366
License Numbers: DPR-57 and NPF-5
License Numbers:
 
DPR-57 and NPF-5
Report Numbers: 05000321/2022003 and 05000366/2022003
Report Numbers:
 
05000321/2022003 and 05000366/2022003
Enterprise Identifier: I-2022-003-0018
Enterprise Identifier:
 
I-2022-003-0018
Licensee: Southern Nuclear Operating Company, Inc.
Licensee:
 
Southern Nuclear Operating Company, Inc.
Facility: Edwin I. Hatch
Facility:
 
Edwin I. Hatch
Location: Baxley, GA
Location:
 
Baxley, GA
Inspection Dates: July 01, 2022 to September 30, 2022
Inspection Dates:
 
July 01, 2022 to September 30, 2022
Inspectors: A. Alen, Senior Project Engineer T. Fanelli, Senior Reactor Inspector J. Hickman, Resident Inspector M. Magyar, Reactor Inspector T. Morrissey, Senior Resident Inspector C. Safouri, Senior Project Engineer R. Smith, Senior Resident Inspector
Inspectors:
 
A. Alen, Senior Project Engineer
Approved By: Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects
T. Fanelli, Senior Reactor Inspector
 
J. Hickman, Resident Inspector
Enclosure
M. Magyar, Reactor Inspector
T. Morrissey, Senior Resident Inspector
C. Safouri, Senior Project Engineer
R. Smith, Senior Resident Inspector
Approved By:
Alan J. Blamey, Chief
Reactor Projects Branch 2
Division of Reactor Projects


=SUMMARY=
=SUMMARY=
Line 69: Line 76:


===List of Findings and Violations===
===List of Findings and Violations===
Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Report Aspect Section Mitigating Green [H.14] - 71152A Systems NCV 05000321,05000366/2022003-01 Conservative Open/Closed Bias An NRC-identified Green NCV, involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.
Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000321,05000366/2022003-01 Open/Closed
[H.14] -
Conservative Bias 71152A An NRC-identified Green NCV, involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.


===Additional Tracking Items===
===Additional Tracking Items===
Line 161: Line 170:
==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Temporary modification to install a temporary supplemental cooling on the unit 2 CRD piping supplying the seal purge flow to the shaft seal cavity of the 2B reactor recirculation pump.
: (1) Temporary modification to install a temporary supplemental cooling on the unit 2 CRD piping supplying the seal purge flow to the shaft seal cavity of the 2B reactor recirculation pump.
Line 168: Line 176:
===Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
: (1) 57SV-SUV-012-1, ATTS Panel 1H11-P926 Channel FT&C, following the replacement of the HPCI exhaust diaphragm high pressure ATTS card, on July 28, 2022.
(1)57SV-SUV-012-1, ATTS Panel 1H11-P926 Channel FT&C, following the replacement of the HPCI exhaust diaphragm high pressure ATTS card, on July 28, 2022.
: (2) 34SO-R42-001-2, "125 Volts Direct Current (VDC) and 125/250 VDC System,"
 
(2)34SO-R42-001-2, "125 Volts Direct Current (VDC) and 125/250 VDC System,"
following cleaning, calibration, and fan replacement of the unit 2 division II station service battery charger F, on July 29, 2022.
following cleaning, calibration, and fan replacement of the unit 2 division II station service battery charger F, on July 29, 2022.
: (3) 57SV-R43-001-2, "Testing the LOCA/LOSP Timer Card," following replacement of the
 
(3)57SV-R43-001-2, "Testing the LOCA/LOSP Timer Card," following replacement of the  


{{a|2R43}}
{{a|2R43}}


==2R43 N782B card, on August 11, 2022.  
==2R43 N782B card, on August 11, 2022.
 
(4)==
(4)==
42SP-07-20-22-RS-1-1, "Diesel Fire Pump Engine Replacement Functional Test,"
42SP-07-20-22-RS-1-1, "Diesel Fire Pump Engine Replacement Functional Test,"
following the replacement of the 1X43-C002B engine, the weeks of August 15, 22, and 29, 2022.
following the replacement of the 1X43-C002B engine, the weeks of August 15, 22, and 29, 2022.
: (5) 34SO-E21-001-2, "Core Spray System", section 4.3.1, B loop CS manual startup, following unit 2 A CS system maintenance outage, on August 31, 2022.
 
: (6) 57SV-R43-001-2, "Testing The LOCA/LOSP Timer Cards," following the K7 relay replacement on the unit 2 B EDG loading timer, on September 2, 2022.
(5)34SO-E21-001-2, "Core Spray System", section 4.3.1, B loop CS manual startup, following unit 2 A CS system maintenance outage, on August 31, 2022.
 
(6)57SV-R43-001-2, "Testing The LOCA/LOSP Timer Cards," following the K7 relay replacement on the unit 2 B EDG loading timer, on September 2, 2022.
: (7) Work Order SNC1340018, computer processing unit replacement in the unit 2 B recirculation adjustable speed drive, on September 10, 2022.
: (7) Work Order SNC1340018, computer processing unit replacement in the unit 2 B recirculation adjustable speed drive, on September 10, 2022.


Line 187: Line 200:


===Surveillance Tests (other) (IP Section 03.01) (2 Samples)===
===Surveillance Tests (other) (IP Section 03.01) (2 Samples)===
: (1) 34SV-P41-001-1, "Plant Service Water Pump Operability," Version 15.3 (section 7.2, "PSW 'A' Loop"), on July 12, 2022.
(1)34SV-P41-001-1, "Plant Service Water Pump Operability," Version 15.3 (section 7.2, "PSW 'A' Loop"), on July 12, 2022.
: (2) 34SV-E11-004-2, "RHR Service Water Pump Operability", Version 19.2, on September 7, 2022.
 
(2)34SV-E11-004-2, "RHR Service Water Pump Operability", Version 19.2, on September 7, 2022.


===Inservice Testing (IP Section 03.01) (1 Sample)===
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) 34SV-E51-002-1, "RCIC Pump Operability," Version 29.2 (sections 4.2, "Operability Test" and 4.3, "RCIC IST Test"), on July 6, 2022
(1)34SV-E51-002-1, "RCIC Pump Operability," Version 29.2 (sections 4.2, "Operability Test" and 4.3, "RCIC IST Test"), on July 6, 2022


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
Line 198: Line 212:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
 
The inspectors verified licensee performance indicators submittals listed below:
 
MS06: Emergency AC Power Systems (IP Section 02.05)===
MS06: Emergency AC Power Systems (IP Section 02.05)===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
Line 215: Line 226:
: (2) Unit 2 (July 1, 2021-June 30, 2022)
: (2) Unit 2 (July 1, 2021-June 30, 2022)


===71152A - Annual Follow-up Problem Identification and Resolution
===71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)===
 
Annual Follow-up of Selected Issues (Section 03.03)===
{{IP sample|IP=IP 71152|count=1}}
{{IP sample|IP=IP 71152|count=1}}
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
Line 229: Line 238:
Significance/Severity: Green. The inspectors assessed the significance of the finding using guidance in IMC 0609, Appendix F, Fire Protection Significance Determination Process, and determined the finding to be of very low safety significance because there was an adequate automatic suppression system inside the EDG room.
Significance/Severity: Green. The inspectors assessed the significance of the finding using guidance in IMC 0609, Appendix F, Fire Protection Significance Determination Process, and determined the finding to be of very low safety significance because there was an adequate automatic suppression system inside the EDG room.


Corrective Action References: Condition reports (CRs) 10901837, 10902255
Corrective Action References: Condition reports (CRs) 10901837, 10902255 Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000321,05000366/2022003-01 Open/Closed
 
[H.14] -
Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Report Aspect Section Mitigating Green [H.14] - 71152A Systems NCV 05000321,05000366/2022003-01 Conservative Open/Closed Bias An NRC-identified Green non-cited violation (NCV), involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.
Conservative Bias 71152A An NRC-identified Green non-cited violation (NCV), involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.


=====Description:=====
=====Description:=====
Line 285: Line 294:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.04 Corrective Action Condition Reports (CR) 10628284, 10632635, 10635610, 10644674,
Type
Documents 10661058, 10694204, 10695300, 10705032,
Designation
Description or Title
Revision or
Date
71111.04
Corrective Action
Documents
Condition Reports (CR)
10628284, 10632635, 10635610, 10644674,
10661058, 10694204, 10695300, 10705032,
10706311, 10706501, 10709640, 10713284,
10706311, 10706501, 10709640, 10713284,
10713434, 10713709, 10714302, 10729116,
10713434, 10713709, 10714302, 10729116,
Line 303: Line 321:
10847035, 10861205, 10871869, 10877955,
10847035, 10861205, 10871869, 10877955,
10885863, 10887149, 10889038, 10889039
10885863, 10887149, 10889038, 10889039
71111.04 Corrective Action Condition Reports (CR) 10823143, 10835132, 10835365, 10838266,
71111.04
Documents 10840019, 10847448, 10847489, 10847705,
Corrective Action
Documents
Condition Reports (CR)
10823143, 10835132, 10835365, 10838266,
10840019, 10847448, 10847489, 10847705,
10848122, 10855525, 10866214, 10868463,
10848122, 10855525, 10866214, 10868463,
10868678, 10868924, 10869381, 10869482,
10868678, 10868924, 10869381, 10869482,
Line 311: Line 333:
10876581, 10879799, 10884793, 10892133,
10876581, 10879799, 10884793, 10892133,
10896398
10896398
71111.04 Drawings H-24739 Unit 2 Core Spray System Logic Diagrams Sheet 1 of 6.0
71111.04
71111.04 Drawings H-24740 Unit 2 Core Spray System Logic Diagrams Sheet 2 of 5
Drawings
71111.04 Drawings H-26018 Unit 2 Core Spray System P&ID 40.0
H-24739
71111.04 Drawings H-26046 Reactor & Radwaste Buildings - Condensate Storage 50.0
Unit 2 Core Spray System Logic Diagrams Sheet 1 of
& Transfer System Diagram
6.0
71111.04 Drawings H16065 Control Rod Drive Hydraulic System P&ID Sheet 2 50.0
71111.04
Inspection Type Designation Description or Title Revision or
Drawings
Procedure Date
H-24740
71111.04 Procedures 34SO-C11-005-1 Control Rod Drive Hydraulic System 34.0
Unit 2 Core Spray System Logic Diagrams Sheet 2 of
71111.04 Procedures 34SO-E11-010-2 Residual Heat Removal System 45.0
71111.04
71111.04 Procedures 34SO-E21-001-2 Core Spray System 26.6
Drawings
71111.04 Procedures 34SO-R43-001-2 Diesel Generator Standby AC System 30.8
H-26018
71111.04 Procedures NMP-ES-012-001 Inspection of Heat Exchangers (2R43-B002C - 2C 2.1
Unit 2 Core Spray System P&ID
40.0
71111.04
Drawings
H-26046
Reactor & Radwaste Buildings - Condensate Storage  
& Transfer System Diagram
50.0
71111.04
Drawings
H16065
Control Rod Drive Hydraulic System P&ID Sheet 2
50.0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.04
Procedures
34SO-C11-005-1
Control Rod Drive Hydraulic System
34.0
71111.04
Procedures
34SO-E11-010-2
Residual Heat Removal System
45.0
71111.04
Procedures
34SO-E21-001-2
Core Spray System
26.6
71111.04
Procedures
34SO-R43-001-2
Diesel Generator Standby AC System
30.8
71111.04
Procedures
NMP-ES-012-001
Inspection of Heat Exchangers (2R43-B002C - 2C
EDG Lube Oil Heat Exchanger)
EDG Lube Oil Heat Exchanger)
71111.04 Work Orders Work Orders (SNC) 1145215, 1145516, 1078706
2.1
71111.05 Corrective Action Condition Report (CR) 10895572
71111.04
Work Orders
Work Orders (SNC)
1145215, 1145516, 1078706
71111.05
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.05 Fire Plans NMP-ES-035-019-GL02-Control Building 147-foot Elevation 1.0
Condition Report (CR)
10895572
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F03
F03
71111.05 Fire Plans NMP-ES-035-019-GL02-Unit 1 Reactor Building 185' Elevation 1.0
Control Building 147-foot Elevation
1.0
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F15
F15
71111.05 Fire Plans NMP-ES-035-019-GL02-U2 Reactor Building El. 158/164 1.0
Unit 1 Reactor Building 185' Elevation
1.0
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F31
F31
71111.05 Fire Plans NMP-ES-035-019-GL02-Unit 2 Rad Waste Building 132' elevation 1.0
U2 Reactor Building El. 158/164
1.0
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F35
F35
71111.05 Fire Plans NMP-ES-035-019-Gl02-U1 Condensate Storage Tank 1.0
Unit 2 Rad Waste Building 132' elevation
1.0
71111.05
Fire Plans
NMP-ES-035-019-Gl02-
F52
F52
71111.05 Fire Plans NMP-ES-035-019-GL02-Fire Pump House 1.0
U1 Condensate Storage Tank
1.0
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F70
F70
71111.05 Fire Plans NMP-ES-035-019-GL02-Service Water Valve Pits 1.0
Fire Pump House
1.0
71111.05
Fire Plans
NMP-ES-035-019-GL02-
F84
F84
71111.05 Procedures NMP-ES-035-017 Fleet Fire Doors Functional Inspection Governance 1.1
Service Water Valve Pits
1.0
71111.05
Procedures
NMP-ES-035-017
Fleet Fire Doors Functional Inspection Governance
and Acceptance Criteria
and Acceptance Criteria
71111.06 Calculations SMNH 99-014 (REV 1) Water Hammer Evaluation for Fire Protection Piping 06/25/2012
1.1
71111.06 Corrective Action Condition Reports (CR) 10904792, 10904824
71111.06
Calculations
SMNH 99-014 (REV 1)
Water Hammer Evaluation for Fire Protection Piping
06/25/2012
71111.06
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.06 Drawings H-16039 Leak Detection System-Instrument & Drainage Sump 8.0
Condition Reports (CR)
10904792, 10904824
71111.06
Drawings
H-16039
Leak Detection System-Instrument & Drainage Sump
P&ID
P&ID
Inspection Type Designation Description or Title Revision or
8.0
Procedure Date
Inspection
71111.06 Drawings H-16110 Types of Penetration Seals For Non Fire Rated Wall 12.0
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.06
Drawings
H-16110
Types of Penetration Seals For Non Fire Rated Wall
Pipe & Duct
Pipe & Duct
71111.06 Drawings H-16176 Radwaste System P&ID 42.0
2.0
71111.06 Engineering LR-REG-001-1098 SER 3-98 Recurring Events Flooding of ECCS 10/05/1998
71111.06
Evaluations Rooms Caused by Fire Protection System Water
Drawings
H-16176
Radwaste System P&ID
2.0
71111.06
Engineering
Evaluations
LR-REG-001-1098
SER 3-98 Recurring Events Flooding of ECCS
Rooms Caused by Fire Protection System Water
Hammer
Hammer
71111.06 Engineering REA HT98703 Hatch Nuclear Plant - Units 1 & 2-Water Hammer 02/17/2000
10/05/1998
Evaluations Analysis for Fire Protection
71111.06
71111.06 Engineering Technical Evaluations (TE) 390614, 78139
Engineering
Evaluations
Evaluations
71111.06 Miscellaneous Response to NRC IN Recent Operating Experience Concerning Hydrostatic 04/18/2007
REA HT98703
2007-001 Barriers
Hatch Nuclear Plant - Units 1 & 2-Water Hammer
71111.06 Miscellaneous Response to NRC IN-Potential Flooding through Unsealed Concrete Floor 09/16/2003
Analysis for Fire Protection
2003-008 Cracks
2/17/2000
71111.06 Miscellaneous Response to NRC IN-Internal Flooding/Spraying-Down of Safety-Related 06/29/2005
71111.06
2005-011 and IN-2005-30 Equipment Due to Unsealed Equipment Hatch Floor
Engineering
Evaluations
Technical Evaluations (TE)
390614, 78139
71111.06
Miscellaneous
Response to NRC IN
2007-001
Recent Operating Experience Concerning Hydrostatic
Barriers
04/18/2007
71111.06
Miscellaneous
Response to NRC IN-
2003-008
Potential Flooding through Unsealed Concrete Floor
Cracks
09/16/2003
71111.06
Miscellaneous
Response to NRC IN-
2005-011 and IN-2005-30
Internal Flooding/Spraying-Down of Safety-Related
Equipment Due to Unsealed Equipment Hatch Floor
Plugs and/or Blocked Floor Drains
Plugs and/or Blocked Floor Drains
Safe Shutdown Potentially Challenged by Unanalyzed
Safe Shutdown Potentially Challenged by Unanalyzed
Internal Flooding Events and Inadequate Design
Internal Flooding Events and Inadequate Design
71111.06 Procedures 34AB-T22-003-1/2 Secondary Containment Control 5.18/4.5
06/29/2005
71111.06 Procedures 34AB-T23-004-1/2 Torus Water Level 1.2/1.4
71111.06
71111.06 Procedures 34AR-657-901-1/2 ARP's For Control Panel 1H11-P657 (2H11-P657) 25.18/23.10
Procedures
71111.11Q Miscellaneous Emergency Preparedness Observation Form 07/11/2022
34AB-T22-003-1/2
71111.11Q Miscellaneous H-LT-AF-CPE-00112 CPE Design - EHC, RFPT Oil Temperature 1.0
Secondary Containment Control
5.18/4.5
71111.06
Procedures
34AB-T23-004-1/2
Torus Water Level
1.2/1.4
71111.06
Procedures
34AR-657-901-1/2
ARP's For Control Panel 1H11-P657 (2H11-P657)
25.18/23.10
71111.11Q
Miscellaneous
Emergency Preparedness Observation Form
07/11/2022
71111.11Q
Miscellaneous
H-LT-AF-CPE-00112
CPE Design - EHC, RFPT Oil Temperature
Controller, Condenser Vacuum, ASD Cell, SDV,
Controller, Condenser Vacuum, ASD Cell, SDV,
ATWS
ATWS
71111.11Q Procedures NMP-RE-008-F02 Simplified Reactivity Management Plan (Hatch - Unit 2.1
1.0
71111.11Q
Procedures
NMP-RE-008-F02
Simplified Reactivity Management Plan (Hatch - Unit
Cycle 27, H2C27-082022-040
Cycle 27, H2C27-082022-040
71111.12 Corrective Action Condition Reports (CR) 10895237, 10889783, 10627699, 10636561,
2.1
Documents 10644291, 10648471, 10649056, 10644291,
71111.12
Corrective Action
Documents
Condition Reports (CR)
10895237, 10889783, 10627699, 10636561,
10644291, 10648471, 10649056, 10644291,
10649128, 10653060, 10661059, 10665465,
10649128, 10653060, 10661059, 10665465,
10671968, 10683877, 10698757, 10700915,
10671968, 10683877, 10698757, 10700915,
10702813, 10702936, 10707324, 10709100,
10702813, 10702936, 10707324, 10709100,
10709104, 10709119, 10716168, 10717046,
10709104, 10709119, 10716168, 10717046,
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
Type
Designation
Description or Title
Revision or
Date
10723279, 10723451, 10726191, 10727321,
10723279, 10723451, 10726191, 10727321,
10729088, 10730446, 10730448, 10730527,
10729088, 10730446, 10730448, 10730527,
Line 403: Line 591:
10803039, 10803106, 10803107, 10807477,
10803039, 10803106, 10803107, 10807477,
10814592, 10814961, 10814961, 10815628
10814592, 10814961, 10814961, 10815628
71111.12 Engineering Technical Evaluations (TE) 1107681, 1075210
71111.12
Engineering
Evaluations
Evaluations
71111.12 Miscellaneous H-1(2) - P33 - Sampling Primary Containment Hydrogen and Oxygen
Technical Evaluations (TE)
1107681, 1075210
71111.12
Miscellaneous
H-1(2) - P33 - Sampling
Primary Containment Hydrogen and Oxygen
Analyzers
Analyzers
71111.12 Miscellaneous P33-01 Sampling Hydrogen and Oxygen Analyzers (Maintenance Rule
71111.12
Miscellaneous
P33-01 Sampling
Hydrogen and Oxygen Analyzers (Maintenance Rule
Function Scoping Sheet)
Function Scoping Sheet)
71111.13 Calibration Condition Report (CR) 10910325
71111.13
Calibration
Records
Records
71111.13 Corrective Action Condition Reports (CR) 10910484,10910972, 10910974
Condition Report (CR)
10910325
71111.13
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.13 Miscellaneous Hatch Unit 2 R8 On-Line Configuration Risk Monitor 08/30/2022
Condition Reports (CR)
10910484,10910972, 10910974
71111.13
Miscellaneous
Hatch Unit 2 R8 On-Line Configuration Risk Monitor
Current
Current
Risk Summary Report
Risk Summary Report
71111.13 Miscellaneous Hatch U1 R8 On-Line Configuration Risk Monitor - 07/14/2022
08/30/2022
71111.13
Miscellaneous
Hatch U1 R8 On-Line Configuration Risk Monitor -
Current Risk Summary Report
Current Risk Summary Report
71111.13 Procedures NMP-GM-031-001 Online Maintenance Rule (a)(4) Risk Calculations 8.0
07/14/2022
71111.13 Procedures NMP-OS-010-002 Hatch Protective Equipment Logs 12.2
71111.13
71111.13 Procedures NMP-OS-010-002 Hatch Protected Equipment Logs 11.1
Procedures
71111.13 Procedures NMP-OS-017 Severe Weather 3.0
NMP-GM-031-001
71111.13 Procedures NMP-OS-017 Severe Weather (Attachments 1 through 9 for Site 09/27/2022
Online Maintenance Rule (a)(4) Risk Calculations
Inspection Type Designation Description or Title Revision or
8.0
Procedure Date
71111.13
Procedures
NMP-OS-010-002
Hatch Protective Equipment Logs
2.2
71111.13
Procedures
NMP-OS-010-002
Hatch Protected Equipment Logs
11.1
71111.13
Procedures
NMP-OS-017
Severe Weather
3.0
71111.13
Procedures
NMP-OS-017
Severe Weather (Attachments 1 through 9 for Site
09/27/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Preps for Hurricane Ian)
Preps for Hurricane Ian)
71111.15 Corrective Action Condition Report (CR) 10895096
71111.15
Corrective Action
Documents
Documents
71111.15 Corrective Action Condition Reports (CR) 10899243, 10627205
Condition Report (CR)
10895096
71111.15
Corrective Action
Documents
Documents
71111.15 Corrective Action Condition Reports (CR) 10895145, 10898218, 10898626, 10901485
Condition Reports (CR)
10899243, 10627205
71111.15
Corrective Action
Documents
Documents
71111.15 Drawings H-26833 RHR Service Water at River Intake Structure - 4.0
Condition Reports (CR)
10895145, 10898218, 10898626, 10901485
71111.15
Drawings
H-26833
RHR Service Water at River Intake Structure -
Isometric
Isometric
71111.15 Drawings S-00768, 00769, 00770 RHR Service Water system E-11-HGR-1, E-11-HGR-2.0/1.0/3.0
4.0
71111.15
Drawings
S-00768, 00769, 00770
RHR Service Water system E-11-HGR-1, E-11-HGR-
2, E-11-HGR-3
2, E-11-HGR-3
71111.15 Engineering DOEJ-HRSNC1358910- Minimum Pipe Wall Thickness for 18 Inch RHRSW 08/08/2022
2.0/1.0/3.0
Evaluations S001 Piping Structures at the Intake
71111.15
71111.15 Engineering NMP-AD-012-F01 Operability Determination Support Bases (CRs 08/18/2022
Engineering
Evaluations 10898218, 10898626, 10895145)
Evaluations
71111.15 Engineering Prompt Determination of Unit 2 RHRSW Division 2 Pumps 08/17/2020
DOEJ-HRSNC1358910-
Evaluations Operability (CR 10730343)
S001
71111.15 Miscellaneous 1-LCO-22-00152 1T48-F323F Vacuum Breaker Failure to Close
Minimum Pipe Wall Thickness for 18 Inch RHRSW
71111.15 Procedures 34AB-P41-001-2 Loss of Plant Service Water 13.13
Piping Structures at the Intake
71111.15 Procedures 34AR-652-207-2 Diesel Gen B Loading Timer Failure Alarm 3.3
08/08/2022
71111.15 Procedures 34SO-T48-002-1 Containment Atmosphere Control and Dilution 26.4
71111.15
Engineering
Evaluations
NMP-AD-012-F01
Operability Determination Support Bases (CRs
10898218, 10898626, 10895145)
08/18/2022
71111.15
Engineering
Evaluations
Prompt Determination of
Operability (CR 10730343)
Unit 2 RHRSW Division 2 Pumps
08/17/2020
71111.15
Miscellaneous
1-LCO-22-00152
1T48-F323F Vacuum Breaker Failure to Close
71111.15
Procedures
34AB-P41-001-2
Loss of Plant Service Water
13.13
71111.15
Procedures
34AR-652-207-2
Diesel Gen B Loading Timer Failure Alarm
3.3
71111.15
Procedures
34SO-T48-002-1
Containment Atmosphere Control and Dilution
System
System
71111.15 Work Orders Work Orders (WO) 1358911, 1358154
26.4
71111.18 Engineering SNC1334334 Design Equivalent Change Package for the 2B 06/06/2022
71111.15
Changes Recirculation Pump Seal Purge Supplemental
Work Orders
Work Orders (WO)
1358911, 1358154
71111.18
Engineering
Changes
SNC1334334
Design Equivalent Change Package for the 2B
Recirculation Pump Seal Purge Supplemental
Cooling
Cooling
71111.18 Miscellaneous NMP-OS-028 Adverse Condition Monitoring and Contingency Plan 07/06/2022
06/06/2022
71111.18
Miscellaneous
NMP-OS-028
Adverse Condition Monitoring and Contingency Plan
for the 2B Recirculation Seal Monitoring
for the 2B Recirculation Seal Monitoring
71111.19 Corrective Action Condition Report (CR) 10897221
07/06/2022
71111.19
Corrective Action
Documents
Documents
71111.19 Corrective Action Condition Report (CR) 10897312
Condition Report (CR)
10897221
71111.19
Corrective Action
Documents
Documents
71111.19 Drawings DECP SNC1225505J001 Fire Protection P&ID 1.0
Condition Report (CR)
71111.19 Drawings DECP Program Fire Protection House Equipment
10897312
Inspection Type Designation Description or Title Revision or
71111.19
Procedure Date
Drawings
DECP SNC1225505J001
Fire Protection P&ID
1.0
71111.19
Drawings
DECP
Program Fire Protection House Equipment
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC125505E100_FCR004
SNC125505E100_FCR004
71111.19 Drawings H-58109 Fire Pump Diesel Engine Mounting Details (1X43-1.0
71111.19
Drawings
H-58109
Fire Pump Diesel Engine Mounting Details (1X43-
C002A and 1X43-C002B)
C002A and 1X43-C002B)
71111.19 Miscellaneous S-78101 Installation and Maintenance Manual for Diesel 2.0
1.0
71111.19
Miscellaneous
S-78101
Installation and Maintenance Manual for Diesel
Engine Fire Pump Controllers Model GPD
Engine Fire Pump Controllers Model GPD
71111.19 Procedures 34SO-R42-001-2 125 VDC and 125/250 VDC System 20.3
2.0
71111.19 Procedures 42SP-07-20-22-RS-1-1 Diesel Fire Pump Engine Replacement Functional 1.0
71111.19
Procedures
34SO-R42-001-2
25 VDC and 125/250 VDC System
20.3
71111.19
Procedures
2SP-07-20-22-RS-1-1
Diesel Fire Pump Engine Replacement Functional
Test
Test
71111.19 Work Orders Work Order (SNC) 1359845 08/11/2022
1.0
71111.19 Work Orders Work Order (SNC) 1356086 07/28/2022
71111.19
71111.19 Work Orders Work Orders (SNC) 1012444, 1012446, 1356128, 1295880, 1296244, 07/29/2022
Work Orders
Work Order (SNC)
1359845
08/11/2022
71111.19
Work Orders
Work Order (SNC)
1356086
07/28/2022
71111.19
Work Orders
Work Orders (SNC)
1012444, 1012446, 1356128, 1295880, 1296244,
1342764, 1368174, 1366668, 1321585, 1323434,
1342764, 1368174, 1366668, 1321585, 1323434,
23466, 1297079, 1302202, 1297079, 1302202,
23466, 1297079, 1302202, 1297079, 1302202,
Line 479: Line 818:
25378, 1325787, 1326726, 1328511, 1329001,
25378, 1325787, 1326726, 1328511, 1329001,
1337341, 1345820, 1352434
1337341, 1345820, 1352434
71111.22 Corrective Action Condition Reports 10892714, 10892718
07/29/2022
71111.22
Corrective Action
Documents
Documents
71111.22 Drawings H-16334 RCIC System P&ID (Sheet No. 1) 51.0
Condition Reports
71111.22 Drawings H-16335 RCIC System P&ID (Sheet No. 2) 36.0
10892714, 10892718
71111.22 Miscellaneous 34SV-E51-002-1S 1E51-C001 Existing Reference Data Page 3.0
71111.22
71111.22 Procedures 34SV-E51-002-1 RCIC Pump Operability, completed on 7/6/2022
Drawings
71111.22 Procedures 34SV-P41-001-1 Plant Service Water Pump Operability 15.3
H-16334
71114.06 Corrective Action Condition Reports (CR) 10897008, 10897010, 10897011
RCIC System P&ID (Sheet No. 1)
51.0
71111.22
Drawings
H-16335
RCIC System P&ID (Sheet No. 2)
36.0
71111.22
Miscellaneous
34SV-E51-002-1S
1E51-C001 Existing Reference Data Page
3.0
71111.22
Procedures
34SV-E51-002-1
RCIC Pump Operability, completed on
7/6/2022
71111.22
Procedures
34SV-P41-001-1
Plant Service Water Pump Operability
15.3
71114.06
Corrective Action
Documents
Documents
71114.06 Miscellaneous Classification Evaluation for Hatch Off Year Exercise
Condition Reports (CR)
10897008, 10897010, 10897011
71114.06
Miscellaneous
Classification Evaluation for Hatch Off Year Exercise
22
22
71114.06 Miscellaneous Hatch Off Year Exercise 2022 07/26/2022
71114.06
71114.06 Miscellaneous Emergency Preparedness Observation Form 07/26/2022
Miscellaneous
71114.06 Procedures NMP-EP-142-F10 Alert/Site Area/General Area Emergency Public 2.0
Hatch Off Year Exercise 2022
07/26/2022
71114.06
Miscellaneous
Emergency Preparedness Observation Form
07/26/2022
71114.06
Procedures
NMP-EP-142-F10
Alert/Site Area/General Area Emergency Public
Address Announcement Scripts (July 26, 2022)
Address Announcement Scripts (July 26, 2022)
71114.06 Procedures NMP-EP-303-F05 Drill and Exercise Objectives (Section E.1 - Off-Site 7.0
2.0
71114.06
Procedures
NMP-EP-303-F05
Drill and Exercise Objectives (Section E.1 - Off-Site
Notification)
Notification)
71152A Corrective Action Corrective Action Report 292959 03/20/2022
7.0
Inspection Type Designation Description or Title Revision or
71152A
Procedure Date
Corrective Action
Documents Determination
Corrective Action Report
 
2959
19
03/20/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Determination
}}
}}

Latest revision as of 12:12, 27 November 2024

Integrated Inspection Report 05000321 /2022003 and 05000366/2022003
ML22311A470
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/08/2022
From: Alan Blamey
NRC/RGN-II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2022003
Download: ML22311A470 (22)


Text

SUBJECT:

EDWIN I. HATCH - INTEGRATED INSPECTION REPORT 05000321/2022003 AND 05000366/2022003

Dear Cheryl A. Gayheart:

On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch. On October 19, 2022, the NRC inspectors discussed the results of this inspection with Johnny Weissinger, Site Vice President, and other members of your staff.

The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as an NCV consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Edwin I. Hatch.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC Resident Inspector at Edwin I. Hatch.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document November 8, 2022 Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated,

Inspection Report

Docket Numbers:

05000321 and 05000366

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2022003 and 05000366/2022003

Enterprise Identifier:

I-2022-003-0018

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Edwin I. Hatch

Location:

Baxley, GA

Inspection Dates:

July 01, 2022 to September 30, 2022

Inspectors:

A. Alen, Senior Project Engineer

T. Fanelli, Senior Reactor Inspector

J. Hickman, Resident Inspector

M. Magyar, Reactor Inspector

T. Morrissey, Senior Resident Inspector

C. Safouri, Senior Project Engineer

R. Smith, Senior Resident Inspector

Approved By:

Alan J. Blamey, Chief

Reactor Projects Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Edwin I. Hatch, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation (NCV) is documented in report section: 71111.0

List of Findings and Violations

Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000321,05000366/2022003-01 Open/Closed

[H.14] -

Conservative Bias 71152A An NRC-identified Green NCV, involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On September 3, 2022, the operators reduced power to 65 percent RTP for a rod pattern adjustment and quarterly turbine valve testing. On September 5, 2022, the operators returned the unit to 100 percent RTP. The unit operated there for the remainder of the inspection period.

Unit 2 began the inspection period at 100 percent RTP. On August 20, 2022, the operators reduced power to 75 percent RTP for a rod pattern adjustment and returned the unit to 100 percent RTP the same day. On September 10, 2022, the operators reduced power to 65 percent RTP for a rod pattern adjustment and quarterly turbine valve testing. On September 11, 2022, the operators returned the unit to 100 percent RTP. On September 23, 2022, the operators reduced power to 87 percent RTP for a rod pattern adjustment and returned the unit to 100 percent RTP the same day. The unit operated there for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 C emergency diesel generator (EDG) system following testing, using 34SO-R43-001-2, on August 22-24, 2022.
(2) Unit 1 control rod drive (CRD) hydraulic system following repairs to the 1B CRD pump seal leak, using 34SO-C11-005-1, on August 25-26, 2022.
(3) Unit 2 B loop residual heat removal service water (RHRSW) system following the replacement of 2D RHRSW pump and motor, using 34SO-E11-010-2, on September 26, 2022.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 core spray (CS) system from July 12 through 14, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Intake structure on 111-foot elevation on July 18, 2022.
(2) Unit 2 reactor building 158 and 164-foot elevations on July 20, 2022.
(3) Unit 1 condensate storage tank, fire pump house, and units 1 and 2 service water valve pits on August 4, 2022.
(4) Unit 1 reactor building 185-foot elevation on August 12, 2022.
(5) Control building 147-foot elevation, including units 1 and 2 cable spreading room and plant computer room on August 18, 2022.
(6) Unit 2 radiological waste building 132-foot elevation on September 16, 2022.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Units 1 and 2 reactor buildings emergency core cooling corner rooms, units 1 and 2 west cable way, and a review of licensee actions to NRC-issued information notices addressing internal flooding at nuclear plants.

71111.07SIX - Heat Exchanger/Sink Performance Ultimate Heat Sink Containment Device and Dam (IP Section 03.05)

The inspectors evaluated the ultimate heat sink performance containment device and dam on the following:

(1) Service water intake structure and Altamaha River

71111.07T - Heat Exchanger/Sink Performance Heat Exchanger (Service Water Cooled) (IP Section 03.02)

The inspectors evaluated heat exchanger performance on the following:

(1) Unit 1 A high pressure coolant injection (HPCI) pump room cooler (1T41B005A)
(2) Unit 2 B residual heat removal (RHR) heat exchanger (2E11B001B)
(3) Unit 2 B reactor core isolation cooling (RCIC) system room cooler (2T41B004B)

Ultimate Heat Sink (IP Section 03.04) (1 Sample)

The inspectors evaluated the ultimate heat sink performance on the following:

(1) Service water intake structure and Altamaha River

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the main control room during a unit 2 rod pattern adjustment, on August 20, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operators respond to License Operator Requalification Program scenario H-LT-AF-CPE-00112, "Crew Performance Evaluation Design - Electrohydraulic Control, Reactor Feed Pump Turbine Oil Temperature Controller, Condenser Vacuum, Adjustable Speed Drive Cell, Scram Discharge Volume, and Anticipated Transient Without Scram," on July 11, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1) Unit 2 hydrogen/oxygen analyzer system, P33-01, due to maintenance rule condition monitoring events being exceeded, on August 2, 2022.
(2) Review of Hatchs living (i.e., continuous) 10CFR50.65 a(3) documentation package with emphasis on unit 1 A plant service water pump, unit 2 primary containment isolation valves, and containment cooling system being monitored under 10CFR50.65 under a(1) status, on August 1, 2022.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 elevated risk due to HPCI system maintenance, on July 14, 2022.
(2) Units 1 and 2 elevated risk due to performance of fire main system surveillance with existing system failures, on July 22, 2022.
(3) Unit 2 elevated risk due to the A CS system maintenance outage, on August 30, 2022.
(4) Unit 1 elevated risk due to emergency lighting relay fire in main control room, on September 14, 2022.
(5) Units 1 and 2 elevated risk due to Hurricane Ian, the week of September 26, 2022.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (8 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Condition report (CR) 10897512, loud knocking sound in bay 12 of unit 2 torus potentially caused by leak-by of the E safety relief valve.
(2) CR 10899243, unit 2 "Diesel Gen B Loading Timer Failure," resulting in potential inoperability of the 1B (swing) EDG for a loss of coolant accident (LOCA) or loss of offsite power (LOSP) or LOCA/LOSP.
(3) CR 10895096, unit 1 torus to drywell vacuum breaker, 1T48-F323F, would not close during testing.
(4) CR 10895145, unit 1 RHRSW pump seal water piping detaching; and CRs 10898218 and10898626 for units 1 and 2 RHRSW piping degradation.
(5) CR 10899388, unit 2 RHRSW pump flow dropped from 4300 gallons per minute (gpm) to 2700 gpm during torus cooling operations.
(6) CR 10905959, unit 1 B EDG relays exceeded 10-year replacement criteria.
(7) CR 10905054, unit 1 reactor pressure low analog transmitter trip system (ATTS)instrument failed to the lower end of the scale.
(8) CR 10910753, unit 2 RHR minimum flow valve, 2E11-F007B, did not operate properly.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Temporary modification to install a temporary supplemental cooling on the unit 2 CRD piping supplying the seal purge flow to the shaft seal cavity of the 2B reactor recirculation pump.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1)57SV-SUV-012-1, ATTS Panel 1H11-P926 Channel FT&C, following the replacement of the HPCI exhaust diaphragm high pressure ATTS card, on July 28, 2022.

(2)34SO-R42-001-2, "125 Volts Direct Current (VDC) and 125/250 VDC System,"

following cleaning, calibration, and fan replacement of the unit 2 division II station service battery charger F, on July 29, 2022.

(3)57SV-R43-001-2, "Testing the LOCA/LOSP Timer Card," following replacement of the

==2R43 N782B card, on August 11, 2022.

(4)==

42SP-07-20-22-RS-1-1, "Diesel Fire Pump Engine Replacement Functional Test,"

following the replacement of the 1X43-C002B engine, the weeks of August 15, 22, and 29, 2022.

(5)34SO-E21-001-2, "Core Spray System", section 4.3.1, B loop CS manual startup, following unit 2 A CS system maintenance outage, on August 31, 2022.

(6)57SV-R43-001-2, "Testing The LOCA/LOSP Timer Cards," following the K7 relay replacement on the unit 2 B EDG loading timer, on September 2, 2022.

(7) Work Order SNC1340018, computer processing unit replacement in the unit 2 B recirculation adjustable speed drive, on September 10, 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1)34SV-P41-001-1, "Plant Service Water Pump Operability," Version 15.3 (section 7.2, "PSW 'A' Loop"), on July 12, 2022.

(2)34SV-E11-004-2, "RHR Service Water Pump Operability", Version 19.2, on September 7, 2022.

Inservice Testing (IP Section 03.01) (1 Sample)

(1)34SV-E51-002-1, "RCIC Pump Operability," Version 29.2 (sections 4.2, "Operability Test" and 4.3, "RCIC IST Test"), on July 6, 2022

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Emergency preparedness off-year exercise involving a LOCA, on July 26,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2021-June 30, 2022)
(2) Unit 2 (July 1, 2021-June 30, 2022)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2021-June 30, 2022)
(2) Unit 2 (July 1, 2021-June 30, 2022)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2021-June 30, 2022)
(2) Unit 2 (July 1, 2021-June 30, 2022)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Testing and replacement schedule for safety related molded case circuit breakers were not being followed in accordance with Institute of Electrical and Electronics Engineers (IEEE) 308-1971 standards (CR 10625944).

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.05 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program (CAP) and is being treated as a non-cited violation (NCV), consistent with Section 2.3.2 of the Enforcement Policy.

Violation: The licensee identified an NCV of Technical Specification 5.4.1.a which required applicable procedures per Regulatory Guide 1.33 Appendix A section 1.l, shall be established, implemented, and maintained covering Fire Protection Program activities. Contrary to this, prior to identifying the issue on August 19, 2022, the licensee failed to establish and maintain fire protection program procedure 42SV-FPX-021-0, Surveillance Of Swinging Fire Doors, Revision 1.20, for inspecting fire doors. Specifically, the licensees procedure did not ensure the flush bolts for the inactive leaf of a double fire door were properly engaged. As a result, the unit 2 A emergency diesel generator (EDG) room door, 1L48-D135, was identified as non-functional on August 17, 2022. The licensee initiated hourly roving fire watches for this fire door and placed the door in their corrective maintenance process to restore the affected fire door. The issue was placed in the CAP on August 19, 2022.

Significance/Severity: Green. The inspectors assessed the significance of the finding using guidance in IMC 0609, Appendix F, Fire Protection Significance Determination Process, and determined the finding to be of very low safety significance because there was an adequate automatic suppression system inside the EDG room.

Corrective Action References: Condition reports (CRs) 10901837, 10902255 Failure to Periodically Test Molded Case Circuit Breakers Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000321,05000366/2022003-01 Open/Closed

[H.14] -

Conservative Bias 71152A An NRC-identified Green non-cited violation (NCV), involving two examples of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to implement corrective actions to periodically test molded case circuit breakers (MCCBs) in order to promptly identify and correct performance degradation, including potential age-related degradation, of MCCBs.

Description:

The updated final safety analysis report (UFSAR) for Hatchs unit 1 (Section 8.3.7) and unit 2 (Section 8.3.1.2.1.C Part 3) states that periodic equipment tests (applicable to MCCBs) are performed at scheduled intervals to detect deterioration of the system toward an unacceptable condition and to demonstrate that standby power equipment and other components that are not exercised during normal operation of the station are operable.

Additionally, the licensee committed to (in the UFSAR for unit 2) testing and surveillances of MCCBs in accordance with the Institute of Electrical and Electronics Engineers (IEEE)standards 308-1971, IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations. Sections 5.2.2 and 5.3.2 for alternating current and direct current distribution systems, respectively, specify in part, that the distribution systems shall be monitored to the extent that it is shown to be ready to perform its intended function. Also, Section 5.4, Vital Instrumentation and Control Power Systems, specifies in part, that dependable power supplies are required for the vital instrumentation and control systems of the unit(s), and Section 6, Surveillance Requirements, specifies in part, that tests shall demonstrate that the equipment operates within design limits and that the system is operational and can meet its performance specifications. Testing can reveal whether degradation has occurred or is occurring that could potentially impact the operability of the load served by the MCCB. Additionally, testing can also identify age-related degradation of the MCCB, such as the potential for hardening of the lubricant used internally to the MCCB as identified by industry operating experience.

Example 1:

In March 2012, during an engineering assessment, the licensee identified that it did not have a test program for the majority (approximately 750 breakers) of its safety-related MCCBs in accordance with the UFSAR and IEEE standards identified above. Many breakers were beyond their 20-year life expectancy, installed in the early 1970s during initial construction, and had not been tested since installation. The licensee identified this issue as a condition adverse to quality (i.e., nonconformance condition) and captured it in the corrective action program (CAP) under condition report (CR) 431380. The licensee initiated a corrective action technical evaluation (TE) 351918 where it documented corrective action plans to replace obsolete breakers and then replace breakers periodically instead of testing. This TE was subsequently closed in May 2012 to a new TE (TE413574) to track and initiate activities to replace the affected breakers. In April 2015, during a second engineering self-assessment, the licensee initiated CR10059075 after identifying that the corrective actions from 2012 (CR431380 and TE413574) were not implemented. The licensee initiated a series of new TEs to establish a testing program, establish PMs to perform the testing, and replace obsolete breakers and distribution panels. TE 930308 tracked actions to ensure all safety related MCCBs located in motor control centers (MCC) were tested within 6 years (complete by 2021), TEs 939734 and 939740 tracked the development of maintenance instructions to test MCCBs in both MCCs and distribution panels, and TE 930309 tracked the replacement of distribution panels planned to begin in 2017. In July 2019, during a third engineering self-assessment, the licensee identified that the corrective actions from 2015 had not been implemented, specifically, no preventive maintenance testing or work orders (WOs) had been created and no replacement distribution panels had been designed or procured. The licensee again entered the failure to take corrective actions in their CAP under CR 10625944. The inspectors determined that between 2012 and 2019 the licensee failed to develop and implement a test program (i.e., corrective actions) for MCCBs. These were corrective actions the licensee acknowledged and documented were needed after identifying the periodic testing nonconformance in 2012 and again in 2015.

Example 2:

The inspectors reviewed the licensees progress towards restoring compliance with the MCCB test requirements since it last identified it in 2019. The inspectors noted that as of September 2022 the licensee had only tested 33 (of approximately 750) in-service MCCBs.

When the licensee began testing in 2019 it deferred testing of in-service MCCBs due to a high number of spare MCCB failures (WOs SNC898390, SNC900113, SNC915932). These failures meant that replacements were not available for in-service MCCB test failures.

Although the licensee determined that the cause of the spare failures may not affect the in-service failure rate, which was not as high as the spares (December 2021 - CR 10845767),the licensee stopped testing in-service MCCBs despite having adverse trend data suggesting MCCBs were in an age degraded state due to being in operation far beyond their design life.

The licensee resumed testing in 2022 after determining the cause of the high failure rate of the spare MCCBs. However, the inspectors noted that in subsequent testing, documented in WOs: SNC900103, SNC900100, and SNC900095, the licensee continued to defer testing of in-service MCCBs. Specifically, 9 out of 35 MCCBs scheduled to be tested in the referenced WOs were not tested due to not having a replacement available.

The licensees Quality Assurance Program is described in topical report SNC-1, Quality Assurance Topical Report (QATR). The QATR describes the quality assurance program and administrative control requirements established to meet 10 CFR 50 Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants. In establishing provisions for corrective action, and compliance with Criterion XVI of 10 CFR Appendix B, SNC commits to comply with Basic Requirement 16, Corrective Action, of ASME NQA-1-1994, Quality Assurance Requirements for Nuclear Facility Applications. Basic Requirement 16 requires, in part, that conditions adverse to quality shall be identified promptly and corrected as soon as practical. The inspectors determined that deferring MCCB testing due to parts availability (particularly considering the long-standing nature and awareness of this issue) was inadequate and inconsistent with correcting a CAQ (lack of testing) as soon as practical.

Corrective Actions: The licensee entered the issue into their CAP as CR 10915674 to ensure testing is conducted regardless of breaker replacement availability. Also, CR10915161 was initiated to create WOs to test MCCBs for which testing has been deferred. Lastly, TE 1112637 will develop and support a test plan to ensure MCCBs are tested at the next available opportunity.

Corrective Action References: CRs 10915674, 10915161, 10916115, and TE 1112637

Performance Assessment:

Performance Deficiency: The failure to implement corrective actions to test MCCBs in accordance with IEEE 308 standards in order to promptly identify and correct degradation, including aging degradation, of MCCBs was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The failure to establish a test program and use it to detect and correct degradation in safety related MCCBs adversely affects the reliability and availability of mitigating systems and could cause undesirable consequences.

Significance: Although the MCCBs associated with this performance deficiency affected systems and components in both the Mitigating Systems and the Containment Barrier Cornerstones, the number of mitigating systems affected was significantly higher than the systems associated with the Containment Barrier; therefore, the Mitigating Systems Cornerstone was used to evaluate the significance of the finding. In accordance with NRC Inspection Manual Chapter (IMC) 0609, Attachment 4, Initial Characterization of Findings, the inspectors assessed the significance of the finding using the mitigating systems screening questions from Exhibit 2 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power. The finding screened as very low safety significance (Green) because the finding was a qualification deficiency that did not result in loss of operability or functionality. Specifically, the licensee determined it had reasonable assurance of operability (CR10852218) regarding untested MCCBs based on results of MCCB tested to-date, operating experience, and the determination that the cause for the high failure rate of spare breakers did not impact in-service breakers.

Cross-Cutting Aspect: H.14 - Conservative Bias: Individuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. The licensees decision making did not act prudently to ensure MCCBs were tested to be safe to use in order to proceed, rather they allowed the use of untested MCCBs, which were beyond their design life, simply because spares were unavailable and work instructions allowed it.

Enforcement:

Violation: 10 CFR 50, Appendix B, Criterion XVI, Corrective Actions, requires in part, that measures shall be established to assure that conditions adverse to quality, such as a nonconformances, are promptly identified and corrected.

In SNC-1, Quality Assurance Topical Report (QATR), Version 25.0, the licensee committed to implement Basic Requirement 16, Corrective Action, of the American Society of Mechanical Engineers (ASME) NQA-1-1994, Quality Assurance Requirements for Nuclear Facility Applications, to comply with 10 CFR 50, Appendix B, Criterion XVI. Basic Requirement 16, Corrective Action, of ASME NQA-1-1994 requires in part, that conditions adverse to quality shall be identified promptly and corrected as soon as practical.

Contrary to the above, since March 2012, the licensee identified a condition adverse to quality associated with the lack of MCCB testing, a nonconforming condition, but failed to implement measures to assure the condition was promptly identified and corrected.

Specifically, as identified in 2015 and 2019, the licensee repeatedly failed to establish a test program for MCCBs. Furthermore, since the licensee began testing in 2019, the deferral to test MCCBs, which were beyond their service life, due to parts availability was inadequate and inconsistent with correcting the nonconformance as soon as practical. Approximately 10 years after the licensee identified (March 2012) the nonconforming condition only a small population of MCCBs have been tested.

Enforcement Action: This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 27, 2022, the inspectors presented the heat sink performance inspection results to Johnny Weissingner, Site Vice President (SVP) and other members of the licensee staff.

On October 19, 2022, the inspectors presented the integrated inspection results to Johnny Weissinger, SVP, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Corrective Action

Documents

Condition Reports (CR)

10628284, 10632635, 10635610, 10644674,

10661058, 10694204, 10695300, 10705032,

10706311, 10706501, 10709640, 10713284,

10713434, 10713709, 10714302, 10729116,

10733813, 10734322, 10739735, 10755977,

10756457, 10767210, 10771203, 10772070,

10773140, 10773366, 10774313, 10774993,

10776756, 10776800, 10776816, 10777640,

10778063, 10778614, 10778614, 10778635,

10778819, 10778940, 10778979, 10779210,

10780003, 10782516, 10782790, 10785605,

10786941, 10786942, 10789793, 10801026,

10803252, 10807247, 10808377, 10826311,

10829392, 10831704, 10839522, 10846527,

10847035, 10861205, 10871869, 10877955,

10885863, 10887149, 10889038, 10889039

71111.04

Corrective Action

Documents

Condition Reports (CR)

10823143, 10835132, 10835365, 10838266,

10840019, 10847448, 10847489, 10847705,

10848122, 10855525, 10866214, 10868463,

10868678, 10868924, 10869381, 10869482,

10869566, 10869866, 10870090, 10870117,

10870147, 10870156, 10870165, 10876258,

10876581, 10879799, 10884793, 10892133,

10896398

71111.04

Drawings

H-24739

Unit 2 Core Spray System Logic Diagrams Sheet 1 of

6.0

71111.04

Drawings

H-24740

Unit 2 Core Spray System Logic Diagrams Sheet 2 of

71111.04

Drawings

H-26018

Unit 2 Core Spray System P&ID

40.0

71111.04

Drawings

H-26046

Reactor & Radwaste Buildings - Condensate Storage

& Transfer System Diagram

50.0

71111.04

Drawings

H16065

Control Rod Drive Hydraulic System P&ID Sheet 2

50.0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Procedures

34SO-C11-005-1

Control Rod Drive Hydraulic System

34.0

71111.04

Procedures

34SO-E11-010-2

Residual Heat Removal System

45.0

71111.04

Procedures

34SO-E21-001-2

Core Spray System

26.6

71111.04

Procedures

34SO-R43-001-2

Diesel Generator Standby AC System

30.8

71111.04

Procedures

NMP-ES-012-001

Inspection of Heat Exchangers (2R43-B002C - 2C

EDG Lube Oil Heat Exchanger)

2.1

71111.04

Work Orders

Work Orders (SNC)

1145215, 1145516, 1078706

71111.05

Corrective Action

Documents

Resulting from

Inspection

Condition Report (CR)

10895572

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F03

Control Building 147-foot Elevation

1.0

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F15

Unit 1 Reactor Building 185' Elevation

1.0

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F31

U2 Reactor Building El. 158/164

1.0

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F35

Unit 2 Rad Waste Building 132' elevation

1.0

71111.05

Fire Plans

NMP-ES-035-019-Gl02-

F52

U1 Condensate Storage Tank

1.0

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F70

Fire Pump House

1.0

71111.05

Fire Plans

NMP-ES-035-019-GL02-

F84

Service Water Valve Pits

1.0

71111.05

Procedures

NMP-ES-035-017

Fleet Fire Doors Functional Inspection Governance

and Acceptance Criteria

1.1

71111.06

Calculations

SMNH 99-014 (REV 1)

Water Hammer Evaluation for Fire Protection Piping

06/25/2012

71111.06

Corrective Action

Documents

Resulting from

Inspection

Condition Reports (CR)

10904792, 10904824

71111.06

Drawings

H-16039

Leak Detection System-Instrument & Drainage Sump

P&ID

8.0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.06

Drawings

H-16110

Types of Penetration Seals For Non Fire Rated Wall

Pipe & Duct

2.0

71111.06

Drawings

H-16176

Radwaste System P&ID

2.0

71111.06

Engineering

Evaluations

LR-REG-001-1098

SER 3-98 Recurring Events Flooding of ECCS

Rooms Caused by Fire Protection System Water

Hammer

10/05/1998

71111.06

Engineering

Evaluations

REA HT98703

Hatch Nuclear Plant - Units 1 & 2-Water Hammer

Analysis for Fire Protection

2/17/2000

71111.06

Engineering

Evaluations

Technical Evaluations (TE)

390614, 78139

71111.06

Miscellaneous

Response to NRC IN 2007-001

Recent Operating Experience Concerning Hydrostatic

Barriers

04/18/2007

71111.06

Miscellaneous

Response to NRC IN-

2003-008

Potential Flooding through Unsealed Concrete Floor

Cracks

09/16/2003

71111.06

Miscellaneous

Response to NRC IN-

2005-011 and IN-2005-30

Internal Flooding/Spraying-Down of Safety-Related

Equipment Due to Unsealed Equipment Hatch Floor

Plugs and/or Blocked Floor Drains

Safe Shutdown Potentially Challenged by Unanalyzed

Internal Flooding Events and Inadequate Design

06/29/2005

71111.06

Procedures

34AB-T22-003-1/2

Secondary Containment Control

5.18/4.5

71111.06

Procedures

34AB-T23-004-1/2

Torus Water Level

1.2/1.4

71111.06

Procedures

34AR-657-901-1/2

ARP's For Control Panel 1H11-P657 (2H11-P657)

25.18/23.10

71111.11Q

Miscellaneous

Emergency Preparedness Observation Form

07/11/2022

71111.11Q

Miscellaneous

H-LT-AF-CPE-00112

CPE Design - EHC, RFPT Oil Temperature

Controller, Condenser Vacuum, ASD Cell, SDV,

ATWS

1.0

71111.11Q

Procedures

NMP-RE-008-F02

Simplified Reactivity Management Plan (Hatch - Unit

Cycle 27, H2C27-082022-040

2.1

71111.12

Corrective Action

Documents

Condition Reports (CR)

10895237, 10889783, 10627699, 10636561,

10644291, 10648471, 10649056, 10644291,

10649128, 10653060, 10661059, 10665465,

10671968, 10683877, 10698757, 10700915,

10702813, 10702936, 10707324, 10709100,

10709104, 10709119, 10716168, 10717046,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

10723279, 10723451, 10726191, 10727321,

10729088, 10730446, 10730448, 10730527,

10733168, 10733904, 10734223, 10735427,

10737276, 10741057, 10742768, 10743777,

10743835, 10750160, 10753242, 10764198,

10767536, 10771598, 10774779, 10776884,

10779262, 10779523, 10780594, 10781036,

10781693, 10782597, 10782937, 10783554,

10786049, 10786052, 10790129, 10791368,

10791498, 10793147, 10794840, 10800016,

10803039, 10803106, 10803107, 10807477,

10814592, 10814961, 10814961, 10815628

71111.12

Engineering

Evaluations

Technical Evaluations (TE)

1107681, 1075210

71111.12

Miscellaneous

H-1(2) - P33 - Sampling

Primary Containment Hydrogen and Oxygen

Analyzers

71111.12

Miscellaneous

P33-01 Sampling

Hydrogen and Oxygen Analyzers (Maintenance Rule

Function Scoping Sheet)

71111.13

Calibration

Records

Condition Report (CR)

10910325

71111.13

Corrective Action

Documents

Resulting from

Inspection

Condition Reports (CR)

10910484,10910972, 10910974

71111.13

Miscellaneous

Hatch Unit 2 R8 On-Line Configuration Risk Monitor

Current

Risk Summary Report

08/30/2022

71111.13

Miscellaneous

Hatch U1 R8 On-Line Configuration Risk Monitor -

Current Risk Summary Report

07/14/2022

71111.13

Procedures

NMP-GM-031-001

Online Maintenance Rule (a)(4) Risk Calculations

8.0

71111.13

Procedures

NMP-OS-010-002

Hatch Protective Equipment Logs

2.2

71111.13

Procedures

NMP-OS-010-002

Hatch Protected Equipment Logs

11.1

71111.13

Procedures

NMP-OS-017

Severe Weather

3.0

71111.13

Procedures

NMP-OS-017

Severe Weather (Attachments 1 through 9 for Site

09/27/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Preps for Hurricane Ian)

71111.15

Corrective Action

Documents

Condition Report (CR)

10895096

71111.15

Corrective Action

Documents

Condition Reports (CR)

10899243, 10627205

71111.15

Corrective Action

Documents

Condition Reports (CR)

10895145, 10898218, 10898626, 10901485

71111.15

Drawings

H-26833

RHR Service Water at River Intake Structure -

Isometric

4.0

71111.15

Drawings

S-00768, 00769, 00770

RHR Service Water system E-11-HGR-1, E-11-HGR-

2, E-11-HGR-3

2.0/1.0/3.0

71111.15

Engineering

Evaluations

DOEJ-HRSNC1358910-

S001

Minimum Pipe Wall Thickness for 18 Inch RHRSW

Piping Structures at the Intake

08/08/2022

71111.15

Engineering

Evaluations

NMP-AD-012-F01

Operability Determination Support Bases (CRs

10898218, 10898626, 10895145)

08/18/2022

71111.15

Engineering

Evaluations

Prompt Determination of

Operability (CR 10730343)

Unit 2 RHRSW Division 2 Pumps

08/17/2020

71111.15

Miscellaneous

1-LCO-22-00152

1T48-F323F Vacuum Breaker Failure to Close

71111.15

Procedures

34AB-P41-001-2

Loss of Plant Service Water

13.13

71111.15

Procedures

34AR-652-207-2

Diesel Gen B Loading Timer Failure Alarm

3.3

71111.15

Procedures

34SO-T48-002-1

Containment Atmosphere Control and Dilution

System

26.4

71111.15

Work Orders

Work Orders (WO)

1358911, 1358154

71111.18

Engineering

Changes

SNC1334334

Design Equivalent Change Package for the 2B

Recirculation Pump Seal Purge Supplemental

Cooling

06/06/2022

71111.18

Miscellaneous

NMP-OS-028

Adverse Condition Monitoring and Contingency Plan

for the 2B Recirculation Seal Monitoring

07/06/2022

71111.19

Corrective Action

Documents

Condition Report (CR)

10897221

71111.19

Corrective Action

Documents

Condition Report (CR)

10897312

71111.19

Drawings

DECP SNC1225505J001

Fire Protection P&ID

1.0

71111.19

Drawings

DECP

Program Fire Protection House Equipment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SNC125505E100_FCR004

71111.19

Drawings

H-58109

Fire Pump Diesel Engine Mounting Details (1X43-

C002A and 1X43-C002B)

1.0

71111.19

Miscellaneous

S-78101

Installation and Maintenance Manual for Diesel

Engine Fire Pump Controllers Model GPD

2.0

71111.19

Procedures

34SO-R42-001-2

25 VDC and 125/250 VDC System

20.3

71111.19

Procedures

2SP-07-20-22-RS-1-1

Diesel Fire Pump Engine Replacement Functional

Test

1.0

71111.19

Work Orders

Work Order (SNC)

1359845

08/11/2022

71111.19

Work Orders

Work Order (SNC)

1356086

07/28/2022

71111.19

Work Orders

Work Orders (SNC)

1012444, 1012446, 1356128, 1295880, 1296244,

1342764, 1368174, 1366668, 1321585, 1323434,

23466, 1297079, 1302202, 1297079, 1302202,

1303107, 1304289, 1305582, 1325361, 1325378,

25378, 1325787, 1326726, 1328511, 1329001,

1337341, 1345820, 1352434

07/29/2022

71111.22

Corrective Action

Documents

Condition Reports

10892714, 10892718

71111.22

Drawings

H-16334

RCIC System P&ID (Sheet No. 1)

51.0

71111.22

Drawings

H-16335

RCIC System P&ID (Sheet No. 2)

36.0

71111.22

Miscellaneous

34SV-E51-002-1S

1E51-C001 Existing Reference Data Page

3.0

71111.22

Procedures

34SV-E51-002-1

RCIC Pump Operability, completed on

7/6/2022

71111.22

Procedures

34SV-P41-001-1

Plant Service Water Pump Operability

15.3

71114.06

Corrective Action

Documents

Condition Reports (CR)

10897008, 10897010, 10897011

71114.06

Miscellaneous

Classification Evaluation for Hatch Off Year Exercise

22

71114.06

Miscellaneous

Hatch Off Year Exercise 2022

07/26/2022

71114.06

Miscellaneous

Emergency Preparedness Observation Form

07/26/2022

71114.06

Procedures

NMP-EP-142-F10

Alert/Site Area/General Area Emergency Public

Address Announcement Scripts (July 26, 2022)

2.0

71114.06

Procedures

NMP-EP-303-F05

Drill and Exercise Objectives (Section E.1 - Off-Site

Notification)

7.0

71152A

Corrective Action

Corrective Action Report

2959

03/20/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Determination