Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011
ML22194A182
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/13/2022
From: Gerald Mccoy
NRC/RGN-II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2022011
Download: ML22194A182 (9)


Text

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - FIRE PROTECTION TEAM INSPECTION REPORT 05000321/2022011 AND 05000366/2022011

Dear Mr. Dean:

On June 2, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant and discussed the results of this inspection with Mr. Johnny Weissinger and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gerald J. McCoy, Chief Engineering Br 2 Division of Reactor Safety Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000321 and 05000366

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2022011 and 05000366/2022011

Enterprise Identifier:

I-2022-011-0016

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Edwin I. Hatch Nuclear Plant

Location:

Baxley, GA

Inspection Dates:

May 16, 2022 to June 02, 2022

Inspectors:

P. Braaten, Senior Reactor Inspector

L. Jones, Senior Reactor Inspector

W. Monk, Senior Reactor Inspector

M. Singletary, Team Lead, Reactor Inspector

Approved By:

Gerald J. McCoy, Chief

Engineering Br 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Fire Protection Team Inspection at Edwin I. Hatch Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) U2 HPCI System E41
(2) Remote Shutdown Panel 2203F
(3) E DC Switchgear Room 1B Fire Detection System
(4) RHR Service Water Pump Intake Structure FA Fire Suppression System

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Hot Work Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) DECP SNC895929 1E11-F068 MOV Breaker Mod

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 2, 2022, the inspectors presented the Fire Protection Team Inspection results at the Exit Meeting to Plant Manager, Johnny Weissinger and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NMP-ES-050-F01

Hydraulic Model of Fire Protection Piping Network

Ver. 4

SENH-16-007

Recovery Action Feasibility Assessment

Rev. 5

SMNH-16-037

NFPA 72E Code Compliance Review

Ver. 2

SMNH-16-044

Engineering Evaluation of Smoke Detector Locations

Ver. 1

SMNH-16-063

Engineering Evaluation of Sprinkler System Restraint

Configurations

Ver. 1

SMNH-16-064

Engineering Evaluation of Sprinkler Location and Spray

Pattern Configurations

Ver. 2

SMNH-16-086

NFPA 805 Chapter 3 Fundamental Fire Protection

Program and Design Elements

Ver. 1

Calculations

SMNH-16-092

NFPA 805 Effects of Fire Suppression Activities Review

Ver. 2

CR 10751486

NFPA 805 Study - Breaker Coordination Issues

11/4/2020

CR 10766792

Breaker/Wire sizing issue found during NFPA 805

breaker coordination modification

01/14/2021

CR 10785119

NFPA 805 Breaker Coordination (Broadness Review)

03/25/2021

CR 10790835

Expected Alarm not received

04/15/21

CR 10865147

22 NRC Fire Protection FASA - Breaker Coordination

Issues

03/9/2022

CR 10869282

NFPA 805 Breaker Coordination Refined FPRA

Evaluation Results

03/25/2022

Corrective Action

Documents

CR 10875233

Leak From DIV 2 RHRSW Strainer Piping Connecting to

1E11F907A Root Valve

04/21/2022

CR 10881563

22 NRC Fire Protection Team Inspection (FPTI) - Typo

05/17/2022

CR 10881741

22 NRC Fire Protection Team Inspection (FPTI) -

Procedure update

05/18/22

CR 10882170

During the 2022 TFPI the team identified an addition error

in SENH-16-007

05/19/2022

CR 10885073

22 TFPI Protectowire System Wire Frayed

06/01/2022

CR 10885074

22 TFPI Non-FP Covering Deficiency

06/01/2022

CR 10885136

Housekeeping - Unit 1 Condensate Demin Panel

06/02/2022

71111.21N.05

Corrective Action

Documents

Resulting from

Inspection

CR 10885296

FPTI 2022: Evaluation of Communication Methods Used

06/02/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

for Alt. Shutdown

Drawings

H-58236

U2 RHR System 2E11-F047B Elementary Diagram

Rev. 1

Engineering

Changes

SNC895929DECP

Design Change Package for "Bucket Mod"

8/18/2020

HNP Fire Protection Health Report

01/26/2022

HNP Fire Protection Health Report

07/14/2021

NFPA-805 Mods

Schedule

NFPA-805 Mods Schedule

5/19/22

1097182

Fire Protection Program NRC Inspection FASA

04/20/2022

H-LT-SG-50213

Bomb Threat/Shutdown From Outside the MCR

Rev. 12

Miscellaneous

HNP-2-FSAR-9

Plant Hatch U2 FSAR, Section 9.5.1, FIRE

PROTECTION SYSTEM

Rev. 39

34AB-X43-001-2

Fire Procedure

23.2

34IT-EOP-001-0

EOP Equipment Checks

VERSION

18.3

2SV-FPX-037-0

Fire Detection Instrumentation Surveillance

Ver. 8

2SV-FPX-016-1

Sprinkler System Surveillance - Safety Related Areas

Ver. 4.7

2SV-FPX-017-1

Surveillance of Water Fire Suppression Systems

VERSION

1.0

NMP-ES-035

Fire Protection Program

NMP-ES-035-001

Fire Protection Program Implementation

NMP-ES-035-003

Fleet Hot Work Instruction

07/20/2021

NMP-ES-039

Engineering Analysis

VERSION

4.1

NMP-OS-007-001

Conduct of Operations Standards and Expectations

VERSION

19.0

Procedures

NMP-OS-014-002

HNP Time Critical Operator Action Program

SNC1101351

2SV-FPX-037-0 Fire Detection Instrumentation

Surveillance

08/15/2021

SNC1338887

Hot Work Permit Yard, Fire Pump HS

05/17/2022

SNC990383

2SV-FPX-037-0 Fire Detection Instrumentation

Surveillance

04/09/20

Work Orders

WO SNC1024402

57SV-C82-003-2 ## REMOTE SHUTDOWN REACTOR

2/14/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

VESSEL WATER LEVEL LOOP CALIBRATION

WO SNC1168028

Recoat 1Y43111W01 Fire Protection Piping

07/15/2021