ML23306A099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML23306A099
| number = ML23306A099
| issue date = 11/02/2023
| issue date = 11/02/2023
| title = and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7)
| title = And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7)
| author name = Fleming J
| author name = Fleming J
| author affiliation = Holtec Decommissioning International, LLC
| author affiliation = Holtec Decommissioning International, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 50.82(a)(7)
{{#Wiki_filter:Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 1 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 10 CFR 50.82(a)(7)
November 2, 2023 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket No. 50-293 and 72-1044 Indian Point Energy Center Provisional Operating License No. DPR-05 Renewed Facility License No. DPR-26 and DPR-64 NRC Docket Nos. 50-003, 50-247, 50-286 and 72-051
November 2, 2023 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket No. 50-293 and 72-1044 Indian Point Energy Center Provisional Operating License No. DPR-05 Renewed Facility License No. DPR-26 and DPR-64 NRC Docket Nos. 50-003, 50-247, 50-286 and 72-051  


==Subject:==
==Subject:==
Notification of Changes in Schedule in accordance with 10 CFR 50.82(a)(7)
Notification of Changes in Schedule in accordance with 10 CFR 50.82(a)(7)
Pursuant to 10 CFR 50.82(a)(7), Holtec Decommissioning International, LLC (HDI) is notifying the U.S. Nuclear Regulatory Commission (NRC) of schedule changes from those described in the Revised Post-Shutdown Decommissioning Activities Report (PSDAR) and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station (Reference 1) and the Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3 (Reference 2).
Pursuant to 10 CFR 50.82(a)(7), Holtec Decommissioning International, LLC (HDI) is notifying the U.S. Nuclear Regulatory Commission (NRC) of schedule changes from those described in the Revised Post-Shutdown Decommissioning Activities Report (PSDAR) and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station (Reference 1) and the Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3 (Reference 2).
Updates to the decommissioning schedules for Pilgrim Nuclear Site PSDAR are reflected in and updates to the decommissioning schedule for Indian Point Energy Center (IPEC) PSDAR are reflected in Enclosure 2. These changes are a result of the on-going challenges associated with the discharge of processed water at the respective sites. Previous material changes to the decommissioning milestone schedules or project cost [10 CFR 50.82(a)(7)] were reported in a letter titled, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations submitted on March 31, 2023 (Reference 3).
Updates to the decommissioning schedules for Pilgrim Nuclear Site PSDAR are reflected in and updates to the decommissioning schedule for Indian Point Energy Center (IPEC) PSDAR are reflected in Enclosure 2. These changes are a result of the on-going challenges associated with the discharge of processed water at the respective sites. Previous material changes to the decommissioning milestone schedules or project cost [10 CFR 50.82(a)(7)] were reported in a letter titled, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations submitted on March 31, 2023 (Reference 3).
Pilgrim On March 31, 2023 HDI submitted a National Pollution Discharge Elimination System (NPDES) permit modification for Pilgrim Nuclear Power Station Permit No. MA0003557 as instructed by the U.S. Environmental Protection Agency (EPA) 1. This underlying permit was jointly issued by 1
Pilgrim On March 31, 2023 HDI submitted a National Pollution Discharge Elimination System (NPDES) permit modification for Pilgrim Nuclear Power Station Permit No. MA0003557 as instructed by the U.S. Environmental Protection Agency (EPA) 1. This underlying permit was jointly issued by 1 {{letter dated|date=February 17, 2022|text=February 17, 2022 letter}} from EPA to HDI stating requirement to submit a permit modification to discharge spent fuel pool water or other water associated with decommissioning the reactor.  
{{letter dated|date=February 17, 2022|text=February 17, 2022 letter}} from EPA to HDI stating requirement to submit a permit modification to discharge spent fuel pool water or other water associated with decommissioning the reactor.
1 of 3 HDI-PIL-23-009 HDI-IPEC-23-050


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 the State of Massachusetts, Department of Environmental Protection (Mass DEP) and the draft NPDES permit issuance is pending EPA review. Separately on July 24, 2023, Mass DEP issued a Tentative Determination to deny a modification to the Massachusetts Permit to Discharge Pollutants to Surface Waters for Pilgrim Nuclear Power Station and initiated a public comment process prior to EPA issuing a draft permit. This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 2 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 the State of Massachusetts, Department of Environmental Protection (Mass DEP) and the draft NPDES permit issuance is pending EPA review. Separately on July 24, 2023, Mass DEP issued a Tentative Determination to deny a modification to the Massachusetts Permit to Discharge Pollutants to Surface Waters for Pilgrim Nuclear Power Station and initiated a public comment process prior to EPA issuing a draft permit. This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.
IPEC New York State passed new legislation (S.6893/A.7208) prohibiting the discharge any radiological substance into the Hudson River in connection with the decommissioning of a nuclear power plant. This legislation conflicts with the IPECs approved State Pollutant Discharge Elimination System (SPDES) permit (NY-0004472), currently undergoing renewal.
IPEC New York State passed new legislation (S.6893/A.7208) prohibiting the discharge any radiological substance into the Hudson River in connection with the decommissioning of a nuclear power plant. This legislation conflicts with the IPECs approved State Pollutant Discharge Elimination System (SPDES) permit (NY-0004472), currently undergoing renewal.
This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.
This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.
Holtec is evaluating all available options to address the disposition of water at both sites, including pursuing legal remedies, all of which will result in impacts to the decommissioning schedules as described in the sites PSDARs.
Holtec is evaluating all available options to address the disposition of water at both sites, including pursuing legal remedies, all of which will result in impacts to the decommissioning schedules as described in the sites PSDARs.
If you have any questions, or need additional information, please contact me at 856-797-0900 x3578.
If you have any questions, or need additional information, please contact me at 856-797-0900 x3578.
Respectfully, Jean A. Fleming Digitally                    signed by Jean A. Fleming Date: 2023.11.02 11:27:44 -04'00' Jean A. Fleming Vice President, Licensing, Regulatory Affairs, & PSA Holtec International
Respectfully, Jean A. Fleming Vice President, Licensing, Regulatory Affairs, & PSA Holtec International  


==References:==
==References:==
: 1. Letter, Holtec Decommissioning International, LLC to US NRC, Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station, November 16, 2018 (Accession No. ML18320A040)
: 1. Letter, Holtec Decommissioning International, LLC to US NRC, Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station, November 16, 2018 (Accession No. ML18320A040)
: 2. Letter, Holtec Decommissioning International, LLC to US NRC, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3, December 19, 2019 (Accession No. ML19354A698) 3.Letter, Holtec Decommissioning International, LLC to US NRC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec Decommissioning International, LLC (HDI) March 31, 2023 (Accession No. ML23090A140) 2 of 3 HDI-PIL-23-009 HDI-IPEC-23-050
: 2. Letter, Holtec Decommissioning International, LLC to US NRC, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3, December 19, 2019 (Accession No. ML19354A698) 3.Letter, Holtec Decommissioning International, LLC to US NRC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec Decommissioning International, LLC (HDI) March 31, 2023 (Accession No. ML23090A140)
Jean A. Fleming Digitally signed by Jean A. Fleming Date: 2023.11.02 11:27:44 -04'00'


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 cc:     NRC Regional Administrator - NRC Region I NRC Project Manager, NMSS - IPEC NRC Project Manager, NMSS - Pilgrim NRC Region 1 Lead Inspector - Pilgrim Nuclear Power Station NRC Region 1 Lead Inspector, Indian Point Units 1, 2 & 3 New York State Department of Public Service New York State Liaison Officer Designee, NYSERDA New York State Department of Environmental Conservation Commonwealth of Massachusetts, Executive Office of Environmental Affairs Commonwealth of Massachusetts, Department of Public Health Commonwealth of Massachusetts, Department of Environmental Protection Commonwealth of Massachusetts, Director, Massachusetts Emergency Management Agency 3 of 3 HDI-PIL-23-009 HDI-IPEC-23-050
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 3 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 cc:
NRC Regional Administrator - NRC Region I NRC Project Manager, NMSS - IPEC NRC Project Manager, NMSS - Pilgrim NRC Region 1 Lead Inspector - Pilgrim Nuclear Power Station NRC Region 1 Lead Inspector, Indian Point Units 1, 2 & 3 New York State Department of Public Service New York State Liaison Officer Designee, NYSERDA New York State Department of Environmental Conservation Commonwealth of Massachusetts, Executive Office of Environmental Affairs Commonwealth of Massachusetts, Department of Public Health Commonwealth of Massachusetts, Department of Environmental Protection Commonwealth of Massachusetts, Director, Massachusetts Emergency Management Agency  


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 ENCLOSURE 1 Pilgrim Nuclear Power Station Decommissioning Schedule Update HDI-PIL-23-009 HDI-IPEC-23-050
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 ENCLOSURE 1 Pilgrim Nuclear Power Station Decommissioning Schedule Update


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Pilgrim (PSDAR/DCE/LTA issued on 11/16/2018)
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 Pilgrim (PSDAR/DCE/LTA issued on 11/16/2018)
DCE Annual  50.82(a)(7)
Project /
PSDAR/DCE/LTA                   Updates     Schedule Project /                            DCE Annual (per project                    (2022)     Updates                    Notes Milestone                          Updates (2021) below)                                     (2023)
Milestone PSDAR/DCE/LTA (per project below)
License Transfer       07/31/2019   08/26/2019     08/26/2019 08/26/2019                   Complete Zirc Fire 03/30/2020   03/31/2020     03/31/2020 03/31/2020                   Complete Elimination Fuel on Pad           11/26/2021   12/13/2021     12/13/2021 12/13/2021                   Complete Segmentation RVI       10/12/2020   10/26/2022     5/25/2023   03/01/2024*           *2023 Schedule change Segmentation RPV       09/18/2022   12/31/2024     12/31/2028 12/31/2032*           *2023 Schedule change Partial Site                                                                           *2023 Schedule change 01/28/2025   09/24/2027     09/24/2031 09/24/2035*
DCE Annual Updates (2021)
Release Fuel Shipment 01/02/2030   01/02/2030     01/02/2030 01/02/2030 Begins Fuel Shipment 12/31/2062   12/31/2062     12/31/2062 12/31/2062 Ends License 09/07/2063   09/07/2063     09/07/2063 09/07/2063 Termination HDI-PIL-23-009 HDI-IPEC-23-050
DCE Annual Updates (2022) 50.82(a)(7)
Schedule Updates (2023)
Notes License Transfer 07/31/2019 08/26/2019 08/26/2019 08/26/2019 Complete Zirc Fire Elimination 03/30/2020 03/31/2020 03/31/2020 03/31/2020 Complete Fuel on Pad 11/26/2021 12/13/2021 12/13/2021 12/13/2021 Complete Segmentation RVI 10/12/2020 10/26/2022 5/25/2023 03/01/2024*  
*2023 Schedule change Segmentation RPV 09/18/2022 12/31/2024 12/31/2028 12/31/2032*  
*2023 Schedule change Partial Site Release 01/28/2025 09/24/2027 09/24/2031 09/24/2035*  
*2023 Schedule change Fuel Shipment Begins 01/02/2030 01/02/2030 01/02/2030 01/02/2030 Fuel Shipment Ends 12/31/2062 12/31/2062 12/31/2062 12/31/2062 License Termination 09/07/2063 09/07/2063 09/07/2063 09/07/2063  


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 ENCLOSURE 2 Indian Point Nuclear Generating Units 1, 2, and 3 Decommissioning Schedule Update HDI-PIL-23-009 HDI-IPEC-23-050
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 ENCLOSURE 2 Indian Point Nuclear Generating Units 1, 2, and 3 Decommissioning Schedule Update  


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Indian Point (PSDAR/DCE/LTA issued on 12/19/2019)
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 Indian Point (PSDAR/DCE/LTA issued on 12/19/2019)
DCE Annual    50.82(a)(7)
Project /
PSDAR/DCE/LTA     DCE Annual Project /                                        Updates      Schedule (per project   Updates (2021)                                                   Notes Milestone                                          (2022)       Updates below)
Milestone PSDAR/DCE/LTA (per project below)
(2023)
DCE Annual Updates (2021)
License Transfer       05/31/2021     05/28/2021     05/28/2021   05/28/2021                         Complete Zirc Fire 09/15/2022     08/01/2022     08/01/2022   08/01/2022                         Complete Elimination (IP3)
DCE Annual Updates (2022) 50.82(a)(7)
Fuel on Pad:
Schedule Updates (2023)
IP1               12/11/2008           -        12/11/2008   12/11/2008                         Complete IP2               03/31/2023     03/31/2023     02/01/2023   02/01/2023                         Complete IP3               04/04/2024     10/31/2023     10/31/2023   10/16/2023                         Complete Segmentation RVI:
Notes License Transfer 05/31/2021 05/28/2021 05/28/2021 05/28/2021 Complete Zirc Fire Elimination (IP3) 09/15/2022 08/01/2022 08/01/2022 08/01/2022 Complete Fuel on Pad:
                                                                                  **IP1 RVI will be removed with the reactor vessel IP1**                    -              -              -                                during RPV segmentation IP2               12/21/2022     05/28/2024     07/18/2025   06/19/2025 IP3               12/21/2021     11/30/2023     03/07/2024   7/31/2024 Segmentation RPV:
IP1 12/11/2008 12/11/2008 12/11/2008 Complete IP2 03/31/2023 03/31/2023 02/01/2023 02/01/2023 Complete IP3 04/04/2024 10/31/2023 10/31/2023 10/16/2023 Complete Segmentation RVI:
IP1               04/13/2024     11/20/2025     11/20/2027   11/20/2031*                 *2023 Schedule change IP2               06/30/2023     11/26/2024     04/29/2026   04/29/2034*                 *2023 Schedule change IP3               06/30/2022     05/37/2024     12/17/2024   12/17/2032*                 *2023 Schedule change Partial Site 07/09/2033     07/09/2033     07/09/2033   07/09/2041*               *2023 Schedule change Release Fuel Shipment Begins:
IP1**
IP1               05/29/2046     05/29/2046     05/29/2046   05/29/2046 IP2               01/02/2030     01/02/2030     01/02/2030   01/02/2030 IP3               08/26/2047     08/26/2047     08/26/2047   08/26/2047 Fuel Shipment Ends:
**IP1 RVI will be removed with the reactor vessel during RPV segmentation IP2 12/21/2022 05/28/2024 07/18/2025 06/19/2025 IP3 12/21/2021 11/30/2023 03/07/2024 7/31/2024 Segmentation RPV:
IP1               08/23/2047     08/23/2047     08/23/2047   08/23/2047 IP2               05/25/2046     05/25/2046     05/25/2046   05/25/2046 IP3               12/30/2061     12/30/2061     12/30/2061   12/30/2061 License 09/06/2062     09/06/2062     09/06/2062   09/06/2062 Termination HDI-PIL-23-009 HDI-IPEC-23-050}}
IP1 04/13/2024 11/20/2025 11/20/2027 11/20/2031*  
*2023 Schedule change IP2 06/30/2023 11/26/2024 04/29/2026 04/29/2034*  
*2023 Schedule change IP3 06/30/2022 05/37/2024 12/17/2024 12/17/2032*  
*2023 Schedule change Partial Site Release 07/09/2033 07/09/2033 07/09/2033 07/09/2041*  
*2023 Schedule change Fuel Shipment Begins:
IP1 05/29/2046 05/29/2046 05/29/2046 05/29/2046 IP2 01/02/2030 01/02/2030 01/02/2030 01/02/2030 IP3 08/26/2047 08/26/2047 08/26/2047 08/26/2047 Fuel Shipment Ends:
IP1 08/23/2047 08/23/2047 08/23/2047 08/23/2047 IP2 05/25/2046 05/25/2046 05/25/2046 05/25/2046 IP3 12/30/2061 12/30/2061 12/30/2061 12/30/2061 License Termination 09/06/2062 09/06/2062 09/06/2062 09/06/2062}}

Latest revision as of 07:58, 25 November 2024

And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7)
ML23306A099
Person / Time
Site: Indian Point, Pilgrim  Entergy icon.png
Issue date: 11/02/2023
From: Fleming J
Holtec Decommissioning International
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
HDI-PIL-23-009, HDI-IPEC-23-050
Download: ML23306A099 (7)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 1 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 10 CFR 50.82(a)(7)

November 2, 2023 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket No. 50-293 and 72-1044 Indian Point Energy Center Provisional Operating License No. DPR-05 Renewed Facility License No. DPR-26 and DPR-64 NRC Docket Nos.50-003, 50-247, 50-286 and 72-051

Subject:

Notification of Changes in Schedule in accordance with 10 CFR 50.82(a)(7)

Pursuant to 10 CFR 50.82(a)(7), Holtec Decommissioning International, LLC (HDI) is notifying the U.S. Nuclear Regulatory Commission (NRC) of schedule changes from those described in the Revised Post-Shutdown Decommissioning Activities Report (PSDAR) and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station (Reference 1) and the Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3 (Reference 2).

Updates to the decommissioning schedules for Pilgrim Nuclear Site PSDAR are reflected in and updates to the decommissioning schedule for Indian Point Energy Center (IPEC) PSDAR are reflected in Enclosure 2. These changes are a result of the on-going challenges associated with the discharge of processed water at the respective sites. Previous material changes to the decommissioning milestone schedules or project cost [10 CFR 50.82(a)(7)] were reported in a letter titled, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations submitted on March 31, 2023 (Reference 3).

Pilgrim On March 31, 2023 HDI submitted a National Pollution Discharge Elimination System (NPDES) permit modification for Pilgrim Nuclear Power Station Permit No. MA0003557 as instructed by the U.S. Environmental Protection Agency (EPA) 1. This underlying permit was jointly issued by 1 February 17, 2022 letter from EPA to HDI stating requirement to submit a permit modification to discharge spent fuel pool water or other water associated with decommissioning the reactor.

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 2 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 the State of Massachusetts, Department of Environmental Protection (Mass DEP) and the draft NPDES permit issuance is pending EPA review. Separately on July 24, 2023, Mass DEP issued a Tentative Determination to deny a modification to the Massachusetts Permit to Discharge Pollutants to Surface Waters for Pilgrim Nuclear Power Station and initiated a public comment process prior to EPA issuing a draft permit. This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.

IPEC New York State passed new legislation (S.6893/A.7208) prohibiting the discharge any radiological substance into the Hudson River in connection with the decommissioning of a nuclear power plant. This legislation conflicts with the IPECs approved State Pollutant Discharge Elimination System (SPDES) permit (NY-0004472), currently undergoing renewal.

This development has disrupted HDIs initial decommissioning plan and the PSDAR decommissioning schedule for discharge of processed water from the site.

Holtec is evaluating all available options to address the disposition of water at both sites, including pursuing legal remedies, all of which will result in impacts to the decommissioning schedules as described in the sites PSDARs.

If you have any questions, or need additional information, please contact me at 856-797-0900 x3578.

Respectfully, Jean A. Fleming Vice President, Licensing, Regulatory Affairs, & PSA Holtec International

References:

1. Letter, Holtec Decommissioning International, LLC to US NRC, Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station, November 16, 2018 (Accession No. ML18320A040)
2. Letter, Holtec Decommissioning International, LLC to US NRC, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3, December 19, 2019 (Accession No. ML19354A698) 3.Letter, Holtec Decommissioning International, LLC to US NRC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec Decommissioning International, LLC (HDI) March 31, 2023 (Accession No. ML23090A140)

Jean A. Fleming Digitally signed by Jean A. Fleming Date: 2023.11.02 11:27:44 -04'00'

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 3 of 3 HDI-PIL-23-009 HDI-IPEC-23-050 cc:

NRC Regional Administrator - NRC Region I NRC Project Manager, NMSS - IPEC NRC Project Manager, NMSS - Pilgrim NRC Region 1 Lead Inspector - Pilgrim Nuclear Power Station NRC Region 1 Lead Inspector, Indian Point Units 1, 2 & 3 New York State Department of Public Service New York State Liaison Officer Designee, NYSERDA New York State Department of Environmental Conservation Commonwealth of Massachusetts, Executive Office of Environmental Affairs Commonwealth of Massachusetts, Department of Public Health Commonwealth of Massachusetts, Department of Environmental Protection Commonwealth of Massachusetts, Director, Massachusetts Emergency Management Agency

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 ENCLOSURE 1 Pilgrim Nuclear Power Station Decommissioning Schedule Update

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 Pilgrim (PSDAR/DCE/LTA issued on 11/16/2018)

Project /

Milestone PSDAR/DCE/LTA (per project below)

DCE Annual Updates (2021)

DCE Annual Updates (2022) 50.82(a)(7)

Schedule Updates (2023)

Notes License Transfer 07/31/2019 08/26/2019 08/26/2019 08/26/2019 Complete Zirc Fire Elimination 03/30/2020 03/31/2020 03/31/2020 03/31/2020 Complete Fuel on Pad 11/26/2021 12/13/2021 12/13/2021 12/13/2021 Complete Segmentation RVI 10/12/2020 10/26/2022 5/25/2023 03/01/2024*

  • 2023 Schedule change Segmentation RPV 09/18/2022 12/31/2024 12/31/2028 12/31/2032*
  • 2023 Schedule change Partial Site Release 01/28/2025 09/24/2027 09/24/2031 09/24/2035*
  • 2023 Schedule change Fuel Shipment Begins 01/02/2030 01/02/2030 01/02/2030 01/02/2030 Fuel Shipment Ends 12/31/2062 12/31/2062 12/31/2062 12/31/2062 License Termination 09/07/2063 09/07/2063 09/07/2063 09/07/2063

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 ENCLOSURE 2 Indian Point Nuclear Generating Units 1, 2, and 3 Decommissioning Schedule Update

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-23-009 HDI-IPEC-23-050 Indian Point (PSDAR/DCE/LTA issued on 12/19/2019)

Project /

Milestone PSDAR/DCE/LTA (per project below)

DCE Annual Updates (2021)

DCE Annual Updates (2022) 50.82(a)(7)

Schedule Updates (2023)

Notes License Transfer 05/31/2021 05/28/2021 05/28/2021 05/28/2021 Complete Zirc Fire Elimination (IP3) 09/15/2022 08/01/2022 08/01/2022 08/01/2022 Complete Fuel on Pad:

IP1 12/11/2008 12/11/2008 12/11/2008 Complete IP2 03/31/2023 03/31/2023 02/01/2023 02/01/2023 Complete IP3 04/04/2024 10/31/2023 10/31/2023 10/16/2023 Complete Segmentation RVI:

IP1**

    • IP1 RVI will be removed with the reactor vessel during RPV segmentation IP2 12/21/2022 05/28/2024 07/18/2025 06/19/2025 IP3 12/21/2021 11/30/2023 03/07/2024 7/31/2024 Segmentation RPV:

IP1 04/13/2024 11/20/2025 11/20/2027 11/20/2031*

  • 2023 Schedule change IP2 06/30/2023 11/26/2024 04/29/2026 04/29/2034*
  • 2023 Schedule change IP3 06/30/2022 05/37/2024 12/17/2024 12/17/2032*
  • 2023 Schedule change Partial Site Release 07/09/2033 07/09/2033 07/09/2033 07/09/2041*
  • 2023 Schedule change Fuel Shipment Begins:

IP1 05/29/2046 05/29/2046 05/29/2046 05/29/2046 IP2 01/02/2030 01/02/2030 01/02/2030 01/02/2030 IP3 08/26/2047 08/26/2047 08/26/2047 08/26/2047 Fuel Shipment Ends:

IP1 08/23/2047 08/23/2047 08/23/2047 08/23/2047 IP2 05/25/2046 05/25/2046 05/25/2046 05/25/2046 IP3 12/30/2061 12/30/2061 12/30/2061 12/30/2061 License Termination 09/06/2062 09/06/2062 09/06/2062 09/06/2062