==SUBJECT:== | ==SUBJECT:== | ||
UPDATED INSPECTION PLAN | UPDATED INSPECTION PLAN FO R LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2 022005 AND 05000353/2022005) | ||
==Dear | ==Dear Da v id Rhoades:== | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Limerick Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) | The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Limerick Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission ( NRC) | ||
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | ||
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and | Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and m anagement2. | ||
In response to the | In response to the COVID 19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process ( ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and | ||
Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22. | 1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22. | ||
The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection | 2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection sam ples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.3 | ||
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about -nrc/covid-19/security -ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID -19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the N RCs important safety and security mission during the COVID -19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | In addition to baseline inspections, the NRC will conduct Inspection Procedure 71003, Post - | ||
Approval Site Inspection for License Renewal, fo r Unit 1 in June 2024. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 610-337-5337 with any questions you have regarding this letter. | Please contact me at 610-337-5337 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety | ||
Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85 Enclosure: | |||
Limerick Inspection Plan cc w/encl: Distribution via ListServ | Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85 | ||
Enclosure: | |||
Limerick Inspection Plan | |||
cc w/encl: Distribution via ListServ | |||
3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021. | |||
D. Rhoades 3 | |||
SUBJECT: UPDATED INSPECTION PLAN FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2 022005 AND 05000353/2022005) | |||
DATED AUGUST 31, 2022 | |||
DISTRIBUTION: | |||
JGreives, D ORS LCasey, DO RS DBeacon, DO RS, SRI LGrimes, DORS, RI SSchm itt, DO RS, AA LMcKown, RI OEDO RidsNrrPMLimerick Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDrolrabResource | |||
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-23 Second Quarter Process/Branch 4/Limerick ROP-23 Inspection Plan Transmittal Letter.docx ADAMS Accession No. ML22242A022 SUNSI Review n -Sensitive Publ Available Sensite n -Publ Avaible OFFICE RI/DO RI/DO ME JGrv TE 8/ /22 8/ /22 OFFICIAL CORD CO Site Inspection Activity Plan Limerick | |||
07/01/2022 - 06/30/2024 | |||
Unit Start End Activity CAC Title Staff Count | |||
EP PROGRAM INSPECTION - LIMERICK 1 | |||
1,2 9/19/2022 9/23/2022 IP 71114.02 000717 Alert and Notification System Testing | |||
1,2 9/19/2022 9/23/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System | |||
1,2 9/19/2022 9/23/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes | |||
1,2 9/19/2022 9/23/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness | |||
1,2 9/19/2022 9/23/2022 IP 71151 001397 Performance Indicator Verification | |||
Rad Safety - Airborne, Dosimetry, & PIV 1 | |||
1,2 10/3/2022 10/7/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1,2 10/3/2022 10/7/2022 IP 71124.04 000728 Occupational Dose Assessment | |||
Access Control, Equip Perf, Sec Trng, SPR, PI-LIM 3 | |||
1,2 10/3/2022 10/7/2022 IP 71130.02 000734 Access Control | |||
1,2 10/3/2022 10/7/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance | |||
1,2 10/3/2022 10/7/2022 IP 71130.07 000739 Security Training | |||
1,2 10/3/2022 10/7/2022 IP 71130.09 001656 Security Plan Changes | |||
1,2 10/3/2022 10/7/2022 IP 71151 001338 Performance Indicator Verification | |||
FY23 - Limerick Initial Licensing Examination 4 | |||
1,2 10/30/2022 11/4/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
1,2 12/4/2022 12/16/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | 1,2 12/4/2022 12/16/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | ||
Site Inspection Activity Plan 1,2 8/7/2023 8/11/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection 1,2 8/21/2023 8/25/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection ISFSI Loading Campaign Inspection (60855) - LM | Rad Safety - 71124.07 REMP 1 | ||
1,2 11/7/2022 11/11/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program | |||
Access Control, AA, FFD, Sec Plan Review, PI-LIM 3 | |||
1,2 1/23/2023 1/27/2023 IP 71130.01 000733 Access Authorization | |||
1,2 1/23/2023 1/27/2023 IP 71130.02 000734 Access Control | |||
1,2 1/23/2023 1/27/2023 IP 71130.08 000740 Fitness For Duty Program | |||
1,2 1/23/2023 1/27/2023 IP 71130.09 001656 Security Plan Changes | |||
1,2 1/23/2023 1/27/2023 IP 71151 001338 Performance Indicator Verification | |||
RP - 71124.05 Instruments 1 | |||
1,2 3/20/2023 3/24/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation | |||
Inservice Inspection - Limerick 2R17 1 | |||
2 5/8/2023 5/12/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR) | |||
RP - 71124.01 Rad Hazards 1 | |||
1,2 5/8/2023 5/12/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls | |||
Focused Engineering Inspection - Aging Related 3 | |||
Prepared on 8/25/2022 8:42:26 AM 1 of 2 Site Inspection Activity Plan | |||
1,2 8/7/2023 8/11/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection | |||
1,2 8/21/2023 8/25/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection | |||
ISFSI Loading Campaign Inspection (60855) - LM 1 | |||
1,2 8/21/2023 8/25/2023 IP 60855 001001 Operation Of An ISFSI | |||
Limerick Requal Inspection with P/F Results 2 | |||
1,2 10/15/2023 10/20/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 10/15/2023 10/20/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance | |||
EP EXERCISE INSPECTION - LIMERICK 5 | |||
1,2 11/13/2023 11/17/2023 IP 71114.01 000716 Exercise Evaluation | |||
1,2 11/13/2023 11/17/2023 IP 71151 001397 Performance Indicator Verification | |||
FY24 Limerick Initial License Exam 4 | |||
1,2 11/12/2023 11/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
1,2 12/3/2023 12/8/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | 1,2 12/3/2023 12/8/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | ||
Cyber Security - Limerick | |||
RP - 71124.01 Rad Hazards | Cyber Security - Limerick 4 | ||
1,2 12/4/2023 12/8/2023 IP 71130.10 000741 Cybersecurity | |||
PI&R Biennial Team Inspection - LM 4 | |||
1,2 1/29/2024 2/2/2024 IP 71152B 000747 Problem Identification and Resolution | |||
1,2 2/12/2024 2/16/2024 IP 71152B 000747 Problem Identification and Resolution | |||
Access Control, Equipment Testing and Maintenance, Training, SPR 3 | |||
1,2 3/11/2024 3/15/2024 IP 71130.02 000734 Access Control | |||
1,2 3/11/2024 3/15/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance | |||
1,2 3/11/2024 3/15/2024 IP 71130.07 000739 Security Training | |||
1,2 3/11/2024 3/15/2024 IP 71130.09 001656 Security Plan Changes | |||
1,2 3/11/2024 3/15/2024 IP 71151 001338 Performance Indicator Verification | |||
Inservice Inspection - Limerick Unit 1 1 | |||
1 4/15/2024 4/19/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR) | |||
RP - 71124.01 Rad Hazards 1 | |||
1 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls | |||
RP - 71124.03 Airborne and 71124.04 Dose 1 | |||
1,2 6/3/2024 6/7/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1,2 6/3/2024 6/7/2024 IP 71124.04 000728 Occupational Dose Assessment | |||
License Renewal Phase 2 - Limerick Unit 1 4 | |||
1 6/10/2024 6/14/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal | |||
1 6/24/2024 6/28/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal | |||
Prepared on 8/25/2022 8:42:26 AM 2 of 2 | |||
}} | }} | ||
Revision as of 04:33, 16 November 2024
| ML22242A022 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 08/31/2022 |
| From: | Jon Greives Division of Operating Reactors |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| Greives J | |
| References | |
| IR 2022005 | |
| Download: ML22242A022 (5) | |
Text
August 31, 2022
SUBJECT:
UPDATED INSPECTION PLAN FO R LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2 022005 AND 05000353/2022005)
Dear Da v id Rhoades:
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Limerick Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission ( NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and m anagement2.
In response to the COVID 19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process ( ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and
1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.
2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection sam ples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.3
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about -nrc/covid-19/security -ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID -19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the N RCs important safety and security mission during the COVID -19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In addition to baseline inspections, the NRC will conduct Inspection Procedure 71003, Post -
Approval Site Inspection for License Renewal, fo r Unit 1 in June 2024.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5337 with any questions you have regarding this letter.
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85
Enclosure:
Limerick Inspection Plan
cc w/encl: Distribution via ListServ
3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.
D. Rhoades 3
SUBJECT: UPDATED INSPECTION PLAN FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2 022005 AND 05000353/2022005)
DATED AUGUST 31, 2022
DISTRIBUTION:
JGreives, D ORS LCasey, DO RS DBeacon, DO RS, SRI LGrimes, DORS, RI SSchm itt, DO RS, AA LMcKown, RI OEDO RidsNrrPMLimerick Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDrolrabResource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-23 Second Quarter Process/Branch 4/Limerick ROP-23 Inspection Plan Transmittal Letter.docx ADAMS Accession No. ML22242A022 SUNSI Review n -Sensitive Publ Available Sensite n -Publ Avaible OFFICE RI/DO RI/DO ME JGrv TE 8/ /22 8/ /22 OFFICIAL CORD CO Site Inspection Activity Plan Limerick
07/01/2022 - 06/30/2024
Unit Start End Activity CAC Title Staff Count
EP PROGRAM INSPECTION - LIMERICK 1
1,2 9/19/2022 9/23/2022 IP 71114.02 000717 Alert and Notification System Testing
1,2 9/19/2022 9/23/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1,2 9/19/2022 9/23/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 9/19/2022 9/23/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
1,2 9/19/2022 9/23/2022 IP 71151 001397 Performance Indicator Verification
Rad Safety - Airborne, Dosimetry, & PIV 1
1,2 10/3/2022 10/7/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 10/3/2022 10/7/2022 IP 71124.04 000728 Occupational Dose Assessment
Access Control, Equip Perf, Sec Trng, SPR, PI-LIM 3
1,2 10/3/2022 10/7/2022 IP 71130.02 000734 Access Control
1,2 10/3/2022 10/7/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 10/3/2022 10/7/2022 IP 71130.07 000739 Security Training
1,2 10/3/2022 10/7/2022 IP 71130.09 001656 Security Plan Changes
1,2 10/3/2022 10/7/2022 IP 71151 001338 Performance Indicator Verification
FY23 - Limerick Initial Licensing Examination 4
1,2 10/30/2022 11/4/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 12/4/2022 12/16/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
1,2 11/7/2022 11/11/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program
Access Control, AA, FFD, Sec Plan Review, PI-LIM 3
1,2 1/23/2023 1/27/2023 IP 71130.01 000733 Access Authorization
1,2 1/23/2023 1/27/2023 IP 71130.02 000734 Access Control
1,2 1/23/2023 1/27/2023 IP 71130.08 000740 Fitness For Duty Program
1,2 1/23/2023 1/27/2023 IP 71130.09 001656 Security Plan Changes
1,2 1/23/2023 1/27/2023 IP 71151 001338 Performance Indicator Verification
1,2 3/20/2023 3/24/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
Inservice Inspection - Limerick 2R17 1
2 5/8/2023 5/12/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 5/8/2023 5/12/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Focused Engineering Inspection - Aging Related 3
Prepared on 8/25/2022 8:42:26 AM 1 of 2 Site Inspection Activity Plan
1,2 8/7/2023 8/11/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection
1,2 8/21/2023 8/25/2023 IP 71111.21N.04 Age Related Focused Engineering Inspection
ISFSI Loading Campaign Inspection (60855) - LM 1
1,2 8/21/2023 8/25/2023 IP 60855 001001 Operation Of An ISFSI
Limerick Requal Inspection with P/F Results 2
1,2 10/15/2023 10/20/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 10/15/2023 10/20/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
EP EXERCISE INSPECTION - LIMERICK 5
1,2 11/13/2023 11/17/2023 IP 71114.01 000716 Exercise Evaluation
1,2 11/13/2023 11/17/2023 IP 71151 001397 Performance Indicator Verification
FY24 Limerick Initial License Exam 4
1,2 11/12/2023 11/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 12/3/2023 12/8/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Cyber Security - Limerick 4
1,2 12/4/2023 12/8/2023 IP 71130.10 000741 Cybersecurity
PI&R Biennial Team Inspection - LM 4
1,2 1/29/2024 2/2/2024 IP 71152B 000747 Problem Identification and Resolution
1,2 2/12/2024 2/16/2024 IP 71152B 000747 Problem Identification and Resolution
Access Control, Equipment Testing and Maintenance, Training, SPR 3
1,2 3/11/2024 3/15/2024 IP 71130.02 000734 Access Control
1,2 3/11/2024 3/15/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 3/11/2024 3/15/2024 IP 71130.07 000739 Security Training
1,2 3/11/2024 3/15/2024 IP 71130.09 001656 Security Plan Changes
1,2 3/11/2024 3/15/2024 IP 71151 001338 Performance Indicator Verification
Inservice Inspection - Limerick Unit 1 1
1 4/15/2024 4/19/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
RP - 71124.03 Airborne and 71124.04 Dose 1
1,2 6/3/2024 6/7/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 6/3/2024 6/7/2024 IP 71124.04 000728 Occupational Dose Assessment
License Renewal Phase 2 - Limerick Unit 1 4
1 6/10/2024 6/14/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
1 6/24/2024 6/28/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Prepared on 8/25/2022 8:42:26 AM 2 of 2