{{#Wiki_filter:November 23, 2022
{{#Wiki_filter:==SUBJECT:==
 
==SUBJECT:==
BRUNSWICK STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000324/2022402 AND 05000325/2022402
BRUNSWICK STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000324/2022402 AND 05000325/2022402


Line 30: Line 28:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Worosilo, Jannette on 11/23/22 Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71


===Enclosure:===
===Enclosure:===
Line 36: Line 34:


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000324 and 05000325 License Numbers: DPR-62 and DPR-71 Report Numbers: 05000324/2022402 and 05000325/2022402 Enterprise Identifier: I-2022-402-0027 Licensee: Duke Energy Progress, LLC Facility: Brunswick Steam Electric Plant Location: Southport, NC Inspection Dates: October 31, 2022 to November 03, 2022 Inspectors: J. Justice, Sr. Physical Security Inspector A. Richardson, Physical Security Inspector J. Wallo, Senior Physical Security Inspector R. Womack, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure
Docket Numbers: 05000324 and 05000325
 
License Numbers: DPR-62 and DPR-71
 
Report Numbers: 05000324/2022402 and 05000325/2022402
 
Enterprise Identifier: I-2022-402-0027
 
Licensee: Duke Energy Progress, LLC
 
Facility: Brunswick Steam Electric Plant
 
Location: Southport, NC
 
Inspection Dates: October 31, 2022 to November 03, 2022
 
Inspectors: J. Justice, Sr. Physical Security Inspector A. Richardson, Physical Security Inspector J. Wallo, Senior Physical Security Inspector R. Womack, Physical Security Inspector
 
Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
 
Enclosure


=SUMMARY=
=SUMMARY=
Line 42: Line 60:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 54: Line 71:
==SAFEGUARDS==
==SAFEGUARDS==
==71130.02 - Access Control==
==71130.02 - Access Control==
The inspectors evaluated the access control program through completion of the following
The inspectors evaluated the access control program through completion of the following


===inspection elements: Access Control===
===inspection elements:
Access Control===
{{IP sample|IP=IP 71130.02|count=1}}
{{IP sample|IP=IP 71130.02|count=1}}
: (1) Tier I: All Requirements Tier II: (02.06 a, c, d, 02.08 d - g, i)
: (1) Tier I: All Requirements Tier II: (02.06 a, c, d, 02.08 d - g, i)
Tier III: (02.10)
Tier III: (02.10)
==71130.05 - Protective Strategy Evaluation==
==71130.05 - Protective Strategy Evaluation==
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:


The inspectors evaluated the licensee's protective strategy through completion of the following
===Protective Strategy Evaluation (2 Samples)===
 
===procedure elements: Protective Strategy Evaluation===
{{IP sample|IP=IP 71130.05|count=2}}
: (1) Tier I: All Requirements Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)
: (1) Tier I: All Requirements Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)
Tier III: (02.08, 02.09 a, b, 02.11 a)
Tier III: (02.08, 02.09 a, b, 02.11 a)
: (2) Drill Observation
: (2) Drill Observation
==71130.09 - Security Plan Changes==
==71130.09 - Security Plan Changes==
The inspectors evaluated the security plan changes through completion of the following
The inspectors evaluated the security plan changes through completion of the following


===procedure elements: Security Plan Changes===
===procedure elements:
Security Plan Changes===
{{IP sample|IP=IP 71130.09|count=1}}
{{IP sample|IP=IP 71130.09|count=1}}
: (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.
: (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
71151 - Performance Indicator Verification
 
The inspectors verified licensee performance indicators submittals listed below:
 
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
: (1) Unit 1 (September 1, 2021, through September 31, 2022)
: (1) Unit 1 (September 1, 2021, through September 31, 2022)
Line 94: Line 114:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                 Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                         Date
Procedure Date
71130.02   Procedures       AD-EP-ALL-0112 Onsite Protective Measures                           Rev 1
71130.02 Procedures AD-EP-ALL-0112 Onsite Protective Measures Rev 1
AD-SY-ALL-0110 Protection of Information Related to Nuclear Security Rev 9
AD-SY-ALL-0110 Protection of Information Related to Nuclear Security Rev 9
AD-SY-ALL-0190 Security Records Program                             Rev 4
AD-SY-ALL-0190 Security Records Program Rev 4
AD-SY-ALL-0210 Site Access Controls                                 Rev 6
AD-SY-ALL-0210 Site Access Controls Rev 6
AD-SY-ALL-0215 Security Search and Entry Processing                 Revision 8
AD-SY-ALL-0215 Security Search and Entry Processing Revision 8
AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures         Revision 2
AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures Revision 2
71130.05   Corrective Action 02448069
71130.05 Corrective Action 02448069
Documents
Documents
Corrective Action 02448068
Corrective Action 02448068
Documents         02448069
Documents 02448069
Resulting from   02448238
Resulting from 02448238
Inspection
Inspection
Miscellaneous                   Various LLEA Agreements                               6/8/2022
Miscellaneous Various LLEA Agreements 6/8/2022
CSD-SY-BNP-   BNP Formal Target Sets                               Revision 0
CSD-SY-BNP-BNP Formal Target Sets Revision 0
0130-02
0130-02
LP-SY-ALL-0559 Controller/Evaluator Training                         Revision 11
LP-SY-ALL-0559 Controller/Evaluator Training Revision 11
Procedures       0PT-12.24     Security UPS Static Switch and Battery Test           Rev 2
Procedures 0PT-12.24 Security UPS Static Switch and Battery Test Rev 2
0PT-12.25     Security Diesel Generator Automatic Load Test         Rev 4
0PT-12.25 Security Diesel Generator Automatic Load Test Rev 4
AD-SY-ALL-0120 Safety/Security Interface                             Revision 2
AD-SY-ALL-0120 Safety/Security Interface Revision 2
AD-SY-ALL-0560 Drill and Exercise Program                           Revision 9
AD-SY-ALL-0560 Drill and Exercise Program Revision 9
AD-SY-BNP-0251 Contingency Response                                 Revision 2
AD-SY-BNP-0251 Contingency Response Revision 2
AD-WC-ALL-     On-Line Work Management                               Revision 20
AD-WC-ALL-On-Line Work Management Revision 20
200
200
71130.09   Procedures                       Brunswick Nuclear Plant Physical Security Plan       Rev 15
71130.09 Procedures Brunswick Nuclear Plant Physical Security Plan Rev 15
71151     Procedures       AD-PI-ALL-0700 Performance Indicators                               Rev 5
71151 Procedures AD-PI-ALL-0700 Performance Indicators Rev 5
 
5
5
}}
}}

Revision as of 00:31, 16 November 2024

Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402
ML22325A266
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/23/2022
From: Jannette Worosilo
Division of Reactor Safety II
To: Krakuszeski J
Duke Energy Progress
References
IR 2022402
Download: ML22325A266 (7)


Text

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000324/2022402 AND 05000325/2022402

Dear Mr. Krakuszeski:

On November 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000324 and 05000325

License Numbers: DPR-62 and DPR-71

Report Numbers: 05000324/2022402 and 05000325/2022402

Enterprise Identifier: I-2022-402-0027

Licensee: Duke Energy Progress, LLC

Facility: Brunswick Steam Electric Plant

Location: Southport, NC

Inspection Dates: October 31, 2022 to November 03, 2022

Inspectors: J. Justice, Sr. Physical Security Inspector A. Richardson, Physical Security Inspector J. Wallo, Senior Physical Security Inspector R. Womack, Physical Security Inspector

Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1) Tier I: All Requirements Tier II: (02.06 a, c, d, 02.08 d - g, i)

Tier III: (02.10)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1) Tier I: All Requirements Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)

Tier III: (02.08, 02.09 a, b, 02.11 a)

(2) Drill Observation

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===procedure elements:

Security Plan Changes===

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1 (September 1, 2021, through September 31, 2022)

Unit 2 (September 1, 2021, through September 31, 2022)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 3, 2022, the inspectors presented the security baseline inspection results to John Krakuszeski and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.02 Procedures AD-EP-ALL-0112 Onsite Protective Measures Rev 1

AD-SY-ALL-0110 Protection of Information Related to Nuclear Security Rev 9

AD-SY-ALL-0190 Security Records Program Rev 4

AD-SY-ALL-0210 Site Access Controls Rev 6

AD-SY-ALL-0215 Security Search and Entry Processing Revision 8

AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures Revision 2

71130.05 Corrective Action 02448069

Documents

Corrective Action 02448068

Documents 02448069

Resulting from 02448238

Inspection

Miscellaneous Various LLEA Agreements 6/8/2022

CSD-SY-BNP-BNP Formal Target Sets Revision 0

0130-02

LP-SY-ALL-0559 Controller/Evaluator Training Revision 11

Procedures 0PT-12.24 Security UPS Static Switch and Battery Test Rev 2

0PT-12.25 Security Diesel Generator Automatic Load Test Rev 4

AD-SY-ALL-0120 Safety/Security Interface Revision 2

AD-SY-ALL-0560 Drill and Exercise Program Revision 9

AD-SY-BNP-0251 Contingency Response Revision 2

AD-WC-ALL-On-Line Work Management Revision 20

200

71130.09 Procedures Brunswick Nuclear Plant Physical Security Plan Rev 15

71151 Procedures AD-PI-ALL-0700 Performance Indicators Rev 5

5