{{#Wiki_filter:Attachment 3 to ULNRC-06780 Page 1 of 11 Revised Technical Specification Pages (Markup)
{{#Wiki_filter:Attachment 3 to ULNRC -06780 Page 1 of 11
 
Revised Technical Specification Pages (Markup)
(10 pages follow this cover sheet)
(10 pages follow this cover sheet)
CompletionTimes 1.3
1.3 Completion Times
EXAMPLES EXAMPLE 1.3-3 (continued)
ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME
A One A.1 Restore Function X7 days Function X train to OPERABLE train status. AND inoperable.
10 days from discovery of failure to meet the LCO
B. One B.1 Restore Function Y 72 hours Function Y train to OPERABLE train status. AND inoperable.
10 days from discovery of failure to meet the LCO


CompletionTimes 1.3 1.3 Completion Times EXAMPLES          EXAMPLE 1.3-3 (continued)
C. One C.1 Restore Function X72 hours Function X train to OPERABLE train status.
ACTIONS COMPLETION CONDITION        REQUIRED ACTION          TIME A  One          A.1 Restore Function X 7 days Function X      train to OPERABLE train            status.            AND inoperable.
10 days from discovery of failure to meet the LCO B. One          B.1 Restore Function Y 72 hours Function Y      train to OPERABLE train            status.            AND inoperable.
10 days from discovery of failure to meet the LCO C. One         C.1 Restore Function X 72 hours Function X       train to OPERABLE train           status.
inoperable.
inoperable.
OR AND C.2 Restore Function Y 72 hours One             train to OPERABLE Function Y       status.
OR AND C.2 Restore Function Y 72 hours One train to OPERABLE Function Y status.
train inoperable.
train inoperable.
(continued)
(continued)
CALLAWAY                             1.3-6                       Amendment 133 PLANT
CALLAWAY 1.3-6 Amendment 133 PLANT RTS Instrumentation 3.3.1


RTS Instrumentation 3.3.1 TABLE 3.3.1-1 (page 5 of 8)
TABLE 3.3.1-1 (page 5 of 8)
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED         REQUIRED                         SURVEILLANCE         ALLOWABLE FUNCTION             CONDITIONS        CHANNELS         CONDITIONS      REQUIREMENTS         VALUE(a)
Reactor Trip System Instrumentation
 
APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONSCONDITIONS CHANNELS REQUIREMENTS VALUE(a)
: 16. Turbine Trip
: 16. Turbine Trip
: a. Low Fluid Oil  1(j)               3               OM              SR 3.3.1.10           539.42 psig Pressure                                                           SR 3.3.1.15
: a. L o w Fluid Oil1(j) 3 O M SR 3.3.1.10 539.42 psig
: b. Turbine Stop 1(j)                 4               PN               SR 3.3.1.10           1% open Valve Closure                                                       SR 3.3.1.15
 
: 17. Safety Injection      1, 2               2 trains       QP               SR 3.3.1.14         NA (SI) Input from Engineered Safety Feature Actuation System (ESFAS)
Pressure S R 3.3.1.15
: b. Turbine Stop1(j) 4 PN SR 3.3.1.10 1% open Valve Closure SR 3.3.1.15
: 17. Safety Injection1, 2 2 trains QP SR 3.3.1.14 NA (SI) Input from Engineered Safety Feature Actuation System (ESFAS)
: 18. Reactor Trip System Interlocks
: 18. Reactor Trip System Interlocks
: a. Intermediate 2(e)                 2               SR               SR 3.3.1.11           6E-11 amp Range                                                               SR 3.3.1.13 Neutron Flux, P-6
: a. Intermediate2(e) 2 SR SR 3.3.1.11 6E-11 amp Range SR 3.3.1.13 Neutron Flux, P-6
: b. Low Power       1                 1 per train     TS               SR 3.3.1.5           NA Reactor Trips Block, P-7
: b. Low Power 1 1 per train TS SR 3.3.1.5 NA Reactor Trips Block, P-7
: c. Power Range 1                      4               TS               SR 3.3.1.11           51.3% RTP Neutron Flux,                                                       SR 3.3.1.13 P-8
: c. Power Range1 4 TS SR 3.3.1.11 51.3% RTP Neutron Flux, SR 3.3.1.13 P-8
: d. Power Range 1                     4               TS               SR 3.3.1.11           53.3% RTP Neutron Flux,                                                       SR 3.3.1.13 P-9 (a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.
: d. Power Range 1 4 TS SR 3.3.1.11 53.3% RTP Neutron Flux, SR 3.3.1.13 P-9
 
(a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.
(e) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(e) Below the P-6 (Intermediate Range Neutron Flux) interlock.
(j) Above the P-9 (Power Range Neutron Flux) interlock.
(j) Above the P-9 (Power Range Neutron Flux) interlock.
CALLAWAY PLANT                                            3.3-23                                Amendment No. 202


RTS Instrumentation 3.3.1 TABLE 3.3.1-1 (page 6 of 8)
CALLAWAY PLANT 3.3-23 Amendment No. 202 RTS Instrumentation 3.3.1
Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED           REQUIRED                       SURVEILLANCE         ALLOWABLE FUNCTION             CONDITIONS          CHANNELS       CONDITIONS      REQUIREMENTS         VALUE(a)
 
TABLE 3.3.1-1 (page 6 of 8)
Reactor Trip System Instrumentation
 
APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONSCONDITIONS CHANNELS REQUIREMENTS VALUE(a)
: 18. Reactor Trip System Interlocks
: 18. Reactor Trip System Interlocks
: e. Power       1, 2               4               SR             SR 3.3.1.11           6.7% RTP and Range                                                           SR 3.3.1.13         12.4% RTP Neutron Flux, P-10
: e. Power 1, 2 4 SR SR 3.3.1.11 6.7% RTP and Range SR 3.3.1.13 12.4% RTP Neutron Flux, P-10
: f. Turbine     1                 2               TS             SR 3.3.1.10           12.4% turbine Impulse                                                         SR 3.3.1.13         power Pressure, P-13
: f. Turbine 1 2 TS SR 3.3.1.10 12.4% turbine Impulse SR 3.3.1.13 power Pressure, P-13
: 19. Reactor Trip           1, 2              2 trains        RQ              SR 3.3.1.4           NA Breakers (RTBs)(k) 3(b), 4(b), 5(b)   2 trains       C               SR 3.3.1.4           NA
: 19. Reactor Trip SR 3.3.1.4 NA Breakers (RTBs)(k) 1, 2 2 trains RQ 3(b), 4(b), 5(b) 2 trains C SR 3.3.1.4 NA
: 20. Reactor Trip           1, 2               1 each per     U               SR 3.3.1.4           NA Breaker                                   RTB Undervoltage and Shunt Trip             3(b), 4(b), 5(b)   1 each per     C               SR 3.3.1.4           NA Mechanisms(k)                             RTB
: 20. Reactor Trip 1, 2 1 each per U SR 3.3.1.4 NA Breaker RTB Undervoltage and Shunt Trip 3(b), 4(b), 5(b) 1 each per C SR 3.3.1.4 NA Mechanisms (k) RTB
: 21. Automatic Trip         1, 2               2 trains       QP             SR 3.3.1.5           NA Logic 3(b), 4(b), 5(b)   2 trains       C               SR 3.3.1.5           NA (a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.
: 21. Automatic Trip 1, 2 2 trains QP SR 3.3.1.5 NA Logic 3(b), 4(b), 5(b) 2 trains C SR 3.3.1.5 NA
 
(a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.
(b) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(b) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.
(k) Including any reactor trip bypass breakers that are racked in and closed for bypassing an RTB.
(k) Including any reactor trip bypass breakers that are racked in and closed for bypassing an RTB.
CALLAWAY PLANT                                            3.3-24                                Amendment No. 202


ESFAS Instrumentation 3.3.2 ACTIONS (continued)
CALLAWAY PLANT 3.3-24 Amendment No. 202 ESFAS Instrumentation 3.3.2
CONDITION                         REQUIRED ACTION                             COMPLETION TIME H. One or more trains     --------------------------NOTE-----------------------
 
inoperable.             One train may be bypassed for up to 4 hours for surveillance testing provided the other train is OPERABLE.
ACTIONS (continued)
H.1               Declare associated                     Immediately Pressurizer PORV(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME H. One or more trains --------------------------NOTE-----------------------
inoperable. One train may be bypassed for up to 4 hours for surveillance testing provided the other train is OPERABLE.
 
H.1 Declare associated Immediately Pressurizer PORV(s) inoperable.
I. One channel inoperable. --------------------------NOTE-----------------------
I. One channel inoperable. --------------------------NOTE-----------------------
The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels.
The inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels.
I.1               Place channel in trip.                 72 hours OR In accordance with the Risk Informed Completion Time Program OR I.2               Be in MODE 3.                           78 hours J. One channel inoperable. --------------------------NOTE-----------------------
I.1 Place channel in trip. 72 hours OR In accordance with the Risk Informed Completion Time Program OR I.2 Be in MODE 3. 78 hours J. One channel inoperable. --------------------------NOTE-----------------------
The inoperable channel may be bypassed for up to 2 hours for surveillance testing of other channels.
The inoperable channel may be bypassed for up to 2 hours for surveillance testing of other channels.
J.1               Place channel in trip.                 24 hours OR In accordance with the Risk Informed Completion Time Program OR J.2               Be in MODE 3.                           30 hours CALLAWAY PLANT                        3.3-31                                  Amendment No. 202
J.1 Place channel in trip. 24 hours OR In accordance with the Risk Informed Completion Time Program OR J.2 Be in MODE 3. 30 hours


ECCS - Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.2 ECCS - Operating LCO 3.5.2             Two ECCS trains shall be OPERABLE.
CALLAWAY PLANT 3.3-31 Amendment No. 202 ECCS - Operating 3.5.2
                      ------------------------------------------- NOTES --------------------------------------------
 
: 1.       In MODE 3, both safety injection (SI) pump flow paths may be isolated by closing the isolation valves for up to 2 hours to perform pressure isolation valve testing per SR 3.4.14.1.
3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
: 2.       Operation in MODE 3 with ECCS pumps made incapable of injecting, pursuant to LCO 3.4.12, Cold Overpressure Mitigation System, is allowed for up to 4 hours or until the temperature of all RCS cold legs exceeds 375°F, whichever comes first.
 
APPLICABILITY:       MODES 1, 2, and 3.
3.5.2 ECCS - Operating
ACTIONS CONDITION                                 REQUIRED ACTION                               COMPLETION TIME A. One or more trains                 A.1               Restore train(s) to                     72 hours inoperable.                                         OPERABLE status.
 
OR AND In accordance with At least 100% of the ECCS                                                                     the Risk Informed flow equivalent to a single                                                                   Completion Time OPERABLE ECCS train                                                                           Program available.
LCO 3.5.2 Two ECCS trains shall be OPERABLE.
B. Required Action and                 B.1               Be in MODE 3.                           6 hours associated Completion Time not met.
 
AND B.2               Be in MODE 4.                           12 hours CALLAWAY PLANT                                       3.5-4                                   Amendment No. 202
------------------------------------------- NOTES --------------------------------------------
: 1. In MODE 3, both safety injection (SI) pump flow paths may be isolated by closing the isolation valves for up to 2 hours to perform pressure isolation valve testing per SR 3.4.14.1.
: 2. Operation in MODE 3 with ECCS pumps made incapable of injecting, pursuant to LCO 3.4.12, Cold Overpressure Mitigation System, is allowed for up to 4 hours or until the temperature o f all
---------------------------------------------------------------------------------------------------RCS cold legs exceeds 375°F, whichever comes first.
 
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
 
CONDITION REQUIRED ACTION COMPLETION TIME
 
A. One or more trains A.1 Restore train(s) to 72 hours inoperable. OPERABLE status. OR AND In accordance with At least 100% of the ECCS the Risk Informed flow equivalent to a single Completion Time OPERABLE ECCS train Program available.
 
B. Required Action and B.1 Be in MODE 3. 6 hours associated Completion Time not met.
 
AND
 
B.2 Be in MODE 4. 12 hours
 
CALLAWAY PLANT 3.5-4 Amendment No. 202 MSIVs, MSIVBVs, and MSLPDIVs 3.7.2
 
3.7 PLANT SYSTEMS
 
3.7.2 Main Steam Isolation Valves (MSIVs), Main Steam Isolation Valve Bypass Valves (MSIVBVs), and Main Steam Low Point Drain Isolation Valves (MSLPDIVs)
 
LCO 3.7.2 The MSIV and its associated actuator trains, the MSIVBV, and the MSLPDIV in each of the four main steam lines shall be OPERABLE.
 
APPLICABILITY: For the MSIV and its associated actuator trains in each main steam line:


MSIVs, MSIVBVs, and MSLPDIVs 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Main Steam Isolation Valves (MSIVs), Main Steam Isolation Valve Bypass Valves (MSIVBVs), and Main Steam Low Point Drain Isolation Valves (MSLPDIVs)
LCO 3.7.2            The MSIV and its associated actuator trains, the MSIVBV, and the MSLPDIV in each of the four main steam lines shall be OPERABLE.
APPLICABILITY:      For the MSIV and its associated actuator trains in each main steam line:
MODE 1, MODE 2 and 3 except when the MSIV is closed and de-activated.
MODE 1, MODE 2 and 3 except when the MSIV is closed and de-activated.
For the MSIVBV in each main steam line:
For the MSIVBV in each main steam line:
MODES 1, 2, and 3 except when:
MODES 1, 2, and 3 except when:
: a. MSIVBV is closed and de-activated, or
: a. MSIVBV is closed and de-activated, or
: b. MSIVBV is closed and isolated by a closed manual valve, or
: b. MSIVBV is closed and isolated by a closed manual valve, or
: c. MSIVBV is isolated by two closed manual valves.
: c. MSIVBV is isolated by two closed manual valves.
For the MSLPDIV in each main steam line:
For the MSLPDIV in each main steam line:
MODES 1, 2, and 3 except when:
MODES 1, 2, and 3 except when:
: a. MSLPDIV is closed and de-activated, or
: a. MSLPDIV is closed and de-activated, or
: b. MSLPDIV is closed and isolated by a closed manual valve, or
: b. MSLPDIV is closed and isolated by a closed manual valve, or
: c. MSLPDIV is isolated by two closed manual valves.
: c. MSLPDIV is isolated by two closed manual valves.
ACTIONS CONDITION                     REQUIRED ACTION                     COMPLETION TIME A. One MSIV actuator train     A.1           Restore MSIV actuator       72 hours inoperable.                             train to OPERABLE OR status.
 
ACTIONS
 
CONDITION REQUIRED ACTION COMPLETION TIME
 
A. One MSIV actuator train A.1 Restore MSIV actuator 72 hours inoperable. train to OPERABLE OR status.
In accordance with the Risk Informed Completion Time Program (continued)
In accordance with the Risk Informed Completion Time Program (continued)
CALLAWAY PLANT                              3.7-5                          Amendment No. 197


AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5                     Three AFW trains shall be OPERABLE.
CALLAWAY PLANT 3.7-5 Amendment No. 197 AFW System 3.7.5
APPLICABILITY:               MODE 1, 2, and 3.
 
3.7 PLANT SYSTEMS
 
3.7.5 Auxiliary Feedwater (AFW) System
 
LCO 3.7.5 Three AFW trains shall be OPERABLE.
APPLICABILITY: MODE 1, 2, and 3.
 
ACTIONS
ACTIONS
-----------------------------------------------------------------NOTE-----------------------------------------------------------------
-----------------------------------------------------------------NOTE-----------------------------------------------------------------
LCO 3.0.4.b is not applicable when entering MODE 1.
LCO 3.0.4.b is not applicable when entering MODE 1.
CONDITION                                   REQUIRED ACTION                               COMPLETION TIME A. One steam supply to                       A.1               Restore steam supply to           7 days turbine driven AFW pump                                   OPERABLE status.
 
OR inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME
In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO B. One ESW supply to turbine                 B.1               Restore ESW supply to             72 hours driven AFW pump                                           OPERABLE status.
 
OR inoperable.
A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status. OR inoperable.
In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO
 
B. One ESW supply to turbine B.1 Restore ESW supply to 72 hours driven AFW pump OPERABLE status. OR inoperable.
In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO (continued)
In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO (continued)
CALLAWAY PLANT                                            3.7-15                                  Amendment No. 198


AC Sources - Operating 3.8.1 ACTIONS (continued)
CALLAWAY PLANT 3.7-15 Amendment No. 198 AC Sources - Operating 3.8.1
CONDITION                   REQUIRED ACTION                             COMPLETION TIME C. Two offsite circuits C.2               Restore one offsite circuit 24 hours inoperable.                           to OPERABLE status.
 
OR (continued)
ACTIONS (continued)
In accordance with the Risk Informed Completion Time Program D. One offsite circuit ----------------------NOTE-------------------
CONDITION REQUIRED ACTION COMPLETION TIME
inoperable.
 
Enter applicable Conditions and Required Actions of LCO 3.8.9, AND Distribution Systems - Operating, when Condition D is entered with no One DG inoperable.
C. Two offsite circuits C.2 Restore one offsite circuit 24 hours inoperable. to OPERABLE status. OR (continued)
AC power source to any train.
In accordance with the Risk Informed Completion Time Program
D.1                 Restore offsite circuit to       12 hours OPERABLE status.
 
OR In accordance with the Risk Informed Completion Time Program OR D.2                 Restore DG to                   12 hours OPERABLE status.
D. One offsite circuit ----------------------NOTE-------------------
OR In accordance with the Risk Informed Completion Time Program E. Two DGs inoperable. E.1                 Restore one DG to               2 hours OPERABLE status.
inoperable. Enter applicable Conditions and AND Required Actions of LCO 3.8.9, Distribution Systems - Operating, One DG inoperable. when Condition D is entered with no AC power source to any train.
 
D.1 Restore offsite circuit to 12 hours OPERABLE status. OR
 
In accordance with the Risk Informed Completion Time Program
 
OR
 
D.2 Restore DG to 12 hours OPERABLE status. OR
 
In accordance with the Risk Informed Completion Time Program
 
E. Two DGs inoperable. E.1 Restore one DG to 2 hours OPERABLE status.
(continued)
(continued)
CALLAWAY PLANT                          3.8.5                                Amendment No. 186


AC Sources - Operating 3.8.1 ACTIONS (continued)
CALLAWAY PLANT 3.8.5 Amendment No. 186 AC Sources - Operating 3.8.1
CONDITION                               REQUIRED ACTION                       COMPLETION TIME F. One required LSELS                 F.1             Declare the affected DG       Immediately inoperable.                                         and offsite circuit inoperable.
 
AND F.2             Restore required LSELS         12 hours to OPERABLE status.
ACTIONS (continued)
OR In accordance with the Risk Informed Completion Time Program G. Required Action and                 G.1             Be in MODE 3.                 6 hours associated Completion Time of Condition A, B, C, D, E,       AND or F not met.
CONDITION REQUIRED ACTION COMPLETION TIME
G.2             Be in MODE 5.                 36 hours H. Three or more AC sources           H.1             Enter LCO 3.0.3.             Immediately inoperable.
 
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                           FREQUENCY SR 3.8.1.1   Verify correct breaker alignment and indicated power             In accordance availability for each required offsite circuit.                   with the Surveillance Frequency Control Program (continued)
F. One required LSELS F.1 Declare the affected DG Immediately inoperable. and offsite circuit inoperable.
CALLAWAY PLANT                                 3.8-6                               Amendment No. 202
 
AND
 
F.2 Restore required LSELS 12 hours to OPERABLE status. OR
 
In accordance with the Risk Informed Completion Time Program
 
G. Required Action and G.1 Be in MODE 3. 6 hours associated Completion Time of Condition A, B, C, D, E, AND or F not met.
G.2 Be in MODE 5. 36 hours
 
H. Three or more AC sources H.1 Enter LCO 3.0.3. Immediately inoperable.
 
SURVEILLANCE REQUIREMENTS
 
SURVEILLANCE FREQUENCY
 
SR 3.8.1.1 Verify correct breaker alignment and indicated power In accordance availability for each required offsite circuit. with the Surveillance Frequency Control Program (continued)
 
CALLAWAY PLANT 3.8-6 Amendment No. 202 Distribution Systems - Operating 3.8.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
 
C. One DC electrical power C.1 Restore DC electrical 2 hours distribution subsystem power distribution OR inoperable. subsystem to OPERABLE status. In accordance with the Risk Informed Completion Time Program AND 16 hours from discovery of failure to meet LCO
 
D. Required Action and D.1 Be in MODE 3. 6 hours associated Completion Time not met. AND
 
D.2 Be in MODE 5. 36 hours
 
E. Two trains with inoperable E.1 Enter LCO 3.0.3. Immediately distribution subsystems that result in a loss of safety function.
 
SURVEILLANCE REQUIREMENTS
 
SURVEILLANCE FREQUENCY
 
SR 3.8.9.1 Verify correct breaker alignments and voltage to In accordance required AC, DC, and AC vital bus electrical power with the distribution subsystems. Surveillance Frequency Control Program


Distribution Systems - Operating 3.8.9 ACTIONS (continued)
CALLAWAY PLANT 3.8-39 Amendment No. 202}}
CONDITION                          REQUIRED ACTION                    COMPLETION TIME C. One DC electrical power          C.1          Restore DC electrical        2 hours distribution subsystem                        power distribution OR inoperable.                                    subsystem to OPERABLE status.            In accordance with the Risk Informed Completion Time Program AND 16 hours from discovery of failure to meet LCO D. Required Action and              D.1          Be in MODE 3.                6 hours associated Completion Time not met.                    AND D.2          Be in MODE 5.              36 hours E. Two trains with inoperable      E.1          Enter LCO 3.0.3.            Immediately distribution subsystems that result in a loss of safety function.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.8.9.1      Verify correct breaker alignments and voltage to          In accordance required AC, DC, and AC vital bus electrical power        with the distribution subsystems.                                  Surveillance Frequency Control Program CALLAWAY PLANT                               3.8-39                         Amendment No. 202}}

Revision as of 16:15, 15 November 2024

Revised Technical Specification Pages (Markup)
ML22334A259
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/2022
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22334A255 List:
References
ULNRC-06780
Download: ML22334A259 (1)


Text

Attachment 3 to ULNRC -06780 Page 1 of 11

Revised Technical Specification Pages (Markup)

(10 pages follow this cover sheet)

CompletionTimes 1.3

1.3 Completion Times

EXAMPLES EXAMPLE 1.3-3 (continued)

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME

A One A.1 Restore Function X7 days Function X train to OPERABLE train status. AND inoperable.

10 days from discovery of failure to meet the LCO

B. One B.1 Restore Function Y 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Function Y train to OPERABLE train status. AND inoperable.

10 days from discovery of failure to meet the LCO

C. One C.1 Restore Function X72 hours Function X train to OPERABLE train status.

inoperable.

OR AND C.2 Restore Function Y 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> One train to OPERABLE Function Y status.

train inoperable.

(continued)

CALLAWAY 1.3-6 Amendment 133 PLANT RTS Instrumentation 3.3.1

TABLE 3.3.1-1 (page 5 of 8)

Reactor Trip System Instrumentation

APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONSCONDITIONS CHANNELS REQUIREMENTS VALUE(a)

16. Turbine Trip
a. L o w Fluid Oil1(j) 3 O M SR 3.3.1.10 539.42 psig

Pressure S R 3.3.1.15

b. Turbine Stop1(j) 4 PN SR 3.3.1.10 1% open Valve Closure SR 3.3.1.15
17. Safety Injection1, 2 2 trains QP SR 3.3.1.14 NA (SI) Input from Engineered Safety Feature Actuation System (ESFAS)
18. Reactor Trip System Interlocks
a. Intermediate2(e) 2 SR SR 3.3.1.11 6E-11 amp Range SR 3.3.1.13 Neutron Flux, P-6
b. Low Power 1 1 per train TS SR 3.3.1.5 NA Reactor Trips Block, P-7
c. Power Range1 4 TS SR 3.3.1.11 51.3% RTP Neutron Flux, SR 3.3.1.13 P-8
d. Power Range 1 4 TS SR 3.3.1.11 53.3% RTP Neutron Flux, SR 3.3.1.13 P-9

(a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.

(e) Below the P-6 (Intermediate Range Neutron Flux) interlock.

(j) Above the P-9 (Power Range Neutron Flux) interlock.

CALLAWAY PLANT 3.3-23 Amendment No. 202 RTS Instrumentation 3.3.1

TABLE 3.3.1-1 (page 6 of 8)

Reactor Trip System Instrumentation

APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONSCONDITIONS CHANNELS REQUIREMENTS VALUE(a)

18. Reactor Trip System Interlocks
e. Power 1, 2 4 SR SR 3.3.1.11 6.7% RTP and Range SR 3.3.1.13 12.4% RTP Neutron Flux, P-10
f. Turbine 1 2 TS SR 3.3.1.10 12.4% turbine Impulse SR 3.3.1.13 power Pressure, P-13
19. Reactor Trip SR 3.3.1.4 NA Breakers (RTBs)(k) 1, 2 2 trains RQ 3(b), 4(b), 5(b) 2 trains C SR 3.3.1.4 NA
20. Reactor Trip 1, 2 1 each per U SR 3.3.1.4 NA Breaker RTB Undervoltage and Shunt Trip 3(b), 4(b), 5(b) 1 each per C SR 3.3.1.4 NA Mechanisms (k) RTB
21. Automatic Trip 1, 2 2 trains QP SR 3.3.1.5 NA Logic 3(b), 4(b), 5(b) 2 trains C SR 3.3.1.5 NA

(a) The Allowable Value defines the limiting safety system setting except for Trip Functions 14.a and 14.b (the Nominal Trip Setpoint defines the limiting safety system setting for these Trip Functions). See the Bases for the Nominal Trip Setpoints.

(b) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.

(k) Including any reactor trip bypass breakers that are racked in and closed for bypassing an RTB.

CALLAWAY PLANT 3.3-24 Amendment No. 202 ESFAS Instrumentation 3.3.2

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. One or more trains --------------------------NOTE-----------------------

inoperable. One train may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing provided the other train is OPERABLE.

H.1 Declare associated Immediately Pressurizer PORV(s) inoperable.

I. One channel inoperable. --------------------------NOTE-----------------------

The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.

I.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR In accordance with the Risk Informed Completion Time Program OR I.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> J. One channel inoperable. --------------------------NOTE-----------------------

The inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels.

J.1 Place channel in trip. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR In accordance with the Risk Informed Completion Time Program OR J.2 Be in MODE 3. 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />

CALLAWAY PLANT 3.3-31 Amendment No. 202 ECCS - Operating 3.5.2

3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)

3.5.2 ECCS - Operating

LCO 3.5.2 Two ECCS trains shall be OPERABLE.


NOTES --------------------------------------------

1. In MODE 3, both safety injection (SI) pump flow paths may be isolated by closing the isolation valves for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to perform pressure isolation valve testing per SR 3.4.14.1.
2. Operation in MODE 3 with ECCS pumps made incapable of injecting, pursuant to LCO 3.4.12, Cold Overpressure Mitigation System, is allowed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or until the temperature o f all

RCS cold legs exceeds 375°F, whichever comes first.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more trains A.1 Restore train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status. OR AND In accordance with At least 100% of the ECCS the Risk Informed flow equivalent to a single Completion Time OPERABLE ECCS train Program available.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND

B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

CALLAWAY PLANT 3.5-4 Amendment No. 202 MSIVs, MSIVBVs, and MSLPDIVs 3.7.2

3.7 PLANT SYSTEMS

3.7.2 Main Steam Isolation Valves (MSIVs), Main Steam Isolation Valve Bypass Valves (MSIVBVs), and Main Steam Low Point Drain Isolation Valves (MSLPDIVs)

LCO 3.7.2 The MSIV and its associated actuator trains, the MSIVBV, and the MSLPDIV in each of the four main steam lines shall be OPERABLE.

APPLICABILITY: For the MSIV and its associated actuator trains in each main steam line:

MODE 1, MODE 2 and 3 except when the MSIV is closed and de-activated.

For the MSIVBV in each main steam line:

MODES 1, 2, and 3 except when:

a. MSIVBV is closed and de-activated, or
b. MSIVBV is closed and isolated by a closed manual valve, or
c. MSIVBV is isolated by two closed manual valves.

For the MSLPDIV in each main steam line:

MODES 1, 2, and 3 except when:

a. MSLPDIV is closed and de-activated, or
b. MSLPDIV is closed and isolated by a closed manual valve, or
c. MSLPDIV is isolated by two closed manual valves.

ACTIONS

CONDITION REQUIRED ACTION COMPLETION TIME

A. One MSIV actuator train A.1 Restore MSIV actuator 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. train to OPERABLE OR status.

In accordance with the Risk Informed Completion Time Program (continued)

CALLAWAY PLANT 3.7-5 Amendment No. 197 AFW System 3.7.5

3.7 PLANT SYSTEMS

3.7.5 Auxiliary Feedwater (AFW) System

LCO 3.7.5 Three AFW trains shall be OPERABLE.

APPLICABILITY: MODE 1, 2, and 3.

ACTIONS


NOTE-----------------------------------------------------------------

LCO 3.0.4.b is not applicable when entering MODE 1.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status. OR inoperable.

In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO

B. One ESW supply to turbine B.1 Restore ESW supply to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> driven AFW pump OPERABLE status. OR inoperable.

In accordance with the Risk Informed Completion Time Program AND 10 days from discovery of failure to meet the LCO (continued)

CALLAWAY PLANT 3.7-15 Amendment No. 198 AC Sources - Operating 3.8.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Two offsite circuits C.2 Restore one offsite circuit 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable. to OPERABLE status. OR (continued)

In accordance with the Risk Informed Completion Time Program

D. One offsite circuit ----------------------NOTE-------------------

inoperable. Enter applicable Conditions and AND Required Actions of LCO 3.8.9, Distribution Systems - Operating, One DG inoperable. when Condition D is entered with no AC power source to any train.

D.1 Restore offsite circuit to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status. OR

In accordance with the Risk Informed Completion Time Program

OR

D.2 Restore DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status. OR

In accordance with the Risk Informed Completion Time Program

E. Two DGs inoperable. E.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OPERABLE status.

(continued)

CALLAWAY PLANT 3.8.5 Amendment No. 186 AC Sources - Operating 3.8.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

F. One required LSELS F.1 Declare the affected DG Immediately inoperable. and offsite circuit inoperable.

AND

F.2 Restore required LSELS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status. OR

In accordance with the Risk Informed Completion Time Program

G. Required Action and G.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, C, D, E, AND or F not met.

G.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

H. Three or more AC sources H.1 Enter LCO 3.0.3. Immediately inoperable.

SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY

SR 3.8.1.1 Verify correct breaker alignment and indicated power In accordance availability for each required offsite circuit. with the Surveillance Frequency Control Program (continued)

CALLAWAY PLANT 3.8-6 Amendment No. 202 Distribution Systems - Operating 3.8.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. One DC electrical power C.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> distribution subsystem power distribution OR inoperable. subsystem to OPERABLE status. In accordance with the Risk Informed Completion Time Program AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND

D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

E. Two trains with inoperable E.1 Enter LCO 3.0.3. Immediately distribution subsystems that result in a loss of safety function.

SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY

SR 3.8.9.1 Verify correct breaker alignments and voltage to In accordance required AC, DC, and AC vital bus electrical power with the distribution subsystems. Surveillance Frequency Control Program

CALLAWAY PLANT 3.8-39 Amendment No. 202