{{#Wiki_filter:June 2, 2021 LICENSEE:      Entergy Nuclear Operations, Inc.
{{#Wiki_filter:}}
FACILITY:      Palisades Nuclear Plant
 
==SUBJECT:==
 
==SUMMARY==
OF MAY 12, 2021, TELECONFERENCE WITH ENTERGY NUCLEAR OPERATIONS, INC. TO DISCUSS POTENTIAL LICENSE AMENDMENT REQUEST RELATED TO PERMANENTLY DEFUELED TECHNICAL SPECIFICATIONS FOR PALISADES NUCLEAR PLANT (EPID L-2021-LRM-0050)
On May 12, 2021, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Entergy Nuclear Operations, Inc. (Entergy, the licensee) via teleconference. The purpose of this meeting was for Entergy to provide information on a planned amendment request for Palisades Nuclear Plant (Palisades), related to revising the Palisades licenses and technical specifications to reflect a permanently defueled condition. The meeting notice and agenda dated April 30, 2021, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML21130A054 and Entergys presentation slides are available at ADAMS Accession No. ML21124A006. A list of attendees is enclosed.
During the meeting, Entergys presentation described the scope and schedule for the proposed license amendment. Entergy indicated that, after permanent shutdown, the only remaining design-basis accidents include postulated cask drop accidents, fuel handling incidents, liquid waste incidents, and waste gas incidents. The licensee stated that the effective date of the amendment would be greater than 17 days after shutdown to support ventilation filtration requirements. Additionally, the licensee stated that the application would include a proposed license condition to prohibit fuel cask movement over the spent fuel pool (SFP) when irradiated fuel assemblies in the SPF have decayed for less than 90 days.
Entergy stated that it intends to submit the licensing action by June 1, 2021.
Following the business portion of the meeting, members of the public were provided the opportunity to ask questions of the NRC staff. Although many of the questions were beyond the scope of the meeting, the NRC staff attempted to answer all questions. Topics included environmental impact of decommissioning, spent fuel storage, dry cask storage, long-term spent fuel storage, reactor vessel embrittlement, and licensee transfer.
No regulatory decisions were made at this meeting.
 
Please direct any inquiries to me at 301-415-2855, or Scott.Wall@nrc.gov.
Sincerely,
                                            /RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
 
==Enclosure:==
 
List of Attendees cc: Listserv
 
LIST OF ATTENDEES MAY 12, 2021, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
PALISADES NUCLEAR PLANT PLANNED LICENSE AMENDMENT REQUEST RELATED TO PERMANENTLY DEFUELED TECHNICAL SPECIFICATIONS Name                                      Organization Scott Wall                                Nuclear Regulatory Commission (NRC)
Gordon Curran                            NRC Fred Forsaty                              NRC Jay Robinson                              NRC John Parillo                              NRC Joshua Wilson                            NRC John Ma                                  NRC Kent Wood                                NRC Matthew Yoder                            NRC Nadim Khan                                NRC On Yee                                    NRC Thinh Dinh                                NRC Vijay Goel                                NRC Sean Meighan                              NRC Hang Vu                                  NRC Nancy Salgado                            NRC Victor Cusumano                          NRC Brian Wittick                            NRC Joseph Colaccino                          NRC Steven Bloom                              NRC Courtney St. Peters                      NRC Otto Gustafson                            Entergy Nuclear Operations, Inc. (Entergy)
Mike Mlynarek                            Entergy Barb Dotson                              Entergy Jim Miksa                                Entergy Robert White                              Entergy Michael Schultheis                        Entergy Jeff Voskuil                              Entergy Phil Couture III                          Entergy Laura Swenzinski                          Enercon Jeff Erickson                            Enercon Enclosure
 
Jared Monroe    Enercon Sam Lafountain  Enercon Brian Froese    Enercon Andrea Sterdis  Holtec Decommissioning International (HDI)
Kevin Kamps*    Beyond Nuclear Michael Keegan  Beyond Nuclear Bette Pierman    Michigan Safe Energy Future Shawn McComb    Energy Safe Futures Mark Muhich      Public Jane Budar      Public
 
ML21145A048                                  *via e-mail OFFICE        NRR/DORL/LPL3/PM*      NRR/DORL/LPL3/LA* NRR/DORL/LPL3/BC*
NAME          SWall                  SRohrer          NSalgado DATE          05/23/2021              05/25/2021        06/02/2021 OFFICE        NRR/DORL/LPL3/PM*
NAME          SWall DATE          06/02/2021}}

Revision as of 10:17, 8 September 2021

Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant
ML21145A048
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/02/2021
From: Scott Wall
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Wall S
References
EPID L-2021-LRM-0050
Download: ML21145A048 (5)