ML19345H406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 94: | Line 94: | ||
l 1 | l 1 | ||
i 4 | i 4 | ||
i | i 1 | ||
i 2 3 4 j | |||
4 F: l'orteil Reason: Methoil: Enhihlt (; - Instnitilims 1 | 4 F: l'orteil Reason: Methoil: Enhihlt (; - Instnitilims 1 | ||
S: Sc hriinics A Eqtilyment Falluse(Explain) 1 -Manual for Picparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for I.icensce C Ilefueling 3 Automatic Scram. Event Repost (l.1:ltil'ile tNilRl(;. | S: Sc hriinics A Eqtilyment Falluse(Explain) 1 -Manual for Picparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for I.icensce C Ilefueling 3 Automatic Scram. Event Repost (l.1:ltil'ile tNilRl(;. | ||
Revision as of 04:42, 18 February 2020
| ML19345H406 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/12/1981 |
| From: | Whitney G BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML19345H405 | List: |
| References | |
| NUDOCS 8105200247 | |
| Download: ML19345H406 (6) | |
Text
. - ._. -
O OPERATING OATA REPORT DOCKET NO. 50-293
.DATE ud/ u/ si COMPLETED BY G G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
April. 1981 l 2. Reporting Period:
1998.
- 3. LicensedThermalPower(MWt):
I 4. Nameplate Rating (Gross MWe): 678.
- 5. Design Electrical Rating (Net MWe):
655.
90.
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
670.
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since List Report. Give Reasons:
None
- 9. Power Level To Which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.-to.Date Cumulative i
l 11. Hours In Reporting Period 719.0 2879.0 73559.0
- 12. Number Of Hours Reactor Was Critical 710.2 2603.6 52788.2
- 13. React- Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 706.0 2574.6 51081.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1316736.0 4590528.0 86879904.0 .
17 Gross Electrical Energy Generated (Mk H) 453930.O _,
1551960.0 28881324.0 IS. Net Electrical Eneqy Generated (MWH) 436753.0 1492720.0 27743327.0
- 19. Unit Service Factor 98.2 89.4 69.4
- 20. Unit Availability Factor 98.2 69.4 o9.4
- 21. Unit Capacity Factor (Using MDC Net) 90.7 77.4 jo.3 92./ /9.2 a/.o
- 22. Unit Capacity Factor (Using DER Net,
- 23. Unit Forced Outage Rate 1.8 1.6 10.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Refuel Outage Commencing Septecher 1981 n Operadng
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Umts in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8105200 @
N/77) l
AVERAGE DAILY UNITFOWER LEVEL DOCXET NO. 50-293 Pilgrim i WT DATE 5/12/81 G.G. Whitney COMPLETED BY 6 17-746-7900 TELEPHONE April, 1981 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POV R LEVEL (Mwe-Net) (g w g.,3 668. 547, 1
63 3. 294.
- IS 656. 39 307.
3 655. ,, 599.
4 462. 670.
- 2. 21 351. 668.
6 487. 668.
' 23 667. 660. .
3 24 591. 25 667.
9 _
637. :s 636.
10 665. ;- 661.
662. 656.
g3 3 662. , 649.
g3 658. 644.
g4 30 656. o 3g 15 655.
16 .
INSTRUCTIONS .
On th:s format.!ist the. average dany unit power level in MWe. Net for each day in the repcmng month. Campute to the nearest wncie megawatt.
l (O f l
l 1
IM)CKEI NO. 50-293 IINil SilllllM)WNS ANI) POWER REDilCIIONS Pilgrim I UNII NAME
! DAIE _5U2L81 CoMrs.E IED liv _n.__G.__Witit.ncy.
RI I'OR I' MON ill APRIL, 1981 IEl.EriloNE _(il7-746-7900 l
"L _
-, jE 3 . E' IIrensee Eg ~L Cause & Cenicctive
- No. D.it e g- 3g s ,yu Event gg gU8 Action to I- y .3 cE 5@C Iteport if 'd U o Paesent Iletureceire l
$ U
! b 6 81/04/05 S 0.0 B 5 N.A. IIC llTEXCll Main Condenser Backwash 4
13.0 A 3 N.A. Z 7. ZZZZZZ Unit trip due to high level in
) 7 81/04/06 F
'C' innisture separator.
l J
B 81/04/18 S 0.0 B 5 N.A. IIC IITEXCil Repnirs inade to 'B' 3rd point henter f expansion joint I
i i
i 4
l 1
i 4
i 1
i 2 3 4 j
4 F: l'orteil Reason: Methoil: Enhihlt (; - Instnitilims 1
S: Sc hriinics A Eqtilyment Falluse(Explain) 1 -Manual for Picparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for I.icensce C Ilefueling 3 Automatic Scram. Event Repost (l.1:ltil'ile tNilRl(;.
D Regulatory Restriction 4.Othes (Explain) 01611 E Operator Tralning A IIrense I:xamination F.Administ atIve 5 i
G Operational fision (1.xplain) 13hibit 1 - Same Somre l
! I'8/if ) II Ollies (Explain)
_ L .
D E
T A
I C
O S D S .
A E
C 1t
!!OE I R TR CU AC m E e ER t r V s e 1 T .
y k TN S a CE t e EV n s r RE i e B RR T .
OP s d C e g e O l n r T c i e s m d u i r M T O E
C N
A N
E E T C s N N e I A b d A l l
d u e t
t E e T n D
T N k r e ,
E c n i t T A I
a a a h . e I
p e p g A. I e l e i l.
' R C R T IR Y
T E
F E gg d Sl nn e n l ii gs e A kd ge k R ~ C cn ub o
~
0 1
~ ai l u r
- PB PT B e
- At ~
- i l
k a c n o
! i O l m
_ I p r r T o e e
_ C n w t T N I o n U l i d
- F e F e L v r t A l w o a , .
1 1 a o o e V L D l l
n e
G o .
T b p N 7 l r m E 1 euo N - sTC O 1 B 6 e $
PI 0 - 1 i rt -
t 3 9 - D os o 1 0 1 t i A
C 2 0 " as O - 3 B rs M E 1 " cA H
E .
T 3 0 6 9 2 S 1 3 2 -
Y S
4 ; ,1
4 PILGRIM NUCLEAR POWER STATION
SUMMARY
OF OPERATIONS FOR APRIL, 1981 On April 1,1981, PNPS was operating at 100% reactor power. With minor power reductions for condenser delta tegerature, the unit operated at 100% until April 4, when power was reduced to 50% for a condenser backwash.
On April 6, while operating at 100%, a unit trip occurred while investigating problems with moisture separator level controls. High level in "C" moisture separator resulter'. in a turbine trip which scrammad the reactor. The unit was taken criticci and returned to 100% at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on April 7.
On April 9, the power was reduced to 75% to allow the 3rd point heater on 'B' feedwater train to be removed from service to repair a crack in the expansion joint. The unit was returned to 100% peyer on April 10 and continued at this level, with minor reductions for eta. denser delta temperature, until April 18.
Da April 18 the unit was reduced to 50% power to mechanically clean the con-de:nser tubes and backwash.
The unit was returned to 100% power on April 20 and continued at this power until the end of the month with minor reductions for condenser delta temperature.
SAFETY / RELIEF VALVE CHALLENGES MR
- APRIL, 1981 Report Requirement: TMI T.A.P. II.K.3.3 No challenges for the month.
m , _ . - -_ .% ._ _ . . . -
..c .
RN ING IN70pl!ATION
~he following refueling infor=ation is included in the P.cn hly Repor: as requested in a letter :o Mr. C. C. Andegnini da:ed Januan IS,1973:
For your con tenience, :he infor:a:1on supplied has been enu=ars:e.d so tha:
each nu=ber cc responds to equivalen: notation u:111:ed in :he request.
- 1. *he na=a of this facill:7 is ?ilgri:: Nuclea: ?ower Sca:1ce, Occke:
Nu=ber 50-29 3.
- 2. Scheduled date for nex: Refueling Shu:down: Sep:e=ber. 1981
- 3. Scheduled date for restar: following refueling:
4.
- 3. Due :o their s1=ilarin, recuests i, 5, & 6 are responded to collec:17ely:
- 6. The fuel, which had been loaded during the 1980 scheduled refueling ou: age, is of the new ?SxfR design, consis:ing of appro:c1=a:ely 64
?SLR3232 assecblies and 120 ?SD?3265 asse=blies.
- 7. (a) ~here are 580 fuel assemblies in the core.
(b) ~here are 764 fuel asse=clies in :he spent fuel pool. .
S. (a) he sta:1on is presently licensed :o s: ore 2220 spen: fuel assecolies.
~he ac:ual spen fuel s:orage capacin is 1770 fuel assa:blies a:
presen:.
(b) ~n e planned spen: fuel s:orage capacin is 2320 fual assemblies.
- 9. %'i:h presen: spen: fuel in s:orage, che spen: fuel pool now has :he l
apacip :o acco odate an addi:ional 1006 fuel assenblies.
i 1