O OPERATING OATA REPORT 50-293 DOCKET NO.
.DATE ud/ u/ si COMPLETED BY G G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
April. 1981 l
- 2. Reporting Period:
1998.
- 3. LicensedThermalPower(MWt):
678.
I
- 4. Nameplate Rating (Gross MWe):
655.
- 5. Design Electrical Rating (Net MWe):
90.
- 6. Maximum Dependable Capacity (Gross MWe):
670.
- 7. Maximum Dependable Capacity (Net MWe):
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since List Report. Give Reasons:
None
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.-to.Date Cumulative i
719.0 2879.0 73559.0 l
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 710.2 2603.6 52788.2 0.0 0.0 0.0
- 13. React-Reserve Shutdown Hours
- 14. Hours Generator On-Line 706.0 2574.6 51081.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1316736.0 4590528.0 86879904.0 17 Gross Electrical Energy Generated (Mk H) 453930.O 1551960.0 28881324.0 IS. Net Electrical Eneqy Generated (MWH) 436753.0 1492720.0 27743327.0 98.2 89.4 69.4
- 19. Unit Service Factor 98.2 69.4 o9.4
- 20. Unit Availability Factor 90.7 77.4 jo.3
- 21. Unit Capacity Factor (Using MDC Net) 92./
/9.2 a/.o
- 22. Unit Capacity Factor (Using DER Net, 1.8 1.6 10.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Refuel Outage Commencing Septecher 1981 n
Operadng
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Umts in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8105200 @
N/77) l
AVERAGE DAILY UNITFOWER LEVEL 50-293 DOCXET NO.
Pilgrim i WT DATE 5/12/81 COMPLETED BY G.G. Whitney 6 17-746-7900 TELEPHONE April, 1981 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POV R LEVEL (Mwe-Net)
(g w g.,3 668.
- 547, 1
63 3.
294.
IS 656.
307.
3 39 655.
599.
4 2.
462.
670.
21 351.
668.
6 487.
668.
23 667.
660.
3 24 591.
667.
9 25 637.
636.
10
- s 665.
661.
662.
656.
g3 3
662.
649.
g3 658.
644.
g4 30 656.
o 15 3g 655.
16 INSTRUCTIONS On th:s format.!ist the. average dany unit power level in MWe. Net for each day in the repcmng month. Campute to the nearest wncie megawatt.
l (O
l f
l 1
50-293 IM)CKEI NO.
IINil SilllllM)WNS ANI) POWER REDilCIIONS UNII NAME Pilgrim I DAIE _5U2L81 CoMrs.E IED liv _n.__G.__Witit.ncy.
RI I'OR I' MON ill APRIL, 1981 IEl.EriloNE _(il7-746-7900 l
"L jE 3
. E' IIrensee Eg
~L Cause & Cenicctive 8
Action to No.
D.it e g-3g s
,yu Event gg gU I-y.3 cE 5@C Iteport if
'd U Paesent Iletureceire o
l U
b 6
81/04/05 S
0.0 B
5 N.A.
IIC llTEXCll Main Condenser Backwash 4
)
7 81/04/06 F
13.0 A
3 N.A.
Z 7.
ZZZZZZ Unit trip due to high level in
'C' innisture separator.
l J
B 81/04/18 S
0.0 B
5 N.A.
IIC IITEXCil Repnirs inade to 'B' 3rd point henter f
expansion joint I
i i
i 4
l 1
i 4
i 1
j i
2 3
4 F: l'orteil Reason:
Methoil:
Enhihlt (; - Instnitilims 4
1 S: Sc hriinics A Eqtilyment Falluse(Explain) 1 -Manual for Picparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for I.icensce C Ilefueling 3 Automatic Scram.
Event Repost (l.1:ltil'ile tNilRl(;.
D Regulatory Restriction 4.Othes (Explain) 01611 E Operator Tralning A IIrense I:xamination i
F.Administ atIve 5
l G Operational fision (1.xplain) 13hibit 1 - Same Somre I'8/if )
II Ollies (Explain)
L DE TA I
CO S
D S
A E
C
!!OE 1t I
E e
ER t
r V
s e
T 1
y k
TN S
a CE t
e EV n
s r
RE i
e B
RR T
OP s
d C
e g
e O
l n
r T
c i
e s
m d
u i
r M
T O
E C
N AN E
E T
C s
N N
e A
b d
I A
l d
u e
l t
E e
T n
t T
k r
e D
N c
n i
t E
I a
a a
h e
T A
p e
p g
A.
I e
l e
i I
R C
R T
l.
IR YTE F
E gg d
S nn e
n l
l ii gs e
A kd ge k
~
C R
~
cn ub o
0
~
ai l u r
1 PB PT B
e A
t
~
i l
k a
c n
o i
!O l
m I
p r
r T
o e
e C
n w
t T
N I
o n
U l
i d
F e
F e
L v
r t
A l
w o
a a
o o
e 1
1 V
L D
l l
ne G o.
T b p N
7 l r m E
1 euo N
sTC O
1 B
6 e
0 1
i rt PI 3
9 D os to 1
0 1
t i A
C 2
0
" as O
3 B rs M
E 1
" cA H
E T
3 0
6 9
2 S
1 3
2 Y
S 4
,1 ij:
14 J
l
PILGRIM NUCLEAR POWER STATION 4
SUMMARY
OF OPERATIONS FOR APRIL, 1981 On April 1,1981, PNPS was operating at 100% reactor power. With minor power reductions for condenser delta tegerature, the unit operated at 100% until April 4, when power was reduced to 50% for a condenser backwash.
On April 6, while operating at 100%, a unit trip occurred while investigating problems with moisture separator level controls. High level in "C" moisture separator resulter'. in a turbine trip which scrammad the reactor. The unit was taken criticci and returned to 100% at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on April 7.
On April 9, the power was reduced to 75% to allow the 3rd point heater on 'B' feedwater train to be removed from service to repair a crack in the expansion joint.
The unit was returned to 100% peyer on April 10 and continued at this level, with minor reductions for eta. denser delta temperature, until April 18.
Da April 18 the unit was reduced to 50% power to mechanically clean the con-de:nser tubes and backwash.
The unit was returned to 100% power on April 20 and continued at this power until the end of the month with minor reductions for condenser delta temperature.
SAFETY / RELIEF VALVE CHALLENGES MR APRIL, 1981 Report Requirement: TMI T.A.P. II.K.3.3 No challenges for the month.
m
..c RN ING IN70pl!ATION
~he following refueling infor=ation is included in the P.cn hly Repor: as requested in a letter :o Mr. C. C. Andegnini da:ed Januan IS,1973:
For your con tenience, :he infor:a:1on supplied has been enu=ars:e.d so tha:
each nu=ber cc responds to equivalen: notation u:111:ed in :he request.
1.
- he na=a of this facill:7 is ?ilgri:: Nuclea: ?ower Sca:1ce, Occke:
Nu=ber 50-29 3.
2.
Scheduled date for nex: Refueling Shu:down:
Sep:e=ber. 1981 3.
Scheduled date for restar: following refueling:
4.
3.
Due :o their s1=ilarin, recuests i, 5, & 6 are responded to collec:17ely:
6.
The fuel, which had been loaded during the 1980 scheduled refueling is of the new ?SxfR design, consis:ing of appro:c1=a:ely 64 ou: age,
?SLR3232 assecblies and 120 ?SD?3265 asse=blies.
7.
(a)
~here are 580 fuel assemblies in the core.
(b) ~here are 764 fuel asse=clies in :he spent fuel pool.
S.
(a) he sta:1on is presently licensed :o s: ore 2220 spen: fuel assecolies.
~he ac:ual spen fuel s:orage capacin is 1770 fuel assa:blies a:
presen:.
~ e planned spen: fuel s:orage capacin is 2320 fual assemblies.
(b) n 9.
%'i:h presen: spen: fuel in s:orage, che spen: fuel pool now has :he apacip :o acco odate an addi:ional 1006 fuel assenblies.