{{#Wiki_filter:FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
{{#Wiki_filter:FACILITY NAME: Turkey Point             Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files: Submitted By: tjw# Verified By '11oJ J' FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files: Submitted By idJm Verified By '1! oJ J'
Submitted By By: Ul~ tjw#
idJm     ~I      Verified By     !oJ J' ~
                                            ''111oJ


* *
Appendix C                                  Job Performance Measure                                  Form ES-C-1 Worksheet
* Appendix C Facility:
* Facility:               Turkey Point                      Task No:            24094001501 Place Unit 4 Post Accident Task Title:               Hydrogen Monitor In Service        JPM No:              NRC-25-IP-JPM-1 KIA  
Task Title: KIA  


==Reference:==
==Reference:==
 
028 A2.02 {3.5/3.9}
Examinee:
Examinee:                                                    NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                          Date:
Method of testing: Job Performance Measure Worksheet Turkey Point Task No: Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No: 028 A2.02 {3.5/3.9}
Method of testing:        In Plant Simulated Performance           X
NRC Examiner:
                                -------------------
Date: In Plant Simulated Performance X -------------------
                                ~-------------
Classroom Simulator
Classroom - - - - - - - -                   Simulator - - - - - - -                     Plant X- - - - - - -
---------------Read to the examinee:
                                                                                                  -----------
Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X --------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. Unit 4 has experienced a valid Safety Injection signal. 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
Task Standard:
* Task Standard:
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems." Required Materials:
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."
: 1. Two way radio (optional communications device) 2. 4-0P-094, "Containment Post-Accident Monitoring Systems" 3. "A" key 4. Valve Operating Handle (located in Aux Bldg EIW hallway) General  
Required Materials:
: 1. Two way radio (optional communications device)
: 2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
: 3. "A" key
: 4. Valve Operating Handle (located in Aux Bldg EIW hallway)
General  


==References:==
==References:==
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C * *
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems"
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KIA


==Reference:==
Appendix C                                    Page 2 of 12                              Form ES-C-1 Initiating Cue:
: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in
* accordance with 4-0P-094, Section 7.1.
Time Critical Task: YES (30 min)
Validation Time:    15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!
*
* NUREG 1021 Rev 9 Appendix C


Examinee:
I Appendix C                              Page 3 of 12                Form ES-C-1 I SIMULATOR SETUP Reset to IC #
Facility Evaluator:
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
Method of testing: Job Performance Measure Worksheet Turkey Point Task No: Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No: 028 A2.02 {3.5/3.9}
*
NRC Examiner:
* NUREG 1021 Rev 9 Appendix C
Date: In Plant Simulated Performance X
Classroom Simulator
-------Read to the examinee:
Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X -----------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. Unit 4 has experienced a valid Safety Injection signal. 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
Task Standard:
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems." Required Materials:
: 1. Two way radio (optional communications device) 2. 4-0P-094, "Containment Post-Accident Monitoring Systems" 3. "A" key 4. Valve Operating Handle (located in Aux Bldg EIW hallway) General


==References:==
Appendix C                                 Page 4 of 12                             Form ES-C-1 Denote critical steps with a check mark( I)
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C 
* Start Time Obtain Required Materials STEP    1                                                                          - - SAT
* *
                                                                                      - - UNSAT
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1. Time Critical Task: YES (30 min) Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME! NUREG 1021 Rev 9 Appendix C * *
: 1. Obtains a copy of 4-0P-094, Post Accident Monitoring System.
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1. Time Critical Task: YES (30 min) Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME! NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
: 2. Verifies latest revision and no outstanding OTSCs.
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A *
Standard:
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
: 3. Begins review of section: 7.1 Post Accident H2 Monitor Startup.
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A *
Evaluator may choose to require the candidate to obtain procedure section.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
Cue When the correct procedure is identified & verified, provide the operator with the procedure.
* Start Time STEP 1 Obtain Required Materials SAT --UNSAT --1. Obtains a copy of 4-0P-094, Post Accident Monitoring System. Standard:
: 2. Verifies latest revision and no outstanding OTSCs. 3. Begins review of section: 7.1 Post Accident H2 Monitor Startup. Evaluator may choose to require the candidate to obtain procedure section. Cue When the correct procedure is identified  
& verified, provide the operator with the procedure.
Comment NOTE
Comment NOTE
* Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE: signal.
* Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:   signal.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
* NUREG 1021 Rev 9 Appendix C
* Start Time STEP 1 Obtain Required Materials SAT --UNSAT --1. Obtains a copy of 4-0P-094, Post Accident Monitoring System. Standard:
 
: 2. Verifies latest revision and no outstanding OTSCs. 3. Begins review of section: 7.1 Post Accident H2 Monitor Startup. Evaluator may choose to require the candidate to obtain procedure section. Cue When the correct procedure is identified
I Appendix C                               Page 5 of 12                                   Form ES-C-1 I NOTE
& verified, provide the operator with the procedure.
*                                                                                             - - SAT STEP     2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.
Comment NOTE
7.1.1 Initial Conditions                                                     - - UNSAT
* Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE: signal.
_ _ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NOTE
: 1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.
* STEP 2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal. SAT --7.1.1 Initial Conditions UNSAT --__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
Standard: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
: 1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal. Standard:
Cue                                     N/A Comment NOTE:
: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
*
Cue N/A Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NOTE
 
* STEP 2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal. SAT --7.1.1 Initial Conditions UNSAT --__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
Appendix C                                     Page 6 of 12                               Form ES-C-1 7.1.2 Procedure Steps STEP     3                                                                                 - - SAT
: 1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal. Standard:
* NOTES
: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
          ..j
Cue N/A Comment NOTE: *
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the   - - UNSAT floor at the junction of the north/south hallway.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3 NOTES SAT --..j UNSAT
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the --* floor at the junction of the north/south hallway.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur. 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns) __ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns) __ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns) d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns) __ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns) Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack. Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise.
Then simulates opening the following valves by engaging the T -handle tool to the valve operator
* and turning the operator the specified number of turns counter Standard:
clockwise:
: a. PASS-4-008 (2 turns). b. PAHM-4-001A (3 turns). c. PAHM-4-001 B (6 turns). d. PAHM-4-002A (6 turns). e. PAHM-4-002B (6 turns). For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed." Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns". Comment NOTES
* Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway. NOTE:
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3 NOTES SAT --..j UNSAT
: 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the --* floor at the junction of the north/south hallway.
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur. 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns) __ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns) __ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns) d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns) __ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns) Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack. Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise.
_ _ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)
Then simulates opening the following valves by engaging the T -handle tool to the valve operator
: d. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)
* and turning the operator the specified number of turns counter Standard:
__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)
clockwise:
Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.
: a. PASS-4-008 (2 turns). b. PAHM-4-001A (3 turns). c. PAHM-4-001 B (6 turns). d. PAHM-4-002A (6 turns). e. PAHM-4-002B (6 turns). For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed." Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns". Comment NOTES
Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the
* Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway. NOTE:
* following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard: clockwise:
: a. PASS-4-008 (2 turns).
: b. PAHM-4-001A (3 turns).
: c. PAHM-4-001 B (6 turns).
: d. PAHM-4-002A (6 turns).
: e. PAHM-4-002B (6 turns).
For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."
Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".
Comment NOTES
* Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are
* located in the floor at the junction of the north/south hallway.
NOTE:
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd) STEP 4 SAT * --..j __ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)  
NUREG 1021 Rev 9 Appendix C
--Removes lock from HV-4-3 remote operator handwheel (South end of Standard:
 
Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
I Appendix C                                 Page 7 of 12                           Form ES-C-1 I 7.1.2 (Cont'd)
Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open. Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .
STEP   4                                                                         - - SAT
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd) STEP 4 SAT * --..j __ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)
*         ..j _ _ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside the Unit 4 Pipe and Valve Room. (An A key is required for this lock.) --
--Removes lock from HV-4-3 remote operator handwheel (South end of Standard:
UNSAT Removes lock from HV-4-3 remote operator handwheel (South end of Standard: Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
Cue     When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.
Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open. Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .
Comment NOTE:   Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I
* NUREG 1021 Rev 9 Appendix C
* STEP 6 Request the Unit 4 RO perform step 7.1.2.4 SAT --UNSAT --Standard:
 
Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion) 2. As Unit 4 RO , tell candidate step 7.1.2.4 has been completed.
I Appendix C                               Page 9 of 12                             Form ES-C-1 I
Direct candidate to continue with step 7.1.2.5. Comment NOTE: Candidate may attempt to use a communication device or simulate communication directly to the evaluator.  
* Request the Unit 4 RO perform step 7.1.2.4 STEP    6                                                                        --
SAT
                                                                                      --
UNSAT Standard: Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094
: 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of 4-0P-094 (Control Room Portion)
Cue
: 2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.
Direct candidate to continue with step 7.1.2.5.
Comment NOTE:   Candidate may attempt to use a communication device or simulate communication directly to the evaluator.
*
*
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I
* NUREG 1021 Rev 9 Appendix C
* STEP 6 Request the Unit 4 RO perform step 7.1.2.4 SAT --UNSAT --Standard:
 
Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion) 2. As Unit 4 RO , tell candidate step 7.1.2.4 has been completed.
Appendix C                                 Page 10 of 12                         Form ES-C-1
Direct candidate to continue with step 7.1.2.5. Comment NOTE: Candidate may attempt to use a communication device or simulate communication directly to the evaluator.
__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP     7                                                                       - - SAT
*
* cap AND close WHT Waste Transfer Pump Discharge to Rad Waste
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 __ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7 cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT --* ..J Building, MPAS-001,(1I4 tum) . UNSAT OR --__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731. 1. Attempts to remove the floor cap for MPAS-001.
          ..J Building, MPAS-001,(1I4 tum) .
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:
OR                               - - UNSAT
leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.
: 1. Attempts to remove the floor cap for MPAS-001.
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:     leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue     2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
Comment
Comment
* NOTE:
* NOTE:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 __ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7 cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT --* ..J Building, MPAS-001,(1I4 tum) . UNSAT OR --__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731. 1. Attempts to remove the floor cap for MPAS-001.
* NUREG 1021 Rev 9 Appendix C
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:
 
leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
I Appendix C                                 Page 11 of 12                                   Form ES-C-1 NOTE STEP     8   The following valves are located on the Auxiliary Building roof near the Unit 4 - - SAT
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
*           ..j containment wall.
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
: 6. Perfonn the following:
Comment
__ a. Unlock and open Isol Vlv from WHT Pp Back, MPAS-4-004 (an A key is required).
* NOTE:
                                                                                                - - UNSAT
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8 The following valves are located on the Auxiliary Building roof near the Unit 4 SAT --* ..j containment wall. UNSAT 6. Perfonn the following:  
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.
--__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).
Standard: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall. Standard:
(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve. (Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
When candidate identifies handwheel has been rotated fully Cue     counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:     Although not specified in the procedure, candidate may reinstall lock on valve.
When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. *
*
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8 The following valves are located on the Auxiliary Building roof near the Unit 4 SAT --* ..j containment wall. UNSAT 6. Perfonn the following:
* NUREG 1021 Rev 9 Appendix C
--__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).
 
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall. Standard:
Appendix C                                 Page 12 of 12                       Form ES-C-1
: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve. (Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
* STEP     9 V
When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. *
_ _ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1
                                                                                  - - SAT
* STEP 9 __ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
                                                                                  - - UNSAT Standard: Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
SAT --V UNSAT --Standard:
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue       has stopped and stem is inserted.
Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
* Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue: will be performed by another operator.
* Termination Cue:
Stop Time ----* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1
Operator returns JPM briefing sheet when informed step 7.1.2.7 will be performed by another operator.
* STEP 9 __ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
Stop Time STOP
SAT --V UNSAT --Standard:
                                                                                  ----
Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
* NUREG 1021 Rev 9 Appendix C
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
 
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
I Appendix C                                   Page 13 of 12               Form ES-C-1 I Verification of Completion
* Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue: will be performed by another operator.
* Job Performance Measure No.
Stop Time ----* NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion
Examinee's Name:
* Job Performance Measure No. NRC-25-IP-JPM-1 Examinee's Name: Examiner's Name: Date Performed:
NRC-25-IP-JPM-1 Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:  
Question:
.-----------------------
.-----------------------
Response:
 
Result: Satisfactory/Unsatisfactory
===Response===
* Examiner's signature and date: ________________
Result:   Satisfactory/Unsatisfactory
_ NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
* Job Performance Measure No. NRC-25-IP-JPM-1 Examinee's Name: Examiner's Name: Date Performed:
NUREG 1021 Rev 9 Appendix C
Facility Evaluator:
 
Number of Attempts:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Time to Complete:
* When you complete the task successfully, the objective for this job performance measure will be satisfied.
Question Documentation:
Question:
.-----------------------
Response:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: ________________
_ NUREG 1021 Rev 9 Appendix C
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 4 has experienced a valid Safety Injection signal. 2. All applicable procedure prerequisites are satisfied.
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 2. All applicable procedure prerequisites are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.
: 3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.
INITIA TlNG CUE: You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1. This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task. HAND THIS PAPER BACK TO YOUR EVALUATOR
INITIA TlNG CUE:
You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.
This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.
HAND THIS PAPER BACK TO YOUR EVALUATOR
* WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 4 has experienced a valid Safety Injection signal. 2. All applicable procedure prerequisites are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.
INITIA TlNG CUE: You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1. This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task. HAND THIS PAPER BACK TO YOUR EVALUATOR
* WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C 


* *
Appendix C                                    Job Performance Measure                                  Form ES-C-1 Worksheet
* Appendix C Facility:
* Facility:                Turkey Point                        Task No:
Task Title: KIA  
TRIP and RESET AFW Pump Task Title:               "A" T&T Valve, MOV-6459A            JPM No:            NRC-25-IP-JPM-J 061-K4.07 Turbine trip, including overspeed 3. 1/3.3 KIA  


==Reference:==
==Reference:==


Examinee:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
                          -----------------
Method of testing: Job Performance Measure Worksheet Turkey Point Task No: TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No: 061-K4.07 Turbine trip, including overspeed
Facility Evaluator:                                          Date:
: 3. 1/3.3 -----------------
                          --------------------
--------------------
Method of testing:
NRC Examiner:
Simulated Performance          X                            Actual Performance
Date: Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X Actual Performance
                                ~--------------                                     ---------------------
---------------------
Classroom - - - - - - - -                     Simulator                                 Plant    X
Classroom  
                                                              -------                             --'---------
--------Simulator  
-------Plant X --'---------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO. 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System. Task Standard:
* Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.
Task Standard:
* AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
* AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
* AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8. Required Materials:
* AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
Required Materials:
* Applicable Personal Protective Equipment
* Applicable Personal Protective Equipment
* 3-0P-075, Auxiliary Feedwater System General  
* 3-0P-075, Auxiliary Feedwater System General  


==References:==
==References:==
* 3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C *  
* 3-0P-075, Auxiliary Feedwater System
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                    Page 2 of 12                              Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
* Time Critical Task: No Validation Time:    15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
*
*
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KIA


==Reference:==
                                                --------------------------
I Appendix C                              Page 3 of 12                Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
*
* NUREG 1021 Rev 9 Appendix C


Examinee:
Appendix C                                Page 4 of 12                            Form ES-C-1 Denote critical steps with a check mark( I)
Facility Evaluator:
* Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
Method of testing: Job Performance Measure Worksheet Turkey Point Task No: TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No: 061-K4.07 Turbine trip, including overspeed
STEP      1                                                                       - - SAT
: 3. 1/3.3 -----------------
          ..J
--------------------
                                                                                    - - UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:  Valve, MOV-6459A Cue    Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
NRC Examiner:
Comment NOTE:
Date: Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X Actual Performance
*
---------------------
* NUREG 1021 Rev 9 Appendix C
Classroom
--------Simulator
-------Plant X --'---------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO. 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System. Task Standard:
* AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
* AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8. Required Materials:
* Applicable Personal Protective Equipment
* 3-0P-075, Auxiliary Feedwater System General


==References:==
I Appendix C                               Page 5 of 12                           Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
* 3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C 
* STEP    2
* *
                                                                                    - - SAT
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
                                                                                    --
Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C *
UNSAT then verify the following:
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed.
Standard:
: 2. Control Room mechanical trip light is ON.
: 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.
Cue        2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.
Comment NOTE:   Evaluator may act as Control Room Operator to simulate communications.
*
*
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
* NUREG 1021 Rev 9 Appendix C
Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C
 
--------------------------
Appendix C                                 Page 6 of 12                           Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
*                                                                                     - - SAT STEP    3
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A *
                                                                                      - - UNSAT Local Test Panel mechanical trip light is On.
* NUREG 1021 Rev 9 Appendix C --------------------------
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
* Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
STEP 1 SAT --..J UNSAT --7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:
Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
* Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
STEP 1 SAT --..J UNSAT --7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:
Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
* STEP 2 SAT --UNSAT --then verify the following:
Standard:
Standard:
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed. 2. Control Room mechanical trip light is ON. 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED. Cue 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED. Comment NOTE: Evaluator may act as Control Room Operator to simulate communications.  
Cue    When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.
Comment NOTE:   Local Test Panel Mechanical Trip Light is AMBER.
*
*
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
* NUREG 1021 Rev 9 Appendix C
* STEP 2 SAT --UNSAT --then verify the following:
 
I Appendix C                                   Page 7 of 12                               Form ES-C-1 Reset AFW Pump A T&T Valve, MOV-6459A
* STEP     4                                                                                --
SAT
            ..j
                                                                                              --
UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed tappet shaft.
Standard:
Standard:
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed. 2. Control Room mechanical trip light is ON. 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED. Cue 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED. Comment NOTE: Evaluator may act as Control Room Operator to simulate communications.
7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.
When NPO describes operating mechanical trip rod tell operator that the Cue    mechanical trip rod will travel no further and does not snap back to the tripped position.
Comment
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
* NUREG 1021 Rev 9 Appendix C
* STEP 3 SAT --UNSAT --Standard:
 
Local Test Panel mechanical trip light is On. Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on. Comment NOTE: Local Test Panel Mechanical Trip Light is AMBER. *
Appendix C                                     Page 8 of 12                             Form ES-C-1 LEVER_
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
HEAD LEVER
* STEP 3 SAT --UNSAT --Standard:
*
Local Test Panel mechanical trip light is On. Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on. Comment NOTE: Local Test Panel Mechanical Trip Light is AMBER. *
                                                                              ]APPET NUT SCRIBE MARK HEAD BRACKET NOTE:     GUIDE SPRING*
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1
SPRING -
* STEP 4 Reset AFW Pump A T&T Valve, MOV-6459A SAT --..j UNSAT --CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:
TAPPET ASSEMBL Y.-   Y_- ... --
tappet shaft. 7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch. When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.
                                          -----
Comment *
* SCRlB" MA.~K
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1
                            " f----.>,.,..""'-:
* STEP 4 Reset AFW Pump A T&T Valve, MOV-6459A SAT --..j UNSAT --CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:
TRIP HEAD LEVER                     TRIP HEAD LEVER INCORRECT CORRECT POSITION                      POSITION ( HELD BY TAPPET)
tappet shaft. 7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch. When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.
* NUREG 1021 Rev 9 Appendix C
Comment *
 
* NUREG 1021 Rev 9 Appendix C Appendix C
I Appendix C                                 Page 9 of 12                               Form ES-C-1 I Verify the limit switch arm roller is properly positioned.
* NOTE: *
* STEP    5                                                                                  SAT
* Page 8 of 12 HEAD LEVER_ SCRIBE MARK GUIDE SPRING -TAPPET ASSEMBL Y_------TRIP HEAD LEVER CORRECT POSITION ]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET) Form ES-C-1 NUREG 1021 Rev 9 Appendix C Appendix C
                                                                                          --
* NOTE: *
                                                                                          - - UNSAT 7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the Standard: scribe mark.
* Page 8 of 12 HEAD LEVER SCRIBE MARK GUIDE SPRING* TAPPET ASSEMBL Y.-... --SCRlB" " f----.>,.,..""'-:
Cue    When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
TRIP HEAD LEVER CORRECT POSITION ]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET) Form ES-C-1 NUREG 1021 Rev 9 Appendix C
Comment NOTE:
* *
* Terminating Cue:
* I Appendix C STEP 5 Standard:
Cue Comment NOTE: Terminating Cue: Page 9 of 12 Verify the limit switch arm roller is properly positioned.
7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark. When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
The task is complete when the Examinee returns the cue sheet to the examiner.
The task is complete when the Examinee returns the cue sheet to the examiner.
Stop Time Form ES-C-1 I SAT --UNSAT --STOP ----NUREG 1021 Rev 9 Appendix C * *
Stop Time STOP
* I Appendix C STEP 5 Standard:
                                                                                          ----
Cue Comment NOTE: Terminating Cue: Page 9 of 12 Verify the limit switch arm roller is properly positioned.
* NUREG 1021 Rev 9 Appendix C
7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark. When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
 
The task is complete when the Examinee returns the cue sheet to the examiner.
Appendix C                                   Page 10 of 12               Form ES-C-1 Verification of Completion
Stop Time Form ES-C-1 I SAT --UNSAT --STOP ----NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion
* Job Performance Measure No.
* Job Performance Measure No. NRC-25-1 P-JPM-J Examinee's Name: Examiner'S Name: Date Performed:
Examinee's Name:
NRC-25-1 P-JPM-J Examiner'S Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:  
Question:
.-----------------------
.-----------------------
Response:
 
Result: Satisfactory/Unsatisfactory
===Response===
* Examiner's signature and date: _________________
Result:   Satisfactory/Unsatisfactory
_ NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
* Job Performance Measure No. NRC-25-1 P-JPM-J Examinee's Name: Examiner'S Name: Date Performed: Facility Evaluator:
_____
Number of Attempts:
NUREG 1021 Rev 9 Appendix C
Time to Complete:
 
Question Documentation:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Question:
When you complete the task successfully, the objective for this job performance measure will be satisfied.
.-----------------------
* INITIAL CONDITIONS:
Response:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: _________________
_ NUREG 1021 Rev 9 Appendix C
* *
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO. 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System. INITIA TlNG CUE: You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C * *
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIA TlNG CUE:
INITIAL CONDITIONS:
You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
Acknowledge to the examiner when you are ready to begin.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO. 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System. INITIA TlNG CUE: You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C
*
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KJA  
 
Appendix C                                  Job Performance Measure                                  Form ES-C-1 Worksheet
* Facility:
Task Title:
KJA  


==Reference:==
==Reference:==


Examinee:
Turke}" Point Transfer Vital Loads Between Inverters 062-A4.04 {2.6/2.71 Task No:
Facility Evaluator:
Job Performance Measure No:          NRC-25-IP-JPM-K Examinee:                                                    NRC Examiner:
Method of testing: Job Performance Measure Worksheet Turke}" Point Task No: Transfer Vital Loads Between Job Performance Inverters Measure No: 062-A4.04
Facility Evaluator:                                          Date:
{2.6/2.71 NRC Examiner:
Method of testing:        In Plant Simulated Performance           X                           Actual Performance
Date: In Plant Simulated Performance X Actual Performance Form ES-C-1 NRC-25-IP-JPM-K
                                -------------------                                 ------------------
-------------------
                                                                                    ----------------------
----------------------
Classroom -    -------------
Classroom  
                  --------                    Simulator --- ----- -- -----  ---          Plant X- - - - - - - -
-------------
                                                                                                  --'--'----------
Simulator  
----------
Plant X --'--'----------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
* Task Standard:
* Task Standard:
: 1. Transfer load to the correct inverter.
: 1. Transfer load to the correct inverter.
Required Materials:
Required Materials:
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08) General  
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
General  


==References:==
==References:==
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
* Appendix C Facility:
Task Title: KJA


==Reference:==
Appendix C                                    Page 2 of 17                                Form ES-C-1 Initiating Cue:
* In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
Time Critical Task: No Validation Time:      18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
*
* NUREG 1021 Rev 9 Appendix C
 
I Appendix C                              Page 3 of 17                Form ES-C-1 I SIMULATOR SETUP
* Reset to IC #
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
*
* NUREG 1021 Rev 9 Appendix C


Examinee:
Appendix C                                      Page 4 of 17                                Form ES-C-1 INSTRUCTIONS TO OPERA TOR
Facility Evaluator:
* INITIAL CONDITIONS:
Method of testing: Job Performance Measure Worksheet Turke}" Point Task No: Transfer Vital Loads Between Job Performance Inverters Measure No: 062-A4.04
HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!
{2.6/2.71 NRC Examiner:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
Date: In Plant Simulated Performance X Actual Performance Form ES-C-1 NRC-25-IP-JPM-K
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
-------------------
INITIA TlNG CUE:
------------------
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.
Classroom Simulator Plant X --------------------------Read to the examinee:
TERMINA TlON CUE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.
Initial Conditions:
Do you have any questions?
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
You may begin.
* Task Standard:
* NOTES TO EVALUATOR:
: 1. Transfer load to the correct inverter.
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
Required Materials:
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08) General
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.
* NUREG 1021 Rev 9 Appendix C


==References:==
I Appendix C                                     Page 5 of 17                                 Form ES-C-1 Denote critical steps with a check mark (I)
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
* Start Time 7.0 INFREQUENT OPERATIONS STEP    1        7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal                   SAT Transfer)
* NUREG 1021 Rev 9 Appendix C 
UNSAT INIT      Transfer from Inverter- - - - -
* *
Date/Time Started: ------~--------
* Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1. Time Critical Task: No Validation Time: 18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C * *
                                                  -----------~------
* Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1. Time Critical Task: No Validation Time: 18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C 
                                                                    /
* *
* I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC # N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C * *
* I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC # N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C 
* *
* Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME! INITIAL CONDITIONS:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
INITIA TlNG CUE: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.
TERMINA TlON CUE: When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me. Do you have any questions?
You may begin. NOTES TO EVALUATOR:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task. NUREG 1021 Rev 9 Appendix C * *
* Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME! INITIAL CONDITIONS:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
INITIA TlNG CUE: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.
TERMINA TlON CUE: When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me. Do you have any questions?
You may begin. NOTES TO EVALUATOR:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task. NUREG 1021 Rev 9 Appendix C 
* *
* I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I) STEP 1 STANDARD:
CUES: Comment NOTE: Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)
IN IT Transfer from Inverter -----Date/Time Started: /
7.1.1 Initial Conditions
7.1.1 Initial Conditions
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM. 2Verifies procedure is current with no outstanding OTSCs. 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC STANDARD:        SYSTEM.
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been met. 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room. Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
2Verifies procedure is current with no outstanding OTSCs.
NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
: 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
SAT UNSAT NUREG 1021 Rev 9 Appendix C * *
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been
* I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I) STEP 1 STANDARD:
* CUES:
CUES: Comment NOTE: Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)
met.
IN IT Transfer from Inverter -----Date/Time Started: /
: 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.
7.1.1 Initial Conditions
Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
Comment NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or NOTE:        Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
* NUREG 1021 Rev 9 Appendix C
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM. 2Verifies procedure is current with no outstanding OTSCs. 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
 
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been met. 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room. Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
Appendix C                                   Page 6 of 17                                       Form ES-C-1 (procedure step 7.1.2.1)
NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
*                                                                                                 - - SAT STEP   2
SAT UNSAT NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)
        ~  __ 1. Place the Alternate Source Transfer Switch to the position indicated in                                                                         - - UNSAT Table 2, TABLE 2                                     I I
* STEP 2 SAT --__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in --Table 2, TABLE 2 I I Wbon for Pia,.. ALITR"AIT
Pia,..
[\'SERYICE SOCRCE T() Position (LOCKED)
Wbon          for ALITR"AIT
SPARE :,\OR\lU TRA.'\SFER D.I:RTER J:\,I:RTER SWITCH AS (3Y04) 3A(3Y01) .\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04) .JB (4Y02) 4Y028 BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\ 3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS 1. Selects correct switch (4Y02B) and unlocks operating handle. STANDARD:
                ~ub')tituting [\'SERYICE SOCRCE               T() Position (LOCKED)       I~TI SPARE       :,\OR\lU TRA.'\SFER D.I:RTER     J:\,I:RTER SWITCH AS (3Y04)     3A(3Y01)   .\YOIB     BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041     4A(W01)     4YOIB     BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04)       3B13Y02)   3Y02B     BACKL? TO SPARE IXVERTER (W04) BS BS (W04)     .JB (4Y02)   4Y028     BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti)   3C (W05)   3YOSE     BACKe? TO SPARE I).YERTER (WOO) CS CS OY06)     4UW05)       4YOSE     BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\       3D (WOn     3Y07B     BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06)     4D(.JY07)   4Y07B     BACKe? TO SPARE lNYERTER 14Y(6) DS
: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock. 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES: handle, confirm these operations.
: 1. Selects correct switch (4Y02B) and unlocks operating handle.
* 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
STANDARD: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
*
: 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:       handle, confirm these operations.
: 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)
* NUREG 1021 Rev 9 Appendix C
* STEP 2 SAT --__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in --Table 2, TABLE 2 I I Wbon for Pia,.. ALITR"AIT
 
[\'SERYICE SOCRCE T() Position (LOCKED)
I Appendix C                               Page 7 of 17                                 Form ES-C-1 I DO NOT ALLOW THE BS INVERTER
SPARE :,\OR\lU TRA.'\SFER D.I:RTER J:\,I:RTER SWITCH AS (3Y04) 3A(3Y01) .\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04) .JB (4Y02) 4Y028 BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\ 3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS 1. Selects correct switch (4Y02B) and unlocks operating handle. STANDARD:
* STEP    3                                                                                  SAT
: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock. 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES: handle, confirm these operations.
                                                                                          -
* 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
4 DOOR TO BE OPENED                                                               UNSAT
Comment NOTE:
                                                                                          -
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3 DO NOT ALLOW THE BS INVERTER SAT -4 DOOR TO BE OPENED UNSAT * -(procedure step 7.1.2.2) 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
(procedure step 7.1.2.2)
STANDARD:
: 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE: tell the operator to simulate going inside the inverter to pOSition the switch. 2. When SW-2 operation properly described, confirm re-positioning.
Comment DO NOT ALLOW THE BS INVERTER
* NOTE: DOOR TO BE OPENED
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3 DO NOT ALLOW THE BS INVERTER SAT -4 DOOR TO BE OPENED UNSAT * -(procedure step 7.1.2.2) 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
STANDARD:
STANDARD:
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE: tell the operator to simulate going inside the inverter to pOSition the switch. 2. When SW-2 operation properly described, confirm re-positioning.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:       tell the operator to simulate going inside the inverter to pOSition the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment DO NOT ALLOW THE BS INVERTER
Comment DO NOT ALLOW THE BS INVERTER
* NOTE: DOOR TO BE OPENED
* NOTE:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)
DOOR TO BE OPENED
* STEP 4 SAT --3. Verify the following at the SPARE inverter:
* NUREG 1021 Rev 9 Appendix C
UNSAT __ a. The IN SYNC light is ON. --__ b. The AL T SOURCE A V AIL light is ON. __ c. The SYNC REFERENCE NORMAL light is ON. STANDARD:
 
Determines the B SPARE (4Y04) inverter lights listed above are all ON. CUE: When each light properly identified, state light is ON. Comment NOTE: *
Appendix C                               Page 8 of 17                           Form ES-C-1 (procedure step 7.1.2.3)
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)
* STEP   4                                                                         - - SAT
* STEP 4 SAT --3. Verify the following at the SPARE inverter:
: 3. Verify the following at the SPARE inverter:
UNSAT __ a. The IN SYNC light is ON. --__ b. The AL T SOURCE A V AIL light is ON. __ c. The SYNC REFERENCE NORMAL light is ON. STANDARD:
__ a. The IN SYNC light is ON.                                         - - UNSAT
Determines the B SPARE (4Y04) inverter lights listed above are all ON. CUE: When each light properly identified, state light is ON. Comment NOTE: *
__ b. The AL T SOURCE A VAIL light is ON.
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5 DO NOT ALLOW THE 4B(4Y02) SAT -..j INVERTER DOOR TO BE OPENED UNSAT * -(procedure step 7.1.2.4) 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position 1. Operator identifies 48 (4Y02) inverter.
_ _ c. The SYNC REFERENCE NORMAL light is ON.
STANDARD:
STANDARD: Determines the B SPARE (4Y04) inverter lights listed above are all ON.
: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
CUE:   When each light properly identified, state light is ON.
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE: the operator to simulate going inside the inverter to position the switch. 2. When SW-2 operation properly described, confirm re-positioning.
Comment NOTE:
Comment
*
* DO NOT ALLOW THE 4B(4Y02) NOTE: INVERTER DOOR TO BE OPENED
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5 DO NOT ALLOW THE 4B(4Y02) SAT -..j INVERTER DOOR TO BE OPENED UNSAT * -(procedure step 7.1.2.4) 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position 1. Operator identifies 48 (4Y02) inverter.
 
STANDARD:
I Appendix C                               Page 9 of 17                               Form ES-C-1 I DO NOT ALLOW THE 4B(4Y02)
: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
* STEP     5                                                                               SAT
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE: the operator to simulate going inside the inverter to position the switch. 2. When SW-2 operation properly described, confirm re-positioning.
                                                                                        -
          ..j INVERTER DOOR TO BE OPENED                                                     UNSAT
                                                                                        -
(procedure step 7.1.2.4)
: 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
: 1. Operator identifies 48 (4Y02) inverter.
STANDARD: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:       the operator to simulate going inside the inverter to position the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment
Comment
* DO NOT ALLOW THE 4B(4Y02) NOTE: INVERTER DOOR TO BE OPENED
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)
* STEP 6 SAT --5. Verify the following at the INSERVICE NORMAL inverter:
UNSAT __ a. The IN SYNC Light is ON. --__ b. The SYNC REFERENCE EXTERNAL light is ON. STANDARD:
Determines the 48 (4Y02)inverter lights listed above are all ON. CUE: When each light properly identified, state light is ON. Comment: NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)
* STEP 6 SAT --5. Verify the following at the INSERVICE NORMAL inverter:
UNSAT __ a. The IN SYNC Light is ON. --__ b. The SYNC REFERENCE EXTERNAL light is ON. STANDARD:
Determines the 48 (4Y02)inverter lights listed above are all ON. CUE: When each light properly identified, state light is ON. Comment: NOTE: *
* NUREG 1021 Rev 9 Appendix C 
, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)
* STEP 7 SAT --..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record: UNSAT --TABLE 3 For Plart When Substitutiug AC ToSt1'PLY I:\TTIALS SPARE I:\T£RTIR
:-;OR.'L.u.
SELECTOR S"TICH Posltion I:\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\1: AS OY(4) 4A(-lYOl) 4P07A AC u:-.1: BS (4Y04) 3B 3P08A AC u:-.1: BS (4Y04) 4B 14Y02, 4POSA ACLDo1: CS OY06) 3C (3Y')5) 3P06A AC ID1: CS (W06) 4C(-tYO))
4POM AC u:-.1: D<; i4'{(6) 3D (3Y07) 3P09A AC ID1: DS 4D (4YO!) 4P09A ACLI:\1: STANDARD:
Using Table 3, identifies 4P08A as the correct Selector Switch to use. CUE: N/A Comment
* NOTE:
* NOTE:
* NUREG 1021 Rev 9 Appendix C , Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)
DO NOT ALLOW THE 4B(4Y02)
* STEP 7 SAT --..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record: UNSAT --TABLE 3 For Plart When Substitutiug AC ToSt1'PLY I:\TTIALS SPARE I:\T&#xa3;RTIR
INVERTER DOOR TO BE OPENED
:-;OR.'L.u.
* NUREG 1021 Rev 9 Appendix C
SELECTOR S"TICH Posltion I:\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\1: AS OY(4) 4A(-lYOl) 4P07A AC u:-.1: BS (4Y04) 3B 3P08A AC u:-.1: BS (4Y04) 4B 14Y02, 4POSA ACLDo1: CS (3Y06) 3C (3Y')5) 3P06A AC ID1: CS (W061 4C (WO)) 4POM AC u:-.1: D<; i4'{(6) 3D (3Y07) 3P09A AC ID1: DS 4D (4YO!) 4P09A ACLI:\1: STANDARD:
 
Using Table 3, identifies 4P08A as the correct Selector Switch to use. CUE: N/A Comment
Appendix C                              Page 10 of 17                            Form ES-C-1 (procedure step 7.1.2.5)
*                                                                                  - - SAT STEP    6
: 5. Verify the following at the INSERVICE NORMAL inverter:
__ a. The IN SYNC Light is ON.                                        - - UNSAT
__ b. The SYNC REFERENCE EXTERNAL light is ON.
STANDARD:  Determines the 48 (4Y02)inverter lights listed above are all ON.
CUE:  When each light properly identified, state light is ON.
Comment:
NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
  , Appendix C                                   Page 11 of 17                             Form ES-C-1 (procedure step 7.1.2.6)
* STEP     7                                                                               - - SAT
          ..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:                                             - - UNSAT TABLE 3 For Plart When Substitutiug ~SER\'ICE                    ToSt1'PLY
                                                    ~STRnlL'\"I AC              I:\TTIALS SPARE I:\T&#xa3;RTIR     :-;OR.'L.u.                   Posltion SELECTOR S"TICH I:\YERTER AS (3Y04)       3A(3YOJ)           3P07A     AC LI:\1:
AS OY(4)       4A(-lYOl)         4P07A     AC u:-.1:
BS (4Y04)       3B (3YO~)          3P08A     AC u:-.1:
BS (4Y04)       4B 14Y02,         4POSA     ACLDo1:
CS (3Y06)
OY06)        3C (3Y')5)         3P06A     AC ID1:
(W06)
CS (W061       4C (WO))
4C(-tYO))          4POM       AC u:-.1:
D<; i4'{(6)     3D (3Y07)         3P09A     AC ID1:
DS (~Y06)      4D (4YO!)         4P09A     ACLI:\1:
STANDARD: Using Table 3, identifies 4P08A as the correct Selector Switch to use.
CUE:   N/A Comment
* NOTE:
* NOTE:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 17 Form ES-C-1
* NUREG 1021 Rev 9 Appendix C
* STEP 8 (procedure step 7.1.2. 7.a) SAT 7. Perform the following steps at the appropriate Instrument AC --Selector Switch panel in the Cable Spreading Room: UNSAT --__ a. Verify that the Alternate Power Available light is ON. STANDARD:
 
Verifies 4P08A alternate power available light ON CUE: When 4P08A alternate power available light correctly identified, tell candidate that light is ON. Comment NOTE: *
Appendix C                             Page 12 of 17                             Form ES-C-1 (procedure step 7.1.2. 7.a)
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 17 Form ES-C-1
*                                                                                   - - SAT STEP   8
* STEP 8 (procedure step 7.1.2. 7.a) SAT 7. Perform the following steps at the appropriate Instrument AC --Selector Switch panel in the Cable Spreading Room: UNSAT --__ a. Verify that the Alternate Power Available light is ON. STANDARD:
: 7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:
Verifies 4P08A alternate power available light ON CUE: When 4P08A alternate power available light correctly identified, tell candidate that light is ON. Comment NOTE: *
                                                                                    - - UNSAT
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 17 Form ES-C-1 I
_ _ a. Verify that the Alternate Power Available light is ON.
* STEP 9 (procedure step 7.1.2. 7.b) SAT b. Test the Sync Verification Light as follows: --__ (1) Position the Sync Switch to SYNCH LAMP TEST. UNSAT --__ (2) Verify lamp comes ON. STANDARD:
Verifies 4P08A alternate power available light ON STANDARD:
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST. 2. Verifies 4P08A SYNC Verification Light ON. 1. When SYNC switch identified and operation correctly described, CUE: confirm switch manipulation.
CUE:   When 4P08A alternate power available light correctly identified, tell candidate that light is ON.
: 2. When Sync Verification Light correctly identified, tell candidate light is ON. Comment NOTE: *
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 17 Form ES-C-1 I
*
* STEP 9 (procedure step 7.1.2. 7.b) SAT b. Test the Sync Verification Light as follows: --__ (1) Position the Sync Switch to SYNCH LAMP TEST. UNSAT --__ (2) Verify lamp comes ON. STANDARD:
* NUREG 1021 Rev 9 Appendix C
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST. 2. Verifies 4P08A SYNC Verification Light ON. 1. When SYNC switch identified and operation correctly described, CUE: confirm switch manipulation.
 
: 2. When Sync Verification Light correctly identified, tell candidate light is ON. Comment NOTE: *
I Appendix C                             Page 13 of 17                                 Form ES-C-1 I (procedure step 7.1.2. 7.b)
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 17 Form ES-C-1 * (procedure step 7.1.2. 7.c) STEP 10 SAT --NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT --OFF, but a slight glow is expected.
*                                                                                        - - SAT STEP    9
This is acceptable.
: b. Test the Sync Verification Light as follows:
: c. Perform a synch check as follows: __ (1) Position the Sync Switch to SYNCH CHECK PUSH. __ (2) Depress and hold the Sync Switch. __ (3) Verify that the Sync Verification Light stays OFF. 1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH. STANDARD:
_ _ (1) Position the Sync Switch to SYNCH LAMP TEST.
: 2. Depresses  
                                                                                          - - UNSAT
& holds 4P08A SYNC Switch. 3. Verifies 4P08A Sync Verification Ught stays OFF. 4. Releases 4P08A SYNC Switch. 1. When SYNC switch identified and operation correctly described, CUE: confirm switch manipulations.
_ _ (2) Verify lamp comes ON.
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
STANDARD:
: 2. Verifies 4P08A SYNC Verification Light ON.
: 1. When SYNC switch identified and operation correctly described, confirm switch manipulation.
CUE:
: 2. When Sync Verification Light correctly identified, tell candidate light is ON.
Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                 Page 14 of 17                                           Form ES-C-1
*
(procedure step 7.1.2. 7.c)
STEP   10                                                                                           - - SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go   - - UNSAT OFF, but a slight glow is expected. This is acceptable.
: c. Perform a synch check as follows:
__ (1) Position the Sync Switch to SYNCH CHECK PUSH.
_ _ (2) Depress and hold the Sync Switch.
_ _ (3) Verify that the Sync Verification Light stays OFF.
: 1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
: 2. Depresses & holds 4P08A SYNC Switch.
STANDARD:
: 3. Verifies 4P08A Sync Verification Ught stays OFF.
: 4. Releases 4P08A SYNC Switch.
: 1. When SYNC switch identified and operation correctly described, confirm switch manipulations.
CUE:
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
* Comment NOTE NOTE: In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected.
* Comment NOTE:
This is acceptable.
NOTE In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 17 Form ES-C-1 * (procedure step 7.1.2. 7.c) STEP 10 SAT --NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT --OFF, but a slight glow is expected.
* NUREG 1021 Rev 9 Appendix C
This is acceptable.
 
: c. Perform a synch check as follows: __ (1) Position the Sync Switch to SYNCH CHECK PUSH. __ (2) Depress and hold the Sync Switch. __ (3) Verify that the Sync Verification Light stays OFF. 1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH. STANDARD:
I Appendix C                                           Page 15 of 17                                     Form ES-C-1
: 2. Depresses
_ _ d. Place the Instrument AC Selector Switch to the position
& holds 4P08A SYNC Switch. 3. Verifies 4P08A Sync Verification Ught stays OFF. 4. Releases 4P08A SYNC Switch. 1. When SYNC switch identified and operation correctly described, CUE: confirm switch manipulations.
*                                                                                                          - - SAT STEP   11   indicated in Table 3.
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
            ~                                              NOTE Initials should be entered for the applicable inverter. NIA should be entered               - - UNSAT for all others.
* Comment NOTE NOTE: In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected.
TABLE.'
This is acceptable.
For               Place Wb~n Sub,tituting I~SERYICE                            To st'PPLY
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 15 of 17 Form ES-C-1 __ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3. SAT --NOTE Initials should be entered for the applicable inverter.
[\,STRc\!E~T AC                     L'"ITLUS SPARE I!'-TERTER     :-;OR\L\L                             Po,ition SELE( TOR SWITCH L"\"ERTER A5(31"04)
NIA should be entered UNSAT --* for all others. TABLE.' For Place Sub,tituting AC To st'PPLY L'"ITLUS SPARE I!'-TERTER
AS  '3Y041      3A(3YC]1 3A  t3YC] 1         3PO-";         ACrn.:E AS f3Y(4)       4.40 (':'Y01)         ~P07A          .4.(' Ln,:::
:-;OR\L\L SELE( TOR SWITCH Po,ition L"\"ERTER AS '3Y041 3A(3YC]1 3PO-"; ACrn.:E AS f3Y(4) 4.40 (':'Y01)
:as (4Yi}~)      38 {3Y02\             3P83A           ACrn,:::
.4.(' Ln,::: :as 38 {3Y02\ 3P83A ACrn,::: 3-'3 (*P{IJ"':}
3-'3 (*P{IJ"':} 4B (4"i")J~l          "P~SA          ACrn,:::
4B ACrn,::: CS (:Y'OC: 3C (;::05') 3Pc'6A ACLn,""E CS (3\1J&#xa2;\ 4C (4\1:5) "])06A AC Ln':::: DS 3D 3P09A AC lJ}.;E DS (4YOo) "D ("YO:', 4P09A AC lJ}.;::: STANDARD:
CS (:Y'OC:       3C (;::05')           3Pc'6A         ACLn,""E CS (3\1J&#xa2;\       4C (4\1:5)           "])06A         AC Ln'::::
: 1. Selects correct switch (4P08A). 2. Positions 4P08A Instrument AC Selector Switch to AC LINE. CUE: When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
DS (4YO~)            ~3YO')
* Comment NOTE NOTE: Initials should be entered for the applicable inverter.
3D (3YO')             3P09A           AC lJ}.;E DS (4YOo)       "D ("YO:',           4P09A           AC lJ}.;:::
NIA should be entered for all others. Tell candidate that another operator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner.
: 1. Selects correct switch (4P08A).
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 15 of 17 Form ES-C-1 __ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3. SAT --NOTE Initials should be entered for the applicable inverter.
STANDARD:
NIA should be entered UNSAT --* for all others. TABLE.' For Place Sub,tituting AC To st'PPLY L'"ITLUS SPARE I!'-TERTER
: 2. Positions 4P08A Instrument AC Selector Switch to AC LINE.
:-;OR\L\L SELE( TOR SWITCH Po,ition L"\"ERTER A5(31"04) 3A t3YC] 1 3PO-"; ACrn.:E AS f3Y(4) 4.40 (':'Y01)  
CUE:     When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
.4.(' Ln,::: :as 38 {3Y02\ 3P83A ACrn,::: 3-'3 (*P{IJ"':}
* Comment NOTE Initials should be entered for the applicable inverter. NIA should be entered NOTE:    for all others.
4B ACrn,::: CS (:Y'OC: 3C (;::05') 3Pc'6A ACLn,""E CS (3\1J&#xa2;\ 4C (4\1:5) "])06A AC Ln':::: DS 3D (3YO') 3P09A AC lJ}.;E DS (4YOo) "D ("YO:', 4P09A AC lJ}.;::: STANDARD:
Tell candidate that another operator    op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:   examiner.
: 1. Selects correct switch (4P08A). 2. Positions 4P08A Instrument AC Selector Switch to AC LINE. CUE: When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
* NUREG 1021 Rev 9 Appendix C
* Comment NOTE NOTE: Initials should be entered for the applicable inverter.
 
NIA should be entered for all others. Tell candidate that another op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner.
Appendix C                                   Page 16 of 17                 Form ES-C-1 Verification of Completion
* NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion
* Job Performance Measure No.
* Job Performance Measure No. NRC-25-IP-JPM-K Examinee's Name: Examiner's Name: Date Performed:
Examinee's Name:
NRC-25-IP-JPM-K Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:  
Question:
.-----------------------
.-----------------------
Response:
 
Result: Satisfactory/Unsatisfactory
===Response===
* Examiner's signature and date: _________________
Result:   Satisfactory/Unsatisfactory
_ NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
* Job Performance Measure No. NRC-25-IP-JPM-K Examinee's Name: Examiner's Name: Date Performed:
NUREG 1021 Rev 9 Appendix C
Facility Evaluator:
 
Number of Attempts:
JPM BRIEFING SHEET
Time to Complete:
* THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
Question Documentation:
Question:
.-----------------------
Response:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: _________________
_ NUREG 1021 Rev 9 Appendix C
* *
* JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
Initial Conditions:
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.  
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
!NITIA TlNG CUE: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C * *
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
* JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
  !NITIA TlNG CUE:
Initial Conditions:
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY. 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
!NITIA TlNG CUE: In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C
*
* NUREG 1021 Rev 9 Appendix C


Appendix C Job Performance Measure Worksheet Form ES-C-1
Appendix C                                         Job Performance Measure                             Form ES-C-1 Worksheet
* Facility:
* Facility:               _T_ur_k_e-"-y_P_o_in_t
_T_ur_k_e-"-y_P_o_in_t
__                    _ _ _ _ _Task No:
_____ Task No: Respond to Turbine Runback, Rods Fail to NRC-25-SIM-1PM-A Task Title: Insert JPM No: ----------------
T-ur-k-e-L-y-P-o-in-t-:------Task Respond to Turbine Runback, Rods Fail to                                   NRC   Task Title:             Insert                           JPM No:             SIM-1PM-A
                            ----------------
                            -------------------
045 K4.12 Automatic turbine runback 3.3/3.6 KIA  
045 K4.12 Automatic turbine runback 3.3/3.6 KIA  


Line 614: Line 630:


Examinee:
Examinee:
NRC Examiner:  
                            -------------------NRC Examiner:
--------------
                            --------------
Facility Evaluator:
Facility Evaluator:                                       Date:
Date: Method of testing: Simulated Performance Actual Performance X -------------------
Method of testing:
-------------
Simulated Performance
Classroom SimulatorX Plant -------------
                                    -------------------     Actual Performance
                                                                              -
xX
                                                                              --------------
                                                                                ------------
Classroom                                           SimulatorX         Plant------------
                                                                              -------------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Unit 3 is operating at 60% power and stable
* Unit 3 is operating at 60% power and stable
* Unit 3 is preparing to return to 100% power. ** No equipment is out of service.
* Unit 3 is preparing to return to 100% power.
* Task Standard:
*
* No equipment is out of service.
Task Standard:
* 3-0NOP-089, Turbine Runback actions have been performed correctly.
* 3-0NOP-089, Turbine Runback actions have been performed correctly.
* Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
* Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
Line 634: Line 658:
==References:==
==References:==
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
* 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C Appendix C Job Performance Measure Worksheet Form ES-C-1
* Facility:
__ T-ur-k-e-L-y-P-o-in-t-:------Task No: Respond to Turbine Runback, Rods Fail to NRC-25-SIM-1PM-A Task Title: Insert JPM No: -------------------
045 K4.12 Automatic turbine runback 3.3/3.6 KIA
==Reference:==
Examinee:
NRC Examiner:
-------------------
Facility Evaluator:
Date: Method of testing: Simulated Performance Actual Performance x -------------------
--------------
Classroom SimulatorX Plant ------------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Unit 3 is operating at 60% power and stable
* Unit 3 is preparing to return to 100% power. ** No equipment is out of service.
* Task Standard:
* 3-0NOP-089, Turbine Runback actions have been performed correctly.
* Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
* Required Materials:
* 0-ONOP-089, Turbine Runback
* 0-ONOP-089, Turbine Runback
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General
* NUREG 1021 Rev 9 Appendix C


==References:==
Appendix C                                 Page 2 of 12                     Form ES-C-1 Initiating Cue:
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
* 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Respond to Plant Conditions Time Cr i tical Task: No Validation Time: 10 minutes HAND JPM BRIEFIN G S HEET TO EXAMINEE A T THIS TIMEt NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Respond to Plant Conditions
* You have been directed to Respond to Plant Conditions
* Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI
* Time Critical Task: No Validation Time Time:10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT         A T THIS TIMEI TIMEt
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C


C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
  ~ppendix C                                 Page 3 of 12                           Form ES-C-1!
* 16 *
SIMULATOR SETUP Reset to IC #
* Instructor Facility Operator Actions 1. Verify Reset to IC 24 2. Schema>> Reactor>> Rod Control/Rod Position>>
* 16 Instructor Facility Operator Actions
SC408 Rod Motion Failures & Controls>>
: 1. Verify Reset to IC 24
TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT 3. Verify RED SQUARE framing SC408. 4. Schema>> Feedwater  
: 2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>
>> FIW Main>> Condensate Polishing Demineralizers  
TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT
>> Feedwater Pumps>> 3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B. Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont) 5. Go to RUN. 6. Go to  
: 3. Verify RED SQUARE framing SC408.
: 4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>
3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.
Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)
: 5. Go to RUN.
: 6. Go to  


==SUMMARY==
==SUMMARY==
>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
>> PENDING>> Right click on TVFABP1 B >> TRIGGER
* 16 *
*
* Instructor Facility Operator Actions 1. Verify Reset to IC 24 2. Schema>> Reactor>> Rod Control/Rod Position>>
* NUREG 1021 Rev 9 Appendix C
SC408 Rod Motion Failures & Controls>>
TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT 3. Verify RED SQUARE framing SC408. 4. Schema>> Feedwater
>> FIW Main>> Condensate Polishing Demineralizers
>> Feedwater Pumps>> 3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B. Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont) 5. Go to RUN. 6. Go to


==SUMMARY==
Appendix C                               Page 4 of 12                             Form ES-C-1 Denote critical steps with a check mark.O Start Time
>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* STEP 1 Recognition by Operator that Turbine Runback is occurring.
*
SAT --UNSAT --Standard:
                                                                                    ----
Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback. Cue Provided by Simulator response.
Recognition by Operator that Turbine Runback is occurring.
Comment NOTE: Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump . *
STEP    1                                                                       - -SAT
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* STEP 1 Recognition by Operator that Turbine Runback is occurring.
                                                                                    - -UNSAT Standard: Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.
SAT --UNSAT --Standard:
Cue   Provided by Simulator response.
Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback. Cue Provided by Simulator response.
Comment NOTE:   Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump .
Comment NOTE: Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump . *
*
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C


C Page 5 of 12 Form ES-C-1!
  ~ppendiX C                                   Page 5 of 12                                 Form ES-C-1!
* STEP 2 14.0 IMMEDIATE OPERA TOR ACTIONS SAT --UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --iStabilize and maintain plant conditions, or assume manual control. Standard:
* STEP     2
Used 3-0NOP-089, Turbine Runback to verify Immediate Operator have been completed.
          ~
Cue 1. Provided by Simulator response. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F. Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
              ~.O IMMEDIATE OPERA TOR ACTIONS 14.0 4.1 Verify the automatic actions listed in Section 3.0 are functioning to
              ~tabilize and maintain plant conditions, or assume manual control.
iStabilize
                                                                                          - -SAT
                                                                                          - -UNSAT Standard: Used 3-0NOP-089, Turbine Runback to verify Immediate Operator
              ~ctions have been completed.
: 1. Provided by Simulator response.
Cue
              ~.
: 2. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Comment Operator may choose at any time to address the lack of Control Rod
              'nsertion and take manual action in accordance with Elements 6, 7, and 8.
NOTE:   Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
* Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C C Page 5 of 12 Form ES-C-1!
* NUREG 1021 Rev 9 Appendix C
* STEP 2 IMMEDIATE OPERA TOR ACTIONS SAT --UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --
 
and maintain plant conditions, or assume manual control. Standard:
Appendix C                                 Page 6 of 12                             Form ES-C-1
Used 3-0NOP-089, Turbine Runback to verify Immediate Operator have been completed.
* 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP   3 Imodulate closed upon receipt of a runback signal from the Generator   - -SAT lGovernor/Speed povernorlSpeed Changer.
Cue 1. Provided by Simulator response.
                                                                                      - -UNSAT Standard:
: 2. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F. Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue     Provided by Simulator response.
* Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Comment Operator may choose at any time to address the lack of Control Rod
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1
* NOTE:
* 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3 Imodulate closed upon receipt of a runback signal from the Generator SAT --lGovernor/Speed Changer. UNSAT --Standard:
                'nsertion and take manual action in accordance with Elements 6,7, and 8.
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Comment Operator may choose at any time to address the lack of Control Rod * 'nsertion and take manual action in accordance with Elements 6,7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1
* NUREG 1021 Rev 9 Appendix C
* 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3 Imodulate closed upon receipt of a runback signal from the Generator SAT --povernorlSpeed Changer. UNSAT --Standard:
 
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.
IAppendix C                                 Page 7 of 12                               Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP     4 1C0ndenser condenser due to the load rejection and subsequent Tavg/Tref           - -SAT
Comment Operator may choose at any time to address the lack of Control Rod * 'nsertion and take manual action in accordance with Elements 6,7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
* Standard:
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Imismatch.
* NUREG 1021 Rev 9 Appendix C IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4 1C0ndenser due to the load rejection and subsequent Tavg/Tref SAT --* Imismatch.
mismatch.
UNSAT --Standard:
lVerified Verified Steam Dump Valves are armed and opened if needed.
lVerified Steam Dump Valves are armed and opened if needed. Cue Provided by Simulator response.
                                                                                        - -UNSAT Cue   Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Comment Operator may choose at any time to address the lack of Control Rod
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
                'nsertion and take manual action in accordance with Elements 6, 7, and
                !insertion 8.
NOTE:   Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the Isubsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4 condenser due to the load rejection and subsequent Tavg/Tref SAT --* mismatch.
* NUREG 1021 Rev 9 Appendix C
UNSAT --Standard:
 
Verified Steam Dump Valves are armed and opened if needed. Cue Provided by Simulator response.
Appendix C                                 Page 8 of 12                               Form ES-C-1 G.3 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP   5  Tavg with Tref.
Comment Operator may choose at any time to address the lack of Control Rod !insertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
iTavg                                                                  - -SAT
Inserting rods to match Tavg and Tref may be delayed until the Isubsequent actions after verifying Automatic Actions w/3-0NOP-089.  
* Standard: Operator recognizes that Control Rods did not insert as required and
                                                                                      - -UNSAT inserts Control Rods to match Tavg within 4 degrees F.
Cue     Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and linsertion a.
NOTE:   Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 .
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 G.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5 iTavg with Tref. SAT --* UNSAT --Standard:
* NUREG 1021 Rev 9 Appendix C
Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F. Cue Provided by Simulator response.
 
Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and a. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
IAppendiX C                                 Page 9 of 12                               Form ES-C-11 Operator places Rod Control Selector Switch to MANUAL.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 . *
STEP    6                                                                             SAT
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5 Tavg with Tref. SAT --* UNSAT --Standard:
Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F. Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and a. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 . *
* NUREG 1021 Rev 9 Appendix C 
-IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6 Operator places Rod Control Selector Switch to MANUAL. SAT --* ..j UNS AT --Standard:
Operator placed Rod Control Selector Switch to MANUAL. Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6 Operator places Rod Control Selector Switch to MANUAL. SAT --* ..j UNS AT --Standard:
                                                                                        --
Operator placed Rod Control Selector Switch to MANUAL. Cue Provided by Simulator response.
            ..j                                                                               UNS AT
Comment Operator may choose at any time to address the lack of Control Rod *nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
                                                                                        --
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
Standard: Operator placed Rod Control Selector Switch to MANUAL.
Cue     Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
                  *nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7 iTref. SAT --* ..j UNSAT --Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:
* NUREG 1021 Rev 9 Appendix C
match Tavg with Tref within 4 [] F. Cue Provided by Simulator response.
 
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Appendix C                                 Page 10 of 12                               Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP   7   Tref.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
iTref.                                                                 - -SAT
*           ..j Standard:
Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to match Tavg with Tref within 4 [] F.
                                                                                        - -UNSAT Cue     Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
                'nsertion and take manual action in accordance with Elements 6, 7, and 8.
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7 Tref. SAT --* ..j UNSAT --Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:
* NUREG 1021 Rev 9 Appendix C
match Tavg with Tref within 4 [] F. Cue Provided by Simulator response.
 
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
  !Appendix C                                 Page 11 of 12                             Form ES-C-11 Tavg and Tref are matched.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
:ravg STEP    8                                                                          - -SAT
*           ~
Standard:
                                                                                        --
UNS AT n-avg Tavg and Tref are within 4&deg;F.
Cue     Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the
                !Subsequent
                !subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
!Appendix C Page 11 of 12 Form ES-C-11 STEP 8 :ravg and Tref are matched. SAT --* UNS AT --Standard:
 
n-avg and Tref are within 4&deg;F. Cue Provided by Simulator response.
Appendix C                                 Page 12 of 12                             Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP   9  programmed response to steamflow/feedflow mismatch and level input      - -SAT
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
* signals, to maintain steam generator levels at program.
Inserting rods to match Tavg and Tref may be delayed until the !subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
                                                                                      - -UNSAT
              ~erified Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain
              !Steamflow/feedflow Standard: steam generator levels at program.
              !Steam Cue     Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
                'nsertion and take manual action in accordance with Elements 6, 7, and linsertion 8.
NOTE:     Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the
              !Subsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
*
* NUREG 1021 Rev 9 Appendix C !Appendix C Page 11 of 12 Form ES-C-11 STEP 8 Tavg and Tref are matched. SAT --* UNS AT --Standard:
* NUREG 1021 Rev 9 Appendix C
Tavg and Tref are within 4&deg;F. Cue Provided by Simulator response.
 
Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
  !Appendix C I          Page 13 of 12 I                Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP   10  Controller vary charging pumps speed and Heater/Spray actuation to      - -SAT
Inserting rods to match Tavg and Tref may be delayed until the !Subsequent actions after verifying Automatic Actions w/3-0NOP-089.  
* Imaintain maintain the programmed level and pressure, as required for the
                ~hanging changing values of Tavg.                                                - -UNSAT
                ~erifies Verifies that Pressurizer Level Controller and Pressurizer Pressure
[controller Controller maintaining the programmed level and pressure, as required Standard: ~or
                -"or the changing values of Tavg.
Cue   Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
                'nsertion and take manual action in accordance with Elements 6, 7, and 8.
NOTE:   Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the
* subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                  Page 14 of 12                            Form ES-C-1
                $UBSEQUENT SUBSEQUENT OPERA TOR ACTIONS STEP  11    5.1 Determine the cause of the runback initiation AND refer to the    - -SAT
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9 programmed response to steamflow/feedflow mismatch and level input SAT --* signals, to maintain steam generator levels at program. UNSAT --Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain Standard:
            ~  ~ppropriate appropriate ONOP for specific recovery instructions.
steam generator levels at program. Cue Provided by Simulator response.
5.2 Verify the following conditions:                                 - -UNSAT 5.2.1 Stearn generator levels and pressures stabilized.
Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
5.2.2 Stearn dumps closed.
Inserting rods to match Tavg and Tref may be delayed until the !Subsequent actions after verifying Automatic Actions w/3-0NOP-089.
5.2.3 Tavg matches Tref.
*
5.2.4 Pressurizer levels and pressures stabilized.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9 programmed response to steamflow/feedflow mismatch and level input SAT --* signals, to maintain steam generator levels at program. UNSAT --
that Main Feedwater Control Valves responded properly to Standard:
!Steamflow/feedflow mismatch and level input signals, to maintain !Steam generator levels at program. Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
* NUREG 1021 Rev 9 Appendix C 
!Appendix C I Page 13 of 12 I Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT --* maintain the programmed level and pressure, as required for the UNSAT changing values of Tavg. --Verifies that Pressurizer Level Controller and Pressurizer Pressure Controller maintaining the programmed level and pressure, as required Standard:
-"or the changing values of Tavg. Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
* NUREG 1021 Rev 9 Appendix C !Appendix C I Page 13 of 12 I Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT --* Imaintain the programmed level and pressure, as required for the UNSAT values of Tavg. --
that Pressurizer Level Controller and Pressurizer Pressure [controller maintaining the programmed level and pressure, as required Standard: the changing values of Tavg. Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod 'nsertion and take manual action in accordance with Elements 6, 7, and 8. NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 $UBSEQUENT OPERA TOR ACTIONS STEP 11 5.1 Determine the cause of the runback initiation AND refer to the SAT --*
ONOP for specific recovery instructions.
UNSAT 5.2 Verify the following conditions:  
--5.2.1 Stearn generator levels and pressures stabilized.
5.2.2 Stearn dumps closed. 5.2.3 Tavg matches Tref. 5.2.4 Pressurizer levels and pressures stabilized.
5.2 Verify the following conditions:
5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
5.2.1 Stearn generator levels and pressures stabilized.
Standard:
5.2.2 Stearn dumps closed.
5.2.2 Stearn dumps closed.
Tavg matches Trefwithin 4&deg; F. 5.2.4 Pressurizer levels and pressures stabilized.
Cue Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F. Comment
* NOTE: Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F. Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: .. he examiner.
Stop Time ___ _
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 SUBSEQUENT OPERA TOR ACTIONS SAT STEP 11 5.1 Determine the cause of the runback initiation AND refer to the --* appropriate ONOP for specific recovery instructions.
UNSAT 5.2 Verify the following conditions:
--5.2.1 Stearn generator levels and pressures stabilized.
5.2.2 Stearn dumps closed. 5.2.3 Tavg matches Tref. 5.2.4 Pressurizer levels and pressures stabilized.
5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
Standard:
Standard:
5.2.2 Stearn dumps closed. 5.2.3 Tavg matches Trefwithin 4&deg; F. 5.2.4 Pressurizer levels and pressures stabilized.
                ~.2.3 5.2.3 Tavg matches Trefwithin 4&deg; F.
Cue Irerminate JPM after Operator matches Tavg-Trefwithin 4&deg; F. Comment
5.2.4 Pressurizer levels and pressures stabilized.
* NOTE: Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F. Terminating
Cue     Irerminate Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
[The task is complete when the Examinee returns the cue sheet to STOP Cue: examiner.
Comment
Stop Time ----* NUREG 1021 Rev 9 Appendix C
* NOTE:     Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F.
/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion
Terminating [The The task is complete when the Examinee returns the cue sheet to Cue:                                                                               STOP
* Job Performance Measure No. NRC-25-SIM-JPM-A Examinee's Name: Examiner's Name: Date Performed:
                ~he
                ..he examiner.
Stop Time -
_ _ __
                                                                                        ---
* NUREG 1021 Rev 9 Appendix C
 
  /Appendix C                                 Page 15 of 12               Form ES-C-11 Verification of Completion
* Job Performance Measure No.
Examinee's Name:
Examiner's Name:
NRC-25-SIM-JPM-A Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 824: Line 855:
Question Documentation:
Question Documentation:
Question:
Question:
* Response:
*
Result: Satisfactory/Unsatisfactory
 
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C /Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion
===Response===
* Job Performance Measure No. NRC-25-SIM-JPM-A Examinee's Name: Examiner's Name: Date Performed:
Result:   Satisfactory/Unsatisfactory
Facility Evaluator:
* Examiner's signature and date:
Number of Attempts:
NUREG 1021 Rev 9 Appendix C
Time to Complete:
 
Question Documentation:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Question:
* When you complete the task successfully, the objective for this job performance measure will be satisfied.
* Response:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C
* *
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Unit 3 is operating at 60% power and stable
* Unit 3 is operating at 60% power and stable
* Unit 3 is preparing to return to 100% power.
* Unit 3 is preparing to return to 100% power.
* No equipment is out of service. INITIA TlNG CUE: You have been directed to respond to plant conditions.
* No equipment is out of service.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C * *
INITIA TlNG CUE:
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
You have been directed to respond to plant conditions.
INITIAL CONDITIONS:
Acknowledge to the examiner when you are ready to begin.
* Unit 3 is operating at 60% power and stable
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* Unit 3 is preparing to return to 100% power.
*
* No equipment is out of service. INITIA TlNG CUE: You have been directed to respond to plant conditions.
* NUREG 1021 Rev 9 Appendix C
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C


* *
Appendix C                                                                          Job Performance Measure                          Form ES-C-1 Worksheet
* Appendix C Facility:
* Facility:              _T-.:.-u=:;r:..:..:k:..::.eLy-'-P--'
Task Title: KJA  
_T...:.-=.ur:..:..k:..::.eLy-'  P-"o:..:..:i o:..:..inn:..:..t=--_
                                                                        ...:..:t'--__________
_ _ _ _ _ Task No:
Pressurizer Level Control Task Title:               Channel Fails Low                                                      JPM No:          NRC-25-SIM-JPM-8
                          -
                          ---------------------
                              -----------------
APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 KJA  


==Reference:==
==Reference:==


Examinee:
Examinee:                                                                                         NRC Examiner:
Facility Evaluator:
                          -------------------
Method of testing: Job Performance Measure Worksheet
                          -----------------------
_T-.:.-u=:;r:..:..:k:..::.eLy-'-P-"o:..:..:in...:..:t'--
Facility Evaluator:                                                                                Date:
__________
                          ------------------
Task No: Pressurizer Level Control Channel Fails Low ---------------------
                          ---------------------
APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 -----------------------
Method of testing:
---------------------
Simulated Performance
JPM No: NRC Examiner:
                                            -------------
Date: Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance X ---------------
                                            ---------------                                         Actual Performance              xX
-------------------
                                                                                                                        -------------------
Classroom  
Classroom
------------
                ------------                                                                   -=====-=!.X~_ _
Simulator
Simulator -=====-:::::!.X~            Plant - - - - - - - - - -
__ Plant ----------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Unit 3 is at 100% and stable
* Unit 3 is at 100% and stable
* No equipment is out of service Task Standard:
* No equipment is out of service
* Task Standard:
* Unit 3 is at 100% and stable.
* Unit 3 is at 100% and stable.
* Pressurizer level stable and returning to programmed level.
* Pressurizer level stable and returning to programmed level.
* Letdown has been returned to service. Required Materials:
* Letdown has been returned to service.
Required Materials:
* 3-0NOP-041.6, Pressurizer Level Control Malfunction General  
* 3-0NOP-041.6, Pressurizer Level Control Malfunction General  


==References:==
==References:==
* 3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C *  
* 3-0NOP-041.6, Pressurizer Level Control Malfunction
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                  Page 2 of 12                    Form ES-C-1 Initiating Cue:
* You have been directed to respond to plant conditions.
* Time Critical Task: No Validation Time:    XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI
*
*
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KJA


==Reference:==
I Appendix C                              Page 3 of 12                          Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
: 1. Verify IC-1
: 2. Place Simulator to RUN
: 3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> LT-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                              Page 4 of 12                              Form ES-C-1 Denote critical steps with a check mark( /)
* Start Time Respond to Pressurizer Level Control Channel 459 fails low.
STEP    1                                                                        - - SAT
                                                                                    - - UNSAT Standard:
* Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
Cue Comment NOTE:    Operator may choose to refer to ARP prior to entering ONOP.
*
* NUREG 1021 Rev 9 Appendix C
 
I Appendix C                                Page 5 of 12                        Form ES-C-1 I Verify automatic actions occur.
* STEP    2                                                                    - - SAT
                                                                                  - - UNSAT Operator verifies the following:
: 1. High Pressure LTON Isolation Valve LCV-3-460 CLOSES.
: 2. LTON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV      Standard:
200C CLOSE.
: 3. All Pressurizer Heaters turn OFF.
: 4. Charging flow INCREASES.
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                Page 6 of 12                            Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461,
* STEP    3 Identifies Channel 459 as failed low.
                                                                                    - - SAT
                                                                                    - - UNSAT Standard:
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C


Examinee:
I Appendix C                          Page 7 of 12                    Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch
Facility Evaluator:
* STEP    4  in position 2 or 3.                                    -
Method of testing: Job Performance Measure Worksheet
SAT
_T...:.-=.ur:..:..k:..::.eLy-'-P--'o:..:..in:..:..t=--
            ..j
______ Task No: Pressurizer Level Control Channel Fails Low ------------------
                                                                        -
APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 -------------------
UNSAT Standard: Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.
------------------
Cue Comment NOTE:
JPM No: NRC Examiner:
*
Date: Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance x -------------
* NUREG 1021 Rev 9 Appendix C
Classroom Simulator
__ Plant ----------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* Unit 3 is at 100% and stable
* No equipment is out of service Task Standard:
* Unit 3 is at 100% and stable.
* Pressurizer level stable and returning to programmed level.
* Letdown has been returned to service. Required Materials:
* 3-0NOP-041.6, Pressurizer Level Control Malfunction General


==References:==
Appendix C                             Page 8 of 12                       Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in
* 3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* STEP    5
* You have been directed to respond to plant conditions.
          ..j MANUAL.                                                      - - SAT
* Time Critical Task: No Validation Time: XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI
                                                                            - - UNSAT
: 1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:    in MANUAL
: 2. Maintain programmed level per Enclosure 1.
Cue Comment NOTE:
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* NUREG 1021 Rev 9 Appendix C
* You have been directed to respond to plant conditions.
 
* Time Critical Task: No Validation Time: XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI
I, Appendix C                               Page 9 of 12                           Form ES-C-1 I,
* STEP    6 IF LR-3-459 is selected to a defective channel, THEN place CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another position.
                                                                                      - - SAT
                                                                                      - - UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard: position other than Channel 459.
Cue Comment NOTE:
*
*
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
* IC-1: 100% Power MOL *
 
* Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
Appendix C                                 Page 10 of 12                             Form ES-C-1 Re-establish Letdown flow
: 1. Verify IC-1 2. Place Simulator to RUN 3. Schema>> Reactor Coolant System>> Pressurizer>>
* STEP     6
L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
          ~
* IC-1: 100% Power MOL *
: 1. Throttle Low Pressure LTON Controller, PCV-3-145, as necessary
* Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
                                                                                      --
: 1. Verify IC-1 2. Place Simulator to RUN 3. Schema>> Reactor Coolant System>> Pressurizer>>
SAT
L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)
                                                                                      - - UNSAT to prevent LTON relief valve from lifting, (approximately 50 percent open).
* Start Time STEP 1 Respond to Pressurizer Level Control Channel 459 fails low. SAT --UNSAT --Standard:
: 2. Manually control Low Pressure Letdown Control Valve, PCV                   145, to limit pressure spike.
* Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
: 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV     Standard:     460.
Cue Comment NOTE: Operator may choose to refer to ARP prior to entering ONOP. *
: 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)
: 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
* Start Time STEP 1 Respond to Pressurizer Level Control Channel 459 fails low. SAT --UNSAT --Standard:
Cue   Tell operator that another operator will perform the remainder of the procedure.
* Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
Cue Comment NOTE: Operator may choose to refer to ARP prior to entering ONOP. *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I
* STEP 2 Verify automatic actions occur. SAT --UNSAT --Operator verifies the following:
: 1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES. Standard:
: 2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV-3-200C CLOSE. 3. All Pressurizer Heaters turn OFF. 4. Charging flow INCREASES.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I
* STEP 2 Verify automatic actions occur. SAT --UNSAT --Operator verifies the following:
: 1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES. Standard:
: 2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV-3-200C CLOSE. 3. All Pressurizer Heaters turn OFF. 4. Charging flow INCREASES.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461, STEP 3 SAT --UNSAT * --Identifies Channel 459 as failed low. Standard:
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461,
* STEP 3 SAT --UNSAT --Identifies Channel 459 as failed low. Standard:
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch
* STEP 4 in position 2 or 3. SAT -..j UNSAT -Standard:
Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch
* STEP 4 in position 2 or 3. SAT -..j UNSAT -Standard:
Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in
* STEP 5 MANUAL. SAT --..j UNSAT --1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:
in MANUAL 2. Maintain programmed level per Enclosure
: 1. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in
* STEP 5 MANUAL. SAT --..j UNSAT --1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:
in MANUAL 2. Maintain programmed level per Enclosure
: 1. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C 
, Appendix C Page 9 of 12 Form ES-C-1 ,
* IF LR-3-459 is selected to a defective channel, THEN place STEP 6 CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT --position.
UNSAT --Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:
position other than Channel 459. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I
* IF LR-3-459 is selected to a defective channel, THEN place STEP 6 CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT --position.
UNSAT --Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:
position other than Channel 459. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow
* STEP 6 SAT --UNSAT --1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open). 2. Manually control Low Pressure Letdown Control Valve, PCV-3-145, to limit pressure spike. 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV-3-Standard:
460. 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level. 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
Cue Tell operator that another operator will perform the remainder of the procedure.
Comment
Comment
* NOTE: Steps 1, 2, and 5 are not critical steps. Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.
* NOTE:   Steps 1, 2, and 5 are not critical steps.
Stop Time ----* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow
Terminating The task is complete when the Examinee returns the cue sheet to Cue:                                                                               STOP the examiner.
* STEP 6 SAT --UNSAT --1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open). 2. Manually control Low Pressure Letdown Control Valve, PCV-3-145, to limit pressure spike. 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV-3-Standard:
Stop Time _ _ __
460. 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level. 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
                                                                                        ----
Cue Tell operator that another operator will perform the remainder of the procedure.
* NUREG 1021 Rev 9 Appendix C
Comment
 
* NOTE: Steps 1, 2, and 5 are not critical steps. Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.
I Appendix C                                 Page 11 of 12               Form ES-C-1 I Verification of Completion
Stop Time ___ _
* Job Performance Measure No.
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion
Examinee's Name:
* Job Performance Measure No. NRC-25-SIM-JPM-8 Examinee's Name: Examiner's Name: Date Performed:
NRC-25-SIM-JPM-8
                                    ~~~~~~~~------------------------------------
Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:  
Question:
.-----------------------
.-----------------------
Response:
 
Result: Satisfactory/Unsatisfactory
===Response===
* Examiner's signature and date: _____________________
Result:   Satisfactory/Unsatisfactory
__ NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion
* Job Performance Measure No. NRC-25-SIM-JPM-8 Examinee's Name: Examiner's Name: Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
.-----------------------
Response:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: _________________________
* Examiner's signature and date: _________________________
_ NUREG 1021 Rev 9 Appendix C
_______________________    _
* *
NUREG 1021 Rev 9 Appendix C
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
* When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Unit 3 is at 100% and stable
* Unit 3 is at 100% and stable
* No equipment is out of service INITIA TlNG CUE:
* No equipment is out of service INITIA TlNG CUE:
* You have been directed to respond to plant conditions.
* You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C *
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
*
*
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* NUREG 1021 Rev 9 Appendix C
INITIAL CONDITIONS:
* Unit 3 is at 100% and stable
* No equipment is out of service INITIA TlNG CUE:
* You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C


* *
Appendix C                                                                             Job Performance Measure                     Form ES-C-1 Worksheet Facility:              T--'
* Appendix C Facility:
                            --'. .T--u-'-,-,-ur_k.
Job Performance Measure Worksheet  
                                            '-r_k..:...ey"------P..:...o_i
--'...T-,-,-ur_k..c:...e,,--Y
                                                  .c:. .e, --Y_P..c:. .o_inn. c..:...t
_P..c:...o_in..c:...t
:. .t_ _ _ _ _ _ _Task No:
_______ Task No: ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM -C 011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA  
* Task Title:
ALIGN SAFETY INJECTION FOR HOT LEG RECIRC
                            --------~--------
011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 JPM No:      NRC-25-SIM-JPM -C KJA  


==Reference:==
==Reference:==


Examinee:
Examinee:
NRC Examiner:  
                            -------------------- NRC Examiner: -
-------------------
                            -------------------                                                                    -------------------
--------------
                                                                                                                    -------------
Facility Evaluator:
Facility Evaluator:                                                                                Date:
Method of testing: Simulated Performance Classroom Read to the examinee:
Method of testing:
Date: Actual Performance
Actual Simulated Performance                                                                             Performance              x Classroom                                                                             Simulator====-:!.X~_
__ _ x Plant -------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Simulator====~X~  _____      Plant-
                                                                                                                              ---------------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
* 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
*      *
* IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
        *
* POWER AVAILABLE TO BOTH 4 KV BUSSES
        *
* 3A HHSI PUMP IS RUNNING
        *
* RHR SUPPLYING COLD LEG RECIRCULATION
* 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED. Task Standard:
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
Task Standard:
* S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
* S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
* 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
* 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
Line 1,056: Line 1,079:


==References:==
==References:==
* 3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION
* 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C *
*
* Appendix C Facility:
Job Performance Measure Worksheet T--'--u-'-'-r_k..:...ey"------P..:...o_in..:...t
_______ Task No: ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM -C 011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA


==Reference:==
*      *
* 3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C


Examinee:
Appendix C                                Page 2 of 12                      Form ES-C-1
NRC Examiner:
* Initiating Cue:
--------------------
* You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
-------------------
Time Critical Task: NO Validation Time:      15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI
Facility Evaluator:
*
Method of testing: Simulated Performance Classroom Read to the examinee:
* NUREG 1021 Rev 9 Appendix C
Date: Actual Performance
__ _ x Plant ---------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
* 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
* IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
* POWER AVAILABLE TO BOTH 4 KV BUSSES
* 3A HHSI PUMP IS RUNNING
* RHR SUPPLYING COLD LEG RECIRCULATION
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED. Task Standard:
* S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
* 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
* 3-EOP-E-1, Loss of Reactor or Secondary Coolant General


==References:==
jAppendix C                               Page 3 of 12                 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58
* 3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION
* 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C 
* *
* Appendix C Page 2 of 12 Form ES-C-1
* Initiating Cue: You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. Time Critical Task: NO Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C * *
* Appendix C Page 2 of 12 Form ES-C-1
* Initiating Cue: You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. Time Critical Task: NO Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58
* Load Lesson
* Load Lesson
* LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
      *
* TRIGGER "MOV-3-869 CLOSED"
      *
* OPEN MOV 863A & MOY 863B
* LOADAND EXECUTE LESSON: JPM Ol062012501.LSN TRIGGER "MOV-3-869 CLOSED" OPEN MOV 863A & MOY 863B
* Unfreeze simulator.
* Unfreeze simulator.
Ensure Simulator Operator Checklist is complete *
Ensure Simulator Operator Checklist is complete
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58
*
* Load Lesson
* NUREG 1021 Rev 9 Appendix C
* LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
 
* TRIGGER "MOV-3-869 CLOSED"
Appendix C                               Page 4 of 12                                 Form ES-C-1 Denote critical steps with a check mark.O Start Time
* OPEN MOV 863A & MOY 863B
* STEP
* Unfreeze simulator.
          ..J 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1                         - -SAT
Ensure Simulator Operator Checklist is complete *
                                                                                        - -UNSAT Standard: ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time
                !TRANSITION RECIRCULATION Cue Comment NOTE:     Candidate should place a mark through circled step 32 prior to transition.
* STEP 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT --..J UNSAT --Standard:
*
ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE: Candidate should place a mark through circled step 32 prior to transition.  
* NUREG 1021 Rev 9 Appendix C
 
  !Appendix C I          Page 5 of 12 I                Form ES-C-11 STEP    2  Check High-Head SI Pumps - ANY                                        SAT
                                                                                -
* RUNNING
                                                                                -    UNSAT Standard:
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                            Page 6 of 12                          Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP    3  Train - OPEN MOV-3-749A for train A                                SAT
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time
                                                                              -
* STEP 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT --..J UNSAT --Standard:  
                                                                              -
!TRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE: Candidate should place a mark through circled step 32 prior to transition.
UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard: OPEN Cue Comment NOTE:
*
*
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
!Appendix C I Page 5 of 12 I Form ES-C-11 STEP 2 Check High-Head SI Pumps -ANY SAT -RUNNING
 
* UNSAT -Standard:
jAppendix C                                   Page 7 of 12                               Form ES-C-1!
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE: *
STEP     4                                                                             - -SAT
* NUREG 1021 Rev 9 Appendix C !Appendix C I Page 5 of 12 I Form ES-C-11 STEP 2 Check High-Head SI Pumps -ANY SAT -RUNNING
* 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -
* UNSAT -Standard:
            ..J OPEN
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE: *
                                                                                          - -UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard: IShould attempt to open valve prior to transitioning to Att. 1 )
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3 Train -OPEN MOV-3-749A for train A SAT -* UNSAT -MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:
Ishould I2.Candidate i2.Candidate transitions to to ATTACHMENT 1.
OPEN Cue Comment NOTE: *
Cue     If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3 Train -OPEN MOV-3-749A for train A SAT -* UNSAT -MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:
OPEN Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1! STEP 4 SAT
* 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869  
---..J OPEN UNSAT --1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:
IShould attempt to open valve prior to transitioning to Att. 1 ) i2.Candidate transitions to to ATTACHMENT
: 1. Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp
* NOTE: o open valve prior to transitioning to Att. 1
* o open valve prior to transitioning to Att. 1 NOTE:
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1! STEP 4 SAT
* NUREG 1021 Rev 9 Appendix C
* 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869
 
---..J OPEN UNSAT --1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:
Appendix C                               Page 8 of 12                       Form ES-C-1
Ishould attempt to open valve prior to transitioning to Att. 1 ) I2.Candidate transitions to to ATTACHMENT
* STEP   4
: 1. Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
            -J ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp
1)
* NOTE: o open valve prior to transitioning to Att. 1
: 1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1
                                                                            -
* STEP 4 ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT. SAT --J 1) UNSAT -1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
                                                                            -
SAT UNSAT
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR  
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR
!TRIGGER "CLOSE 3-752A1B", Cue I.F. OPERATOR REPORTS COMPLETION OF TASK. Comment
              !TRIGGER ITRIGGER "CLOSE 3-752A1B",
Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.
Comment
* NOTE:
* NOTE:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1
* NUREG 1021 Rev 9 Appendix C
* STEP 4 ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT. SAT --J 1) UNSAT -1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
 
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
  !Appendix C                         Page 9 of 12                         Form ES-C-1j STEP    5                                                                SAT
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR ITRIGGER "CLOSE 3-752A1B", Cue I.F. OPERATOR REPORTS COMPLETION OF TASK. Comment
* VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET      -
VALVE                                                        UNSAT
                                                                          -
SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
Cue    BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                          Page 10 of 12                      Form ES-C-1 STEP    6                                                              SAT
* REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS      -
            ..j FROM SERVICE                                                UNSAT
                                                                      -
CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard: RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
                              ,
  !Appendix C                        Page 11 of 12 I                Form ES-C-11 STEP    7                                                                SAT
                ~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN      -
* Standard:
MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN
                                                                        -
UNSAT Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                          Page 12 of 12                      Form ES-C-1 STEP    8  ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH            -
SAT
*
            ..;
                                                                        -  UNSAT
* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
  ~ppendix C                          Page 13 of 12                        Form ES-C-1!
* STEP    9  ALIGN THE RHR RECIRCULATION FLOWPATH                    -
SAT
            ..j
                                                                          -
UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:  ~ALVE VALVE Cue    BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                        Page 14 of 12                      Form ES-C-1
                ~ERIFY VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP  10                                                              SAT
*
                                                                      -
            .,j
                                                                      -
UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:  DECREASING Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
[Appendix C 1        Page 15 of 12 I                 Form ES-C-11
                ~ONTINUE CONTINUE LONG-TERM RECOVERY ACTIONS STEP    11                                                              SAT
                                                                        -
*
* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
                                                                        -    UNSAT
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:      VERIFIED
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue    IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA  TOR SHOULD USE OPERATOR                  ERDADS SCREEN  TO CONFIRM AL TERNA TE RHR FLOW
* NOTE:
* NOTE:
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
!Appendix C Page 9 of 12 Form ES-C-1j STEP 5 SAT
* VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET -VALVE UNSAT -SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C !Appendix C Page 9 of 12 Form ES-C-1j STEP 5 SAT
* VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET -VALVE UNSAT -SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 STEP 6 SAT
* REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS -..j FROM SERVICE UNSAT -CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:
RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 STEP 6 SAT
* REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS -..j FROM SERVICE UNSAT -CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:
RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C 
!Appendix C , Page 11 of 12 I Form ES-C-11 STEP 7 RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT -* UNSAT -MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C !Appendix C , Page 11 of 12 I Form ES-C-11 STEP 7 RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT -* UNSAT -MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 8 ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT -* ..; UNSAT -* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 8 ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT -* ..; UNSAT -* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C 


C Page 13 of 12 Form ES-C-1!
Appendix C                               Page 16 of 12                           Form ES-C-1 Return To Procedure And Step In Effect STEP   12                                                                      - -SAT
* STEP 9 ALIGN THE RHR RECIRCULATION FLOWPATH SAT -..j UNSAT -SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:
* Standard:
Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE: *
RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, STEP 15.
* NUREG 1021 Rev 9 Appendix C C Page 13 of 12 Form ES-C-1!
                                                                                    - -UNSAT Cue Comment NOTE:
* STEP 9 ALIGN THE RHR RECIRCULATION FLOWPATH SAT -..j UNSAT -SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:
Terminating [The                                                                  STOP The task is complete when the Examinee returns the cue sheet to the Cue:     ~xaminer.
VALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE: *
examiner.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT -* .,j UNSAT -CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:
Stop Time
DECREASING Cue Comment NOTE: *
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT -* .,j UNSAT -CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:
DECREASING Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
[Appendix C 1 Page 15 of 12 I Form ES-C-11 CONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT -* UNSAT -* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
 
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:
  !AppendiX C                                 Page 17 of 12                   Form ES-C-11 Verification of Completion
VERIFIED
~ JobPe~rmanceMeasureNo.
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA TOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE: AL TERNA TE RHR FLOW *
JobPe~rmanceMeasureNo.N          N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_
* NUREG 1021 Rev 9 Appendix C [Appendix C 1 Page 15 of 12 I Form ES-C-11 LONG-TERM RECOVERY ACTIONS STEP 11 SAT -* UNSAT -* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
__R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:
Examinee's Name:
VERIFIED
Examiner's Name:
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERATOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE: AL TERNA TE RHR FLOW *
Date Performed:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT --* UNSAT --RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:
STEP 15. Cue Comment NOTE: Terminating
[The task is complete when the Examinee returns the cue sheet to the STOP Cue:
Stop Time *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT --* UNSAT --RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:
STEP 15. Cue Comment NOTE: Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner.
Stop Time *
* NUREG 1021 Rev 9 Appendix C 
!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion Examinee's Name: Examiner's Name: Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response:
Question:
Result: Satisfactory/Unsatisfactory
~
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C !AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion
 
__
===Response===
Examinee's Name: Examiner's Name: Date Performed:
Result:   Satisfactory/Unsatisfactory
Facility Evaluator:
* Examiner's signature and date:
Number of Attempts:
NUREG 1021 Rev 9 Appendix C
Time to Complete:
 
Question Documentation:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Question: Response:
* When you complete the task successfully, the objective for this job performance measure will be satisfied.
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
Line 1,230: Line 1,258:
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED. INITIA TlNG CUE: You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
INITIA TlNG CUE:
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
* Acknowledge to the examiner when you are ready to begin.
* Acknowledge to the examiner when you are ready to begin.
* HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* NUREG 1021 Rev 9 Appendix C
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
* 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
* IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
* POWER AVAILABLE TO BOTH 4 KV BUSSES
* 3A HHSI PUMP IS RUNNING
* RHR SUPPLYING COLD LEG RECIRCULATION
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED. INITIA TlNG CUE: You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
* Acknowledge to the examiner when you are ready to begin.
* HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C


*
Appendix C                                 Job Performance Measure                                   Form ES-C-1 Worksheet Facility:              Turkey Point                       Task No:
* Appendix C Facility:
* Respond to a Source Range Nuclear Instrument Malfunction Job Performance Task Title:              (MODE 6)                           Measure No:               NRC-2S-SIM-JPM-D KIA  
Task Title: Job Performance Measure Worksheet Turkey Point Task No: Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6) Measure No: KIA  


==Reference:==
==Reference:==
015 A2.02 (3.1/3.5)
015 A2.02 (3.1/3.5)
Examinee:
Examinee:                                                   NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Method of testing:       Simulator / Control Room Simulated Performance                                      Actual Performance                     Yes Classroom                                     Simulator- - -Yes                         Plant._ _ _ _ _ __
Date: Method of testing: Simulator  
Plant
/ Control Room Actual Performance Simulated Performance Classroom Simulator Yes -------Read to the examinee:
                                                                    ----                           -------
Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant. ______ _ I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
: 1. Unit 3 is in Mode 6.
: 3. NIS Source Ranges N-31 and N-32 are both in service. 4. Both Gamma Metrics Channels are OOS for maintenance.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges N-31 and N-32 are both in service.
* 4. Both Gamma Metrics Channels are OOS for maintenance.
Task Standard:
Task Standard:
: 1. N-32 selected for audio count rate. 2. Core alterations suspended.
: 1. N-32 selected for audio count rate.
: 2. Core alterations suspended.
Required Materials:
Required Materials:
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General  
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General  
Line 1,270: Line 1,290:
==References:==
==References:==


3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue: Respond to plant conditions.
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:
Time Critical Task: No Validation Time: 10 minutes
Respond to plant conditions.
* HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI *
Time Critical Task: No Validation Time:         10 minutes
* Appendix C Facility:
* HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI
Task Title: Job Performance Measure Worksheet Turkey Point Task No: Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6) Measure No: KIA


==Reference:==
Appendix C                                    Page 2 of 7                                Form ES-C-1 INITIAL CONDITIONS:
*
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
  /NITIA TlNG CUE:
Respond to plant conditions.
TERMINA TlON CUE:
When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.
Do you have any questions?
You may begin.
*
*


015 A2.02 (3.1/3.5)
  !AppendiX C                                 Page 3 of 7                               Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
Examinee:
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete
NRC Examiner:
*
Facility Evaluator:
: 2. Place both channels of Gamma-Metrics O.O.S.:
Date: Method of testing: Simulator
: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
/ Control Room Simulated Performance Classroom Simulator Actual Performance Yes -------Read to the examinee:
: b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant -------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: c. Place both Gamma-Metric Block Switches to BLOCK on console
Initial Conditions:
: 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
: 4. Place CSD Placards on Vertical Panels.
: 3. NIS Source Ranges N-31 and N-32 are both in service. 4. Both Gamma Metrics Channels are OOS for maintenance.
: 5.                                             =
Task Standard:
Update console placard to read RCS BORON 2000 ppm
: 1. N-32 selected for audio count rate. 2. Core alterations suspended.
: 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron
Required Materials:
                              =             =
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General
concentration (HIC-3-114 4.0, FC-3-113 B.O)
 
: 7. Change ERDADS screen on VPA to P-T display.
==References:==
B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
 
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue: Respond to plant conditions.
Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT
Time Critical Task: No Validation Time: 10 minutes
*
* HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI 
* Appendix C                                         Page 4 of7                               Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -
* *
* STEP     1
* Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:
          ..j Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE NUCLEAR INSTRUMENTATION MALFUNCTION.
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
14.0 14.0 IMMEDIATE ACTIONS
: 3. NIS Source Ranges are both in service. 4. Both Gamma Metrics are OOS for maintenance.
                                                                                            - - SAT
/NITIA TlNG CUE: Respond to plant conditions.
                                                                                            --
TERMINA TlON CUE: When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me. Do you have any questions?
UNSAT 14.5 r.5 Mode 6 - Refueling 14.5.1 f4..5.1 Malfunction of ONE channel:
You may begin. * *
: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
* Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:
: 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service. 4. Both Gamma Metrics are OOS for maintenance.
/NITIA TlNG CUE: Respond to plant conditions.
TERMINA TlON CUE: When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me. Do you have any questions?
You may begin. 
* * * !AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete 2. Place both channels of Gamma-Metrics O.O.S.: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT c. Place both Gamma-Metric Block Switches to BLOCK on console 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder 4. Place CSD Placards on Vertical Panels. 5. Update console placard to read RCS BORON = 2000 ppm 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114
= 4.0, FC-3-113 = B.O) 7. Change ERDADS screen on VPA to P-T display. B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH: Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT * * * !AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete 2. Place both channels of Gamma-Metrics O.O.S.: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT c. Place both Gamma-Metric Block Switches to BLOCK on console 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder 4. Place CSD Placards on Vertical Panels. 5. Update console placard to read RCS BORON = 2000 ppm 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114  
= 4.0, FC-3-113 = B.O) 7. Change ERDADS screen on VPA to P-T display. B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH: Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* STEP 1 Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.  
--..j 14.0 IMMEDIATE ACTIONS UNSAT --14.5 Mode 6 -Refueling 14.5.1 Malfunction of ONE channel: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range. 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
* 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm. STANDARD:
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32. Suspends all operations involving core alterations since only one of four source range Nls are operable.
* 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions. Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE: stop refueling activities and store fuel assemblies in a safe location.
Report that refueling has stopped and fuel assemblies are all safely oeated. Comment
* NOTE: Source Range N-31 has failed HIGH. Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* STEP 1 Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.
--..j 14.0 IMMEDIATE ACTIONS UNSAT --r.5 Mode 6 -Refueling f4..5.1 Malfunction of ONE channel: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range. 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
* 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm. STANDARD:
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32. 2. Suspends all operations involving core alterations since only one of four source range Nls are operable.
* 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions. Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE: stop refueling activities and store fuel assemblies in a safe location.
Report that refueling has stopped and fuel assemblies are all safely oeated. Comment
* NOTE: Source Range N-31 has failed HIGH. 
!AppendiX C Page 5 of 7 Form ES-C-11
* STEP 2 Operator obtains copy of 3-0NOP-059.5.
SAT --UNSAT --STANDARD:
: 1. Operator obtains Simulator copy of 3-0NOP-059.5 Operator verifies Immediate Actions are correct. Cue Comment NOTE: * * !AppendiX C Page 5 of 7 Form ES-C-11
* STEP 2 Operator obtains copy of 3-0NOP-059.5.
SAT --UNSAT --STANDARD:
: 1. Operator obtains Simulator copy of 3-0NOP-059.5 Operator verifies Immediate Actions are correct. Cue Comment NOTE: *
* Appendix C Page 6 of7 Form ES-C-1
* 5.0 SUBSEQUENT ACTIONS STEP 3 5.5 Mode 6 -Refueling SAT --..J UNSAT 5.5.1 Malfunction of ONE channel: --1. Place LEVEL TRIP switch on failed channel in BYPASS position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
: 3. Switch an NIS RECORDER to the operable source range. 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours. 5. Notify I&C. 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
* STANDARD:
* STANDARD:
Operator removes N-31 from service. 1. Positions LEVEL TRIP switch to BYPASS. 2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK. 3. Verifies N-32 displayed on console NIS recorder.
: 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
: 4. Contacts Chemistry determines Boron concentration::::
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.
1950 ppm. 5. Notifies I&C of N-31 failure. 6. Determines both backup NIS (Gamma-Metric) channels OOS. 1.lf called as Reactor Engineering, state that the required RCS Boron jeoncentration is> 1950 ppm. CUES: 12.lf called as Chemistry, confirm Boron concentration is 2000 ppm. 3.Respond as I&C if notified of N-31 failure. 14. Inform the applicant that another operator will continue from this ipoint. Comment
                  ~.
* NOTE: Only Standards 1 and 2 are critical.
: 2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
Appendix C Page 6 of7 Form ES-C-1
: 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.
* 5.0 SUBSEQUENT ACTIONS STEP 3 5.5 Mode 6 -Refueling SAT --..J UNSAT 5.5.1 Malfunction of ONE channel: --1. Place LEVEL TRIP switch on failed channel in BYPASS position.
Respond as Refueling SRO and/or Reactor Engineer/STA if notified to stop refueling activities and store fuel assemblies in a safe location.
CUE:       Report that refueling has stopped and fuel assemblies are all safely oeated.
Comment
* NOTE:       Source Range N-31 has failed HIGH.
 
  !AppendiX C                              Page 5 of 7          Form ES-C-11
* Operator obtains copy of 3-0NOP-059.5.
STEP  2                                                      - -SAT
                                                                  - -UNSAT
: 1. Operator obtains Simulator copy of 3-0NOP-059.5 STANDARD:
              ~. Operator verifies Immediate Actions are correct.
Cue Comment NOTE:
*
* Appendix C                                   Page 6 of7                               Form ES-C-1 5.0 SUBSEQUENT ACTIONS
* STEP     3 5.5 Mode 6 - Refueling                                                   - -SAT
          ..J 5.5.1 Malfunction of ONE channel:                                       - -UNSAT
: 1. Place LEVEL TRIP switch on failed channel in BYPASS position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
: 3. Switch an NIS RECORDER to the operable source range. 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours. 5. Notify I&C. 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
: 3. Switch an NIS RECORDER to the operable source range.
* STANDARD:
: 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours.
Operator removes N-31 from service. 1. Positions LEVEL TRIP switch to BYPASS. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK. 3. Verifies N-32 displayed on console NIS recorder.
: 5. Notify I&C.
f4. Contacts Chemistry determines Boron concentration::::
: 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
1950 ppm. 5. Notifies I&C of N-31 failure. Determines both backup NIS (Gamma-Metric) channels OOS. 1.lf called as Reactor Engineering, state that the required RCS Boron is> 1950 ppm. CUES:
* STANDARD: Operator removes N-31 from service.
called as Chemistry, confirm Boron concentration is 2000 ppm. 3.Respond as I&C if notified of N-31 failure. f4.lnform the applicant that another operator will continue from this ipoint. Comment
: 1. Positions LEVEL TRIP switch to BYPASS.
* NOTE: Only Standards 1 and 2 are critical.
              ~.
\Appendix C Page 7 of 7 Form ES-C-11
: 2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
* STEP 4 iApplicant should return JPM Initial Condition sheet and state that SAT pperator actions are complete.
: 3. Verifies N-32 displayed on console NIS recorder.
--UNSAT --Terminating If operator attempts any other compensatory actions beyond this point STOP CUE: ell operator that JPM has been completed.
: 4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.
Stop Time ----* * \Appendix C Page 7 of 7 Form ES-C-11
f4.
* STEP 4 Applicant should return JPM Initial Condition sheet and state that SAT operator actions are complete.  
: 5. Notifies I&C of N-31 failure.
--UNSAT --Terminating If operator attempts any other compensatory actions beyond this point STOP CUE: ell operator that JPM has been completed.
              ~.
Stop Time ----*
: 6. Determines both backup NIS (Gamma-Metric) channels OOS.
* Appendix C Page 8 of7 Form ES-C-1 Verification of Completion Examinee's Name: Examiner's Name: Date Performed:
1.lf called as Reactor Engineering, state that the required RCS Boron
Facility Evaluator:
              ~oncentration is> 1950 ppm.
Number of Attempts:
jeoncentration
Time to Complete:
              ~.If called as Chemistry, confirm Boron concentration is 2000 ppm.
Question Documentation:
12.lf CUES:
Question: Response:
3.Respond as I&C if notified of N-31 failure.
Result: Satisfactory/Unsatisfactory Examiner's signature and date: Appendix C Page 8 of7 Form ES-C-1 Verification of Completion
14.
* Job Performance Measure No.N =-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---
f4.lnform Inform the applicant that another operator will continue from this ipoint.
________________
Comment
_ Examinee's Name: Examiner's Name: Date Performed:
* NOTE:         Only Standards 1 and 2 are critical.
 
  \Appendix C                                 Page 7 of 7                               Form ES-C-11 iApplicant Applicant should return JPM Initial Condition sheet and state that STEP  4                                                                            - -SAT
* pperator operator actions are complete.
                                                                                        - -UNSAT Terminating If operator attempts any other compensatory actions beyond this point     STOP CUE:     ell operator that JPM has been completed.
Stop Time ----
*
* Appendix C                                                                     Page 8 of7                                         Form ES-C-1 Verification of Completion
*~ Job JobPe~rmanceMeasuffiNo.N Performance Measure No.N     ~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_
                                    =-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,380: Line 1,404:
Question Documentation:
Question Documentation:
Question:
Question:
* Response:
*~
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: 


C Page 9 of 7 Form ES-C-11 * *
===Response===
* C Page 9 of 7 Form ES-C-11 * * * 
Result:  Satisfactory/Unsatisfactory
* *
*~
* JPM BRIEFING SHEET INITIAL CONDITIONS:
Examiner's signature and date:
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
 
: 3. NIS Source Ranges are both in service. 4. Both Gamma Metrics are OOS for maintenance.
  ~ppendix C Page 9 of 7 Form ES-C-11
!NITIA TlNG CUE: Respond to plant conditions.
*
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK . * *
*
* JPM BRIEFING SHEET INITIAL CONDITIONS:
* JPM BRIEFING SHEET
: 1. Unit 3 is in Mode 6. 2. Refueling activities are in progress.
* INITIAL CONDITIONS:
: 3. NIS Source Ranges are both in service. 4. Both Gamma Metrics are OOS for maintenance.  
: 1. Unit 3 is in Mode 6.
!NITIA TlNG CUE: Respond to plant conditions.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
  !NITIA TlNG CUE:
Respond to plant conditions.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
* Appendix C Facility:
*
Job Performance Measure Worksheet T_ur_k_e-'-y_P_o_in_t
* Appendix C                                         Job Performance Measure                               Form ES-C-1 Worksheet Facility:              _T_u_rk_e___y_P_o_in_t T_ur_k_e-'-y_P_o_in_t_ _ _ _ _ _ _Task No:
_______ Task No: Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume) Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM-E
* Task Title:
----------------------
Purging the PRT to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)
007 Kl.04 Nitrogen 2.1/2.3 KIA  
                            -
                            ----------------------
                              ------------
007 Kl.04 Nitrogen 2.1/2.3 JPM No:          NRC-25-SIM-JPM-E KIA  


==Reference:==
==Reference:==


Examinee:
Examinee:
NRC Examiner:
                            ----------------------NRC Examiner:
----------------------
                            -----------------
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing: Simulated Performance Actual Performance x Classroom SimulatorX Plant -------------------
Method of testing:
Simulated Performance                                         Actual Performance                   x Classroom                                         SimulatorX                             Plant
                                                              --
                                                              - ----  ----- ---                    - ---------
                                                                                                    -----------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service. ** 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the going shift
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-
* going shift
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* PRT Level is at 80%. Task Standard:
* PRT Level is at 80%.
Task Standard:
* Purge the PRT to Reduce Oxygen Concentration to within required specifications.
* Purge the PRT to Reduce Oxygen Concentration to within required specifications.
Required Materials:
Required Materials:
Line 1,424: Line 1,460:
* 3-NOP-041.3, Pressurizer Relief Tank
* 3-NOP-041.3, Pressurizer Relief Tank
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
* Appendix C Facility:
Job Performance Measure Worksheet
_T_u_rk_e
___ y_P_o_in_t
_______ Task No: Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume) Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM-E
-------------
007 Kl.04 Nitrogen 2.1/2.3 KIA


==Reference:==
Appendix C                                    Page 2 of 12                                Form ES-C-1 Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
*
* All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
Time Critical Task: No Validation Time:      10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
*
* NUREG 1021 Rev 9 Appendix C
 
  !AppendiX C                                Page 3 of 12                Form ES-C-1!
SIMULATOR SETUP Reset to IC #
* Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                    Page 4 of 12                          Form ES-C-1 Denote critical steps with a check mark,O Start Time - - - -
* STEP    1
          ..J
: 11. ENSURE CV-3-549, PRT VENT, is OPEN
                                                                                    -
                                                                                    -
SAT UNSAT
: 1. Placed PRT Vent Valve, CV-3-S49 switch to open.
Standard:
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.
Cue Comment NOTE:        Standard #2 is not critical.
*
* NUREG 1021 Rev 9 Appendix C
 
  !Appendix C                                Page 5 of 12                            Form ES-C-1!
: 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.
STEP    2                                                                        SAT
*
                                                                                  -
            "                                                                    -
UNSAT
: 1. Placed PRT Vent Valve, CV-3-5198 switch to open.
Standard:
                ~.
: 2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.
Cue Comment NOTE:    Standard #2 is not critical.
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                  Page 6 of 12                      Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP    3  ~oncentration                                                        SAT
* Concentration (Major Gas Volume) (continued)                    -
            ~
UNSAT
: 14. WHEN any of the following conditions exists:                -
* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY
              ~ATER WATER MAKE UP.
: 1. When PRT level approaches 95% placed PRT Vent Valve, CV                    5198 switch to close.
Standard:
              ~.
: 2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
*
: 1. Standard #2 is not critical.
NOTE:
* NUREG 1021 Rev 9 Appendix C


Examinee:
jAppendix C                                Page 7 of 12                            Form ES-C-1!
NRC Examiner:  
: 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.
-----------------
STEP    4                                                                          SAT
Facility Evaluator:
*
Date: Method of testing: Simulated Performance Actual Performance x Classroom SimulatorX Plant -----------------
                                                                                    -
Read to the examinee:
                                                                                    -
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
UNSAT Standard:
Initial Conditions:
: 1. Tell operator that 35 minutes have elapsed.
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
Cue    ~.
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service. ** 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the going shift
: 2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
* You are the oncoming Reactor Operator and have been briefed on the evolution.
Comment NOTE:
* PRT Level is at 80%. Task Standard:
*
* Purge the PRT to Reduce Oxygen Concentration to within required specifications.
* NUREG 1021 Rev 9 Appendix C
Required Materials:
* 3-NOP-041.3, Pressurizer Relief Tank General


==References:==
Appendix C   Page 8 of 12                 Form ES-C-1 STEP    5                                 SAT
* 3-NOP-041.3, Pressurizer Relief Tank
* NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11. *
* All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift. Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11. *
* All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift. Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! *
* NUREG 1021 Rev 9 Appendix C 
!AppendiX C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
* Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B *
* NUREG 1021 Rev 9 Appendix C !AppendiX C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
* Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----* 11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1 SAT -..J UNSAT -1. Placed PRT Vent Valve, CV-3-S49 switch to open. Standard:
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF. Cue Comment NOTE: Standard #2 is not critical.
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----* 11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1 SAT -..J UNSAT -1. Placed PRT Vent Valve, CV-3-S49 switch to open. Standard:
                                          -
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF. Cue Comment NOTE: Standard #2 is not critical.
                                          -
UNSAT Standard:
Cue Comment NOTE:
*
*
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
!Appendix C Page 5 of 12 Form ES-C-1! 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP. STEP 2 SAT -* " UNSAT -1. Placed PRT Vent Valve, CV-3-5198 switch to open. Standard: Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF. Cue Comment NOTE: Standard #2 is not critical.
 
jAppendix C                                 Page 9 of 12                             Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP     6  Concentration (Major                                                      SAT
*
*
* NUREG 1021 Rev 9 Appendix C !Appendix C Page 5 of 12 Form ES-C-1! 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP. STEP 2 SAT -* " UNSAT -1. Placed PRT Vent Valve, CV-3-5198 switch to open. Standard:
                                                                                      -
: 2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF. Cue Comment NOTE: Standard #2 is not critical.  
            .,j Gas Volume) (continued)
                                                                                      -
UNSAT
: 19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.
ITHEN
: 1. Placed PRT Vent Valve, CV-3-549 switch to close.
Standard: ~.
: 2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT trell Cue    oxygen reading is less than 2 percent oxygen by volume.
Comment Standard #2 is not critical.
NOTE:
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3 (Major Gas Volume) (continued)
* NUREG 1021 Rev 9 Appendix C
SAT -* UNSAT 14. WHEN any of the following conditions exists: -* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
 
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY WATER MAKE UP. 1. When PRT level approaches 95% placed PRT Vent Valve, CV-3-Standard:
Appendix C                                   Page 10 of 12                             Form ES-C-1
5198 switch to close. 2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment 1. Standard #2 is not critical.
*
* NOTE:
                ~1. WHEN Chemistry reports PRT oxygen reading less than 2%
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3 Concentration (Major Gas Volume) (continued)
121.
SAT -* UNSAT 14. WHEN any of the following conditions exists: -* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
STEP   7         by volume, THEN:                                                 - -SAT
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY MAKE UP. 1. When PRT level approaches 95% placed PRT Vent Valve, CV-3-Standard:
            ..j IA.
5198 switch to close. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment 1. Standard #2 is not critical.
                'A. CLOSE CV-3-519A, PRT VENT.                                         - -UNSAT
* NOTE:
: 1. CV-3-519A, Primary Water to Containment Isolation switch Standard:           taken to close.
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1! 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes. STEP 4 SAT -* UNSAT -Standard:
: 2. Veriified CV-3-519A Green Light ON, Red Light OFF.
: 1. Tell operator that 35 minutes have elapsed. Cue 2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
Cue     ~fter After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Comment NOTE: *
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1! 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes. STEP 4 SAT -* UNSAT -Standard:
Standard #2 is not critical.
: 1. Tell operator that 35 minutes have elapsed. Cue Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
* Terminating Cue:                                                                               STOP
Comment NOTE: *
                'The task is complete when the Examinee returns the cue sheet to IThe
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 SAT -* UNSAT -Standard:
                ~he the examiner.
Cue Comment NOTE: *
Stop Time _ _ __
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 SAT -* UNSAT -Standard:
                                                                                        ----
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6 Concentration (Major SAT -* .,j Gas Volume) (continued)
 
UNSAT -19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT. 1. Placed PRT Vent Valve, CV-3-549 switch to close. Standard:
jAppendix C                               Page 11 of 12                   Form ES-C-11 Verification of Completion
: 2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume. Comment Standard #2 is not critical.
* Job Performance Measure No. NRC-2S-SIM-JPM-E Examinee's Name:
NOTE: *
Examiner's Name:
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6 Concentration (Major SAT -* .,j Gas Volume) (continued)
                                    ~~~~~~~~-------------------------------------
UNSAT -19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, ITHEN CLOSE CV-3-549, PRT VENT. 1. Placed PRT Vent Valve, CV-3-549 switch to close. Standard: Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON trell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume. Comment Standard #2 is not critical.
Date Performed:
NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1
* WHEN Chemistry reports PRT oxygen reading less than 2% STEP 7 by volume, THEN: SAT --..j UNSAT 'A. CLOSE CV-3-519A, PRT VENT. --1. CV-3-519A, Primary Water to Containment Isolation switch Standard:
taken to close. 2. Veriified CV-3-519A Green Light ON, Red Light OFF. Cue After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Comment NOTE: Standard #2 is not critical.
* Terminating STOP Cue: 'The task is complete when the Examinee returns the cue sheet to the examiner.
Stop Time ----* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1
* 121. WHEN Chemistry reports PRT oxygen reading less than 2% STEP 7 by volume, THEN: SAT --..j UNSAT IA. CLOSE CV-3-519A, PRT VENT. --1. CV-3-519A, Primary Water to Containment Isolation switch Standard:
taken to close. 2. Veriified CV-3-519A Green Light ON, Red Light OFF. Cue standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Comment NOTE: Standard #2 is not critical.
* Terminating STOP Cue: IThe task is complete when the Examinee returns the cue sheet to examiner.
Stop Time ___ _
* NUREG 1021 Rev 9 Appendix C jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion
* Job Performance Measure No. NRC-2S-SIM-JPM-E Examinee's Name: Examiner's Name: Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,522: Line 1,590:
Question Documentation:
Question Documentation:
Question:
Question:
* Response:
*
Result: Satisfactory/Unsatisfactory
 
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion
===Response===
* Job Performance Measure No. NRC-2S-SIM-JPM-E Examinee's Name: Examiner's Name: Date Performed:
Result:   Satisfactory/Unsatisfactory
Facility Evaluator:
* Examiner's signature and date:
Number of Attempts:
NUREG 1021 Rev 9 Appendix C
Time to Complete:
 
Question Documentation:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Question:
* When you complete the task successfully, the objective for this job performance measure will be satisfied .
* Response:
Initial Conditions:
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C
* *
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied . Initial Conditions:
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the going shift
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* PRT Level is at 80%. Initiating Cue:
* PRT Level is at 80%.
Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
* All prerequisites have been satisfied.
* All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK . NUREG 1021 Rev 9 Appendix C * *
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied . Initial Conditions:
Acknowledge to the examiner when you are ready to begin.
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
*
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the going shift
* NUREG 1021 Rev 9 Appendix C
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* PRT Level is at 80%. Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
* All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK . NUREG 1021 Rev 9 Appendix C


* *
Appendix C                                     Job Performance Measure                                 Form ES-C-1 Worksheet Facility:              T_u_r_k~eY,---P_oi_nt Turkey      Point_ _ _ _ _ _ _Task No:
* Appendix C Facility:
*
Job Performance Measure Worksheet
                            --~~---------------
_______ Task No: INITIATE CONTAINMENT PURGE Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM-F  
INITIATE CONTAINMENT PURGE Task Title:                                                                     NRC-25-SIM-JPM-F
-------------
                            -  - - - - - - - - - - - -JPM No:
                            ---------------------
029 A4.01 Containment purge flow rate 2.5/2.5 KIA  
029 A4.01 Containment purge flow rate 2.5/2.5 KIA  


Line 1,564: Line 1,625:


Examinee:
Examinee:
NRC Examiner:  
                            ---------------------NRC Examiner:
----------------
                            ----------------
Facility Evaluator:
Facility Evaluator:                                         Date:
Date: Method of testing: Simulated Performance Classroom Actual Performance SimulatorX  
Method of testing:
--------Read to the examinee:
Simulated Performance                                       Actual Performance                     x Classroom                                      SimulatorX                               Plant-
x Plant ---------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                                            --------                               -- ------------ -
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT
* EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
Line 1,583: Line 1,647:


==References:==
==References:==
* 3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C * *
* 3-NOP-053, CONTAINMENT PURGE SYSTEM
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Job Performance Measure Worksheet Turkey Point Task No:
 
INITIATE CONTAINMENT PURGE Form ES-C-1 Task Title: JPM No: NRC-25-SIM-JPM-F
Appendix C                                     Page 2 of 12                            Form ES-C-1 Initiating Cue:
---------------------
* 1. A satisfactory shift turnover has been completed.
029 A4.01 Containment purge flow rate 2.5/2.5 KIA
: 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Time Critical Task: No Validation Time:     10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl
*
* NUREG 1021 Rev 9 Appendix C
 
  ~ppendix C                                Page 3 of 12                      Form ES-C-1!
SIMULATOR SETUP Reset to IC #
* Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete
*
* NUREG 1021 Rev 9 Appendix C


==Reference:==
Appendix C                                Page 4 of 12                              Form ES-C-1 Denote critical steps with a check marI(O Start Time
*
                                                                                      ----
              ~.1.1.12 4.1.1.12 STEP    1                                                                        - -SAT
          ~  Open the following valves:
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602                  - -UNSAT
              ~.
: 2. Containment Purge Exhaust Isol (I.c.),
(I.e.), POV 2603
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
: 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
Light On, Green Light Off.
: 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open
              ~.
: 4. Verified Containment Purge Exhaust Isol (O.c.),
(O.e.), POV-3-2603 Red Light On, Green Light Off.
Cue Comment
* NOTE:    Standards #2 and #4 not critical
* NUREG 1021 Rev 9 Appendix C


Examinee:
  ~ppendix C                                    Page 5 of 12                            Form ES-C-11
NRC Examiner:
                ~.1.1.13 4.1.1.13 STEP    2                                                                        - -SAT
---------------------
* Prepare to open Containment Purge Supply Isolation Valves
Facility Evaluator:
                !prepare If both conditions are met then both Unit 3 Containment Purge Supply
Date: Method of testing: Simulated Performance Classroom Actual Performance SimulatorX
                ;Valves will be open.
--------Read to the examinee:
lValves
x Plant -------I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                                                                      - -UNSAT Standard:
Initial Conditions:
: 1. Verified Containment Doors/Hatches closed to atmosphere.
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
p.2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
Cue
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* Comment NOTE:   [This This information is covered in the Initial Conditions
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.
* NUREG 1021 Rev 9 Appendix C
Task Standard:
* ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
* 3-NOP-053, CONTAINMENT PURGE SYSTEM
* APPROVED CONTAINMENT PURGE RELEASE PERMIT General


==References:==
Appendix C                                 Page 6 of 12                             Form ES-C-1
* 3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
              ~.1.1.13 4.1.1.13 (contd.)'
* 1. A satisfactory shift turnover has been completed.  
STEP    3                                                                            SAT
*
*
* 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
                                                                                      -
Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
Open the following valves:
* 1. A satisfactory shift turnover has been completed.  
            ~
: 1. Containment Purge Supply Isol (O.C.), POV-3-2600                  -
UNSAT t2.Q. Containment Purge Supply Isol (I.C.), POV 2601
: 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.
              ~.
: 2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:      Light On, Green Light Off.
b.
: 3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.
              ~.
: 4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.
Cue Comment
* NOTE:   Standards #2 and #4 not critical
* NUREG 1021 Rev 9 Appendix C
 
jAppendiX C                                 Page 7 of 12                                 Form ES-C-1!
fl.1.1.14 4.1.1.14 STEP    4                                                                            - -SAT
*            ~  Start 3V20: Unit 3 Containment Purge Exhaust Fan .
: 1. Control Switch Positioned to Run
                                                                                          - -UNSAT
                ~.
: 2. Verified Fan Red Light On and Green Light Off Standard:
: 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue    Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.
Comment NOTE:    Standards 2,3, and 4 are not critical
*
*
* 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
* NUREG 1021 Rev 9 Appendix C
Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C


C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
Appendix C                                   Page 8 of 12                               Form ES-C-1
* Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete *
                ~.1.1.15 14*1.1.15 STEP   5                                                                           - -SAT
* NUREG 1021 Rev 9 Appendix C C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC #
*           ..J Start 3V9: Unit 3 Containment Purge Supply Fan.
* Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete *
: 1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----*
                                                                                        - -UNSAT
STEP 1 SAT --Open the following valves: UNSAT 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602
                ~.
--Containment Purge Exhaust Isol (I.e.), POV 2603 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
: 2. Control Switch Positioned to Run Standard:   3. Verified Fan Red Light On and Green Light Off
Light On, Green Light Off. 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open 4. Verified Containment Purge Exhaust Isol (O.e.), POV-3-2603 Red Light On, Green Light Off. Cue Comment
                ~.
* NOTE: Standards
: 4. Verified Damper Red Light On Green Light Off
#2 and #4 not critical
: 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----* 4.1.1.12 STEP 1 SAT --Open the following valves: UNSAT 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602
Cue     rrell Tell candidate that another operator will complete the remainder of the procedure.
--2. Containment Purge Exhaust Isol (I.c.), POV 2603 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
Comment NOTE:
Light On, Green Light Off. 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open Verified Containment Purge Exhaust Isol (O.c.), POV-3-2603 Red Light On, Green Light Off. Cue Comment
* Standards #2 and #3not critical Terminating The task is complete when the Examinee returns the cue sheet to             STOP Cue:     the examiner.
* NOTE: Standards
#2 and #4 not critical
* NUREG 1021 Rev 9 Appendix C 
 
C Page 5 of 12 Form ES-C-11 STEP 2 4.1.1.13 SAT
* Prepare to open Containment Purge Supply Isolation Valves --UNSAT --If both conditions are met then both Unit 3 Containment Purge Supply lValves will be open. Standard:
: 1. Verified Containment Doors/Hatches closed to atmosphere.
: p. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED. Cue
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED. Comment
* NOTE: This information is covered in the Initial Conditions
* NUREG 1021 Rev 9 Appendix C C Page 5 of 12 Form ES-C-11 STEP 2 SAT * !prepare to open Containment Purge Supply Isolation Valves --UNSAT --If both conditions are met then both Unit 3 Containment Purge Supply ;Valves will be open. Standard:
: 1. Verified Containment Doors/Hatches closed to atmosphere.
: 2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED. Cue
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED. Comment
* NOTE: [This information is covered in the Initial Conditions
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 STEP 3 4.1.1.13 (contd.)'
SAT
* Open the following valves: -1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT -t2. Containment Purge Supply Isol (I.C.), POV 2601 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:
Light On, Green Light Off. b. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off. Cue Comment
* NOTE: Standards
#2 and #4 not critical
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 STEP 3 (contd.)'
SAT
* Open the following valves: -1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT -Q. Containment Purge Supply Isol (I.C.), POV 2601 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open. 2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:
Light On, Green Light Off. 3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open. 4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off. Cue Comment
* NOTE: Standards
#2 and #4 not critical
* NUREG 1021 Rev 9 Appendix C jAppendiX C Page 7 of 12 Form ES-C-1! fl.1.1.14 STEP 4 SAT --* Start 3V20: Unit 3 Containment Purge Exhaust Fan . UNSAT --1. Control Switch Positioned to Run Standard: Verified Fan Red Light On and Green Light Off 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started. Comment NOTE: Standards 2 , 3 , and 4 are not critical *
* NUREG 1021 Rev 9 Appendix C jAppendiX C Page 7 of 12 Form ES-C-1! 4.1.1.14 STEP 4 SAT --* Start 3V20: Unit 3 Containment Purge Exhaust Fan . UNSAT --1. Control Switch Positioned to Run Standard:
: 2. Verified Fan Red Light On and Green Light Off 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started. Comment NOTE: Standards 2 , 3 , and 4 are not critical *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 SAT
* Start 3V9: Unit 3 Containment Purge Supply Fan. --..J UNSAT --1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open. 2. Control Switch Positioned to Run Standard:
: 3. Verified Fan Red Light On and Green Light Off 4. Verified Damper Red Light On Green Light Off 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN. Cue Tell candidate that another operator will complete the remainder of the procedure.
Comment NOTE: Standards  
#2 and #3not critical
* Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.
Stop Time
Stop Time
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 14*1.1.15 SAT
* NUREG 1021 Rev 9 Appendix C
* Start 3V9: Unit 3 Containment Purge Supply Fan. --..J UNSAT --1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open. Control Switch Positioned to Run Standard:
: 3. Verified Fan Red Light On and Green Light Off Verified Damper Red Light On Green Light Off 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN. Cue rrell candidate that another operator will complete the remainder of the procedure.
Comment NOTE: Standards
#2 and #3not critical
* Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.
Stop Time
* NUREG 1021 Rev 9 Appendix C 


C Page 9 of 12 Form ES-C-1! Verification of Completion Examinee's Name: Examiner's Name: Date Performed:
  ~ppendix C                                 Page 9 of 12                     Form ES-C-1!
Verification of Completion
~ JobPe~rmanceMeasureNo.N            _~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~
JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response:
Question:
Result: Satisfactory/Unsatisfactory
~
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C C Page 9 of 12 Form ES-C-1! Verification of Completion Examinee's Name: Examiner's Name: Date Performed:
 
Facility Evaluator:
===Response===
Number of Attempts:
Result:   Satisfactory/Unsatisfactory
Time to Complete:
* Examiner's signature and date:
Question Documentation:
NUREG 1021 Rev 9 Appendix C
Question: Response:
 
Result: Satisfactory/Unsatisfactory
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C
* When you complete the task successfully, the objective for this job performance measure will be satisfied .
* *
Initial Conditions:
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied . Initial Conditions:
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
Line 1,705: Line 1,773:
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.  
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.
!NITIA TlNG CUE: You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
  !NITIA TlNG CUE:
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK . NUREG 1021 Rev 9 Appendix C * *
You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied . Initial Conditions:
Acknowledge to the examiner when you are ready to begin.
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
*
* UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* NUREG 1021 Rev 9 Appendix C
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.
!NITIA TlNG CUE: You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK . NUREG 1021 Rev 9 Appendix C


* *
Appendix C                                                                                       Job Performance Measure                              Form ES-C-1 Worksheet Facility:              T_ur_k_e.Ly_P_o_in_t Turkey                        Point_ _ _ _ _ _ _Task No:
* Appendix C Facility:
*
Task Title: KIA  
                          ----~----------
                          -:Fill    -II:-3.:.3A                                                                                        NRC-25-SIM-JPM-G Task Title:
                          - : -Fi: --        .-
006 A 1.13 Accumulator
                                                      -Accumulator
:. .A--=---Ac::-cc.-
:. ,u:.-
:. -m.:. .-
:. .u=l=at-
: . : .o.-
:. .:. .r_
                                                                                                              --_-
_ -_
                                                                                                                    -JPM No:
pressure (level, boron concentration )3.5/3.7 KIA  


==Reference:==
==Reference:==


Examinee:
Examinee:
Facility Evaluator:
                          - - - - - - - - - - - - -NRC Examiner:
Method of testing: Job Performance Measure Worksheet Turkey Point Task No:
Facility Evaluator:                                                                                                Date:
Fill 3A Accumulator JPM No: --------------
Method of testing:
006 A 1.13 Accumulator pressure (level, boron concentration
Simulated Performance                                                                                              Actual Performance              x Classroom                                                                                              Simulator======~X~_ _
)3.5/3.7 -------------
Simulator----.....,X~                Plant
NRC Examiner:
                                                                                                                                                    - --
Date: Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x Classroom Plant ----------
                                                                                                                                                    - --- ----
                                                                                                                                                              ------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Line 1,737: Line 1,815:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
* 7.1.2.2.b,c, and d are marked N/A.
*
* It is desired to use the 3A HHSI Pump for this task Task Standard:
* It is desired to use the 3A HHSI Pump for this task Task Standard:
* Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons. Required Materials:
* Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.
Required Materials:
* 3-0P-064 Safety Injection Accumulators General  
* 3-0P-064 Safety Injection Accumulators General  


==References:==
==References:==
* 3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C * *
* 3-0P-064 Safety Injection Accumulators
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KIA


==Reference:==
Appendix C                                              Page 2 of 12                                    Form ES-C-1 Initiating Initi ating Cue:
You have been directed to raise 3A    JA Accumulator Level to 6600 +/- 20 gallons gall ons using 3A SAFETY INJECT ION PUMP INJECTION          PUM P starting at step:  7. 1.2.2.3.
step: 7.1.2.2 .3.
* 3-0  P- 064 Safety Injection Accumulators, Section 3-0P-064                                          Sec tion 7.1,
: 7. 1, Adding Make-up to the Safety Injection Injecti on Accumulators up to 7.1.2.2.2.a
: 7. 1.2.2.2.a has been completed.
compl eted.
* 77.1.2.2.b,c,                      NIA.
        . 1.2.2.b,c, and d are marked N/A.
Ti me Critical Time    Cri tica l Task: NO Va lidati on Time:
Validation                15 minutes HAND Jl'M  JPM BRIEFING SHEET T          TOO EXAMINEE AT TID          T BlS TIME!
TI ME!
NUREG 1021 Rev 9 Appendix C


Examinee:
  ~ppendiX C                                     Page 3 of 12                                   Form ES-C-1!
Facility Evaluator:
SIMULATOR SETUP Reset to IC # 1
Method of testing: Job Performance Measure Worksheet T_ur_k_e.Ly_P_o_in_t
* Load Lesson
_______ Task No: -:::-Fi::--II:-3.:...:...A--=---Ac::-cc.:..,u:.:..-m.:...:...u=l=at::..::.o.:...:...r
____ JPM No: 006 A 1.13 Accumulator pressure (level, boron concentration
)3.5/3.7 NRC Examiner:
-------------
Date: Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x Classroom
__ Plant -------Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
* It is desired to use the 3A HHSI Pump for this task Task Standard:
* Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons. Required Materials:
* 3-0P-064 Safety Injection Accumulators General
 
==References:==
* 3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A. Time Critical Task: NO Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO E XAMINEE AT TID TIME! NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 I n iti a t ing Cue: You h ave bee n d i rec t ed t o r aise JA Acc um u l a t o r Level t o 6600 +/- 20 ga ll o n s u s in g 3A SA F ETY IN J ECT I ON P UM P sta rting a t step: 7.1.2.2.3.
* 3-0 P-064 Safe t y In ject i o n Accu m u l a t ors, Sec ti o n 7.1 , A ddin g Ma k e-u p t o th e Safety I n j ec ti o n Acc u m ul a t ors up t o 7.1.2.2.2.a h as b ee n co mpl eted.
* 7 .1.2.2.b,c , a nd d a r e mar k ed N I A. Ti me C ri t i ca l Tas k: NO Va lid a ti o n Tim e: 1 5 m i nut es HAND Jl'M BRIEFING SHE E T TO E X A MINEE AT T Bl S TI ME! NUREG 1021 Rev 9 Appendi x C 
* *
* C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC # 1 Load Lesson
* Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
* Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
* Open SI Pump 3A Test Recirc Isolation, 3-899K. Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* Open SI Pump 3A Test Recirc Isolation, 3-899K.
Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled. NUREG 1021 Rev 9 Appendix C * *
Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.
* C Page 3 of 12 Form ES-C-1! SIMULATOR SETUP Reset to IC # 1 Load Lesson
* Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
* Open SI Pump 3A Test Recirc Isolation, 3-899K. Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled. NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1 SAT --..j UNSAT --1. Placed Control Switch to Open for Accumulator A, CV-3-851A
: 2. Verified Red OPEN light ON Standard:
: 3. Verified Green CLOSED light OFF Cue Comment NOTE: Standards 2 and 3 are not critical.  
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----* Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1 SAT --..j UNSAT --1. Placed Control Switch to Open for Accumulator A, CV-3-851A
* NUREG 1021 Rev 9 Appendix C
: 2. Verified Red OPEN light ON Standard:
 
: 3. Verified Green CLOSED light OFF Cue Comment NOTE: Standards 2 and 3 are not critical.  
Appendix C                                 Page 4 of 12                         Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -
* STEP    1
          ..j Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A
                                                                                  - -SAT
                                                                                  - -UNSAT
: 1. Placed Control Switch to Open for Accumulator A, CV-3-851A
: 2. Verified Red OPEN light ON Standard: 3. Verified Green CLOSED light OFF Cue Comment NOTE:   Standards 2 and 3 are not critical.
*
*
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
!AppendiX C Page 5 of 12 Form ES-C-1! Start the 3A Safety Injection Pump document the start time on QA STEP 2 !Record Page SAT --* UNSAT --1. 3A HHSI Pump Control Switch turned to START Standard: 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE: Standards 2 and 3 are not critical.  
 
  !AppendiX C                                 Page 5 of 12                             Form ES-C-1!
Start the 3A Safety Injection Pump document the start time on QA STEP     2 !Record Page                                                         - -SAT
*           ~
Standard:
: 1. 3A HHSI Pump Control Switch turned to START
                ~. 3A HHSI Pump Red Run light is ON
                                                                                      - -UNSAT l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:   Standards 2 and 3 are not critical.
*
*
* NUREG 1021 Rev 9 Appendix C !AppendiX C Page 5 of 12 Form ES-C-1! Start the 3A Safety Injection Pump document the start time on QA STEP 2 !Record Page SAT --* UNSAT --1. 3A HHSI Pump Control Switch turned to START Standard: 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE: Standards 2 and 3 are not critical.  
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                   Page 6 of 12                                 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP   3                                                                            - -SAT
* establish flow to the accumulator.
            ..j
                                                                                        - -UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.
Standard: 2. MOV-3-869 Red OPEN light is ON.
: 3. MOV-3-869 Green CLOSED light is OFF.
                ~f Operator asks for the use of another operator tell operator that the Cue
                !evaluator/designated operator will serve in this capacity.
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.
NOTE:
Standards 2 and 3 are not critical.
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3 establish flow to the accumulator.
* NUREG 1021 Rev 9 Appendix C
SAT --* ..j UNSAT --I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869. Standard:
 
: 2. MOV-3-869 Red OPEN light is ON. 3. MOV-3-869 Green CLOSED light is OFF. Cue Operator asks for the use of another operator tell operator that the !evaluator/designated operator will serve in this capacity.
  !Appendix C                                 Page 7 of 12                       Form ES-C-1!
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process. NOTE: Standards 2 and 3 are not critical.  
WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP    4  close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.             - -SAT
*           -j
: l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
                                                                                  - -UNSAT
: 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Light is ON.
Standard:
: 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.
Cue Comment
* NOTE:    Standards 2 and 3 are not critical.
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                  Page 8 of 12                          Form ES-C-1 STEP    5  ~perator Stops the 3A Safety Injection Pump AND verifies the control - -SAT
*          "  switch is in the mid position.
: 1. 3A HHSI Pump Control Switch turned to Stop and released to Mid
                                                                                    - -UNSAT Standard: 2. 3A HHSI Pump Red Run light is OFF
: 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:   Standards 2 and 3 are not Critical to this step.
*
*
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3 establish flow to the accumulator.
* NUREG 1021 Rev 9 Appendix C
SAT --* ..j UNSAT --I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869. Standard:
 
: 2. MOV-3-869 Red OPEN light is ON. 3. MOV-3-869 Green CLOSED light is OFF. Cue Operator asks for the use of another operator tell operator that the !evaluator/designated operator will serve in this capacity.
  !Appendix C                                 Page 9 of 12                               Form ES-C-11 STEP     6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV             - -SAT
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process. NOTE: Standards 2 and 3 are not critical.
*           ~    851A
*
: 1. Placed CV-3-851A Control Switch to CLOSE and released to MID
* NUREG 1021 Rev 9 Appendix C 
                ~. Verified CV-3-851A RED Open light OFF
!Appendix C Page 7 of 12 Form ES-C-1! WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4 close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.
                                                                                        - -UNSAT Standard: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue   pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
SAT --* -j UNSAT --l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:
Comment NOTE:   Standards 2 and 3 are not Critical to this step.
Light is ON. 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF. Cue Comment
Terminating !The task is complete when the Examinee returns the cue sheet to the Cue:                                                                               STOP
* NOTE: Standards 2 and 3 are not critical.
                !examiner.
* NUREG 1021 Rev 9 Appendix C !Appendix C Page 7 of 12 Form ES-C-1! WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4 close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.
* Stop Time _ _ __
SAT --* -j UNSAT --l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:
* NUREG 1021 Rev 9 Appendix C
Light is ON. 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF. Cue Comment
 
* NOTE: Standards 2 and 3 are not critical.
Appendix C                                                               Page 10 of 12                                                   Form ES-C-1 Verification of Completion
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 Stops the 3A Safety Injection Pump AND verifies the control SAT --* " switch is in the mid position.
*~ JobPertormanceMeasureNo.          ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~
UNSAT --1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
Job Performance Measure No. :..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
: 2. 3A HHSI Pump Red Run light is OFF 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE: Standards 2 and 3 are not Critical to this step. *
Examinee's Name:
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 Stops the 3A Safety Injection Pump AND verifies the control SAT --* " switch is in the mid position.
Examiner's Name:
UNSAT --1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
Date Pertormed:
: 2. 3A HHSI Pump Red Run light is OFF 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE: Standards 2 and 3 are not Critical to this step. *
Performed:
* NUREG 1021 Rev 9 Appendix C 
!Appendix C Page 9 of 12 Form ES-C-11 STEP 6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV-3-SAT --* 851A UNSAT --1. Placed CV-3-851A Control Switch to CLOSE and released to MID Verified CV-3-851A RED Open light OFF Standard:
: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
Comment NOTE: Standards 2 and 3 are not Critical to this step. Terminating  
!The task is complete when the Examinee returns the cue sheet to the STOP Cue: !examiner .
* Stop Time ___ _
* NUREG 1021 Rev 9 Appendix C !Appendix C Page 9 of 12 Form ES-C-11 STEP 6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV-3-SAT --* 851A UNSAT --1. Placed CV-3-851A Control Switch to CLOSE and released to MID Verified CV-3-851A RED Open light OFF Standard:
: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
Comment NOTE: Standards 2 and 3 are not Critical to this step. Terminating
!The task is complete when the Examinee returns the cue sheet to the STOP Cue: !examiner .
* Stop Time ___ _
* NUREG 1021 Rev 9 Appendix C rr Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion
* Job Performance Measure No.
________________
_ Examinee's Name: Examiner's Name: Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,837: Line 1,925:
Question Documentation:
Question Documentation:
Question:
Question:
* Response:
*~
Result: Satisfactory/Unsatisfactory
 
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion JobPertormanceMeasureNo.
===Response===
Examinee's Name: Examiner's Name: Date Pertormed:
Result:   Satisfactory/Unsatisfactory
Facility Evaluator:
* Examiner's signature and date:
Number of Attempts:
NUREG 1021 Rev 9 Appendix C
Time to Complete:
 
Question Documentation:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Question: Response:
* When you complete the task successfully, the objective for this job performance measure will be satisfied.
Result: Satisfactory/Unsatisfactory
* Examiner's signature and date: NUREG 1021 Rev 9 Appendix C
* *
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
* 7.1.2.2.b,c, and d are marked N/A.
* It is desired to use the 3A HHSI Pump for this task INITIATING CUE: You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
* It is desired to use the 3A HHSI Pump for this task INITIATING CUE:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
* 7.1.2.2.b,c, and d are marked N/A. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C *
*
* JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
* 7.1.2.2.b,c, and d are marked N/A.
* It is desired to use the 3A HHSI Pump for this task INITIATING CUE: You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
Acknowledge to the examiner when you are ready to begin.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* 7.1.2.2.b,c, and d are marked N/A. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C


* *
Appendix C                                                                          Job Performance Measure                        Form ES-C-1 Worksheet
* Appendix C Facility:
* Facility:
Task Title: KIA  
Task Title:
KIA  


==Reference:==
==Reference:==


Job Performance Measure Worksheet
_T_u_r_k_ey"--P__.o_in_t
_T-'-u.:.:.:r-'...:kc::.eYL..:.-P...:::.o..:.:..in.:..:.t
_T-' -u.:.:.:r-'. .:kc::.eYL..:.-P.. : :.o. :.:. in.:. :.t_ _ _ _ _ _ _ Task No:
_______ Task No: Perfonn EDG Nonnal Start Test (Alternate Path) JPM No:
Perfonn EDG Nonnal Start Test (Alternate Path)
064 A2.05 Loading the EDIG 3.1/3.2 Examinee:
                          --~----~----
NRC Examiner:
                          ---~---~~~=---
Facility Evaluator:
064 A2.05 Loading the EDIG 3.1/3.2 JPM No:        NRC-25-SIM-JPM-H Examinee:                                                                                         NRC Examiner:
Date: Form ES-C-1 NRC-25-SIM-JPM-H Method of testing:
Facility Evaluator:                                                                                Date:
_________________________
Method of testing:          Simulator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
_ Simulated Performance
_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r
__________
                          ~~~~-----------------------------------------------
Actual Performance
Simulated Performance _ _ _ _ _ _ _ _ _ _ Actual Performance _ _ _ _ _. . :X                                                  X-.:. . . . ._ _ _ __
_____ ....:X-.:.........
                                                -------------------                                                  ---------~~--------
____ _ Classroom  
Classroom -    -----------
-------Simulator
                    ------                                                                               x
__ _ Plant _________
                                                                                                -=====-:!.X~_ __
_ Read to the examinee:
Simulator -----------            Plant __________
                                                                                                                              ------------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 . Task Standard:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 .
: 1. The EDG will be synchronized to the Bus in accordance with 3-0SP-023  
* Task Standard:
.1. 2. The EDG is placed to Emergency Stop when required.
1.
2.
The EDG will be synchronized to the Bus in accordance with 3-0SP-023 .1.
The EDG is placed to Emergency Stop when required.
Required Materials:
Required Materials:
: 1. 3-0SP-023.1, "Diesel Generator Operability Test" General  
: 1.       3-0SP-023.1, "Diesel Generator Operability Test" General  


==References:==
==References:==
: 1. 3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C * *
: 1.       3-0SP-023.1, "Diesel Generator Operability Test"
* Appendix C Facility:
* NUREG 1021 Rev 9 Appendix C
Task Title: KIA


==Reference:==
Appendix C                                  Page 2 of 12                              Form ES-C-1 Initiating Cue:
* You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.
Time Critical Task: No Validation Time:    15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
*
* NUREG 1021 Rev 9 Appendix C


Job Performance Measure Worksheet
I Appendix C                                Page 3 of 12                    Form ES-C-1 I SIMULATOR SETUP Reset to IC #
_T_u_r_k_ey"--P__.o_in_t
* Reset to IC-1.
_______ Task No: Perfonn EDG Nonnal Start Test (Alternate Path) JPM No:
Load Lesson
064 A2.05 Loading the EDIG 3.1/3.2 Examinee:
: 1. Open lesson JPM 01 023006201.lsn and execute.
NRC Examiner:
: 2. Ensure 3A EDG has been started and in stable operation.
Facility Evaluator:
Ensure Simulator Operator Checklist is complete
Date: Form ES-C-1 NRC-25-SIM-JPM-H Method of testing: Simulator Simulated Performance Actual Performance X -------------------
*
Classroom Simulator x Plant -----------
* NUREG 1021 Rev 9 Appendix C
-----------
------------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 . Task Standard:
: 1. The EDG will be synchronized to the Bus in accordance with 3-0SP-023
.1. 2. The EDG is placed to Emergency Stop when required.
Required Materials:
: 1. 3-0SP-023.1, "Diesel Generator Operability Test" General


==References:==
Appendix C                                 Page 4 of 12                         Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
: 1. 3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C 
* STEP     1
* *
          ..j
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.
: 1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
3-0SP-023.1.
                                                                                  - - SAT
Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C * *
                                                                                  - - UNSAT
* Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.
: 2. Check that the WHITE synchronizing lights are cycling ON.
3-0SP-023.1.
Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME! NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* Reset to IC-1. Load Lesson 1. Open lesson JPM 01 023006201.lsn and execute. 2. Ensure 3A EDG has been started and in stable operation.
Ensure Simulator Operator Checklist is complete *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* Reset to IC-1. Load Lesson 1. Open lesson JPM 01 023006201.lsn and execute. 2. Ensure 3A EDG has been started and in stable operation.
Ensure Simulator Operator Checklist is complete *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
* STEP 1 SAT --..j UNSAT --1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON. 2. Check that the WHITE synchronizing lights are cycling ON. Standard:
Cue Comment NOTE: Standard #2 is not Critical to this step. *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
* STEP 1 SAT --..j UNSAT --1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON. 2. Check that the WHITE synchronizing lights are cycling ON. Standard:
Cue Comment NOTE: Standard #2 is not Critical to this step. *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I
* STEP 2 Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT --...; match Running indicated voltage . UNSAT --Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I
* STEP 2 Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT --...; match Running indicated voltage . UNSAT --Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the
* STEP 3 pointer on the Synchroscope is rotating slowly in the FAST direction . SAT --..j UNSAT --Adjusted engine speed so that the pointer on the synchroscope is Standard:
rotating slowly in the FAST direction.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the
* STEP 3 pointer on the Synchroscope is rotating slowly in the FAST direction . SAT --..j UNSAT --Adjusted engine speed so that the pointer on the synchroscope is Standard:
rotating slowly in the FAST direction.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4 Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT --* ..j slightly higher than Running voltage . UNSAT --Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4 Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT --* ..j slightly higher than Running voltage . UNSAT --Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT --* verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases. --Standard:
Verified voltages are approximately equal. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5 Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT --* verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases. --Standard:
Verified voltages are approximately equal. Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6 the Gen Frequency indicator SAT --* UNSAT --Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:
on the Gen Frequency indicator Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6 the Gen Frequency indicator SAT --* UNSAT --Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:
on the Gen Frequency indicator Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9 close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT --* ..j Control Switch to the CLOSE position (spring return to nonnal). UNSAT --1. Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
Standard:
Standard:
: 2. Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON). Cue Comment NOTE: Standard #2 is not Critical to this step . *
Cue Comment NOTE:     Standard #2 is not Critical to this step.
* NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9 close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT --* ..j Control Switch to the CLOSE position (spring return to nonnal). UNSAT --1. Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
*
* NUREG 1021 Rev 9 Appendix C
 
I Appendix C                                  Page 5 of 12                              Form ES-C-1  I
* STEP    2
            ...;
Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to match Running indicated voltage .
Using the voltage adjust control switch, adjusted the generator voltage
                                                                                          - - SAT
                                                                                          --
UNSAT Standard:  on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                Page 6 of 12                              Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the
*                                                                                    - - SAT STEP    3  pointer on the Synchroscope is rotating slowly in the FAST direction .
          ..j
                                                                                      - - UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard:  rotating slowly in the FAST direction.
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
I Appendix C                                Page 7 of 12                              Form ES-C-1  I STEP    4  Using the A Diesel Gen Volt Regulator, adjust Incoming voltage          - - SAT
*            ..j Standard:
slightly higher than Running voltage .
Using the voltage adjust control switch, adjusted the generator voltage on the Bus Voltage Incoming indicator to match the voltage on the Bus
                                                                                        - - UNSAT Voltage Running indicator.
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                              Page 8 of 12                            Form ES-C-1 STEP    5                                                                      - - SAT
* Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, verify voltages are approximately equal between the 3A Diesel Generator output and the 3A 4KV Bus for all three phases.            - - UNSAT Standard: Verified voltages are approximately equal.
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
I Appendix C                              Page 9 of 12                            Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP    6                                                                      - - SAT
* the Gen Frequency indicator
                                                                                    - - UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard: on the Gen Frequency indicator Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                 Page 10 of 12                           Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP     9                                                                         - - SAT
* close the diesel generator breaker by placing the EDG Bkr 3AA20
          ..j Control Switch to the CLOSE position (spring return to nonnal).
                                                                                      - - UNSAT
: 1.     Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
Standard:
Standard:
: 2. Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON). Cue Comment NOTE: Standard #2 is not Critical to this step . *
: 2.     Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I
Cue Comment NOTE:     Standard #2 is not Critical to this step.
* Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT --..J UNSAT --Standard:
*
Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE: *
* NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I
 
* Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT --..J UNSAT --Standard:
I Appendix C                           Page 11 of 12                           Form ES-C-1 I
Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE: *
* Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP   10
* NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 Tum the A EDG Speed Changer in the RAISE direction and slowly STEP 11 increase diesel generator load to approximately 1000 KW. SAT --..J UNSAT --I. Turned the Governor Control Switch AND slowly loaded diesel generator to approximately 1000 KW. Standard: 2. Operator recognizes EDG problem and places EDG to Emergency Stop. 1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw. 2. When the 3A EDG Voltage Regulator is taken to RAISE, SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where increasing oscillations in Voltage/Load begin. Cue 3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will take over. 4. Tell operator that JPM is complete. Comment NOTE: Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner. Stop Time ----NUREG 1021 Rev 9 Appendix C A p pend ix C Pag e 12 of 12 F o rm ES-C-l Turn the A EDG Speed r in the . u... Land ,. .., 11 SA T : increase die s e l generator l o ad to approximately 1000 KW. .J UN SA T I. t umed the ,AND I die se l gen e rator to appro x imatel y 1000 KW. Standard:
                                                                                  - - SAT
2 Operator reco g nize s EDG prob l em and places EDG to Emergency SlOp. 1. If candi d ate asks tell candidate that vendor h as cleared generator power inc r ease to 1000 kw. 2. Wh e n the 3 A EDG Vo ltage Regul a tor i s t a ke n to RAISE. 81M OPERATOR initiates a c o n t inuous i ncr ea s e i n Voltag e R e gulat or s e tting up to th e p o int wh e re in c re asi n g osc ill a t io n s i n V oltag e/lo ad b e g in. Cue 3. Wh e n Operator places EDG to Emergency St o p or EDG trip s tell operat o r that another operator wi ll tak e over. 4. Tell operator that JPM i s complete.
            ..J
a Comment NOTE: T e rm i nating The task is complete when the Examinee returns the cue sheet to the S T OP Cue: examiner. Stop Time NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No. NRC-25-SIM-JPM-H Examinee's Name: Examiner's Name: Date Performed:
                                                                                  - - UNSAT Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Standard:
Cue Comment NOTE:
*
* NUREG 1021 Rev 9 Appendix C
 
Appendix Ap pend ix C                                       Page 12 of 12                                     Form ES-C-l ES-C-1 Turn                                                u...
Tum the A EDG Speed Changerr in the RAISE. directionLand          and ,.  ..,
slowly SAT STEP     11     : increase diesel generator load to approximately 1000 KW.     KW .
~
                                                                                                        --
                                                                                                        ~-
            .J..J
                                                                                                        - - UNSAT
                                                                                                        ~-
t umed the Governor Control Switch,AND I. Turned                                    AND slowly loadedI diesel approximatelyy 1000 KW.
generator to approximatel            KW.
Standard Standard::          22. Operator recognizes recognizes EDG problem and places EDG to Emergency SlOp.Stop.
: 1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw. kw.
: 2. When the 3A EDG Voltage Regulator is taken to RAISE.          RAISE, 81M SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where Voltage/Load begin.
increasing oscillations in Voltage/load Cue
: 3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will trips                                        wi ll take over.
over.
: 4. Tell operator that JPM is  is complete.
a~
Comment NOTE:
Terminating Term  inating                                                                                          STOP The task is complete when the Examinee returns the cue sheet to the Cue:
Cue:          examiner.
Stop Time _~~~
                                                                                                        ----
NUREG 1021 Rev 9 Appendix C
 
I Appendix C                                 Page 13 of 12               Form ES-C-1 I Verification of Completion e   Job Performance Measure No.       NRC-25-SIM-JPM-H Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Line 1,991: Line 2,107:
Question Documentation:
Question Documentation:
Question:
Question:
e ______________________
e _______________________
_ Response:
 
Result: Satisfactory/Unsatisfactory
===Response===
* Examiner's signature and date: ________________
Result:   Satisfactory/Unsatisfactory
_ NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No. NRC-25-SIM-JPM-H Examinee's Name: Examiner's Name: Date Performed:
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Facility Evaluator:
NUREG 1021 Rev 9 Appendix C
Number of Attempts:
 
Time to Complete:
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, discuss, and provide initiating cues.
Question Documentation:
When you complete the task successfully, successfully, the objective for this job performance measure will be satisfied.
Question:
satisfied .
e ______________________
INITIAL CONDITIONS:
_ Response:
You are the Unit 3 RCO . 3-0SP-023.1, 3-0SP-023.1, Diesel Generator Operability Test Test,, has been satisfactorily completed through 7.1.2.30.
Result: Satisfactory/Unsatisfactory
INITIA TlNG CUE:
* Examiner's signature and date: ________________
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31     7.1.2.31..
_ NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial condit i ons , which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. INITIAL CONDITIONS:
3-0SP-023.1.
You are the Unit 3 RCO. 3-0SP-023.1 , Diesel Generator Operability Test , has been satisfactorily completed through 7.1.2.30. INITIA TlNG CUE: You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1. Acknowledge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the ini tial conditio n s , wh i ch steps to simulate or di scuss , and provide ini ti ating cues. When you complete the task successfully , the objective for this jo b performance measure will be s atisfi ed. INITIAL CONDITIONS:
Acknowledge to the examiner when you are ready to begin.
You a r e the Unit 3 RCO. 3-0S P-023.1, Diesel Genera tor Operability Test , has been sa t isfactorily comp l eted through 7.1.2.30. INITIA TlNG CUE: You have been directed to contin u e the Monthly EDG Normal Start T est (3A EDG) starti ng at s tep 7.1.2.31. 3-0SP-0 23.1. Acknowl e dge to the examiner when you are ready to begin. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. NUREG 1021 Rev 9 Appendix C}}
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C}}

Revision as of 21:07, 13 November 2019

Initial Exam 2009-302 Draft Sim/In-Plant JPMs
ML100670500
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/11/2009
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
50-250/09-302, 50-251/09-302 50-250/09-302, 50-251/09-302
Download: ML100670500 (156)


Text

FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:

E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:

Submitted By By: Ul~ tjw#

idJm ~I Verified By !oJ J' ~

111oJ

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility: Turkey Point Task No: 24094001501 Place Unit 4 Post Accident Task Title: Hydrogen Monitor In Service JPM No: NRC-25-IP-JPM-1 KIA

Reference:

028 A2.02 {3.5/3.9}

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: In Plant Simulated Performance X


~-------------

Classroom - - - - - - - - Simulator - - - - - - - Plant - X- - - - - - -


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable prerequisites listed in Section 3.0 are satisfied.
3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
  • Task Standard:
1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."

Required Materials:

1. Two way radio (optional communications device)
2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
3. "A" key
4. Valve Operating Handle (located in Aux Bldg EIW hallway)

General

References:

1. 4-0P-094, "Containment Post-Accident Monitoring Systems"

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in
  • accordance with 4-0P-094, Section 7.1.

Time Critical Task: YES (30 min)

Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

  • Start Time Obtain Required Materials STEP 1 - - SAT

- - UNSAT

1. Obtains a copy of 4-0P-094, Post Accident Monitoring System.
2. Verifies latest revision and no outstanding OTSCs.

Standard:

3. Begins review of section: 7.1 Post Accident H2 Monitor Startup.

Evaluator may choose to require the candidate to obtain procedure section.

Cue When the correct procedure is identified & verified, provide the operator with the procedure.

Comment NOTE

  • Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE: signal.

I Appendix C Page 5 of 12 Form ES-C-1 I NOTE

  • - - SAT STEP 2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.

7.1.1 Initial Conditions - - UNSAT

_ _ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.

Standard: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).

Cue N/A Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3 - - SAT

  • NOTES

..j

  • Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the - - UNSAT floor at the junction of the north/south hallway.
  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.

__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)

__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)

_ _ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)

d. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)

__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)

Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.

Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the

  • following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard: clockwise:
a. PASS-4-008 (2 turns).
b. PAHM-4-001A (3 turns).
c. PAHM-4-001 B (6 turns).
d. PAHM-4-002A (6 turns).
e. PAHM-4-002B (6 turns).

For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."

Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".

Comment NOTES

  • Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are
  • located in the floor at the junction of the north/south hallway.

NOTE:

  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)

STEP 4 - - SAT

  • ..j _ _ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside the Unit 4 Pipe and Valve Room. (An A key is required for this lock.) --

UNSAT Removes lock from HV-4-3 remote operator handwheel (South end of Standard: Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.

Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.

Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .

I Appendix C Page 9 of 12 Form ES-C-1 I

  • Request the Unit 4 RO perform step 7.1.2.4 STEP 6 --

SAT

--

UNSAT Standard: Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094

1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of 4-0P-094 (Control Room Portion)

Cue

2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.

Direct candidate to continue with step 7.1.2.5.

Comment NOTE: Candidate may attempt to use a communication device or simulate communication directly to the evaluator.

Appendix C Page 10 of 12 Form ES-C-1

__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7 - - SAT

  • cap AND close WHT Waste Transfer Pump Discharge to Rad Waste

..J Building, MPAS-001,(1I4 tum) .

OR - - UNSAT

__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.

1. Attempts to remove the floor cap for MPAS-001.
2. When MPAS-001 floor cap determined to be jammed in place, Standard: leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.

Comment

  • NOTE:

I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8 The following valves are located on the Auxiliary Building roof near the Unit 4 - - SAT

  • ..j containment wall.
6. Perfonn the following:

__ a. Unlock and open Isol Vlv from WHT Pp Back, MPAS-4-004 (an A key is required).

- - UNSAT

1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.

Standard: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.

(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)

When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve.

Appendix C Page 12 of 12 Form ES-C-1

  • STEP 9 V

_ _ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.

- - SAT

- - UNSAT Standard: Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)

1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
  • Termination Cue:

Operator returns JPM briefing sheet when informed step 7.1.2.7 will be performed by another operator.

Stop Time STOP


I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion

Examinee's Name:

NRC-25-IP-JPM-1 Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

.-----------------------

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

INITIAL CONDITIONS:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable procedure prerequisites are satisfied.
3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.

INITIA TlNG CUE:

You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.

This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.

HAND THIS PAPER BACK TO YOUR EVALUATOR

  • WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility: Turkey Point Task No:

TRIP and RESET AFW Pump Task Title: "A" T&T Valve, MOV-6459A JPM No: NRC-25-IP-JPM-J 061-K4.07 Turbine trip, including overspeed 3. 1/3.3 KIA

Reference:

Examinee: NRC Examiner:


Facility Evaluator: Date:


Method of testing:

Simulated Performance X Actual Performance

~-------------- ---------------------

Classroom - - - - - - - - Simulator Plant X


--'---------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual
  • Start is in progress.
2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.

Task Standard:

  • AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
  • AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

Required Materials:

  • Applicable Personal Protective Equipment

References:

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.

  • Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

  • Start Time Trip AFW Pump A T&T Valve, MOV-6459A.

STEP 1 - - SAT

..J

- - UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard: Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.

Comment NOTE:

I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.

  • STEP 2

- - SAT

--

UNSAT then verify the following:

1. AFW Pump A T&T Valve, MOV-6459A, is closed.

Standard:

2. Control Room mechanical trip light is ON.
1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.

Cue 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.

Comment NOTE: Evaluator may act as Control Room Operator to simulate communications.

Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.

- - UNSAT Local Test Panel mechanical trip light is On.

Standard:

Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.

Comment NOTE: Local Test Panel Mechanical Trip Light is AMBER.

I Appendix C Page 7 of 12 Form ES-C-1 Reset AFW Pump A T&T Valve, MOV-6459A

  • STEP 4 --

SAT

..j

--

UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed tappet shaft.

Standard:

7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.

When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.

Comment

Appendix C Page 8 of 12 Form ES-C-1 LEVER_

HEAD LEVER

]APPET NUT SCRIBE MARK HEAD BRACKET NOTE: GUIDE SPRING*

SPRING -

TAPPET ASSEMBL Y.- Y_- ... --


  • SCRlB" MA.~K

" f----.>,.,..""'-:

TRIP HEAD LEVER TRIP HEAD LEVER INCORRECT CORRECT POSITION POSITION ( HELD BY TAPPET)

I Appendix C Page 9 of 12 Form ES-C-1 I Verify the limit switch arm roller is properly positioned.

--

- - UNSAT 7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the Standard: scribe mark.

Cue When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.

Comment NOTE:

  • Terminating Cue:

The task is complete when the Examinee returns the cue sheet to the examiner.

Stop Time STOP


Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion

Examinee's Name:

NRC-25-1 P-JPM-J Examiner'S Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

.-----------------------

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_____

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

  • INITIAL CONDITIONS:

I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.

2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.

INITIA TlNG CUE:

You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility:

Task Title:

KJA

Reference:

Turke}" Point Transfer Vital Loads Between Inverters 062-A4.04 {2.6/2.71 Task No:

Job Performance Measure No: NRC-25-IP-JPM-K Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: In Plant Simulated Performance X Actual Performance


------------------


Classroom - -------------


Simulator --- ----- -- ----- --- Plant - X- - - - - - - -

--'--'----------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
  • Task Standard:
1. Transfer load to the correct inverter.

Required Materials:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

General

References:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:

  • In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

Time Critical Task: No Validation Time: 18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 17 Form ES-C-1 I SIMULATOR SETUP

  • Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR

  • INITIAL CONDITIONS:

HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

INITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.

Do you have any questions?

You may begin.

  • NOTES TO EVALUATOR:
1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.

I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)

  • Start Time 7.0 INFREQUENT OPERATIONS STEP 1 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal SAT Transfer)

UNSAT INIT Transfer from Inverter- - - - -

Date/Time Started: ------~--------


~------

/

7.1.1 Initial Conditions

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.

1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC STANDARD: SYSTEM.

2Verifies procedure is current with no outstanding OTSCs.

1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
2. Inform operator that Sections 3.0 and 5. 1 conditions have been
  • CUES:

met.

3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.

Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.

Comment NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or NOTE: Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.

Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)

~ __ 1. Place the Alternate Source Transfer Switch to the position indicated in - - UNSAT Table 2, TABLE 2 I I

Pia,..

Wbon for ALITR"AIT

~ub')tituting [\'SERYICE SOCRCE T() Position (LOCKED) I~TI SPARE  :,\OR\lU TRA.'\SFER D.I:RTER J:\,I:RTER SWITCH AS (3Y04) 3A(3Y01) .\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04) .JB (4Y02) 4Y028 BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I).YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\ 3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS

1. Selects correct switch (4Y02B) and unlocks operating handle.

STANDARD: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.

1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES: handle, confirm these operations.
2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.

Comment NOTE:

I Appendix C Page 7 of 17 Form ES-C-1 I DO NOT ALLOW THE BS INVERTER

-

4 DOOR TO BE OPENED UNSAT

-

(procedure step 7.1.2.2)

2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
1. Operator identifies the B SPARE (4Y04) inverter.

STANDARD:

2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE: tell the operator to simulate going inside the inverter to pOSition the switch.
2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE BS INVERTER

  • NOTE:

DOOR TO BE OPENED

Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)

3. Verify the following at the SPARE inverter:

__ a. The IN SYNC light is ON. - - UNSAT

__ b. The AL T SOURCE A VAIL light is ON.

_ _ c. The SYNC REFERENCE NORMAL light is ON.

STANDARD: Determines the B SPARE (4Y04) inverter lights listed above are all ON.

CUE: When each light properly identified, state light is ON.

Comment NOTE:

I Appendix C Page 9 of 17 Form ES-C-1 I DO NOT ALLOW THE 4B(4Y02)

-

..j INVERTER DOOR TO BE OPENED UNSAT

-

(procedure step 7.1.2.4)

4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
1. Operator identifies 48 (4Y02) inverter.

STANDARD: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.

1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE: the operator to simulate going inside the inverter to position the switch.
2. When SW-2 operation properly described, confirm re-positioning.

Comment

  • NOTE:

DO NOT ALLOW THE 4B(4Y02)

INVERTER DOOR TO BE OPENED

Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)

5. Verify the following at the INSERVICE NORMAL inverter:

__ a. The IN SYNC Light is ON. - - UNSAT

__ b. The SYNC REFERENCE EXTERNAL light is ON.

STANDARD: Determines the 48 (4Y02)inverter lights listed above are all ON.

CUE: When each light properly identified, state light is ON.

Comment:

NOTE:

, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)

..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record: - - UNSAT TABLE 3 For Plart When Substitutiug ~SER\'ICE ToSt1'PLY

~STRnlL'\"I AC I:\TTIALS SPARE I:\T£RTIR  :-;OR.'L.u. Posltion SELECTOR S"TICH I:\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\1:

AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:

BS (4Y04) 3B (3YO~) 3P08A AC u:-.1:

BS (4Y04) 4B 14Y02, 4POSA ACLDo1:

CS (3Y06)

OY06) 3C (3Y')5) 3P06A AC ID1:

(W06)

CS (W061 4C (WO))

4C(-tYO)) 4POM AC u:-.1:

D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:

DS (~Y06) 4D (4YO!) 4P09A ACLI:\1:

STANDARD: Using Table 3, identifies 4P08A as the correct Selector Switch to use.

CUE: N/A Comment

  • NOTE:

Appendix C Page 12 of 17 Form ES-C-1 (procedure step 7.1.2. 7.a)

7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:

- - UNSAT

_ _ a. Verify that the Alternate Power Available light is ON.

Verifies 4P08A alternate power available light ON STANDARD:

CUE: When 4P08A alternate power available light correctly identified, tell candidate that light is ON.

Comment NOTE:

I Appendix C Page 13 of 17 Form ES-C-1 I (procedure step 7.1.2. 7.b)

b. Test the Sync Verification Light as follows:

_ _ (1) Position the Sync Switch to SYNCH LAMP TEST.

- - UNSAT

_ _ (2) Verify lamp comes ON.

1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.

STANDARD:

2. Verifies 4P08A SYNC Verification Light ON.
1. When SYNC switch identified and operation correctly described, confirm switch manipulation.

CUE:

2. When Sync Verification Light correctly identified, tell candidate light is ON.

Comment NOTE:

Appendix C Page 14 of 17 Form ES-C-1

(procedure step 7.1.2. 7.c)

STEP 10 - - SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go - - UNSAT OFF, but a slight glow is expected. This is acceptable.

c. Perform a synch check as follows:

__ (1) Position the Sync Switch to SYNCH CHECK PUSH.

_ _ (2) Depress and hold the Sync Switch.

_ _ (3) Verify that the Sync Verification Light stays OFF.

1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
2. Depresses & holds 4P08A SYNC Switch.

STANDARD:

3. Verifies 4P08A Sync Verification Ught stays OFF.
4. Releases 4P08A SYNC Switch.
1. When SYNC switch identified and operation correctly described, confirm switch manipulations.

CUE:

2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
  • Comment NOTE:

NOTE In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.

I Appendix C Page 15 of 17 Form ES-C-1

_ _ d. Place the Instrument AC Selector Switch to the position

  • - - SAT STEP 11 indicated in Table 3.

~ NOTE Initials should be entered for the applicable inverter. NIA should be entered - - UNSAT for all others.

TABLE.'

For Place Wb~n Sub,tituting I~SERYICE To st'PPLY

[\,STRc\!E~T AC L'"ITLUS SPARE I!'-TERTER  :-;OR\L\L Po,ition SELE( TOR SWITCH L"\"ERTER A5(31"04)

AS '3Y041 3A(3YC]1 3A t3YC] 1 3PO-"; ACrn.:E AS f3Y(4) 4.40 (':'Y01) ~P07A .4.(' Ln,:::

as (4Yi}~) 38 {3Y02\ 3P83A ACrn,:::

3-'3 (*P{IJ"':} 4B (4"i")J~l "P~SA ACrn,:::

CS (:Y'OC: 3C (;::05') 3Pc'6A ACLn,""E CS (3\1J¢\ 4C (4\1:5) "])06A AC Ln'::::

DS (4YO~) ~3YO')

3D (3YO') 3P09A AC lJ}.;E DS (4YOo) "D ("YO:', 4P09A AC lJ}.;:::

1. Selects correct switch (4P08A).

STANDARD:

2. Positions 4P08A Instrument AC Selector Switch to AC LINE.

CUE: When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.

  • Comment NOTE Initials should be entered for the applicable inverter. NIA should be entered NOTE: for all others.

Tell candidate that another operator op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner.

Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion

Examinee's Name:

NRC-25-IP-JPM-K Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

.-----------------------

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET

  • THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

!NITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility: _T_ur_k_e-"-y_P_o_in_t

__ _ _ _ _ _Task No:

T-ur-k-e-L-y-P-o-in-t-:------Task Respond to Turbine Runback, Rods Fail to NRC Task Title: Insert JPM No: SIM-1PM-A



045 K4.12 Automatic turbine runback 3.3/3.6 KIA

Reference:

Examinee:


NRC Examiner:


Facility Evaluator: Date:

Method of testing:

Simulated Performance


Actual Performance

-

xX



Classroom SimulatorX Plant------------


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Unit 3 is operating at 60% power and stable
  • Unit 3 is preparing to return to 100% power.
  • No equipment is out of service.

Task Standard:

  • 3-0NOP-089, Turbine Runback actions have been performed correctly.
  • Tavgrrref within 4°F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4° F during a transient)
  • Required Materials:
  • 0-ONOP-089, Turbine Runback
  • 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General

References:

  • 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
  • 0-ONOP-089, Turbine Runback

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to Respond to Plant Conditions
  • Time Critical Task: No Validation Time Time:: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT A T THIS TIMEI TIMEt

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • 16 Instructor Facility Operator Actions
1. Verify Reset to IC 24
2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>

TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT

3. Verify RED SQUARE framing SC408.
4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>

3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.

Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)

5. Go to RUN.
6. Go to

SUMMARY

>> PENDING>> Right click on TVFABP1 B >> TRIGGER

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time


Recognition by Operator that Turbine Runback is occurring.

STEP 1 - -SAT

- -UNSAT Standard: Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.

Cue Provided by Simulator response.

Comment NOTE: Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump .

~ppendiX C Page 5 of 12 Form ES-C-1!

  • STEP 2

~

~.O IMMEDIATE OPERA TOR ACTIONS 14.0 4.1 Verify the automatic actions listed in Section 3.0 are functioning to

~tabilize and maintain plant conditions, or assume manual control.

iStabilize

- -SAT

- -UNSAT Standard: Used 3-0NOP-089, Turbine Runback to verify Immediate Operator

~ctions have been completed.

1. Provided by Simulator response.

Cue

~.

2. Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

  • Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 6 of 12 Form ES-C-1

  • 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3 Imodulate closed upon receipt of a runback signal from the Generator - -SAT lGovernor/Speed povernorlSpeed Changer.

- -UNSAT Standard:

IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

  • NOTE:

'nsertion and take manual action in accordance with Elements 6,7, and 8.

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4 1C0ndenser condenser due to the load rejection and subsequent Tavg/Tref - -SAT

  • Standard:

Imismatch.

mismatch.

lVerified Verified Steam Dump Valves are armed and opened if needed.

- -UNSAT Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

!insertion 8.

NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the Isubsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 8 of 12 Form ES-C-1 G.3 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5 Tavg with Tref.

iTavg - -SAT

  • Standard: Operator recognizes that Control Rods did not insert as required and

- -UNSAT inserts Control Rods to match Tavg within 4 degrees F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and linsertion a.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 .

IAppendiX C Page 9 of 12 Form ES-C-11 Operator places Rod Control Selector Switch to MANUAL.

STEP 6 SAT

--

..j UNS AT

--

Standard: Operator placed Rod Control Selector Switch to MANUAL.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

  • nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7 Tref.

iTref. - -SAT

  • ..j Standard:

Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to match Tavg with Tref within 4 [] F.

- -UNSAT Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

!Appendix C Page 11 of 12 Form ES-C-11 Tavg and Tref are matched.

ravg STEP 8 - -SAT
  • ~

Standard:

--

UNS AT n-avg Tavg and Tref are within 4°F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent

!subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9 programmed response to steamflow/feedflow mismatch and level input - -SAT

- -UNSAT

~erified Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain

!Steamflow/feedflow Standard: steam generator levels at program.

!Steam Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and linsertion 8.

NOTE: Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.

!Appendix C I Page 13 of 12 I Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to - -SAT

  • Imaintain maintain the programmed level and pressure, as required for the

~hanging changing values of Tavg. - -UNSAT

~erifies Verifies that Pressurizer Level Controller and Pressurizer Pressure

[controller Controller maintaining the programmed level and pressure, as required Standard: ~or

-"or the changing values of Tavg.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

  • subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 14 of 12 Form ES-C-1

$UBSEQUENT SUBSEQUENT OPERA TOR ACTIONS STEP 11 5.1 Determine the cause of the runback initiation AND refer to the - -SAT

~ ~ppropriate appropriate ONOP for specific recovery instructions.

5.2 Verify the following conditions: - -UNSAT 5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

5.2.3 Tavg matches Tref.

5.2.4 Pressurizer levels and pressures stabilized.

5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

Standard:

~.2.3 5.2.3 Tavg matches Trefwithin 4° F.

5.2.4 Pressurizer levels and pressures stabilized.

Cue Irerminate Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment

  • NOTE: Critical Step: 5.2.3 Tavg matches Trefwithin 4° F.

Terminating [The The task is complete when the Examinee returns the cue sheet to Cue: STOP

~he

..he examiner.

Stop Time -

_ _ __

---

/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion

Examinee's Name:

Examiner's Name:

NRC-25-SIM-JPM-A Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

INITIAL CONDITIONS:

  • Unit 3 is operating at 60% power and stable
  • Unit 3 is preparing to return to 100% power.
  • No equipment is out of service.

INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility: _T-.:.-u=:;r:..:..:k:..::.eLy-'-P--'

_T...:.-=.ur:..:..k:..::.eLy-' P-"o:..:..:i o:..:..inn:..:..t=--_

...:..:t'--__________

_ _ _ _ _ Task No:

Pressurizer Level Control Task Title: Channel Fails Low JPM No: NRC-25-SIM-JPM-8

-



APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 KJA

Reference:

Examinee: NRC Examiner:



Facility Evaluator: Date:



Method of testing:

Simulated Performance



Actual Performance xX


Classroom


-=====-=!.X~_ _

Simulator -=====-:::::!.X~ Plant - - - - - - - - - -

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Unit 3 is at 100% and stable
  • No equipment is out of service
  • Task Standard:
  • Unit 3 is at 100% and stable.
  • Pressurizer level stable and returning to programmed level.
  • Letdown has been returned to service.

Required Materials:

  • 3-0NOP-041.6, Pressurizer Level Control Malfunction General

References:

  • 3-0NOP-041.6, Pressurizer Level Control Malfunction

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to respond to plant conditions.
  • Time Critical Task: No Validation Time: XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
1. Verify IC-1
2. Place Simulator to RUN
3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> LT-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)

  • Start Time Respond to Pressurizer Level Control Channel 459 fails low.

STEP 1 - - SAT

- - UNSAT Standard:

  • Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.

Cue Comment NOTE: Operator may choose to refer to ARP prior to entering ONOP.

I Appendix C Page 5 of 12 Form ES-C-1 I Verify automatic actions occur.

- - UNSAT Operator verifies the following:

1. High Pressure LTON Isolation Valve LCV-3-460 CLOSES.
2. LTON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV Standard:

200C CLOSE.

3. All Pressurizer Heaters turn OFF.
4. Charging flow INCREASES.

Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461,

  • STEP 3 Identifies Channel 459 as failed low.

- - SAT

- - UNSAT Standard:

Cue Comment NOTE:

I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch

  • STEP 4 in position 2 or 3. -

SAT

..j

-

UNSAT Standard: Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.

Cue Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in

  • STEP 5

..j MANUAL. - - SAT

- - UNSAT

1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard: in MANUAL
2. Maintain programmed level per Enclosure 1.

Cue Comment NOTE:

I, Appendix C Page 9 of 12 Form ES-C-1 I,

  • STEP 6 IF LR-3-459 is selected to a defective channel, THEN place CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another position.

- - SAT

- - UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard: position other than Channel 459.

Cue Comment NOTE:

Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow

  • STEP 6

~

1. Throttle Low Pressure LTON Controller, PCV-3-145, as necessary

--

SAT

- - UNSAT to prevent LTON relief valve from lifting, (approximately 50 percent open).

2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard: 460.
4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.

Cue Tell operator that another operator will perform the remainder of the procedure.

Comment

  • NOTE: Steps 1, 2, and 5 are not critical steps.

Terminating The task is complete when the Examinee returns the cue sheet to Cue: STOP the examiner.

Stop Time _ _ __


I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion

Examinee's Name:

NRC-25-SIM-JPM-8

~~~~~~~~------------------------------------

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

.-----------------------

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _________________________

_______________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

INITIAL CONDITIONS:

  • Unit 3 is at 100% and stable
  • No equipment is out of service INITIA TlNG CUE:
  • You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T--'

--'. .T--u-'-,-,-ur_k.

'-r_k..:...ey"------P..:...o_i

.c:. .e, --Y_P..c:. .o_inn. c..:...t

. .t_ _ _ _ _ _ _Task No:
  • Task Title:

ALIGN SAFETY INJECTION FOR HOT LEG RECIRC


~--------

011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 JPM No: NRC-25-SIM-JPM -C KJA

Reference:

Examinee:


NRC Examiner: -


-------------------


Facility Evaluator: Date:

Method of testing:

Actual Simulated Performance Performance x Classroom Simulator====-:!.X~_

Simulator====~X~ _____ Plant-


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
  • *
  • 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION

  • ALL CCW HEAT EXCHANGERS ARE IN SERVICE
  • STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
  • 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

Task Standard:

  • S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
  • 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
  • 3-EOP-E-1, Loss of Reactor or Secondary Coolant General

References:

  • *
  • 3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1

  • Initiating Cue:
  • You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Time Critical Task: NO Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI

jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58

  • Load Lesson
  • LOADAND EXECUTE LESSON: JPM Ol062012501.LSN TRIGGER "MOV-3-869 CLOSED" OPEN MOV 863A & MOY 863B
  • Unfreeze simulator.

Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time

  • STEP

..J 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 - -SAT

- -UNSAT Standard: ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG

!TRANSITION RECIRCULATION Cue Comment NOTE: Candidate should place a mark through circled step 32 prior to transition.

!Appendix C I Page 5 of 12 I Form ES-C-11 STEP 2 Check High-Head SI Pumps - ANY SAT

-

  • RUNNING

- UNSAT Standard:

  • Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3 Train - OPEN MOV-3-749A for train A SAT

-

-

UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard: OPEN Cue Comment NOTE:

jAppendix C Page 7 of 12 Form ES-C-1!

STEP 4 - -SAT

  • 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -

..J OPEN

- -UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard: IShould attempt to open valve prior to transitioning to Att. 1 )

Ishould I2.Candidate i2.Candidate transitions to to ATTACHMENT 1.

Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.

Comment MOV-3-869 is closed and cannot be opened. Operator should attemp

  • o open valve prior to transitioning to Att. 1 NOTE:

Appendix C Page 8 of 12 Form ES-C-1

  • STEP 4

-J ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.

1)

1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4

-

-

SAT UNSAT

2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR

!TRIGGER ITRIGGER "CLOSE 3-752A1B",

Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.

Comment

  • NOTE:

!Appendix C Page 9 of 12 Form ES-C-1j STEP 5 SAT

  • VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET -

VALVE UNSAT

-

SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:

Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:

Appendix C Page 10 of 12 Form ES-C-1 STEP 6 SAT

..j FROM SERVICE UNSAT

-

CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard: RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:

,

!Appendix C Page 11 of 12 I Form ES-C-11 STEP 7 SAT

~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN -

  • Standard:

MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN

-

UNSAT Cue Comment NOTE:

Appendix C Page 12 of 12 Form ES-C-1 STEP 8 ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH -

SAT

..;

- UNSAT

  • MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
  • MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:

~ppendix C Page 13 of 12 Form ES-C-1!

  • STEP 9 ALIGN THE RHR RECIRCULATION FLOWPATH -

SAT

..j

-

UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard: ~ALVE VALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:

Appendix C Page 14 of 12 Form ES-C-1

~ERIFY VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT

-

.,j

-

UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard: DECREASING Cue Comment NOTE:

[Appendix C 1 Page 15 of 12 I Form ES-C-11

~ONTINUE CONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT

-

  • RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF

- UNSAT

  • INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard: VERIFIED
  • RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA TOR SHOULD USE OPERATOR ERDADS SCREEN TO CONFIRM AL TERNA TE RHR FLOW
  • NOTE:

Appendix C Page 16 of 12 Form ES-C-1 Return To Procedure And Step In Effect STEP 12 - -SAT

  • Standard:

RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, STEP 15.

- -UNSAT Cue Comment NOTE:

Terminating [The STOP The task is complete when the Examinee returns the cue sheet to the Cue: ~xaminer.

examiner.

Stop Time

!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion

~ JobPe~rmanceMeasureNo.

JobPe~rmanceMeasureNo.N N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_

__R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions:

  • UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
  • 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
  • POWER AVAILABLE TO BOTH 4 KV BUSSES
  • 3A HHSI PUMP IS RUNNING
  • RHR SUPPLYING COLD LEG RECIRCULATION
  • ALL CCW HEAT EXCHANGERS ARE IN SERVICE
  • STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
  • 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

INITIA TlNG CUE:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

  • Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Turkey Point Task No:

  • Respond to a Source Range Nuclear Instrument Malfunction Job Performance Task Title: (MODE 6) Measure No: NRC-2S-SIM-JPM-D KIA

Reference:

015 A2.02 (3.1/3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: Simulator / Control Room Simulated Performance Actual Performance Yes Classroom Simulator- - -Yes Plant._ _ _ _ _ __

Plant


-------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges N-31 and N-32 are both in service.
  • 4. Both Gamma Metrics Channels are OOS for maintenance.

Task Standard:

1. N-32 selected for audio count rate.
2. Core alterations suspended.

Required Materials:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General

References:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:

Respond to plant conditions.

Time Critical Task: No Validation Time: 10 minutes

  • HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI

Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

/NITIA TlNG CUE:

Respond to plant conditions.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.

Do you have any questions?

You may begin.

!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:

1. Reset to IC 117 Cavity Drain Pre-Req's Complete
2. Place both channels of Gamma-Metrics O.O.S.:
a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
c. Place both Gamma-Metric Block Switches to BLOCK on console
3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
4. Place CSD Placards on Vertical Panels.
5. =

Update console placard to read RCS BORON 2000 ppm

6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron

concentration (HIC-3-114 4.0, FC-3-113 B.O)

7. Change ERDADS screen on VPA to P-T display.

B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.

9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:

Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT

  • Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -
  • STEP 1

..j Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE NUCLEAR INSTRUMENTATION MALFUNCTION.

14.0 14.0 IMMEDIATE ACTIONS

- - SAT

--

UNSAT 14.5 r.5 Mode 6 - Refueling 14.5.1 f4..5.1 Malfunction of ONE channel:

1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
  • STANDARD:
3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.

~.

2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.

Respond as Refueling SRO and/or Reactor Engineer/STA if notified to stop refueling activities and store fuel assemblies in a safe location.

CUE: Report that refueling has stopped and fuel assemblies are all safely oeated.

Comment

  • NOTE: Source Range N-31 has failed HIGH.

!AppendiX C Page 5 of 7 Form ES-C-11

  • Operator obtains copy of 3-0NOP-059.5.

STEP 2 - -SAT

- -UNSAT

1. Operator obtains Simulator copy of 3-0NOP-059.5 STANDARD:

~. Operator verifies Immediate Actions are correct.

Cue Comment NOTE:

  • Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS
  • STEP 3 5.5 Mode 6 - Refueling - -SAT

..J 5.5.1 Malfunction of ONE channel: - -UNSAT

1. Place LEVEL TRIP switch on failed channel in BYPASS position.
2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
3. Switch an NIS RECORDER to the operable source range.
4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
5. Notify I&C.
6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
  • STANDARD: Operator removes N-31 from service.
1. Positions LEVEL TRIP switch to BYPASS.

~.

2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
3. Verifies N-32 displayed on console NIS recorder.
4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.

f4.

5. Notifies I&C of N-31 failure.

~.

6. Determines both backup NIS (Gamma-Metric) channels OOS.

1.lf called as Reactor Engineering, state that the required RCS Boron

~oncentration is> 1950 ppm.

jeoncentration

~.If called as Chemistry, confirm Boron concentration is 2000 ppm.

12.lf CUES:

3.Respond as I&C if notified of N-31 failure.

14.

f4.lnform Inform the applicant that another operator will continue from this ipoint.

Comment

  • NOTE: Only Standards 1 and 2 are critical.

\Appendix C Page 7 of 7 Form ES-C-11 iApplicant Applicant should return JPM Initial Condition sheet and state that STEP 4 - -SAT

  • pperator operator actions are complete.

- -UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE: ell operator that JPM has been completed.

Stop Time ----

  • Appendix C Page 8 of7 Form ES-C-1 Verification of Completion
  • ~ Job JobPe~rmanceMeasuffiNo.N Performance Measure No.N ~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_

=-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

  • ~

Response

Result: Satisfactory/Unsatisfactory

  • ~

Examiner's signature and date:

~ppendix C Page 9 of 7 Form ES-C-11

  • JPM BRIEFING SHEET
  • INITIAL CONDITIONS:
1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

!NITIA TlNG CUE:

Respond to plant conditions.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

  • Task Title:

Purging the PRT to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)

-



007 Kl.04 Nitrogen 2.1/2.3 JPM No: NRC-25-SIM-JPM-E KIA

Reference:

Examinee:


NRC Examiner:


Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom SimulatorX Plant

--

- ---- ----- --- - ---------


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
  • Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
  • 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-
  • going shift
  • You are the oncoming Reactor Operator and have been briefed on the evolution.
  • PRT Level is at 80%.

Task Standard:

  • Purge the PRT to Reduce Oxygen Concentration to within required specifications.

Required Materials:

  • 3-NOP-041.3, Pressurizer Relief Tank General

References:

  • 3-NOP-041.3, Pressurizer Relief Tank

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
  • All prerequisites have been satisfied.
  • You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

!AppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time - - - -

  • STEP 1

..J

11. ENSURE CV-3-549, PRT VENT, is OPEN

-

-

SAT UNSAT

1. Placed PRT Vent Valve, CV-3-S49 switch to open.

Standard:

2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.

Cue Comment NOTE: Standard #2 is not critical.

!Appendix C Page 5 of 12 Form ES-C-1!

13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.

STEP 2 SAT

-

" -

UNSAT

1. Placed PRT Vent Valve, CV-3-5198 switch to open.

Standard:

~.

2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.

Cue Comment NOTE: Standard #2 is not critical.

Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3 ~oncentration SAT

  • Concentration (Major Gas Volume) (continued) -

~

UNSAT

14. WHEN any of the following conditions exists: -
  • PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
  • PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY

~ATER WATER MAKE UP.

1. When PRT level approaches 95% placed PRT Vent Valve, CV 5198 switch to close.

Standard:

~.

2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
1. Standard #2 is not critical.

NOTE:

jAppendix C Page 7 of 12 Form ES-C-1!

15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.

STEP 4 SAT

-

-

UNSAT Standard:

1. Tell operator that 35 minutes have elapsed.

Cue ~.

2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.

Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 SAT

-

-

UNSAT Standard:

Cue Comment NOTE:

jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6 Concentration (Major SAT

-

.,j Gas Volume) (continued)

-

UNSAT

19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.

ITHEN

1. Placed PRT Vent Valve, CV-3-549 switch to close.

Standard: ~.

2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT trell Cue oxygen reading is less than 2 percent oxygen by volume.

Comment Standard #2 is not critical.

NOTE:

Appendix C Page 10 of 12 Form ES-C-1

~1. WHEN Chemistry reports PRT oxygen reading less than 2%

121.

STEP 7 by volume, THEN: - -SAT

..j IA.

'A. CLOSE CV-3-519A, PRT VENT. - -UNSAT

1. CV-3-519A, Primary Water to Containment Isolation switch Standard: taken to close.
2. Veriified CV-3-519A Green Light ON, Red Light OFF.

Cue ~fter After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.

Comment NOTE:

Standard #2 is not critical.

  • Terminating Cue: STOP

'The task is complete when the Examinee returns the cue sheet to IThe

~he the examiner.

Stop Time _ _ __


jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion

Examiner's Name:

~~~~~~~~-------------------------------------

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions:

  • Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
  • Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
  • 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift
  • You are the oncoming Reactor Operator and have been briefed on the evolution.
  • PRT Level is at 80%.

Initiating Cue:

  • You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
  • All prerequisites have been satisfied.
  • You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T_u_r_k~eY,---P_oi_nt Turkey Point_ _ _ _ _ _ _Task No:

--~~---------------

INITIATE CONTAINMENT PURGE Task Title: NRC-25-SIM-JPM-F

- - - - - - - - - - - - -JPM No:


029 A4.01 Containment purge flow rate 2.5/2.5 KIA

Reference:

Examinee:


NRC Examiner:


Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom SimulatorX Plant-


-- ------------ -

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT
  • EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
  • ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
  • CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.

Task Standard:

  • ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM
  • APPROVED CONTAINMENT PURGE RELEASE PERMIT General

References:

  • 3-NOP-053, CONTAINMENT PURGE SYSTEM

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • 1. A satisfactory shift turnover has been completed.
2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time


~.1.1.12 4.1.1.12 STEP 1 - -SAT

~ Open the following valves:

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 - -UNSAT

~.

2. Containment Purge Exhaust Isol (I.c.),

(I.e.), POV 2603

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:

Light On, Green Light Off.

3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open

~.

4. Verified Containment Purge Exhaust Isol (O.c.),

(O.e.), POV-3-2603 Red Light On, Green Light Off.

Cue Comment

  • NOTE: Standards #2 and #4 not critical

~ppendix C Page 5 of 12 Form ES-C-11

~.1.1.13 4.1.1.13 STEP 2 - -SAT

  • Prepare to open Containment Purge Supply Isolation Valves

!prepare If both conditions are met then both Unit 3 Containment Purge Supply

Valves will be open.

lValves

- -UNSAT Standard:

1. Verified Containment Doors/Hatches closed to atmosphere.

p.2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:

  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Cue

  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • Comment NOTE: [This This information is covered in the Initial Conditions

Appendix C Page 6 of 12 Form ES-C-1

~.1.1.13 4.1.1.13 (contd.)'

STEP 3 SAT

-

Open the following valves:

~

1. Containment Purge Supply Isol (O.C.), POV-3-2600 -

UNSAT t2.Q. Containment Purge Supply Isol (I.C.), POV 2601

1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.

~.

2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard: Light On, Green Light Off.

b.

3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.

~.

4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.

Cue Comment

  • NOTE: Standards #2 and #4 not critical

jAppendiX C Page 7 of 12 Form ES-C-1!

fl.1.1.14 4.1.1.14 STEP 4 - -SAT

  • ~ Start 3V20: Unit 3 Containment Purge Exhaust Fan .
1. Control Switch Positioned to Run

- -UNSAT

~.

2. Verified Fan Red Light On and Green Light Off Standard:
3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.

Comment NOTE: Standards 2,3, and 4 are not critical

Appendix C Page 8 of 12 Form ES-C-1

~.1.1.15 14*1.1.15 STEP 5 - -SAT

  • ..J Start 3V9: Unit 3 Containment Purge Supply Fan.
1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.

- -UNSAT

~.

2. Control Switch Positioned to Run Standard: 3. Verified Fan Red Light On and Green Light Off

~.

4. Verified Damper Red Light On Green Light Off
5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.

Cue rrell Tell candidate that another operator will complete the remainder of the procedure.

Comment NOTE:

  • Standards #2 and #3not critical Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.

Stop Time

~ppendix C Page 9 of 12 Form ES-C-1!

Verification of Completion

~ JobPe~rmanceMeasureNo.N _~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~

JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

Initial Conditions:

  • UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
  • CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.

!NITIA TlNG CUE:

You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T_ur_k_e.Ly_P_o_in_t Turkey Point_ _ _ _ _ _ _Task No:


~----------

-:Fill -II:-3.:.3A NRC-25-SIM-JPM-G Task Title:

- : -Fi: -- .-

006 A 1.13 Accumulator

-Accumulator

. .A--=---Ac::-cc.-
. ,u:.-
. -m.:. .-
. .u=l=at-
. : .o.-
. .:. .r_

--_-

_ -_

-JPM No:

pressure (level, boron concentration )3.5/3.7 KIA

Reference:

Examinee:

- - - - - - - - - - - - -NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom Simulator======~X~_ _

Simulator----.....,X~ Plant

- --

- --- ----


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.
  • It is desired to use the 3A HHSI Pump for this task Task Standard:
  • Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.

Required Materials:

References:

Appendix C Page 2 of 12 Form ES-C-1 Initiating Initi ating Cue:

You have been directed to raise 3A JA Accumulator Level to 6600 +/- 20 gallons gall ons using 3A SAFETY INJECT ION PUMP INJECTION PUM P starting at step: 7. 1.2.2.3.

step: 7.1.2.2 .3.

  • 3-0 P- 064 Safety Injection Accumulators, Section 3-0P-064 Sec tion 7.1,
7. 1, Adding Make-up to the Safety Injection Injecti on Accumulators up to 7.1.2.2.2.a
7. 1.2.2.2.a has been completed.

compl eted.

  • 77.1.2.2.b,c, NIA.

. 1.2.2.b,c, and d are marked N/A.

Ti me Critical Time Cri tica l Task: NO Va lidati on Time:

Validation 15 minutes HAND Jl'M JPM BRIEFING SHEET T TOO EXAMINEE AT TID T BlS TIME!

TI ME!

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC # 1

  • Load Lesson
  • Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
  • Open SI Pump 3A Test Recirc Isolation, 3-899K.

Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -

  • STEP 1

..j Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A

- -SAT

- -UNSAT

1. Placed Control Switch to Open for Accumulator A, CV-3-851A
2. Verified Red OPEN light ON Standard: 3. Verified Green CLOSED light OFF Cue Comment NOTE: Standards 2 and 3 are not critical.

!AppendiX C Page 5 of 12 Form ES-C-1!

Start the 3A Safety Injection Pump document the start time on QA STEP 2 !Record Page - -SAT

  • ~

Standard:

1. 3A HHSI Pump Control Switch turned to START

~. 3A HHSI Pump Red Run light is ON

- -UNSAT l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE: Standards 2 and 3 are not critical.

Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3 - -SAT

..j

- -UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.

Standard: 2. MOV-3-869 Red OPEN light is ON.

3. MOV-3-869 Green CLOSED light is OFF.

~f Operator asks for the use of another operator tell operator that the Cue

!evaluator/designated operator will serve in this capacity.

Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.

NOTE:

Standards 2 and 3 are not critical.

!Appendix C Page 7 of 12 Form ES-C-1!

WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4 close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869. - -SAT

  • -j
l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE

- -UNSAT

2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Light is ON.

Standard:

3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.

Cue Comment

  • NOTE: Standards 2 and 3 are not critical.

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 ~perator Stops the 3A Safety Injection Pump AND verifies the control - -SAT

  • " switch is in the mid position.
1. 3A HHSI Pump Control Switch turned to Stop and released to Mid

- -UNSAT Standard: 2. 3A HHSI Pump Red Run light is OFF

3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE: Standards 2 and 3 are not Critical to this step.

!Appendix C Page 9 of 12 Form ES-C-11 STEP 6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV - -SAT

  • ~ 851A
1. Placed CV-3-851A Control Switch to CLOSE and released to MID

~. Verified CV-3-851A RED Open light OFF

- -UNSAT Standard: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.

Comment NOTE: Standards 2 and 3 are not Critical to this step.

Terminating !The task is complete when the Examinee returns the cue sheet to the Cue: STOP

!examiner.

  • Stop Time _ _ __

Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion

  • ~ JobPertormanceMeasureNo. ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~

Job Performance Measure No. :..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Examinee's Name:

Examiner's Name:

Date Pertormed:

Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

  • ~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

INITIAL CONDITIONS:

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.
  • It is desired to use the 3A HHSI Pump for this task INITIATING CUE:

You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.

Acknowledge to the examiner when you are ready to begin.

  • HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility:

Task Title:

KIA

Reference:

_T_u_r_k_ey"--P__.o_in_t

_T-' -u.:.:.:r-'. .:kc::.eYL..:.-P.. : :.o. :.:. in.:. :.t_ _ _ _ _ _ _ Task No:

Perfonn EDG Nonnal Start Test (Alternate Path)

--~----~----

---~---~~~=---

064 A2.05 Loading the EDIG 3.1/3.2 JPM No: NRC-25-SIM-JPM-H Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: Simulator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r

~~~~-----------------------------------------------

Simulated Performance _ _ _ _ _ _ _ _ _ _ Actual Performance _ _ _ _ _. . :X X-.:. . . . ._ _ _ __


---------~~--------

Classroom - -----------


x

-=====-:!.X~_ __

Simulator ----------- Plant __________


Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 .

  • Task Standard:

1.

2.

The EDG will be synchronized to the Bus in accordance with 3-0SP-023 .1.

The EDG is placed to Emergency Stop when required.

Required Materials:

1. 3-0SP-023.1, "Diesel Generator Operability Test" General

References:

1. 3-0SP-023.1, "Diesel Generator Operability Test"

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.

Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • Reset to IC-1.

Load Lesson

1. Open lesson JPM 01 023006201.lsn and execute.
2. Ensure 3A EDG has been started and in stable operation.

Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.

  • STEP 1

..j

1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.

- - SAT

- - UNSAT

2. Check that the WHITE synchronizing lights are cycling ON.

Standard:

Cue Comment NOTE: Standard #2 is not Critical to this step.

I Appendix C Page 5 of 12 Form ES-C-1 I

  • STEP 2

...;

Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to match Running indicated voltage .

Using the voltage adjust control switch, adjusted the generator voltage

- - SAT

--

UNSAT Standard: on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the

  • - - SAT STEP 3 pointer on the Synchroscope is rotating slowly in the FAST direction .

..j

- - UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard: rotating slowly in the FAST direction.

Cue Comment NOTE:

I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4 Using the A Diesel Gen Volt Regulator, adjust Incoming voltage - - SAT

  • ..j Standard:

slightly higher than Running voltage .

Using the voltage adjust control switch, adjusted the generator voltage on the Bus Voltage Incoming indicator to match the voltage on the Bus

- - UNSAT Voltage Running indicator.

Cue Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 - - SAT

  • Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, verify voltages are approximately equal between the 3A Diesel Generator output and the 3A 4KV Bus for all three phases. - - UNSAT Standard: Verified voltages are approximately equal.

Cue Comment NOTE:

I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6 - - SAT

  • the Gen Frequency indicator

- - UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard: on the Gen Frequency indicator Cue Comment NOTE:

Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9 - - SAT

  • close the diesel generator breaker by placing the EDG Bkr 3AA20

..j Control Switch to the CLOSE position (spring return to nonnal).

- - UNSAT

1. Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.

Standard:

2. Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).

Cue Comment NOTE: Standard #2 is not Critical to this step.

I Appendix C Page 11 of 12 Form ES-C-1 I

  • Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10

- - SAT

..J

- - UNSAT Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Standard:

Cue Comment NOTE:

Appendix Ap pend ix C Page 12 of 12 Form ES-C-l ES-C-1 Turn u...

Tum the A EDG Speed Changerr in the RAISE. directionLand and ,. ..,

slowly SAT STEP 11  : increase diesel generator load to approximately 1000 KW. KW .

~

--

~-

.J..J

- - UNSAT

~-

t umed the Governor Control Switch,AND I. Turned AND slowly loadedI diesel approximatelyy 1000 KW.

generator to approximatel KW.

Standard Standard:: 22. Operator recognizes recognizes EDG problem and places EDG to Emergency SlOp.Stop.

1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw. kw.
2. When the 3A EDG Voltage Regulator is taken to RAISE. RAISE, 81M SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where Voltage/Load begin.

increasing oscillations in Voltage/load Cue

3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will trips wi ll take over.

over.

4. Tell operator that JPM is is complete.

a~

Comment NOTE:

Terminating Term inating STOP The task is complete when the Examinee returns the cue sheet to the Cue:

Cue: examiner.

Stop Time _~~~


NUREG 1021 Rev 9 Appendix C

I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No. NRC-25-SIM-JPM-H Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

e _______________________

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, discuss, and provide initiating cues.

When you complete the task successfully, successfully, the objective for this job performance measure will be satisfied.

satisfied .

INITIAL CONDITIONS:

You are the Unit 3 RCO . 3-0SP-023.1, 3-0SP-023.1, Diesel Generator Operability Test Test,, has been satisfactorily completed through 7.1.2.30.

INITIA TlNG CUE:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31 7.1.2.31..

3-0SP-023.1.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C