IR 05000263/2011002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ary 21, 2012
{{#Wiki_filter:bruary 21, 2012


==SUBJECT:==
==SUBJECT:==
ERRATA TO MONTICELLO NUCLEAR GENERATING PLANT NRC INTEGRATED AND POWER UPRATE REVIEW INSPECTION REPORT 05000263/2011002
ERRATA TO MONTICELLO NUCLEAR GENERATING PLANT NRC INTEGRATED AND POWER UPRATE REVIEW INSPECTION REPORT 05000263/2011002


==Dear Mr. O'Connor:==
==Dear Mr. OConnor:==
On May 10, 2011, the U.S. Nuclear Regulatory Co mmission (NRC) issued Integrated Inspection Report 05000263/2011002 (ML111300561). The inspection report did not include documentation for an inspection sample that was completed under inspection procedure 71111.01, "Adverse Weather Protection." Please replace Section 1R01 of the May 10, 2011, report with Section1R01 which is enclosed.
On May 10, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000263/2011002 (ML111300561). The inspection report did not include documentation for an inspection sample that was completed under inspection procedure 71111.01, Adverse Weather Protection. Please replace Section 1R01 of the May 10, 2011, report with Section1R01 which is enclosed.


We apologize for any inconvenience to you and your staff.
We apologize for any inconvenience to you and your staff.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and M anagement System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA/
/RA/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22  
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22


===Enclosure:===
===Enclosure:===
Errata to Integrated Inspection Report 05000263/2011002  
Errata to Integrated Inspection Report 05000263/2011002


REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 21, 2012  
REGION III==
 
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 21, 2012 Mr. Timothy
Mr. Timothy
}}
}}

Revision as of 08:01, 12 November 2019

Errata to Monticello Nuclear Generating Plant - NRC Integrated and Power Uprate Review Inspection Report 05000263-11-002
ML12052A187
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/21/2012
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To: O'Connor T
Northern States Power Co
References
ML111300561 IR-11-002
Download: ML12052A187 (5)


Text

bruary 21, 2012

SUBJECT:

ERRATA TO MONTICELLO NUCLEAR GENERATING PLANT NRC INTEGRATED AND POWER UPRATE REVIEW INSPECTION REPORT 05000263/2011002

Dear Mr. OConnor:

On May 10, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000263/2011002 (ML111300561). The inspection report did not include documentation for an inspection sample that was completed under inspection procedure 71111.01, Adverse Weather Protection. Please replace Section 1R01 of the May 10, 2011, report with Section1R01 which is enclosed.

We apologize for any inconvenience to you and your staff.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22

Enclosure:

Errata to Integrated Inspection Report 05000263/2011002

REGION III==

2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 21, 2012 Mr. Timothy