ML12265A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW 1)2)3)4)5)6)7)8)9)10)02546 WC LIBRARY -MG01WC 03044 MCG DOC CNTRL MISC MAN MG05DM 03379 D E CALDWELL MG01MM 03447 HARRY J SLOAN MG01RP 03614 MCG OPS PROCEDURE GP MG01OP 03744 OPS TRNG MGR. MG03OT 03759 U S NUC REG WASHINGTON, DC 04809 MCG PLANT ENG. LIBR. MG05SE 09460 W C SPENCER MG01RP 09665 JON H THOMPSON, USNRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION:
{{#Wiki_filter:DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY      Normal            THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS                                   Date:    09/11112 OTHERWISE IDENTIFIED BELOW Document Transmittal #:          DUK122550021
581188 SELECTED LICENSEE COMMITMENTS MANUAL --- (SLC)Page 2 of 2 Date: 09/11112 Document Transmittal
: 1) 02546 WC LIBRARY - MG01WC
#: DUK122550021 QA CONDITION E] Yes
: 2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy                    QA CONDITION                              E] Yes
* No OTHER ACKNOWLEDGEMENT REQUIRED
* No
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C. 28078 Rec'd By Date DOCUMENT NO LOES 2 PAGES SLC 16.9.6 11 PAGES QACOND REV #/ DATE DISTR CODE I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 x V1 V1 V1 V2 vi V1 V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.
: 3) 03379 D E CALDWELL MG01MM
S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.
: 4) 03447 HARRY J SLOAN MG01RP DOCUMENT TRANSMITTAL FORM            OTHER ACKNOWLEDGEMENT REQUIRED
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY: BC BEAVER MG01RC BCB/TLC PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW Date: 09/11/12 Document Transmittal  
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
#: DUK122550021
: 5) 03614 MCG OPS PROCEDURE GP MG01OP                                                                               ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
: 1) 00003 NRI&IA MGR EC050 2) 00070 VICKIE BREWER -MG03OT 3) 00200 M E CARROLL EC08H 4) 00297 V M MCCREE REG ATL, GA 5) 00422 MCG BONNIE C BEAVER -MG01RC 6) 00485 OPS TEST GROUP -MG01OP 7) 00692 MCG OPS STAFF MGR MG01OP 8) 00707 SERV BLDG FILE ROOM -MG01S1 9) 00841 OPS HUMAN PERFORMANCE-MG01OP 10) 01202 K L CRANE -MG01RC 11) 01492 BLUE DOT LIBRARY MG02MO 12) 01503 VICKIE L MC GINNIS -MG03OT 13) 01623 G L MONTGOMERY MG01WC 14) 02467 ELECT. LICENSING LIBRARY EC050 15) 02532 RESIDENT NRC INSPECT MG01NRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION:
: 6) 03744 OPS TRNG MGR. MG03OT                                                           REFERENCE
581188 SELECTED LICENSEE COMMITMENTS MANUAL -- (SLC)Page 1 of 2 QA CONDITION D Yes E No OTHER ACKNOWLEDGEMENT REQUIRED
: 7) 03759 U S NUC REG WASHINGTON, DC                                       MCGUIRE NUCLEAR STATION Duke Energy
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C. 28078 Rec'd By Date-, -' r -r -, -r -r*1 -r---r r r r r F F t DOCUMENT NO QA COND REV #/DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL_____ 4 A +/- -I----+/----  
: 8) 04809 MCG PLANT ENG. LIBR. MG05SE                                                                                       McGuire
+/--+--+ F F F F F -F LOES 2 PAGES SLC 16.9.6 11 PAGES NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 T1 V1 vi v1 vi V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.
: 9) 09460 W C SPENCER MG01RP                                                                                               DCRM MGO2DM RECORD RETENTION: 581188
S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.
: 10) 09665 JON HTHOMPSON, USNRC                                                                                             13225 Hagers Ferry Road Huntersville, N.C. 28078 SELECTED LICENSEE COMMITMENTS MANUAL --- (SLC)
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY: B C BEAVER MGO1RC BCB/TLC SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED -REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED -REVISION 43 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 130 5/16/12 16.9.7 REVISION 122 1/14/11 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED -REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 111 SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED -REVISION 13 ... 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 116 4/7/10 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 DELETED -REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED -REVISION 75 7/20/05 16.13.3 DELETED -REVISION 75 7/20/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 111 Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT APPLICABILITY The fire detection instrumentation for each fire detection zone shown in Table 16.9.6-1 shall be OPERABLE.Whenever equipment protected by fire detection instrument is required to be OPERABLE.REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more, but not A.1 Restore the inoperable 14 days more than half, of the instrument(s) to Function A fire detectors OPERABLE status.in any zone inoperable.
Rec'd By Page 2 of 2 Date DOCUMENT NO                                          QACOND      REV #/ DATE  DISTR CODE    I  2 3    4  5  6      7    8    9      10  11    12 13    14  15  TOTAL LOES 2 PAGES                                            NA      111 05/16/12  MADM-03A      V1 x  V1  V1 V1 V2    vi    V1    V1    V1                              24 SLC 16.9.6 11 PAGES                                      NA      130 09/05/12 S D CAPPS REMARKS: PLEASE UPDATE             ACCORDINGLY.
B. More than half of the B.1 Establish fire watch patrol 1 hour Function A fire detectors to inspect zones outside AND in any zone inoperable, containment with inoperable instruments.
UPDATE ACCORDINGLY.
Once per hour thereafter OR AND One or more Function B B.2.1 Establish a fire watch patrol 1 hour fire detectors inoperable, to inspect zones inside AND containment with OR inoperable instruments.
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:
Once per 8 hours thereafter Two or more adjacent OR fire detectors inoperable.
BC BEAVER         MG01RC   BCB/TLC
B.2.2 Monitor containment air Once per hour OR temperature at the locations given in ITS Required Action and 3.6.5.1 or 3.6.5.2.associated Completion Time of Condition A not met.(continued)
 
McGuire Units 1 and 2 16.9.6-1 Revision 130 Fire Detection Instrumentation 16.9.6 REMEDIAL ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME C. One or more annulus fire C.1 Perform a fire watch patrol 1 hour detectors inoperable, of the annulus.AND C.2.1 Verify at least one adjacent Once per hour annulus fire detector zone thereafter is OPERABLE.OR C.2.2 Perform a fire watch patrol Once per 8 hours of the annulus if no thereafter adjacent zone is OPERABLE.TESTING REQUIREMENTS TEST FREQUENCY TR 16.9.6.1 Verify the non-supervised circuits associated with 31 days detector alarms between the instrument and the control room are OPERABLE.TR 16.9.6.2 Verify the NFPA Standard 72D supervised circuits 6 months supervision associated with detector alarms are OPERABLE.TR 16.9.6.3 Perform a TADOT on fire detectors which are accessible 6 months during plant operation.(continued)
DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY    Normal            THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS                                                         Date:     09/11/12 OTHERWISE IDENTIFIED BELOW Document Transmittal #:               DUK122550021
McGuire Units 1 and 2 16.9.6-2 Revision 130 Fire Detection Instrumentation 16.9.6 TESTING REQUIREMENTS (continued)
: 1) 00003 NRI&IA MGR EC050
TEST FREQUENCY_TR_ 16.9.6A _ Perform a TADOT on fire detectors which_ are not- Prior to entering accessible during plant operation.
: 2) 00070 VICKIE BREWER - MG03OT                                                       Duke Energy                                    QA CONDITION                                    D    Yes  E    No
MODE 4 when the unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.5 --------------------
: 3) 00200
NOTE-----------------
: 4) 00297 ME CARROLL EC08H VM MCCREE REG ATL, GA DOCUMENT TRANSMITTAL FORM                                OTHER ACKNOWLEDGEMENT REQUIRED
Different detectors shall be selected for each test.Perform a TADOT on at least one detector on each 6 months signal initiating circuit for fixed temperature/rate of rise restorable spot type heat detectors which are accessible during plant operation.
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
TR 16.9.6.6 Perform a TADOT on fixed temperature/rate of rise Prior to entering restorable spot type heat detectors which are not MODE 4 when the accessible during plant operation.
: 5) 00422 MCG BONNIE C BEAVER - MG01RC                                                                                                 ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.7 --------------------
REFERENCE
NOTES-----------------
: 6) 00485 OPS TEST GROUP - MG01OP
: 1. For each failure that occurs, two additional detectors shall be removed and tested.2. Replacement of all fixed temperature/rate of rise non-restorable spot type heat detectors within population satisfies testing requirement.
: 7) 00692 MCG OPS STAFF MGR MG01OP                                             MCGUIRE NUCLEAR STATION Duke Energy
Perform a functional test on at least 2% of the fixed 5 years temperature/rate of rise non-restorable spot type heat detectors.
: 8) 00707 SERV BLDG FILE ROOM - MG01S1                                                                                                           McGuire
TR 16.9.6.8 Replace all fixed temperature/rate of rise non-restorable 15 years spot type heat detectors.
: 9) 00841 OPS HUMAN PERFORMANCE- MG01OP                                                                                                         DCRM MGO2DM RECORD RETENTION: 581188
McGuire Units 1 and 2 16.9.6-3 Revision 130 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Description Location Zone 1 2 3 4 5 6 7 8 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45A 45B 45C 45D 45G Reactor Coolant Pump 1A Reactor Coolant Pump 1 B Reactor Coolant Pump 1C Reactor Coolant Pump 1 D Reactor Coolant Pump 2A Reactor Coolant Pump 2B Reactor Coolant Pump 2C Reactor Coolant Pump 2D Aux. Bldg. Vent Filter Elec. Pen. Rm.Elec. Pen. Rm.Elec. Pen. Rm.Unit 2 Aux. Bldg. Vent. Filter Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Diesel Gen. 1A Diesel Gen. 2A Cable Room Control Room Swgr. Rm. IETA Swgr. Rm. IETB SWG. Room 2ETA SWG. Room 2ETB Battery Room EVCA Battery Room EVCB Battery Room EVCC Battery Room EVCD Battery Chg. Equip. & Pnl EVCA, EVCC RCP-1A RCP-1B RCP-1C RCP-1 D RCP-2A RCP-2B RCP-2C RCP-2D KK52-53 EL. 767 CC-51 EL. 767 CC-51 EL. 750 CC-51 EL. 733 KK-59/60 EL. 767 CC-61 EL. 767 CC-61 EL. 750 CC-61 EL. 733 CC-43 EL. 733 CC-69 EL. 733 CC-55 EL. 750 CC-56 EL. 767 AA-49 EL. 750 AA-49 EL. 733 AA-62 EL. 750 AA-62 EL. 733 CC-54 EL. 733 CC-55 EL. 733 CC-56 EL. 733 CC-57 EL. 733 CC-56 EL. 733 Number of Smoke Detectors 0 0 0 0 0 0 0 0 2 9 10(5)1 (5)2 9 10(5)11(5)0(0)0(0)24 9(5)10(5)9(5)10(5)2(5)2(5)2 (5)2 (5)13(5)Number of Heat Detectors 0 1 I 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 8(4)0 19 0 0 0 0 0 0 0 0 0 Function(z)
: 10) 01202 KLCRANE - MG01RC                                                                                                                       13225 Hagers Ferry Road Huntersville, N.C. 28078
A A A A A A A A A A A A A A A A A(B)A(B)A A A A A A A A A A A Revision 130 McGuire Units 1 and 2 16.9.6-4 0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Description Location Zone 45H 50 51 52 61 62 63 64 66 67 68 69 70 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 Battery Chg. Equip. & PnI EVCB, EVCD Diesel Gen. 1 B Diesel Gen. 2B Unit 2 Cable Room Cont. Spray Pump 1A/Corridor Cont. Spray Pump 1B/Cooridor RHR Pump 1B RHR Pump 1A Cont. Spray Pump 2B/Corridor Cont. Spray Pump 2A/Cooridor RHR Pump 2A RHR Pump 2B Aux. FW Pumps Mech. Pen. Rm./Cables Corridor/Cables Sample Panel/Cables Cent. Chg. Pump 1B Cent. Chg. Pump 1A PD Pump #1 Safety Injection Pump 1A Safety Injection Pump 1 B Aisle/Cables Aisle/Cables Cent. Chg. Pump 2B Cent. Chg. Pump 2A PD Pump #2 Safety Injection Pump 2A Safety Injection Pump 2B Aux. FW Pumps BB-56 EL. 733 BB-43 EL. 733 BB-69 EL. 733 CC-57 EL. 750 GG-55 EL. 695 GG-56 EL. 695 FF-54 EL. 695 GG-54 EL. 695 GG-56 EL. 695 GG-57 EL. 695 GG-58 EL. 695 FF-58 EL. 695 BB-51 EL. 716 JJ-51 EL. 716 HH-53 EL. 716 EE-55 EL. 716 JJ-55 EL. 716 JJ-55 EL. 716 JJ-54 EL. 716 HH-54 EL. 716 GG-54 EL. 716 GG-55 EL. 716 GG-57 EL. 716 JJ-57 EL. 716 JJ-57 EL. 716 JJ-58 EL. 716 HH-58 EL. 716 GG-58 EL. 716 CC-60 EL. 716 Number of Smoke Detectors 12(b)0(0)0(0)11I(5)2(5)2 (5)1 (5)1 (5)2 (5)2 (5)1 (5)1 (5)10(0o 5 6 (5)5 (5)2 (5)2 (5)2 (5)2 (5)2(5)13(s)11 (5)2 (5)2(5)2 (5)2 (5)2(5)10(0) (5)Number of Heat Detectors 0 8(4)8(4)0 0 0 0 0 0 0 0 0 0(1)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0(1)Function"'
: 11) 01492 BLUE DOT LIBRARY MG02MO
A A(B)A(B)A A A A A A A A A A(B)A A A A A A A A A A A A A A A A(B)Revision 130 McGuire Units I and 2 16.9.6-5 0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Zone 88 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 106 107 108 109 110 111 112 113 114 115 116 120 122 Description Location Mech. Penetration Room/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Aisle/Cables 600V MCC 1EMXB -1 EMXB3 Cable Tray Access Cable Tray Access 600V MCC 2EMXB -2EMXB3 Aisle/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Hatch Area Cables 600V MCC 1 EMXA 600V MCC 2EMXA Aisle/Cables Hatch Area Cables Corridor/Cables Corridor/Cables Aisle/Cables HVAC Equipment Area/Cables Respiratory Equipment Room Corridor/Cables HVAC Equipment Area/Cables Environmental Lab HVAC Equipment Area JJ-61 EL. 716 NN-59 EL. 716 EE-53 EL. 733 JJ-51 EL. 733 NN-52 EL. 733 JJ-55 EL. 733 FF-55 EL. 733 EE-55 EL. 733 EE-57 EL. 733 FF-57 EL. 733 JJ-57 EL. 733 NN-58 EL. 733 JJ-61 EL. 733 EE-59 EL. 733 MM-51 EL. 750 LL-53 EL. 750 FF-54 EL. 750 FF-57 EL. 750 JJ-55 EL. 750 PP-57 EL. 750 PP-60 EL. 750 LL-59 EL. 750 JJ-57 EL. 750 FF-56 EL. 767 GG-54 EL. 767 JJ-54 EL. 767 NN-52 EL. 767 PP-55 EL. 767 NN-59 EL. 767 Number of Smoke Detectors 4(5)5(5)4 6(5)12 (5)9(5)1 (5)2 (5)2(5)1 (5)9(5)12 (5)6 (5)4 7(5)4(5)5(5)14 (5)15 (5)8 (5)6 (5)13(5)11 (5)1 (5)16(5)8(5)1 (5)10(5)Number of Heat Detectors 0 0 4 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Function(2)A A A A A A A A A A A A A A A A A A A A A A A A A A A A A Revision 130 McGuire Units 1 and 2 16.9.6-6 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Description Location Zone Detector Description Location Zone 123 125 127 128 129 130 131 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153A 153B 153C Corridor/Cables Fuel Pool Area Fuel Pool Area Aisle/Cable 600V MCC 2EMXH Cables/KF Pumps Respiratory RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit I RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit I RB Below Oper, Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Annulus -Unit 1 RB Annulus -Unit 1 RB Annulus -Unit 1 JJ-57 EL. 767 NN-62 EL. 778+10 NN-50 EL. 731+ 6 EE-57 EL. 716 KK-56 EL. 733 PP-52 EL. 750 HH-56 EL. 767 2150 -2700 2700- 3150 3150 -0O 00 _ 440 440 -900 90 -1260 1260- 1730 3290 -3490 130 -290 340 -510 510- 1240 1240 -1430 1430- 1670 RCP -1A Motor RCP -1 B Motor RCP -1C Motor RCP -1D Motor Purge Filter Bed 1700-1900, R20'-R35'00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 Number of Smoke Detectors 1V8*)Note 4 Note 4 5(5)4 (5)4(5)6 (5)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Number of Heat Detectors 0 Note 4 Note 4 0 0 0 0 5 5 6 4 4 4 7 7 4 3 13 3 8 5 2 4 5 2 2 Note 3 Note 3 Note 3 Function (2 McGuire Units 1 and 2 16.9.6-7 Revision 130 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Zone 153D 153E 153F 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182A 182B 182C 182D 182E 182F Description Location RB Annulus -Unit 1 RB Annulus -Unit 1 RB Annulus -Unit 1 Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor RB Annulus -Unit 2 RB Annulus -Unit 2 RB Annulus -Unit 2 RB Annulus -Unit 2 RB Annulus -Unit 2 RB Annulus -Unit 2 0o-3600 EL. 805 0o-3600 EL. 820 0o-3600 EL. 835 2150 -2700 2700- 3150 315° .00 00 440 440 -900 900-1260 1260 -1730 3290 -3470 130 -290 340 510 510 -1240 1240 -1430 1430- 1670 RCP -2A Motor RCP -2B Motor RCP -2C Motor RCP -2D Motor Purge Filter Bed 1700-1900, R20'-R35'00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 00-3600 EL. 805 00-3600 EL. 820 0o-3600 EL. 835 Number of Smoke Detectors 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Number of Heat Detectors Note 3 Note 3 Note 3 4 5 6 4 4 4 7 7 4 3 13 3 8 4 3 3 5 2 2 Note 3 Note 3 Note 3 Note 3 Note 3 Note 3 Function (2)McGuire Units 1 and 2 16.9.6-8 Revision 130 S Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION" 1'Detector Description Location Number of Number of Function(2)
: 12) 01503 VICKIE LMC GINNIS - MG03OT                                           SELECTED LICENSEE COMMITMENTS
Zone Smoke Detectors Heat Detectors 197 Mech. Pen. Rm./UHI Valves JJ-52 EL. 750 5(t) 0 A 198 Mech. Pen. Rm./UHI Valves JJ-60 EL. 750 5(5) 0 A 206 Control Room Control Board AA-56 EL. 767 20 5 A NOTES: 1. The fire detection instruments located within containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.2. Function A: Early warning fire detection and notification only.Function B: Actuation of fire suppression system and early warning and notification.
: 13) 01623 G LMONTGOMERY MG01WC                                                 MANUAL -- (SLC)
: 14) 02467 ELECT. LICENSING LIBRARY EC050
: 15) 02532 RESIDENT NRC INSPECT MG01NRC Rec'd By Page 1 of 2                               Date
                                                      -,                      -'               r     -r   -,   -r   -r*1                 -r---r       r     r     r     r   F     F   t DOCUMENT NO                                             QA COND     REV #/DATE       DISTR CODE       1     2   3     4     5     6     7         8   9   10   11     12   13   14   15   TOTAL
_____  4               A                         +/-   -I----+/----           +/--+--+             F     F     F   F     F   -F LOES 2 PAGES                                               NA      111 05/16/12     MADM-03A                     V1         T1           V1     vi     v1   vi                     V1   V1     24 SLC 16.9.6 11 PAGES                                        NA      130 09/05/12 S D CAPPS REMARKS: PLEASE UPDATE               ACCORDINGLY.
UPDATE ACCORDINGLY.
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:
B C BEAVER         MGO1RC     BCB/TLC
 
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION             REVISION NUMBER                 DATE 16.1                   REVISION 32                 12/2/02 16.2                   REVISION 90                 3/13/07 16.3                   REVISION 48                 7/31/03 16.4                   Not Issued 16.5.1                 REVISION 115               0308/10 16.5.2                 REVISION 0                 12/14/99 16.5.3                 REVISION 0                 12/14/99 16.5.4                 REVISION 55                 3/23/04 16.5.5                 REVISION 0                 12/14/99 16.5.6                 DELETED - REVISION 120     12/30/10 16.5.7                 REVISION 53                 1/13/04 16.5.8                 REVISION 0                 12/14/99 16.5.9                 REVISION 108               06/10/09 16.5.10               REVISION 38                 4/9/03 16.6.1                 REVISION 0                 12/14/99 16.6.2                 DELETED - REVISION 43       6/11/03 16.6.3                 REVISION 61                 04/07/05 16.6.4                 REVISION 27                 06/12/02 16.7.1                 REVISION 0                 12/14/99 16.7.2                 REVISION 80                 10/1/05 16.7.3                 REVISION 0                 12/14/99 16.7.4                 REVISION 1                 4/11/00 16.7.5                 REVISION 0                 12/14/99 16.7.6                 REVISION 103               12/03/08 16.7.7                 REVISION 0                 12/14/99 16.7.8                 REVISION 77                 10/12/05 16.7.9                 REVISION 97                 10/06/08 16.7.10               REVISION 0                 12/14/99 16.7.11               REVISION 71                 05/25/05 16.8.1                 REVISION 98                 11/1/07 16.8.2                 REVISION 0                   12/14/99 16.8.3                 REVISION 121                 12/30/10 16.9.1                 REVISION 53                 1/13/04 16.9.2               REVISION 81                 6/15/06 16.9.3               REVISION 106               05/26/09 16.9.4               REVISION 83                 7/12/06 16.9.5               REVISION 81                 6/15/06 16.9.6               REVISION 130                 5/16/12 16.9.7               REVISION 122                 1/14/11 16.9.8               REVISION 96                 9/10/07 16.9.9               REVISION 101                 4/02/08 16.9.10               DELETED - REVISION 13       2/26/01 16.9.11               REVISION 22                 2/25/02 16.9.12               REVISION 101                 4/02/08 McGuire Units 1 and 2                 I                         Revision 111
 
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION             REVISION NUMBER                   DATE 16.9.13               DELETED - REVISION 13   ... 2/26/01 16.9.14               REVISION 22                 2/25/02 16.9.15               REVISION 116                 4/7/10 16.9.16               REVISION 111                 09/09/09 16.9.17               REVISION 86                 1/17/07 16.9.18               REVISION 0                   12/14/99 16.9.19               REVISION 102                 9/3/08 16.9.20               REVISION 8                   11/30/00 16.9.21               REVISION 0                   12/14/99 16.9.22               REVISION 109                 8/13/09 16.9.23               REVISION 88                 1/17/07 16.9.24               DELETED - REVISION 74       6/27/05 16.9.25               REVISION 87                 1/17/07 16.10.1               REVISION 56                 4/6/04 16.11.1               REVISION 112                 2/4/10 16.11.2               REVISION 84                 7/19/06 16.11.3               REVISION 0                   12/14/99 16.11.4               REVISION 0                   12/14/99 16.11.5               REVISION 0                   12/14/99 16.11.6               REVISION 112                 2/4/10 16.11.7               REVISION 84                 7/19/06 16.11.8               REVISION 0                   12/14/99 16.11.9               REVISION 0                   12/14/99 16.11.10             REVISION 0                   12/14/99 16.11.11             REVISION 41                 8/21/03 16.11.12             REVISION 67                 2/28/05 16.11.13             REVISION 91                 3/22/07 16.11.14             REVISION 21                   1/17/02 16.11.15             REVISION 21                   1/17/02 16.11.16             REVISION 1                   4/11/00 16.11.17             REVISION 118                 10/19/10 16.11.18             REVISION 0                   12/14/99 16.11.19             REVISION 0                   12/14/99 16.11.20             REVISION 0                   12/14/99 16.12.1               REVISION 0                   12/14/99 16.12.2               REVISION 0                   12/14/99 16.13.1               REVISION 51                   10/1/03 16.13.2               DELETED - REVISION 75         7/20/05 16.13.3               DELETED - REVISION 75         7/20/05 16.13.4               REVISION 58                   5/11/04 16.14.1               REVISION 0                   12/14/99 16.14.2               REVISION 104                 3/18/09 McGuire Units 1 and 2               2                           Revision 111
 
Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT             The fire detection instrumentation for each fire detection zone shown in Table 16.9.6-1 shall be OPERABLE.
APPLICABILITY          Whenever equipment protected by fire detection instrument is required to be OPERABLE.
REMEDIAL ACTIONS CONDITION                       REQUIRED ACTION                     COMPLETION TIME A. One or more, but not         A.1     Restore the inoperable           14 days more than half, of the               instrument(s) to Function A fire detectors           OPERABLE status.
in any zone inoperable.
B. More than half of the         B.1     Establish fire watch patrol     1 hour Function A fire detectors           to inspect zones outside         AND in any zone inoperable,             containment with inoperable instruments.         Once per hour thereafter OR                           AND One or more Function B       B.2.1   Establish a fire watch patrol   1 hour fire detectors inoperable,           to inspect zones inside         AND containment with OR                                   inoperable instruments.         Once per 8 hours thereafter Two or more adjacent               OR fire detectors inoperable.
B.2.2 Monitor containment air           Once per hour OR                                   temperature at the locations given in ITS Required Action and                   3.6.5.1 or 3.6.5.2.
associated Completion Time of Condition A not met.
(continued)
McGuire Units 1 and 2                     16.9.6-1                                 Revision 130
 
Fire Detection Instrumentation 16.9.6 REMEDIAL ACTIONS (continued CONDITION                         REQUIRED ACTION                 COMPLETION TIME C. One or more annulus fire   C.1     Perform a fire watch patrol     1 hour detectors inoperable,               of the annulus.
AND C.2.1   Verify at least one adjacent   Once per hour annulus fire detector zone     thereafter is OPERABLE.
OR C.2.2   Perform a fire watch patrol     Once per 8 hours of the annulus if no           thereafter adjacent zone is OPERABLE.
TESTING REQUIREMENTS TEST                                           FREQUENCY TR 16.9.6.1 Verify the non-supervised circuits associated with               31 days detector alarms between the instrument and the control room are OPERABLE.
TR 16.9.6.2 Verify the NFPA Standard 72D supervised circuits                 6 months supervision associated with detector alarms are OPERABLE.
TR 16.9.6.3   Perform a TADOT on fire detectors which are accessible         6 months during plant operation.
(continued)
McGuire Units 1 and 2                   16.9.6-2                                 Revision 130
 
Fire Detection Instrumentation 16.9.6 TESTING REQUIREMENTS (continued)
TEST                                           FREQUENCY
_TR_ 16.9.6A _ Perform a TADOT on fire detectors which_ are not-               Prior to entering accessible during plant operation.                               MODE 4 when the unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.5       -------------------- NOTE-----------------
Different detectors shall be selected for each test.
Perform a TADOT on at least one detector on each                 6 months signal initiating circuit for fixed temperature/rate of rise restorable spot type heat detectors which are accessible during plant operation.
TR 16.9.6.6   Perform a TADOT on fixed temperature/rate of rise                 Prior to entering restorable spot type heat detectors which are not                 MODE 4 when the accessible during plant operation.                               unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.7       -------------------- NOTES-----------------
: 1. For each failure that occurs, two additional detectors shall be removed and tested.
: 2. Replacement of all fixed temperature/rate of rise non-restorable spot type heat detectors within population satisfies testing requirement.
Perform a functional test on at least 2% of the fixed           5 years temperature/rate of rise non-restorable spot type heat detectors.
TR 16.9.6.8   Replace all fixed temperature/rate of rise non-restorable         15 years spot type heat detectors.
McGuire Units 1 and 2                     16.9.6-3                                 Revision 130
 
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Description                             Location             Number of      Number of      Function(z)
Zone                                                               Smoke Detectors Heat Detectors 1         Reactor Coolant Pump 1A                 RCP-1A                      0                          A 2        Reactor Coolant Pump 1B                RCP-1B                      0            1             A 3        Reactor Coolant Pump 1C                 RCP-1C                      0                          A 4        Reactor Coolant Pump 1D                RCP-1 D                     0                          A 5        Reactor Coolant Pump 2A                 RCP-2A                      0            01            A RCP-2B                      0            11            A 6        Reactor Coolant Pump 2B 7        Reactor Coolant Pump 2C                 RCP-2C                      0            I              A 8        Reactor Coolant Pump 2D                 RCP-2D                      0            0              A KK52-53 EL. 767            2            0 0              A 29      Aux. Bldg. Vent Filter CC-51 EL. 767              9            0 0              A 30        Elec. Pen. Rm.                                                   10(5) 31        Elec. Pen. Rm.                         CC-51 EL. 750            1 (5)          0              A 32        Elec. Pen. Rm.                         CC-51 EL. 733                            0              A 33        Unit 2 Aux. Bldg. Vent. Filter         KK-59/60 EL. 767            2                          A 34        Unit 2 Elec. Penetration Room           CC-61 EL. 767              9                          A 10(5)          0              A 35        Unit 2 Elec. Penetration Room           CC-61 EL. 750            11(5) 36        Unit 2 Elec. Penetration Room           CC-61 EL. 733                            0              A 37        Diesel Gen. 1A                         CC-43 EL. 733            0(0)            0 8(4)            A(B) 38        Diesel Gen. 2A                         CC-69 EL. 733            0(0)                          A(B) 0 39        Cable Room                             CC-55 EL. 750                                          A 40        Control Room                           CC-56 EL. 767              24          19              A 41        Swgr. Rm. IETA                         AA-49 EL. 750              9(5)          0              A 10(5)          00              A 42        Swgr. Rm. IETB                         AA-49 EL. 733 43        SWG. Room 2ETA                         AA-62 EL. 750              9(5)        0              A 44        SWG. Room 2ETB                          AA-62 EL. 733            10(5)          00              A CC-54 EL. 733              2(5)        0              A 45A      Battery Room EVCA CC-55 EL. 733              2(5)        0              A 45B      Battery Room EVCB CC-56 EL. 733              2 (5)        0              A 45C      Battery Room EVCC 45D      Battery Room EVCD                      CC-57 EL. 733              2 (5)        0              A 13(5) 45G      Battery Chg. Equip. & Pnl EVCA, EVCC    CC-56 EL. 733                                           A McGuire Units 1 and 2                                    16.9.6-4                                    Revision 130
 
0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector  Description                            Location            Number of      Number of        Function"'
Zone                                                                Smoke Detectors Heat Detectors 12(b)          0              A 45H      Battery Chg. Equip. & PnI EVCB, EVCD    BB-56 EL. 733 50        Diesel Gen. 1 B                        BB-43 EL. 733            0(0)          8(4)            A(B) 51        Diesel Gen. 2B                          BB-69 EL. 733           0(0)          8(4)            A(B) 11I(5)          0              A 52        Unit 2 Cable Room                      CC-57 EL. 750 2(5)                          A 61        Cont. Spray Pump 1A/Corridor            GG-55 EL. 695                            0 GG-56 EL. 695 2 (5)          0              A 62        Cont. Spray Pump 1B/Cooridor 1(5)          0              A 63        RHR Pump 1B                            FF-54 EL. 695 1(5)          0              A 64        RHR Pump 1A                            GG-54 EL. 695 Cont. Spray Pump 2B/Corridor            GG-56 EL. 695 2 (5)         0             A 66 Cont. Spray Pump 2A/Cooridor            GG-57 EL. 695 2 (5)         0              A 67 1 (5)         0              A 68        RHR Pump 2A                            GG-58 EL. 695 1(5)           0              A 69        RHR Pump 2B                            FF-58 EL. 695 10(0o 5 70      Aux. FW Pumps                            BB-51 EL. 716                          0(1)           A(B) 72        Mech. Pen. Rm./Cables                  JJ-51 EL. 716                            0             A Corridor/Cables                        HH-53 EL. 716              6 (5)         0             A 73 EE-55 EL. 716 5 (5)          0             A 74        Sample Panel/Cables 75        Cent. Chg. Pump 1B                      JJ-55 EL. 716 2 (5)         0              A 76        Cent. Chg. Pump 1A                      JJ-55 EL. 716 2 (5)         0              A PD Pump #1                              JJ-54 EL. 716 2 (5)         0              A 77 HH-54 EL. 716              2 (5)          0              A 78        Safety Injection Pump 1A 2(5)          0              A 79        Safety Injection Pump 1 B              GG-54 EL. 716 13(s)            0             A 80      Aisle/Cables                            GG-55 EL. 716            11 (5) 81      Aisle/Cables                            GG-57 EL. 716                            0              A 82        Cent. Chg. Pump 2B                      JJ-57 EL. 716 2 (5)          0              A 2(5)          0              A 83        Cent. Chg. Pump 2A                      JJ-57 EL. 716 PD Pump #2                              JJ-58 EL. 716 2 (5)          0              A 84 Safety Injection Pump 2A               HH-58 EL. 716 2 (5)          0              A 85 2(5)          0              A 86      Safety Injection Pump 2B                GG-58 EL. 716 10(0) (5)        0(1)            A(B) 87      Aux. FW Pumps                           CC-60 EL. 716 McGuire Units I and 2                                    16.9.6-5                                    Revision 130
 
0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector  Description                          Location            Number of      Number of      Function(2 )
Zone                                                              Smoke Detectors Heat Detectors 88        Mech. Penetration Room/Cables         JJ-61 EL. 716              4(5)          0              A 90        Corridor/Cables                      NN-59 EL. 716              5(5)          0              A 91        Corridor/Cables                      EE-53 EL. 733               4            4              A 92        Corridor/Cables                      JJ-51 EL. 733              6(5)          0              A NN-52 EL. 733 12 (5)          0              A 93        Corridor/Cables 94        Aisle/Cables                          JJ-55 EL. 733              9(5)          0              A 1 (5)                        A 95        600V MCC 1EMXB - 1 EMXB3              FF-55 EL. 733                            0 EE-55 EL. 733 2 (5)        0              A 96        Cable Tray Access 2(5)          0 97        Cable Tray Access                    EE-57 EL. 733                                            A 1 (5) 98        600V MCC 2EMXB - 2EMXB3              FF-57 EL. 733              9(5)          0              A 99        Aisle/Cables                          JJ-57 EL. 733                            0              A 12 (5)          0              A 100      Corridor/Cables                      NN-58 EL. 733 101      Corridor/Cables                      JJ-61 EL. 733 6 (5)        0              A 102      Corridor/Cables                      EE-59 EL. 733              4            4              A 103      Corridor/Cables                      MM-51 EL. 750              7(5)          0              A 104      Hatch Area Cables                    LL-53 EL. 750              4(5)          0              A 106      600V MCC 1EMXA                        FF-54 EL. 750              5(5)          0              A 107      600V MCC 2EMXA                        FF-57 EL. 750                            0              A JJ-55 EL. 750 14 (5)          0              A 108      Aisle/Cables PP-57 EL. 750 15 (5)          0              A 109      Hatch Area Cables 8 (5)        0              A 110      Corridor/Cables                      PP-60 EL. 750 111      Corridor/Cables                      LL-59 EL. 750 6 (5)        0              A 13(5) 112      Aisle/Cables                          JJ-57 EL. 750                            0               A 11 (5)         0 113      HVAC Equipment Area/Cables            FF-56 EL. 767                                            A 1 (5)         0              A 114      Respiratory Equipment Room            GG-54 EL. 767 16(5)           0 115      Corridor/Cables                      JJ-54 EL. 767                                            A 8(5)         0              A 116      HVAC Equipment Area/Cables            NN-52 EL. 767 1(5)         0 120      Environmental Lab                    PP-55 EL. 767                                            A 10(5)           0 122      HVAC Equipment Area                  NN-59 EL. 767                                            A McGuire Units 1 and 2                                   16.9.6-6                                      Revision 130
 
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector  Description                        Location              Number of      Number of      Function (2 Zone                                          Location            Smoke Detectors Heat Detectors Zone 123 Detector  Description Corridor/Cables                    JJ-57 EL. 767            1V8)             0 125      Fuel Pool Area                      NN-62 EL. 778+10        Note 4          Note 4 127      Fuel Pool Area                      NN-50 EL. 731+ 6        Note 4          Note 4 128      Aisle/Cable                          EE-57 EL. 716              5(5)             0 129      600V MCC 2EMXH                      KK-56 EL. 733              4 (5)           0 4(5) 130      Cables/KF Pumps                    PP-52 EL. 750                              0 6 (5)           0 131      Respiratory                        HH-56 EL. 767 134      RB Pipe Corridor-Unit 1            2150 -2700                  0              5 135      RB Pipe Corridor-Unit 1            2700- 3150                  0               5 136      RB Pipe Corridor-Unit I            3150 -0O                    0               6 137      RB Pipe Corridor-Unit 1            00 _440                    0               4 138      RB Pipe Corridor-Unit 1            440 - 900                  0               4 139      RB Pipe Corridor-Unit 1             90 - 1260                  0               4 140      RB Pipe Corridor-Unit 1            1260- 1730                  0               7 141      RB Below Oper. Floor-Unit 1        3290 - 3490                0               7 142      RB Below Oper. Floor-Unit 1        130 - 290                  0               4 143      RB Below Oper. Floor-Unit 1        340 - 510                  0               3 144      RB Below Oper. Floor-Unit 1        510- 1240                  0             13 145      RB Below Oper. Floor-Unit 1        1240 - 1430                0              3 146      RB Below Oper. Floor-Unit 1        1430- 1670                  0              8 147      RB Below Oper. Floor-Unit I        RCP - 1A Motor              0              5 148      RB Below Oper, Floor-Unit 1        RCP - 1 B Motor            0              2 149      RB Below Oper. Floor-Unit 1        RCP - 1C Motor              0              4 150      RB Below Oper. Floor-Unit 1          RCP - 1D Motor              0              5 151      RB Below Oper. Floor-Unit 1         Purge Filter Bed            0              2 152      RB Below Oper. Floor-Unit 1         1700-1900, R20'-R35'       0              2 153A    RB Annulus - Unit 1                  00-3600 EL. 745            0          Note 3 153B    RB Annulus - Unit 1                  00-3600 EL. 765            0          Note 3 153C    RB Annulus - Unit 1                 00-3600 EL. 785            0          Note 3 McGuire Units 1 and 2                                16.9.6-7                                      Revision 130
 
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
2)
Detector  Description                          Location              Number of      Number of      Function (
Zone                                                                Smoke Detectors Heat Detectors 153D      RB Annulus - Unit 1                  0o-3600 EL. 805            0            Note 3 153E      RB Annulus - Unit 1                  0o-3600 EL. 820            0            Note 3 153F      RB Annulus - Unit 1                  0o-3600 EL. 835            0            Note 3 163      Unit 2 RB  Pipe Corridor            2150 -2700                0              4 164      Unit 2 RB  Pipe Corridor            2700- 3150                0                5 165      Unit 2 RB  Pipe Corridor            315° .00                  0              6 166      Unit 2 RB  Pipe Corridor            00 440                    0              4 167      Unit 2 RB  Pipe Corridor            440 - 900                  0              4 168      Unit 2 RB  Pipe Corridor            900-1260                  0              4 169      Unit 2 RB  Pipe Corridor            1260 -1730                0              7 170      Unit 2 RB  Below Oper. Floor        3290 - 3470                0              7 171      Unit 2 RB  Below Oper. Floor        130 - 290                  0              4 172      Unit 2 RB  Below Oper. Floor        340 510                    0              3 173      Unit 2 RB  Below Oper. Floor        510 - 1240                0              13 174      Unit 2 RB  Below Oper. Floor        1240 -1430                0              3 175      Unit 2 RB  Below Oper. Floor        1430- 1670                0              8 176      Unit 2 RB  Below Oper. Floor        RCP - 2A Motor            0              4 177      Unit 2 RB  Below Oper. Floor        RCP - 2B Motor            0              3 178      Unit 2 RB  Below Oper. Floor        RCP - 2C Motor            0                3 179      Unit 2 RB  Below Oper. Floor        RCP - 2D Motor            0              5 180      Unit 2 RB  Below Oper. Floor        Purge Filter Bed          0              2 181      Unit 2 RB  Below Oper. Floor        1700-1900, R20'-R35'      0              2 182A      RB  Annulus  - Unit 2                00-3600 EL. 745            0            Note 3 182B      RB  Annulus  - Unit 2                00-3600  EL. 765          0            Note 3 182C      RB  Annulus  - Unit 2                00-3600  EL. 785          0            Note 3 182D      RB  Annulus  - Unit 2              00-3600  EL. 805          0            Note 3 182E      RB  Annulus  - Unit 2               00-3600  EL. 820          0            Note 3 182F      RB  Annulus  - Unit 2               0o-3600 EL. 835            0            Note 3 McGuire Units 1 and 2                                  16.9.6-8                                      Revision 130
 
S Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector    Description                                Location                      Number of        Number of        Function(2)
Zone                                                                            Smoke Detectors    Heat Detectors 197        Mech. Pen. Rm./UHI Valves                  JJ-52 EL. 750                    5(t)               0                A 198        Mech. Pen. Rm./UHI Valves                  JJ-60 EL. 750                    5(5)               0                A 206        Control Room Control Board                  AA-56 EL. 767                    20                5               A NOTES:
: 1. The fire detection instruments located within containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.
: 2. Function A: Early warning fire detection and notification only.
Function B: Actuation of fire suppression system and early warning and notification.
: 3. The fire detection instruments located in the RB Annulus are restorable, cable-type sensors which cover the entire 360 degrees of the annulus at each subzone elevation.
: 3. The fire detection instruments located in the RB Annulus are restorable, cable-type sensors which cover the entire 360 degrees of the annulus at each subzone elevation.
: 4. Upon implementation of MD501276 / EC95846, detection in each Spent Fuel Pool areas (Unit 1, Fire Zone 127 and Unit 2, Fire Zone 125) will consist of 4 video-based (camera) flame and smoke detectors (2 mounted above the Bypass Leakage Enclosure directed North and 2 mounted above the New Fuel Vault directed South), 1 linear heat detection circuit in the uppermost cable tray bordering the pool, 6 multimode heat/smoke detectors in the overhead of the Decon and vestibule areas adjacent to the containment, and 4 multimode heat/smoke detectors in the New Fuel Vault. A camera failure should be treated as any other single detector failure when determining remedial actions.5. Upon implementation of EC95846, EC95847, and subsequent modifications, the separate smoke and heat detectors are replaced with single multi-sensor detectors.
: 4. Upon implementation of MD501276 / EC95846, detection in each Spent Fuel Pool areas (Unit 1, Fire Zone 127 and Unit 2, Fire Zone 125) will consist of 4 video-based (camera) flame and smoke detectors (2 mounted above the Bypass Leakage Enclosure directed North and 2 mounted above the New Fuel Vault directed South), 1 linear heat detection circuit in the uppermost cable tray bordering the pool, 6 multimode heat/smoke detectors in the overhead of the Decon and vestibule areas adjacent to the containment, and 4 multimode heat/smoke detectors in the New Fuel Vault. A camera failure should be treated as any other single detector failure when determining remedial actions.
McGuire Units 1 and 2 16.9.6-9 Revision 130 Fire Detection Instrumentation 16.9.6 BASES Fire detection instrumentation is required to be operable at all times unless a complete evaluation has been made of the area protected by any particular instrument and all equipment in that area has been identified and determined not to be required operable.This evaluation would have to consider not only mechanical equipment in the area but all piping, tubing, and cables that transit through the area.OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that fire suppression systems, that are actuated by fire detectors, will discharge the extinguishing agent in a timely manner.Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.An inoperable detector is defined as: a) a fire alarm with no actual fire or b) a trouble alarm.Fire detectors that are used to actuate Fire Suppression Systems represent a more critically important component of a plant's fire protection program than detectors that are installed solely for early fire warning and notification.
: 5. Upon implementation of EC95846, EC95847, and subsequent modifications, the separate smoke and heat detectors are replaced with single multi-sensor detectors.
Consequently, the minimum number of OPERABLE fire detectors must be greater.The loss of detection capability for the Fire Suppression Systems, actuated by fire detectors, represents a significant degradation of fire protection for any area. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABLE status. If fire detection capability is monitored by a local or remote panel, the fire watch patrol needs only check the panel to verify no loss in fire detection capability.
McGuire Units 1 and 2                                         16.9.6-9                                               Revision 130
Note that Fire Alarm Control Panels (FACP) 1 and 9 monitor all areas that the Fireworks Operator Interface Computer monitors and both FACP 1 and 9 activate control room annunciator 1AD13.E-3.
 
Therefore loss of the Fireworks Operator Interface Computer does not constitute a loss of fire detection capability for those areas. Note that the MNS Fire Protection Safe Shutdown Review considers the annulus to be part of the containment building.This selected licensee commitment is part of the McGuire Fire Protection Program and therefore subject to the provisions of McGuire Facility Operating License Conditions C.4 (Unit 1) and C.7 (Unit 2).TR 16.9.6.7, "Perform a functional test on at least 2% of the fixed temperature/rate of rise non-restorable spot type heat detectors," is satisfied by either testing within population or replacement of all heat detectors as per TR 16.9.6.8.TR 16.9.6.8, "Replace all fixed temperature/rate of rise non-restorable spot type heat detectors," purpose is compliance with NFPA 72-2002 Table 10.4.2.2 Device 13 (d) 3. This is applicable to all containment fire zones (Unit 1 zones 134 -152, Unit 2 zones 163 -181).McGuire Units 1 and 2 16.9.6-10 Revision 130 Fire Detection Instrumentation 16.
Fire Detection Instrumentation 16.9.6 BASES Fire detection instrumentation is required to be operable at all times unless a complete evaluation has been made of the area protected by any particular instrument and all equipment in that area has been identified and determined not to be required operable.
This evaluation would have to consider not only mechanical equipment in the area but all piping, tubing, and cables that transit through the area.
OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that fire suppression systems, that are actuated by fire detectors, will discharge the extinguishing agent in a timely manner.
Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.
An inoperable detector is defined as: a) a fire alarm with no actual fire or b) a trouble alarm.
Fire detectors that are used to actuate Fire Suppression Systems represent a more critically important component of a plant's fire protection program than detectors that are installed solely for early fire warning and notification. Consequently, the minimum number of OPERABLE fire detectors must be greater.
The loss of detection capability for the Fire Suppression Systems, actuated by fire detectors, represents a significant degradation of fire protection for any area. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABLE status. If fire detection capability is monitored by a local or remote panel, the fire watch patrol needs only check the panel to verify no loss in fire detection capability. Note that Fire Alarm Control Panels (FACP) 1 and 9 monitor all areas that the Fireworks Operator Interface Computer monitors and both FACP 1 and 9 activate control room annunciator 1AD13.E-3. Therefore loss of the Fireworks Operator Interface Computer does not constitute a loss of fire detection capability for those areas. Note that the MNS Fire Protection Safe Shutdown Review considers the annulus to be part of the containment building.
This selected licensee commitment is part of the McGuire Fire Protection Program and therefore subject to the provisions of McGuire Facility Operating License Conditions C.4 (Unit 1) and C.7 (Unit 2).
TR 16.9.6.7, "Perform a functional test on at least 2% of the fixed temperature/rate of rise non-restorable spot type heat detectors," is satisfied by either testing within population or replacement of all heat detectors as per TR 16.9.6.8.
TR 16.9.6.8, "Replace all fixed temperature/rate of rise non-restorable spot type heat detectors," purpose is compliance with NFPA 72-2002 Table 10.4.2.2 Device 13 (d) 3. This is applicable to all containment fire zones (Unit 1 zones 134 - 152, Unit 2 zones 163 - 181).
McGuire Units 1 and 2                       16.9.6-10                               Revision 130
 
Fire Detection Instrumentation 16.


==9.6 REFERENCES==
==9.6 REFERENCES==
: 1. McGuire Nuclear Station UFSAR, Chapter 9.5.1 2. McGuire Nuclear Station SER Supplement 2, Chapter 9.5.1 and Appendix D 3. McGuire Nuclear Station SER Supplement 5, Chapter 9.5.1 and Appendix B 4. McGuire Fire Protection Review, as revised 5. McGuire Nuclear Station SER Supplement 6, Chapter 9.5.1 and Appendix C 6. NFPA Codes 72D and 72E 7. McGuire Nuclear Station Facility Operating Licenses, Unit 1 License Condition C.(4)and Unit 2 License Condition C.(7)McGuire Units 1 and 2 16.9.6-11 Revision 130}}
: 1. McGuire Nuclear Station UFSAR, Chapter 9.5.1
: 2. McGuire Nuclear Station SER Supplement 2, Chapter 9.5.1 and Appendix D
: 3. McGuire Nuclear Station SER Supplement 5, Chapter 9.5.1 and Appendix B
: 4. McGuire Fire Protection Review, as revised
: 5. McGuire Nuclear Station SER Supplement 6, Chapter 9.5.1 and Appendix C
: 6. NFPA Codes 72D and 72E
: 7. McGuire Nuclear Station Facility Operating Licenses, Unit 1 License Condition C.(4) and Unit 2 License Condition C.(7)
McGuire Units 1 and 2                 16.9.6-11                             Revision 130}}

Revision as of 22:14, 11 November 2019

Selected License Commitments Manual Update
ML12265A077
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/11/2012
From: Beaver B, Capps S
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
DUK122550021
Download: ML12265A077 (15)


Text

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 09/11112 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK122550021

1) 02546 WC LIBRARY - MG01WC
2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy QA CONDITION E] Yes
  • No
3) 03379 D E CALDWELL MG01MM
4) 03447 HARRY J SLOAN MG01RP DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED
  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 03614 MCG OPS PROCEDURE GP MG01OP ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
6) 03744 OPS TRNG MGR. MG03OT REFERENCE
7) 03759 U S NUC REG WASHINGTON, DC MCGUIRE NUCLEAR STATION Duke Energy
8) 04809 MCG PLANT ENG. LIBR. MG05SE McGuire
9) 09460 W C SPENCER MG01RP DCRM MGO2DM RECORD RETENTION: 581188
10) 09665 JON HTHOMPSON, USNRC 13225 Hagers Ferry Road Huntersville, N.C. 28078 SELECTED LICENSEE COMMITMENTS MANUAL --- (SLC)

Rec'd By Page 2 of 2 Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL LOES 2 PAGES NA 111 05/16/12 MADM-03A V1 x V1 V1 V1 V2 vi V1 V1 V1 24 SLC 16.9.6 11 PAGES NA 130 09/05/12 S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.

UPDATE ACCORDINGLY.

S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

BC BEAVER MG01RC BCB/TLC

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 09/11/12 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK122550021

1) 00003 NRI&IA MGR EC050
2) 00070 VICKIE BREWER - MG03OT Duke Energy QA CONDITION D Yes E No
3) 00200
4) 00297 ME CARROLL EC08H VM MCCREE REG ATL, GA DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED
  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 00422 MCG BONNIE C BEAVER - MG01RC ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

6) 00485 OPS TEST GROUP - MG01OP
7) 00692 MCG OPS STAFF MGR MG01OP MCGUIRE NUCLEAR STATION Duke Energy
8) 00707 SERV BLDG FILE ROOM - MG01S1 McGuire
9) 00841 OPS HUMAN PERFORMANCE- MG01OP DCRM MGO2DM RECORD RETENTION: 581188
10) 01202 KLCRANE - MG01RC 13225 Hagers Ferry Road Huntersville, N.C. 28078
11) 01492 BLUE DOT LIBRARY MG02MO
12) 01503 VICKIE LMC GINNIS - MG03OT SELECTED LICENSEE COMMITMENTS
13) 01623 G LMONTGOMERY MG01WC MANUAL -- (SLC)
14) 02467 ELECT. LICENSING LIBRARY EC050
15) 02532 RESIDENT NRC INSPECT MG01NRC Rec'd By Page 1 of 2 Date

-, -' r -r -, -r -r*1 -r---r r r r r F F t DOCUMENT NO QA COND REV #/DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL

_____ 4 A +/- -I----+/---- +/--+--+ F F F F F -F LOES 2 PAGES NA 111 05/16/12 MADM-03A V1 T1 V1 vi v1 vi V1 V1 24 SLC 16.9.6 11 PAGES NA 130 09/05/12 S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.

UPDATE ACCORDINGLY.

S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

B C BEAVER MGO1RC BCB/TLC

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED - REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED - REVISION 43 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 130 5/16/12 16.9.7 REVISION 122 1/14/11 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED - REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 111

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED - REVISION 13 ... 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 116 4/7/10 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 DELETED - REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED - REVISION 75 7/20/05 16.13.3 DELETED - REVISION 75 7/20/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 111

Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT The fire detection instrumentation for each fire detection zone shown in Table 16.9.6-1 shall be OPERABLE.

APPLICABILITY Whenever equipment protected by fire detection instrument is required to be OPERABLE.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more, but not A.1 Restore the inoperable 14 days more than half, of the instrument(s) to Function A fire detectors OPERABLE status.

in any zone inoperable.

B. More than half of the B.1 Establish fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Function A fire detectors to inspect zones outside AND in any zone inoperable, containment with inoperable instruments. Once per hour thereafter OR AND One or more Function B B.2.1 Establish a fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detectors inoperable, to inspect zones inside AND containment with OR inoperable instruments. Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter Two or more adjacent OR fire detectors inoperable.

B.2.2 Monitor containment air Once per hour OR temperature at the locations given in ITS Required Action and 3.6.5.1 or 3.6.5.2.

associated Completion Time of Condition A not met.

(continued)

McGuire Units 1 and 2 16.9.6-1 Revision 130

Fire Detection Instrumentation 16.9.6 REMEDIAL ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME C. One or more annulus fire C.1 Perform a fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> detectors inoperable, of the annulus.

AND C.2.1 Verify at least one adjacent Once per hour annulus fire detector zone thereafter is OPERABLE.

OR C.2.2 Perform a fire watch patrol Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the annulus if no thereafter adjacent zone is OPERABLE.

TESTING REQUIREMENTS TEST FREQUENCY TR 16.9.6.1 Verify the non-supervised circuits associated with 31 days detector alarms between the instrument and the control room are OPERABLE.

TR 16.9.6.2 Verify the NFPA Standard 72D supervised circuits 6 months supervision associated with detector alarms are OPERABLE.

TR 16.9.6.3 Perform a TADOT on fire detectors which are accessible 6 months during plant operation.

(continued)

McGuire Units 1 and 2 16.9.6-2 Revision 130

Fire Detection Instrumentation 16.9.6 TESTING REQUIREMENTS (continued)

TEST FREQUENCY

_TR_ 16.9.6A _ Perform a TADOT on fire detectors which_ are not- Prior to entering accessible during plant operation. MODE 4 when the unit has been in MODE 5 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more, if testing has not been performed in previous 6 months TR 16.9.6.5 -------------------- NOTE-----------------

Different detectors shall be selected for each test.

Perform a TADOT on at least one detector on each 6 months signal initiating circuit for fixed temperature/rate of rise restorable spot type heat detectors which are accessible during plant operation.

TR 16.9.6.6 Perform a TADOT on fixed temperature/rate of rise Prior to entering restorable spot type heat detectors which are not MODE 4 when the accessible during plant operation. unit has been in MODE 5 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more, if testing has not been performed in previous 6 months TR 16.9.6.7 -------------------- NOTES-----------------

1. For each failure that occurs, two additional detectors shall be removed and tested.
2. Replacement of all fixed temperature/rate of rise non-restorable spot type heat detectors within population satisfies testing requirement.

Perform a functional test on at least 2% of the fixed 5 years temperature/rate of rise non-restorable spot type heat detectors.

TR 16.9.6.8 Replace all fixed temperature/rate of rise non-restorable 15 years spot type heat detectors.

McGuire Units 1 and 2 16.9.6-3 Revision 130

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function(z)

Zone Smoke Detectors Heat Detectors 1 Reactor Coolant Pump 1A RCP-1A 0 A 2 Reactor Coolant Pump 1B RCP-1B 0 1 A 3 Reactor Coolant Pump 1C RCP-1C 0 A 4 Reactor Coolant Pump 1D RCP-1 D 0 A 5 Reactor Coolant Pump 2A RCP-2A 0 01 A RCP-2B 0 11 A 6 Reactor Coolant Pump 2B 7 Reactor Coolant Pump 2C RCP-2C 0 I A 8 Reactor Coolant Pump 2D RCP-2D 0 0 A KK52-53 EL. 767 2 0 0 A 29 Aux. Bldg. Vent Filter CC-51 EL. 767 9 0 0 A 30 Elec. Pen. Rm. 10(5) 31 Elec. Pen. Rm. CC-51 EL. 750 1 (5) 0 A 32 Elec. Pen. Rm. CC-51 EL. 733 0 A 33 Unit 2 Aux. Bldg. Vent. Filter KK-59/60 EL. 767 2 A 34 Unit 2 Elec. Penetration Room CC-61 EL. 767 9 A 10(5) 0 A 35 Unit 2 Elec. Penetration Room CC-61 EL. 750 11(5) 36 Unit 2 Elec. Penetration Room CC-61 EL. 733 0 A 37 Diesel Gen. 1A CC-43 EL. 733 0(0) 0 8(4) A(B) 38 Diesel Gen. 2A CC-69 EL. 733 0(0) A(B) 0 39 Cable Room CC-55 EL. 750 A 40 Control Room CC-56 EL. 767 24 19 A 41 Swgr. Rm. IETA AA-49 EL. 750 9(5) 0 A 10(5) 00 A 42 Swgr. Rm. IETB AA-49 EL. 733 43 SWG. Room 2ETA AA-62 EL. 750 9(5) 0 A 44 SWG. Room 2ETB AA-62 EL. 733 10(5) 00 A CC-54 EL. 733 2(5) 0 A 45A Battery Room EVCA CC-55 EL. 733 2(5) 0 A 45B Battery Room EVCB CC-56 EL. 733 2 (5) 0 A 45C Battery Room EVCC 45D Battery Room EVCD CC-57 EL. 733 2 (5) 0 A 13(5) 45G Battery Chg. Equip. & Pnl EVCA, EVCC CC-56 EL. 733 A McGuire Units 1 and 2 16.9.6-4 Revision 130

0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function"'

Zone Smoke Detectors Heat Detectors 12(b) 0 A 45H Battery Chg. Equip. & PnI EVCB, EVCD BB-56 EL. 733 50 Diesel Gen. 1 B BB-43 EL. 733 0(0) 8(4) A(B) 51 Diesel Gen. 2B BB-69 EL. 733 0(0) 8(4) A(B) 11I(5) 0 A 52 Unit 2 Cable Room CC-57 EL. 750 2(5) A 61 Cont. Spray Pump 1A/Corridor GG-55 EL. 695 0 GG-56 EL. 695 2 (5) 0 A 62 Cont. Spray Pump 1B/Cooridor 1(5) 0 A 63 RHR Pump 1B FF-54 EL. 695 1(5) 0 A 64 RHR Pump 1A GG-54 EL. 695 Cont. Spray Pump 2B/Corridor GG-56 EL. 695 2 (5) 0 A 66 Cont. Spray Pump 2A/Cooridor GG-57 EL. 695 2 (5) 0 A 67 1 (5) 0 A 68 RHR Pump 2A GG-58 EL. 695 1(5) 0 A 69 RHR Pump 2B FF-58 EL. 695 10(0o 5 70 Aux. FW Pumps BB-51 EL. 716 0(1) A(B) 72 Mech. Pen. Rm./Cables JJ-51 EL. 716 0 A Corridor/Cables HH-53 EL. 716 6 (5) 0 A 73 EE-55 EL. 716 5 (5) 0 A 74 Sample Panel/Cables 75 Cent. Chg. Pump 1B JJ-55 EL. 716 2 (5) 0 A 76 Cent. Chg. Pump 1A JJ-55 EL. 716 2 (5) 0 A PD Pump #1 JJ-54 EL. 716 2 (5) 0 A 77 HH-54 EL. 716 2 (5) 0 A 78 Safety Injection Pump 1A 2(5) 0 A 79 Safety Injection Pump 1 B GG-54 EL. 716 13(s) 0 A 80 Aisle/Cables GG-55 EL. 716 11 (5) 81 Aisle/Cables GG-57 EL. 716 0 A 82 Cent. Chg. Pump 2B JJ-57 EL. 716 2 (5) 0 A 2(5) 0 A 83 Cent. Chg. Pump 2A JJ-57 EL. 716 PD Pump #2 JJ-58 EL. 716 2 (5) 0 A 84 Safety Injection Pump 2A HH-58 EL. 716 2 (5) 0 A 85 2(5) 0 A 86 Safety Injection Pump 2B GG-58 EL. 716 10(0) (5) 0(1) A(B) 87 Aux. FW Pumps CC-60 EL. 716 McGuire Units I and 2 16.9.6-5 Revision 130

0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function(2 )

Zone Smoke Detectors Heat Detectors 88 Mech. Penetration Room/Cables JJ-61 EL. 716 4(5) 0 A 90 Corridor/Cables NN-59 EL. 716 5(5) 0 A 91 Corridor/Cables EE-53 EL. 733 4 4 A 92 Corridor/Cables JJ-51 EL. 733 6(5) 0 A NN-52 EL. 733 12 (5) 0 A 93 Corridor/Cables 94 Aisle/Cables JJ-55 EL. 733 9(5) 0 A 1 (5) A 95 600V MCC 1EMXB - 1 EMXB3 FF-55 EL. 733 0 EE-55 EL. 733 2 (5) 0 A 96 Cable Tray Access 2(5) 0 97 Cable Tray Access EE-57 EL. 733 A 1 (5) 98 600V MCC 2EMXB - 2EMXB3 FF-57 EL. 733 9(5) 0 A 99 Aisle/Cables JJ-57 EL. 733 0 A 12 (5) 0 A 100 Corridor/Cables NN-58 EL. 733 101 Corridor/Cables JJ-61 EL. 733 6 (5) 0 A 102 Corridor/Cables EE-59 EL. 733 4 4 A 103 Corridor/Cables MM-51 EL. 750 7(5) 0 A 104 Hatch Area Cables LL-53 EL. 750 4(5) 0 A 106 600V MCC 1EMXA FF-54 EL. 750 5(5) 0 A 107 600V MCC 2EMXA FF-57 EL. 750 0 A JJ-55 EL. 750 14 (5) 0 A 108 Aisle/Cables PP-57 EL. 750 15 (5) 0 A 109 Hatch Area Cables 8 (5) 0 A 110 Corridor/Cables PP-60 EL. 750 111 Corridor/Cables LL-59 EL. 750 6 (5) 0 A 13(5) 112 Aisle/Cables JJ-57 EL. 750 0 A 11 (5) 0 113 HVAC Equipment Area/Cables FF-56 EL. 767 A 1 (5) 0 A 114 Respiratory Equipment Room GG-54 EL. 767 16(5) 0 115 Corridor/Cables JJ-54 EL. 767 A 8(5) 0 A 116 HVAC Equipment Area/Cables NN-52 EL. 767 1(5) 0 120 Environmental Lab PP-55 EL. 767 A 10(5) 0 122 HVAC Equipment Area NN-59 EL. 767 A McGuire Units 1 and 2 16.9.6-6 Revision 130

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function (2 Zone Location Smoke Detectors Heat Detectors Zone 123 Detector Description Corridor/Cables JJ-57 EL. 767 1V8) 0 125 Fuel Pool Area NN-62 EL. 778+10 Note 4 Note 4 127 Fuel Pool Area NN-50 EL. 731+ 6 Note 4 Note 4 128 Aisle/Cable EE-57 EL. 716 5(5) 0 129 600V MCC 2EMXH KK-56 EL. 733 4 (5) 0 4(5) 130 Cables/KF Pumps PP-52 EL. 750 0 6 (5) 0 131 Respiratory HH-56 EL. 767 134 RB Pipe Corridor-Unit 1 2150 -2700 0 5 135 RB Pipe Corridor-Unit 1 2700- 3150 0 5 136 RB Pipe Corridor-Unit I 3150 -0O 0 6 137 RB Pipe Corridor-Unit 1 00 _440 0 4 138 RB Pipe Corridor-Unit 1 440 - 900 0 4 139 RB Pipe Corridor-Unit 1 90 - 1260 0 4 140 RB Pipe Corridor-Unit 1 1260- 1730 0 7 141 RB Below Oper. Floor-Unit 1 3290 - 3490 0 7 142 RB Below Oper. Floor-Unit 1 130 - 290 0 4 143 RB Below Oper. Floor-Unit 1 340 - 510 0 3 144 RB Below Oper. Floor-Unit 1 510- 1240 0 13 145 RB Below Oper. Floor-Unit 1 1240 - 1430 0 3 146 RB Below Oper. Floor-Unit 1 1430- 1670 0 8 147 RB Below Oper. Floor-Unit I RCP - 1A Motor 0 5 148 RB Below Oper, Floor-Unit 1 RCP - 1 B Motor 0 2 149 RB Below Oper. Floor-Unit 1 RCP - 1C Motor 0 4 150 RB Below Oper. Floor-Unit 1 RCP - 1D Motor 0 5 151 RB Below Oper. Floor-Unit 1 Purge Filter Bed 0 2 152 RB Below Oper. Floor-Unit 1 1700-1900, R20'-R35' 0 2 153A RB Annulus - Unit 1 00-3600 EL. 745 0 Note 3 153B RB Annulus - Unit 1 00-3600 EL. 765 0 Note 3 153C RB Annulus - Unit 1 00-3600 EL. 785 0 Note 3 McGuire Units 1 and 2 16.9.6-7 Revision 130

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

2)

Detector Description Location Number of Number of Function (

Zone Smoke Detectors Heat Detectors 153D RB Annulus - Unit 1 0o-3600 EL. 805 0 Note 3 153E RB Annulus - Unit 1 0o-3600 EL. 820 0 Note 3 153F RB Annulus - Unit 1 0o-3600 EL. 835 0 Note 3 163 Unit 2 RB Pipe Corridor 2150 -2700 0 4 164 Unit 2 RB Pipe Corridor 2700- 3150 0 5 165 Unit 2 RB Pipe Corridor 315° .00 0 6 166 Unit 2 RB Pipe Corridor 00 440 0 4 167 Unit 2 RB Pipe Corridor 440 - 900 0 4 168 Unit 2 RB Pipe Corridor 900-1260 0 4 169 Unit 2 RB Pipe Corridor 1260 -1730 0 7 170 Unit 2 RB Below Oper. Floor 3290 - 3470 0 7 171 Unit 2 RB Below Oper. Floor 130 - 290 0 4 172 Unit 2 RB Below Oper. Floor 340 510 0 3 173 Unit 2 RB Below Oper. Floor 510 - 1240 0 13 174 Unit 2 RB Below Oper. Floor 1240 -1430 0 3 175 Unit 2 RB Below Oper. Floor 1430- 1670 0 8 176 Unit 2 RB Below Oper. Floor RCP - 2A Motor 0 4 177 Unit 2 RB Below Oper. Floor RCP - 2B Motor 0 3 178 Unit 2 RB Below Oper. Floor RCP - 2C Motor 0 3 179 Unit 2 RB Below Oper. Floor RCP - 2D Motor 0 5 180 Unit 2 RB Below Oper. Floor Purge Filter Bed 0 2 181 Unit 2 RB Below Oper. Floor 1700-1900, R20'-R35' 0 2 182A RB Annulus - Unit 2 00-3600 EL. 745 0 Note 3 182B RB Annulus - Unit 2 00-3600 EL. 765 0 Note 3 182C RB Annulus - Unit 2 00-3600 EL. 785 0 Note 3 182D RB Annulus - Unit 2 00-3600 EL. 805 0 Note 3 182E RB Annulus - Unit 2 00-3600 EL. 820 0 Note 3 182F RB Annulus - Unit 2 0o-3600 EL. 835 0 Note 3 McGuire Units 1 and 2 16.9.6-8 Revision 130

S Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function(2)

Zone Smoke Detectors Heat Detectors 197 Mech. Pen. Rm./UHI Valves JJ-52 EL. 750 5(t) 0 A 198 Mech. Pen. Rm./UHI Valves JJ-60 EL. 750 5(5) 0 A 206 Control Room Control Board AA-56 EL. 767 20 5 A NOTES:

1. The fire detection instruments located within containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.
2. Function A: Early warning fire detection and notification only.

Function B: Actuation of fire suppression system and early warning and notification.

3. The fire detection instruments located in the RB Annulus are restorable, cable-type sensors which cover the entire 360 degrees of the annulus at each subzone elevation.
4. Upon implementation of MD501276 / EC95846, detection in each Spent Fuel Pool areas (Unit 1, Fire Zone 127 and Unit 2, Fire Zone 125) will consist of 4 video-based (camera) flame and smoke detectors (2 mounted above the Bypass Leakage Enclosure directed North and 2 mounted above the New Fuel Vault directed South), 1 linear heat detection circuit in the uppermost cable tray bordering the pool, 6 multimode heat/smoke detectors in the overhead of the Decon and vestibule areas adjacent to the containment, and 4 multimode heat/smoke detectors in the New Fuel Vault. A camera failure should be treated as any other single detector failure when determining remedial actions.
5. Upon implementation of EC95846, EC95847, and subsequent modifications, the separate smoke and heat detectors are replaced with single multi-sensor detectors.

McGuire Units 1 and 2 16.9.6-9 Revision 130

Fire Detection Instrumentation 16.9.6 BASES Fire detection instrumentation is required to be operable at all times unless a complete evaluation has been made of the area protected by any particular instrument and all equipment in that area has been identified and determined not to be required operable.

This evaluation would have to consider not only mechanical equipment in the area but all piping, tubing, and cables that transit through the area.

OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that fire suppression systems, that are actuated by fire detectors, will discharge the extinguishing agent in a timely manner.

Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.

An inoperable detector is defined as: a) a fire alarm with no actual fire or b) a trouble alarm.

Fire detectors that are used to actuate Fire Suppression Systems represent a more critically important component of a plant's fire protection program than detectors that are installed solely for early fire warning and notification. Consequently, the minimum number of OPERABLE fire detectors must be greater.

The loss of detection capability for the Fire Suppression Systems, actuated by fire detectors, represents a significant degradation of fire protection for any area. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABLE status. If fire detection capability is monitored by a local or remote panel, the fire watch patrol needs only check the panel to verify no loss in fire detection capability. Note that Fire Alarm Control Panels (FACP) 1 and 9 monitor all areas that the Fireworks Operator Interface Computer monitors and both FACP 1 and 9 activate control room annunciator 1AD13.E-3. Therefore loss of the Fireworks Operator Interface Computer does not constitute a loss of fire detection capability for those areas. Note that the MNS Fire Protection Safe Shutdown Review considers the annulus to be part of the containment building.

This selected licensee commitment is part of the McGuire Fire Protection Program and therefore subject to the provisions of McGuire Facility Operating License Conditions C.4 (Unit 1) and C.7 (Unit 2).

TR 16.9.6.7, "Perform a functional test on at least 2% of the fixed temperature/rate of rise non-restorable spot type heat detectors," is satisfied by either testing within population or replacement of all heat detectors as per TR 16.9.6.8.

TR 16.9.6.8, "Replace all fixed temperature/rate of rise non-restorable spot type heat detectors," purpose is compliance with NFPA 72-2002 Table 10.4.2.2 Device 13 (d) 3. This is applicable to all containment fire zones (Unit 1 zones 134 - 152, Unit 2 zones 163 - 181).

McGuire Units 1 and 2 16.9.6-10 Revision 130

Fire Detection Instrumentation 16.

9.6 REFERENCES

1. McGuire Nuclear Station UFSAR, Chapter 9.5.1
2. McGuire Nuclear Station SER Supplement 2, Chapter 9.5.1 and Appendix D
3. McGuire Nuclear Station SER Supplement 5, Chapter 9.5.1 and Appendix B
4. McGuire Fire Protection Review, as revised
5. McGuire Nuclear Station SER Supplement 6, Chapter 9.5.1 and Appendix C
6. NFPA Codes 72D and 72E
7. McGuire Nuclear Station Facility Operating Licenses, Unit 1 License Condition C.(4) and Unit 2 License Condition C.(7)

McGuire Units 1 and 2 16.9.6-11 Revision 130