ML14021A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
- SECURITY RELATED INFORMATION
                                                  UNITED STATES
  UNITED STATES NUCLEAR REGULATORY COMMISSION  
                                      NUCLEAR REGULATORY COMMISSION
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                                      REGION II
  Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this  
                                    245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                            ATLANTA, GEORGIA 30303-1257
                                                January 16, 2014
      Mr. Mano Nazar
      Executive Vice President
        and Chief Nuclear Officer
      Florida Power and Light Company
      P.O. Box 14000
      Juno Beach, FL 33408-0420
      SUBJECT:        TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER
                      SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
                      INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND
                      05000251/2014404)
      Dear Mr. Nazar:
      The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
      Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
      specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &
      4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor
      Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII
      office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
      The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,
      Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will
      be performed to evaluate and verify your ability to meet the interim milestone requirements of
      the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
      Section 54, Protection of Digital Computer and Communication Systems and Networks.
      During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya
      of your staff, arrangements for an information-gathering site visit and a one-week onsite
      inspection. The schedule is as follows:
          *  Information gathering visit: April 29 - May 1, 2014
          *  Onsite inspection: May 19 - 23, 2014
      The purpose of the information gathering visit is to: (1) obtain information and documentation
      needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power
      Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled
transmittal document is decontrolled
 
LIMITED INTERNAL
LIMITED INTERNAL
DISTRIBUTION PERMITTED
DISTRIBUTION PERMITTED
  OFFICIAL USE ONLY  
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
- SECURITY-RELATED INFORMATION
  January 16, 2014
Mr. Mano Nazar
Executive Vice President


  and Chief Nuclear Officer
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Florida Power and Light Company
M. Nazar                                        2
P.O. Box 14000 Juno Beach, FL  33408-0420
office space, availability of knowledgeable office personnel and to ensure unescorted site
access privileges.
SUBJECT:  TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR
In order to assure a productive TI inspection, we have enclosed a request for documents
INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND
needed to ensure the inspectors are adequately prepared. These documents have been
05000251/2014404)
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
planning for the TI inspection prior to the information gathering visit. It is requested that this
Dear Mr. Nazar:
information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists
information and possible areas for discussion necessary to assist the inspectors during the
TI inspection. It is requested this information be available during the information gathering visit
April 29, 2014. Group III consists of those items that the inspectors will review, or need access
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
in tracking questions and answers identified as a result of the TI inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
TI inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &
M. Nazar                                      3
4, on May 19 - 23, 2014.  The inspection team will be led by Mr. Rodney Fanner, Reactor
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
Inspector, of the NRC RII office.  The team
available electronically for public inspection in the NRC Public Document Room or from the
will be composed of personnel from the NRC RII office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7."  The TI inspection will be performed to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya of your staff, arrangements for an information-gathering site visit and a one-week onsite
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
inspection. The schedule is as follows: 
Public Electronic Reading Room). However, because of the security-related concerns
* Information gathering visit: April 29 - May 1, 2014 
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
* Onsite inspection: May 19 - 23, 2014
enclosure will not be available for public inspection.
The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power
                                                Sincerely,
Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as 
                                                /RA/
OFFICIAL USE ONLY  
                                                Scott M. Shaeffer, Chief
- SECURITY RELATED INFORMATION
                                                Engineering Branch 2
M. Nazar 2 OFFICIAL USE  
                                                Division of Reactor Safety
ONLY - SECURITY RELATED INFORMATION
Docket Nos.: 50-250, 50-251
  office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.
License Nos.: DPR-31, DPR-41
Enclosure: Document Request For Cyber Security
            Temporary Instruction (TI) 2201/004 Interim
            Milestones 1-7 Inspection
            (OFFICIAL USE ONLY)
cc: (See page 4)
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


In order to assure a productive TI inspection, we have enclosed a request for documents needed to ensure the inspectors are adequately prepared.  These documents have been
divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in
planning for the TI inspection prior to the information gathering visit.  It is requested that this
information be provided to the lead inspector via mail no later than April 18, 2014.  Group II lists
information and possible areas for discussion necessary to assist the inspectors during the TI inspection.  It is requested this information be available during the information gathering visit April 29, 2014.  Group III consists of those items that the inspectors will review, or need access
to, during the TI inspection.  Group III also lists the information necessary to aid the inspectors
in tracking questions and answers identified as a result of the TI inspection.  It is requested that
this information be provided to the lead inspector as the information is generated during the TI inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the
onsite portions of the TI inspection.


   
_ML14021A097__________                      x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office
OFFICE            RII:DRS        RII:DRS
of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a
SIGNATURE            RJF2        SMS
request for information or an information collection requirement unless the requesting document
NAME              RFANNER        SSHAEFFER
displays a currently valid Office of Management and Budget control number. 
DATE                  1/16/2014      1/ 16/2014      1/  /2014        1/ /2014      1/ /2014        1/  /2014    1/  /2014
E-MAIL COPY?        YES    NO    YES      NO    YES      NO      YES    NO      YES    NO      YES    NO    YES    NO
       
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
M. Nazar                              4
cc:
Michael Kiley
Site Vice President
Turkey Point Nuclear Power Plant
P.O. Box 14000
Juno Beach, FL 33408-0420
Robert Tomonto
Licensing Manager
Turkey Point Nuclear Power Plant
P.O. Box 14000
Juno Beach, FL 33408-0420
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
 
Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.
SUBJECT:       TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI
 
              MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
 
              INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
M. Nazar 3 OFFICIAL USE
ONLY - SECURITY RELATED INFORMATION
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) co
mponent of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).  However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection. 
Sincerely,        /RA/
  Scott M. Shaeffer, Chief Engineering Branch 2
 
Division of Reactor Safety 
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure:  Document Request For Cyber Security 
        Temporary Instruction
(TI) 2201/004 Interim          Milestones 1-7 Inspection
          (OFFICIAL USE ONLY)
 
cc:  (See page 4) 
 
_ML14021A097__________  x SUNSI REVIEW COMPLETE
G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE    RJF2 SMS            NAME RFANNER SSHAEFFER      DATE 1/16/2014 1/ 16/2014 1/    /2014 1/    /2014 1/    /2014 1/    /2014 1/      /2014 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
M. Nazar 4 OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
  cc: Michael Kiley
Site Vice President
Turkey Point Nuclear Power Plant P.O. Box 14000
Juno Beach, FL  33408-0420
 
Robert Tomonto
Licensing Manager
Turkey Point Nuclear Power Plant P.O. Box 14000
Juno Beach, FL 33408-0420
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
    OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
  Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014  
SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC  
INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)  
 
Distribution:
Distribution:
RidsNrrPMTurkey Point  
RidsNrrPMTurkey Point
C. Evans, RII EICS L. Douglas, RII EICS  
C. Evans, RII EICS
G. West, NSIR (hard copy w/ encl)  
L. Douglas, RII EICS
G. West, NSIR (hard copy w/ encl)
RIDSNRRDIRS
RIDSNRRDIRS
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}
}}

Revision as of 09:16, 4 November 2019

Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000250-14-404 and 05000251-14-404)
ML14021A097
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/16/2014
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Nazar M
Florida Power & Light Co
References
IR-14-404
Download: ML14021A097 (6)


See also: IR 05000250/2014404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

January 16, 2014

Mr. Mano Nazar

Executive Vice President

and Chief Nuclear Officer

Florida Power and Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND

05000251/2014404)

Dear Mr. Nazar:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &

4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor

Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII

office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).

The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,

Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will

be performed to evaluate and verify your ability to meet the interim milestone requirements of

the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,

Section 54, Protection of Digital Computer and Communication Systems and Networks.

During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya

of your staff, arrangements for an information-gathering site visit and a one-week onsite

inspection. The schedule is as follows:

  • Information gathering visit: April 29 - May 1, 2014
  • Onsite inspection: May 19 - 23, 2014

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power

Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar 2

office space, availability of knowledgeable office personnel and to ensure unescorted site

access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the

TI inspection. It is requested this information be available during the information gathering visit

April 29, 2014. Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

TI inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar 3

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

Enclosure: Document Request For Cyber Security

Temporary Instruction (TI) 2201/004 Interim

Milestones 1-7 Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

_ML14021A097__________ x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RJF2 SMS

NAME RFANNER SSHAEFFER

DATE 1/16/2014 1/ 16/2014 1/ /2014 1/ /2014 1/ /2014 1/ /2014 1/ /2014

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

M. Nazar 4

cc:

Michael Kiley

Site Vice President

Turkey Point Nuclear Power Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

Robert Tomonto

Licensing Manager

Turkey Point Nuclear Power Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014

SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI

MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)

Distribution:

RidsNrrPMTurkey Point

C. Evans, RII EICS

L. Douglas, RII EICS

G. West, NSIR (hard copy w/ encl)

RIDSNRRDIRS

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION