{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E LAMAR BLVD | |||
-4511 August 31, 2016 | ARLINGTON, TX 76011-4511 | ||
August 31, 2016 | |||
Mr. Dennis Koehl | |||
President and Chief Executive Officer | |||
STP Nuclear Operating Company | |||
P.O. Box 289 | |||
Wadsworth, TX 77483 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT | |||
ELECTRIC GENERATING STATION, UNITS 1 AND 2 | |||
(REPORT 05000498/2016005 AND 05000499/2016005) | |||
Dear Mr. Koehl: | |||
inspections at your facility. | On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle | ||
performance review of South Texas Project Electric Generating Station, Units 1 and 2. The | |||
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection | |||
Station, Units 1 and | results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs | ||
you of the NRCs assessment of your facility during this period and its plans for future | |||
inspections at your facility. | |||
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and | |||
-of-cycle performance review. | 2, operated in a manner that preserved public health and safety and met all cornerstone | ||
objectives. The NRC determined the performance at South Texas Project Electric Generating | |||
Station, Units 1 and during the most recent quarter was within the Licensee Response Column | |||
-12-049, | of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings | ||
-Design-Basis External Events | had very low (i.e., Green) safety significance, and all PIs indicated that your performance was | ||
, | within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP | ||
-12-051, | baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine | |||
inspections performed by resident inspectors are not included in the inspection plan. The | |||
inspections listed during the second half of the inspection plan are tentative and may be revised | |||
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the | |||
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact | |||
you as soon as possible to discuss changes to the inspection plan should circumstances | |||
warrant any changes. This inspection plan does not include security related inspections, which | |||
will be sent via separate, non-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order | |||
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- | |||
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to | |||
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts | |||
D. Koehl -2- | |||
towards compliance with these Orders, and the information gathered will aid staff in | |||
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the | |||
Non-Publicly Available | Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff | ||
will confirm through inspections the full implementation of the orders mentioned above by | |||
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies | |||
Letter to Dennis Koehl | and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness | ||
Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the | |||
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the | |||
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning | |||
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue | |||
to conduct quarterly assessment meetings and communicate changes in the assessment of | |||
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, | |||
Operating Reactor Assessment Program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs | |||
Rules of Practice, a copy of this letter will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records (PARS) component of | |||
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public | |||
Electronic Reading Room). | |||
Please contact me at 817-200-1141 with any questions you have regarding this letter. | |||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | Sincerely, | ||
/RA/ | |||
Nicholas H. Taylor, Chief | |||
Projects Branch B | |||
Division of Reactor Projects | |||
Docket Nos.: 50-498, 50-499 | |||
License Nos.: NPF-76 and NPF-80 | |||
Enclosure: | |||
South Texas Project Electric Generating | |||
Station, Units 1 and 2 Inspection/ | |||
Activity Plan | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP | |||
Page 1 of 3 South Texas Project | |||
08/30/2016 09:36:28 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
EP-2 - EP PERFORMANCE INDICATORS 2 | |||
1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance | |||
1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness | |||
1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability | |||
EP-3 - BIENNIAL EP EXERCISE INSPECTION 4 | |||
1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation | |||
1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
TSB 52B - BIENNIAL PI&R INSPECTION 4 | |||
1, 2 08/08/2016 08/12/2016 IP 71152B Problem Identification and Resolution | |||
1, 2 08/22/2016 08/26/2016 IP 71152B Problem Identification and Resolution | |||
71111.08 - INSERVICE INSPECTION 1 | |||
2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR | |||
RS 12 PI - RADIATION SAFETY 2 | |||
1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls | |||
1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness | |||
1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences | |||
RS 5678 - RADIATION SAFETY - TEAM 4 | |||
1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation | |||
1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment | |||
1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program | |||
1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation | |||
EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 | |||
1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial] | |||
1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial] | |||
EXAM - INITIAL EXAM 6 | |||
1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017) | |||
2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017) | |||
1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017) | |||
2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017) | |||
RS 13 PI - RADIATION SAFETY 3 | |||
1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP | |||
Page 2 of 3 South Texas Project | |||
08/30/2016 09:36:28 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
RS 13 PI - RADIATION SAFETY 3 | |||
1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences | |||
71111.08 - INSERVICE INSPECTION UNIT 1 1 | |||
1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR | |||
EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 | |||
1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing | |||
1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System | |||
1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1 | |||
1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance | |||
1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness | |||
1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability | |||
EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS 3 | |||
1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications | |||
1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications | |||
ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS) 1 | |||
1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants | |||
RS 24 - RADIATION SAFETY 2 | |||
1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls | |||
1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment | |||
ISFSI - FIRST CASK LOADING INSPECTION 1 | |||
1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants | |||
BRQ - BRQ INSPECTION 3 | |||
1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program | |||
7111108 - INSERVICE INSPECTION UNIT 2 1 | |||
2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR | |||
EB1-07T - STP HEAT SINK PERFORMANCE 1 | |||
1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance | |||
EP-1 - EP EXERCISE INSPECTION 4 | |||
1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation | |||
1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP | |||
Page 3 of 3 South Texas Project | |||
08/30/2016 09:36:28 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
EP-1 - EP EXERCISE INSPECTION 4 | |||
1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness | |||
1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
ML16237A060 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: NHT Yes No Non-Publicly Available Sensitive NRC-002 | |||
OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B | |||
NAME DProulx AVegel TWPruett NTaylor | |||
SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/ | |||
DATE 8/22/16 8/22/16 8/23/16 8/23/16 | |||
Letter to Dennis Koehl from Nicholas H. Taylor dated August 31, 2016 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT | |||
ELECTRIC GENERATING STATION, UNITS 1 AND 2 | |||
(REPORT 05000498/2016005 AND 05000499/2016005) | |||
DISTRIBUTION: | |||
Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | |||
Resident Inspector (Nicholas.Hernandez@nrc.gov) | |||
Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | |||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | |||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | |||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (Lisa.Regner@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
Director, DIRS, NRR (Chris.Miller@nrc.gov) | |||
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) | |||
Director, DORL, NRR (Anne.Boland@nrc.gov) | |||
Deputy Director, DORL, NRR (George.Wilson@nrc.gov) | |||
Director, NSIR (Brian.Holian@nrc.gov) | |||
Director, DPR, NSIR (Marissa.Bailey@nrc.gov) | |||
DRP Branch Chiefs (R4DRPBC@nrc.gov) | |||
DRS Branch Chiefs (R4DRSBC@nrc.gov) | |||
ROPreports.Resource@nrc.gov | |||
ROPassessment.Resource@nrc.gov | |||
}} | }} | ||
Revision as of 14:50, 30 October 2019
| ML16237A060 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/31/2016 |
| From: | Nick Taylor NRC/RGN-IV/DRP/RPB-B |
| To: | Koehl D South Texas |
| Taylor N | |
| References | |
| IR 2016005 | |
| Download: ML16237A060 (7) | |
See also: IR 05000498/2016005
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 31, 2016
Mr. Dennis Koehl
President and Chief Executive Officer
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT
ELECTRIC GENERATING STATION, UNITS 1 AND 2
(REPORT 05000498/2016005 AND 05000499/2016005)
Dear Mr. Koehl:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of South Texas Project Electric Generating Station, Units 1 and 2. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs
you of the NRCs assessment of your facility during this period and its plans for future
inspections at your facility.
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and
2, operated in a manner that preserved public health and safety and met all cornerstone
objectives. The NRC determined the performance at South Texas Project Electric Generating
Station, Units 1 and during the most recent quarter was within the Licensee Response Column
of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings
had very low (i.e., Green) safety significance, and all PIs indicated that your performance was
within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP
baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
D. Koehl -2-
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Chief
Projects Branch B
Division of Reactor Projects
Docket Nos.: 50-498, 50-499
License Nos.: NPF-76 and NPF-80
Enclosure:
South Texas Project Electric Generating
Station, Units 1 and 2 Inspection/
Activity Plan
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP
Page 1 of 3 South Texas Project
08/30/2016 09:36:28 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
EP-2 - EP PERFORMANCE INDICATORS 2
1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance
1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness
1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability
EP-3 - BIENNIAL EP EXERCISE INSPECTION 4
1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation
1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes
TSB 52B - BIENNIAL PI&R INSPECTION 4
1, 2 08/08/2016 08/12/2016 IP 71152B Problem Identification and Resolution
1, 2 08/22/2016 08/26/2016 IP 71152B Problem Identification and Resolution
71111.08 - INSERVICE INSPECTION 1
2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR
1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls
1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness
1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
RS 5678 - RADIATION SAFETY - TEAM 4
1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation
1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program
1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4
1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]
1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]
EXAM - INITIAL EXAM 6
1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)
2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)
1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)
2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)
1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP
Page 2 of 3 South Texas Project
08/30/2016 09:36:28 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
71111.08 - INSERVICE INSPECTION UNIT 1 1
1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR
EP-1 - BIENNIAL EP PROGRAM INSPECTION 1
1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing
1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1
1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance
1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness
1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability
EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS 3
1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS) 1
1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants
RS 24 - RADIATION SAFETY 2
1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls
1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment
ISFSI - FIRST CASK LOADING INSPECTION 1
1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
BRQ - BRQ INSPECTION 3
1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program
7111108 - INSERVICE INSPECTION UNIT 2 1
2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR
EB1-07T - STP HEAT SINK PERFORMANCE 1
1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance
EP-1 - EP EXERCISE INSPECTION 4
1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation
1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes
1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP
Page 3 of 3 South Texas Project
08/30/2016 09:36:28 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
EP-1 - EP EXERCISE INSPECTION 4
1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness
1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: NHT Yes No Non-Publicly Available Sensitive NRC-002
OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B
NAME DProulx AVegel TWPruett NTaylor
SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/
DATE 8/22/16 8/22/16 8/23/16 8/23/16
Letter to Dennis Koehl from Nicholas H. Taylor dated August 31, 2016
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT
ELECTRIC GENERATING STATION, UNITS 1 AND 2
(REPORT 05000498/2016005 AND 05000499/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov