IR 05000335/2016005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES August 31, 2016 | ||
==SUBJECT:== | |||
MID-CYCLE ASSESSMENT LETTER FOR SAINT LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - NRC INSPECTION REPORT 05000335/2016005 AND 05000389/2016005 | |||
==Dear Mr. Nazar:== | |||
On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of St. Lucie Nuclear Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, St. Lucie Nuclear Plant Unit 1 and Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Plant Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) | |||
Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). | |||
, | |||
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. | The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | ||
The NRC | The NRC staff received the Saint Lucie Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Saint Lucie Safety Evaluation on July 5, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | ||
Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes Saint Lucie Unit 2 Post Approval License Renewal Phase 1 and Phase 2. | |||
From July 1, 2015, to June 30, 2016, the NRC issued five Severity Level IV traditional enforcement violations. Four associated with impeding the regulatory process, and one associated with actual consequences. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. | |||
From July 1, 2015, to June 30, | |||
, | |||
In Staff Requirements Memorandum | In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program. | ||
- SECY 16-0009, | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at 404-997-4539 with any questions you have regarding this letter. | Please contact me at 404-997-4539 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects | /RA/ | ||
LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure: | |||
Docket Nos.: | St Lucie Inspection/Activity Plan (09/01/2016 - 06/30/2018) | ||
50-335, 50-389 License Nos.: | cc: Distribution via Listserv | ||
DPR-67, NPF-16 Enclosure: | |||
St Lucie Inspection/Activity Plan ( | |||
___________ | ___________ | ||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? | ML16244A269 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SAINT LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - NRC INSPECTION REPORT 05000335/2016005 AND 05000389/2016005 DISTRIBUTION: | ||
YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SAINT LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - NRC INSPECTION REPORT 05000335/ | |||
D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | ||
Page 1 of 3 08/31/2016 06:59:17 | Page 1 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS ANALYSIS 1 1, 2 09/26/2016 09/30/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/03/2016 10/07/2016 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/10/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 2 1, 2 01/23/2017 01/27/2017 IP 7111402 Alert and Notification System Testing 1, 2 01/23/2017 01/27/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 01/23/2017 01/27/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 01/23/2017 01/27/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 01/23/2017 01/27/2017 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 02/27/2017 03/03/2017 IP 7111108P Inservice Inspection Activities - PWR LR - UNIT 2 POST APPROVAL LR PHASE 1 2 2 02/27/2017 03/03/2017 IP 71003 Post-Approval Site Inspection for License Renewal RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 02/27/2017 03/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/27/2017 03/03/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/27/2017 03/03/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/27/2017 03/03/2017 IP 71124.04 Occupational Dose Assessment 1, 2 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 02/27/2017 03/03/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 03/06/2017 03/10/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 04/03/2017 04/07/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/03/2017 04/07/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/03/2017 04/07/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/03/2017 04/07/2017 IP 71124.04 Occupational Dose Assessment 1, 2 04/03/2017 04/07/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/03/2017 04/07/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Page 2 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications TI-191 - MITIGATING STRATEGIES 4 1, 2 07/17/2017 07/21/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 LR - POST APPROVAL LR PHASE 2 (UNIT 2) 3 2 08/28/2017 09/01/2017 IP 71003 Post-Approval Site Inspection for License Renewal 2 09/11/2017 09/15/2017 IP 71003 Post-Approval Site Inspection for License Renewal OL EXAM - INITIAL LICENSE EXAM PREP 3 1 11/06/2017 11/10/2017 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES OL RQ - REQUAL INSPECTION 2 1, 2 11/13/2017 11/17/2017 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL LICENSE EXAM 3 1 12/04/2017 12/22/2018 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC INSPECTION 2 1, 2 01/22/2018 01/26/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/22/2018 01/26/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 01/22/2018 01/26/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP EXERCISE 6 1, 2 02/19/2018 02/23/2018 IP 7111401 Exercise Evaluation 1, 2 02/19/2018 02/23/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/19/2018 02/23/2018 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 02/19/2018 02/23/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/19/2018 03/23/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 03/19/2018 03/23/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/19/2018 03/23/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 03/26/2018 03/30/2018 IP 7111108P Inservice Inspection Activities - PWR PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/07/2018 05/11/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Page | Page 3 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/21/2018 05/25/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. Enclosure | |||
}} | }} | ||
Revision as of 14:38, 30 October 2019
| ML16244A269 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/31/2016 |
| From: | Ladonna Suggs NRC/RGN-II/DRP/RPB3 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR 2016005 | |
| Download: ML16244A269 (7) | |
Text
UNITED STATES August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR SAINT LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - NRC INSPECTION REPORT 05000335/2016005 AND 05000389/2016005
Dear Mr. Nazar:
On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of St. Lucie Nuclear Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, St. Lucie Nuclear Plant Unit 1 and Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Plant Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP)
Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC staff received the Saint Lucie Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Saint Lucie Safety Evaluation on July 5, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes Saint Lucie Unit 2 Post Approval License Renewal Phase 1 and Phase 2.
From July 1, 2015, to June 30, 2016, the NRC issued five Severity Level IV traditional enforcement violations. Four associated with impeding the regulatory process, and one associated with actual consequences. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4539 with any questions you have regarding this letter.
Sincerely,
/RA/
LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure:
St Lucie Inspection/Activity Plan (09/01/2016 - 06/30/2018)
cc: Distribution via Listserv
___________
ML16244A269 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SAINT LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - NRC INSPECTION REPORT 05000335/2016005 AND 05000389/2016005 DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
Page 1 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS ANALYSIS 1 1, 2 09/26/2016 09/30/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/03/2016 10/07/2016 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/10/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 2 1, 2 01/23/2017 01/27/2017 IP 7111402 Alert and Notification System Testing 1, 2 01/23/2017 01/27/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 01/23/2017 01/27/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 01/23/2017 01/27/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 01/23/2017 01/27/2017 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 02/27/2017 03/03/2017 IP 7111108P Inservice Inspection Activities - PWR LR - UNIT 2 POST APPROVAL LR PHASE 1 2 2 02/27/2017 03/03/2017 IP 71003 Post-Approval Site Inspection for License Renewal RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 02/27/2017 03/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/27/2017 03/03/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/27/2017 03/03/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/27/2017 03/03/2017 IP 71124.04 Occupational Dose Assessment 1, 2 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 02/27/2017 03/03/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 03/06/2017 03/10/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 04/03/2017 04/07/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/03/2017 04/07/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/03/2017 04/07/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/03/2017 04/07/2017 IP 71124.04 Occupational Dose Assessment 1, 2 04/03/2017 04/07/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/03/2017 04/07/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications TI-191 - MITIGATING STRATEGIES 4 1, 2 07/17/2017 07/21/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 LR - POST APPROVAL LR PHASE 2 (UNIT 2) 3 2 08/28/2017 09/01/2017 IP 71003 Post-Approval Site Inspection for License Renewal 2 09/11/2017 09/15/2017 IP 71003 Post-Approval Site Inspection for License Renewal OL EXAM - INITIAL LICENSE EXAM PREP 3 1 11/06/2017 11/10/2017 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES OL RQ - REQUAL INSPECTION 2 1, 2 11/13/2017 11/17/2017 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL LICENSE EXAM 3 1 12/04/2017 12/22/2018 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC INSPECTION 2 1, 2 01/22/2018 01/26/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/22/2018 01/26/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 01/22/2018 01/26/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP EXERCISE 6 1, 2 02/19/2018 02/23/2018 IP 7111401 Exercise Evaluation 1, 2 02/19/2018 02/23/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/19/2018 02/23/2018 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 02/19/2018 02/23/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/19/2018 03/23/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 03/19/2018 03/23/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/19/2018 03/23/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 03/26/2018 03/30/2018 IP 7111108P Inservice Inspection Activities - PWR PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/07/2018 05/11/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 3 of 3 Saint Lucie 08/31/2016 06:59:17 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/21/2018 05/25/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure