{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 1, 2017
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/
 
201 6 006 AND 05000370/201 6 006
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006


==Dear Mr. Capps:==
==Dear Mr. Capps:==
The NRC has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs)
The NRC has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
, inspection results
, and enforcement actions from January 1, 20 16 through December 31, 20 16. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31
The NRC concluded that overall performance at your facility preserved public health and safety.
, 20 18. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant.


This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The NRC will conduct Temporary Instruction 2515/192, "Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems," in March 2017
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
. In accordance with Title 10 of the Code of Federal Regulati ons (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4 61 1 with any questions you have regarding this letter.
The NRC will conduct Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems, in March 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4611 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Frank Ehrhardt
/RA/
, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure:
: 50-369, 50-370 License Nos.
McGuire Inspection/Activity Plan (03/01/2017 - 12/31/2018)
: NPF-9, NPF-17 Enclosure:
cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006 March 1, 2017 DISTRIBUTION:
McGuire Inspection/Activity Plan (0 3/01/201 7 - 12/3 1/201 8) cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/
M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
201 6 006 AND 05000370/
ADAMS Accession Number: ML17060A199 OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD
201 6 006 March 1, 2017 DISTRIBUTION: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD
Page 1 of 2      McGuire 02/28/2017 06:54:35    Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RP - RAD HAZARDS      1 1, 2 04/03/2017 04/07/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 2 IN-SERVICE INSPECTION      1 2 04/10/2017 04/14/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION      1 2 04/17/2017 04/21/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RAD SAFETY BASELINE      3 1, 2 06/05/2017 06/09/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/05/2017 06/09/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/05/2017 06/09/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 06/05/2017 06/09/2017 IP 71151  Performance Indicator Verification EP - EP EXERCISE      3 1, 2 08/07/2017 08/11/2017 IP 7111401 Exercise Evaluation 1, 2 08/07/2017 08/11/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/07/2017 08/11/2017 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 08/07/2017 08/11/2017 IP 71151  Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION      1 1 10/02/2017 10/06/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION      1 1 10/09/2017 10/13/2017 IP 7111108P Inservice Inspection Activities - PWR DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM)      6 1, 2 01/22/2018 01/26/2018 IP 7111121M Component Design Bases Inspection (Teams)
1, 2 02/12/2018 02/16/2018 IP 7111121M Component Design Bases Inspection (Teams)
1, 2 02/26/2018 03/02/2018 IP 7111121M Component Design Bases Inspection (Teams)
OL EXAM - INITIAL LICENSE EXAM PREP      3 1 03/19/2018 03/23/2018 V23511 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM      3 1 04/16/2018 04/27/2018 V23511 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTECTION INSPECTION      5 1, 2 04/30/2018 05/04/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)
1, 2 05/14/2018 05/18/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)
EP - EP PROGRAM INSPECTION      3 1, 2 06/18/2018 06/22/2018 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 03/01/2017-12/31/2018 Page 1 of 2 02/28/2017 06:54:35 RP-RAD HAZARDS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/03/2017 04/07/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 04/10/2017 04/14/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 04/17/2017 04/21/2017 RP-RP PUBLIC RAD SAFETY BASELINE 3 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/05/2017 06/09/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 06/05/2017 06/09/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 06/05/2017 06/09/2017 1, 2 IP Performance Indicator Verification71151 06/05/2017 06/09/2017 EP-EP EXERCISE 3 1, 2 IP Exercise Evaluation7111401 08/07/201708/11/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 08/07/201708/11/2017 1, 2 IP Exercise Evaluation - Scenario Review7111408 08/07/201708/11/2017 1, 2 IP Performance Indicator Verification71151 08/07/201708/11/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/09/2017 10/13/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
Page 2 of 2     McGuire 02/28/2017 06:54:35     Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site EP - EP PROGRAM INSPECTION     3 1, 2 06/18/2018 06/22/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/18/2018 06/22/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/18/2018 06/22/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/18/2018 06/22/2018 IP 71151  Performance Indicator Verification OL RQ - REQUAL INSPECTION    2 1, 2 06/18/2018 06/22/2018 IP 7111111B Licensed Operator Requalification Program HS - TRIENNIAL HEAT SINK PERFORMANCE    1 1, 2 06/25/2018 06/29/2018 IP 7111107T Heat Sink Performance PI&R - PROBLEM IDENTIFICATION AND RESOLUTION    4 1, 2 07/24/2018 07/28/2018 IP 71152B Problem Identification and Resolution 1, 2 08/07/2018 08/11/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 2 IN-SERVICE INSPECTION   2 2 09/24/2018 09/28/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 1    3 1, 2 09/24/2018 09/28/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2018 09/28/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/24/2018 09/28/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2018 09/28/2018 IP 71124.04 Occupational Dose Assessment 1, 2 09/24/2018 09/28/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/24/2018 09/28/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/24/2018 09/28/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RP - RP OCCUPATIONAL - WEEK 2    2 1, 2 10/15/2018 10/19/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2018 10/19/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/15/2018 10/19/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/15/2018 10/19/2018 IP 71124.04 Occupational Dose Assessment 1, 2 10/15/2018 10/19/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/15/2018 10/19/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/15/2018 10/19/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.
6 1, 2 IP Component Design Bases Inspection (Teams)7111121M 01/22/2018 01/26/2018 1, 2 IP Component Design Bases Inspection (Teams)7111121M 02/12/2018 02/16/2018 1, 2 IP Component Design Bases Inspection (Teams)7111121M 02/26/2018 03/02/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 03/19/2018 03/23/2018OL EXAM-INITIAL LICENSE EXAM 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 04/16/2018 04/27/2018 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 05/14/2018 05/18/2018 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 06/18/2018 06/22/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 03/01/2017-12/31/2018 Page 2 of 2 02/28/2017 06:54:35 EP-EP PROGRAM INSPECTION 3 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification71151 06/18/2018 06/22/2018OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 06/18/2018 06/22/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 06/25/2018 06/29/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 07/24/2018 07/28/2018 1, 2 IP Problem Identification and Resolution71152B 08/07/201808/11/2018 ISI-UNIT 2 IN-SERVICE INSPECTION 2 2 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/24/2018 09/28/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 06:13, 30 October 2019

Annual Assessment Letter for McGuire Nuclear Station, Units 1 & 2 -NRC Inspection Report 05000369/2016006 and 05000370/2016006
ML17060A199
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/01/2017
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Capps S
Duke Energy Carolinas
References
IR 2016006
Download: ML17060A199 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006

Dear Mr. Capps:

The NRC has completed its end-of-cycle performance assessment of McGuire Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at McGuire Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems, in March 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 Enclosure:

McGuire Inspection/Activity Plan (03/01/2017 - 12/31/2018)

cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000369/2016006 AND 05000370/2016006 March 1, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17060A199 OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 McGuire 02/28/2017 06:54:35 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS 1 1, 2 04/03/2017 04/07/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 04/10/2017 04/14/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 04/17/2017 04/21/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP PUBLIC RAD SAFETY BASELINE 3 1, 2 06/05/2017 06/09/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/05/2017 06/09/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/05/2017 06/09/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 06/05/2017 06/09/2017 IP 71151 Performance Indicator Verification EP - EP EXERCISE 3 1, 2 08/07/2017 08/11/2017 IP 7111401 Exercise Evaluation 1, 2 08/07/2017 08/11/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/07/2017 08/11/2017 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 08/07/2017 08/11/2017 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/02/2017 10/06/2017 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/09/2017 10/13/2017 IP 7111108P Inservice Inspection Activities - PWR DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 01/22/2018 01/26/2018 IP 7111121M Component Design Bases Inspection (Teams)

1, 2 02/12/2018 02/16/2018 IP 7111121M Component Design Bases Inspection (Teams)

1, 2 02/26/2018 03/02/2018 IP 7111121M Component Design Bases Inspection (Teams)

OL EXAM - INITIAL LICENSE EXAM PREP 3 1 03/19/2018 03/23/2018 V23511 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 04/16/2018 04/27/2018 V23511 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 04/30/2018 05/04/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1, 2 05/14/2018 05/18/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

EP - EP PROGRAM INSPECTION 3 1, 2 06/18/2018 06/22/2018 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 McGuire 02/28/2017 06:54:35 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 3 1, 2 06/18/2018 06/22/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/18/2018 06/22/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/18/2018 06/22/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/18/2018 06/22/2018 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 06/18/2018 06/22/2018 IP 7111111B Licensed Operator Requalification Program HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 06/25/2018 06/29/2018 IP 7111107T Heat Sink Performance PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 07/24/2018 07/28/2018 IP 71152B Problem Identification and Resolution 1, 2 08/07/2018 08/11/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 2 IN-SERVICE INSPECTION 2 2 09/24/2018 09/28/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 1 3 1, 2 09/24/2018 09/28/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2018 09/28/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/24/2018 09/28/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2018 09/28/2018 IP 71124.04 Occupational Dose Assessment 1, 2 09/24/2018 09/28/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/24/2018 09/28/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/24/2018 09/28/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RP - RP OCCUPATIONAL - WEEK 2 2 1, 2 10/15/2018 10/19/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2018 10/19/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/15/2018 10/19/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/15/2018 10/19/2018 IP 71124.04 Occupational Dose Assessment 1, 2 10/15/2018 10/19/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/15/2018 10/19/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/15/2018 10/19/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.