{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 May 1, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION May 1, 2018
- INTEGRATED INSPECTION REPORT 05000 244/2018001


==Dear Mr. Hanso n:==
==SUBJECT:==
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant, LLC (Ginna)
R.E. GINNA NUCLEAR POWER PLANT, LLC - INTEGRATED INSPECTION REPORT 05000244/2018001
. On April 16, 2018, the NRC inspectors discussed the results of this inspection with Mr. William Carsky, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
 
==Dear Mr. Hanson:==
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant, LLC (Ginna). On April 16, 2018, the NRC inspectors discussed the results of this inspection with Mr. William Carsky, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspectors did not identify any finding or violation of more than minor significance.
The NRC inspectors did not identify any finding or violation of more than minor significance.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA/ Michelle Catts , Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Number: 50-244 License Number: D PR-18  
/RA/
Michelle Catts, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Number: 50-244 License Number: DPR-18


===Enclosure:===
===Enclosure:===
==Inspection Report==
Inspection Report 05000244/2018001
05000 244/20 18 00 1


==Inspection Report==
==Inspection Report==
Docket Number: 50-244 License Number: DPR-18 Report Number: 05000 244/20 18 00 1 Enterprise Identifier:
Docket Number: 50-244 License Number: DPR-18 Report Number: 05000244/2018001 Enterprise Identifier: I-2018-001-0045 Licensee: Exelon Generation Company, LLC (Exelon)
I-20 18-001-0045 Licensee: Exelon Generation Company, LLC (Exelon)
Facility: R.E. Ginna Nuclear Power Plant, LLC (Ginna)
Facility: R.E. Ginna Nuclear Power Plant, LLC (Ginna)
Location: Ontario, New York Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors:
Location: Ontario, New York Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: N. Perry, Senior Resident Inspector J. Schussler, Resident Inspector A. Rosebrook, Senior Project Engineer H. Anagnostopoulos, Senior Health Physicist S. Obadina, Project Engineer Observer: K. Warner, Health Physicist Approved By: M. Catts, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure
N. Perry, Senior Resident Inspector J. Schussler, Resident Inspector A. Rosebrook, Senior Project Engineer H. Anagnostopoulos, Senior Health Physicist S. Obadina, Project Engineer Observer: K. Warner, Health Physicist Approved By:
M. Catts, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects
 
2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at


Exelon's performance at Ginna by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Ginna by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


No findings or more-than-minor violations were identified.
No findings or more-than-minor violations were identified.


Additional Tracking Item s  Type Issue number Title Report Section Status LER 05000244/201800 1-00 Leakage in Reactor Coolant System Pressure Boundary N/A Open LER 05000244/2017001
Additional Tracking Items Type     Issue number             Title                           Report         Status Section LER     05000244/2018001-00       Leakage in Reactor Coolant     N/A           Open System Pressure Boundary LER     05000244/2017001-01       During Surveillance Testing,   71153          Open/Closed Lift Pressure Setpoints on Three Main Steam Safety Valves Found Outside Technical Specification Limits
-01 During Surveillance Testing, Lift Pressure Setpoints on Three Main Steam Safety Valves F ound Outside Technical Specification Limits 71153  Open/Closed
 
3


=PLANT STATUS=
=PLANT STATUS=


===The unit began the inspection period at 100 percent power and operated at full power until March 8 , 2018, when the unit was shut down to replace a faulty current transformer on the main generator's output line. The unit was returned to rated power on March 13, following replacement of the current transformer, and it remained at or near 100 percent power for the remainder of the inspection period.
===The unit began the inspection period at 100 percent power and operated at full power until March 8, 2018, when the unit was shut down to replace a faulty current transformer on the main generators output line. The unit was returned to rated power on March 13, following replacement of the current transformer, and it remained at or near 100 percent power for the remainder of the inspection period.
 
==INSPECTION SCOPE==
S  Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
-Water Reactor Inspection Program - Operations Phase."
 
The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP
 
===71152, "Problem Identification and Resolution."


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Exelon's performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards."
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Exelons performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
Line 81: Line 64:
===Impending Severe Weather===
===Impending Severe Weather===
{{IP sample|IP=IP 71111.01|count=1}}
{{IP sample|IP=IP 71111.01|count=1}}
The inspectors evaluated readiness for impending adverse weather conditions for predicted heavy snow accumulation on March 1, 2018
 
.
The inspectors evaluated readiness for impending adverse weather conditions for predicted heavy snow accumulation on March 1, 2018.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==


===Partial Walkdown (3 Sample s)  The inspectors evaluated system configuration s during partial walkdowns of the following systems/trains
===Partial Walkdown===
:
{{IP sample|IP=IP 71111.04|count=3}}
: (1) 'C' standby auxiliary feedwater on January 26, 2018
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) C standby auxiliary feedwater on January 26, 2018
: (2) Turbine-driven auxiliary feedwater on March 9, 2018
: (2) Turbine-driven auxiliary feedwater on March 9, 2018
: (3) 'B' safety injection on March 22, 2018
: (3) B safety injection on March 22, 2018


==71111.05Q - Fire Protection Quarterly==
==71111.05Q - Fire Protection Quarterly==


Quarterly Inspection===
===Quarterly Inspection===
{{IP sample|IP=IP 71111.04|count=5}}
{{IP sample|IP=IP 71111.05Q|count=5}}
 
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Co mpensatory measures during replacement of fire water piping in 'A' emergency diesel generator room on January 17, 2018
: (1) Compensatory measures during replacement of fire water piping in A emergency diesel generator room on January 17, 2018
: (2) 'B' b attery room on February 16, 2018
: (2) B battery room on February 16, 2018
: (3) Intermediate building controlled side basement on March 22, 2018
: (3) Intermediate building controlled side basement on March 22, 2018
: (4) Intermediate building controlled side top floor on March 30, 2018
: (4) Intermediate building controlled side top floor on March 30, 2018
: (5) Hemyc wrap on March 30, 2 018
: (5) Hemyc wrap on March 30, 2018


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
Line 107: Line 93:
===Cables===
===Cables===
{{IP sample|IP=IP 71111.06|count=1}}
{{IP sample|IP=IP 71111.06|count=1}}
The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
: (1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A
: (1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A-01, 02, and 03 on February 19 and 20, 2018.
-01, 02 , and 03 on February 19 and 20, 2018.


==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance==
Line 115: Line 101:
===Operator Requalification===
===Operator Requalification===
{{IP sample|IP=IP 71111.11|count=1}}
{{IP sample|IP=IP 71111.11|count=1}}
The inspectors observed and evaluated a crew of licensed operators in the plant's simulator during licensed operator requalification training, involving a failed steam flow transmitter, trip of a running component cooling water pump, a main steam line leak and a steam generator tube rupture, on February 13, 2018.


Operator Performance (1 Sample) The inspectors observed Control Room operator performance during a lowering water level in the screen house intake on February 13, 2018, power decrease for the turbine-driven auxiliary feedwater run on March 7, 2018
The inspectors observed and evaluated a crew of licensed operators in the plants simulator during licensed operator requalification training, involving a failed steam flow transmitter, trip of a running component cooling water pump, a main steam line leak and a steam generator tube rupture, on February 13, 2018.
, and start up activities on March 10 to March 13, 2018.
 
Operator Performance (1 Sample)===
The inspectors observed Control Room operator performance during a lowering water level
 
===in the screen house intake on February 13, 2018, power decrease for the turbine-driven auxiliary feedwater run on March 7, 2018, and start up activities on March 10 to March 13, 2018.


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
Line 124: Line 113:
===Routine Maintenance Effectiveness===
===Routine Maintenance Effectiveness===
{{IP sample|IP=IP 71111.12|count=2}}
{{IP sample|IP=IP 71111.12|count=2}}
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions
 
.
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions.
: (1) House heating boiler maintenance rule (a)(1) evaluation on March 1, 20 18
: (1) House heating boiler maintenance rule (a)(1) evaluation on March 1, 2018
: (2) Chemical and volume control system (charging) on March 6, 2018
: (2) Chemical and volume control system (charging) on March 6, 2018


Line 132: Line 121:


==={{IP sample|IP=IP 71111.13|count=5}}
==={{IP sample|IP=IP 71111.13|count=5}}
The inspectors evaluated the risk assessments for the following planned and emergent work activities
 
:
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Elevated risk for planned under
: (1) Elevated risk for planned under-voltage testing on electrical busses 16 and 17 on February 1, 2018
-voltage testing on electrical bus s es 16 and 17 on February 1, 2018
: (2) Atmospheric relief valve 3411 hand-wheel planned replacement on February 27, 2018
: (2) Atmospheric relief valve 3411 hand-wheel planned replacement on February 27, 2018
: (3) 'A' residual heat removal planned maintenance on March 15, 2018
: (3) A residual heat removal planned maintenance on March 15, 2018
: (4) 'C' safety injection pump planned maintenance on March 21 and March 22, 2018
: (4) C safety injection pump planned maintenance on March 21 and March 22, 2018
: (5) 'A' component cooling water planned maintenance on March 26, 2018
: (5) A component cooling water planned maintenance on March 26, 2018


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
Line 145: Line 133:


The inspectors evaluated the following operability determinations and functionality assessments:
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) 'A' emergency diesel generator due to a ground on a lube oil heater on January 12, 2018
: (1) A emergency diesel generator due to a ground on a lube oil heater on January 12, 2018
: (2) 'B' battery room vault water intrusion on January 31, 2018
: (2) B battery room vault water intrusion on January 31, 2018
: (3) Fire suppression system S
: (3) Fire suppression system S-15 alarm inputs on February 13, 2018
-15 alarm inputs on February 13, 2018
: (4) Main steam safety valve 3512 seat leakage on February 28, 2018
: (4) Main steam safety valve 351 2 seat leakage on February 28, 2018


==71111.19 - Post Maintenance Testing==
==71111.19 - Post Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=7}}
{{IP sample|IP=IP 71111.19|count=7}}
The inspectors evaluated post maintenance testing for the following maintenance/repair activities
 
:
The inspectors evaluated post maintenance testing for the following maintenance/repair activities:
: (1) Excess letdown divert valve AOV
: (1) Excess letdown divert valve AOV-312 gag installation on February 12, 2018
-312 gag installation on February 12, 2018
: (2) A spent fuel pool pump check valve, CV-8655 maintenance, on February 13, 2018
: (2) 'A' spent fuel pool pump check valve, CV-8655 maintenance, on February 13, 2018
: (3) A spent fuel pool pump maintenance and diode replacement on February 16, 2018
: (3) 'A' spent fuel pool pump maintenance and diode replacement on February 16, 2018
: (4) A flex diesel air compressor preventive maintenance on February 22, 2018
: (4) 'A' flex diesel air compressor preventive maintenance on February 22, 2018
: (5) D service water pump/motor replacement and maintenance on March 3, 2018
: (5) 'D' service water pump/motor replacement and maintenance on March 3, 2018
: (6) A residual heat removal pump/motor alignment on March 15, 2018
: (6) 'A' residual heat removal pump/motor alignment on March 15, 2018
: (7) Technical support center ventilation fan maintenance on March 22, 2018
: (7) Technical support center ventilation fan maintenance on March 22, 2018


==71111.20 - Refueling and Other Outage Activities==
==71111.20 - Refueling and Other Outage Activities==
{{IP sample|IP=IP 71111.20|count=1}}
{{IP sample|IP=IP 71111.20|count=1}}
The inspectors evaluated forced outage activities from March 7 t o March 10, 2018
 
.
The inspectors evaluated forced outage activities from March 7 to March 10, 2018.


==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
Line 174: Line 160:
Routine===
Routine===
{{IP sample|IP=IP 71111.13|count=3}}
{{IP sample|IP=IP 71111.13|count=3}}
: (1) STP-O-16QA , 'A' motor driven auxiliary feedwater pump surveillance test on January 10, 2018
: (1) STP-O-16QA, A motor driven auxiliary feedwater pump surveillance test on January 10, 2018
: (2) STP-O-40.5 , national fire protection association emergency diesel generator surveillance test on February 9, 2018
: (2) STP-O-40.5, national fire protection association emergency diesel generator surveillance test on February 9, 2018
: (3) STP-O-12.1 , 'A' emergency diesel generator surveillance test on February 12, 2018 Inservice ===
: (3) STP-O-12.1, A emergency diesel generator surveillance test on February 12, 2018 Inservice (1 Sample)===
{{IP sample|IP=IP 71152|count=1}}
: (1) STP-O-3QB, containment spray pump B quarterly test on March 20, 2018
: (1) STP-O-3QB, containment spray pump 'B' quarterly test on March 20, 2018 RADIATION SAFET Y
 
=====RADIATION SAFETY==


==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls==
==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls==
Line 185: Line 172:
{{IP sample|IP=IP 71124.02|count=1}}
{{IP sample|IP=IP 71124.02|count=1}}


The inspectors evaluated Exelon's radiological work planning by reviewing the following activities
The inspectors evaluated Exelons radiological work planning by reviewing the following activities:
:
: (1) ALARA Plan 2017-1009
: (1) ALARA Plan 2017
: (2) ALARA Plan 2017-1018
-1009
: (3) ALARA Plan 2017-1036 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)===
: (2) ALARA Plan 2017
The inspectors evaluated dose estimates and exposure tracking.
-1018
: (3) ALARA Plan 2017
-1036 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)===
The inspectors


===evaluated dose estimates and exposure tracking
===Implementation of ALARA and Radiological Work Controls (1 Sample)===
. Implementation of ALARA and Radiological Work Controls (1 Sample)===
The inspectors reviewed ALARA practices and radiological work controls by reviewing the
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:
: (1) ALARA Plan 2017
-1009
: (2) ALARA Plan 2017
-1018
: (3) ALARA Plan 2017
-1036


==OTHER ACTIVITIES
===following activities:
- BASELINE==
: (1) ALARA Plan 2017-1009
: (2) ALARA Plan 2017-1018
: (3) ALARA Plan 2017-1036


===71151 - Performance Indicator Verification The inspectors verified Exelon's performance indicator submittals listed below. (3 Sample s)
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification The inspectors verified Exelons performance indicator submittals listed below. ===
{{IP sample|IP=IP 71151|count=3}}
: (1) Unplanned Scrams on March 16, 2018
: (1) Unplanned Scrams on March 16, 2018
: (2) Unplanned Scrams with Complications on March 16, 2018
: (2) Unplanned Scrams with Complications on March 16, 2018
Line 215: Line 196:
==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==


===Annual Follow
===Annual Follow-up of Selected Issues===
-up of Selected Issue s===
{{IP sample|IP=IP 71152|count=1}}
{{IP sample|IP=IP 71152|count=1}}
The inspectors reviewed the Exelon's implementation of its corrective action program related to the following issues:
 
: (1) Maintenance Rule availability performance criteria and reliability performance criteria selection in accordance with Exelon procedure ER
The inspectors reviewed the Exelons implementation of its corrective action program related to the following issues:
-AA-310-1003 Revision 5, on March 30, 2018. Action Request (AR)04126470 and 02658070
: (1) Maintenance Rule availability performance criteria and reliability performance criteria selection in accordance with Exelon procedure ER-AA-310-1003 Revision 5, on March 30, 2018. Action Request (AR) 04126470 and 02658070.
.
 
71153 - Follow-up of Events and Notices of Enforcement Discretion Events (2 Sample s)  T h e inspectors evaluated response to the following events
===71153 - Follow-up of Events and Notices of Enforcement Discretion Events ===
.
{{IP sample|IP=IP 71153|count=2}}
The inspectors evaluated response to the following events.
: (1) Reactor coolant system leak January 23 through January 27, 2018
: (1) Reactor coolant system leak January 23 through January 27, 2018
: (2) Forced outage March 7 to March 10, 2018 Licensee Event Reports (1 Sample) The inspectors evaluated the following licensee event report which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx
: (2) Forced outage March 7 to March 10, 2018 Licensee Event Reports (1 Sample)===
:
The inspectors evaluated the following licensee event report which can be accessed at
: (1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift pressure s et points on three main stream safety valves found outside Technical Specifications limits on March 23, 2018. Revision 0 of this LER was previously closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with the results of the cause evaluation.
 
===https://lersearch.inl.gov/LERSearchCriteria.aspx:
: (1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift pressure set points on three main stream safety valves found outside Technical Specifications limits on March 23, 2018. Revision 0 of this LER was previously closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with the results of the cause evaluation. No additional findings were identified. This LER is closed.


No additional findings were identified. This LER is close d. Personnel Performance
Personnel Performance (1 Sample)===
===
: (1) Unplanned plant shutdown March 8 to 9, 2018, due to a current transformer failure on the main generator outgoing power line.
{{IP sample|IP=IP 71151|count=1}}
: (1) Unplanned plant shutdown March 8 to 9, 2018, due to a current transformer failure on the main generator outgoing power line


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Minor Violation 71152 Follow
Minor Violation                                 71152 Follow-up of Selected Issues Minor Violation: Title 10 of the Code of Federal Regulations (10 CFR) 50.65 (a)(2) allows safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an adequate demonstration that system performance is being maintained through effective maintenance is provided. In order to demonstrate this, Maintenance Rule availability performance criteria and reliability performance criteria are established and selected in accordance with Exelon procedure ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection. Section 4.4, Selecting Reliability Performance Criteria, Attachment 3, Process for Selecting Reliability Performance Criteria, contains a process to be used in which a criteria greater than or equal to two is acceptable with documentation of past performance. Contrary to the above, two maintenance rule systems contained criteria greater than or equal to two without documentation of past performance in the Basis and Justification for Criteria Values section of the maintenance rule basis document. Thus, an adequate technical basis was not documented for a required 10 CFR 50.65 (a)(2) performance criteria in accordance with Exelons procedures.
-up of Selected Issues Minor Violation: Title 10 of the Code of Federal Regulations (10 CFR) 50.65 (a)(2) allows safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an adequate demonstration that system performance is being maintained through effective maintenance is provided. In order to demonstrate this, Maintenance Rule availability performance criteria and reliability performance criteria are established and select ed in accordance with Exelon procedure ER
-AA-310-1003 , "Maintenance Rule  
- Performance Criteria Selection.Section 4.4, "Selecting Reliability Performance Criteria,"
3, "Process for Selecting Reliability Performance Criteria," contains a process to be used in which a criteria greater than or equal to two is acceptable with documentation of past performance. Contrary to the above , two maintenance rule systems contained criteria greater than or equal to two without documentation of past performance in the "Basis and Justification for Criteria Values" section of the maintenance rule basis document.


Thus, an adequate technical basis was not documented for a required 10 CFR 50.65 (a)(2) performance criteria in accordance with Exelon's procedures.
Screening: The inspectors independently evaluated the deficiency for significance in accordance with the guidance in IMC 0612, Appendix B, Issue Screening, issued December 31, 2017, and Appendix E, Examples of Minor Issues, issued August 11, 2009.


Screening:
The inspectors determined that not documenting the past performance, which was used to determine the reliability criteria, was a deficiency of minor significance since the criteria selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to enforcement action in accordance with the NRCs enforcement policy. This issue was captured in Exelons Corrective Action Program as AR 04126470 and 02658070.
The inspectors independently evaluated the deficiency for significance in accordance with the guidance in IMC 0612, Appendix B, "Is sue Screening," issued December 31, 2017, and Appendix E, "Examples of Minor Issues," issued August 11, 2009. The inspectors determined that not documenting the past performance , which was used to determine the reliability criteria
, was a deficiency of minor significance since the criteria selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to enforcement action in accordance with the NRC's enforcement policy. This issue was captured in Exelon's Corrective Action Program as A R 04126470 and 02658070
.  


=====Enforcement:=====
=====Enforcement:=====
This failure to comply with procedure ER
This failure to comply with procedure ER-AA-310-1003, Revision 5, constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
-AA-310-1003 , Revision 5, constitutes a minor violation that is not subject to enforcement action in accordance with the NRC's Enforcement Policy.


==EXIT MEETING S AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
 
* On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02 to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.
On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02 to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.
* On April 16, 2018, the inspectors presented the integrated quarterly resident inspector report inspection results to Mr. William Carsky, Site Vice President and other members of the Ginna staff.
 
On April 16, 2018, the inspector s presented the integrated quarterly resident inspector report inspection results to Mr. William Carsky, Site Vice President and other members of the Ginna staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=
Line 266: Line 237:
71111.05 - Fire Protection
71111.05 - Fire Protection
Procedures
Procedures
A-54.7, Fire Protection Tour, Revision
A-54.7, Fire Protection Tour, Revision 37
A-601.13, Fire Protection Compensatory Actions, Revision
A-601.13, Fire Protection Compensatory Actions, Revision 8
FPS-3, Fire Barrier
FPS-3, Fire Barrier Inspection Program, Revision 3
Inspection Program, Revision
71111.06 - Flood Protection Measures
71111.06 - Flood Protection Measures
Condition Reports
Condition Reports
04106112 04106114 04106123 Drawings 33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L
04106112       04106114       04106123
Drawings
33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L
Maintenance Orders/Work Orders
Maintenance Orders/Work Orders
WO C 93597827  71111.11 - Licensed Operator Requalification Program
WO C93597827
71111.11 - Licensed Operator Requalification Program
Procedures
Procedures
HU-AA-1211, Pre-Job Briefings, Revision
HU-AA-1211, Pre-Job Briefings, Revision 11
OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision
OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision 9
TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,   Revision 4 71111.12 - Maintenance Effectiveness
TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,
Revision 4
71111.12 - Maintenance Effectiveness
Procedures
Procedures
ER-AA-310, Implementation of the Maintenance Rule, Revision
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
1 ER-AA-310-1001, Maintenance Rule  
ER-AA-310-1001, Maintenance Rule - Scoping, Revision 4
- Scoping, Revision
ER-AA-310-1002, Maintenance Rule Functions - Safety Significance Classification, Revision 3
ER-AA-310-1002, Maintenance Rule Functions  
ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5
- Safety Significance Classification, Revision
ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14
ER-AA-310-1003, Maintenance Rule  
ER-AA-310-1005, Maintenance Rule - Dispositioning Between (A)(1) and (A)(2), Revision 7
- Performance Criteria Selection, Revision 5 ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision
ER-AA-310-1005, Maintenance Rule  
- Dispositioning Between (A)(1) and (A)(2), Revision 7
Condition Reports
Condition Reports
04068393 04083945
04068393       04083945
71111.13 - Maintenance Risk Assessments and Emergent Work Control
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Procedures
Procedures
OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15
OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15
OP-A A-108-117, Protected
OP-AA-108-117, Protected Equipment Program, Revision 5
Equipment Program, Revision 5
OPG-PROTECTED-EQUIPMENT, Operations Protected Equipment Program, Revision 18
OPG-PROTECTED-EQUIPMENT, Operations Protected
Equipment Program, Revision
WC-AA-101, On-Line Work Control Process, Revision 27
WC-AA-101, On-Line Work Control Process, Revision 27
WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2
WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2
WC-AA-104, Integrated Risk Management, Revision
WC-AA-104, Integrated Risk Management, Revision 25
Condition Reports
Condition Reports
04099860 71111.15 - Operability Determinations and Functionality Assessments
04099860
71111.15 - Operability Determinations and Functionality Assessments
Procedures
Procedures
A-3.3, Containment Integrity Program, Revision 27
A-3.3, Containment Integrity Program, Revision 27
OP-AA-108-115, Operability Determinations, Revision 19
OP-AA-108-115, Operability Determinations, Revision 19
Condition Reports
Condition Reports
2534565 04091493 04096584 04099235 04101267 04108798* Miscellaneous
2534565       04091493       04096584       04099235   04101267   04108798*
Miscellaneous
ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0
ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0
OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65  
OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65 - Diesel Generator Emergency
- Diesel Generator Emergency Power System, Revision 1
Power System, Revision 1
OPEVAL-18-001, S/G 'B' Main Steam Safety Valve 3512, Revision 1
OPEVAL-18-001, S/G B Main Steam Safety Valve 3512, Revision 1
71152 - Problem Identification and Resolution
71152 - Problem Identification and Resolution
Procedures
Procedures
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
ER-AA-310-1003, Maintenance Rule  
ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5
- Performance Criteria Selection, Revision 5
ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14
ER-AA-310-1004, Maintenance Rule  
ER-AA-310-1005, Maintenance Rule - Dispositioning Between (a)(1) and (a)(2), Revision 7
- Performance Monitoring, Revision 14
ER-AA-310-1005, Maintenance Rule  
- Dispositioning Between (a)(1) and (a)(2), Revision 7
PI-AA-120, Issue Identification and Screening Process, Revision 7
PI-AA-120, Issue Identification and Screening Process, Revision 7
PI-AA-125, Corrective Action Program (CAP) Procedure, Revision
PI-AA-125, Corrective Action Program (CAP) Procedure, Revision 4
Condition Reports (*initiated in response to inspection)
Condition Reports (*initiated in response to inspection)
AR 02658070
AR 02658070 AR 04126470*
AR 04126470
71153 - Follow-up of Events and Notices of Enforcement Discretion
71153 - Follow-up of Events and Notices of Enforcement Discretion
Procedures
Procedures
A-80, Startup Readiness Control, Revision019
A-80, Startup Readiness Control, Revision019
AP-TURB.5, Rapid Load Reduction, Revision 018
AP-TURB.5, Rapid Load Reduction, Revision 018
Condition Reports
Condition Reports
04096294 04097619 Maintenance Orders/Work Orders
04096294       04097619
Maintenance Orders/Work Orders
WO C93654311
WO C93654311
UNITED STATES NUCLEAR REGULATORY COMMISSION
UNITED STATES
REGION I 2100 RENAISSANCE BLVD., Suite 100
NUCLEAR REGULATORY COMMISSION
KING OF PRUSSIA, PENNSYLVANIA
REGION I
19406-2713   May 1, 2018 Mr. Bryan C. Hanson
2100 RENAISSANCE BLVD., Suite 100
KING OF PRUSSIA, PENNSYLVANIA 19406-2713
May 1, 2018
Mr. Bryan C. Hanson
Senior Vice President, Exelon Generation Company, LLC
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer, Exelon Nuclear
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT:  
SUBJECT:        
: [[contact::R.E. GINNA NUCLEAR POWER PLANT]], LLC
: [[contact::R.E. GINNA NUCLEAR POWER PLANT]], LLC - INTEGRATED INSPECTION
- INTEGRATED INSPECTION REPORT 05000 244/2018001   Dear Mr. Hanso n: On March 31, 2018, the  
REPORT 05000244/2018001
: [[contact::U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant]], LLC (Ginna)
Dear Mr. Hanson:
. On April 16, 2018, the NRC inspectors discussed the results of this inspection with Mr. William Carsky, Site Vice President and other
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at  
: [[contact::R.E. Ginna Nuclear Power Plant]], LLC (Ginna). On April 16, 2018, the NRC inspectors
discussed the results of this inspection with Mr. William Carsky, Site Vice President and other
members of your staff. The results of this inspection are documented in the enclosed report.
members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made
This letter, its enclosure, and your response (if any) will be made available for public inspection
available for public inspection and copying at http://www.nrc.gov/reading
and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room
-rm/adams.html
in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public
and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations
Inspections, Exemptions, Requests for Withholding.
(10 CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
Sincerely,       /RA/ Michelle Catts , Acting Chief Reactor Projects Branch
                                                /RA/
Michelle Catts, Acting Chief
Reactor Projects Branch 1
Division of Reactor Projects
Division of Reactor Projects
Docket Number:   50-244   License Number: D PR-18 Enclosure:
Docket Number: 50-244
Inspection Report
License Number: DPR-18
05000 244/20 18 00 1    cc w/encl:
Enclosure:
Distribution via ListServ
Inspection Report 05000244/2018001
cc w/encl: Distribution via ListServ
ML18122A322
SUNSI Review        Non-Sensitive                    Publicly Available
Sensitive                        Non-Publicly Available
OFFICE        RI/DRP          RI/DRP        RI/DRP
NAME          NPerry/AR per  ARosebrook    MCatts
tele conv
DATE          05/1/18        05/1/18        05/1/18


ML18122A322  SUNSI Review
U.S. NUCLEAR REGULATORY COMMISSION
Non-Sensitive  Sensitive  Publicly Available
Non-Publicly Available  OFFICE RI/DRP RI/DRP RI/DRP  NAME NPerry/AR per tele conv ARosebrook
MCatts  DATE 0 5/1/18 0 5/1/18 0 5/1/18
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Inspection Report
Docket Number: 50-244   License Number: DPR-18   Report Number: 05000 244/20 18 00 1  Enterprise Identifier:
Docket Number:         50-244
I-20 18-001-0045   Licensee: Exelon Generation Company, LLC (Exelon)
License Number:       DPR-18
Facility:  
Report Number:         05000244/2018001
Enterprise Identifier: I-2018-001-0045
Licensee:             Exelon Generation Company, LLC (Exelon)
Facility:            
: [[contact::R.E. Ginna Nuclear Power Plant]], LLC (Ginna)
: [[contact::R.E. Ginna Nuclear Power Plant]], LLC (Ginna)
Location: Ontario, New York
Location:             Ontario, New York
Inspection Dates: January 1, 2018
Inspection Dates:     January 1, 2018 to March 31, 2018
to March 31, 2018
Inspectors:          
Inspectors:
: [[contact::N. Perry]], Senior Resident Inspector
: [[contact::N. Perry]], Senior Resident Inspector
: [[contact::J. Schussler]], Resident Inspector
: [[contact::J. Schussler]], Resident Inspector
: [[contact::A. Rosebrook]], Senior Project
: [[contact::A. Rosebrook]], Senior Project Engineer
Engineer  
: [[contact::H. Anagnostopoulos]], Senior Health Physicist
: [[contact::H. Anagnostopoulos]], Senior Health Physicist
: [[contact::S. Obadina]], Project Engineer
: [[contact::S. Obadina]], Project Engineer
Observer:  
Observer:            
: [[contact::K. Warner]], Health Physicist
: [[contact::K. Warner]], Health Physicist
Approved By:
Approved By:          
: [[contact::M. Catts]], Acting Chief   Reactor Projects Branch
: [[contact::M. Catts]], Acting Chief
Reactor Projects Branch 1
Division of Reactor Projects
Division of Reactor Projects


SUMMARY The U.S. Nuclear Regulatory Commission (NRC) continued monitoring
SUMMARY
Exelon's performance at Ginna by conducting the baseline inspections described in this report
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for
Ginna by conducting the baseline inspections described in this report in accordance with the
overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html
Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for
for more information.
overseeing the safe operation of commercial nuclear power reactors. Refer to
No findings
https://www.nrc.gov/reactors/operating/oversight.html for more information.
or more-than-minor violations
No findings or more-than-minor violations were identified.
were identified.
Additional Tracking Items
Additional Tracking Item s  Type Issue number
Type     Issue number             Title                           Report         Status
Title Report Section Status LER 05000244/201800
Section
1-00 Leakage in
LER     05000244/2018001-00       Leakage in Reactor Coolant     N/A           Open
Reactor Coolant System Pressure Boundary N/A Open LER 05000244/2017001
System Pressure Boundary
-01 During Surveillance
LER     05000244/2017001-01       During Surveillance Testing,   71153          Open/Closed
Testing, Lift Pressure Setpoints on
Lift Pressure Setpoints on
Three Main Steam Safety Valves F ound Outside Technical Specification
Three Main Steam Safety
Limits 71153  Open/Closed
Valves Found Outside
 
Technical Specification
Limits
PLANT STATUS
PLANT STATUS
The unit began the inspection period at 100 percent power and operated at full power until March 8 , 2018, when the unit was shut down to replace a faulty current transformer on the main generator's output line. The unit was returned to rated power on March 13, following replacement of the current transformer, and it remained at or near 100 percent power for the remainder of the inspection period.
The unit began the inspection period at 100 percent power and operated at full power until
INSPECTION SCOPE
March 8, 2018, when the unit was shut down to replace a faulty current transformer on the main
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
generators output line. The unit was returned to rated power on March 13, following
-rm/doc-collections/insp
replacement of the current transformer, and it remained at or near 100 percent power for the
-manual/inspection
remainder of the inspection period.
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
INSPECTION SCOPES
-Water Reactor Inspection Program - Operations Phase."
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
The inspectors performed plant status activities described in IMC 2515 Appendix
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
D, "Plant Status" and conducted routine reviews using IP
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
71152, "Problem Identification and Resolution."
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Exelon's performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards."
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess Exelons performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
REACTOR SAFETY
71111.01 - Adverse Weather Protection
71111.01 - Adverse Weather Protection
Impending Severe Weather
Impending Severe Weather (1 Sample)
(1 Sample) The inspectors evaluated readiness for impending adverse weather conditions for predicted heavy snow accumulation
The inspectors evaluated readiness for impending adverse weather conditions for predicted
on March 1, 2018
heavy snow accumulation on March 1, 2018.
. 71111.04 - Equipment Alignment
71111.04 - Equipment Alignment
Partial Walkdown
Partial Walkdown (3 Samples)
(3 Sample s) The inspectors evaluated system configuration
The inspectors evaluated system configurations during partial walkdowns of the following
s during partial walkdowns of the following systems/trains
systems/trains:
(1) 'C' standby auxiliary feedwater
    (1) C standby auxiliary feedwater on January 26, 2018
on January 26, 2018
    (2) Turbine-driven auxiliary feedwater on March 9, 2018
(2) Turbine-driven auxiliary feedwater on March 9, 2018
    (3) B safety injection on March 22, 2018
(3) 'B' safety injection on March 22, 2018
71111.05Q - Fire Protection Quarterly
71111.05Q  
Quarterly Inspection (5 Samples)
- Fire Protection Quarterly
The inspectors evaluated fire protection program implementation in the following selected
Quarterly Inspection
areas:
(5 Samples) The inspectors evaluated fire protection program implementation in the following selected areas:     
   (1) Compensatory measures during replacement of fire water piping in A emergency diesel
(1) Co mpensatory measures during replacement of fire water piping in 'A' emergency diesel generator room on January
generator room on January 17, 2018
17, 2018 (2) 'B' b attery room on February 16, 2018
  (2) B battery room on February 16, 2018
(3) Intermediate building controlled side basement on March 22, 2018
  (3) Intermediate building controlled side basement on March 22, 2018
(4) Intermediate building controlled side top floor
  (4) Intermediate building controlled side top floor on March 30, 2018
on March 30, 2018
  (5) Hemyc wrap on March 30, 2018
(5) Hemyc wrap on March 30, 2
71111.06 - Flood Protection Measures
018  71111.06 - Flood Protection Measures
Cables (1 Sample)
Cables (1 Sample) The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
  (1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A
    (1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A-01, 02, and 03 on February 19
-01, 02 , and 03 on February 19 and 20, 2018.
and 20, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification
Operator Requalification (1 Sample)
(1 Sample) The inspectors observed and evaluated a crew of licensed operators in the plant's simulator during licensed operator requalification training, involving a failed steam flow transmitter, trip of a running component cooling water pump, a main steam line leak
The inspectors observed and evaluated a crew of licensed operators in the plants simulator
and a steam generator tube rupture, on February 13, 2018.
during licensed operator requalification training, involving a failed steam flow transmitter, trip
Operator Performance
of a running component cooling water pump, a main steam line leak and a steam generator
(1 Sample) The inspectors
tube rupture, on February 13, 2018.
observed Control Room
Operator Performance (1 Sample)
operator performance during a lowering water level in the screen house intake on February 13, 2018, power decrease for the turbine-driven auxiliary feedwater run
The inspectors observed Control Room operator performance during a lowering water level
on March 7, 2018
in the screen house intake on February 13, 2018, power decrease for the turbine-driven
, and start up activities on March 10
auxiliary feedwater run on March 7, 2018, and start up activities on March 10 to March 13,
to March 13, 2018. 71111.12 - Maintenance Effectiveness
2018.
Routine Maintenance Effectiveness
71111.12 - Maintenance Effectiveness
(2 Samples) The inspectors evaluated
Routine Maintenance Effectiveness (2 Samples)
the effectiveness of routine
The inspectors evaluated the effectiveness of routine maintenance activities associated
maintenance activities associated with the following equipment and/or safety significant functions
with the following equipment and/or safety significant functions.
(1) House heating boiler
  (1) House heating boiler maintenance rule (a)(1) evaluation on March 1, 2018
maintenance rule (a)(1) evaluation on March 1, 20
  (2) Chemical and volume control system (charging) on March 6, 2018
(2) Chemical and volume control system (charging) on March 6, 2018
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent
(5 Samples) The inspectors evaluated the risk assessments for the following planned and emergent work activities
work activities:
(1) Elevated risk for planned under
  (1) Elevated risk for planned under-voltage testing on electrical busses 16 and 17 on
-voltage testing on electrical bus
s es 16 and 17 on
February 1, 2018
February 1, 2018
(2) Atmospheric relief valve
  (2) Atmospheric relief valve 3411 hand-wheel planned replacement on February 27, 2018
3411 hand-wheel planned replacement on February 27, 2018
  (3) A residual heat removal planned maintenance on March 15, 2018
 
  (4) C safety injection pump planned maintenance on March 21 and
(3) 'A' residual heat removal
March 22, 2018
planned maintenance on March 15, 2018
  (5) A component cooling water planned maintenance on March 26, 2018
(4) 'C' safety injection pump planned maintenance on March 21 and
71111.15 - Operability Determinations and Functionality Assessments (4 Samples)
The inspectors evaluated the following operability determinations and functionality
assessments:
  (1) A emergency diesel generator due to a ground on a lube oil heater on January 12, 2018
  (2) B battery room vault water intrusion on January 31, 2018
  (3) Fire suppression system S-15 alarm inputs on February 13, 2018
  (4) Main steam safety valve 3512 seat leakage on February 28, 2018
71111.19 - Post Maintenance Testing (7 Samples)
The inspectors evaluated post maintenance testing for the following maintenance/repair
activities:
  (1) Excess letdown divert valve AOV-312 gag installation on February 12, 2018
  (2) A spent fuel pool pump check valve, CV-8655 maintenance, on February 13, 2018
  (3) A spent fuel pool pump maintenance and diode replacement on February 16, 2018
  (4) A flex diesel air compressor preventive maintenance on February 22, 2018
  (5) D service water pump/motor replacement and maintenance on March 3, 2018
  (6) A residual heat removal pump/motor alignment on March 15, 2018
  (7) Technical support center ventilation fan maintenance on
March 22, 2018
March 22, 2018
(5) 'A' component cooling water
71111.20 - Refueling and Other Outage Activities (1 Sample)
planned maintenance on March 26, 2018
The inspectors evaluated forced outage activities from March 7 to March 10, 2018.
71111.15 - Operability Determinations and Functionality Assessments
71111.22 - Surveillance Testing
(4 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
  (1) 'A' emergency diesel generator due to a ground on
a lube oil heater on January 12, 2018
(2) 'B' battery room vault water
intrusion on January 31, 2018
(3) Fire suppression system S
-15 alarm inputs on February 13, 2018
(4) Main steam safety valve
351 2 seat leakage on February 28, 2018
71111.19 - Post Maintenance Testing
(7 Samples)  The inspectors evaluated
post maintenance testing for the following maintenance/repair activities
:  (1) Excess letdown divert valve AOV
-312 gag installation on February 12, 2018
(2) 'A' spent fuel pool
pump check valve, CV-8655 maintenance, on February 13, 2018
(3) 'A' spent fuel pool
pump maintenance and diode replacement on February 16, 2018
(4) 'A' flex diesel air compressor preventive maintenance on February 22, 2018
(5) 'D' service water pump/motor replacement and maintenance on March 3, 2018
(6) 'A' residual heat removal
pump/motor
alignment on March 15, 2018
(7) Technical support center
ventilation fan
maintenance
on  March 22, 2018
71111.20 - Refueling and Other Outage Activities
(1 Sample) The inspectors evaluated forced outage activities
from March 7 t o March 10, 2018
. 71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
The inspectors evaluated the following surveillance tests:
Routine (3 Samples) (1) STP-O-16QA , 'A' motor driven auxiliary feedwater
Routine (3 Samples)
pump surveillance test
  (1) STP-O-16QA, A motor driven auxiliary feedwater pump surveillance test on
on January 10, 2018 (2) STP-O-40.5 , national fire protection association
January 10, 2018
emergency diesel generator
  (2) STP-O-40.5, national fire protection association emergency diesel generator surveillance
surveillance test on February 9, 2018
test on February 9, 2018
(3) STP-O-12.1 , 'A' emergency diesel generator
  (3) STP-O-12.1, A emergency diesel generator surveillance test on February 12, 2018
surveillance test on February 12, 2018
Inservice (1 Sample)
Inservice (1 Sample)
  (1) STP-O-3QB, containment spray pump 'B' quarterly test on March 20, 2018
  (1) STP-O-3QB, containment spray pump B quarterly test on March 20, 2018
 
RADIATION SAFETY
RADIATION SAFET
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
Radiological Work Planning (1 Sample)
Radiological Work Planning
The inspectors evaluated Exelons radiological work planning by reviewing the following
(1 Sample)
activities:
The inspectors evaluated Exelon's radiological work planning by reviewing the following activities
  (1) ALARA Plan 2017-1009
(1) ALARA Plan 2017
  (2) ALARA Plan 2017-1018
-1009 (2) ALARA Plan 2017
  (3) ALARA Plan 2017-1036
-1018 (3) ALARA Plan 2017
Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
-1036 Verification of Dose Estimates and Exposure Tracking
The inspectors evaluated dose estimates and exposure tracking.
Systems (1 Sample)
Implementation of ALARA and Radiological Work Controls (1 Sample)
The inspectors
The inspectors reviewed ALARA practices and radiological work controls by reviewing the
evaluated dose estimates and
following activities:
exposure tracking
  (1) ALARA Plan 2017-1009
. Implementation of ALARA and Radiological Work Controls
  (2) ALARA Plan 2017-1018
(1 Sample)
  (3) ALARA Plan 2017-1036
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:
OTHER ACTIVITIES - BASELINE
  (1) ALARA Plan 2017
71151 - Performance Indicator Verification
-1009 (2) ALARA Plan 2017
The inspectors verified Exelons performance indicator submittals listed below. (3 Samples)
-1018 (3) ALARA Plan 2017
  (1) Unplanned Scrams on March 16, 2018
-1036 OTHER ACTIVITIES
  (2) Unplanned Scrams with Complications on March 16, 2018
- BASELINE 71151 - Performance Indicator Verification
  (3) Unplanned Power Changes Per 7000 Critical Hours on March 16, 2018
The inspectors verified Exelon's performance
71152 - Problem Identification and Resolution
indicator submittals
Annual Follow-up of Selected Issues (1 Sample)
listed below. (3 Sample s) (1) Unplanned Scrams on March 16, 2018
The inspectors reviewed the Exelons implementation of its corrective action program related
(2) Unplanned Scrams with Complications
on March 16, 2018
(3) Unplanned
Power Changes Per 7000 Critical Hours
on March 16, 2018 71152 - Problem Identification and Resolution
Annual Follow
-up of Selected Issue s (1 Sample) The inspectors reviewed the Exelon's
implementation of its corrective action program related
to the following issues:
to the following issues:
  (1) Maintenance Rule availability performance criteria and reliability performance criteria selection in accordance with Exelon procedure ER
  (1) Maintenance Rule availability performance criteria and reliability performance criteria
-AA-310-1003 Revision 5, on March 30, 2018. Action Request (AR)
selection in accordance with Exelon procedure ER-AA-310-1003 Revision 5, on
04126470 and 02658070
March 30, 2018. Action Request (AR) 04126470 and 02658070.
.
71153 - Follow-up of Events and Notices of Enforcement Discretion
71153 - Follow-up of Events
Events (2 Samples)
and Notices of Enforcement Discretion
The inspectors evaluated response to the following events.
Events (2 Sample s) T h e inspectors evaluated response to the following events
        (1) Reactor coolant system leak January 23 through January 27, 2018
(1) Reactor coolant system
        (2) Forced outage March 7 to March 10, 2018
leak January 23
Licensee Event Reports (1 Sample)
through January 27, 2018 (2) Forced outage March 7 to
The inspectors evaluated the following licensee event report which can be accessed at
March 10, 2018 Licensee Event Reports (1 Sample) The inspectors evaluated the following licensee event report which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx
https://lersearch.inl.gov/LERSearchCriteria.aspx:
(1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift
        (1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift
pressure s et points on three main stream
pressure set points on three main stream safety valves found outside Technical
safety valves found outside Technical Specifications
Specifications limits on March 23, 2018. Revision 0 of this LER was previously
limits on March 23, 2018. Revision 0 of this LER was previously closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with the results of the cause evaluation.
closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with
No additional findings were identified. This LER is close d. Personnel Performance
the results of the cause evaluation. No additional findings were identified. This LER
(1 Sample)
is closed.
  (1) Unplanned plant shutdown March 8
Personnel Performance (1 Sample)
to 9, 2018, due to a current transformer failure
        (1) Unplanned plant shutdown March 8 to 9, 2018, due to a current transformer failure
on the main generator outgoing power line
on the main generator outgoing power line.
. INSPECTION RESULTS
INSPECTION RESULTS
Minor Violation
Minor Violation                                 71152 Follow-up
71152 Follow
of Selected
-up of Selected Issues Minor Violation: Title 10 of the Code of Federal Regulations  
Issues
(10 CFR) 50.65 (a)(2) allows safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an adequate demonstration that system performance is being maintained through effective maintenance is provided. In order to demonstrate this, Maintenance Rule availability performance criteria and reliability performance criteria are established and select ed in accordance with Exelon procedure ER
Minor Violation: Title 10 of the Code of Federal Regulations (10 CFR) 50.65 (a)(2) allows
-AA-310-1003 , "Maintenance Rule  
safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an
- Performance Criteria Selection.Section 4.4, "Selecting Reliability Performance Criteria,"
adequate demonstration that system performance is being maintained through effective
3, "Process for Selecting Reliability Performance Criteria," contains a process to be used in which a criteria greater than or equal to two is acceptable with documentation of past performance. Contrary to the above , two maintenance rule systems contained criteria greater than or equal to two without documentation of past performance in the "Basis and Justification for Criteria Values" section of the maintenance rule basis document.
maintenance is provided. In order to demonstrate this, Maintenance Rule availability
Thus, an adequate technical basis was not documented
performance criteria and reliability performance criteria are established and selected in
for a required 10
accordance with Exelon procedure ER-AA-310-1003, Maintenance Rule - Performance
CFR 50.65 (a)(2) performance criteria in accordance with Exelon's procedures.
Criteria Selection. Section 4.4, Selecting Reliability Performance Criteria, Attachment 3,
Screening:
Process for Selecting Reliability Performance Criteria, contains a process to be used in
The inspectors independently evaluated the deficiency for significance in accordance with the guidance in IMC
which a criteria greater than or equal to two is acceptable with documentation of past
0612, Appendix B, "Is
performance. Contrary to the above, two maintenance rule systems contained criteria greater
sue Screening," issued December 31, 2017, and Appendix E, "Examples of Minor Issues," issued August 11, 2009. The inspectors determined that not documenting the past performance , which was used to determine the reliability criteria
than or equal to two without documentation of past performance in the Basis and Justification
, was a deficiency of minor significance since the criteria
for Criteria Values section of the maintenance rule basis document. Thus, an adequate
selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to enforcement action in accordance with the NRC's enforcement
technical basis was not documented for a required 10 CFR 50.65 (a)(2) performance criteria
policy. This issue was captured in Exelon's Corrective Action Program
in accordance with Exelons procedures.
as A R 04126470 and 02658070
Screening: The inspectors independently evaluated the deficiency for significance in
. Enforcement: This failure to comply with procedure ER
accordance with the guidance in IMC 0612, Appendix B, Issue Screening, issued
-AA-310-1003 , Revision 5, constitutes a minor violation that is not subject to enforcement action in accordance with the NRC's Enforcement Policy.
December 31, 2017, and Appendix E, Examples of Minor Issues, issued August 11, 2009.
EXIT MEETING S AND DEBRIEFS
The inspectors determined that not documenting the past performance, which was used to
determine the reliability criteria, was a deficiency of minor significance since the criteria
selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to
enforcement action in accordance with the NRCs enforcement policy. This issue was
captured in Exelons Corrective Action Program as AR 04126470 and 02658070.
Enforcement: This failure to comply with procedure ER-AA-310-1003, Revision 5, constitutes
a minor violation that is not subject to enforcement action in accordance with the NRCs
Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02 to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.
On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02
On April 16, 2018, the inspector
to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.
s presented the integrated quarterly resident inspector report inspection results to Mr. William Carsky, Site Vice President
On April 16, 2018, the inspectors presented the integrated quarterly resident inspector
and other members of the Ginna staff.
report inspection results to Mr. William Carsky, Site Vice President and other members of
the Ginna staff.
DOCUMENTS REVIEWED
DOCUMENTS REVIEWED
71111.01 - Adverse Weather Protection
71111.01 - Adverse Weather Protection
Line 605: Line 577:
71111.05 - Fire Protection
71111.05 - Fire Protection
Procedures
Procedures
A-54.7, Fire Protection Tour, Revision
A-54.7, Fire Protection Tour, Revision 37
A-601.13, Fire Protection Compensatory Actions, Revision
A-601.13, Fire Protection Compensatory Actions, Revision 8
FPS-3, Fire Barrier
FPS-3, Fire Barrier Inspection Program, Revision 3
Inspection Program, Revision
71111.06 - Flood Protection Measures
71111.06 - Flood Protection Measures
Condition Reports
Condition Reports
04106112 04106114 04106123 Drawings 33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L
04106112       04106114       04106123
Drawings
33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L
Maintenance Orders/Work Orders
Maintenance Orders/Work Orders
WO C 93597827  71111.11 - Licensed Operator Requalification Program
WO C93597827
71111.11 - Licensed Operator Requalification Program
Procedures
Procedures
HU-AA-1211, Pre-Job Briefings, Revision
HU-AA-1211, Pre-Job Briefings, Revision 11
OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision
OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision 9
TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,   Revision 4 71111.12 - Maintenance Effectiveness
TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,
Revision 4
71111.12 - Maintenance Effectiveness
Procedures
Procedures
ER-AA-310, Implementation of the Maintenance Rule, Revision
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
1 ER-AA-310-1001, Maintenance Rule  
ER-AA-310-1001, Maintenance Rule - Scoping, Revision 4
- Scoping, Revision
ER-AA-310-1002, Maintenance Rule Functions - Safety Significance Classification, Revision 3
ER-AA-310-1002, Maintenance Rule Functions  
ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5
- Safety Significance Classification, Revision
ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14
ER-AA-310-1003, Maintenance Rule  
ER-AA-310-1005, Maintenance Rule - Dispositioning Between (A)(1) and (A)(2), Revision 7
- Performance Criteria Selection, Revision 5 ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision
ER-AA-310-1005, Maintenance Rule  
- Dispositioning Between (A)(1) and (A)(2), Revision 7
Condition Reports
Condition Reports
04068393 04083945
04068393       04083945
71111.13 - Maintenance Risk Assessments and Emergent Work Control
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Procedures
Procedures
OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15
OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15
OP-A A-108-117, Protected
OP-AA-108-117, Protected Equipment Program, Revision 5
Equipment Program, Revision 5
OPG-PROTECTED-EQUIPMENT, Operations Protected Equipment Program, Revision 18
OPG-PROTECTED-EQUIPMENT, Operations Protected
Equipment Program, Revision
WC-AA-101, On-Line Work Control Process, Revision 27
WC-AA-101, On-Line Work Control Process, Revision 27
WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2
WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2
WC-AA-104, Integrated Risk Management, Revision
WC-AA-104, Integrated Risk Management, Revision 25
Condition Reports
Condition Reports
04099860 71111.15 - Operability Determinations and Functionality Assessments
04099860
71111.15 - Operability Determinations and Functionality Assessments
Procedures
Procedures
A-3.3, Containment Integrity Program, Revision 27
A-3.3, Containment Integrity Program, Revision 27
OP-AA-108-115, Operability Determinations, Revision 19
OP-AA-108-115, Operability Determinations, Revision 19
Condition Reports
Condition Reports
2534565 04091493 04096584 04099235 04101267 04108798* Miscellaneous
2534565       04091493       04096584       04099235   04101267   04108798*
Miscellaneous
ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0
ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0
OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65  
OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65 - Diesel Generator Emergency
- Diesel Generator Emergency Power System, Revision 1
Power System, Revision 1
OPEVAL-18-001, S/G 'B' Main Steam Safety Valve 3512, Revision 1
OPEVAL-18-001, S/G B Main Steam Safety Valve 3512, Revision 1
71152 - Problem Identification and Resolution
71152 - Problem Identification and Resolution
Procedures
Procedures
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
ER-AA-310, Implementation of the Maintenance Rule, Revision 11
ER-AA-310-1003, Maintenance Rule  
ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5
- Performance Criteria Selection, Revision 5
ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14
ER-AA-310-1004, Maintenance Rule  
ER-AA-310-1005, Maintenance Rule - Dispositioning Between (a)(1) and (a)(2), Revision 7
- Performance Monitoring, Revision 14
ER-AA-310-1005, Maintenance Rule  
- Dispositioning Between (a)(1) and (a)(2), Revision 7
PI-AA-120, Issue Identification and Screening Process, Revision 7
PI-AA-120, Issue Identification and Screening Process, Revision 7
PI-AA-125, Corrective Action Program (CAP) Procedure, Revision
PI-AA-125, Corrective Action Program (CAP) Procedure, Revision 4
Condition Reports (*initiated in response to inspection)
Condition Reports (*initiated in response to inspection)
AR 02658070
AR 02658070 AR 04126470*
AR 04126470
71153 - Follow-up of Events and Notices of Enforcement Discretion
71153 - Follow-up of Events and Notices of Enforcement Discretion
Procedures
Procedures
A-80, Startup Readiness Control, Revision019
A-80, Startup Readiness Control, Revision019
AP-TURB.5, Rapid Load Reduction, Revision 018
AP-TURB.5, Rapid Load Reduction, Revision 018
Condition Reports
Condition Reports
04096294 04097619 Maintenance Orders/Work Orders
04096294       04097619
Maintenance Orders/Work Orders
WO C93654311
WO C93654311
}}
}}

Revision as of 06:00, 21 October 2019

R.E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2018001
ML18122A332
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/01/2018
From: Michelle Catts
NRC Region 1
To: Bryan Hanson
Exelon Generation Co
References
IR 2018001
Download: ML18122A332 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION May 1, 2018

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT, LLC - INTEGRATED INSPECTION REPORT 05000244/2018001

Dear Mr. Hanson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant, LLC (Ginna). On April 16, 2018, the NRC inspectors discussed the results of this inspection with Mr. William Carsky, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Michelle Catts, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Number: 50-244 License Number: DPR-18

Enclosure:

Inspection Report 05000244/2018001

Inspection Report

Docket Number: 50-244 License Number: DPR-18 Report Number: 05000244/2018001 Enterprise Identifier: I-2018-001-0045 Licensee: Exelon Generation Company, LLC (Exelon)

Facility: R.E. Ginna Nuclear Power Plant, LLC (Ginna)

Location: Ontario, New York Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: N. Perry, Senior Resident Inspector J. Schussler, Resident Inspector A. Rosebrook, Senior Project Engineer H. Anagnostopoulos, Senior Health Physicist S. Obadina, Project Engineer Observer: K. Warner, Health Physicist Approved By: M. Catts, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Ginna by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

Additional Tracking Items Type Issue number Title Report Status Section LER 05000244/2018001-00 Leakage in Reactor Coolant N/A Open System Pressure Boundary LER 05000244/2017001-01 During Surveillance Testing, 71153 Open/Closed Lift Pressure Setpoints on Three Main Steam Safety Valves Found Outside Technical Specification Limits

PLANT STATUS

===The unit began the inspection period at 100 percent power and operated at full power until March 8, 2018, when the unit was shut down to replace a faulty current transformer on the main generators output line. The unit was returned to rated power on March 13, following replacement of the current transformer, and it remained at or near 100 percent power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Exelons performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather

The inspectors evaluated readiness for impending adverse weather conditions for predicted heavy snow accumulation on March 1, 2018.

71111.04 - Equipment Alignment

Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) C standby auxiliary feedwater on January 26, 2018
(2) Turbine-driven auxiliary feedwater on March 9, 2018
(3) B safety injection on March 22, 2018

71111.05Q - Fire Protection Quarterly

Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Compensatory measures during replacement of fire water piping in A emergency diesel generator room on January 17, 2018
(2) B battery room on February 16, 2018
(3) Intermediate building controlled side basement on March 22, 2018
(4) Intermediate building controlled side top floor on March 30, 2018
(5) Hemyc wrap on March 30, 2018

71111.06 - Flood Protection Measures

Cables

The inspectors evaluated cable submergence protection in:

(1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A-01, 02, and 03 on February 19 and 20, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification

The inspectors observed and evaluated a crew of licensed operators in the plants simulator during licensed operator requalification training, involving a failed steam flow transmitter, trip of a running component cooling water pump, a main steam line leak and a steam generator tube rupture, on February 13, 2018.

Operator Performance (1 Sample)===

The inspectors observed Control Room operator performance during a lowering water level

===in the screen house intake on February 13, 2018, power decrease for the turbine-driven auxiliary feedwater run on March 7, 2018, and start up activities on March 10 to March 13, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions.

(1) House heating boiler maintenance rule (a)(1) evaluation on March 1, 2018
(2) Chemical and volume control system (charging) on March 6, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

===

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Elevated risk for planned under-voltage testing on electrical busses 16 and 17 on February 1, 2018
(2) Atmospheric relief valve 3411 hand-wheel planned replacement on February 27, 2018
(3) A residual heat removal planned maintenance on March 15, 2018
(4) C safety injection pump planned maintenance on March 21 and March 22, 2018
(5) A component cooling water planned maintenance on March 26, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) A emergency diesel generator due to a ground on a lube oil heater on January 12, 2018
(2) B battery room vault water intrusion on January 31, 2018
(3) Fire suppression system S-15 alarm inputs on February 13, 2018
(4) Main steam safety valve 3512 seat leakage on February 28, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated post maintenance testing for the following maintenance/repair activities:

(1) Excess letdown divert valve AOV-312 gag installation on February 12, 2018
(2) A spent fuel pool pump check valve, CV-8655 maintenance, on February 13, 2018
(3) A spent fuel pool pump maintenance and diode replacement on February 16, 2018
(4) A flex diesel air compressor preventive maintenance on February 22, 2018
(5) D service water pump/motor replacement and maintenance on March 3, 2018
(6) A residual heat removal pump/motor alignment on March 15, 2018
(7) Technical support center ventilation fan maintenance on March 22, 2018

71111.20 - Refueling and Other Outage Activities

The inspectors evaluated forced outage activities from March 7 to March 10, 2018.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine===

(1) STP-O-16QA, A motor driven auxiliary feedwater pump surveillance test on January 10, 2018
(2) STP-O-40.5, national fire protection association emergency diesel generator surveillance test on February 9, 2018
(3) STP-O-12.1, A emergency diesel generator surveillance test on February 12, 2018 Inservice (1 Sample)===
(1) STP-O-3QB, containment spray pump B quarterly test on March 20, 2018

===RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning

The inspectors evaluated Exelons radiological work planning by reviewing the following activities:

(1) ALARA Plan 2017-1009
(2) ALARA Plan 2017-1018
(3) ALARA Plan 2017-1036 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)===

The inspectors evaluated dose estimates and exposure tracking.

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the

===following activities:

(1) ALARA Plan 2017-1009
(2) ALARA Plan 2017-1018
(3) ALARA Plan 2017-1036

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified Exelons performance indicator submittals listed below.

(1) Unplanned Scrams on March 16, 2018
(2) Unplanned Scrams with Complications on March 16, 2018
(3) Unplanned Power Changes Per 7000 Critical Hours on March 16, 2018

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues

The inspectors reviewed the Exelons implementation of its corrective action program related to the following issues:

(1) Maintenance Rule availability performance criteria and reliability performance criteria selection in accordance with Exelon procedure ER-AA-310-1003 Revision 5, on March 30, 2018. Action Request (AR) 04126470 and 02658070.

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated response to the following events.

(1) Reactor coolant system leak January 23 through January 27, 2018
(2) Forced outage March 7 to March 10, 2018 Licensee Event Reports (1 Sample)===

The inspectors evaluated the following licensee event report which can be accessed at

===https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift pressure set points on three main stream safety valves found outside Technical Specifications limits on March 23, 2018. Revision 0 of this LER was previously closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with the results of the cause evaluation. No additional findings were identified. This LER is closed.

Personnel Performance (1 Sample)===

(1) Unplanned plant shutdown March 8 to 9, 2018, due to a current transformer failure on the main generator outgoing power line.

INSPECTION RESULTS

Minor Violation 71152 Follow-up of Selected Issues Minor Violation: Title 10 of the Code of Federal Regulations (10 CFR) 50.65 (a)(2) allows safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an adequate demonstration that system performance is being maintained through effective maintenance is provided. In order to demonstrate this, Maintenance Rule availability performance criteria and reliability performance criteria are established and selected in accordance with Exelon procedure ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection. Section 4.4, Selecting Reliability Performance Criteria, Attachment 3, Process for Selecting Reliability Performance Criteria, contains a process to be used in which a criteria greater than or equal to two is acceptable with documentation of past performance. Contrary to the above, two maintenance rule systems contained criteria greater than or equal to two without documentation of past performance in the Basis and Justification for Criteria Values section of the maintenance rule basis document. Thus, an adequate technical basis was not documented for a required 10 CFR 50.65 (a)(2) performance criteria in accordance with Exelons procedures.

Screening: The inspectors independently evaluated the deficiency for significance in accordance with the guidance in IMC 0612, Appendix B, Issue Screening, issued December 31, 2017, and Appendix E, Examples of Minor Issues, issued August 11, 2009.

The inspectors determined that not documenting the past performance, which was used to determine the reliability criteria, was a deficiency of minor significance since the criteria selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to enforcement action in accordance with the NRCs enforcement policy. This issue was captured in Exelons Corrective Action Program as AR 04126470 and 02658070.

Enforcement:

This failure to comply with procedure ER-AA-310-1003, Revision 5, constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02 to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.
  • On April 16, 2018, the inspectors presented the integrated quarterly resident inspector report inspection results to Mr. William Carsky, Site Vice President and other members of the Ginna staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Procedures

ER-SC.1, Adverse Weather Plan, Revision 024

71111.05 - Fire Protection

Procedures

A-54.7, Fire Protection Tour, Revision 37

A-601.13, Fire Protection Compensatory Actions, Revision 8

FPS-3, Fire Barrier Inspection Program, Revision 3

71111.06 - Flood Protection Measures

Condition Reports

04106112 04106114 04106123

Drawings

33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L

Maintenance Orders/Work Orders

WO C93597827

71111.11 - Licensed Operator Requalification Program

Procedures

HU-AA-1211, Pre-Job Briefings, Revision 11

OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision 9

TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,

Revision 4

71111.12 - Maintenance Effectiveness

Procedures

ER-AA-310, Implementation of the Maintenance Rule, Revision 11

ER-AA-310-1001, Maintenance Rule - Scoping, Revision 4

ER-AA-310-1002, Maintenance Rule Functions - Safety Significance Classification, Revision 3

ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5

ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14

ER-AA-310-1005, Maintenance Rule - Dispositioning Between (A)(1) and (A)(2), Revision 7

Condition Reports

04068393 04083945

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Procedures

OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15

OP-AA-108-117, Protected Equipment Program, Revision 5

OPG-PROTECTED-EQUIPMENT, Operations Protected Equipment Program, Revision 18

WC-AA-101, On-Line Work Control Process, Revision 27

WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2

WC-AA-104, Integrated Risk Management, Revision 25

Condition Reports

04099860

71111.15 - Operability Determinations and Functionality Assessments

Procedures

A-3.3, Containment Integrity Program, Revision 27

OP-AA-108-115, Operability Determinations, Revision 19

Condition Reports

2534565 04091493 04096584 04099235 04101267 04108798*

Miscellaneous

ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0

OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65 - Diesel Generator Emergency

Power System, Revision 1

OPEVAL-18-001, S/G B Main Steam Safety Valve 3512, Revision 1

71152 - Problem Identification and Resolution

Procedures

ER-AA-310, Implementation of the Maintenance Rule, Revision 11

ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5

ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14

ER-AA-310-1005, Maintenance Rule - Dispositioning Between (a)(1) and (a)(2), Revision 7

PI-AA-120, Issue Identification and Screening Process, Revision 7

PI-AA-125, Corrective Action Program (CAP) Procedure, Revision 4

Condition Reports (*initiated in response to inspection)

AR 02658070 AR 04126470*

71153 - Follow-up of Events and Notices of Enforcement Discretion

Procedures

A-80, Startup Readiness Control, Revision019

AP-TURB.5, Rapid Load Reduction, Revision 018

Condition Reports

04096294 04097619

Maintenance Orders/Work Orders

WO C93654311

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., Suite 100

KING OF PRUSSIA, PENNSYLVANIA 19406-2713

May 1, 2018

Mr. Bryan C. Hanson

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT, LLC - INTEGRATED INSPECTION

REPORT 05000244/2018001

Dear Mr. Hanson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at

R.E. Ginna Nuclear Power Plant, LLC (Ginna). On April 16, 2018, the NRC inspectors

discussed the results of this inspection with Mr. William Carsky, Site Vice President and other

members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room

in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Michelle Catts, Acting Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Number: 50-244

License Number: DPR-18

Enclosure:

Inspection Report 05000244/2018001

cc w/encl: Distribution via ListServ

ML18122A322

SUNSI Review Non-Sensitive Publicly Available

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME NPerry/AR per ARosebrook MCatts

tele conv

DATE 05/1/18 05/1/18 05/1/18

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 50-244

License Number: DPR-18

Report Number: 05000244/2018001

Enterprise Identifier: I-2018-001-0045

Licensee: Exelon Generation Company, LLC (Exelon)

Facility:

R.E. Ginna Nuclear Power Plant, LLC (Ginna)

Location: Ontario, New York

Inspection Dates: January 1, 2018 to March 31, 2018

Inspectors:

N. Perry, Senior Resident Inspector
J. Schussler, Resident Inspector
A. Rosebrook, Senior Project Engineer
H. Anagnostopoulos, Senior Health Physicist
S. Obadina, Project Engineer

Observer:

K. Warner, Health Physicist

Approved By:

M. Catts, Acting Chief

Reactor Projects Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Ginna by conducting the baseline inspections described in this report in accordance with the

Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

Additional Tracking Items

Type Issue number Title Report Status

Section

LER 05000244/2018001-00 Leakage in Reactor Coolant N/A Open

System Pressure Boundary

LER 05000244/2017001-01 During Surveillance Testing, 71153 Open/Closed

Lift Pressure Setpoints on

Three Main Steam Safety

Valves Found Outside

Technical Specification

Limits

PLANT STATUS

The unit began the inspection period at 100 percent power and operated at full power until

March 8, 2018, when the unit was shut down to replace a faulty current transformer on the main

generators output line. The unit was returned to rated power on March 13, following

replacement of the current transformer, and it remained at or near 100 percent power for the

remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess Exelons performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather (1 Sample)

The inspectors evaluated readiness for impending adverse weather conditions for predicted

heavy snow accumulation on March 1, 2018.

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) C standby auxiliary feedwater on January 26, 2018

(2) Turbine-driven auxiliary feedwater on March 9, 2018

(3) B safety injection on March 22, 2018

71111.05Q - Fire Protection Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Compensatory measures during replacement of fire water piping in A emergency diesel

generator room on January 17, 2018

(2) B battery room on February 16, 2018

(3) Intermediate building controlled side basement on March 22, 2018

(4) Intermediate building controlled side top floor on March 30, 2018

(5) Hemyc wrap on March 30, 2018

71111.06 - Flood Protection Measures

Cables (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Manholes MH1A-01, MH1B-01, MH3-03 West, MH5A-01, 02, and 03 on February 19

and 20, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated a crew of licensed operators in the plants simulator

during licensed operator requalification training, involving a failed steam flow transmitter, trip

of a running component cooling water pump, a main steam line leak and a steam generator

tube rupture, on February 13, 2018.

Operator Performance (1 Sample)

The inspectors observed Control Room operator performance during a lowering water level

in the screen house intake on February 13, 2018, power decrease for the turbine-driven

auxiliary feedwater run on March 7, 2018, and start up activities on March 10 to March 13,

2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions.

(1) House heating boiler maintenance rule (a)(1) evaluation on March 1, 2018

(2) Chemical and volume control system (charging) on March 6, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Elevated risk for planned under-voltage testing on electrical busses 16 and 17 on

February 1, 2018

(2) Atmospheric relief valve 3411 hand-wheel planned replacement on February 27, 2018

(3) A residual heat removal planned maintenance on March 15, 2018

(4) C safety injection pump planned maintenance on March 21 and

March 22, 2018

(5) A component cooling water planned maintenance on March 26, 2018

71111.15 - Operability Determinations and Functionality Assessments (4 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) A emergency diesel generator due to a ground on a lube oil heater on January 12, 2018

(2) B battery room vault water intrusion on January 31, 2018

(3) Fire suppression system S-15 alarm inputs on February 13, 2018

(4) Main steam safety valve 3512 seat leakage on February 28, 2018

71111.19 - Post Maintenance Testing (7 Samples)

The inspectors evaluated post maintenance testing for the following maintenance/repair

activities:

(1) Excess letdown divert valve AOV-312 gag installation on February 12, 2018

(2) A spent fuel pool pump check valve, CV-8655 maintenance, on February 13, 2018

(3) A spent fuel pool pump maintenance and diode replacement on February 16, 2018

(4) A flex diesel air compressor preventive maintenance on February 22, 2018

(5) D service water pump/motor replacement and maintenance on March 3, 2018

(6) A residual heat removal pump/motor alignment on March 15, 2018

(7) Technical support center ventilation fan maintenance on

March 22, 2018

71111.20 - Refueling and Other Outage Activities (1 Sample)

The inspectors evaluated forced outage activities from March 7 to March 10, 2018.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (3 Samples)

(1) STP-O-16QA, A motor driven auxiliary feedwater pump surveillance test on

January 10, 2018

(2) STP-O-40.5, national fire protection association emergency diesel generator surveillance

test on February 9, 2018

(3) STP-O-12.1, A emergency diesel generator surveillance test on February 12, 2018

Inservice (1 Sample)

(1) STP-O-3QB, containment spray pump B quarterly test on March 20, 2018

RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated Exelons radiological work planning by reviewing the following

activities:

(1) ALARA Plan 2017-1009

(2) ALARA Plan 2017-1018

(3) ALARA Plan 2017-1036

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the

following activities:

(1) ALARA Plan 2017-1009

(2) ALARA Plan 2017-1018

(3) ALARA Plan 2017-1036

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified Exelons performance indicator submittals listed below. (3 Samples)

(1) Unplanned Scrams on March 16, 2018

(2) Unplanned Scrams with Complications on March 16, 2018

(3) Unplanned Power Changes Per 7000 Critical Hours on March 16, 2018

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the Exelons implementation of its corrective action program related

to the following issues:

(1) Maintenance Rule availability performance criteria and reliability performance criteria

selection in accordance with Exelon procedure ER-AA-310-1003 Revision 5, on

March 30, 2018. Action Request (AR) 04126470 and 02658070.

71153 - Follow-up of Events and Notices of Enforcement Discretion

Events (2 Samples)

The inspectors evaluated response to the following events.

(1) Reactor coolant system leak January 23 through January 27, 2018

(2) Forced outage March 7 to March 10, 2018

Licensee Event Reports (1 Sample)

The inspectors evaluated the following licensee event report which can be accessed at

https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Report (LER) 05000244/2017-001-01, During surveillance testing, lift

pressure set points on three main stream safety valves found outside Technical

Specifications limits on March 23, 2018. Revision 0 of this LER was previously

closed in Inspection Report 05000244/2017004. Revision 1 updates the LER with

the results of the cause evaluation. No additional findings were identified. This LER

is closed.

Personnel Performance (1 Sample)

(1) Unplanned plant shutdown March 8 to 9, 2018, due to a current transformer failure

on the main generator outgoing power line.

INSPECTION RESULTS

Minor Violation 71152 Follow-up

of Selected

Issues

Minor Violation: Title 10 of the Code of Federal Regulations (10 CFR) 50.65 (a)(2) allows

safety system structure and components to not be monitored under 10 CFR 50 (a)(1), if an

adequate demonstration that system performance is being maintained through effective

maintenance is provided. In order to demonstrate this, Maintenance Rule availability

performance criteria and reliability performance criteria are established and selected in

accordance with Exelon procedure ER-AA-310-1003, Maintenance Rule - Performance

Criteria Selection. Section 4.4, Selecting Reliability Performance Criteria, Attachment 3,

Process for Selecting Reliability Performance Criteria, contains a process to be used in

which a criteria greater than or equal to two is acceptable with documentation of past

performance. Contrary to the above, two maintenance rule systems contained criteria greater

than or equal to two without documentation of past performance in the Basis and Justification

for Criteria Values section of the maintenance rule basis document. Thus, an adequate

technical basis was not documented for a required 10 CFR 50.65 (a)(2) performance criteria

in accordance with Exelons procedures.

Screening: The inspectors independently evaluated the deficiency for significance in

accordance with the guidance in IMC 0612, Appendix B, Issue Screening, issued

December 31, 2017, and Appendix E, Examples of Minor Issues, issued August 11, 2009.

The inspectors determined that not documenting the past performance, which was used to

determine the reliability criteria, was a deficiency of minor significance since the criteria

selected did not require a maintenance rule a(1) evaluation. As a result it is not subject to

enforcement action in accordance with the NRCs enforcement policy. This issue was

captured in Exelons Corrective Action Program as AR 04126470 and 02658070.

Enforcement: This failure to comply with procedure ER-AA-310-1003, Revision 5, constitutes

a minor violation that is not subject to enforcement action in accordance with the NRCs

Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 22, 2018, the inspectors presented the inspection results related to IP 71124.02

to Mr. William Carsky, Site Vice President, and other members of the Ginna staff.

  • On April 16, 2018, the inspectors presented the integrated quarterly resident inspector

report inspection results to Mr. William Carsky, Site Vice President and other members of

the Ginna staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Procedures

ER-SC.1, Adverse Weather Plan, Revision 024

71111.05 - Fire Protection

Procedures

A-54.7, Fire Protection Tour, Revision 37

A-601.13, Fire Protection Compensatory Actions, Revision 8

FPS-3, Fire Barrier Inspection Program, Revision 3

71111.06 - Flood Protection Measures

Condition Reports

04106112 04106114 04106123

Drawings

33013-0014, 34.5KV Duct & Control Duct Plan & Profile, Revision L

Maintenance Orders/Work Orders

WO C93597827

71111.11 - Licensed Operator Requalification Program

Procedures

HU-AA-1211, Pre-Job Briefings, Revision 11

OP-AA-101-113-1006, 4.0 Crew Critique Guidelines, Revision 9

TQ-GI-150-F31 (LORT), Ginna Site Specific License Operator Requalification Training Program,

Revision 4

71111.12 - Maintenance Effectiveness

Procedures

ER-AA-310, Implementation of the Maintenance Rule, Revision 11

ER-AA-310-1001, Maintenance Rule - Scoping, Revision 4

ER-AA-310-1002, Maintenance Rule Functions - Safety Significance Classification, Revision 3

ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5

ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14

ER-AA-310-1005, Maintenance Rule - Dispositioning Between (A)(1) and (A)(2), Revision 7

Condition Reports

04068393 04083945

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Procedures

OP-AA-102-102, General Area Checks and Operator Field Rounds, Revision 15

OP-AA-108-117, Protected Equipment Program, Revision 5

OPG-PROTECTED-EQUIPMENT, Operations Protected Equipment Program, Revision 18

WC-AA-101, On-Line Work Control Process, Revision 27

WC-AA-101-1006, On-Line Risk Management and Assessment, Revision 2

WC-AA-104, Integrated Risk Management, Revision 25

Condition Reports

04099860

71111.15 - Operability Determinations and Functionality Assessments

Procedures

A-3.3, Containment Integrity Program, Revision 27

OP-AA-108-115, Operability Determinations, Revision 19

Condition Reports

2534565 04091493 04096584 04099235 04101267 04108798*

Miscellaneous

ECP-17-000051, Technical Evaluation of Lube Oil Heaters, Revision 0

OPEVAL-15-008, 64 - 125 VDC Electrical System SR, 65 - Diesel Generator Emergency

Power System, Revision 1

OPEVAL-18-001, S/G B Main Steam Safety Valve 3512, Revision 1

71152 - Problem Identification and Resolution

Procedures

ER-AA-310, Implementation of the Maintenance Rule, Revision 11

ER-AA-310-1003, Maintenance Rule - Performance Criteria Selection, Revision 5

ER-AA-310-1004, Maintenance Rule - Performance Monitoring, Revision 14

ER-AA-310-1005, Maintenance Rule - Dispositioning Between (a)(1) and (a)(2), Revision 7

PI-AA-120, Issue Identification and Screening Process, Revision 7

PI-AA-125, Corrective Action Program (CAP) Procedure, Revision 4

Condition Reports (*initiated in response to inspection)

AR 02658070 AR 04126470*

71153 - Follow-up of Events and Notices of Enforcement Discretion

Procedures

A-80, Startup Readiness Control, Revision019

AP-TURB.5, Rapid Load Reduction, Revision 018

Condition Reports

04096294 04097619

Maintenance Orders/Work Orders

WO C93654311