{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
{{#Wiki_filter:ust 28, 2019


KING OF PRUSSIA, PA 19406-2713 August 28, 2019 Mr. Rod Penfield Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2 019 00 5 AND 05000412/2019 00 5
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2019005 AND 05000412/2019005


==Dear Mr. Penfield:==
==Dear Mr. Penfield:==
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 21 , for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Additionally, NRC Region I plans to conduct an inspection per Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, at your facility during the period.


Additionally, NRC Region I plans to conduct an inspection per Temporary Instruction 2515/194
You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.
, "Inspection of the Licensees'
Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems ," at your facility during the period. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"), and other changes to the baseline inspection program described in SECY-19-0067, "Recommendations for Enhancing the Reactor Oversight Process." Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you have regarding this letter.
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room
). Please contact me at 610-337-5205 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.
/RA/
Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Enclosure:
Beaver Valley Inspection Plan cc: Distribution via ListServ


50-334 and 50-412 License Nos.
ML19232A338 SUNSI Review Non-Sensitive  Publicly Available Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RVadella MYoung DATE 8/15/19 8/16/19


DPR-66 and NPF-73 Enclosure:
IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC   Title Staff Count RAD SAFETY REMP         1 1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink         1 1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance BV-ACCESS CONTROL, EQUIP PERF, TRAINING         3 1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04         1 1, 2 07/29/2019 08/02/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 07/29/2019 08/02/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 07/29/2019 08/02/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 07/29/2019 08/02/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process         3 1, 2 08/04/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM         4 2 09/01/2019 09/07/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
Beaver Valley Inspection Plan cc: Distribution via ListServ SUBJECT: BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2019 00 5 AND 05000412/2019 00 5 DATED AUGUST 28, 2019 DISTRIBUTION w/encl (via e-mail) DLew, RA (R1ORAMAIL)
2 10/06/2019 10/19/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
RLorson, DRA (R1ORAMAIL)
INSERVICE INSPECTION - UNIT 1         1 1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
DCollins, DRP (R1DRPMAIL)
RAD SAFETY OUT         1 1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/21/2019 10/25/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/21/2019 10/25/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities.      Page 1 of 4 This report shows only on-site and announced inspection procedures.
Deputy Director, DRP (R1DRPMAIL)
JYerokun, DRS (R1DRSMAIL)
PKrohn, DRS (R1DRSMAIL)
MFerdas, DRP MYoung, DRP RVadella, DRP JKrafty, DRP SHorvitz, DRP AGould, AA DDodson, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpabResource ROPassessment Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-20 Second Quarter Process
\Branch 6\2019 Beaver Valley MC Letter.docx ADAMS ACCESSION NUMBER:
ML19232A338 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RVadella MYoung DATE 8/15/19 8/16/19 OFFICIAL RECORD CO PY Beaver Valley
 
07/01/2019 - 06/30/2021
 
Unit Start End Activity CAC Title Staff Count
 
RAD SAFETY REMP
 
1, 2 07/08/2019
 
07/12/2019
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
1, 2 07/08/2019
 
07/12/2019
 
IP 71151 000746 Performance Indicator Verification
 
Triennial Heat Sink
 
1, 2 07/14/2019
 
07/20/2019
 
IP 71111.07T
 
000700 Heat Sink Performance
 
BV-ACCESS CONTROL, EQUIP PERF, TRAINING
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.02
 
000734 Access Control
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.07
 
000739 Security Training
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71151 001338 Performance Indicator Verification
 
RAD SAFETY 01,02,03,04
 
1, 2 07/29/2019
 
08/02/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 07/29/2019
 
08/02/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 07/29/2019
 
08/02/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 07/29/2019
 
08/02/2019
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
50.59 Process
 
1, 2 08/04/2019
 
08/17/2019
 
IP 71111.17T
 
000709 Evaluations of Changes, Tests, and Experiments
 
BEAVER VALLEY 2 INITIAL OL EXAM
 
2 09/01/2019
 
09/07/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
10/06/2019
 
10/19/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
INSERVICE INSPECTION - UNIT 1
 
1 10/20/2019
 
11/02/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)
 
RAD SAFETY OUT
 
1, 2 10/21/2019
 
10/25/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 10/21/2019
 
10/25/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 10/21/2019
 
10/25/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 10/21/2019
 
10/25/2019
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
1, 2 10/21/2019
 
10/25/2019
 
IP 71151 000746 Performance Indicator Verification


8/20/2019 8:19:13 AM
8/20/2019 8:19:13 AM


Page
IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC   Title   Staff Count TI-194 Open Phase Condition Inspection - BV         2 1, 2 01/27/2020 01/31/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
 
Rad Safety Inspection           1 1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment BV1 Requal Inspection with P/F Results         2 1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Rad Safety Refuel           1 1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2           1 2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
of
BEAVER VALLEY EP EXERCISE INSPECTION         5 1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS           1 1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments           1 1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.        Page 2 of 4 This report shows only on-site and announced inspection procedures.
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
07/01/2019 - 06/30/2021
 
Unit Start End Activity CAC Title Staff Count
 
TI-194 Open Phase Condition Inspection - BV
 
1, 2 01/27/2020
 
01/31/2020
 
TI 2515/194
 
000512 Inspection of the Licensee
 
s Implementation of Industry Initiative Associated With the  
 
Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin  
 
2012-01)
Rad Safety Inspection
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
BV1 Requal Inspection with P/F Results
 
1 04/12/2020
 
04/18/2020
 
IP 71111.11A
 
000703 Licensed Operator Requalification Program and Licensed Operator Performance
 
04/12/2020
 
04/18/2020
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance
 
Rad Safety Refuel
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 04/13/2020
 
04/17/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
ISI - UNIT 2
 
2 04/20/2020
 
05/01/2020
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)
 
BEAVER VALLEY EP EXERCISE INSPECTION
 
1, 2 06/08/2020
 
06/12/2020
 
IP 71114.01
 
000716 Exercise Evaluation
 
1, 2 06/08/2020
 
06/12/2020
 
IP 71114.04
 
000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 06/08/2020
 
06/12/2020
 
IP 71151 001397 Performance Indicator Verification
 
Rad Safety RETS
 
1, 2 06/22/2020
 
06/26/2020
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
1, 2 06/22/2020
 
06/26/2020
 
IP 71151 000746 Performance Indicator Verification
 
Rad Safety Instruments
 
1, 2 08/17/2020
 
08/21/2020
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation


8/20/2019 8:19:13 AM
8/20/2019 8:19:13 AM


Page
IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC   Title   Staff Count Access Control, Equip Perf, Training         3 1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION         6 1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
 
1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
of
Rad safety Inspection         1 1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste           1 1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Rad Safety Inspection         1 1, 2 01/11/2021 01/15/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/11/2021 01/15/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/11/2021 01/15/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/11/2021 01/15/2021 IP 71124.04 000728 Occupational Dose Assessment FY21 Beaver Valley 1 Initial Examination         4 1 01/31/2021 02/06/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1 02/28/2021 03/13/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
This report does not include INPO and OUTAGE activities.
PI&R BIENNIAL           4 1, 2 02/08/2021 02/12/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 02/22/2021 02/26/2021 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities.      Page 3 of 4 This report shows only on-site and announced inspection procedures.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
07/01/2019 - 06/30/2021
 
Unit Start End Activity CAC Title Staff Count
 
Access Control, Equip Perf, Training
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.02
 
000734 Access Control
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71130.07
 
000739 Security Training
 
1, 2 09/07/2020
 
09/11/2020
 
IP 71151 001338 Performance Indicator Verification
 
DESIGN BASIS ASSURANCE INSPECTION
 
1, 2 09/14/2020
 
09/18/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
1, 2 09/28/2020
 
10/02/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
Rad safety Inspection
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71151 000746 Performance Indicator Verification
 
Radwaste
 
1, 2 11/16/2020
 
11/20/2020
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and  
 
Transportation
 
Rad Safety Inspection
 
1, 2 01/11/2021
 
01/15/2021
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 01/11/2021
 
01/15/2021
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 01/11/2021
 
01/15/2021
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 01/11/2021
 
01/15/2021
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
FY21 Beaver Valley 1 Initial Examination
 
1 01/31/2021
 
02/06/2021
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
02/28/2021
 
03/13/2021
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
PI&R BIENNIAL
 
1, 2 02/08/2021
 
02/12/2021
 
IP 71152B 000747 Problem Identification and Resolution
 
1, 2 02/22/2021
 
02/26/2021
 
IP 71152B 000747 Problem Identification and Resolution


8/20/2019 8:19:13 AM
8/20/2019 8:19:13 AM


Page
IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC   Title Staff Count Beaver Valley EP Program Inspection         1 1, 2 04/05/2021 04/09/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 04/05/2021 04/09/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 04/05/2021 04/09/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 04/05/2021 04/09/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 04/05/2021 04/09/2021 IP 71151 001397 Performance Indicator Verification Rad Safety Inspection         1 1, 2 04/19/2021 04/23/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/19/2021 04/23/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/19/2021 04/23/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/19/2021 04/23/2021 IP 71124.04 000728 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.      Page 4 of 4 This report shows only on-site and announced inspection procedures.
 
of
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Beaver Valley
 
07/01/2019 - 06/30/2021
 
Unit Start End Activity CAC Title Staff Count
 
Beaver Valley EP Program Inspection
 
1, 2 04/05/2021
 
04/09/2021
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 04/05/2021
 
04/09/2021
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
1, 2 04/05/2021
 
04/09/2021
 
IP 71114.04
 
000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 04/05/2021
 
04/09/2021
 
IP 71114.05
 
000720 Maintenance of Emergency Preparedness
 
1, 2 04/05/2021
 
04/09/2021
 
IP 71151 001397 Performance Indicator Verification
 
Rad Safety Inspection
 
1, 2 04/19/2021
 
04/23/2021
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/19/2021
 
04/23/2021
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 04/19/2021
 
04/23/2021
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 04/19/2021
 
04/23/2021
 
IP 71124.04
 
000728 Occupational Dose Assessment


8/20/2019 8:19:13 AM
8/20/2019 8:19:13 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
}}
}}

Revision as of 23:08, 7 October 2019

Updated Inspection Plan Inspection Report 05000334/2019005 and 05000412/2019005
ML19232A338
Person / Time
Site: Beaver Valley
Issue date: 08/28/2019
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Penfield R
FirstEnergy Nuclear Operating Co
References
IR 2019005
Download: ML19232A338 (7)


Text

ust 28, 2019

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 UPDATED INSPECTION PLAN INSPECTION REPORT 05000334/2019005 AND 05000412/2019005

Dear Mr. Penfield:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Beaver Valley Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, NRC Region I plans to conduct an inspection per Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, at your facility during the period.

You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely,

/RA/

Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Enclosure:

Beaver Valley Inspection Plan cc: Distribution via ListServ

ML19232A338 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RVadella MYoung DATE 8/15/19 8/16/19

IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count RAD SAFETY REMP 1 1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink 1 1, 2 07/14/2019 07/20/2019 IP 71111.07T 000700 Heat Sink Performance BV-ACCESS CONTROL, EQUIP PERF, TRAINING 3 1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification RAD SAFETY 01,02,03,04 1 1, 2 07/29/2019 08/02/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 07/29/2019 08/02/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 07/29/2019 08/02/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 07/29/2019 08/02/2019 IP 71124.04 000728 Occupational Dose Assessment 50.59 Process 3 1, 2 08/04/2019 08/17/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments BEAVER VALLEY 2 INITIAL OL EXAM 4 2 09/01/2019 09/07/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 10/06/2019 10/19/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 1 1 1 10/20/2019 11/02/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RAD SAFETY OUT 1 1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/21/2019 10/25/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/21/2019 10/25/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

8/20/2019 8:19:13 AM

IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count TI-194 Open Phase Condition Inspection - BV 2 1, 2 01/27/2020 01/31/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Rad Safety Inspection 1 1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment BV1 Requal Inspection with P/F Results 2 1 04/12/2020 04/18/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 04/12/2020 04/18/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Rad Safety Refuel 1 1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2 1 2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

BEAVER VALLEY EP EXERCISE INSPECTION 5 1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification Rad Safety RETS 1 1, 2 06/22/2020 06/26/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/22/2020 06/26/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Instruments 1 1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

8/20/2019 8:19:13 AM

IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Access Control, Equip Perf, Training 3 1, 2 09/07/2020 09/11/2020 IP 71130.02 000734 Access Control 1, 2 09/07/2020 09/11/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 09/07/2020 09/11/2020 IP 71130.07 000739 Security Training 1, 2 09/07/2020 09/11/2020 IP 71151 001338 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION 6 1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Rad safety Inspection 1 1, 2 11/16/2020 11/20/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/16/2020 11/20/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 11/16/2020 11/20/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/16/2020 11/20/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/16/2020 11/20/2020 IP 71151 000746 Performance Indicator Verification Radwaste 1 1, 2 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Rad Safety Inspection 1 1, 2 01/11/2021 01/15/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/11/2021 01/15/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/11/2021 01/15/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/11/2021 01/15/2021 IP 71124.04 000728 Occupational Dose Assessment FY21 Beaver Valley 1 Initial Examination 4 1 01/31/2021 02/06/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 02/28/2021 03/13/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

PI&R BIENNIAL 4 1, 2 02/08/2021 02/12/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 02/22/2021 02/26/2021 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

8/20/2019 8:19:13 AM

IP 22 Inspection Activity Plan Report Beaver Valley 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Beaver Valley EP Program Inspection 1 1, 2 04/05/2021 04/09/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 04/05/2021 04/09/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 04/05/2021 04/09/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 04/05/2021 04/09/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 04/05/2021 04/09/2021 IP 71151 001397 Performance Indicator Verification Rad Safety Inspection 1 1, 2 04/19/2021 04/23/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/19/2021 04/23/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/19/2021 04/23/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/19/2021 04/23/2021 IP 71124.04 000728 Occupational Dose Assessment This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

8/20/2019 8:19:13 AM