IR 05000483/2012006: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 09/04/2012 | | issue date = 09/04/2012 | ||
| title = Mid-Cycle Performance Review and Inspection Plan - Callaway Plant (05000483/2012006) | | title = Mid-Cycle Performance Review and Inspection Plan - Callaway Plant (05000483/2012006) | ||
| author name = O'Keefe N | | author name = O'Keefe N | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-B | | author affiliation = NRC/RGN-IV/DRP/RPB-B | ||
| addressee name = Heflin A | | addressee name = Heflin A | ||
| addressee affiliation = Union Electric Co | | addressee affiliation = Union Electric Co | ||
| docket = 05000483 | | docket = 05000483 | ||
Latest revision as of 16:33, 22 June 2019
| ML12248A435 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/04/2012 |
| From: | O'Keefe N NRC/RGN-IV/DRP/RPB-B |
| To: | Heflin A Union Electric Co |
| References | |
| Download: ML12248A435 (4) | |