IR 05000483/2015406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 05/05/2015 | | issue date = 05/05/2015 | ||
| title = NRC Inspection Report 05000483/2015406 | | title = NRC Inspection Report 05000483/2015406 | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Diya F | | addressee name = Diya F | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:May 5, 2015 | ||
==SUBJECT:== | |||
CALLAWAY PLANT - N RC INSPECTION REPORT 05000483/2015406 | |||
==Dear Mr. Diya:== | ==Dear Mr. Diya:== | ||
Revision as of 22:56, 20 June 2019
| ML15126A476 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/05/2015 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Diya F Union Electric Co |
| References | |
| IR 2015406 | |
| Download: ML15126A476 (4) | |
Text
May 5, 2015
SUBJECT:
CALLAWAY PLANT - N RC INSPECTION REPORT 05000483/2015406
Dear Mr. Diya:
On April 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant, and the NRC in spectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection
report. The NRC inspector did not identify any findings or violation of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Branch Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic Enclosure:
NRC Inspection Report 05000483/2015406 w/Attachment: Supplemental Information
cc w/encl:
Mr. Dennis A. Bakalar
Manager, Site Security Omaha Public Power District
Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane
Blair, NE 68008
cc w/o encl:
Electronic Distribution for Callaway Plant