IR 05000272/2018005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 22: | Line 22: | ||
KING OF PRUSSIA, PA 19406 | KING OF PRUSSIA, PA 19406 | ||
-2713 August 28, 2018 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC | -2713 August 28, 2018 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC | ||
- N09 P.O. Box 236 Hancocks Bridge, NJ 08038 | - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: SALEM GENERATING STATION UNITS 1 AND 2 UPDATED INSPECTION PLAN (INSPECTION REPORT S 05000 272/20 18 005 AND 05000311/2018005 | ||
SUBJECT: SALEM GENERATING STATION UNITS 1 AND 2 UPDATED INSPECTION PLAN (INSPECTION REPORT S 05000 272/20 18 005 AND 05000311/2018005 | |||
) | ) | ||
Revision as of 03:20, 16 May 2019
| ML18228A565 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/28/2018 |
| From: | Bower F L NRC Region 1 |
| To: | Sena P P Public Service Enterprise Group |
| References | |
| IR 2018005 | |
| Download: ML18228A565 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 August 28, 2018 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC
- N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: SALEM GENERATING STATION UNITS 1 AND 2 UPDATED INSPECTION PLAN (INSPECTION REPORT S 05000 272/20 18 005 AND 05000311/2018005
)
Dear Mr. Sena:
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for Salem Generating Station Units 1 and 2 (Salem). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 60855.1 , "Operation of an Independent Spent Fuel Storage Installation at Operating Plants
," and IP 71003, "Post
-Approval Site Inspection for License Renewal
," on Unit 2.
Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50
-272 and 311 License Nos. DPR-70 and DPR
-75 Enclosure:
Salem 1 and 2 Inspection Plan cc: Distribution via ListServ SUBJECT: SALEM GENERATING STATION UNITS 1 AND 2 UPDATED INSPECTION PLAN (INSPECTION REPORTS 05000272/2018005 AND 05000311/2018005)
DATED AUGUST 28, 2018 DISTRIBUTION w/encl
- DLew, RA (R1ORAMAIL Res)
JGiessner, DRA (R1ORAMAIL Res)
RLorson, DRP (R1DRPMAIL Res)
DPelton, DRP (R1DRPMAIL Res)
JYerokun, DRS (R1DRSMAIL Res)
BWelling, DRS (R1DRSMAIL Res
) FBower, DRP CLally, DRP MDraxton, DRP PFinney, DRP, SRI AZiedonis, DRP, RI SCalabrese, DRP, RI JBowen, RI, OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource ROPreports Resource DRS Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME:
G:\DRP\BRANCH3\Assessment
\ROP 19\Mid-Cycle\Letters\Salem\ROP 19 Inspection Plan Letter SAL_FINAL.docx ADAMS ACCESSION NUMBER:
ML18228A565 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME CLally/CML via email PFinney/PWF via email FBower DATE 8/15/18 8/15/18 8/28/18 OFFICIAL RECORD CO PY Salem 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
Salem REMP
1, 2 08/27/2018
08/31/2018
000731 Radiological Environmental Monitoring Program
1, 2 09/10/2018
09/14/2018
000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 09/10/2018
09/14/2018
IP 71151 000746 Performance Indicator Verification
License Renewal - Phase 1 - Unit 2
2 10/22/2018
10/26/2018
IP 71003 000687 Post-Approval Site Inspection for License Renewal
10/29/2018
11/02/2018
IP 71003 000687 Post-Approval Site Inspection for License Renewal
UNIT 2 INSERVICE INSPECTION
2 10/22/2018
11/02/2018
000702 Inservice Inspection Activities - PWR
BASELINE HP
1 10/29/2018
11/02/2018
000725 Radiological Hazard Assessment and Exposure Controls
10/29/2018
11/02/2018
000726 Occupational ALARA Planning and Controls
1, 2 10/29/2018
11/02/2018
000728 Occupational Dose Assessment
SALEM INITIAL OL EXAM
1, 2 11/26/2018
11/30/2018
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 01/14/2019
01/25/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
ISFSI OPERATIONAL INSPECTION
1, 2 01/07/2019
01/11/2019
000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
PI&R BIENNIAL
1, 2 01/28/2019
02/01/2019
IP 71152B 000747 Problem Identification and Resolution
1, 2 02/11/2019
02/15/2019
IP 71152B 000747 Problem Identification and Resolution
1, 2 02/04/2019
02/08/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 02/04/2019
02/08/2019
000726 Occupational ALARA Planning and Controls
EP PROGRAM INSPECTION
1, 2 02/11/2019
02/15/2019
000717 Alert and Notification System Testing
1, 2 02/11/2019
02/15/2019
000718 Emergency Response Organization Staffing and Augmentation System
8/15/2018 7:14:28 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Salem 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
EP PROGRAM INSPECTION
1, 2 02/11/2019
02/15/2019
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
1, 2 02/11/2019
02/15/2019
IP 71151 001397 Performance Indicator Verification
INSERVICE INSPECTION - UNIT 1
1 04/15/2019
04/26/2019
000702 Inservice Inspection Activities - PWR
1 04/15/2019
04/19/2019
000725 Radiological Hazard Assessment and Exposure Controls
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
1, 2 06/17/2019
06/21/2019
000734 Access Control
1, 2 06/17/2019
06/21/2019
000737 Protective Strategy Evaluation
1, 2 06/17/2019
06/21/2019
000743 Review of Power Reactor Target Sets
1, 2 06/17/2019
06/21/2019
IP 71151 001338 Performance Indicator Verification
License Renewal - Phase 2 - Unit 2
2 07/15/2019
07/19/2019
IP 71003 000687 Post-Approval Site Inspection for License Renewal
EQ PROGRAM
1, 2 08/19/2019
08/23/2019
000714 Design Bases Assurance Inspection (Programs)
1, 2 09/09/2019
09/13/2019
000714 Design Bases Assurance Inspection (Programs)
SALEM REQUAL INSP WITH P/F RESULTS
1, 2 09/16/2019
09/20/2019
000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)
1, 2 09/16/2019
09/20/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
1, 2 09/23/2019
09/27/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 09/23/2019
09/27/2019
000726 Occupational ALARA Planning and Controls
1, 2 09/23/2019
09/27/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 09/23/2019
09/27/2019
000729 Occupational Dose Assessment
1, 2 09/23/2019
09/27/2019
000729 Radiation Monitoring Instrumentation
8/15/2018 7:14:28 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Salem 07/01/2018 - 06/30/2020
Unit Start End Activity CAC Title Staff Count
Radwaste
1, 2 10/07/2019
10/11/2019
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
Triennial Heat Sink
1, 2 11/18/2019
11/22/2019
000700 Heat Sink Performance -Triennial
1, 2 01/27/2020
01/31/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 01/27/2020
01/31/2020
000726 Occupational ALARA Planning and Controls
1, 2 01/27/2020
01/31/2020
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 01/27/2020
01/31/2020
000729 Occupational Dose Assessment
1, 2 01/27/2020
01/31/2020
000729 Radiation Monitoring Instrumentation
FORCE-ONFORCE PLANNING AND EXERCISE WEEKS
1, 2 02/24/2020
02/28/2020
000735 Contingency Response - Force-On-Force Testing
1, 2 03/16/2020
03/20/2020
000735 Contingency Response - Force-On-Force Testing
ISI - UNIT 2
2 04/27/2020
05/08/2020
000702 Inservice Inspection Activities - PWR
1, 2 04/27/2020
05/01/2020
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/27/2020
05/01/2020
000726 Occupational ALARA Planning and Controls
SALEM INITIAL OL EXAM
1, 2 05/11/2020
05/15/2020
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 06/08/2020
06/19/2020
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
SALEM EP EXERCISE INSPECTION
1, 2 05/18/2020
05/22/2020
000716 Exercise Evaluation
1, 2 05/18/2020
05/22/2020
IP 71151 001397 Performance Indicator Verification
8/15/2018 7:14:28 AM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report