{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
-2713 March 4, 2019 Mr. Rich Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077
-2713 March 4, 2019 Mr. Rich Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT S 05000334/2018006 AND 05000412/2018006)
 
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT S 05000334/2018006 AND 05000412/2018006)


==Dear Mr. Bologna ,==
==Dear Mr. Bologna ,==

Revision as of 19:19, 14 May 2019

Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Reports 05000334/2018006 and 05000412/2018006)
ML19064B365
Person / Time
Site: Beaver Valley
Issue date: 03/04/2019
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Bologna R
FirstEnergy Nuclear Operating Co
References
IR 2018006
Download: ML19064B365 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 March 4, 2019 Mr. Rich Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT S 05000334/2018006 AND 05000412/2018006)

Dear Mr. Bologna ,

The NRC has completed its end

-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program,"

because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and The enclosed inspection plan lists the inspections scheduled through December 31, 202 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY

-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"). Should these changes to the ROP be implemented, the engineering and other region

-based inspections are subject to change in scope, as well as schedule, beginning in January 202 In a letter (ML18115A007) dated April 25, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Beaver Valley Unit 1 by May 31, 2021 and Beaver Valley Unit 2 by October 31, 202 Therefore, the inspection schedule is tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change R. Bologna 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this lette

Sincerely,

/RA/ Matt hew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334 and 50

-412 License Nos.: DPR-66 and NPR

-73 Enclosure:

Beaver Valley Inspection Plan

ML19064B365 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/DRP MYoung/DRP DATE 2/26/19 2/27/19 Beaver Valley

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

RAD SAFETY 01,02,03,04

1, 2 02/25/2019

03/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 02/25/2019

03/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 02/25/2019

03/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 02/25/2019

03/01/2019

IP 71124.04

000728 Occupational Dose Assessment

PI&R BIENNIAL

1, 2 03/04/2019

03/08/2019

IP 71152B 000747 Problem Identification and Resolution

1, 2 03/18/2019

03/22/2019

IP 71152B 000747 Problem Identification and Resolution

FORCE-ON-FORCE PLANNING AND EXERCISES

1, 2 03/25/2019

03/29/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

1, 2 04/15/2019

04/19/2019

IP 71130.03

000735 Contingency Response - Force-On-Force Testing

EQ PROGRAM

1, 2 04/29/2019

05/03/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

1, 2 05/20/2019

05/24/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

BV2 REQUAL INSP WITH P/F RESULTS

2 05/05/2019

05/10/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

05/05/2019

05/10/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

EP PROGRAM INSPECTION

1, 2 06/10/2019

06/14/2019

IP 71114.02

000717 Alert and Notification System Testing

1, 2 06/10/2019

06/14/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

1, 2 06/10/2019

06/14/2019

IP 71114.05

000720 Maintenance of Emergency Preparedness

1, 2 06/10/2019

06/14/2019

IP 71151 001397 Performance Indicator Verification

RAD SAFETY REMP

1, 2 07/08/2019

07/12/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

1, 2 07/08/2019

07/12/2019

IP 71151 000746 Performance Indicator Verification

Triennial Heat Sink

1, 2 07/14/2019

07/20/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

2/22/2019 9:41:27 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Beaver Valley

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 07/22/2019

07/26/2019

IP 71130.02

000734 Access Control

1, 2 07/22/2019

07/26/2019

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

1, 2 07/22/2019

07/26/2019

IP 71130.07

000739 Security Training

1, 2 07/22/2019

07/26/2019

IP 71151 001338 Performance Indicator Verification

RAD SAFETY 01,02,03,04

1, 2 08/05/2019

08/09/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 08/05/2019

08/09/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 08/05/2019

08/09/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 08/05/2019

08/09/2019

IP 71124.04

000728 Occupational Dose Assessment

50.59 Process

1, 2 08/11/2019

08/17/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

BEAVER VALLEY 2 INITIAL OL EXAM

2 09/01/2019

09/06/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

10/06/2019

10/18/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 1

1 10/20/2019

11/02/2019

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

RAD SAFETY OUT

1, 2 10/28/2019

11/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 10/28/2019

11/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 10/28/2019

11/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 10/28/2019

11/01/2019

IP 71124.04

000728 Occupational Dose Assessment

1, 2 10/28/2019

11/01/2019

IP 71151 000746 Performance Indicator Verification

Rad Safety Inspection

1, 2 01/27/2020

01/31/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 01/27/2020

01/31/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 01/27/2020

01/31/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 01/27/2020

01/31/2020

IP 71124.04

000728 Occupational Dose Assessment

2/22/2019 9:41:27 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Beaver Valley

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

BV1 Requal Inspection with P/F Results

1 04/12/2020

04/18/2020

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

04/12/2020

04/18/2020

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Rad Safety Refuel

1, 2 04/13/2020

04/17/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 04/13/2020

04/17/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 04/13/2020

04/17/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 04/13/2020

04/17/2020

IP 71124.04

000728 Occupational Dose Assessment

ISI - UNIT 2

2 04/20/2020

05/01/2020

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

BEAVER VALLEY EP EXERCISE INSPECTION

1, 2 06/08/2020

06/12/2020

IP 71114.01

000716 Exercise Evaluation

1, 2 06/08/2020

06/12/2020

IP 71151 001397 Performance Indicator Verification

Rad Safety RETS

1, 2 06/22/2020

06/26/2020

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

1, 2 06/22/2020

06/26/2020

IP 71151 000746 Performance Indicator Verification

Rad Safety Instruments

1, 2 08/17/2020

08/21/2020

IP 71124.05

000729 Radiation Monitoring Instrumentation

Access Control, Equip Perf, Training

1, 2 09/07/2020

09/11/2020

IP 71130.02

000734 Access Control

1, 2 09/07/2020

09/11/2020

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

1, 2 09/07/2020

09/11/2020

IP 71130.07

000739 Security Training

1, 2 09/07/2020

09/11/2020

IP 71151 001338 Performance Indicator Verification

DESIGN BASIS ASSURANCE INSPECTION

1, 2 09/14/2020

09/18/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

1, 2 09/28/2020

10/02/2020

IP 71111.21M

000713 Design Bases Assurance Inspection (Teams)

2/22/2019 9:41:27 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Beaver Valley

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

Rad safety Inspection

1, 2 11/16/2020

11/20/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

1, 2 11/16/2020

11/20/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

1, 2 11/16/2020

11/20/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 11/16/2020

11/20/2020

IP 71124.04

000728 Occupational Dose Assessment

1, 2 11/16/2020

11/20/2020

IP 71151 000746 Performance Indicator Verification

Radwaste

1, 2 11/16/2020

11/20/2020

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and