| Line 38: | Line 38: | ||
disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
Thomas R. Farnholtz, Chief Engineering Branch 1 | Thomas R. Farnholtz, Chief Engineering Branch 1 | ||
Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 | Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 | ||
Enclosure: | |||
Inspection Report 05000275/2016007 and 05000323/2016007 | Inspection Report 05000275/2016007 and 05000323/2016007 w/Attachment: | ||
Supplemental Information | |||
cc w/encl: Electronic Distribution Enclosure U.S. NUCLEAR REGULATORY COMMISSION | |||
==REGION IV== | |||
Dockets: 05000275; 05000323 Licenses: DPR-80; DPR-82 Reports: 05000275/2016007; 05000323/2016007 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: 7 1/2 miles NW of Avila Beach Avila Beach, CA Dates: February 8 through March 10, 2016 Team Leader: J. Braisted, Reactor Inspector, Engineering Branch 1 Inspectors: C. Steely, Operations Engineer, Operations Branch M. Hayes, Operations Engineer, Operations Branch N. Okonkwo, Reactor Inspector, Engineering Branch 2 R. Kopriva, Senior Reactor Inspector, Engineering Branch 1 R. Latta, Senior Reactor Inspector, Engineering Branch 1 Senior Reactor Analyst: D. Loveless, Senior Reactor Analyst, Plant Support Branch 2 Accompanying Personnel: H. Leake, Contractor, Beckman and Associates J. Zudans, Contractor, Beckman and Associates Approved By: Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
Revision as of 16:58, 10 May 2019
| ML16112A422 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/21/2016 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Halpin E D Pacific Gas & Electric Co |
| References | |
| IR 2016007 | |
| Download: ML16112A422 (71) | |
Text
April 21, 2016
Mr. Edward D. Halpin, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC COMPONENT DESIGN BASES INSPECTION REPORT 05000275/2016007 AND 05000323/2016007
Dear Mr. Halpin:
On March 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Welsch, Site Vice President, and other members of your staff. On April 7, 2016, the NRC inspectors discussed the final results of this inspection with Mr. R. Waltos, Acting Director, Engineering, Mr. T. Baldwin, Director, Nuclear Site Services, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
The NRC inspectors documented six findings of very low safety significance (Green) in this report. All of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief Engineering Branch 1
Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Inspection Report 05000275/2016007 and 05000323/2016007 w/Attachment:
Supplemental Information
cc w/encl: Electronic Distribution Enclosure U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Dockets: 05000275; 05000323 Licenses: DPR-80; DPR-82 Reports: 05000275/2016007; 05000323/2016007 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: 7 1/2 miles NW of Avila Beach Avila Beach, CA Dates: February 8 through March 10, 2016 Team Leader: J. Braisted, Reactor Inspector, Engineering Branch 1 Inspectors: C. Steely, Operations Engineer, Operations Branch M. Hayes, Operations Engineer, Operations Branch N. Okonkwo, Reactor Inspector, Engineering Branch 2 R. Kopriva, Senior Reactor Inspector, Engineering Branch 1 R. Latta, Senior Reactor Inspector, Engineering Branch 1 Senior Reactor Analyst: D. Loveless, Senior Reactor Analyst, Plant Support Branch 2 Accompanying Personnel: H. Leake, Contractor, Beckman and Associates J. Zudans, Contractor, Beckman and Associates Approved By: Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety
SUMMARY
IR 05000275; 05000323/2016007; 02/08/2016 - 03/10/2016; Diablo Canyon Power Plant, Units 1 and 2: Baseline inspection, NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
The inspection activities described in this report were performed between February 8, 2016, and March 10, 2010, by six inspectors from the NRC's Region IV office and two contractors. Six findings of very low safety significance (Green) are documented in this report. All of these findings involved violations of NRC requirements. The significance of in spection findings is indicated by their color (Green, White, Yellow, or Red), which is determined using Inspection Manual Chapter 0609, "Significance Determination Process." Their cross-cutting aspects are determined using Inspection Manual Chapter 0310, "Aspects within the Cross-cutting Areas." Violations of NRC requirements are dis positioned in accordance with the NRCs Enforcement Policy. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
Cornerstone: Mitigating Systems
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program."
Specifically, prior to September 10, 2013, the licensee failed to verify the design of 480 Vac combination motor starter instantaneous magnetic circuit breakers settings, by the use of alternate or simplified calculational methods, for those breakers whose settings are higher than their manufacturers' specifications, as documented in calculation 195B-DC, "MCCB Settings for 460VAC Class 1E Motors," to provide the required level of protection and ensure that certain failures that could be caused by sustained fault currents below the circuit breaker trip setting would not occur. In response to this finding, the licensee conducted a preliminary evaluation of some of the affected equipment and concluded that sustained fault currents below the trip settings are unlikely. This finding was entered into the licensee's corrective action program as Notification 50838071.
The team determined the failure to evaluate 480 Vac combination motor starters with instantaneous magnetic circuit breaker trip current settings higher than their manufacturers'
specifications was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.
Specifically, improper motor starter breaker trip settings could result in a fire in the motor control center cubicle, damage to motor starter components, spurious tripping of the entire motor control center, or lack of protection for downstream components during fault conditions. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety signi ficance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding did not have a cross-cutting aspect because the most significant causal factor of the performance deficiency did not reflect current licensee performance. (Section 1R21.2.3.b.1)
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," which states, in part, "Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected." Specifically, prior to March 16, 2016, the licensee failed to assure that the lack of design verification of 460 Vac motors, which could be overloaded at the maximum allowable diesel generator frequency, was promptly corrected after having been identified in a 2013 apparent cause evaluation and again in a 2015 self-assessment as documented in Notifications 50572850 and 50826105, respectively. In response to this finding, the licensee performed a preliminary evaluation of the affected 460 Vac motors and concluded that operation at maximum emergency diesel generator frequency would not cause them to overheat or trip on overcurrent. This finding was entered into the licensee's corrective action program as Notifications 50835699 and 50838988.
The team determined the failure to correct the lack of design verification of 460 Vac motors at maximum allowable frequency when powered from the emergency diesel generators was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, operation of 460 Vac motors above their rated or analyzed maximum allowable frequencies could result in motor overheating or a trip of the thermal overload relays. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of problem identification and resolution associated with evaluation because the licensee failed to ensure that the organization thoroughly evaluated issues to ensure that resolutions address causes and extent of conditions [P.2]. (Section 1R21.2.3.b.2)
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program."
Specifically, prior to February 10, 2016, the licensee failed to verify the design of (1) equipment on the nominally 125 Vdc system at the maximum voltage specified in Procedure OP J-9:IV, "Performing a Battery Equalizing Charge," and (2) equipment on 480 Vac and 120 Vac vital buses at maximum voltages specified in Procedure OP J-2:VIII,
"Guidelines for Reliable Transmission Service for DCPP," by the use of alternate or simplified calculational methods, to ensure equipment functionality. In response to this finding, the licensee conducted a preliminary evaluation of the affected equipment and concluded that any past exposure to voltages above their maximum rating would not have caused a loss of functionality. This finding was entered into the licensee's corrective action program as Notifications 50834558, 50835906, 50835394, 50835945, 50835949, 50836376, 50836439, 50836638, 50836872, and 50836995.
The team determined the failure to evaluate operation of 125 Vdc and 480 and 120 Vac equipment at maximum allowable voltages was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the equipment performance attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, operation of equipment outside of its rated or analyzed maximum allowable voltages adversely affects the reliability and capability of that equipment required to perform safety-related functions. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a des ign or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6]. (Section 1R21.2.4.b)
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," which states, in part, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings." Specifically, in October of 2015, the licensee failed to evaluate the extent of condition of a cracked holding pawl on a nonsafety-related 4160 Vac SF6 breaker, which was procured as safety-related, in accordance with Procedure OM7.ID1, "Problem Identification and Resolution," when the failure of the component could adversely impact safety-related breakers of the same make and model. In response to this finding, the licensee is performing a procedure review to include steps to perform an extent of condition analysis fo r unplanned nonsafety-related equipment issues that may also affect similar safety-related equipment. This finding was entered into the licensee's corrective action program as Notifications 50836859 and 50836689.
The team determined the failure to evaluate the impact of a cracked holding pawl identified on a nonsafety-related 4160 Vac SF6 breaker on additional safety-related 4160 Vac SF6 breakers was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the equipment performance attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.
Specifically, the 4160 Vac breaker with the cracked holding pawl was procured as safety-related; therefore, the condition extends to safety-related 4160 Vac breakers of the same make and model and potentially adversely affects the ability to perform their safety function.
In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with conservative bias because the licensee failed to ensure that individuals used decision-making practices that emphasized prudent choices [H.14]. (Section 1R21.2.5.b)
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program." Specifically, prior to January 30, 2014, the licensee failed to verify the design of the 230 kV preferred offsite power source, such as by the performance of design reviews or use of alte rnate or simplified calculational methods, by assuming in calculation 359-DC, "Determination of 230 kV Grid Capability Limits as DCPP Offsite Power Source," that the reactor trip and engineered safety features actuation system signals are coincident in time for all postulated design basis events. However, the plant is designed such that, during some events, the signals are separate in time and would result in a greater vital bus voltage depression than analyzed. In response to this finding, the licensee conducted a preliminary evaluation and concluded that the current transmission grid conditions were such that the calculation criteria would be met in the event of a design basis event involving non-coincident reactor trip and engineered safety features actuation system signals. This finding was entered into the licensee's corrective action program as Notification 50839137.
The team determined the failure to evaluate the voltage effects of a limiting design basis event with non-coincident reactor trip and engineered safety features actuation system signals on the 230 kV offsite power circuit was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to ensure adequate bus voltages as a result of a design basis event with non-coincident reactor trip and engineered safety features actuation system signals would result in a trip of the undervoltage relays and the loss of the preferred offsite power circuit. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety signi ficance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6]. (Section 1R21.3.1.b.1)
- Green.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," which states, in part, "Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished." Specifically, prior to November 25, 2015, the licensee failed to include appropriate quantitative acceptance criteria in Procedure MP E-62.3, "Tap Changer Functional Test for Standby-Startup Transformer 11," to ensure that the load tap changer speed for standby-startup transformer 11 was adequate to restore vital bus voltages to the required level during design basis events. In response to this finding, the licensee performed a preliminary evaluation of the condition and concluded that the most recently measured speed of the load tap changer was adequate to ensure that it would restore vital bus voltage within the required time. This finding was entered into the licensee's corrective action program as
Notification 50839333.
The team determined the failure to translate appropriate load tap changer timing acceptance criteria into functional tests to ensure that design assumptions were being maintained was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the load tap changer could meet its functional test acceptance criterion, but not operate fast enough to restore vital bus voltages within the required time during design basis events, which would result in an undervoltage trip and loss of the preferred offsite power circuit. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a des ign or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6]. (Section 1R21.3.1.b.2)
REPORT DETAILS
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity This inspection of component design bases verifies that plant components are maintained within their design basis. Additionally, this inspection provides monitoring of the capability of the selected components and operator actions to perform their design basis functions. As plants age, modifications may alter or disable important design features making the design bases difficult to determine or obsolete. The plant risk assessment model assumes the capability of safety systems and components to perform their intended safety function successfully. This inspectable area verifies aspects of the Initiating Events, Mitigating Systems, and Barrier Integrity cornerstones for which there are no indicators to measure performance.
1R21 Component Design Bases Inspection
.1 Overall Scope
To assess the ability of the Diablo Canyon Power Plant, Units 1 and 2, equipment and operators to perform their required safety functions, the team inspected risk-significant components and the licensee's responses to industry operating experience. The team
selected risk-significant components for review using information contained in the Diablo Canyon Power Plant, Units 1 and 2, probabilistic risk assessments and the NRC standardized plant analysis risk model. In general, the selection process focused on
components that had a risk achievement worth factor greater than 1.3 or a risk reduction worth factor greater than 1.005. The items selected included components in both safety-related and nonsafety-related systems, including pumps, circuit breakers, heat exchangers, transformers, and valves. The team selected the risk-significant operating experience to be inspected based on its collective past experience.
To verify that the selected components would function as required, the team reviewed design basis assumptions, calculations, and procedures. In some instances, the team performed calculations to independently verify the licensee's conclusions. The team also verified that the condition of the components was consistent with the design basis and that the tested capabilities met the required criteria.
The team reviewed maintenance work records, corrective action documents, and industry operating experience records to verify that licensee personnel considered degraded conditions and their impact on the components. For selected components, the team observed operators during simulator scenarios, as well as during simulated actions in the plant.
The team performed a margin assessment and detailed review of the selected risk-significant components to verify that the design basis have been correctly implemented and maintained. This design margin assessment considered original design issues, margin reductions because of modifications, and margin reductions identified as a result of material condition issues. Equipment reliability issues were also considered in the selection of components for detailed review. These included items such as failed performance test results; significant corrective actions; repeated
maintenance; 10 CFR 50.65(a)1 status; operable, but degraded, conditions; NRC resident inspector input of problem equipment; system health reports; industry operating experience; and licensee problem equipment lists. Consideration was also given to the uniqueness and complexity of the design, operating experience, and the available defense in-depth margins.
The inspection procedure requires a review of 15 to 25 total samples that include risk-significant and low design margin components, components that affect the large
early release frequency (LERF) and operating experience issues. The sample selection for this inspection was 15 components, 1 component that affects LERF, and 5 operating experience items. The selected inspection and associated operating experience items supported risk-significant functions including the following:
a. Electrical power to mitigation systems: The team selected several components in the electrical power distribution systems to verify operability to supply alternating current (ac)and direct current
- (dc) power to risk-significant and safety-related loads in support of safety system operation in response to initiating events such as loss of offsite power, station blackout, and a loss-of-coolant accident with offsite power available. As such the team selected:
- Diesel Generator 1-3 Instrument and Control System
- 4160 Volt Switchgear Bus 2F
- 480 Volt Switchgear 2F
- 125 Volt Distribution Panel and Bus 2-2
- 4160 Volt Feeder Breaker 52HF10
- 4160 Volt / 480 Volt Transformer 2F b. Components that affect LERF: The team reviewed a component required to perform functions that mitigate or prevent an unmonitored release of radiation. The team selected the following component:
- Containment Fan Cooler Unit 2-5 c. Mitigating systems needed to attain safe shutdown: The team reviewed components required to perform the safe shutdown of the plant. As such the team selected:
- Auxiliary Saltwater Pump 1-1
- Auxiliary Saltwater Traveling Screen 1-7
- Charging Pump Suction Valves LCV-112B and LCV-112C
- Component Cooling Water Pump 2-2
- Component Cooling Water Heat Exchanger Inlet Valves FCV-602 and FCV-603
- Condensate Storage Tank
- Pressurizer Power Operated Relief Valves PCV-455, PCV-456, and PCV-474
- Residual Heat Removal System Valves RHR-8701 and RHR-8702
.2 Results of Detailed Reviews for Components:
.2.1 Diesel Generator 1-3 Instrument and Control System
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with diesel generator 1-3 instrument and control system. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Engineering changes and resultant design revisions, including work orders and condition reports
- Single-line and wiring diagrams of the local control panel, including functional descriptions
- Vendor manual for emergency diesel generator 1-3 instrument and controls
- Surveillance and preventive maintenance procedures and performed preventive maintenance, inspection, and testing documents
- Diesel generator 1-3 output traces, including observation of a field flash
- Output breaker sizing and protection calculations
b. Findings
No findings were identified.
.2.2 4160 Volt Switchgear 2F
a. Inspection Scope
The team reviewed the updated final safety analysis report, design basis documents, the current system health report, selected drawings, maintenance and test procedures, and condition reports associated with 4160 Volt switchgear 2F to ensure design basis requirements and specifications were met. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Calculations for electrical distribution system loading, steady-state and transient voltages, and maximum short-circuit levels to evaluate the adequacy of the switchgear bus and breakers to carry anticipated loads under limiting conditions
- Protective device settings and circuit breaker ratings to confirm adequate selective protection and coordination of connected equipment during worst-case short circuit conditions and to withstand and interrupt maximum available faults
- Degraded voltage and loss of voltage relay protection schemes that initiate automatic transfers from the offsite power supply to the diesel generator to assess adequacy of voltage at the terminals of the safety-related loads, and ability to remain connected to offsite power under worst operating and accident
conditions
- Corrective action history to determine whether there had been any adverse operating trends
- Visual inspection to assess material condition, the presence of hazards, and consistency of installed equipment with design documentation and analyses
b. Findings
No findings were identified.
.2.3 480 Volt Switchgear 2F
a. Inspection Scope
The team reviewed the updated final safety analysis report, design basis documents, the current system health report, selected drawings, maintenance and test procedures, and condition reports associated with 480 Volt switchgear 2F to ensure design basis requirements and specifications were met. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Calculations for electrical distribution system loading, steady-state and transient voltages, and maximum short-circuit levels to evaluate the adequacy of the switchgear bus and breakers to carry anticipated loads under limiting conditions
- Protective device settings and circuit breaker ratings to confirm adequate selective protection and coordination of connected equipment during worst-case short circuit conditions and to withstand and interrupt maximum available faults
- Corrective action history to determine whether there had been any adverse operating trends
- Visual inspection to assess material condition, the presence of hazards, and consistency of installed equipment with design documentation and analyses
b. Findings
.1 Failure to Evaluate 480 Vac Motor Starters with Circuit Breaker Trip Settings Higher than Manufacturers' Specifications
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," involving the failure to evaluate 480 Vac combination motor starters with instantaneous magnetic circuit breaker trip current settings higher than their manufacturers' specifications.
Description.
The 480 Vac combination motor starters, which are used in motor control centers, contain an instantaneous magnetic circuit breaker, contactor, and thermal overload relay. The thermal overload relay senses excessive current due to motor overloads and failures to start and responds by signaling the contactor to open in order to protect the motor, components of the combination motor starter, and downstream cables and containment penetrations against excessive heating due to overcurrent conditions. If properly coordinated with the thermal overload setting, the instantaneous magnetic circuit breaker protects the combination starter components and downstream cables, and penetrations from downstream faults. Calculation 366A-DC, "Molded Case Circuit Breakers and Thermal Overload Relays," Appendix 9, includes the following precaution from a Cutler Hammer vendor document: "WARNING - To maintain overcurrent, short circuit, and ground fault protection, the manufacturer's instructions for selection of the heater pack and setting of the instantaneous trip circuit breaker (current interrupter) must be followed." Other Cutler Hammer documents provide more specific setting instructions for the instantaneous magnetic circuit breakers to coordinate with the thermal overload relay setting, such as no higher than 13 times the motor full load amp
ratings. Trip settings of the vital instantaneous magnetic circuit breakers in combination starters are documented and analyzed in calculation 195B-DC, "Evaluation of Molded Case Circuit Breaker Settings for 460VAC Class 1E Motors." Many of those breakers were set higher than the limits specified by their manufacturers. This lack of compliance with manufacturers' setting instructions could result in downstream faults causing damage to the combination starter components, fire in the motor control center cubicle, spurious tripping of the entire motor control center, or thermal damage to cables and containment penetrations. The licensee had no analysis to demonstrate that these vulnerabilities do
not exist.
Analysis.
The team determined the failure to evaluate 480 Vac combination motor starters with instantaneous magnetic circuit breaker trip current settings higher than their manufacturers' specifications was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, improper motor starter breaker trip settings could result in a fire in the motor control center cubicle, damage to motor starter components, spurious tripping of the entire motor control center, or lack of protection for downstream components during fault conditions. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding did not have a cross-cutting aspect because the most significant causal factor of the performance deficiency did not reflect current licensee performance.
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program." Contrary to the above, prior to September 10, 2013, the licensee failed to verify or check the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program.
Specifically, the licensee failed to verify the design of 480 Vac combination motor starter instantaneous magnetic circuit breakers settings, by the use of alternate or simplified calculational methods, for those breakers whose settings are higher than their manufacturers' specifications, as documented in calculation 195B-DC, "MCCB Settings for 460VAC Class 1E Motors," to provide the required level of protection and ensure that certain failures that could be caused by sustained fault currents below the circuit breaker trip setting would not occur. In response to this finding, the licensee conducted a preliminary evaluation of some of the affected equipment and concluded that sustained fault currents below the trip settings are unlikely. This finding was entered into the licensee's corrective action program as Notification 50838071. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-01 and 05000323/2016007-01, "Failure to Evaluate 480 Vac Motor Starters with Circuit Breaker Trip Settings Higher than Manufacturers' Specifications."
.2 Failure to Promptly Correct the Lack of Design Verification of 460 Vac Motors at Maximum Allowable Frequency
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," involving the failure to correct the lack of design verification of 460 Vac motors at maximum allowable frequency when powered from the emergency diesel generators.
Description.
Technical specification surveillance requirements 3.8.1.2, 3.8.1.7, 3.8.1.11, 3.8.1.12, 3.8.1.15, and 3.8.1.20 allow a maximum emergency diesel generator frequency of 60.8 Hz. Increased frequency of a motor power supply causes a faster motor speed and increases the brake horsepower of the driven equipment. Motors that operate at or near their thermal capability limit at 60 Hz could overheat or trip on overcurrent when operating at a higher frequency.
Procedure OM7.ID1, "Problem Identification and Resolution," provides instructions on the timeliness of problem resolution in Section 5.3. The procedure specifies the timeframe in calendar days within which actions should be completed from the time the action is generated. The timeframe for corrective actions from apparent cause evaluations is 180 days, and the timeframe for a preliminary plan for resolution is 30 days.
On July 31, 2013, the licensee completed an apparent cause evaluation under Notification 50573621 to address Non-cited Violations05000275/2013007-02 and 05000373/2013007-02 documented in the 2013 component design bases inspection report regarding the effect of maximum allowable emergency diesel generator voltage on the auxiliary feedwater pump motors. The licensee's corrective actions in response to these non-cited violations identified the need to perform an extent of condition review for all vital alternating current motors in Task #5. The apparent cause evaluation stated, "As a result the scope of Notification 50572850 has increased to include an extent of condition which applies to all ESF motors that have a BHP loading greater than their name plate rating." However, the associated corrective action task did not include all engineered safety feature (ESF) motors as described in the apparent cause evaluation, but limited the review to 4 kV motors (i.e., not 460 Vac motors).
In addition, on December 17, 2015, the licensee issued the "DCPP 2016 Component Design Basis Inspection (CDBI) Self-Assessment" report, which identified that, for 460 Vac motors, "a documented Engineering evaluation of Class 1E motor heating when operating at 60.8 Hz via a DG powered vital bus should be prepared." Although Notification 50826105 was initiated on December 17, 2015, to address this issue, an action to perform the technical motor evaluation had not been initiated prior to the team's
inquiry.
Analysis.
The team determined the failure to correct the lack of design verification of 460 Vac motors at maximum allowable frequency when powered from the emergency diesel generators was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, operat ion of 460 Vac motors above their rated or analyzed maximum allowable frequencies could result in motor overheating or a trip of the thermal overload relays. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power,"
dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of problem identification and resolution associated with evaluation because the licensee failed to ensure that the organization thoroughly evaluated issues to ensure that resolutions address causes and extent of conditions [P.2].
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," which states, in part, "Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected." Contrary to the above, prior to March 16, 2016, the licensee failed to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances were promptly identified and corrected. Specifically, the licensee failed to assure that the lack of design verification of 460 Vac motors, which could be overloaded at the maximum allowable diesel generator frequency, was promptly corrected after having been identified in a 2013 apparent cause evaluation and again in a 2015 self-assessment as documented in Notifications 50572850 and 50826105, respectively. In response to this finding, the licensee performed a preliminary evaluation of the affected 460 Vac motors and concluded that operation at maximum emergency diesel generator frequency would not cause them to overheat or trip on overcurrent. This finding was entered into the licensee's corrective action program as Notifications 50835699 and 50838988. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-02 and 05000323/2016007-02, "Failure to Promptly Correct the Lack of Design Verification of 460 Vac Motors at Maximum Allowable Frequency."
.2.4 125 Volt Distribution Panel and Bus 2-2
a. Inspection Scope
The team reviewed the updated final safety analysis report, design basis documents, the current system health report, selected drawings, maintenance and test procedures, and condition reports associated with 125 Volt Distribution Panel and Bus 2-2 to ensure
design basis requirements and specificati ons were met. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Calculations for electrical distribution system loading, voltages, and maximum short-circuit levels to evaluate the adequacy of the distribution panel bus and breakers to carry anticipated loads under limiting conditions
- Protective device settings and circuit breaker ratings to confirm adequate selective protection and coordination of connected equipment during worst-case short circuit conditions and to withstand and interrupt maximum available faults
- Corrective action history to determine whether there had been any adverse operating trends
- Visual inspection to assess material condition, the presence of hazards, and consistency of installed equipment with design documentation and analyses
b. Findings
Failure to Ensure Safety-Related Alternating Current and Direct Current Equipment Functionality at Maximum Allowable Voltages
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," involving the failure to evaluate operation of 125 Volt direct current
- (dc) and 480 and 120 Volt alternating current
- (ac) equipment at maximum allowable voltages (two examples).
Description.
Example 1: Equipment is designed and rated by its manufacturers to withstand supply voltages within a limited range. Procedure OP J-9:IV, "Performing a Battery Equalizing Charge," specified an equalizing voltage of approximately 138 Vdc, and design criterion memorandum S-67, "125V/250V Volt Direct Current System,"
specified a maximum equalizing voltage of 139.8 Vdc, on nominally 125 Vdc systems, without an analysis to ensure that safety-related direct current equipment would not be adversely affected at the equalizing voltage level. However, the licensee had not performed a comprehensive review to verify or check that the maximum voltage to which
vital dc equipment would be exposed during battery equalizing, which could be as high as 139.8 Vdc, was within the equipment maximum voltage ratings or that the equipment had been analyzed to function above its rated voltage limits. In response to the team's inquiry, the licensee performed a preliminary evaluation of the condition and determined that some of the dc equipment had maximum voltage ratings that were less than 139.8 Vdc, but that it was unlikely that they had been damaged due to exposure to
voltages above their ratings.
Example 2: Equipment is designed and rated by its manufacturers to withstand supply voltages within a limited range. On June 30, 1997, the licensee issued design change package E-050321, which increased the voltage of the vital 480 Vac buses by 2.5 percent. The design change package stated, "The calculation performed by Duke Engineering and Services (358A-DC) detailed the acceptable voltages on all buses during normal operation, accident conditions, and plant shutdown."
Calculation 358A-DC, "DCPP Unit 2 Load Flow, Short Circuit, and Transient Stability Calculation," established a maximum voltage acceptance criterion of 105.4 percent (506 Volt) for the 480 Volt buses. Units 1 and 2 Procedures STP I-1C, "Routine Weekly Checks Required by Licenses," include voltage checks of vital 480 Vac buses to verify that the voltage does not exceed 126.33 Vac on the secondary of the potential transformers, which translates to a limit of about 506 Vac on the 480 Vac buses. Calculation 357G-DC, "Guidelines for Circuit Breaker Data Entered into ETAP Database," specified a maximum voltage of 508 Vac on the 480 Vac buses to maintain the credited circuit breaker interrupting ratings. Calculation 357A-DC, "Units 1&2 Load Flow, Short Circuit, and Motor Starting," identifies, in section 3.1.6, a voltage limit of 511 Vac to avoid overvoltages on the 120 Vac control circuits.
Contrary to these established voltage limits, implementation of design change package E-050321 resulted in measured bus voltages that were sometimes as high as 528 Vac. These overvoltage conditions were justified in Procedure OP J-2:VIII, "Guidelines for Reliable Transmission Service for DCPP," Section 5.4, which stated that they are acceptable based on several corrective action documents that it referenced. The team reviewed the referenced notifications and determined that they lacked the rigor of a formal calculation and failed to address a number of vulnerabilities. Specifically, the licensee lacked analysis of allowable overvoltage conditions on induction motor rotor overheating, comprehensive review of non-motor maximum voltage ratings, consideration of additional voltage boosting at the 120 Vac level, derating of circuit breaker interrupting capacities, motor operated valve torque considerations, and exceedance of maximum voltages for which equipment was qualified.
Analysis.
The team determined the failure to evaluate operation of 125 Vdc and 480 and 120 Vac equipment at maximum allowable voltages was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the equipment performance attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, operation of equipment outside of its rated or analyzed maximum allowable voltages adversely affects the reliability and capability of that equipment required to perform safety-related functions.
In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6].
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program." Contrary to the above, prior to February 10, 2016, the licensee failed to verify or check the adequacy of design, such as by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, the licensee failed to verify the design of
- (1) equipment on the nomi nally 125 Vdc system at the maximum voltage specified in Procedure OP J-9:IV, "Performing a Battery Equalizing Charge," and
- (2) equipment on 480 Vac and 120 Vac vital buses at maximum voltages specified in Procedure OP J-2:VIII, "Guidelines for Reliable Transmission Service for DCPP," by the use of alternate or simplified calculational methods, to ensure equipment functionality. In response to this finding, the licensee conducted a preliminary evaluation of the affected equipment and concluded that any past exposure to voltages above their maximum rating would not have caused a loss of functionality. This finding was entered into the licensee's corrective action program as Notifications 50834558, 50835906, 50835394, 50835945, 50835949, 50836376, 50836439, 50836638, 50836872, and 50836995. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-03 and 05000323/2016007-03, "Failure to Ensure Safety-Related Alternating Current and Direct Current Equipment Functionality at Maximum Allowable Voltages."
.2.5 4160 Volt Feeder Breaker 52HF10
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with 4160 Volt feeder breaker 52HF10. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component functional description, maintenance history, and corrective action program reports to verify the monitoring of potential degradation
- Component logic, schematic, and wiring diagrams
- Feeder breaker vendor manual and qualification document
- Calculations for electrical distribution, system load flow/voltage drop, short-circuit, cable sizing and routing, and electrical protection to verify that switchgear bus capacity and voltages remained within minimum acceptable limits
- Protective device settings and circuit breaker ratings to ensure adequate selective protection coordination of connected equipment during worst-case short circuit conditions
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Results of completed preventative maintenance on breakers, including other breakers in the switchgear
b. Findings
Failure to Evaluate the Extent of Condition for a Degraded Condition on a Nonsafety-Related 4160 Vac Breaker
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," involving the failure to evaluate the impact of a cracked holding pawl identified on a nonsafety-related 4160 Vac SF6 breaker on additional safety-related 4160 Vac SF6 breakers.
Description.
Feeder circuit breaker 52HF10 is a 1200 A, 4160 Vac SF6 breaker. Although 1200 A and 2000 A 4160 Vac SF6 circuit breakers were procured safety-related, some of their applications are classified as nonsafety-related. These breakers are mostly used in Units 1 and 2 4160 Vac switchgear buses, D and E, and safety-related switchgear, buses F and G.
The team reviewed corrective actions associated with the 4160 Vac SF6 breakers and observed that, on October 8, 2015, Notification 50809805 documented corrective actions associated with a cracked holding pawl on nonsafety-related 4160 Vac SF6 breaker 52HD10. As a corrective action, the licensee promptly removed the part and replaced it with a spare, but failed to review the impact of the condition on safety-related breakers. Specifically, although breaker 52HD10 is used in a nonsafety-related application, it was procured as safety-related and is of the same make and model as the safety-related 4160 Vac SF6 breakers.
The licensee failed to review Notification 50809805 and implement corrective actions in accordance with Procedure OM7.ID1, "Problem Identification and Resolution."
Section 5.2.4.b.2, states that ---"ensure positive contact is made with WCSFM" to perform extent of condition "if problem could adversely impact safety ---- or the ability of equipment to perform its intended licensing and or design function." Contrary to that provision, the licensee failed to recognize that the problem associated with the 4160 Vac nonsafety-related SF6 breaker could impact the ability of other safety-related breakers to perform their intended safety function and, as such, perform an extent of condition on safety-related 4160 Vac SF6 breakers due to the cracked holding pawl on the nonsafety-related 4160 Vac SF6 breaker, which was procured as quality equipment and, similar in make and model, to the safety related 4160 Vac SF6 breakers.
Analysis.
The team determined the failure to evaluate the impact of a cracked holding pawl identified on a nonsafety-related 4160 Vac SF6 breaker on additional safety-related 4160 Vac SF6 breakers was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the equipment performance attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the 4160 Vac breaker with the cracked holding pawl was procured as safety-related; therefore, the condition extends to safety-related 4160 Vac breakers of the same make and model and potentially adversely affects the ability to perform their safety function. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with conservative bias because the licensee failed to ensure that individuals used decision making-practices that emphasized prudent choices
[H.14].
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," which states, in part, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings." Contrary to the above, in October of 2015, the licensee failed to accomplish activities affecting quality prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstance in accordance with these instructions, procedures, or drawings.
Specifically, the licensee failed to evaluate the extent of condition of a cracked holding pawl on a nonsafety-related 4160 Vac SF6 breaker, which was procured as safety-related, in accordance with Procedure OM7.ID1, "Problem Identification and Resolution,"
when the failure of the component could adversely impact safety-related breakers of the same make and model. In response to this finding, the licensee is performing a procedure review to include steps to perform extent of condition analysis for unplanned nonsafety-related equipment issues that may also affect similar safety-related equipment. This finding was entered into the licensee's corrective action program as Notifications 50836859 and 50836689. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-04 and 05000323/2016007-04, "Failure to Evaluate the Extent of Condition for a Degraded Condition on a Nonsafety-
Related 4160 Vac Breaker."
.2.6 4160 Volt / 480 Volt Transformer 2F
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with the 4160 Volt / 480 Volt transformer 2F. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Load tap changer design and temperature sensor monitor
- Component functional description, protection, logic and schematic diagram and sizing calculation
- Calculations for electrical distribution, system load flow/voltage drop, short-circuit, cable de-rate for load center transformer 2F, and electrical protection to verify that 480 Vac bus capacity and voltages remained within minimum acceptable
limits
- Protective device settings and circuit breaker 52HF10 ratings to ensure adequate selective protection coordination of connected equipment during worst-case short circuit conditions
- Procedures for transformer maintenance, surveillances, inspection, and testing to compare maintenance practices against industry and vendor guidance; including the cable and insulation aging management program
- Results of completed preventative maintenance on transformer and supply breaker 52HF10, including breaker tracking
- Vendor manual and vendor recommended preventive maintenance requirements
b. Findings
No findings were identified.
.2.7 Containment Fan Cooler Unit 2-5
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with containment fan cooler unit 2-5. The team also performed walkdowns and conducted interviews with
system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Surveillances of containment air flow
- Modifications to the containment fan cooler unit back-draft damper
- Technical specifications and bases documents
- Vendor documentation
- External cleaning processes of the fan cooler units
- Chemistry control surveillances and test results of component cooling water system water with respect to system corrosion and containment fan cooler fouling requirements
- Piping and instrumentation diagrams
- System operating instructions
- Component one-line and control wiring diagram, cable schedule and cable routing for the fan motor
- Component fan motor cable sizing and routing for the fan motor and brake horsepower calculation
- Calculations for electrical distribution, system load flow/voltage drop, short-circuit, and electrical protection to verify that bus capacity and voltages remained within minimum acceptable limits
- Protective device settings and circuit breaker ratings for fan motor to ensure adequate selective protection coordination of connected equipment during worst-case short circuit conditions
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance; including the cable aging management program
b. Findings
No findings were identified.
.2.8 Auxiliary Saltwater Pump 1-1
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, modifications, vendor technical manual and condition reports associated with auxiliary saltwater pump 1-1. The team also performed walk downs and conducted interviews with system engineering personnel and inservice testing program personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Net positive suction head calculations, including elevated ultimate heat sink temperatures and varying tidal conditions, hydraulic balancing calculations to verify that the pump will be able to perform its functions during normal and accident conditions
- Modification to upgrade the pump to a larger impeller and the hydraulic effects on the system and pump
- Test trends for the last three years to verify that the pump has been operating in the desired range and is operationally ready, as well actions taken to correct any deficient conditions identified during tests
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Schematic diagrams to confirm the mo tor operation conformed to the design requirements
- Voltage drop calculations to determine whether the motor had adequate voltage for starting and running under degraded voltage conditions
- Cable sizes to determine whether the motor circuit cabling had adequate ampacity
- Maximum power demand of the pump to verify it was properly reflected in alternating current distribution system and diesel generator loading analyses, that the electrical protective devices were set appropriately, and that the motor
thermal capability was not exceeded
b. Findings
No findings were identified.
.2.9 Auxiliary Saltwater Traveling Screen 1-7
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, selected drawings and calculations, maintenance and test procedures, modifications, vendor technical manual and condition reports associated with auxiliary saltwater travelling screen 1-7 and associated components. The team also performed walk downs and conducted interviews with system engineering personnel and operations personnel to ensure the capability of the auxiliary saltwater strainer components (e.g., screens, pumps, differential pressure instruments) to perform their desired design basis function under varying intake conditions. Specifically, the team
reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Seismic calculation to verify the travelling screens are adequately supported during seismic and normal operating conditions, including considerations for maximum tidal conditions associated with tsunami conditions
- Intake management and alarm response procedures associated with the travelling screes to verify that changing conditions in the intake structure are managed adequately
- Modification to screen wash pumps and travelling screens to improve system performance
- Data collected from operator rounds to assure that the travelling screen system is operating acceptably and corrective actions are taken when system problems are encountered
- Material condition of this system to assure that the components get adequate consideration in the corrosive salt water environment
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Schematic diagrams to confirm that the screen and screen wash pump motor operation conformed to the design requirements
- Voltage drop calculations to determine whether the motor had adequate voltage for starting and running under degraded voltage conditions
- Cable sizes to determine whether the motor circuit cabling had adequate ampacity
b. Findings
No findings were identified.
.2.10 Charging Pump Suction Valves LCV-112B and LCV-112C
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with the charging pump suction valves. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of the related components to perform their desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Corrective action documents issued in the past five years to verify that repeat failures, and potential chronic issues, will not prevent the charging pump suction valves from performing their safety function
b. Findings
No findings were identified.
.2.11 Condensate Storage Tank
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with the condensate storage tank for Unit 2. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Corrective action documents issued in the past five years to verify that repeat failures, and potential chronic issues, will not prevent the condensate storage tank and associated components from performing their safety function
b. Findings
No findings were identified.
.2.12 Component Cooling Water Pump 2-2
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, modifications, vendor technical manual and condition reports associated with component cooling water pump 2-2. The team also performed walk downs and conducted interviews with system engineering personnel and inservice testing program personnel to ensure the capability of this component to perform its desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Net positive suction head calculations including elevated ultimate heat sink, hydraulic balancing calculations to verify that the pump will be able to perform its functions during normal and accident conditions
- Test trends for the last three years to verify that the pump has been operating in the desired range and is operationally ready, as well actions taken to correct any deficient conditions identified during tests
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Schematic diagrams to confirm the mo tor operation conformed to the design requirements
- Voltage drop calculations to determine whether the motor had adequate voltage for starting and running under degraded voltage conditions
- Cable sizes to determine whether the motor circuit cabling had adequate ampacity
- Maximum power demand of the pump to verify it was properly reflected in alternating current distribution system and diesel generator loading analyses, that the electrical protective devices were set appropriately, and that the motor
thermal capability was not exceeded
b. Findings
No findings were identified.
.2.13 Component Cooling Water Heat Exchanger Inlet Valves FCV-602 and FCV-603
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with the component cooling water heat exchanger inlet valves FCV-602 and FCV-603. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function.
Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Calculations for air-operated valve design basis operating conditions, and weak-link analyses
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Air supply system and back up air accumulator system associated with valves FCV-602 and FVC-603
- System quarterly functional tests
- Technical specifications and bases documents
- Vendor manual for the valves
- Work orders and corrective action program documents
- Piping and instrumentation diagrams
- System operating instructions
b. Findings
No findings were identified.
.2.14 Pressurizer Power Operated Relief Valves PCV-445, PCV-456, and PCV-474
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with pressurizer power operated relief valves PCV-445, PCV-456, and PVC-474. The team also reviewed recent photographs of the valves and conducted interviews with system engineering personnel to ensure the capability of these components to perform their desired design basis function. Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Corrective action documents issued in the past five years to verify that repeat failures, and potential chronic issues, will not prevent the valves from performing their safety function
b. Findings
No findings were identified.
.2.15 Residual Heat Removal System Valves RHR-8701 and RHR-8702
a. Inspection Scope
The team reviewed the updated final safety analysis report, system description, design basis documents, the current system health report, selected drawings and calculations, maintenance and test procedures, and condition reports associated with residual heat removal system motor operated valves RHR-8701 and RHR-8702. The team also performed walkdowns and conducted interviews with system engineering personnel to ensure the capability of this component to perform its desired design basis function.
Specifically, the team reviewed:
- Component maintenance history and corrective action program reports to verify the monitoring of potential degradation
- Calculations for motor-operated valve design basis operating conditions, torque and thrust capabilities, and weak-link analyses
- Procedures for preventive maintenance, inspection, and testing to compare maintenance practices against industry and vendor guidance
- Surveillances pertaining to valve leakage requirements and test results
- System quarterly functional tests
- Technical specifications and bases documents
- Vendor documentation for installation, operation, and maintenance of the valves
- Work orders and corrective action program documents
- Piping and instrumentation diagrams
- System operating instructions
- Component one-line and control wiring diagram, cable schedule and cable routing for the valve motors
- Component motor cable sizing and routing for the valve motors and brake horsepower calculations
- Calculations for electrical distribution, system load flow/voltage drop, short-circuit, and electrical protection to verify that bus capacity and voltages remained within minimum acceptable limits
- Protective device settings and circuit breaker ratings to ensure adequate selective protection coordination of connected equipment during worst-case short circuit conditions
- Procedures for preventive maintenance, corrective actions, inspection, and testing to compare maintenance practices against industry and vendor guidance; including the cable aging management program
- Valve motor control power transformer and fuse sizing
b. Findings
No findings were identified.
.3 Results of Reviews for Operating Experience
.3.1 Inspection of NRC Generic Letter 2006-02, "Grid Reliability and the Impact on Plant Risk
and the Operability of Offsite Power"
a. Inspection Scope
The inspectors reviewed the licensee response to NRC Generic Letter 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power." The licensee's interface and coordination with the transmission system operator for plant voltage requirements and notification of the need for compensatory measures were reviewed. The inspectors also reviewed the capacity and capability of the 230 kV offsite power circuit to perform its required functions during anticipated operational occurrences and postulated accidents. The review included the ability of the load tap changing standby-startup transformers to automatically correct low voltage conditions prior to actuation of the degraded voltage relays.
b. Findings
.1 Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power Circuit
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," involving the failure to evaluate the voltage effects of a limiting design basis event with non-coincident reactor trip and engineered safety features actuation system signals on the 230 kV offsite power circuit.
Description.
The licensee's updated final safety analysis report states in Section 8.2.1.2, "The preferred power supply has sufficient capacity and capability to assure that:
- (1) specified fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences, and
- (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents." Calculation 359-DC, "Determination of 230 kV Grid Capability Limits as DCPP Offsite Power Source," models the transient voltage effects of various design basis events and verifies that the resulting voltage depression is not so severe that it would result in loss of the 230 kV offsite power circuit due to an undervoltage trip. The calculation assumes a coincident engineered safety features actuation system signal and reactor trip signal. The engineered safety features actuation system signal initiates immediate automatic transfer of the vital buses from the
auxiliary transformer to the standby startup transformer, but transfer of the non-vital buses to the standby startup transformer and tripping of the main generator is delayed for approximately 30 seconds after a reactor trip. However, the team reviewed the licensee's accident analyses and observed that the reactor trip signal could also occur before the engineered safety features actuation system signal for steam generator tube rupture, steam line break, and small break loss-of-coolant accidents. Therefore, the transfer of vital and non-vital loads to the standby startup transformer and tripping of the main generator could coincide and the voltage effect on the vital buses could be more severe than the scenarios modeled in the calculation.
Analysis.
The team determined the failure to evaluate the voltage effects of a limiting design basis event with non-coincident reactor trip and engineered safety features actuation system signals on the 230 kV offsite power circuit was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to ensure adequate bus voltages as a result of a design basis event with non-coincident reactor trip and engineered safety features actuation system signals would result in a trip of the undervoltage relays and the loss of the preferred offsite power circuit. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6].
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, "Design Control," which states, in part, "The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program." Contrary to the above, prior to January 30, 2014, the licensee failed to verify or check the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, the licensee failed to verify the design of the 230 kV preferred offsite power source, such as by the performance of design reviews or use of alternate or simplified calculational methods, by assuming in calculation 359-DC, "Determination of 230 kV Grid Capability Limits as DCPP Offsite Power Source," that the reactor trip and engineered safety features actuation system signals are coincident in time for all postulated design basis events. However, the plant is designed such that, during some events, the signals are separate in time and would result in a greater vital bus voltage depression than analyzed. In response to this finding, the licensee conducted a preliminary evaluation and concluded that the current transmission grid conditions were such that the calculation criteria would be met in the event of a design basis event involving non-coincident reactor trip and engineered safety features actuation system signals.
This finding was entered into the licensee's corrective action program as Notification 50839137. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-05 and 05000323/2016007-05, "Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power Circuit."
.2 Failure to Translate Appropriate Load Tap Changer Timing Acceptance Criteria into
Periodic Tests
Introduction.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," involving the failure to translate appropriate load tap changer timing acceptance criteria into functional tests to ensure that design assumptions were being maintained.
Description.
The licensee's updated final safety analysis report states in Section 8.2.1.2: "The preferred power supply has sufficient capacity and capability to assure that:
- (1) specified fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences, and
- (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents." Calculation 359-DC, "230 kV Grid Interface Requirements as a DCPP Offsite Power Source," includes simulations to verify that vital bus voltage transients during design basis events are automatically corrected by the standby startup transformer load tap changers to ensure that that the 230 kV offsite power circuit has the required capability (i.e., that it would not be lost due to an undervoltage trip). However, Unit 1 Procedure MP E-62.3, "Tap Changer Functional Test for Standby-Startup Transformer 11," allows up to 16 seconds for three load tap changer step changes, but calculations 357A-DC, "Unit 1 and 2 Load Flow, Short Circuit and Motor Starting Analysis," and 359-DC, "230 kV Grid Interface Requirements as a DCPP Offsite Power Source," credit a faster speed of 3.3 seconds per step. Most of the postulated cases require multiple load tap changer steps to achieve a voltage that exceeds the second level undervoltage relay voltage threshold. Margins between the calculated voltage recovery times and the second level undervoltage relay minimum time delay are discussed in calculation 359-DC, Section 9.1. For the bounding case, the calculated recovery time is 16.07 seconds versus a required recovery time of 16.09 seconds, so the design margin is only 0.02 seconds.
Analysis.
The team determined the failure to translate appropriate load tap changer timing acceptance criteria into functional tests to ensure that design assumptions were being maintained was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the load tap changer could meet its functional test acceptance criterion but not operate fast enough to restore vital bus voltages within the required time during design basis events, which would result in an undervoltage trip and loss of the preferred offsite power circuit. In accordance with Inspection Manual Chapter 0609, Appendix A, "The Significance Determination Process (SDP) for Findings At-Power," dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6].
Enforcement.
The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," which states, in part, "Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished." Contrary to the above, prior to November 25, 2015, the licensee failed to include appropriate quantitative or qualitative acceptance criteria in instructions, procedures, and drawings for determining that important activities have been satisfactorily accomplished. Specifically, the licensee failed to include appropriate quantitative acceptance criteria in Procedure MP E-62.3, "Tap Changer Functional Test for Standby-Startup Transformer 11," to ensure that the load tap changer speed for standby-startup transformer 11 was adequate to restore vital bus voltages to the required level during design basis events. In response to this finding, the licensee performed a preliminary evaluation of the condition and concluded that the most recently measured speed of the load tap changer was adequate to ensure that it would restore vital bus voltage within the required time. This finding was entered into the licensee's corrective action program as Notification 50839333. Because this finding was of very low safety significance and has been entered into the licensee's corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy: NCV 05000275/2016007-06 and 05000323/2016007-06, "Failure to Translate Appropriate Load Tap Changer Timing Acceptance Criteria into Periodic Tests."
.3.2 Inspection of NRC Information Notice 2007-36, "Emergency Diesel Generator Voltage
Regulator Problems"
a. Inspection Scope
The team reviewed the licensee's evaluation of Information Notice 2007-36, "Emergency Diesel Generator Voltage Regulator Problems," to verify the licensee performed an applicability review and took corrective actions, if appropriate, to address the concerns described in the information notice. This information notice discusses various failure associated with emergency diesel generator voltage regulators. The team verified that the licensee's review adequately addressed the issues in the information notice.
b. Findings
No findings were identified.
.3.3 Inspection of NRC Information Notice 2012-06, "Ineffective Use of Vendor Technical Recommendations"
a. Inspection Scope
The team reviewed the licensee's evaluation of Information Notice 2012-06, "Ineffective Use of Vendor Technical Recommendations," to verify the licensee performed an applicability review and took corrective actions, if appropriate, to address the concerns described in the information notice. This information notice discusses recent operating experience regarding ineffective use of vendor technical recommendations at U.S. nuclear power plants. The team verified that the licensee's review adequately addressed the issues in the information notice.
b. Findings
No findings were identified.
.3.4 Inspection of NRC Information Notice 2012-14, "Motor-Operated Valve Inoperable due to
Stem-Disc Separation"
a. Inspection Scope
The team reviewed the licensee's evaluation of Information Notice 2012-14, "Motor-Operated Valve Inoperable due to Stem-Disc Separation," to verify the licensee performed an applicability review and took corrective actions, if appropriate, to address the concerns described in the information notice. The team also reviewed enhancements to the licensee's processes for verifying valve position and the affected procedures to assure that this key aspect of the information notice was considered. The team verified that the licensee's review adequately addressed the issues in the information notice.
b. Findings
No findings were identified.
.3.5 Inspection of NRC Information Notice 2014-03, "Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues"
a. Inspection Scope
The team reviewed the licensee's evaluation of Information Notice 2014-03, "Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues," to verify the licensee performed an applicability review and took corrective actions, if appropriate, to address the concerns described in the information notice. This information notice discusses recent operating experience related to improper adjustments of control mechanisms that led to inoperability of turbine-driven auxiliary feedwater pumps. The team reviewed several corrective action program documents and maintenance activities for physical inspection and measurement of the pump control mechanisms to address the concerns identified in the information notice. The team verified that the licensee's review adequately addressed the issues in the information notice.
b. Findings
No findings were identified.
.4 Results of Reviews for Operator Actions
a. Inspection Scope
The team selected risk-significant components and operator actions for review using information contained in the licensee's probabilistic risk assessment. This included components and operator actions that had a risk achievement worth factor greater than two or Birnbaum value greater than 1E-6.
For the review of operator actions, the team observed operators during simulator scenarios associated with the selected components as well as observing simulated actions in the plant.
The selected operator actions were:
- Scenario 1 was initiated by a spurious safety injection signal. The crews were required to stop centrifugal charging pump number 3, make a power operated relief valve available, restore instrument air to containment, and to establish
normal letdown.
- Scenario 2 was initiated by a leak in the component cooling water system. The crews were required to locate and isolate the leak, which includes field actions, after receiving component cooling water surge tank makeup alarm.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity
4OA2 Problem Identification and Resolution
The team reviewed actions requests and notifications associated with the selected components, operator actions and operating experience notificat ions. Any related findings are documented in prior sections of this report.
4OA6 Meetings, Including Exit
Exit Meeting Summary
On March 10, 2016, the inspectors presented the inspection results to Mr. James Welsch, Site Vice President, and other members of the licensee staff. On April 7, 2016, the NRC inspectors discussed the final results of this inspection with Mr. Robert Waltos, Acting Director, Engineering, and Mr. Thomas Baldwin, Director, Nuclear Site Services, and other members of the licensee's staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.
A-1 Attachment
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- A. Heffner, NRC Interface, Regulatory Services
- A. Peck, Director, Engineering Services
- C. Basulto, Mechanical Engineer, Design Engineering
- C. Ingram, Mechanical Engineer, Design Engineering
- E. Tahlman, Electrical Engineer, Electrical Systems and Components
- G. Reimers, Senior Consultant, Design Engineering
- H. Hamzehee, Manager, Regulatory Services
- J. Loya, Manager, Quality Verification
- J. Morris, Senior Advising Engineer
- J. Nimick, Senior Station Director
- J. Salazar, Engineer, Mechanical Systems
- J. Welsch, Site Vice President
- L. Orozco, Electrical Engineer, Design Engineering
- L. Parker, STARS Regulatory Affairs Specialist
- M. McCoy, NRC Interface, Regulatory Services
- M. Sharp, Manager, Design Engineering
- P. Gerfen, Director, Operation Services
- R. Waltos, Acting Director, Engineering
- T. Baldwin, Director, Nuclear Site Services
- T. Stanton, Senior Engineer, Design Engineering
NRC Personnel
- B. Tharakan, Senior Resident Inspector
- J. Reynoso, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
- 05000275;
- 05000373/2016007-01 NCV Failure to Evaluate 480 Vac Motor Starters with Circuit Breaker Trip Settings Higher than Manufacturers' Specifications (Section 1R21.2.3.b.1)
- 05000275;
- 05000373/2016007-02 NCV Failure to Promptly Correct the Lack of Design Verification of 460 Vac Motors at Maximum Allowable
Frequency (Section 1R21.2.3.b.2)
- 05000275;
- 05000373/2016007-03 NCV Failure to Ensure Safety-Related Alternating Current
and Direct Current Equipment Functionality at Maximum Allowable Voltages (Section 1R21.2.4.b)
Opened and Closed
- 05000275;
- 05000373/2016007-04 NCV Failure to Evaluate the Extent of Condition for a Degraded Condition on a Nonsafety-Related
4160 Vac Breaker (Section 1R21.2.5.b)
- 05000275;
- 05000373/2016007-05 NCV Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power
Circuit (Section 1R21.3.1.b.1)
- 05000275;
- 05000373/2016007-06 NCV Failure to Translate Appropriate Load Tap Changer Timing Acceptance Criteria into Periodic Tests
(Section 1R21.3.1.b.2)
LIST OF DOCUMENTS REVIEWED
Calculations
- Number Title Revision / Date 100A-DC 4kV ESF Motor Stator Temperature Rise for Operation Above Nameplate Horsepower
- 114-DC Protection Relay Setting for Bus and Feeders, Class
- 1E 4.16kV Switchgear
- 156-DC 4kV Motor Starting Times as a Function of Voltage 6 15-DC Diesel Generator Loading for Vital Bus Loads Units 1
and 2 25 170-DC Basler Class 1E 4kV Motor Overcurrent Relay Setpoints
- 192A-DC Determine the Maximum Allowable Length of 120 VAC Control Wire for Control Circuits of 480 MCCs
- 195A-DC 460V Motors Thermal Overload Setting for 460V Continuous Duty Motors
- 195B-DC 460V Motors Magnetic Trip Setting of Molded Case Circuit Breakers for Class 1E 460V Motors
- 195C-DC Evaluation of Thermal Overload Relay Settings for 460VAC Class 1E MOV/MOD Motors
- 195D-DC MCCB Settings for 480VAC Class 1E Non-Motor Loads 9 202-DC System Coordination Study for Class 1E 480V Buses 1 207B-DC MCCB Settings/460VAC Non-Class 1E Continuous Duty Motors
- 230-DC Under and Overvoltage Setting for Class 1E 125V DC
- System 0 234E-DC 125 VDC Battery 22 Coordination Evaluation 4A 235A-DC Battery 11 Sizing, Load Flow, Voltage Drop, Short Circuit and Charger Sizing 11 235E-DC Battery 22 Sizing, Load Flow, Voltage Drop, Short Circuit and Charger Sizing 11 258-DC 32G Generator Reverse Power Relay 0 357A-DC 12kV / 4kV / 480V Electrical Distribution System 14
Calculations
- Database 2 357I-DC 230/12KV Startup Transformer LTC 2 357R-DC 4.16 kV Bus Under-Voltage Relay & Timer 2 358A-DC Load Flow, Short Circuit and Transient Stability Calculation
- 359-DC 230 kV & 500 kV Grid Interface Requirements 10 360-DC 125VDC System Analysis Methodology & Scenario Development
- 361-DC 125 VDC Ground Detection System Sensitivity 0 364-DC Electrical Penetration Protection for Unit 2 6
- 366A-DC Sizing and Setting of Molded Case Circuit Breakers and Thermal Overload Relays
- 9000033359 (357A-DC)
- 12kV / 4kV / 480V Electrical Distribution System 14A B-22-09-04-02 Seismic Interaction East of CCW Ht. Ex. 2-2 Above Mech. Panel 149 North of CL June 15, 1983
- DC-135 Auxiliary Salt Water Pumps Increased Loading 0
- HVAC-2005-03 Backflow through the Idle CFCUs without the Backdraft Dampers
- M-0180 Calculation of the Brake Horse Power for Miscellaneous Pumps
- M-1018 Evaluate CCW Split Train Operations with Vital Bus Failure and Temporary Loss of Cooling
- Temperature in Mode 4
- M-1141 Maximum Emergency Diesel Generator Mechanical Loading 2
Calculations
- Number Title Revision / Date
- M-1141, 90000040769 Emergency Diesel Generator, 4kv System, 480 V
- System Part 2, Version 00 M-1185 SAP CALC NO. 90000041599 - CCW FATHOM Flow and Heat Transfer Analysis Model December 18, 2014 M-175 Check NPSHA for CCW for Temperatures of 100 to 250 deg.F and Flows from 5000 to 20000 gpm
- Auxiliary Lube Oil Pumps
- M-877 Demonstrate the Acceptability of Throttling Cooling Water Flow to the CCW Pump Lube Oil coolers
- M-885 Determine Change in ASW Flow When Switching Configuration and Tidal Conditions
- M-888 Minimum Hold Time for
- FCV-602 and
- FCV-603 2 M-919 Single CCW Pump Operation During Station Blackout - Analysis of Ability to Support Cold Shutdown
- M-951 Evaluation of CCW System Accident Mitigation Capabilities during Plant Cooldown and During ASME Section XI testing May 28, 2015 M-953 Determine if Adequate NPSH is Available for ASW
- Pump Operations
- M-988 ASW System Flows, Pressures and Temperatures
- SAP Calculation No. 9000013922-
- 008-00 Environmental Qualification Requirements:
- Bases for "Note 11: and "Note 16" Devices; Bases for the Required Post-DBA Operating Time" and "Minimum Required Qualification Time"; Review of Potential
- 10CFR50.49(b)(2) Devices; and Radiation EQ of Non-
- Electronic Devices Subject to a TID of between 10
and 10 4 Rads.
- Legacy No. EZ-002.
- SAP Calculation No. 9000039862-
- 006-01 Component Cooling Water System Flow Balancing.
- Legacy No. M-1017
- SAP Calculation No. 9000039872-
- 2-00 Component Cooling Water System and Auxiliary Saltwater System - To determine the maximum allowable ASW temperature when two CCW HXs are aligned.
- Legacy No. M-1027
Calculations
- Number Title Revision / Date SAP Calculation No. 9000039872-
- 003-00 Component Cooling Water System and Auxiliary Saltwater System - To determine the maximum allowable ASW temperature when two CCW HXs are aligned.
- Legacy No. M-1027
- SAP Calculation No.
- 9000041599 Component Cooling Water (CCW) - Component Cooling Water Fathom Flow and Heat Transfer Analysis Model.
- Legacy No. M-1185
- SAP Calculation No.:
- 9000035423 Rising-Stem MOV Actuator Sizing and Setpoints. 7
- SAP Calculation No.:
- 9000039834 Calculation M-988 Auxiliary Saltwater System (ASW).
- To evaluate the effects of the new ASW bypass piping. 6
- SQME-63 Evaluation of Seismic Lateral Restraint for Traveling Water Screens
- STA-246 ASW Outlet Pressure of the CCCW H 0
- STA-274 Establish a Bounding Time to Implement the 500 kV Backfeed and Restore Reactor Coolant System RCS Makeup Flow and Still Meet the
- GDC 17 Requirements for a Delayed Offsite Power Source
- WCAP-14282 Evaluation of Peak CCW Temperature Scenarios for Diablo Canyon Units 1 and 2
- 52.21.1 Seismic Verification of Outdoor Water Storage Tanks
- 4
- EQP-52.21.9 Structural Integrity of Outdoor Water Storage Tanks
- 3 52.21.10 Structural Integrity of Outdoor Water Storage Tanks Relative to Effects of Tornado Loading and Normal Wind Loading Design Change Packages Number Title Revision / Date
- C-49207 ASW Bypass Piping - Intake to Hillside Tie-in 7
- DC2-EP-4328 Installation of Vacuum Relief System on Each Aux.
- Saltwater Line
- DCM S-10 Residual Heat Removal System 20 DCM S-7 Reactor Coolant System 28
- Design Change Packages Number Title Revision / Date
- DCM-S-14 Component Cooling Water System 28
- DCM-S-17B Auxiliary Saltwater System 21A
- DCM-S-23A Containment HVAC System 22
- DCM-S-25B Backup Air / Nitrogen Supply System 16
- DCN 2000000751 Unit 1 Traveling Screen Speed Control Upgrade August 2, 2011
- DCN 2000000752
- Replacement of Existing Travelling Screen and Screen Wash Controls Unit 1&2 August 2, 2011 DCN 2-SE-50649 125/250 Volt Direct Current System - 125V DC Vital Battery Charger BTC21(ED21)
- DCN 2-SE-50650 125/250 Volt Direct Current System - 125V DC Vital Battery Charger BTC22(ED22)
- DCN 2-SE-50651 125/250 Volt Direct Current System - 125V DC Vital Battery Charger BTC221(ED221)
- DCN 2-SE-50652 125/250 Volt Direct Current System - 125 VDC Vital Battery Charger
- BTC 231 (ED231)
- DCN 2-SE-50653 125/250 Volt Direct Current System -125V DC Vital Battery Charger BTC232 (ED232)
- DCP - 50649 Replace Vital Battery Chargers 0 DDN
- 2-1297 Containment Fan Cooler Unit Inlet Damper Modification 1
- DDN 2-249 Containment Fan Cooler Unit Anti-Reverse Rotation Device 0 DDN 2-442 Containment Fan Cooler Unit Anti-Reverse Rotation Device 0 DDP 1-119 Containment Fan Cooler Unit Anti-Reverse Rotation Device 0 DDP
- 1-24907 Containment Fan Cooler Unit Inlet Damper Modification 1 DFC 3-1340 Containment Fan Cooler Unit Anti-Reverse Rotation Device
- 0 DFC 3-2239 Containment Fan Cooler Unit Inlet Damper Modification 0 DFC 3-2254 Containment Fan Cooler Unit Inlet Damper Modification 0
- DFC 3-756 Containment Fan Cooler Unit Anti-Reverse Rotation Device 0
- Design Change Packages Number Title Revision / Date DFC 3-964 Containment Fan Cooler Unit Anti-Reverse Rotation Device 0 E-41629 Change Overcurrent Relay Setpoint of Auxiliary Saltwater Pumps Motor
- E-50321 Adjust Various Transformer Taps 0 E-50322 Replace Startup Transformer 21 1 E-50365 Replace Startup Transformer 21 0 E-50649 Replace Battery Chargers 0
- LBIE Screen Applicability DCP
- M-49948 Installations of Lube Oil Sample Ports on Safety Related and Non-Safety Related Pumps, Motors and Gearboxes January 23, 2008M000096 Lube oil Sample Points 12 M-09383 John Crane Mechanical Seal - Component Cooling Water Pump
- M-39834 Change Impeller Size on ASW Pumps 0 MMD M00010-1 Damaged Bolt Hole Repair 3
Drawings
- Number Title Revision / Date
- 067998 DCPP Unit 2 SRData Cable Report for cable G02P00 23
- 102008, Sheet 4B Chemical &Volume Control System (Unit 1) 114
- 2008, Sheet 4D Chemical & Volume Control System (Unit 1) 131
- 102017, Sheet 1 Piping Schematic - Saltwater Systems 89
- 102017, Sheet 10 Piping Schematic - Saltwater Systems 60
- 2017, Sheet 11 Piping Schematic - Saltwater Systems 73
- 2017, Sheet 12 Piping Schematic - Saltwater Systems 84
- 2017, Sheet 13 Piping Schematic - Saltwater Systems 89
- 2017, Sheet 2 Piping Schematic - Saltwater Systems 15
- 102017, Sheet 3 Piping Schematic - Saltwater Systems 109
- 102017, Sheet 3A Piping Schematic - Saltwater Systems 99
Drawings
- Number Title Revision / Date
- 102017, Sheet 3B Piping Schematic - Saltwater Systems 95
- 102017, Sheet 4 Piping Schematic - Saltwater Systems 68
- 2017, Sheet 5 Piping Schematic - Saltwater Systems 98
- 2017, Sheet 5A Piping Schematic - Saltwater Systems 3
- 2017, Sheet 6 Piping Schematic - Saltwater Systems 102
- 2017, Sheet 6A Piping Schematic - Saltwater Systems 93
- 102017, Sheet 6B Piping Schematic - Saltwater Systems 1
- 102017, Sheet 7 Piping Schematic - Saltwater Systems 15
- 2017, Sheet 8 Piping Schematic - Saltwater Systems 15
- 2017, Sheet 9 Piping Schematic - Saltwater Systems 38
- 103011 Logic Diagram 12kV Bus Sections "D" & "E" Automatic Transfer
- 106717, Sheet 7 Saltwater OVID 198
- 107031, Sheet 1 Piping Schematic Long Term Cooling Water System 7
- 107031, Sheet 1A Piping Schematic Long Term Cooling Water System 6
- 107714, Sheet 2 Component Cooling Water System 65
- 107723, Sheet 4 Containment Fan Cooler Units - Containment Air Circulation
- 104
- 108007, Sheet 4 Reactor Coolant System (Unit 2)` 59
- 108009, Sheet 3 Safety Injection System 55
- 108010, Sheet 1 Piping Schematic - Residual Heat Removal System 18
- 108010, Sheet 2 Piping Schematic - Residual Heat Removal System 17
- 108010, Sheet 3 Piping Schematic - Residual Heat Removal System 30
- 108010, Sheet 4 Piping Schematic - Residual Heat Removal System 16
- 108010, Sheet 5 Piping Schematic - Residual Heat Removal System 18
- 108010, Sheet 6 Piping Schematic - Residual Heat Removal System 18
- 108014, Sheet 1 Piping Schematic - Component Cooling Water System 51
- 108014, Sheet 10 Piping Schematic - Component Cooling Water System 42
Drawings
- Number Title Revision / Date
- 108014, Sheet 2 Piping Schematic - Component Cooling Water System 12
- 108014, Sheet 3 Piping Schematic - Component Cooling Water System 12
- 108014, Sheet 4 Piping Schematic - Component Cooling Water System 22
- 108014, Sheet 4A Piping Schematic - Component Cooling Water System 45
- 108014, Sheet 5 Piping Schematic - Component Cooling Water System 49
- 108014, Sheet 5A Piping Schematic - Component Cooling Water System 35
- 108014, Sheet 6 Piping Schematic - Component Cooling Water System 43
- 108014, Sheet 6A Piping Schematic - Component Cooling Water System 30
- 108014, Sheet 7 Piping Schematic - Component Cooling Water System 36
- 108014, Sheet 8 Piping Schematic - Component Cooling Water System 41
- 108014, Sheet 9
- Piping Schematic - Component Cooling Water System 46
- 108016, Sheet 17 Make-up Water System (Unit 2) 50
- 108017, Sheet 1 Piping Schematic Salt Water Systems 72
- 108017, Sheet 3 Diablo Canyon Power Plant Salt Water System Unit 2 79
- 108017, Sheet 3 Saltwater System 79
- 108017, Sheet 3B Diablo Canyon Power Plant Salt Water System 82
- 108023, Sheet 3 Ventilation and Airconditioning system 82
- 333354 Schematic Diagram Ground Detector 125/250 Volt
- DC Buses 9
- 437530 Single Line Meter & Relay Diagram 12kV Startup System 38
- 437533 Single Line Meter & Relay Diagram 4160 V System 43
Drawings
- Number Title Revision / Date
- 437533, Sheet 1 Electrical Single line, Single line Meter and Relay Diagram, 4160 Volt System
- 437541 Single Line Meter and Relay Diagram 480 Volt System Bus Sections 14D and 14E
- 437583, Sheet 1 Electrical Schematic Diagram, Auxiliary Feedwater system
- 25
- 437594 Schematic Diagram Auxiliary Salt Water Pump 33
- 437595, Sheet 1 Electrical Schematic Diagram, Charging Pumps 11 &
- 33
- 437629, Sheet 1 Electrical Schematic Diagram, Motor Control Center transformer
- 437641 Schematic Diagram Screen Drive System 17
- 437666, Sheet 1 Electrical Schematic Diagram, 4KV Diesel Generator and Associated Breakers
- 441219 Single Line Diagram 12/4.16kV System 18
- 441220 Single Line Diagram for Station Auxiliaries 28
- 441228 Single Line Meter & Relay Diagram, 4160 V System Bus section "D" & "E"
- 441229 Single Line Meter and Relay Diagram 4160 Volt System Bus Section "F" 20
- 441229, Sheet 1 Electrical Single Line Meter and Relay Diagram, 4160 V System Bus Section "F"
- DG 23
- 441230 Single Line Meter & Relay Diagram 4160 V System Bus Section "G" & "H" 31
- 441231 Single Line Meter & Relay Diagram 480 Volt System Bus Sections 21D & 21E
- 441237 Single Line Meter and Relay Diagram 480 Volt System Bus Section 2F
- 441237, Sheet 1 Electrical Single line Meter and Relay Diagram, 480 Volt System Bus Section 2F
- 441238, Sheet 1
- Single line Meter & Relay Diagram, 480 Volt System Bus Section 2G
- 441239, Sheet 1
- Single line Meter & Relay Diagram, 480 Volt System Bus Section 2H
Drawings
- Number Title Revision / Date
- 441240 Single Line Meter and Relay Diagram 125V D.C.
- System 43
- 441240, Sheet 1 Electrical Single line Meter and Relay Diagram, 125V D.C. System
- 441286 Logic Diagram 4160 Volt Bus Section "F" Automatic Transfer 11
- 441287 Schematic Diagram Auxiliary Salt Water Pumps 28
- 441310, Sheet 1
- Electrical Schematic Diagram, Residual Heat Removal Motor Operated Valves
- 441311 Schematic Diagram Component Cooling Water Pumps 27
- 441313, Sheet 1 Electrical Schematic Diagram, Containment Fan Coolers 35
- 441313, Sheet 2 Electrical Schematic Diagram, Containment Fan Coolers, No. 21, 23, 24 & 25
- 441339 Bus Potential and Synchronizing 4160 V System 11
- 441340 Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H
- 441352 Schematic Diagram 4160 Volt Bus Section "F" Automatic Transfer
- 441352, Sheet 1 Electrical Schematic Diagram' 4160V Bus Section "F" Automatic Transfer
- 441359 Schematic Diagram 4kV Diesel Generators Auxiliary Motors 22
- 441363 Schematic Diagram Motor Control Center Transformer
- 441364 Schematic Diagram Motor Control Center Transformer
- 441368 Schematic diagram 125 Volt DC System 22
- 441457 Diagram of Connections 125 Volt Battery No. 22 and
- DC Distribution Panel No. 22
- 441462, Sheet 1 Electrical Diagram of Connections, Penetration No. 3E, 9E, 15E, 29E, 32E
Drawings
- Number Title Revision / Date
- 441473, Sheet 1 Electrical Diagram of Connections, Penetration No. 16E 16
- 441493 Diagram & Panel Schedule Lighting Distribution 76
- 448570 Electrical Wiring Diagram, 4160 Volt Switchgear Bus
"F" Cell 8
- 448572 Electrical Wiring Diagram, 4160 Volt Switchgear Bus
"F" Cell 10
- 448573 Electrical Wiring Diagram, 4160 Volt Switchgear Bus "F" Cell 11
- 451805 Single Line Diagram Main Control Board 2VB1 &
2VB2 Fuse Panels
- 498123 Schematic Diagram Stand-By Start-Up Transformer No. 11 Cooling and Local Annunciator
- 498124 Schematic Diagram Stand-By Start-Up Transformer No. 11 Load Tap Changer
- 500788, Sheet 1 Electrical Schematic Diagram, Main Annunciator Windows
- PK 1817 -
- PK 1923
- 500800 Functional Diagram Reactor - Turbine - Generator Protection
- 502110 Single Line Diagram 500/230/25/12/4.16kV Systems 21
- 502669, Sheet 1 Electrical Diagram of Connections, Above elevation 140' - 0" Area G
- 663030-61 PG&E Diablo Canyon Unit 1&2 Auxiliary Saltwater Pump Curve May 24, 1989
- 663219 4 Inch - Limitorque 150 lb. Gate Valve
- 17
- 663219, Sheet
- 430 Piping - 14 inch Motor Operated Gate Valve Assembly 16
- 663393, Sheet 42 Electrical Wiring Diagram, ASL and
- ASL-R Transformer
- FIGURE 9.2-2 Arrangement of Intake Structure September 12, 1998 FIGURE 9.2-3 Arrangement of Auxiliary Saltwater System Piping September 12, 1998
Procedures
- Number Title Revision / Date AD13.DC1 Control of the Surveillance Testing Program 43 AD13-ID4 Post Maintenance Testing 20
- AD13-ID4 Post Maintenance Testing 23A
- AD4.ID1 Housekeeping 14
- AD9.DC2 Purchase Classification and Documentation Requirements
- HI-LO 11
- AR PK11-21 High Radiation 31
- AR PK13-01 DCPP Annunciator Alarm Response - Bar Rack/Screens
- LVL 22 AR PK18-22
- Annunciator Response 480 V Bus 2F 13
- AR PK19-17 U1 12kV SU Transf 11
- AR PK20-04 U1 SU Transf 11, 12, or 21 Local Annun 14
- CF3.ID22 Minor Modification Process 1
- CF3.ID4 Design Calculations 22
- CF3.ID9 Design Change Development 50A
- CF4.ID10 Non-Design Modifications (N-MOD) 25
- CF5.ID2 Control of Material in Storage 13
- DCM No. T-19 Electrical Separation and Isolation 12 DCM T-22 Electrical Cable, Termination and Raceway 11
- EDDG-005 Fuse Control Program 0
- EQ File
- IH-07 System Component Evaluation Worksheet - Limitorque Valve Actuators
- ER1.ID1 Equipment Reliability Process 4A
- MA1.DC54 Conduct of Maintenence 10
- MA1.ID27 Preventive Maintenance Program 1 ME E-50.30B Agastat Type ETR Timing Relay Maintenance 26
Procedures
- Number Title Revision / Date ME E-50.61 Basler Type
- BE1-27 Medium Inverse Undervoltage Relay Maintenance
- MP E-35.2 Transformer Temperature Probe Calibration 11 MP E-50.1 Thermal Overload Relay and Cubicle Maintenance 48
- MP E-52.1 480 Volt Switchgear Maintenance 30
- MP E-53.10A Preventative Maintenance of Limitorque Motor Operators
- MP E-53.10A1 Low Impact External Inspection of Limitorque Motor Operators
- MP E-53.10N Limitorque SMB 0, 1, 2, and 3 Overhaul 25 MP E-53.10R Augmented Stem Lubrication for Limitorque Operated Valves 6 MP E-53.10S Limitorque Swap-Out and Switch Settings 12 MP E-57.11A Preparations for Working on Potentially Energized Load Centers and Transformers
- MP E-63.1C Overhaul of 4KV and 12KV Magna-Blast Circuit Breaker 5 MP E-63.3C Maintenance of 4 and 12 KV Switchgear 30 MP E-63.6A Maintenance of SF6 4kV Circuit Breakers 24 MP E-64.6A Maintenance of ABB K-line Circuit Breaker 41
- 2 Calibration
- 603 Calibration
- O-23 Operating Instructions for Reliable Transmission Service to DCPP
- 2.2
- OM4.ID14 Notification Review Team (NRT) 26
- OM7 Corrective Action Program 6
- OM7.ID1 Problem Identification and Resolution 47
- OM7.ID1 Problem Identification and Resolution 48
- OM7.ID12 Operability Determination 27
Procedures
- Number Title Revision / Date
- OM7.ID12 Operability Determination 29
- OM7.ID12 Operability Determination 34
- OP
- AP-1 Excessive Reactor Coolant System Leakage 22
- OP
- AP-11 Malfunction of Component Cooling Water 32
- OP E-5 Auxiliary Saltwater System 9
- OP E-5:I Auxiliary Saltwater - Make Available 35 OP E-5:II Auxiliary Saltwater System Two CCW Heat Exchanger Operation
- OP F-2:VII Alternate Makeup Water Sources to the CCW System 8A OP H-2:I Operating Procedure - Containment Fan Cooler Units - Make Available and System Operation
- OP J-2:VIII
- Guidelines for Reliable Transmission Service for DCPP 27 OP K01014 Sealed Component Checklist for Backup Regulating Transformer TRY -24 (NORMAL Supply)
- OP K-10 Systems Requiring Sealed Component Checklists 39 OP K10B2 Sealed Component Checklist for Containment Manual Isolation Components Outside Containment
- OP K10F Sealed Component Checklist for Auxiliary Saltwater System 10 OP K10G1 Sealed Component Checklist for ECCS Modes 1, 2 and
- 25 OP O-28 Intake Management 18
- OP1.DC16 Control of Plant Equipment Not Required by the Technical Specification
- 2b
- OP1.DC20 Sealed Components 20
- OP1.ID2 Time Critical Operator Action 8A
- STP 1-1C Routine Weekly Checks Required by licenses 89A STP I 1A Routine Shift Checks Required By Licenses 133 STP I-1B Routine Daily Checks Required By Licenses 124 STP I-1C Routine Weekly Checks Required by Licenses 89A STP M 31 Vital Switchgear Appendix R Circuit Isolation Test 1
Procedures
- Number Title Revision / Date STP M-109 Test of Back-Up Air Accumulator System to
- FCV-602, CCW Heat Exchanger No. 1 Saltwater Inlet Valve
- STP M-110 Test of Back-Up Air Accumulator System to
- FCV-603, CCW Heat Exchanger No. 2 Saltwater Inlet Valve
- STP M-13F 4KV Bus Non-Si Auto Transfer Test 57 STP M-26 ASW System Flow Monitoring 31 STP M-31 Vital Switchgear Appendix R circuit isolation Test 1 STP M-31 Vital Switchgear Appendix R Circuit Isolation Test 3
- STP M-51 Routine Surveillance Test of Containment Fan Cooler Units 24 STP M-8B Leak Rate Testing of Electrical Penetrations 6 STP M-93A Refueling Interval Surveillance - Containment Fan Cooler System
- STP M-93A Refueling Interval Surveillance - Containment Fan Cooler System
- STP M-9G Diesel Generator 24-Hour Load Test and Hot Restart Test 57 STP P-ASW-11 Routine Surveillance Test of Auxiliary Saltwater Pump
- 1-1 33 STP P-ASW-A
- Performance Test of Auxiliary Saltwater Pumps 30 STP P-ASW-A11 Comprehensive Test of Auxiliary Saltwater Pump 1-1 10
- STP P-CCW 22 Routine Surveillance Test for Component Cooling Water Pump 2-2
- STP P-CCW-A Performance Test of Component Cooling Water Pumps 11 STP P-CCW-A22 Comprehensive Pump Test for Component Cooling Water Pump 2-2
- STP R-10 Reactor Coolant System Leak Evaluation 12 STP R-10C Reactor Coolant System Water Inventory Balance 46 STP V-13A CCW Flow Balancing 17 STP V-2 Pacific Gas and Electric Company Nuclear Power Generation Diablo Canyon Power Plant Surveillance Test Procedure
Procedures
- Number Title Revision / Date STP V-2D3 Pacific Gas and Electric Company Nuclear Power Generation Diablo Canyon Power Plant Surveillance Test Procedure
- STP V-2D3 Excersizing and Position Verification of Vavles 8701 and
- 8702 7 STP V-2D3 Exercising and Position Verification of Valves 8701 and
- 8702 March 31, 2013 STP V-2D3 Exercising and Position Verification of Valves 8701 and
- 8702 May 18, 2011 STP V-2D3 Exercising and Position Verification of Valves 8701 and
- 8702 October 20, 2016STP V-3F4 Exercising Valve
- FCV-603 CCW Hx No. 2 Saltwater Inlet 22 STP V-3T6 Exercising Containment Ventilatlon Isolation Valves
- FCV-662,
- FCV-663 and
- FCV-664
- STP V-682B Penetrations 82B and 82C Containment Isolation Valve Leak Testing
- TS3.ID2 Licensing Basis Impact Evaluations 40A
- TS5.ID1 System Engineering Program 25
- U1 OP J-9:IV Performing a Battery Equalizing Charge 9A
- U1 OP L-4 Normal Operation at Power 89 U1&2 MP E-
- 50.33A Westinghouse Type
- SSV-T One Unit Voltage Relay Maintenance
- U1&2 MP E-
- 50.62 Basler
- BE1-GPS100 Relay Maintenance 8 U1&2 MP E-
- 57.15 Maintenance & Calibration of Ammeters Voltmeters, Frequency Meters & Tachometers
Procedures
- Number Title Revision / Date U1&2 MP E-
- 64.1B Molded Case Circuit Breaker Exercise and Maintenance 15A U1&2 STP M-
- 84F
- CIAX-F and
- CIAX2-F Operations Test 10 U2 EOP
- ECA-0.0 Loss of all Vital AC Power 24 U2 MP E-62.3 Tap Changer Functional Test for Standby-Startup Transformer 21
- U2 OP
- AP-26 Loss of Offsite Power 18 U2 OP J-2:V Backfeeding the Unit from the 500 kV System 14
- U2 STP M-75F 4kv Vital Bus F Undervoltage Relay Calibration 4
- XI1.ID4 NRC Communications and Inspection Support 6
Miscellaneous
- Number Title Revision / Date 64136746-0100 Performance Test of Component Cooling Water Pumps November 3, 2014
- 663022-76 Traveling Screen Vendor Technical Manual August 22, 1997
- 663213-55 Installation, Operation and Maintenance Instructions for Component Cooling Water Pumps Unit 2
- Appendix B Systems Interaction Program Appendix B Source Acceptance Criteria
- CDBI Self-Assessment DCPP 2016 Component Design Basis Inspection (CDBI) Self-Assessment, Notification
- 50795610 December 17, 2015
- DC 663030-17 Instruction Manual -
- ASW 22
- DC-2-14-M-PP-CCWP2 Component Cooling Water Pump 2-2 August 20, 1985
Miscellaneous
- Number Title Revision / Date
- DC2-EP-4328 Installation of Vacuum Relief System on Each Aux.
- Saltwater Line
- DCM NO. S-17B Design Criteria
- Memorandum DCM S-17B Auxiliary Saltwater System
- 21A DCM S-14
- Component Cooling Water System 28
- DCN 2000000751 Unit 1 Traveling Screen Speed Control Upgrade August 2, 2011
- DCN 2000000752
- Replacement of Existing Travelling Screen and Screen Wash Controls Unit 1&2 August 2, 2011 DCP M-050284 CCW Surge Tank Pressurization 0 DCPP UFSARY DCPP UNITS 1&2 FSAR UPDATE 22
- IST PROGRAM
- PLAN Inservice Testing Program Plan - Fourth Ten Year Interval 0 IST PROGRAM
- PLAN Inservice Testing Program Plan - Third Ten Year Interval 0 LBIE Screen Applicability DCP M-49948 Installations of Lube Oil Sample Ports on Safety Related and Non-Safety Related Pumps, Motors and Gearboxes January 23, 2008LER 1-88-032-00 Improper Design Change Package for Auxiliary Saltwater System Pump Impeller Replacement Due to
- Personnel Error March 29, 1989 Log Entries Logs For high DP traveling screen start Various M000096 Lube oil Sample Points 12 M-09383 John Crane Mechanical Seal - Component Cooling Water Pump
- MR-APP C Appendix C Mapping of Maintenance Rule Performance Criteria Functions From Scoping Functions
- RPE 8000001132
- DCI , Au x iliary Salt Water Pump (ASP) Parts , Sulzer Bingham , HydoAire Services , Inc., etc. 10 SAPN
- 50501007
- SISI Manual Seismically Induced Systems Interaction Manual Unit 1 Screens dp Traveling Screen DP Plot and Operator logs for traveling screens Various Dates
Miscellaneous
- Number Title Revision / Date A-005 Component Cooling Water Data Sheet January 25, 2016
- Component Cooling Water Data Sheet February 1, 2016
- Component Cooling Water Data Sheet February 8, 2016
- Component Cooling Water Data Sheet February 16, 2016 A-005 Component Cooling Water Data Sheet February 22, 2016 A-006
- Component Cooling Water Data Sheet January 25, 2016
- Component Cooling Water Data Sheet February 1, 2016
- Component Cooling Water Data Sheet February 8, 2016
- Component Cooling Water Data Sheet February 16, 2016 A-006
- Component Cooling Water Data Sheet February 22, 2016 B-2 System Training Guide -Residual Heat Removal System 20
- DCL-95-135 PG&E Letter
- DCL 95-135: 10
- CFR 50.59 Report of Facility Changes, Procedure Changes, Tests, and Experiments for the Report Period May 3, 1993 -
- October 28, 1994 June 16, 1995 DCM S-10 Residual Heat Removal System 20
- ECC-0001 Critical Component List - Limitorque Operator
- SMB-1 7 H-2 System Training Guide - Containment Fan Coolers 18
- Material D772854 Stockable Materials - Material D772854.
- Limitorque Limit Switch Compartment Cover
- NA8281O5 Unit 1R15 Motor Operated Valves Trending Study.
- RHR Valve 8701 Last Three Diagnostic Test Reports with Trend Data
- RHR Valve 8702 Last Three Diagnostic Test Reports with Trend Data
- STI_Listu3r03 Surveillance Test Intervals List, Revision 3 November 19, 2015 STP V-13A Surveillance - CCW Flow Balancing March 2013
Miscellaneous
- Number Title Revision / Date
- TES 420DC 96-
- 161 Diablo Canyon Power Plant (DCPP) Molybdate Blend Monitoring, Evaluation of Corrosion Coupons Exposed in the Closed Cooling Water Systems (CCW) Unit 1 and Unit 2, and in the Intake Cooling Water System (ICW)
- Unit 2 October 30, 1996
- Unit 2 System
- 03B System Health Report - Auxiliary Feedwater, Fourth Quarter Report, 2015 December 31, 2015 Unit 2 System 10 System Health Report - Residual Heat Removal System, Fourth Quarter, 2015 December 31, 2015 Unit 2 System 14 System Health Report - Component Cooling Water, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 17A System Health Report - Saltwater, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 17B System Health Report - Auxiliary Saltwater, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 23-3 System Health Report - Control Room and Containment Ventilation , Fourth Quarter, 2015 December 31, 2015 1-LCV-112B Valve Stroke Time Data February 21, 1999 - Feb. 25,
- 2014
- 1-LCV-112C Valve Stroke Time Data October 14, 2010
- October 16, 2015 60431-95N Dedication / Acceptance Basis for Class 1E Retrofit circuit breakers 4KV, 350MVA for Diablo Canyon Power Plant units 1 & 2 Pacific Gas and Electric Company
- 64136746-0100 Performance Test of Component Cooling Water Pumps November 3, 2014
- 663022-76 Traveling Screen Vendor Technical Manual August 22, 1997
- 663213-55 Installation, Operation and Maintenance Instructions for Component Cooling Water Pumps Unit 2
- 663219-539 Maintenance Manual for Masoneilan Control Valves 29 A-005 Component Cooling Water Data Sheet January 25, 2016A-005
- Component Cooling Water Data Sheet February 1, 2016 A-005 Component Cooling Water Data Sheet February 8, 2016
Miscellaneous
- Number Title Revision / Date A-005
- Component Cooling Water Data Sheet February 16, 2016 A-005 Component Cooling Water Data Sheet February 22, 2016 A-006
- Component Cooling Water Data Sheet January 25, 2016
- Component Cooling Water Data Sheet February 1, 2016 A-006
- Component Cooling Water Data Sheet February 8, 2016 A-006
- Component Cooling Water Data Sheet February 16, 2016 A-006
- Component Cooling Water Data Sheet February 22, 2016 A0712687 Evaluation of NRC
- IN 2007-036, Emergency Diesel Generator Voltage Regulator problem February 6, 2008
- ANSI/IEEE
- C37.09-1979 IEEE Standard Test Procedure for AC High Voltage Circuit Breakers rated on a Symmetrical Current Basis October 15, 1979Appendix B Systems Interaction Program Appendix B Source Acceptance Criteria
- B-2 System Training Guide -Residual Heat Removal System 20 B-35 Notification Review March 23, 2015 CCW PUMP TEST DATA IST data for 2-2 CCW pump - approximately last years Various Dates CHRON
- 191107 Review of Westinghouse CFCU Backdraft Damper
Calculations
- June 8, 1992 Chron
- 219049 Meeting minutes from DCPP Breaker Project Kick off meeting March 29, 1994
- CVCS-1-LCV-112B Diagnostic Testing MP E-53.10V1 February 25, 2014
- CVCS-1-LCV-112B External Inspection MP E-53.10A1 April 25, 2014
- CVCS-1-LCV-112C Diagnostic Testing MP e-53.10V1 December 29, 2015
- CVCS-1-LCV-112C External Inspection MP E-53.10A1 March 11, 2014
Miscellaneous
- Number Title Revision / Date
- DC 663030-17 Instruction Manual -
- ASW 22
- DC 663216-66-1 Vortex Suppression, Refueling, Condensate, and Fire Water Storage Tanks August 2, 2009
- DC-2-14-M-PP-CCWP2 Component Cooling Water Pump 2-2 August 20, 1985
- DC2-EP-4328 Installation of Vacuum Relief System on Each Aux.
- Saltwater Line
- DCL-95-135 PG&E Letter
- DCL 95-135: 10
- CFR 50.59 Report of Facility Changes, Procedure Changes, Tests, and Experiments for the Report Period May 3, 1993 -
- October 28, 1994 June 16, 1995 DCM NO. S-17B Design Criteria
- Memorandum DCM S-17B Auxiliary Saltwater System
- 21A DCM S-10 Residual Heat Removal System 20 DCM S-14
- Component Cooling Water System 28
- DCN 2000000751 Unit 1 Traveling Screen Speed Control Upgrade August 2, 2011
- DCN 2000000752
- Replacement of Existing Travelling Screen and Screen Wash Controls Unit 1&2 August 2, 2011 DCP M-050284 CCW Surge Tank Pressurization 0 DCPP UFSARY DCPP UNITS 1&2 FSAR UPDATE 22
- EA-15-040 Diablo Canyon Power Plant - NRC Integrated Inspection Report 05000275/2015002 and
- 05000323/2015002 August 7, 2015
- ECC-0001 Critical Component List - Limitorque Operator
- SMB-1 7 FCT 7*1944 Revise Drawing
- 441237 to correct the discrepancy between Electrical Calcs and Electrical design dwgs December 20, 2012 H-2 System Training Guide - Containment Fan Coolers 18
- IST PROGRAM
- PLAN Inservice Testing Program Plan - Fourth Ten Year Interval 0 IST PROGRAM
- PLAN Inservice Testing Program Plan - Third Ten Year Interval 0
Miscellaneous
- Number Title Revision / Date
- LBIE Screen Applicability DCP
- M-49948 Installations of Lube Oil Sample Ports on Safety Related and Non-Safety Related Pumps, Motors and Gearboxes January 23, 2008LER 1-88-032-00 Improper Design Change Package for Auxiliary Saltwater System Pump Impeller Replacement Due to
- Personnel Error March 29, 1989 Log Entries Logs For high DP traveling screen start Various M000096 Lube oil Sample Points 12
- M-09383 John Crane Mechanical Seal - Component Cooling Water Pump Material D772854 Stockable Materials - Material D772854.
- Limitorque Limit Switch Compartment Cover
- MP E-53.10A PM of Limitorque Motor Operators
- 37 MP E-53.10A Preventive Maintenance of Limitorque Motor Operators 37
- MP E-53.10R Augmented Stem Lubrication - Limitorque 6
- MP M-5128 Actuator Maintenance for Masoneilan Actuator Sizes 9, 11, 13, 15 and 18
- MR-APP C Appendix C Mapping of Maintenance Rule Performance Criteria Functions From Scoping Functions
- NA8281O5 Unit 1R15 Motor Operated Valves Trending Study.
- NRC Letter to DCPP Diablo Canyon Power Plant, Units Nos.1&2 - Issuance of Amendments Regarding Revision to Technical Specification (TS) 3,8,1, "AC Sources - Operating"
(TAC Nos. MF3826 AND MF3827)
- July 1,2015
- OE 36324 Essential Power Breaker Lost Control Power Unexpectedly Due To A Failed Breaker Subcomponent
(Charging Spring Motor)
- March 6, 2012 PG&E Letter
- DCL-14-018 License Amendment Request 14-01 Revision to Technical Specification 3.8.1, "AC Sources - Operating" March 27, 2014 RHR Valve 8701 Last Three Diagnostic Test Reports with Trend Data
- RHR Valve 8702 Last Three Diagnostic Test Reports with Trend Data
- RPE 8000001132
- DCI , Au x iliary Salt Water Pump (ASP) Parts , Sulzer Bingham , HydoAire Services , Inc. etc. 10
Miscellaneous
- Number Title Revision / Date SAPN
- 50501007
- SISI Manual Seismically Induced Systems Interaction Manual
- STI_Listu3r03 Surveillance Test Intervals List, Revision 3 November 19, 2015 STP I-1D Surveillance Test January 2016
- STP M-105 Test of Backup Nitrogen Accumulator System to Pressurize
- PCV-455C
- STP M-106 Test of Backup Nitrogen Accumulator System to Pressurize
- PCV-456
- STP V-13A Surveillance - CCW Flow Balancing March 2013 STP V-13A Surveillance - CCW Flow Balancing October 2014 STP V-21 Charging and Letdown Valves 10 STP V-2I1 Surveillance Test October 2015
- STP V-2T1 Pressurizer Power Operated Relief Valves
- 9
- STP V-3J2 Exercising Pressurizer Power Operated Relief Valves
- PVC-455C, 456 and 474.
- LCV 112B and
- LCV-112C 2 STP V-I1 Charging and Letdown Valves 9A
- STP-1-1D Routine Monthly Checks Required by Licensees 88
- TES 420DC 96-
- 161 Diablo Canyon Power Plant (DCPP) Molybdate Blend Monitoring, Evaluation of Corrosion Coupons Exposed in the Closed Cooling Water Systems (CCW) Unit 1 and Unit 2, and in the Intake Cooling Water System (ICW)
- Unit 2 October 30, 1996
- Unit 1 Screens dp Traveling Screen DP Plot and Operator logs for traveling screens Various Dates Unit 2 System
- 03B System Health Report - Auxiliary Feedwater, Fourth Quarter Report, 2015 December 31, 2015 Unit 2 System 10 System Health Report - Residual Heat Removal System, Fourth Quarter, 2015 December 31, 2015
Miscellaneous
- Number Title Revision / Date Unit 2 System 14 System Health Report - Component Cooling Water, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 17A System Health Report - Saltwater, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 17B System Health Report - Auxiliary Saltwater, Fourth Quarter, 2015 December 31, 2015 Unit 2 System
- 23-3 System Health Report - Control Room and Containment Ventilation , Fourth Quarter, 2015 December 31, 2015
- Vendor Documents Number Title Revision / Date 6009838-207-1 Maintenance Manual of Yaskawa Circuit Breakers for PG&E April 16, 1997
- 660030, Sheet 61 Aux. Saltwater Pumps June 2 , 1998
- 663022, Sheet 95 Envirex Products Operation & Maintenance Manual 1
- 663030, Sheet 17 Bingham-Willamette Co. Aux. Saltwater Pumps 22
- 663030, Sheet 83 Motor Outline Drawing 6 663079-110 Performance curves for motor Shop orders 17565 LN with Air gaos September 15, 1998
- 663079-51 Reactor Containment fan cooler - Westinghouse Technical Manual
- 663102, Sheet 24 Electrical Relay Boards 18
- 663213, Sheet 22 Comp Cooling Water Pump Motor Outline 10
- 663213, Sheet 55 Installation, Operation, & Maintenance Instructions for Component Cooling Water Pumps
- 663332, Sheet 220 Instruction Manual for Generator Protection System
- BE1-GPS100
- 663332, Sheet 80 4kV and 12kV Switchgear 27
- 663332, Sheet 221 Instruction Manual for Undervoltage, Overvoltage, and Under/Overvoltage Relays
- BE1-27,
- BE1-59, and BE1-
- 27/59 1
- 663336, Sheet 20 Instructions for Type W Control Centers 5
- Vendor Documents Number Title Revision / Date
- 663345, Sheet
- 141 125VDC Vital Panels 1
- 663345, Sheet. 6 125VDC Distribution Panel No. 22 8
- 663347, Sheet 33 Delta-Star Metal Enclosed Bus Motor Operated Disconnect Switch
- 663393, Sheet 80 NLI Safety Related Type W Motor Control Center Cubicles 6
- DC 663079-51 Reactor Containment Fan Cooler 31
- DC 663219-619 Instruction Manual for Installation, Operation, and Maintenance of 14" Motor Operated Gate Valve
- DC 663219-629 Limitorque Type SMB - Instruction and Maintenance Manual - Installation Book
- DC 663336-6-2 Instruction for Temperature Indicator Hottest Spot Dial Type, Three Switch, Electrically Isolated Bulb for Type
- ASL Transformer October 1971
- DC-663173 Fisher Controls Company - Type 7600 Butterfly Control Valve Body.
- DC-663303 6-1 Instruction Book for Westinghouse Type ASL Core Form Power center Transformer Class AA/FA 1000/1333
- KVA 4160 V Delta-480 Y Volt Three Phase, 60 Hz
- 150 degree C Rise August 8, 1972
- Design Basis Documents Number Title Revision DCM S-14 Component Cooling Water System 28 DCM S-17B Auxiliary Saltwater System -
- DCM S-61B 500-kV and 230-kV Systems 16
- DCM S-62 12-kV System 16
- DCM S-63 4160 Systems 17
- Design Basis Documents Number Title Revision DCM S-64 480V System 12 DCM S-67 125/250 Volt Direct Current System 15
- DCM T-18 Electrical System Protection 13A
- DCM T-22 Electrical Cable, Termination and Raceway 11
- DCM T-23 Miscellaneous Electrical Devices 5A
- T-19 Electrical Separation and Isolation 12
- System Health Reports Number Title Date System Health Report Diablo Canyon System Health Report (10/1/2015 to 12/31/2015) System 17b Auxiliary Saltwater Unit 2
- January 11, 2016System Health Report Diablo Canyon System Health Report (10/1/2015 to 12/31/2015) System 17b Auxiliary Saltwater Unit 1
- January 11, 2016System Health Report Diablo Canyon System Health Report (10/1/2015 to 12/31/2015) System 14 Component Cooling Water
- Unit 2 January 11, 2016System Health Report Unit 2, System 62, 12kV January 11, 2016System Health Report Unit 2, System 69, 230kV January 11, 2016System Health Report Unit 2, Systems 64A/B, 480V Vital & Non-Vital January 11, 2016System Health Report Unit 2, Systems 673A/B, 4kV Vital & Non-Vital January 11, 2016System Health Report Unit 2, Systems 67A/B, 125VDC Vital & Non-Vital January 11, 2016
- System Training Guides Number Title Date E-5 Salt Water Systems Training Guide May 7, 2012 F-2 CCW System Training Guide April 29, 2013
Notifications
- 50300606
- 50491644
- 50620750
- 50587273
- 50373271
- 0549975
- 50830482
- 50534891
- 50629148
- 50656852
- 50291751
- 50828426
- 50595631
- 50681168
- 50381215
- 50358136 50231071-214
- 50608110 A0659098
- 50321527
- 50431909
- 50632130
- 50568523
- 50330692
- 50676139
- 50455238
- 50662593
- 50570469
- 50501007
- 50681486
- 50517064
- 50503166
- 50811791
- 50814814
- 50540447
- 50532192
- 50576508
- 50627543
- 50807847
- 50702101
- 50545886
- 50546077
- 50286329
- 50538388
- 50663465
- 50554741
- 50604297
- 50658301
- 50627627
- 50386803
- 50568258
- 50560220
- 50269363
- 50540604
- 50706699
- 50595604
- 50809805
- 50811253
- 50635014
- 50635017
- 50596378
- 50455238
- 50662593
- 50570469
- 50501007
- 50596454
- 50495384
- 50486697
- 50595863
- 50276427
- 50607511
- 50662776
- 50595473
- 50635018
- 50276427
- 50613228
- 50664721
- 50671890
- 50406133
- 50661719
- 50631370
- 50626989
- 50534892
- 50698514
- 50604534
- 50664410
- 50570744
- 50807849
- 50621835
- 50306109
- 50664723
- 50760568
- 50447137
- 50662235
- 50665755
- 50670046
- 50710844
- 50231547
- 50622084
- 50688120
- 50681486 A0411052
- 50455129 N0001391 A0528007
- 50797891
- 50641515
- 50603907
- 50596454
- 50595324
- 50807943
- 50573621
- 50826105 A0419055
- 50116231
- 50833428
- 50477565
- 50662501
- 50665898
- 50833948 A0324392
- 50430900
- 50618155
- 50371576
- 50611955
- A0326480
- 50541523
- 50614215
- 50370944
- 50658850
- A0326851
- 50250049
- 50581356
- 50711542
- 50504168
- A0345486
- 50381172
- 50584794
- 50708628
- 50666965
- A0350041
- 50392548
- 50600263
- 50683171
- 50451797
Notifications
- A0430641
- 50467570
- 50494229
- 50572850
- 50577620 A0436537
- 50417986
- 50659277
- 50682630
- 50451576 A0504915 A0528008 A0505071 A0211602 A0199950
- A0535671
- 50584579
- 50700200
- 50673779 A0314487
- A0716463
- 50700052
- 50822636
- 50537323 A0205747
Notifications
(generated during inspection)
- 50833428
- 50834112
- 50834259
- 50835432
- 50836297
- 50838195
- 50834130
- 50834558
- 50835906
- 50836436
- 50833948
- 50833957
- 50834545
- 50835945
- 50836439
- 50833972
- 50834163
- 50835394
- 50835949
- 50836490
- 50834034
- 50834333
- 50835416
- 50836360
- 50836630
- 50836636
- 50836747
- 50837032
- 50838307
- 50839137
- 50836637
- 50836816
- 50838071
- 50838381
- 50839164
- 50836607
- 50836820
- 50838195
- 50838988
- 50836859
- 50836645
- 50836872
- 50838241
- 50839030
- 50839333
Work Orders
- 60038044
- 64136746
- 60041960
- C0202740
- 64096130
- 60063640 64012403-0100
- 64044027
- 64104386
- 64045811
- 60063640-0010 64012403-0200 64044027-0100
- 64104385 64012403-0010
- 60063640-0020 64012403-0300
- 64036577
- 64078368 64002034-0020
- 60065396
- 60064964
- 64014577
- 64014600
- 64014645
- 64005883
- 64034249
- 60083430 64002394-0300 64021013-0100
- 64014600 R0172924
- 64013424 R0242344 R0180547
- 64014650
- 64027789
- 64051113
- 64053313 R0182081
- 64072501 60055360-0030 64012403-0400
- 64021013 64078368-0100
- 64081494 R0242307
- R0182081 R0115538
- C0135888
- 64090893
- 64088052
- 64071952
- 64100631
- 64064575 A0400036 A0352283 A0242552
- 64076563
- 64075043
Work Orders
- A0532210 A0492191
- 64014654 R0108355 A0712687 A0554731
- 64077454
- 64009140 A0666608 A0574886 R0231692 R0242307
- C0200957
- 64013958
- 64033837
- 64063041
- 60076719
- 60075280
- 64065125
- 64068023
- 64009141
- 64085198
- 64048109
- 64081125
- 64065847
- SUNSI Review By:
- TFarnholtz
- Yes
- No
- Publicly Available
- Non-Publicly Available
- Non-Sensitive
- Sensitive Keyword:
- NRC-002 OFFICE RI:DRS/EB1 SRI:DRS/EB1 SRI:DRS/EB1 RI:DRS/EB2 RI:DRS/OB RI:DRS/OB C:DRS/EB1
- NAME JBraisted RKopriva RLatta NOkonkwo MHayes CSteely TFarnholtz SIGNATURE E-mail E-mail E-mail /RA/ E-mail E-mail /RA/ DATE 4/19/16 4/19/16 4/14/16 4/19/16 4/11/16 4/15/16 4/21/16 OFFICE C:DRP/PBA
- NAME JGroom
- SIGNATURE /RA/
- DATE 4/21/16
- Letter to Edward D. Halpin from Thomas R. Farnholtz, dated April 21, 2016
- SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC COMPONENT
- DESIGN BASES INSPECTION REPORT 05000275/2016007 AND