-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.


Sincerely,/RA/ James A. Krafty , Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50
Sincerely,
/RA/ James A. Krafty , Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50
-278 License Nos.
-278 License Nos.


DPR-44 and DPR
DPR-44 and DPR
-56  
-56 Enclosure:
 
===Enclosure:===
Inspection/Activit y Plan  
Inspection/Activit y Plan  


Line 53: Line 52:
Annual Sample - Structural Monitoring Program
Annual Sample - Structural Monitoring Program


1 2, 3 01/29/2018
2, 3 01/29/2018


02/02/2018
02/02/2018
Line 61: Line 60:
RAD MONITORING INSTRU Mod 05
RAD MONITORING INSTRU Mod 05


1 2, 3 03/26/2018
2, 3 03/26/2018


03/30/2018
03/30/2018
Line 71: Line 70:
TRIENNIAL FIRE PROTECTION
TRIENNIAL FIRE PROTECTION


4 2, 3 04/02/2018
2, 3 04/02/2018


04/06/2018
04/06/2018
Line 89: Line 88:
EP EXERCISE INSPECTION
EP EXERCISE INSPECTION


4 2, 3 04/16/2018
2, 3 04/16/2018


04/20/2018
04/20/2018
Line 99: Line 98:
RAD HAZARD & ALARA Mods 01, 02
RAD HAZARD & ALARA Mods 01, 02


1 2, 3 04/23/2018
2, 3 04/23/2018


04/27/2018
04/27/2018
Line 117: Line 116:
ISFSI LOADING CAMPAIGN INSPECTION
ISFSI LOADING CAMPAIGN INSPECTION


2 2, 3 05/14/2018
2, 3 05/14/2018


05/18/2018
05/18/2018
Line 127: Line 126:
OCCUPATIONAL DOSE ASSESSMENT Mod 04
OCCUPATIONAL DOSE ASSESSMENT Mod 04


1 2, 3 05/21/2018
2, 3 05/21/2018


05/25/2018
05/25/2018
Line 137: Line 136:
ACCESS CONTROL, EQUIP PERF, TRAINING
ACCESS CONTROL, EQUIP PERF, TRAINING


3 2, 3 08/06/2018
2, 3 08/06/2018


08/10/2018
08/10/2018
Line 175: Line 174:
REMP Mod 07
REMP Mod 07


1 2, 3 09/17/2018
2, 3 09/17/2018


09/21/2018
09/21/2018
Line 185: Line 184:
Unit 2 ISI
Unit 2 ISI


1 2
2 10/22/2018
10/22/2018


10/26/2018
10/26/2018
Line 196: Line 194:
2/8/2018 5:03:26 PM
2/8/2018 5:03:26 PM


Page 1
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 212: Line 212:
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03


1 2, 3 10/29/2018
2, 3 10/29/2018


11/02/2018
11/02/2018
Line 238: Line 238:
UNIT 2 - LICENSE RENEWAL PHASE 4
UNIT 2 - LICENSE RENEWAL PHASE 4


2 2
2 11/26/2018
11/26/2018


11/30/2018
11/30/2018
Line 247: Line 246:
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)


1 2, 3 12/10/2018
2, 3 12/10/2018


12/14/2018
12/14/2018
Line 287: Line 286:
EQ PROGRAM
EQ PROGRAM


3 2, 3 01/14/2019
2, 3 01/14/2019


01/18/2019
01/18/2019
Line 305: Line 304:
PEACH BOTTOM INITIAL OL EXAM
PEACH BOTTOM INITIAL OL EXAM


5 2, 3 01/28/2019
2, 3 01/28/2019


02/01/2019
02/01/2019
Line 319: Line 318:
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


2 2, 3 03/04/2019
2, 3 03/04/2019


03/08/2019
03/08/2019
Line 351: Line 350:
PB REQUAL INSP WITH P/F RESULTS
PB REQUAL INSP WITH P/F RESULTS


2 2, 3 03/11/2019
2, 3 03/11/2019


03/15/2019
03/15/2019
Line 369: Line 368:
Biennial 2/8/2018 5:03:26 PM
Biennial 2/8/2018 5:03:26 PM


Page 2
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 383: Line 384:
Unit Start End Activity CAC Title Staff Count
Unit Start End Activity CAC Title Staff Count


CYBER MS8 2
CYBER MS8
 
2, 3 03/18/2019
2, 3 03/18/2019


Line 402: Line 404:
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR


4 2, 3 03/25/2019
2, 3 03/25/2019


03/29/2019
03/29/2019
Line 434: Line 436:
RAD EFFLUENTS Mod 06
RAD EFFLUENTS Mod 06


1 2, 3 04/15/2019
2, 3 04/15/2019


04/19/2019
04/19/2019
Line 444: Line 446:
Triennial Heat Sink
Triennial Heat Sink


1 2, 3 05/13/2019
2, 3 05/13/2019


05/17/2019
05/17/2019
Line 454: Line 456:
RAD HAZARD & ALARA Mods 01, 02
RAD HAZARD & ALARA Mods 01, 02


1 2, 3 05/13/2019
2, 3 05/13/2019


05/17/2019
05/17/2019
Line 472: Line 474:
PI&R BIENNIAL
PI&R BIENNIAL


4 2, 3 06/10/2019
2, 3 06/10/2019


06/14/2019
06/14/2019
Line 484: Line 486:
IP 71152B 000747 Problem Identification and Resolution
IP 71152B 000747 Problem Identification and Resolution


Radwaste 1
Radwaste
 
2, 3 07/29/2019
2, 3 07/29/2019


Line 495: Line 498:
Transportation
Transportation


MC&A 1
MC&A
 
2 08/12/2019
2 08/12/2019


Line 506: Line 510:
INSERVICE INSPECTION - UNIT 3
INSERVICE INSPECTION - UNIT 3


1 3
3 10/28/2019
10/28/2019


11/01/2019
11/01/2019
Line 517: Line 520:
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03


1 2, 3 10/28/2019
2, 3 10/28/2019


11/01/2019
11/01/2019
Line 535: Line 538:
2/8/2018 5:03:26 PM
2/8/2018 5:03:26 PM


Page 3
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


Line 551: Line 556:
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03
RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03


1 2, 3 10/28/2019
2, 3 10/28/2019


11/01/2019
11/01/2019
Line 561: Line 566:
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)
RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)


1 2, 3 12/02/2019
2, 3 12/02/2019


12/06/2019
12/06/2019
Line 601: Line 606:
2/8/2018 5:03:26 PM
2/8/2018 5:03:26 PM


Page 4
Page  
of 4
 
of  
 
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.



Revision as of 15:10, 9 May 2019

Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501)
ML18047A006
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/2018
From: Krafty J A
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Krafty J A
Shared Package
ML18046A367 List:
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18047A006 (7)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 2018 Mr. Bryan Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfiel d Road Warrenville, I L 60555 SUBJEC T: ANNUAL ASSESSMENT LETTER FOR PEAC H BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - (REPORT 05000 277/ 20170 06 AND 05000278/2017 006 REPORT 05000277/2017402 AND 05000278/2017402 REPORT 05000277/2017501 AND 05000278/2017501)

Dear Mr. Hanson:

The NRC has completed its end

-of-cycle performance assessment of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Additionally, the NRC plans to conduct Inspection Procedure 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plant and 71003, Post Approval Site Inspection For License Renewal at Unit 2." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the

NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5120 with any questions you may have regarding this letter.

Sincerely,

/RA/ James A. Krafty , Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50

-278 License Nos.

DPR-44 and DPR

-56 Enclosure:

Inspection/Activit y Plan

ML18047A006 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-PubliclyAvailableOFFICE RI/DRP RI/DRP NAME SBarber JKrafty DATE 2/28/18 /218 Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

Annual Sample - Structural Monitoring Program

2, 3 01/29/2018

02/02/2018

IP 71152 000748 Problem Identification and Resolution

RAD MONITORING INSTRU Mod 05

2, 3 03/26/2018

03/30/2018

IP 71124.05

000729 Radiation Monitoring Instrumentation

TRIENNIAL FIRE PROTECTION

2, 3 04/02/2018

04/06/2018

IP 71111.05T

000696 Fire Protection (Triennial)

2, 3 04/16/2018

04/20/2018

IP 71111.05T

000696 Fire Protection (Triennial)

EP EXERCISE INSPECTION

2, 3 04/16/2018

04/20/2018

IP 71114.01

000716 Exercise Evaluation

RAD HAZARD & ALARA Mods 01, 02

2, 3 04/23/2018

04/27/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 04/23/2018

04/27/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

ISFSI LOADING CAMPAIGN INSPECTION

2, 3 05/14/2018

05/18/2018

IP 60855.1

000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

OCCUPATIONAL DOSE ASSESSMENT Mod 04

2, 3 05/21/2018

05/25/2018

IP 71124.04

000728 Occupational Dose Assessment

ACCESS CONTROL, EQUIP PERF, TRAINING

2, 3 08/06/2018

08/10/2018

IP 71130.02

000734 Access Control

2, 3 08/06/2018

08/10/2018

IP 71130.04

000736 Equipment Performance, Testing, and Maintenance

2, 3 08/06/2018

08/10/2018

IP 71130.07

000739 Security Training

2, 3 08/06/2018

08/10/2018

IP 71151 001338 Performance Indicator Verification

2, 3 08/06/2018

08/10/2018

IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations

REMP Mod 07

2, 3 09/17/2018

09/21/2018

IP 71124.07

000731 Radiological Environmental Monitoring Program

Unit 2 ISI

2 10/22/2018

10/26/2018

IP 71111.08G

000701 Inservice Inspection Activities - BWR

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/29/2018

11/02/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 10/29/2018

11/02/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 10/29/2018

11/02/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

UNIT 2 - LICENSE RENEWAL PHASE 4

2 11/26/2018

11/30/2018

IP 71003 000687 Post-Approval Site Inspection for License Renewal

RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/10/2018

12/14/2018

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 12/10/2018

12/14/2018

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 12/10/2018

12/14/2018

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2, 3 12/10/2018

12/14/2018

IP 71124.04

000728 Occupational Dose Assessment

2, 3 12/10/2018

12/14/2018

IP 71151 000746 Performance Indicator Verification

EQ PROGRAM

2, 3 01/14/2019

01/18/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

2, 3 01/28/2019

02/01/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

PEACH BOTTOM INITIAL OL EXAM

2, 3 01/28/2019

02/01/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 02/25/2019

03/08/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION

2, 3 03/04/2019

03/08/2019

IP 71114.02

000717 Alert and Notification System Testing

2, 3 03/04/2019

03/08/2019

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

2, 3 03/04/2019

03/08/2019

IP 71114.05

000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

2, 3 03/04/2019

03/08/2019

IP 71151 001397 Performance Indicator Verification

PB REQUAL INSP WITH P/F RESULTS

2, 3 03/11/2019

03/15/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 2, 3 03/11/2019

03/15/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial 2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

CYBER MS8

2, 3 03/18/2019

03/22/2019

IP 71130.10P

000741 Cyber Security

2, 3 04/01/2019

04/05/2019

IP 71130.10P

000741 Cyber Security

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

2, 3 03/25/2019

03/29/2019

IP 71130.02

000734 Access Control

2, 3 03/25/2019

03/29/2019

IP 71130.05

000737 Protective Strategy Evaluation

2, 3 03/25/2019

03/29/2019

IP 71130.14

000743 Review of Power Reactor Target Sets

2, 3 03/25/2019

03/29/2019

IP 71151 001338 Performance Indicator Verification

RAD EFFLUENTS Mod 06

2, 3 04/15/2019

04/19/2019

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

Triennial Heat Sink

2, 3 05/13/2019

05/17/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

RAD HAZARD & ALARA Mods 01, 02

2, 3 05/13/2019

05/17/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 05/13/2019

05/17/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

PI&R BIENNIAL

2, 3 06/10/2019

06/14/2019

IP 71152B 000747 Problem Identification and Resolution

2, 3 06/24/2019

06/28/2019

IP 71152B 000747 Problem Identification and Resolution

Radwaste

2, 3 07/29/2019

08/02/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

MC&A

2 08/12/2019

08/16/2019

IP 71130.11

000742 Material Control and Accounting (MC&A)

INSERVICE INSPECTION - UNIT 3

3 10/28/2019

11/01/2019

IP 71111.08G

000701 Inservice Inspection Activities - BWR

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019

11/01/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 10/28/2019

11/01/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Peach Bottom

01/01/2018 - 12/31/2019

Unit Start End Activity CAC Title Staff Count

RAD HAZARD, ALARA, AIR ACT CNTRL Mods 01, 02, 03

2, 3 10/28/2019

11/01/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

RAD SAFETY Mods 01, 02, 03,04, PI (OR01, PR01)

2, 3 12/02/2019

12/06/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

2, 3 12/02/2019

12/06/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

2, 3 12/02/2019

12/06/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

2, 3 12/02/2019

12/06/2019

IP 71124.04

000729 Occupational Dose Assessment

2, 3 12/02/2019

12/06/2019

IP 71151 000746 Performance Indicator Verification

2/8/2018 5:03:26 PM

Page

of

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report