IR 05000219/2017006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 48: | Line 48: | ||
Please contact Mr. Matthew Young at 610-337-5205 with any questions you may have regarding this letter. | Please contact Mr. Matthew Young at 610-337-5205 with any questions you may have regarding this letter. | ||
Sincerely,/RA/ David L. Pelton, Acting Director Division of Reactor Projects Docket No. | Sincerely, | ||
/RA/ David L. Pelton, Acting Director Division of Reactor Projects Docket No. | |||
50-219 License No. | 50-219 License No. | ||
DPR-16 | DPR-16 Enclosure: | ||
Inspection/Plan Activity | |||
ML18058A069 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer DPelton DATE 2/28/18 | |||
Oyster Creek | Oyster Creek | ||
| Line 66: | Line 66: | ||
EQ PROGRAM | EQ PROGRAM | ||
1 01/29/2018 | |||
01/29/2018 | |||
02/02/2018 | 02/02/2018 | ||
| Line 75: | Line 74: | ||
000714 Design Bases Assurance Inspection (Programs) | 000714 Design Bases Assurance Inspection (Programs) | ||
02/12/2018 | |||
02/16/2018 | 02/16/2018 | ||
| Line 83: | Line 82: | ||
000714 Design Bases Assurance Inspection (Programs) | 000714 Design Bases Assurance Inspection (Programs) | ||
RADWASTE | RADWASTE | ||
1 02/05/2018 | 1 02/05/2018 | ||
| Line 96: | Line 96: | ||
ACCESS CONTROL, EQUIP PERF, TRAINING | ACCESS CONTROL, EQUIP PERF, TRAINING | ||
1 04/09/2018 | |||
04/09/2018 | |||
04/13/2018 | 04/13/2018 | ||
| Line 105: | Line 104: | ||
000734 Access Control | 000734 Access Control | ||
04/09/2018 | |||
04/13/2018 | 04/13/2018 | ||
| Line 113: | Line 112: | ||
000736 Equipment Performance, Testing, and Maintenance | 000736 Equipment Performance, Testing, and Maintenance | ||
04/09/2018 | |||
04/13/2018 | 04/13/2018 | ||
| Line 121: | Line 120: | ||
000739 Security Training | 000739 Security Training | ||
04/09/2018 | |||
04/13/2018 | 04/13/2018 | ||
| Line 129: | Line 128: | ||
ISFSI OPERATIONAL INSPECTION | ISFSI OPERATIONAL INSPECTION | ||
1 04/23/2018 | |||
04/23/2018 | |||
04/27/2018 | 04/27/2018 | ||
| Line 140: | Line 138: | ||
RAD HAZARD, EXPOSURE CONTROL 01 | RAD HAZARD, EXPOSURE CONTROL 01 | ||
1 | 1 05/21/2018 | ||
05/21/2018 | |||
05/25/2018 | 05/25/2018 | ||
| Line 151: | Line 148: | ||
PI&R BIENNIAL | PI&R BIENNIAL | ||
1 06/11/2018 | |||
06/11/2018 | |||
06/15/2018 | 06/15/2018 | ||
| Line 160: | Line 156: | ||
50.59 PROCESS | 50.59 PROCESS | ||
1 07/23/2018 | |||
07/23/2018 | |||
07/27/2018 | 07/27/2018 | ||
| Line 171: | Line 166: | ||
EP PROGRAM INSPECTION | EP PROGRAM INSPECTION | ||
1 | 1 09/10/2018 | ||
09/10/2018 | |||
09/14/2018 | 09/14/2018 | ||
| Line 180: | Line 174: | ||
000717 Alert and Notification System Testing | 000717 Alert and Notification System Testing | ||
09/10/2018 | |||
09/14/2018 | 09/14/2018 | ||
| Line 188: | Line 182: | ||
000718 Emergency Response Organization Staffing and Augmentation System | 000718 Emergency Response Organization Staffing and Augmentation System | ||
09/10/2018 | |||
09/14/2018 | 09/14/2018 | ||
| Line 196: | Line 190: | ||
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies | 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies | ||
09/10/2018 | |||
09/14/2018 | 09/14/2018 | ||
| Line 204: | Line 198: | ||
UNIT 1 INSERVICE INSPECTION | UNIT 1 INSERVICE INSPECTION | ||
1 | 1 09/24/2018 | ||
09/24/2018 | |||
09/28/2018 | 09/28/2018 | ||
| Line 215: | Line 208: | ||
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 | RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 | ||
1 | 1 09/24/2018 | ||
09/24/2018 | |||
09/28/2018 | 09/28/2018 | ||
| Line 226: | Line 218: | ||
2/21/2018 2:19:59 PM | 2/21/2018 2:19:59 PM | ||
Page | Page | ||
of | |||
of | |||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
| Line 242: | Line 236: | ||
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 | RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04 | ||
1 | 1 09/24/2018 | ||
09/24/2018 | |||
09/28/2018 | 09/28/2018 | ||
| Line 251: | Line 244: | ||
000726 Occupational ALARA Planning and Controls | 000726 Occupational ALARA Planning and Controls | ||
09/24/2018 | |||
09/28/2018 | 09/28/2018 | ||
| Line 259: | Line 252: | ||
000727 In-Plant Airborne Radioactivity Control and Mitigation | 000727 In-Plant Airborne Radioactivity Control and Mitigation | ||
09/24/2018 | |||
09/28/2018 | 09/28/2018 | ||
| Line 269: | Line 262: | ||
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, OR01, PR01 | RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, OR01, PR01 | ||
1 | 1 11/05/2018 | ||
11/05/2018 | |||
11/09/2018 | 11/09/2018 | ||
| Line 278: | Line 270: | ||
000725 Radiological Hazard Assessment and Exposure Controls | 000725 Radiological Hazard Assessment and Exposure Controls | ||
11/05/2018 | |||
11/09/2018 | 11/09/2018 | ||
| Line 286: | Line 278: | ||
000726 Occupational ALARA Planning and Controls | 000726 Occupational ALARA Planning and Controls | ||
11/05/2018 | |||
11/09/2018 | 11/09/2018 | ||
| Line 294: | Line 286: | ||
000727 In-Plant Airborne Radioactivity Control and Mitigation | 000727 In-Plant Airborne Radioactivity Control and Mitigation | ||
11/05/2018 | |||
11/09/2018 | 11/09/2018 | ||
| Line 302: | Line 294: | ||
000728 Occupational Dose Assessment | 000728 Occupational Dose Assessment | ||
11/05/2018 | |||
11/09/2018 | 11/09/2018 | ||
| Line 310: | Line 302: | ||
FORCE-ON-FORCE PLANNING & EXERCISE WEEK | FORCE-ON-FORCE PLANNING & EXERCISE WEEK | ||
1 11/26/2018 | |||
11/26/2018 | |||
11/30/2018 | 11/30/2018 | ||
| Line 319: | Line 310: | ||
000735 Contingency Response - Force-On-Force Testing | 000735 Contingency Response - Force-On-Force Testing | ||
12/17/2018 | |||
12/21/2018 | 12/21/2018 | ||
| Line 329: | Line 320: | ||
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 | RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04 | ||
1 | 1 01/14/2019 | ||
01/14/2019 | |||
01/18/2019 | 01/18/2019 | ||
| Line 338: | Line 328: | ||
000725 Radiological Hazard Assessment and Exposure Controls | 000725 Radiological Hazard Assessment and Exposure Controls | ||
01/14/2019 | |||
01/18/2019 | 01/18/2019 | ||
| Line 346: | Line 336: | ||
000726 Occupational ALARA Planning and Controls | 000726 Occupational ALARA Planning and Controls | ||
01/14/2019 | |||
01/18/2019 | 01/18/2019 | ||
| Line 354: | Line 344: | ||
000727 In-Plant Airborne Radioactivity Control and Mitigation | 000727 In-Plant Airborne Radioactivity Control and Mitigation | ||
01/14/2019 | |||
01/18/2019 | 01/18/2019 | ||
| Line 364: | Line 354: | ||
ACCESS AUTH & CONTROL, SGI CONTROL, FFD | ACCESS AUTH & CONTROL, SGI CONTROL, FFD | ||
1 01/28/2019 | |||
01/28/2019 | |||
02/01/2019 | 02/01/2019 | ||
| Line 373: | Line 362: | ||
000733 Access Authorization | 000733 Access Authorization | ||
01/28/2019 | |||
02/01/2019 | 02/01/2019 | ||
| Line 381: | Line 370: | ||
000734 Access Control | 000734 Access Control | ||
01/28/2019 | |||
02/01/2019 | 02/01/2019 | ||
| Line 389: | Line 378: | ||
000738 Protection of Safeguards Information | 000738 Protection of Safeguards Information | ||
01/28/2019 | |||
02/01/2019 | 02/01/2019 | ||
| Line 397: | Line 386: | ||
000740 Fitness For Duty Program | 000740 Fitness For Duty Program | ||
01/28/2019 | |||
02/01/2019 | 02/01/2019 | ||
| Line 405: | Line 394: | ||
Design Basis Assurance Inspection - Team | Design Basis Assurance Inspection - Team | ||
1 03/04/2019 | |||
03/04/2019 | |||
03/08/2019 | 03/08/2019 | ||
| Line 414: | Line 402: | ||
000713 Design Bases Assurance Inspection (Teams) | 000713 Design Bases Assurance Inspection (Teams) | ||
03/18/2019 | |||
03/22/2019 | 03/22/2019 | ||
| Line 424: | Line 412: | ||
OYSTER CREEK REQUAL INSP W/ P/F RESULTS | OYSTER CREEK REQUAL INSP W/ P/F RESULTS | ||
1 06/10/2019 | |||
06/10/2019 | |||
06/14/2019 | 06/14/2019 | ||
| Line 435: | Line 422: | ||
Annual 2/21/2018 2:19:59 PM | Annual 2/21/2018 2:19:59 PM | ||
Page | Page | ||
of | |||
of | |||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
| Line 451: | Line 440: | ||
OYSTER CREEK REQUAL INSP W/ P/F RESULTS | OYSTER CREEK REQUAL INSP W/ P/F RESULTS | ||
1 06/10/2019 | |||
06/10/2019 | |||
06/14/2019 | 06/14/2019 | ||
| Line 462: | Line 450: | ||
Biennial RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 | Biennial RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 | ||
1 | 1 06/17/2019 | ||
06/17/2019 | |||
06/21/2019 | 06/21/2019 | ||
| Line 473: | Line 460: | ||
RP REMP 07 | RP REMP 07 | ||
1 | 1 07/15/2019 | ||
07/15/2019 | |||
07/19/2019 | 07/19/2019 | ||
| Line 482: | Line 468: | ||
000731 Radiological Environmental Monitoring Program | 000731 Radiological Environmental Monitoring Program | ||
MC&A | MC&A | ||
1 07/22/2019 | 1 07/22/2019 | ||
| Line 493: | Line 480: | ||
EP EXERCISE INSPECTION | EP EXERCISE INSPECTION | ||
1 10/07/2019 | |||
10/07/2019 | |||
10/11/2019 | 10/11/2019 | ||
| Line 502: | Line 488: | ||
000716 Exercise Evaluation | 000716 Exercise Evaluation | ||
10/07/2019 | |||
10/11/2019 | 10/11/2019 | ||
| Line 510: | Line 496: | ||
RAD HAZARD, DOSE ASSESS, PI's 01, 04, PR01, OR01 | RAD HAZARD, DOSE ASSESS, PI's 01, 04, PR01, OR01 | ||
1 | 1 10/21/2019 | ||
10/21/2019 | |||
10/25/2019 | 10/25/2019 | ||
| Line 519: | Line 504: | ||
000725 Radiological Hazard Assessment and Exposure Controls | 000725 Radiological Hazard Assessment and Exposure Controls | ||
10/21/2019 | |||
10/25/2019 | 10/25/2019 | ||
| Line 527: | Line 512: | ||
000729 Occupational Dose Assessment | 000729 Occupational Dose Assessment | ||
10/21/2019 | |||
10/25/2019 | 10/25/2019 | ||
| Line 535: | Line 520: | ||
RAD INSTRUMENTATION 05 | RAD INSTRUMENTATION 05 | ||
1 | 1 11/18/2019 | ||
11/18/2019 | |||
11/22/2019 | 11/22/2019 | ||
| Line 546: | Line 530: | ||
2/21/2018 2:19:59 PM | 2/21/2018 2:19:59 PM | ||
Page | Page | ||
of | |||
of | |||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
Revision as of 14:30, 9 May 2019
| ML18058A069 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 02/28/2018 |
| From: | David Pelton NRC Region 1 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Young M | |
| Shared Package | |
| ML18046A521 | List: |
| References | |
| IR 2017006, IR 2017402, IR 2017501 | |
| Download: ML18058A069 (6) | |
Text
[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
-2713 2018 Mr. Bryan Hanson Senior Vice President Exelon Generation Co., LLC Presid ent and Chief Nuclear Officer Exelon Nuclear 4300 Winfiel d Road Warrenville, I L 6 0555 SUBJ EC T: ANNUAL ASSESSMENT LETTER FOR OYSTER C REEK NUCLEAR GENERATING STATION (REPORTS 05000219/20170 06 05000219/2017402 AND 05000219/2017501)
Dear Mr. Hanson:
The NRC has completed its end
-of-cycle performance assessment of Oyster Creek Nuclear Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Note that Oyster Creek Nuclear Generating Station transitioned from the Regulatory Response Column to the Licensee Response Column on October 1, 2017, following the successful completion of Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs," which was initiated due to one White finding in the Mitigating System cornerstone associated with the inoperability of the 'E' electromatic relief valve (ADAMS Accession No. ML17291A306).
1 The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. In a letter (ML18045A084) dated February 14, 2018, pursuant to 10 CFR 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Oyster Creek Nuclear Generating Station no later than October 31, 2018. Therefore, the inspection schedule is tentative and may be revised.
Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that Oyster Creek Nuclear Generating Station is permanently shutdown , and that all the nuclear fuel has been removed from the reactor vessel, then Oyster Creek Nuclear Generating Station will transition from NRC IMC 0305, "Operating Reactor Assessment Program," and IMC 2515, "Light
-Water Reactor Inspection Program
- Operations Phase," to IMC 2561, "Decommissioning Power Reactor Inspection Program." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The NRC will also be performing Inspection Procedure 60855.1, "Operation of an ISFSI at Operating Plants," in the second quarter of 2018.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Matthew Young at 610-337-5205 with any questions you may have regarding this letter.
Sincerely,
/RA/ David L. Pelton, Acting Director Division of Reactor Projects Docket No.
50-219 License No.
DPR-16 Enclosure:
Inspection/Plan Activity
ML18058A069 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer DPelton DATE 2/28/18
Oyster Creek
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
EQ PROGRAM
1 01/29/2018
02/02/2018
000714 Design Bases Assurance Inspection (Programs)
02/12/2018
02/16/2018
000714 Design Bases Assurance Inspection (Programs)
RADWASTE
1 02/05/2018
02/09/2018
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
ACCESS CONTROL, EQUIP PERF, TRAINING
1 04/09/2018
04/13/2018
000734 Access Control
04/09/2018
04/13/2018
000736 Equipment Performance, Testing, and Maintenance
04/09/2018
04/13/2018
000739 Security Training
04/09/2018
04/13/2018
IP 71151 001338 Performance Indicator Verification
ISFSI OPERATIONAL INSPECTION
1 04/23/2018
04/27/2018
000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
RAD HAZARD, EXPOSURE CONTROL 01
1 05/21/2018
05/25/2018
000725 Radiological Hazard Assessment and Exposure Controls
PI&R BIENNIAL
1 06/11/2018
06/15/2018
IP 71152B 000747 Problem Identification and Resolution
50.59 PROCESS
1 07/23/2018
07/27/2018
000709 Evaluations of Changes, Tests, and Experiments
EP PROGRAM INSPECTION
1 09/10/2018
09/14/2018
000717 Alert and Notification System Testing
09/10/2018
09/14/2018
000718 Emergency Response Organization Staffing and Augmentation System
09/10/2018
09/14/2018
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
09/10/2018
09/14/2018
IP 71151 001397 Performance Indicator Verification
UNIT 1 INSERVICE INSPECTION
1 09/24/2018
09/28/2018
000701 Inservice Inspection Activities - BWR
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04
1 09/24/2018
09/28/2018
000725 Radiological Hazard Assessment and Exposure Controls
2/21/2018 2:19:59 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Oyster Creek
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01 02 03 04
1 09/24/2018
09/28/2018
000726 Occupational ALARA Planning and Controls
09/24/2018
09/28/2018
000727 In-Plant Airborne Radioactivity Control and Mitigation
09/24/2018
09/28/2018
000728 Occupational Dose Assessment
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, OR01, PR01
1 11/05/2018
11/09/2018
000725 Radiological Hazard Assessment and Exposure Controls
11/05/2018
11/09/2018
000726 Occupational ALARA Planning and Controls
11/05/2018
11/09/2018
000727 In-Plant Airborne Radioactivity Control and Mitigation
11/05/2018
11/09/2018
000728 Occupational Dose Assessment
11/05/2018
11/09/2018
IP 71151 000746 Performance Indicator Verification
FORCE-ON-FORCE PLANNING & EXERCISE WEEK
1 11/26/2018
11/30/2018
000735 Contingency Response - Force-On-Force Testing
12/17/2018
12/21/2018
000735 Contingency Response - Force-On-Force Testing
RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS 01, 02, 03, 04
1 01/14/2019
01/18/2019
000725 Radiological Hazard Assessment and Exposure Controls
01/14/2019
01/18/2019
000726 Occupational ALARA Planning and Controls
01/14/2019
01/18/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
01/14/2019
01/18/2019
000729 Occupational Dose Assessment
ACCESS AUTH & CONTROL, SGI CONTROL, FFD
1 01/28/2019
02/01/2019
000733 Access Authorization
01/28/2019
02/01/2019
000734 Access Control
01/28/2019
02/01/2019
000738 Protection of Safeguards Information
01/28/2019
02/01/2019
000740 Fitness For Duty Program
01/28/2019
02/01/2019
IP 71151 001338 Performance Indicator Verification
Design Basis Assurance Inspection - Team
1 03/04/2019
03/08/2019
000713 Design Bases Assurance Inspection (Teams)
03/18/2019
03/22/2019
000713 Design Bases Assurance Inspection (Teams)
OYSTER CREEK REQUAL INSP W/ P/F RESULTS
1 06/10/2019
06/14/2019
000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 2/21/2018 2:19:59 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Oyster Creek
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
OYSTER CREEK REQUAL INSP W/ P/F RESULTS
1 06/10/2019
06/14/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06
1 06/17/2019
06/21/2019
000730 Radioactive Gaseous and Liquid Effluent Treatment
1 07/15/2019
07/19/2019
000731 Radiological Environmental Monitoring Program
1 07/22/2019
07/26/2019
000742 Material Control and Accounting (MC&A)
EP EXERCISE INSPECTION
1 10/07/2019
10/11/2019
000716 Exercise Evaluation
10/07/2019
10/11/2019
IP 71151 001397 Performance Indicator Verification
RAD HAZARD, DOSE ASSESS, PI's 01, 04, PR01, OR01
1 10/21/2019
10/25/2019
000725 Radiological Hazard Assessment and Exposure Controls
10/21/2019
10/25/2019
000729 Occupational Dose Assessment
10/21/2019
10/25/2019
IP 71151 000746 Performance Indicator Verification
RAD INSTRUMENTATION 05
1 11/18/2019
11/22/2019
000729 Radiation Monitoring Instrumentation
2/21/2018 2:19:59 PM
Page
of
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report