05000266/FIN-2018001-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| finding integer = 01
| finding integer = 01
| quarter = 2018Q1
| quarter = 2018Q1
| IR section = PROB IDENT & RESOLUTION
| IR section = 1R04
| finding type = Finding
| finding type = Finding
| significance =  
| significance = Green
| cornerstone = Mitigating Systems
| cornerstone = Mitigating Systems
| violation of =  
| violation of =  
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 1R04
| Inspection procedure = IP 71111.04
| Inspector = 71111.0
| Inspector = T Hartman, K Barclay, G Edwards, M Holmberg, J Cameron
| CCA = PI.2
| CCA =  
| INPO aspect = NO SL
| INPO aspect = PI.2
| description = The inspectors identified a finding of very low significance, for the failure to follow procedure NP 7.7.22, Service Water and Fire Protection Inspection Program.  Specifically, Section 4.10, Degraded Component Characterization and System Failure Analysis, step 4.10.1  states, in part, the extent of pipe wall degradation shall be characterized by volumetric  non-destructive examination (NDE) for subsequent flaw evaluation.  The licensee identified pipe corrosion on November 28, 2012, and failed to characterize it by volumetric NDE.
| description = The inspectors identified a finding of very low significance, for the failure to follow procedure NP 7.7.22, Service Water and Fire Protection Inspection Program.  Specifically, Section 4.10, Degraded Component Characterization and System Failure Analysis, step 4.10.1  states, in part, the extent of pipe wall degradation shall be characterized by volumetric  non-destructive examination (NDE) for subsequent flaw evaluation.  The licensee identified pipe corrosion on November 28, 2012, and failed to characterize it by volumetric NDE.
}}
}}

Latest revision as of 17:34, 10 September 2018

01
Site: Point Beach NextEra Energy icon.png
Report IR 05000266/2018001 Section 1R04
Date counted Mar 31, 2018 (2018Q1)
Type: Finding: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.04
Inspectors (proximate) T Hartman
K Barclay
G Edwards
M Holmberg
J Cameron
INPO aspect PI.2
'