Winter Storm Nemo
Jump to navigation
Jump to search
| Start date | Site | Title | |
|---|---|---|---|
| ML21081A038 | 22 March 2021 | Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods | |
| ML20239A835 | 21 September 2020 | Results of the ROP Self-Assessment Effectiveness Review of the Cross-Cutting Issues Program | |
| ML18135A109 | 20 June 2018 | Qualitative PRA Insights from Operational Events | |
| ML18173A026 | 19 June 2018 | M180619: Transcript - Briefing on Results of the Agency Action Review Meeting (Public) | |
| ML18158A130 | 7 June 2018 | Pilgrim | Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station |
| 05000293/LER-2018-004, Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power | 14 May 2018 | Pilgrim | Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power |
| 05000293/LER-2018-001, Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line | 5 March 2018 | Pilgrim | Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line |
| ML15273A456 | 1 October 2015 | Pilgrim | Problem Identification and Resolution Inspection Report and Notices of Violation 05000293/2015010 |
| ML15218A280 | 5 August 2015 | Pilgrim | Region I Reply - W. Maurer (Citizen) Email White Finding SRVs |
| ML15208A460 | 8 July 2015 | Pilgrim | Slides of Regulatory Conference for July 8, 2015 |
| 05000293/LER-2015-001, Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno | 1 April 2015 | Pilgrim | Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno |
| ML14168A216 | 10 June 2014 | Pilgrim | Entergy Comments on Pilgrim Nuclear Power Plant-Preliminary Accident Sequence Precursor Analysis (TAC No. K81136) |
| ML14139A376 | 15 May 2014 | Pilgrim | Annual Radiological Environmental Operating Report for January 1 Through December 31, 2013 |
| ML14139A475 | 15 May 2014 | Pilgrim | Annual Radioactive Effluent Release Report for January 1 Through December 31, 2013 |
| ML14241A018 | 15 May 2014 | Pilgrim | Annual Radioactive Effluent Release Report for January 1 Through December 31, 2013 |
| ML14245A196 | 15 May 2014 | Pilgrim | Annual Radiological Environmental Operating Report for January 1 Through December 31, 2013 |
| ML14136A350 | 14 May 2014 | Pilgrim | Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) |
| 05000293/LER-2013-009, Regarding Loss of Offsite Power and Reactor Scram | 13 December 2013 | Pilgrim | Regarding Loss of Offsite Power and Reactor Scram |
| IR 05000293/2013008 | 20 November 2013 | Pilgrim | IR 05000293-13-008; 09/16/2013 - 10/03/2013; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution (Public) |
| IR 05000293/2013004 | 14 November 2013 | Pilgrim | IR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution |
| IR 05000293/2013002 | 8 May 2013 | Pilgrim | IR 05000293-13-002, 01/01/2013 - 03/31/2013, Pilgrim Nuclear Power Station, Routine Integrated Inspection Report |
| IR 05000443/2013002 | 1 May 2013 | Seabrook | IR 05000443-13-002; Seabrook Station Unit 1 - NRC Integrated Inspection Report (01-01-13 - 03-31-13) |
| 05000293/LER-2013-003, Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo | 8 April 2013 | Pilgrim | Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo |
| ML130500119 | 12 February 2013 | Pilgrim | G20130119/LTR-13-0138 - Ltr. Margaret Sheehan Requests the Proper NRC Oversight of the Construction of a High Level Nuclear Waste Facility at the Site of the Pilgrim Nuclear Power Station in Plymouth, Ma |
| ENS 48743 | 11 February 2013 19:35:00 | Pilgrim | Loss of Emergency Response Capability - Joint Information Center (Jic) Unavailable |
| PNO-I-13-001C, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo | 11 February 2013 | Pilgrim | PNO-I-13-001C - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo |
| PNO-I-13-001B, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo | 10 February 2013 | Pilgrim | PNO-I-13-001B - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo |
| PNO-I-13-001, Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo | 9 February 2013 | Pilgrim | PNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo |
| PNO-I-13-001A, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo | 9 February 2013 | Pilgrim | PNO-I-13-001A - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo |