Winter Storm Nemo

From kanterella
Jump to navigation Jump to search
 Start dateSiteTitle
ML21081A03822 March 2021Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods
ML20239A83521 September 2020Results of the ROP Self-Assessment Effectiveness Review of the Cross-Cutting Issues Program
ML18135A10920 June 2018Qualitative PRA Insights from Operational Events
ML18173A02619 June 2018M180619: Transcript - Briefing on Results of the Agency Action Review Meeting (Public)
ML18158A1307 June 2018PilgrimEvaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station
05000293/LER-2018-004, Automatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power14 May 2018PilgrimAutomatic Emergency Diesel Generator System Actuation Caused by Loss of Offsite Power
05000293/LER-2018-001, Regarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line5 March 2018PilgrimRegarding Manual Reactor Scram Due to Loss of One Offsite Transmission Line
ML15273A4561 October 2015PilgrimProblem Identification and Resolution Inspection Report and Notices of Violation 05000293/2015010
ML15218A2805 August 2015PilgrimRegion I Reply - W. Maurer (Citizen) Email White Finding SRVs
ML15208A4608 July 2015PilgrimSlides of Regulatory Conference for July 8, 2015
05000293/LER-2015-001, Regarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno1 April 2015PilgrimRegarding Loss of 345KV Power Resulting in Automatic Reactor Scram During Winter Storm Juno
ML14168A21610 June 2014PilgrimEntergy Comments on Pilgrim Nuclear Power Plant-Preliminary Accident Sequence Precursor Analysis (TAC No. K81136)
ML14139A37615 May 2014PilgrimAnnual Radiological Environmental Operating Report for January 1 Through December 31, 2013
ML14139A47515 May 2014PilgrimAnnual Radioactive Effluent Release Report for January 1 Through December 31, 2013
ML14241A01815 May 2014PilgrimAnnual Radioactive Effluent Release Report for January 1 Through December 31, 2013
ML14245A19615 May 2014PilgrimAnnual Radiological Environmental Operating Report for January 1 Through December 31, 2013
ML14136A35014 May 2014PilgrimSummary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides)
05000293/LER-2013-009, Regarding Loss of Offsite Power and Reactor Scram13 December 2013PilgrimRegarding Loss of Offsite Power and Reactor Scram
IR 05000293/201300820 November 2013PilgrimIR 05000293-13-008; 09/16/2013 - 10/03/2013; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution (Public)
IR 05000293/201300414 November 2013PilgrimIR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution
IR 05000293/20130028 May 2013PilgrimIR 05000293-13-002, 01/01/2013 - 03/31/2013, Pilgrim Nuclear Power Station, Routine Integrated Inspection Report
IR 05000443/20130021 May 2013SeabrookIR 05000443-13-002; Seabrook Station Unit 1 - NRC Integrated Inspection Report (01-01-13 - 03-31-13)
05000293/LER-2013-003, Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo8 April 2013PilgrimRegarding Loss of Off-Site Power Events Due to Winter Storm Nemo
ML13050011912 February 2013PilgrimG20130119/LTR-13-0138 - Ltr. Margaret Sheehan Requests the Proper NRC Oversight of the Construction of a High Level Nuclear Waste Facility at the Site of the Pilgrim Nuclear Power Station in Plymouth, Ma
ENS 4874311 February 2013 19:35:00PilgrimLoss of Emergency Response Capability - Joint Information Center (Jic) Unavailable
PNO-I-13-001C, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo11 February 2013PilgrimPNO-I-13-001C - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
PNO-I-13-001B, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo10 February 2013PilgrimPNO-I-13-001B - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
PNO-I-13-001, Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo9 February 2013PilgrimPNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
PNO-I-13-001A, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo9 February 2013PilgrimPNO-I-13-001A - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo