W3F1-2002-0077, July 2002 Monthly Operating Report for Waterford 3 Ses

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Waterford 3 Ses
ML022280210
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/08/2002
From: Brandon M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2002-0077
Download: ML022280210 (7)


Text

-.

1T*

e.

Entergy Operations, Inc.

fJ17265 River Road Ent&WJ Killona, LA 70066 Tel 504 739 6650 W3F1-2002-0077 A4.05 PR August 8, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject report which covers the operating statistics for the month of July, 2002. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments associated with this submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, M.K. Brandon Licensing Manager MKB/TMM/cbh Attachment cc:

E.W. Merschoff (NRC Region IV), N. Kalyanam (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

lerevents@inpo.org - INPO Records Center, NRC Resident Inspectors Office

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for July, 2002 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.

Page I of 6 8/7/02

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for July, 2002 There were no pressurizer safety valve failures or challenges experienced during the month.

Page 2 of 6 8/7102

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 August 7, 2002 Jim Pollock (504) 739-6561 OPERATING STATUS

1. Reporting Period Jul)

Gross Hours in Reporting Period 744

2. Currently Authorized Power Level (MWt) 3,441 Maximum Dependable Capacity (Net MWe) 1,075 Design Electrical Rating (Net MWe) 1,104
3. Power Level to which Restricted (if any) (Net MWe)
4. Reason for Restriction (if any)

N/A Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator was On-line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Reactor Service Factor Reactor Availability Factor Unit Service Factor Unit Availability Factor Unit Capacity Factor (using MDC)

Unit Capacity Factor (using DER)

Unit Forced Outage Rate THIS MONTH 744.0 0.0 744.0 0.0 2,554,918 845,717 808,278 100.0 100.0 100.0 100.0 101.1 98.4 0.0 YEAR TO DATE 4,492.8 0.0 4,464.8 0.0 15,018,293 5,027,080 4,815,954 88.3 88.3 87.8 87.8 88.1 85.8 0.0 CUMULATIVE 126,576.2 0.0 125,289.5 0.0 417,115,329 139,822,897 133,548,260 85.7 85.7 84.8 84.8 84.1 81.9 3.8 Page 3 of 6

, 2002 N/A

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

8/7/02

OPERATING DATA REPORT DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE

20. If Shutdown at end of report period, estimated date of startup :
21. Unit is in Commercial Operation.

YEAR TO DATE 50-382 WATERFORD 3 August 7, 2002 Jim Pollock (504) 739-6561 Hours in Reporting Period Unit Forced Outage Hours

24. Nameplate Rating (Gross MWe)

Max. Dependable Capacity (Gross MWe) 744 5,087 147,720 0.0 0.0 4,897.9 1,200 1,120

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

Page 4 of 6

22.

23.

NIA THIS MONTH CUMULATIVE 8n/,'02

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 August 7, 2002 Jim Pollock (504) 739-6561 Reporting Period :

July, 2002 DAY Avg. Power Level 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1,097 1,096 1,094 1,094 1,090 1,092 1,092 1,090 1,089 1,086 1,085 1,085 1,085 1,085 1,084 (NET MWe)

DAY Avg. Power Level 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1,085 1,084 1,086 1,085 1,086 1,086 1,079 1,079 1,077 1,077 1,084 1,086 1,085 1,084 1,084 1,086 INSTRUCTIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

Page 5 of 6 8*/702

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:

UNIT NAME:

DATE OF REPORT:

COMPLETED BY:

TELEPHONE:

50-382 WATERFORD 3 August 7, 2002 Jim Pollock (504) 739-6561 REPORTING PERIOD:

Date Number (yymmdd)

NA Type July, 2002 Outage Duration (Hours)

Reason Shutdown Method Cause, Comments and Corrective Actions TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

Page. 6 of 6 t*

9/7'02